1 Second Regional Workshop on Practical Nuclear Power Plants Construction Experience October, 2013, Beijing, China Nuclear Power Program in Bangladesh Mohammad Ohedul Islam & Mohammad Shariful Islam Bangladesh Atomic Energy Commission

2 Outline Bangladesh Overview Present Power Situation Current & Future plans for NP development Rooppur NPP Site Overview. Historical Background. IAEA Milestones Road Map for RNPP Recent Progress Structure of NEPIO Public Awareness Program 2

3 Bangladesh: Overview Area: 147,570 sq. km. Population: 160 million GDP: 848 US$ GDP Growth: 6~6.5 % Energy Consumption Total: 230 kgoe Electricity: 320 kwh (approx.) Access to Electricity: 60% (approx.) 3

4 Bangladesh: Overview Political Map of Bangladesh with Neighboring Countries China 4 Rooppur NPP site Country without Nuclear Power Reactor Country with Nuclear Power Reactor

5 Present Power Situation Electricity Generation Scenario Electricity Generation Capacity: 8525 MW Public Sector: 4794(56%) Private Sector: 3731(44%) Fuel Type Contribution Natural Gas 67.21% Furnace Oil % Imported Diesel 5.52 % Hydro 2.58 % Domestic Coal 2.35 % Max. Demand Served: 6675(July 2013) MW (aged plants, poor capacity factor) 5

6 Current & Future plans for NP development Policy Documents Perspective Plan of Bangladesh 2010~2021 Vision 2021: -Digital Bangladesh -Electricity for all Power system Master plan: 2010~2030 Vision: 2030; Long-term Power Development Strategy for Bangladesh Generation Policy Installed Capacity (MW) 14,493 22,509 29,717 38,685 Nuclear Power (MW) 0 2,000 4,000 4,000 6

7 Current & Future plans for NP development Fuel Diversification Fuel Type Gas 67.21% 25% Oil % 5% Domestic Coal 5.52 % 30% Imported Coal 2.58 % 20% Renewable + Cross 2.35 % 10% Border Nuclear 0% 10% Total Installed Capacity (MW) 8,525 38,685 7

8 Rooppur NPP Site Overview (contd.) Site Area: 261 acre (106 hect.) acre(121 hect.) upto river bank (acquire in process) GPS Position: ,

9 Rooppur NPP Site Overview (contd.) Satellite picture of Site Area: Flow direction of Ganges River Hardinge Bridge Highway & Railway Lalon Shah Bridge Intake point Proposed Power Plant Site Left bank channel Outfall point Main channel 9

10 Rooppur NPP Site Overview (contd.) Strategic Position of NPP Establishment of Roopur NPP will boost power generation as well as industrialization in the Western zone of Bangladesh. Nuclear Power Plant Cross Border Import Imported Coal Power Plant 10 Source: Power System Master Plan

11 Historical Background Nuclear power was identified as a feasible and viable proposition for Bangladesh (former East-Pakistan). Rooppur was selected as a site for NPP (70 MW, 140 MW, 200 MW) and Pre-feasibility studies were conducted. 1971: Independence from Pakistan. 1977~78 Feasibility studies were conducted by Sofratome, France and viability of Rooppur NPP (125 MW) was confirmed. Postponed in light of cost-effectiveness 11

12 Historical Background : Plant capacity raised to 300 MW and fresh initiative taken : New feasibility study was conducted by Lahmeyer International, Germany in association with Motor Columbus, Switzerland. Financing difficulties : Nuclear Power option was included in National Energy Policy 1997: The government decided to expedite the implementation process of NPP with two units of 600 MW each. 12

13 Historical Background : Pre-implementation phase activities such as SSR for two units were initiated. 2000: Bangladesh Nuclear Energy Action Plan was approved by the government. 2008: Implementation of Rooppur NPP had become an Election Pledge of the present ruling party including all major political parties. 2008: An IAEA Mission on a Holistic Approach for the establishing nuclear infrastructure in Bangladesh was conducted during 17-21, November. 2009: A project for performing essential preparatory activities for implementation of 13 initiated. 2 (two) units of 1000 MW(e) each have been

14 14

15 STEP 1 (a) STEP 1(b) STEP 1(c) Justification of NPP Feasibility Study on Introduction of NPP Formulation of Nuclear Power Action Plan STEP 2 Conclusion of agreement(s)/contract(s) with Vendor STEP 1(e) Bidding/Bilateral Agreement STEP 1(d) Accomplishment of activities for introduction of NPP STEP 3 (a) STEP 3 (b) STEP 3 (c) Designing the Plant NPP Construction Commercial Operation 15 STEP 1: Completed STEP 2: Ongoing STEP 3:Planning Stage 15

16 Nuclear power is considered as a possible option MILESTONE 0 Ready to include nuclear as realistic national energy strategy option MILESTONE 1 Ready to make commitment to a nuclear MILESTONE 2 Ready to invite bids for the first NPP MILESTONE 3 Ready to commission and operate first NPP PHASE 0 PHASE 1 PHASE 2 PHASE 3 Infrastructure development programme Readiness to include nuclear as a national energy strategy option since 1960s Pre-Project activities after Agency Mission Preparatory work for construction of a RNPP after a policy decision has been taken Activities to implement first NPP, the RNPP Maintenance and continuous infrastructure improvement Preproject Prepolicy RNPP definition RNPP Construction Op s 1960s Preparation for RNPP Implementation Commissioning RNPP Project Timeline (proposed according to Vision 2021 and Sixth Five Year Planning of Bangladesh

17 Recent Progress : An MOU between BAEC and the ROSATOM was signed for cooperation in the Peaceful Uses of Nuclear Energy on 13 May. 2010: A National Committee on RNPP headed by the Prime Minister was formed. 2010: In order to overcome the increasing power crisis in the country nuclear power plant shall be established immediately - Resolution was passed unanimously by the National Parliament in November. 2010: Hon ble DG of IAEA, Mr. Amano visited Bangladesh during December and assured his kind support for implementation of Rooppur NPP. 17

18 Recent Progress : The Cabinet approved the Interagency agreement between the Russian Regulatory Body and the Ministry of Science and Technology on cooperation in the areas of Nuclear Safety Regulation on 31 October,2011. IAEA -INIR mission conducted during November 2011, which concluded that Bangladesh Nuclear Power Program in general has progressed into Phase 2, being in the stage of preparation to negotiate agreement(s)/contract(s) Cooperation Agreement between GoB and Russian Federation concern-ing the construction of Rooppur NPP was signed on 02 Nov,

19 Recent Progress 2012 Bangladesh Atomic Energy Regulatory Authority (BAERA) Act was enacted in the National Parliament on 31 May An independent regulatory body has been established under the provision of BAERA Act; A MOU for the training of the staff of nuclear power sector was signed on 4 June 2012 A MOU for the establishment of Information Centre of Nuclear Energy in Bangladesh was signed on 4 June Bilateral consultation meeting between Russian Federation and GoB for determining potential NPP cost and defining the terms and conditions of the borrowed loans/credit financing from the vendor sources conducted in July,

20 Recent Progress 2012 Bilateral consultation on main terms and conditions of the draft contract (Legal and technical) for carrying out engineering survey and environmental studies of Rooppur NPP) was held in Dhaka, 1~7 September, A Loan agreement has been signed with Russian Federation for financing of $ 500 Million for MW NPP on 15th January 2013 for preparatory stage of construction. An agreement between Atomstroyexport, RF and BAEC has been signed on 27 June 2013 for the development of the Feasibility Evaluation, Environmental Impact Assessment for Rooppur NPP site and the performance of the necessary Engineering Survey and Environmental Studies. Negotiations held between an expert team of Atomstroyexport, RF and BAEC during July 2013 to finalize the contract on Performance of survey works and development of design documentation and first-priority working documentation for Rooppur NPP. On the 2nd of October the Russian Federation and the People s Republic of Bangladesh signed a technical contract for construction of Ruppur NPP. 20

21 Recent Progress On 2 nd October, 2013 Bangladesh prime minister Sheikh Hasina Wazed and Rosatom head Sergei Kiryenko applaud the laying of the foundation stone for the Rooppur plant. 21

22 Recent Progress Scopes of the agreement: Engineering Survey. Feasibility Evaluation. Environmental Impact Assessment (EIA). Pre-construction infrastructure development. NPP design and documentation. Human Resources Development. Preparation of Main Contract Documents. Preparation of Construction Permit. All other relevant activities. 22

23 Structure of NEPIO - Bangladesh Legal and Regulatory Aspects, International Obligations Ownership, Project execution and Project Management Funding and Financing Development of Human Resources National Participation Grid System Nuclear Fuel Cycle, Waste Management and Environ Monitoring Heavy Equipment Transportation Planning 8 Working Sub-Groups (Ministry) Prime Minister National Committee Minister MOST Technical Committee Secretary MOST Working Group BAERA BAEC Coordination Committee Nuclear Power and Energy Division (NPED) NEPIO Legal and Regulatory International Obligations Ownership, Project execution & Management Development of Human Resources Funding and Financing Nuclear FC, WM and Environ Monitoring Grid System Development National Participation & Procurement 7 Sub-Committees on RNPP (BAEC) 23

24 Rooppur NPP Development Timeline Project Development Preparation Phase Pre-Feasibility Study Preparatory Construction Activities Construction Site Resource Invest; basic infrastructure dev. FE, EIA, Site Engineering & Environ. Study Basic & detailed design, PSAR, PSA Launch Site supporting infra. Dev.; HRD.;, Site Grading & Excavation General Contract Construction of NPP Commissioning Programme & Regulatory Development Regulatory Framework Preparation Permits & Safety Analysis Operation Permits & Safety Reports Legislative Development in light of International practices, IAEA recommendations Baseline Radiological Data Gathering, Site safety related Investigations Site Permit/license Detailed Engineering Design; PSAR, PSA Construction License Final Safety Analysis Report (FSAR) for Operating License Operator Training Continuous Stakeholder Involvement, Public Information, Human Capital, Industrial & Technological Development 24 Proposed National Nuclear Power Programme Implementation Plan

25 National nuclear power infrastructure: Role of NEPIO Preparatory works for nuclear power project are being managed by the NEPIO, which consists of high level Committees involving Ministries, BAEC, Nuclear regulator, Electricity producers and Distributors, Education and Research institutions and related Stakeholders. During Phase 1, the NEPIO will play the key role in establishing national nuclear power infrastructure. The NEPIO will play a significant role at Phase 2 activities and the Project Management will be handed over to NPP Owner/ Operator (say BAEC) at the final stage of Phase 2 under IAEA Milestone-2. 25

26 National nuclear power infrastructure: Role of NEPIO PHASE 3 UNDER MILESTONE-2 The Vendor along with the Project Management Team will manage Engineering, Procurement and Construction of the Rooppur NPP. BASIS OF MANAGEMENT OF ROOPPUR NPP PROJECT Rooppur NPP project activities would be accomplished fulfilling the requirements of internationally established management system to achieve safety goals in connection with the design, construction, commissioning, operation and maintenance. 26

27 General Nuclear Communication Program Scientific Information Division: Under BAEC, this division is working for dissemination of information regarding Nuclear applications and Nuclear Power projects through Publishing Booklets/ Brochures, Press release for news media (local & International) etc. Response to queries placed by phone/letter/ . attending Science Fairs/Exhibition (focused on Students and Common People), TV Shows; Dialogue and Open discussion with News Media : 27 Officials from BAEC, NPP key personnel enjoys attending TV/Radio Shows regarding Nuclear Aspects. Seminar and Round Table discussion with Print & Electronic Media also held often.

28 Interactions with Media at Site and National Forum Recent round table discussion among BAEC officials and other national experts on Nuclear Power Programme 28

29 Interactions with Media at Site and National Forum 29 International Seminar on Nuclear Power: A chance of successful economic and socio-political development held on May, 2013 at Dhaka.

30 Interactions with Media at Site and National Forum Interaction between ROSATOM and students of the Nuclear Engineering department of Dhaka University 30

31 Interactions with Media at Site and National Forum 31

32 Public Awareness Program Reaching Students through TEXTbooks and Hands-on-Experience: Initiative for addition of Facts about Nuclear Power Plant has been taken and expected to be included in upcoming revision Secondary/Higher Secondary Textbooks 32

33 Dialogues with the public, the people's representatives at various levels and the decision makers are being conducted and Round Table Discussion on NPP are being organized different media and professional bodies these activities establish the public acceptance level of the Project A Round Table Discussion on N-power plant discussion organized by the Daily Star Newspaper A Meeting with local public and people's representatives in August 2010 BAEC also conducted a limited survey on public acceptance/awareness about nuclear power programme that clearly described the unique public acceptance level of the project 33

34 Thank you for your kind attention 34

NUCLEAR POWER PROFILES OF BANGLADESH

NUCLEAR POWER PROFILES OF BANGLADESH Technical Meeting on the Country Nuclear Power Profiles (CNPP) IAEA Headquarter, Vienna, 18 21 March, 2013 NUCLEAR POWER PROFILES OF BANGLADESH ABU SAYEED MOHAMMAD FIROZ and MOHAMMAD SHAWKAT AKBAR BANGLADESH

More information

Country s Vision and Strategy for Nuclear Power (1/2)

Country s Vision and Strategy for Nuclear Power (1/2) Country s Vision and Strategy for Nuclear Power (1/2) Long-term policy for nuclear energy Bangladesh is committed to the peaceful usages of nuclear technology for its socioeconomic development. Being mandated

More information

Update on Nuclear Energy Programme in Bangladesh

Update on Nuclear Energy Programme in Bangladesh Update on Nuclear Energy Programme in Bangladesh MOHAMMAD SOHELUR RAHMAN, MD. ABDUR RAZZAQUE and DEBABRATA DAS BANGLADESH ATOMIC ENERGY COMMISSION (BAEC) Interregional Workshop on Advanced Nuclear Reactor

More information

Emergency Preparedness and Response

Emergency Preparedness and Response Emergency Preparedness and Response Bangladesh Dr. Md. Mamunur Rashid Bangladesh Atomic Energy Commission Presentation Outline Country Overview NPP Status of Bangladesh Radiation Facilities in Bangladesh

More information

MALAYSIA NUCLEAR POWER PROGRAMME

MALAYSIA NUCLEAR POWER PROGRAMME MALAYSIA NUCLEAR POWER PROGRAMME Regional Workshop On Safety Review and Assessment for Regulators Korea Institute of Nuclear Safety (KINS) Daejeon, Republic of Korea 9 13 September 2013 Outline Natural

More information

Current Status of Thailand s Nuclear Power Program. Electricity Generating Authority of Thailand Power for Thai Happiness

Current Status of Thailand s Nuclear Power Program. Electricity Generating Authority of Thailand Power for Thai Happiness Current Status of Thailand s Nuclear Power Program Electricity Generating Authority of Thailand Power for Thai Happiness Outline Status of Electricity of Thailand NPP Plan NPP Infrastructure Development

More information

IAEA Support to Countries Starting Nuclear Programs

IAEA Support to Countries Starting Nuclear Programs ASIA-EUROPE MEETING (ASEM) 2 nd Seminar on Nuclear safety International Instruments for Ensuring Nuclear Safety 4-5 November 2013, Vilnius Lithuania Support to Countries Starting Nuclear Programs Pal Vincze

More information

Nuclear Energy Seminar. Rajamangala University of Technology Thanyaburi. Status of. Nuclear Engineering Division

Nuclear Energy Seminar. Rajamangala University of Technology Thanyaburi. Status of. Nuclear Engineering Division Nuclear Energy Seminar 12 1414 March h2012 Rajamangala University of Technology Thanyaburi Status of Nuclear Energy Project in Thailand Mr. Sh Saharath hboonpotipukdee Nuclear Engineering Division Electricity

More information

THE PROGRESS OF NUCLEAR POWER PROGRAMME IN MALAYSIA

THE PROGRESS OF NUCLEAR POWER PROGRAMME IN MALAYSIA THE PROGRESS OF NUCLEAR POWER PROGRAMME IN MALAYSIA INPRO Dialogue Forum on Nuclear Energy Innovations: Common User Consideration for Small and Medium-sized Nuclear PR, Vienna, 10-14 October 2011 Ir Dr

More information

Sudan Development of a National Position for Nuclear Power

Sudan Development of a National Position for Nuclear Power Sudan Development of a National Position for Nuclear Power Technical Meeting on Establishing a National Position for New Nuclear Power Programmes and the Pre-Feasibility Studies Vienna 27-30 October, 2015

More information

The Egyptian Nuclear Power Program

The Egyptian Nuclear Power Program The Egyptian Nuclear Power Program Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt The 2 nd Meeting of the Arab- Japan Economic Forum (AJECOF) 11-12 Dec 2010, Tunis, Tunisia Venue:

More information

Country Report: Bangladesh

Country Report: Bangladesh FNCA 17 TH MINISTERIAL LEVEL MEETING 30 TH NOVEMBER, 2016, TOKYO, JAPAN Country Report: Bangladesh Dilip Kumar Basak Additional Secretary Ministry of Science and Technology PRESENTATION OUTLINE FNCA Projects

More information

Assistance to Newcomer Countries Regulators. Russian Approach.

Assistance to Newcomer Countries Regulators. Russian Approach. FEDERAL ENVIRONMENTAL, INDUSTRIAL AND NUCLEAR SUPERVISION SERVICE OF RUSSIA (ROSTECHNADZOR) Assistance to Newcomer Countries Regulators. Russian Approach. Alexey Utenkov Deputy Head of International Relations

More information

About 30 countries are currently

About 30 countries are currently By Dick Kovan About 30 countries are currently considering or planning to build their first nuclear power reactors or have already ordered a reactor or started plant construction. This new wave of interest,

More information

HUMAN RESOURCE DEVELOPMENT IN AN EMERGING COUNTRY; CASE STUDY OF KENYA

HUMAN RESOURCE DEVELOPMENT IN AN EMERGING COUNTRY; CASE STUDY OF KENYA HUMAN RESOURCE DEVELOPMENT IN AN EMERGING COUNTRY; CASE STUDY OF KENYA PROF. JOSEPH MALO BOARD MEMBER, KENYA NUCLEAR ELECTRICITY BOARD INTERNATIONAL FRAMEWORK FOR NUCLEAR ENERGY COOPERATION INFRASTRUCTURE

More information

Specific Considerations in Different Phases of the Country s First Research Reactor Project

Specific Considerations in Different Phases of the Country s First Research Reactor Project Specific Considerations in Different Phases of the Country s First Research Reactor Project A. M. Shokr Research Reactor Safety Section Division of Nuclear Installation Safety International Atomic Energy

More information

Working Material RESPONSIBILITIES AND FUNCTIONS OF A NUCLEAR ENERGY PROGRAMME IMPLEMENTING ORGANIZATION

Working Material RESPONSIBILITIES AND FUNCTIONS OF A NUCLEAR ENERGY PROGRAMME IMPLEMENTING ORGANIZATION Working Material RESPONSIBILITIES AND FUNCTIONS OF A NUCLEAR ENERGY PROGRAMME IMPLEMENTING ORGANIZATION INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, 2018 1 FOREWORD One of the IAEA s statutory objectives

More information

INDONESIA NUCLEAR ENERGY DEVELOPMENT IN INDONESIA. Achmad S. Sastratenaya Ariyanto Sudi Center for Nuclear Energy Development, BATAN

INDONESIA NUCLEAR ENERGY DEVELOPMENT IN INDONESIA. Achmad S. Sastratenaya Ariyanto Sudi Center for Nuclear Energy Development, BATAN INDONESIA NUCLEAR ENERGY DEVELOPMENT IN INDONESIA Achmad S. Sastratenaya Ariyanto Sudi Center for Nuclear Energy Development, BATAN IAEA TC workshop long range planning Vienna, June 14-17, 2010 I. GENERAL

More information

Status of Nuclear HR Program in Bangladesh

Status of Nuclear HR Program in Bangladesh Round Table on Integrated solution for personnel training and development of nuclear infrastructure for national nuclear programmes ATOMEXPO - 2015 Moscow, Russian Federation 1-3 June 2015 Status of Nuclear

More information

Challenges and Opportunities to Introduce the First Nuclear Power Plant in Bangladesh

Challenges and Opportunities to Introduce the First Nuclear Power Plant in Bangladesh IAEA-CN-164-2S01 Challenges and Opportunities to Introduce the First Nuclear Power Plant in Bangladesh M.M. Haque, M.S. Islam and M.A. Zulquarnain Reactor Operation and Maintenance Unit (ROMU) Atomic Energy

More information

MALAYSIA: OPTIMIZING IAEA & INTERNATIONAL COOPERATION FOR A NEW NUCLEAR POWER PROJECT

MALAYSIA: OPTIMIZING IAEA & INTERNATIONAL COOPERATION FOR A NEW NUCLEAR POWER PROJECT MALAYSIA: OPTIMIZING IAEA & INTERNATIONAL COOPERATION FOR A NEW NUCLEAR POWER PROJECT By Dato Dr Muhamad Lebai Juri Director General Malaysian Nuclear Agency IAEA National Liaison Agency OUTLINE Introduction

More information

Challenges Faced by Developing Countries in Nuclear Power Deployment: UAE Approach. November 27 th,2009

Challenges Faced by Developing Countries in Nuclear Power Deployment: UAE Approach. November 27 th,2009 Challenges Faced by Developing Countries in Nuclear Power Deployment: UAE Approach November 27 th,2009 Hamad Al Kaabi Permanent Representative of the UAE to the IAEA Introduction High interest for the

More information

Concept of Intelligent Customer and Application to NPP

Concept of Intelligent Customer and Application to NPP Thursday,10 February 2011 Concept of Intelligent Customer and Application to NPP S J Mortin 1 Keeping an intelligent customer capability Large National Owner/Operator/ Distributor Large Government research

More information

Considerations and Infrastructure Milestones for A Research Reactor Project

Considerations and Infrastructure Milestones for A Research Reactor Project Considerations and Infrastructure Milestones for A Research Reactor Project 1 A. M. Shokr, 2 K. Alldred, 2 P. Adelfang, 1 D. Ridikas, 1 H. Abou Yehia 1 RRSS/NSNI/NS/IAEA 2 RRS/NEFW/NE/IAEA 3 PS/NAPC/IAEA

More information

Environmental issues in Phase 1 and Phase 2 of the nuclear power programme of the Republic of Belarus

Environmental issues in Phase 1 and Phase 2 of the nuclear power programme of the Republic of Belarus Environmental issues in Phase 1 and Phase 2 of the nuclear power programme of the Republic of Belarus tel.: +375 17 218 21 15 e-mail: dulinets@min.energo.by Outline Self-evaluation of the Status of National

More information

DEVELOPMENT OF A NATIONAL POSITION FOR NUCLEAR POWER IN UGANDA

DEVELOPMENT OF A NATIONAL POSITION FOR NUCLEAR POWER IN UGANDA DEVELOPMENT OF A NATIONAL POSITION FOR NUCLEAR POWER IN UGANDA Thomas Ocilaje Technical Meeting on Establishing a National Position for New Nuclear Power Programmes and the Pre-Feasibility Studies 27-31

More information

CONSIDERATIONS AND MILESTONES INFRASTRUCTURE FOR A RESEARCH REACTOR PROJECT

CONSIDERATIONS AND MILESTONES INFRASTRUCTURE FOR A RESEARCH REACTOR PROJECT Invited Paper C1 CONSIDERATIONS AND MILESTONES INFRASTRUCTURE FOR A RESEARCH REACTOR PROJECT A.M. SHOKR, H. ABOU YEHIA Department of Nuclear Safety and Security, International Atomic Energy Agency (IAEA),

More information

Paliukhovich Vasili Ministry of Energy. Technical Meeting on Technology Assessment for New Nuclear Power Programmes Vienna 1-3 September 2015

Paliukhovich Vasili Ministry of Energy. Technical Meeting on Technology Assessment for New Nuclear Power Programmes Vienna 1-3 September 2015 Paliukhovich Vasili Ministry of Energy Technical Meeting on Technology Assessment for New Nuclear Power Programmes Vienna 1-3 September 2015 RUSSIA BELARUS POLAND UKRAINE 3 4 5 18 July, 2006 Plan of main

More information

The role of nuclear energy in the optimum energy mix of Indonesia

The role of nuclear energy in the optimum energy mix of Indonesia The role of nuclear energy in the optimum energy mix of Indonesia Adiwardojo Presented at the Consultancy Meeting on Survey of Existing National- Long-Range Nuclear Energy Strategies, 22 to 23 March, 2012

More information

NUCLEAR POWER PROGRAM IN MALAYSIA. Zulkafli Ghazali

NUCLEAR POWER PROGRAM IN MALAYSIA. Zulkafli Ghazali NUCLEAR POWER PROGRAM IN MALAYSIA Zulkafli Ghazali OVERALL STATUS OF MALAYSIA NUCLEAR PROGRAM The Government of Malaysia has yet to decide on the implementation of the construction of nuclear power plant

More information

Recent Status of Nuclear Energy Programme in Turkey

Recent Status of Nuclear Energy Programme in Turkey Recent Status of Nuclear Energy Programme in Turkey Ayşen TONGAL Turkish Atomic Energy Authority IAEA Interregional Workshop on Advanced Nuclear Reactor Technology for Near Term Deployment, 04-08 July

More information

Status of the Croatian Nuclear Energy Programme (CRONEP)

Status of the Croatian Nuclear Energy Programme (CRONEP) Status of the Croatian Nuclear Energy Programme (CRONEP) Željko Tomšić University of Zagreb Faculty of Electrical Engineering and Computing Regional Workshop on Establishing a National Position and Decision

More information

E.Gaafar Elhadi E.Mukhlis Ahmed Ministry of Electricity and Dams (SUDAN)

E.Gaafar Elhadi E.Mukhlis Ahmed Ministry of Electricity and Dams (SUDAN) INPRO Dialogue Forum Drivers and Impediments Regional Cooperation on the Way to Sustainable Nuclear Energy Systems, IAEA, Vienna, Austria, 30 July 03 August 2012 E.Gaafar Elhadi E.Mukhlis Ahmed Ministry

More information

Convention on Nuclear Safety 7 th Review Meeting 2017

Convention on Nuclear Safety 7 th Review Meeting 2017 Convention on Nuclear Safety 7 th Review Meeting 2017 International Atomic Energy Agency IAEA, Vienna Country Review Report for GHANA Drafted by Country Group 3 Bangladesh, Belarus, Canada, Japan, Latvia,

More information

Small modular reactors deployment and their applications for embarking countries

Small modular reactors deployment and their applications for embarking countries Small modular reactors deployment and their applications for embarking countries Many developing countries with smaller electricity grids are interested in small modular nuclear reactors (SMRs) as part

More information

Joint ICTP-IAEA School of Nuclear Energy Management November Workforce Planning for Nuclear Power Programmes

Joint ICTP-IAEA School of Nuclear Energy Management November Workforce Planning for Nuclear Power Programmes 2374-58 Joint ICTP-IAEA School of Nuclear Energy Management 5-23 November 2012 Workforce Planning for Nuclear Power Programmes PAGANNONE Brenda International Atomic Energy Agency, IAEA Department of Nuclear

More information

WHY NUCLEAR and to share relevant Government decisions with respect to Nuclear Power Development (COD 2025+). Deploying Nuclear Energy for Power

WHY NUCLEAR and to share relevant Government decisions with respect to Nuclear Power Development (COD 2025+). Deploying Nuclear Energy for Power WHY NUCLEAR and to share relevant Government decisions with respect to Nuclear Power Development (COD 2025+). Deploying Nuclear Energy for Power Generation is one of Entry Point OGE Projects (EPP11) in

More information

TABLE 1. Number of Member States considering or planning a nuclear power programme, according to their official statements (as of 31 December 2016)

TABLE 1. Number of Member States considering or planning a nuclear power programme, according to their official statements (as of 31 December 2016) Objective To assist Member States embarking on new nuclear power programmes in planning and building their national nuclear infrastructures. To provide integrated support to Member States with existing

More information

Setting Up a Nuclear Programme: International Support

Setting Up a Nuclear Programme: International Support Setting Up a Nuclear Programme: International Support Anne Starz Nuclear Energy Department a.starz@iaea.org International Atomic Energy Agency Contents Rising Expectations Infrastructure Approach Assistance

More information

Implementation of the Visaginas Nuclear Power Plant Project

Implementation of the Visaginas Nuclear Power Plant Project IAEA-CN-164-1S03 Implementation of the Visaginas Nuclear Power Plant Project M. Grinevičius, Dr. G. Klevinskas, L. Koraliovas Visagino Atominė Elektrinė, UAB, Vilnius, Lithuania Abstract. On June 28, 2007,

More information

Turkish Atomic Energy Authority Department of Nuclear Safety February 2016

Turkish Atomic Energy Authority Department of Nuclear Safety February 2016 Turkish Atomic Energy Authority Department of Nuclear Safety 02-05 February 2016 1 Turkish Atomic Energy Authority Nuclear Regulatory Framework for Licensing of NPPs Legislation and Regulatory Documents

More information

Mr. Director General,

Mr. Director General, Statement of the Head of the Delegation of the Republic of Armenia, Minister of Energy Infrastructures and Natural Resources Mr. Ashot Manukyan at the 61st Annual Regular Session of the IAEA General Conference

More information

Challenges of Nuclear Communications in Newcomer Countries - Malaysia s Experience

Challenges of Nuclear Communications in Newcomer Countries - Malaysia s Experience Challenges of Nuclear Communications in Newcomer Countries - Malaysia s Experience Technical Meeting on Engaging the Public and Local Communities in the Development of a Nuclear Power Programme 2 September

More information

IAEA NUCLEAR ENERGY SERIES No. NG-G-3.1 MILESTONES IN THE DEVELOPMENT OF A NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER

IAEA NUCLEAR ENERGY SERIES No. NG-G-3.1 MILESTONES IN THE DEVELOPMENT OF A NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IAEA NUCLEAR ENERGY SERIES No. NG-G-3.1 MILESTONES IN THE DEVELOPMENT OF A NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, 2007 CONTENTS 1. INTRODUCTION 1 1.1. Background

More information

Nuclear Landscape & Regulatory Framework

Nuclear Landscape & Regulatory Framework Nuclear Landscape & Regulatory Framework Mosa Rasweswe Group Executive: Nuclear Compliance & Services Nuclear Africa Conference 2017 29 March 2017 Presentation Outline RSA Nuclear Programme Developments

More information

Future of the Nuclear Power Generation in Hungary

Future of the Nuclear Power Generation in Hungary IAEA-CN-164-1S06 Future of the Nuclear Power Generation in Hungary Tamás János Katona Paks Nuclear Power Plant Ltd. 7031 Paks Hungary Abstract. In the paper the development options of electric power generation

More information

Overview for a feasibility study

Overview for a feasibility study Overview for a feasibility study What, Why & Objectives of Feasibility Study? International Atomic Energy Agency Nuclear power option included within the national energy strategy MILESTONE 1 Ready to

More information

ROLE OF NEPIO IN DEVELOPING A NATIONAL ROADMAP

ROLE OF NEPIO IN DEVELOPING A NATIONAL ROADMAP ROLE OF NEPIO IN DEVELOPING A NATIONAL ROADMAP IAEA Technical Meeting on Topical Issues in the Development of Nuclear Power Infrastructure 2 5 February 2016; IAEA Vienna, Austria OVERVIEW NUCLEAR ROADMAP

More information

Steps towards Nuclear Power Regulator in Kenya

Steps towards Nuclear Power Regulator in Kenya Steps towards Nuclear Power Regulator in Kenya Radiation Protection Board 12-15 December, 2017, Hammamet, Tunisia Outline 1 Introduction 2 Steps towards nuclear power regulator 3 Interest, Decision-making

More information

CURRENT NUCLEAR POWER SITUATION IN TURKEY. Salih SARI MSc, Nuclear Engineer The Ministry of Energy & Natural Resources (MENR)

CURRENT NUCLEAR POWER SITUATION IN TURKEY. Salih SARI MSc, Nuclear Engineer The Ministry of Energy & Natural Resources (MENR) CURRENT NUCLEAR POWER SITUATION IN TURKEY Salih SARI MSc, Nuclear Engineer The Ministry of Energy & Natural Resources (MENR) IAEA Technical Meeting on CNPP Vienna, Austria, 18-21 March 2013 1 Content I.

More information

CASE STUDY OF FLEXIBLE OPERATIONS IN EGYPT

CASE STUDY OF FLEXIBLE OPERATIONS IN EGYPT IAEA Technical Meeting TM Flexible (Non-Baseload) Operation for Load Following and Frequency Control in New NPPs, October 6-8,, Erlangen-GERMANY CASE STUDY OF FLEXIBLE OPERATIONS IN EGYPT Eng. Ahmed AWAISE

More information

Future for Nuclear in Malaysia

Future for Nuclear in Malaysia Future for Nuclear in Malaysia Energy Forum 9 th August, 2010 Sheraton Imperial, Kuala Lumpur Datuk Dr Daud Mohamad Director General, Malaysian Nuclear Agency, Ministry of Science, Technology and Innovation

More information

NPP PROGRAM IN INDONESIA

NPP PROGRAM IN INDONESIA NPP PROGRAM IN INDONESIA Suparman National Nuclear Energy Agency (BATAN) Republic of Indonesia TM on CNPP, Vienna, 18-21 March 2013 General Information An archipelago with 17,508 islands 1.9 million square

More information

Multiple approaches on supporting nuclear program development and contracting of NPPs

Multiple approaches on supporting nuclear program development and contracting of NPPs Multiple approaches on supporting nuclear program development and contracting of NPPs STATE NUCLEAR ENERGY CORPORATION ROSATOM Technical Meeting Topical Issues on Infrastructure Development: Development

More information

EMERGING AND PERSISTENT ISSUES

EMERGING AND PERSISTENT ISSUES Member State Perspectives ENERGY SITUATION IN ASIA AND THE PACIFIC EMERGING AND PERSISTENT ISSUES Bangladesh Bangladesh Power Sector at a Glance Generation Capacity Power Import : 10,341 MW : 500 MW Highest

More information

The Human Resources Roadmap Key Issues and Observation from the Field

The Human Resources Roadmap Key Issues and Observation from the Field TECHNICAL MEETING ON HUMAN RESOURCE ROADMAPS AND CAPACITY BUILDING FOR NEW AND EXPANDING NUCLEAR POWER PROGRAMMES Vienna, 1 4 October 2013 The Human Resources Roadmap Key Issues and Observation from the

More information

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER Theinformationcontainedinthisdocumentcannotbechangedormodifiedinanywayand shouldserveonlythepurposeofpromotingexchangeofexperience,knowledgedissemination

More information

NATIONAL NUCLEAR POWER PROGRAMME AND EXPECTATION TO INTERNATIONAL ORGANISATIONS

NATIONAL NUCLEAR POWER PROGRAMME AND EXPECTATION TO INTERNATIONAL ORGANISATIONS NATIONAL NUCLEAR POWER PROGRAMME AND EXPECTATION TO INTERNATIONAL ORGANISATIONS Special Symposium for the IAEA 50 th Anniversary, of Indonesia (BATAN) Jl Kuningan Barat, Mampang Prapatan, Jakarta 12710,

More information

REPORT on THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) MISSION to

REPORT on THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) MISSION to REPORT on THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) MISSION to Review the Status of the National Nuclear Infrastructure in The United Arab Emirates Counterparts: FANR, ENEC Technical Cooperation

More information

REGULATORY CHALLENGES IN PREPARING FOR THE REGULATION OF NEW REACTOR SITING: MALAYSIA EXPERIENCE

REGULATORY CHALLENGES IN PREPARING FOR THE REGULATION OF NEW REACTOR SITING: MALAYSIA EXPERIENCE REGULATORY CHALLENGES IN PREPARING FOR THE REGULATION OF NEW REACTOR SITING: MALAYSIA EXPERIENCE Regional Workshop on Volcanic, Seismic and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

Joint ICTP-IAEA School of Nuclear Energy Management November 2012 FEASIBILITY STUDY FOR A NEW NPP

Joint ICTP-IAEA School of Nuclear Energy Management November 2012 FEASIBILITY STUDY FOR A NEW NPP 2374-40 Joint ICTP- School of Nuclear Energy Management 5-23 November 2012 FEASIBILITY STUDY FOR A NEW NPP ROTARU Ioan Management Proiecte Nuclear Sector1, 57 Aleea Teisani 014034 Bucharest ROMANIA FEASIBILITY

More information

An Overview of Nigeria s Nuclear Energy Programme in the INPRO Methodology area of Infrastructure

An Overview of Nigeria s Nuclear Energy Programme in the INPRO Methodology area of Infrastructure An Overview of Nigeria s Nuclear Energy Programme in the INPRO Methodology area of Infrastructure Francis Ibitoye Centre for Energy Research and Development, Obafemi Awolowo University, Ile-Ife. Nigeria.

More information

Korea s Experiences in Implementing a Nuclear Power Programme

Korea s Experiences in Implementing a Nuclear Power Programme Korea s Experiences in Implementing a Nuclear Power Programme by Dr. Byoung Whie Lee, Director, Atomic Energy Bureau, Ministry of Science and Technology, Republic of Korea This article is taken from the

More information

Development of Indonesian Experimental Power Reactor Program: An Approach to Innovative R&D, Nuclear Cogeneration and Public Acceptance

Development of Indonesian Experimental Power Reactor Program: An Approach to Innovative R&D, Nuclear Cogeneration and Public Acceptance Development of Indonesian Experimental Power Reactor Program: An Approach to Innovative R&D, Nuclear Cogeneration and Public Acceptance Taswanda TARYO National Nuclear Energy Agency of Indonesia (BATAN)

More information

NUCLEAR ENERGY PERSPECTIVE IN INDONESIA

NUCLEAR ENERGY PERSPECTIVE IN INDONESIA NUCLEAR ENERGY PERSPECTIVE IN INDONESIA Paper Presented at The 8 th Nuclear Energy Symposium Tokyo, 15-16 March 2004 National Nuclear Energy Agency of Indonesia (BATAN) INTRODUCTION THE ARCHIPELAGO OF

More information

Rosatom Projects Worldwide

Rosatom Projects Worldwide Rosatom Projects Worldwide Vadim Titov Director Rosatom Central Europe Varna, 7 June 2017 Nuclear energy meets global energy challenges: Reduction of CO2 Emissions Low CO2 power generation Reduce local

More information

INPRO Introduction and Status

INPRO Introduction and Status International Project on: Innovative Nuclear Reactors and Fuel Cycles Introduction and Status Paris, NEA workshop 6 November 2002 Ronald Steur, IAEA IAEA General Conference 2000 R IAEA General Conference

More information

Dr. Tamás János KATONA Scientific Advisor Paks Nuclear Power Plant Hungary

Dr. Tamás János KATONA Scientific Advisor Paks Nuclear Power Plant Hungary Future of the nuclear power generation in Hungary Dr. Tamás János KATONA Scientific Advisor Paks Nuclear Power Plant Hungary International Conference on Opportunities and Challenges for Water Cooled Reactors

More information

Nuclear Power: An Option for Kenya s Future Power Mix. By Winfred Ndubai Kenya Nuclear Electricity Board

Nuclear Power: An Option for Kenya s Future Power Mix. By Winfred Ndubai Kenya Nuclear Electricity Board Nuclear Power: An Option for Kenya s Future Power Mix By Winfred Ndubai Kenya Nuclear Electricity Board PRESENTATION OUTLINE 1 CURRENT & FUTURE ELECTRICITY CAPACITY IN KENYA 2 WHY NUCLEAR? 3 BENEFITS AND

More information

Capacity building supporting long-range sustainable nuclear energy system planning

Capacity building supporting long-range sustainable nuclear energy system planning Capacity building supporting long-range sustainable nuclear energy system planning A key challenge in the 21 st century, as countries expanding their nuclear programmes are joined by those embarking on

More information

The Importance of Nuclear Energy Utilization for Electricity Generation in Bangladesh

The Importance of Nuclear Energy Utilization for Electricity Generation in Bangladesh The Importance of Nuclear Energy Utilization for Electricity Generation in Bangladesh Md. Tasbirul Islam 1, A. Z. A. Saifullah 2 1 Lecturer, 2 Professor & Chair Department of Mechanical Engineering, International

More information

Assessment of the Human Resources Infrastructure for Nuclear Energy Program in Macedonia

Assessment of the Human Resources Infrastructure for Nuclear Energy Program in Macedonia BgNS TRANSACTIONS volume 20 number 1 (2015) pp. 1 6 Assessment of the Human Resources Infrastructure for Nuclear Energy Program in Macedonia Anton Chaushevski 1, Hristina Spasevska 1, Sofija Nikolova-Poceva

More information

Regulatory Cooperation Forum 22 January 2013 Brussels

Regulatory Cooperation Forum 22 January 2013 Brussels Regulatory Cooperation Forum 22 January 2013 Brussels Kenta Okano Regulatory Activities Section, Division of Nuclear Installation Safety Department of Nuclear Safety & Security/IAEA K.Okano@iaea.org Overview

More information

Jordan s Nuclear Energy Programme

Jordan s Nuclear Energy Programme Technical Meeting on the Country Nuclear Power Profiles Jordan s Nuclear Energy Programme Yasmin Majali 10-13 May 2016 0 Jordan s Country Profile Total Area: 89,213 Km 2 Sea Port: Aqaba Coastline: 26 Km

More information

Milestones for Nuclear Power Infrastructure Development

Milestones for Nuclear Power Infrastructure Development Milestones for Nuclear Power Infrastructure Development Vienna, IAEA 5 9 November 2007 The French General Feeling Marc Ponchet French Atomic Energy Commission, International Affairs Division In charge

More information

Outline of Activities for Development of Foreign Human Resources

Outline of Activities for Development of Foreign Human Resources [:1 7] Target 1 IAEA Nuclear Energy Management School Grow future leaders in newcomer mainly in Asia Leadership in power politics, administration and technology Nuclear Engineering, Safety, Management,

More information

KAZAKHSTAN. A. Kim Atomic Energy Committee Republic of Kazakhstan

KAZAKHSTAN. A. Kim Atomic Energy Committee Republic of Kazakhstan 18 th Asian Nuclear Safety Network Steering Committee Meeting Chiang Mai, Thailand 20-22 November 2013 KAZAKHSTAN A. Kim Atomic Energy Committee Republic of Kazakhstan Content Regulatory system Regulatory

More information

KENYA S NUCLEAR INDUSTRY

KENYA S NUCLEAR INDUSTRY KENYA S NUCLEAR INDUSTRY By Mr. Karanja Kabage Head of Kenya Delegation Member of Nuclear Electricity Project Committee(NEPC) & chairperson Legal Sub-Committee S. Korea 6 th December 2011 Presentation

More information

Joint ICTP-IAEA School of Nuclear Energy Management November 2012 ENVIRONMENTAL ASPECTS OF A NEW NPP

Joint ICTP-IAEA School of Nuclear Energy Management November 2012 ENVIRONMENTAL ASPECTS OF A NEW NPP 2374-41 Joint ICTP- School of Nuclear Energy Management 5-23 November 2012 ENVIRONMENTAL ASPECTS OF A NEW NPP ROTARU Ioan Management Proiecte Nuclear Sector1, 57 Aleea Teisani 014034 Bucharest ROMANIA

More information

Fukushima Accident Impacts on Thailand: Then, Now, and Future

Fukushima Accident Impacts on Thailand: Then, Now, and Future Fukushima Accident Impacts on Thailand: Then, Now, and Future Pongkrit Siripirom Director of Bureau of Nuclear Safety Regulation Office of Atoms for Peace, Thailand December 11, 2013 JNES Before the accident:

More information

Overview on the Development of the Egyptian PPP Program

Overview on the Development of the Egyptian PPP Program Overview on the Development of the Egyptian PPP Program Rania G. Zayed Advisor to Minister Director, Ministry of Finance USAID Infrastructure Workshop December 19, 2008 1 Agenda PPP Drivers Egypt - PPP

More information

AKKUYU NGS AŞ. Akkuyu Nuclear Power Plant Progress To-date and the Way Forward. Conference Nuclear Power Asia. Akkuyu NPP Power Generation JSC

AKKUYU NGS AŞ. Akkuyu Nuclear Power Plant Progress To-date and the Way Forward. Conference Nuclear Power Asia. Akkuyu NPP Power Generation JSC Akkuyu Nuclear Power Plant Progress To-date and the Way Forward Conference Nuclear Power Asia Akkuyu NPP Power Generation JSC Why BOO? Pros and Cons What is BOO? Build-own-operate under this scheme, the

More information

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems A COUNTRY REPORT OF NEPAL Presented by: Pralhad Prasad Sapkota Under Scretary Government of Nepal,Ministry of Energy, Kathmandu, Nepal Content Introduction Institutional Arrangement Energy Policy Documents

More information

ATOMS FOR THE FUTURE 2014 October 13-14, IAEA SERVICES Nuclear Power Reactor Technologies Construction & Operation

ATOMS FOR THE FUTURE 2014 October 13-14, IAEA SERVICES Nuclear Power Reactor Technologies Construction & Operation ATOMS FOR THE FUTURE 2014 October 13-14, 2014 SERVICES Nuclear Power Reactor Technologies Construction & Operation Thomas Koshy, Head Nuclear Power Technology Development Department of Nuclear Energy International

More information

NUCLEAR CONSULTING SERVICES

NUCLEAR CONSULTING SERVICES NUCLEAR CONSULTING SERVICES AN EXPERIENCED DEVELOPER OF NEW NUCLEAR POWER PLANTS ABOUT US Brief history Lithuania has more than 30 years of experience operating and decommissioning the Ignalina NPP and

More information

Evaluation on Status of Indonesia Nuclear Infrastructure Development

Evaluation on Status of Indonesia Nuclear Infrastructure Development Evaluation on Status of Indonesia Nuclear Infrastructure Development Bambang Suprawoto Nuclear Energy Development Center NATIONAL NUCLEAR ENERGY AGENCY Jln. Kuningan Barat, Mampang Prapatan, Jakarta Selatan

More information

Challenges on the Road to the 1 st National NPP A Countdown

Challenges on the Road to the 1 st National NPP A Countdown Zoran V. STOŠIĆ Director R&D Installed Base Engineering Director Sales & Marketing Ex Yugoslavia Peter SCHIMANN Installed Base Engineering VGB Projects Challenges on the Road to the 1 st National NPP A

More information

Current Status of the Radioactive Waste Management, issues to be overcome, and the way forward to access the JC

Current Status of the Radioactive Waste Management, issues to be overcome, and the way forward to access the JC Current Status of the Radioactive Waste Management, issues to be overcome, and the way forward to access the JC ~ Debasish Paul, Ph.D. Chief Scientific Officer Health Physics & Radioactive Waste Management

More information

Radioactive waste and spent nuclear fuel management strategy in Republic of Armenia. IAEA, Vienna May

Radioactive waste and spent nuclear fuel management strategy in Republic of Armenia. IAEA, Vienna May Radioactive waste and spent nuclear fuel management strategy in Republic of Armenia IAEA, Vienna 24-26 May Geography and Climate The Republic of Armenia is a landlocked mountainous country bordered on

More information

Workshop on Small Modular Reactors : Safety and Licensing. IAEA, ANNUR, December 2017

Workshop on Small Modular Reactors : Safety and Licensing. IAEA, ANNUR, December 2017 Workshop on Small Modular Reactors : Safety and Licensing IAEA, ANNUR, 12-15 December 2017 The Role of the Safety Authority in the Study BEN ABDELHADI DRISS Engineer in the Nuclear Safety Department, AMSSNuR,

More information

3. Management IAEA. International Atomic Energy Agency

3. Management IAEA. International Atomic Energy Agency 3. Management IAEA International Atomic Energy Agency 3. Management (Phase 1) Evaluation Conditions Energy strategy and nuclear power compatibility analyzed Unique MS conditions evaluated Available Nuclear

More information

IAEA NPP Bidding Publications and Nuclear Contracting Toolkit John Moore Division of Nuclear Power

IAEA NPP Bidding Publications and Nuclear Contracting Toolkit John Moore Division of Nuclear Power IAEA NPP Bidding Publications and Nuclear Contracting Toolkit John Moore Division of Nuclear Power j.h.moore@iaea.org Vienna, Austria, February 11, 2016 (Infrastructure Workshop) Topics IAEA Bidding related

More information

Nuclear power program in Poland

Nuclear power program in Poland 9th International School on Nuclear Power Warsaw, 15th November 2017 Dr Józef Sobolewski Director Department of Nuclear Energy Ministry, Poland Polish Power System Ministry The total maximum capacity in

More information

IAEA Technical Cooperation Programme 60 Years and Beyond: Contributing to Development

IAEA Technical Cooperation Programme 60 Years and Beyond: Contributing to Development IAEA Technical Cooperation Programme 60 Years and Beyond: Contributing to Development Statement by H. E. Sheikh Hasina Hon ble Prime Minister Government of the People s Republic of Bangladesh IAEA, Vienna,

More information

EU-RUSSIA ENERGY DIALOGUE

EU-RUSSIA ENERGY DIALOGUE EU-RUSSIA ENERGY DIALOGUE Thematic Group on Energy Efficiency REPORT 2010 (SECOND HALF 2008 SECOND HALF 2010) INTRODUCTION Cooperation on energy efficiency, energy savings and renewable energy is an important

More information

Nuclear Power Profile of Tunisia

Nuclear Power Profile of Tunisia Nuclear Power Profile of Tunisia Prof. Hafedh BELMABROUK National Centre for Nuclear Science and Technology Vienna, 17 21 March 2013 Outline Country overview Summary of basic information on the national

More information

Human Capability Building for Polish Nuclear Power Program. Adam Kordas Nuclear Energy Department

Human Capability Building for Polish Nuclear Power Program. Adam Kordas Nuclear Energy Department Human Capability Building for Polish Nuclear Power Program Adam Kordas Nuclear Energy Department 2 General context (1) Poland is surrounded by NPPs up to 300 km from state borders Norway Sweden Russia

More information

THE ROMANIAN EXPERIENCES IN CERNAVODA NPP FINANCING

THE ROMANIAN EXPERIENCES IN CERNAVODA NPP FINANCING 2 nd Regional Conference on Energy and Nuclear Power in Africa 30 31 May 2011-05-11 Cape Town, South Africa THE ROMANIAN EXPERIENCES IN CERNAVODA NPP FINANCING Dr. IOAN ROTARU IAEA Invited Expert CONTENT

More information

Armenia Nuclear Power Profile. IAEA, Vienna May

Armenia Nuclear Power Profile. IAEA, Vienna May Armenia Nuclear Power Profile IAEA, Vienna 10-13 May General Information The referendum for independence of Armenia was held on 21 September 1991. Based on the results of the referendum (99% voted for

More information

Integrated Regulatory Infrastructure Support Service (IRISS)

Integrated Regulatory Infrastructure Support Service (IRISS) Integrated Regulatory Infrastructure Support Service (IRISS) Jinho Lee (peacelee@kins.re.kr) Head of Global Nuclear Safety Infrastructure Dept. Korea Institute of Nuclear Safety Daejeon, Korea November

More information