VIESMANN. VITOLADENS, VITORONDENS Flue systems for oil condensing boilers. Technical guide. Vitoladens and Vitorondens flue systems
|
|
- Jasper Bennett
- 5 years ago
- Views:
Transcription
1 VIESMNN VITOLDENS, VITORONDENS Flue systems f oil ondensing oilers Tehnil guide Vitoldens nd Vitondens flue systems Vitoldens 00- Vitoldens 00-T Vitoldens 00-W Vitoldens -F Vitondens 00-T Vitondens -F 58 5 G 5/01
2 Index Index 1. Flue systems Struturl unit... System ertifition lned flue opertion Open flue opertion (type ) Flue gs temperture protetion Lightning protetion E ertifition f the PPs flue systems (rigid nd flexile) f the Vitoldens Flue instlltion options f lned flue opertion... 7 In n instlltion room with one me full steys ove... 8 In n instlltion room immeditely elow the roof with only the roof spe ove 8 In n instlltion room with ventiltion ir supplied through the externl wll Flue instlltion options f open flue opertion... 9 In n instlltion room (non-living spe) with one me full steys ove Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F. Design nd sizing infmtion f the Vitoldens 00-W nd -F.1 Plsti (PPs) lned flue system f routing through shft with lned flue opertion (type 6 to TRÖI 009) Internl shft dimensions Flue, system size 80 nd 100 (omponents) (type 6x to TRÖI 009) Vitoldens in onjuntion with solid fuel oilers... 1 Flue, flexile, system size 80 nd 100 (omponents) (type 6x to TRÖI 009) Plsti (PPs) flue gs/ventiltion ir system f seprte ventiltion ir nd flue gs routing (type 8 to TRÖI 009) Plsti (PPs) lned flue system f routing over externl wlls (type 5 to TRÖI 009) Mx. totl length of the flue pipe Plsti (PPs) lned flue system f routing through lightweight shft Shft modules "UNIFIX" offered y Skoerne (mde from erted onrete) "SKOIFIXnno" nd "SKOIFIXXs 0" shft profiles offered y Skoerne (mde from fomed ermis) nhing f roof outlets with shft profiles Promt shft profiles Roof outlet f shfts with Promt profiles Plsti (PPs) flue pipe f routing through shft with open flue opertion (type to TRÖI 009)... 0 Internl shft dimensions... 0 Flue, system size 80 nd 100 (omponents) (type to TRÖI 009)... 1 Flue, flexile, system size 80 nd 100 (omponents) (type to TRÖI 009)....6 Plsti (PPs) flue pipe f routing the flue over externl wlls (type to TRÖI 009) Mx. totl length of the flue pipe....1 Plsti (PPs) lned flue system f routing through shft with lned flue opertion (type 6x to TRÖI 009)... 5 Internl shft dimensions... 5 Flue, system size 60/100 nd 80/15 (omponents) (type 6x to TRÖI 009)... 6 Vitoldens in onjuntion with solid fuel oilers... 7 Flue, flexile, system size 60/100 nd 80/15 (omponents) (type 6x to TRÖI 009) Plsti (PPs) lned flue system f routing flues over n externl wll (type 5x to TRÖI 009) Plsti (PPs) flue gs/ventiltion ir system f seprte ventiltion ir nd flue gs routing (type 8x to TRÖI 009) Plsti (PPs) lned flue system f vertil routing through pithed flt roof (type x to TRÖI 009)... F vertil roof outlet... Vertil flt roof outlet....5 Plsti (PPs) lned flue system f routing through lightweight shft....6 Plsti (PPs) flue pipe f routing through shft with open flue opertion (type to TRÖI 009)... Internl shft dimensions... Flue, system size 60 nd 80 (omponents) (type to TRÖI 009)... 5 Flue, flexile, system size 60 nd 80 (omponents) (type x to TRÖI 009)... 6 onnetion to moisture-resistnt himney (MR himney negtive pressure) with plsti (PPs) flue pipe (type to TRÖI 009) G VIESMNN VITOLDENS, VITORONDENS
3 Index (ont.). omponents of the plsti flue systems lned flue omponents... 7 omponents f externl wll instlltion... Single pipe system omponents... omponents of the flexile single pipe system f flexile flue... 6 omponents f seprte ventiltion ir nd flue gs routing Vitoldens 00-W nd -F... 8 Roof elements Keywd index G VITOLDENS, VITORONDENS VIESMNN
4 Flue systems 1 The following requirements regrding design nd instlltion pply to flue systems f ondensing omustion equipment: Pri to strting wk on the flue system, your heting ontrt should onfer with the flue gs inspet responsile [where pplile]. omustion equipment must e onneted to the domesti himney stk on the sme flo s the one on whih it is instlled (no trnsition through seprting eilings). We reommend instlltion in seprte room. Struturl unit The fementioned onditions re generlly met when one of the flue systems (essies) listed elow is used. The following Viessmnn lned flue systems f lned flue opertion re tested to DVGW [stndrd] s single tehnil unit with the Vitoldens, similr to gs ondensing oilers: Vertil roof outlets Seprte ventiltion ir nd flue gs routing Externl routing through oxil pipe dvntges of single struturl units: No lulted perfmne verifition f flue pipes to DIN EN 18 is required f individul ses ding to the Lndesudnung, some Federl Sttes (e.g. Nth Rhine-Westphli) do not require tightness test to e rried out during ommissioning y the flue gs inspet [hek lol regultions] System ertifition System ertifition similr to DVGW-VP 11 nd E Gs pplines Diretive 90/96/EE in onjuntion with PPs flue pipes offered y Skoerne: Vitoldens 00-: E-005S10 Vitoldens 00-T: E-005O107 Vitoldens 00-W: E-005M11 Envisged f the future is simplified visul inspetion y the flue gs inspet on iennil sis No dditionl pprovl ertifite y the flue pipe mnufturer is required The flue pipe my lso e routed through the instlltion room without seondry ventiltion. However, the instlltion room must then provide vent to the outside of t lest 150 m 75 m. The plin flue pipe must e type pproved y the Deutshe Institut für utehnik (DIt) [Germny] (open flue opertion). The flue ville s n essy is E-designted nd pproved in dne with DIN EN 171. Vitoldens -F: E-005M11 Vitondens 00-T: E-005L10 Vitondens -F: E-005L10 Generl uilding pprovl: pprovl ertifite Z lned flue opertion The Vitoldens nd Vitondens re suitle f lned flue opertion. Vitondens 00-T from 6 kw n only operte in open flue mode. The Vitoldens 00-W nd -F re tegised s x, 5x, 6x 8x. The Vitoldens 00-, Vitoldens 00-T, Vitondens 00-T up to 5 kw nd Vitondens -F re tegised s pplines type 5, 6 8. In dne with TRÖI 009, joint pprovl f the Vitoldens, Vitondens nd the lned flue system pplies to this type of equipment. F lned flue systems tested together with the oiler, some uthities wive the requirement f tightness test (overpressure test) during ommissioning y the flue gs inspet nd the verifition of E designtion. If this pplies, we reommend tht your heting engineer rries out simple tightness test during the ommissioning of your system. F this it is suffiient to hek the O onentrtion in the omustion ir t the nnulr gp of the lned flue pipe. The flue is onsidered suffiiently gs-tight if the O onentrtion in the omustion ir is no higher thn 0. %, if the O onentrtion is t lest 0.6 %. If higher O lower O vlues re ptured, hek the flue system f tightness. In onjuntion with the onentri oxil pipe (lned flue system), the surfe temperture of the oiler tht of the lned flue system will never exeed 85 º. Therefe, lernes to omustile omponents ding to TRÖI re not required. The E-designted flues from the Viessmnn rnge n e used in equipment type 6. Use ondenste trp ove the oiler flue onnetion if n luminium flue pipe is instlled. Instll the onneting lines with fll of t lest to the oiler. The lned flue system is E-designted nd pproved in dne with DIN EN 171 (see pge 6). If instlling the oiler in sement on lower flo, n existing himney shft of suffiient size my e used f routing the lned flue pipe. ding to TRÖI 009, flue pipes tht ridge severl flos must e routed inside shft with fire rting of t lest 90 minutes, nd f uildings in tegies 1 nd, fire rting of t lest 0 minutes. The lned flue gs/ventiltion ir is routed in lned flue pipe up to the himney shft. The flue pipe is routed inside the himney shft to ove roof level. Where no suitle shft is ville, the flue my e routed to the roof through retrofitted shft. F this shft, uilding Regultions test ertifite E designtion responding to the design of the shft is required. In ddition, the shft must hve fire rting of L0 L Open flue opertion (type ) Flue gs is routed through single wll plsti pipes (PPs). The flue system is E-designted nd pproved in dne with EN 171 (see pge 6). Supplying omustion ir: 58 5 G VIESMNN VITOLDENS, VITORONDENS
5 Flue systems (ont.) Vitoldens 00-: Vi the ventiltion ir onnet on top of the oiler Vitoldens 00-T, Vitondens 00-T, -F: Diret on the urner sing Vitoldens 00-W nd -F: y the nnulr gp etween the flue pipe nd ventiltion ir inlet on the oiler flue onnetion of the Vitoldens Flue gs temperture protetion The following Viessmnn lned flue systems f lned flue opertion re tested to the DVGW stndrd s single tehnil unit with the Vitoldens Vitondens 00-T up to 5 kw, s with gs ondensing oilers: Vertil roof outlet (only Vitoldens 00-W nd -F) Seprte ventiltion ir nd flue gs routing Externl routing through oxil pipe If different flue is used, ensure onnetion in dne with the guidelines f the pprovl of flue systems f low temperture flue gs. F the Vitoldens, these re plsti flue pipes type (mx. permissile flue gs temperture 10 ). Fetures inside the equipment ensure tht the mx. permissile flue gs temperture is not exeeded. n dditionl flue gs high limit sfety ut-out is therefe not required. 1.5 Lightning protetion If lightning protetion system is instlled, ny metlli flue system should e inluded in the lightning protetion sheme G VITOLDENS, VITORONDENS VIESMNN 5
6 Flue systems (ont.) 1.6 E ertifition f the PPs flue systems (rigid nd flexile) f the Vitoldens G 6 VIESMNN VITOLDENS, VITORONDENS
7 Flue systems (ont.) G 1.7 Flue instlltion options f lned flue opertion No seprte vents required in the instlltion room. VITOLDENS, VITORONDENS VIESMNN 7
8 Flue systems (ont.) Shown with the Vitoldens 00-W. 1 In n instlltion room with one me full steys ove Routing through shft (type 6x 6, to TRÖI 009) The oiler drws omustion ir from the tmosphere through the nnulr gp inside the shft (himney) nd expels the flue gs vi the flue pipe ove roof level. The shft is not prt of the stndrd delivery. F detiled desription, see pges 6 to 8. Retrofitted shft F instlltion into retrofitted, uilding Regultions-pproved shft mde of shft elements minerl profiles. F detiled desription of shfts, see pge 18. Flue gs Ventiltion ir Routing over externl wlls (type 5x 5, to TRÖl 009) The oiler drws omustion ir from the tmosphere vi hizontl, onentri oxil pipe on the externl wll nd expels flue gs to the tmosphere vi the roof. In its vertil setion, the outside pipe of the onentri oxil pipe ts s therml insultion thnks to its stti ir gp. The omustion ir is supplied vi the lned flue ir inlet. F detiled desription, see pge 9. Flue gs Ventiltion ir In n instlltion room immeditely elow the roof with only the roof spe ove 1 Vertil outlet, if no shft is ville (type x, to TRÖl 009) (vrious options) 1 Diret, vertil roof outlet through pithed roof Indiret, vertil roof outlet through pithed roof with protetive pipe inside the tti spe (if not onverted) fire protetion rikwk (if tti onverted) Diret, vertil roof outlet through flt roof The oiler drws omustion ir from the tmosphere nd expels flue gs to the tmosphere vi onentri oxil pipe through the roof. F detiled desription, see pge. Flue gs Ventiltion ir Protetive pipe ginst mehnil dmge 58 5 G 8 VIESMNN VITOLDENS, VITORONDENS
9 Flue systems (ont.) In n instlltion room with ventiltion ir supplied through the externl wll Seprte ventiltion ir nd flue gs routing (type 8x, to TRÖl 009) The oiler drws omustion ir from outside vi seprte supply pipe routed through the externl wll, nd expels flue gs to the tmosphere vi shft leding through the roof. The onnetion piee to the himney is designed s oxil pipe. This lned flue system is used if the existing himney is unsuitle f routing omustion ir due to its dimensions hrteristis (deposits). F detiled desription, see pge 1. 1 Flue gs Ventiltion ir 1.8 Flue instlltion options f open flue opertion (Seprte ventiltion ir perture with 150 m 75 m ross-setion required) Shown with the Vitoldens 00-W. In n instlltion room (non-living spe) with one me full steys ove Routing through shft (type, to TRÖl 009) The oiler drws omustion ir from the instlltion room nd expels flue gs through the flue vi the roof (lned flow). F detiled desription, see pge. Flue gs Seondry ventiltion Ventiltion ir onnetion to moisture-resistnt himney (MR himney) (type, to TRÖl 009) The oiler drws omustion ir from the instlltion room nd routes flue gs through the moisture-resistnt himney vi the roof. F detiled desription, see pge G Flue gs Seondry ventiltion Ventiltion ir VITOLDENS, VITORONDENS VIESMNN 9
10 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F.1 Plsti (PPs) lned flue system f routing through shft with lned flue opertion (type 6 to TRÖI 009) F lned flue opertion, oxil flue (internl pipe f flue gs, externl pipe f omustion ir) is required s onnetion piee etween the oiler nd the shft. Up to 5. kw: Internl flue dimeter: Ø 80 mm Internl dimeter, ventiltion ir pipe: Ø 15 mm From.8 kw: Internl flue dimeter: Ø 100 mm Internl dimeter, ventiltion ir pipe: Ø 150 mm The onnetion piee is fitted to the oiler flue onnetion nd must provide n inspetion pt. F instlltion through shfts hnnels with longitudinl ventiltion whih meet the requirements f domesti himney stks to DIN V , with fire rting of 90 minutes (L90), fire rting of 0 minutes (L0) f uildings in tegies 1 nd (mx. steys). Pri to instlltion, the flue gs inspet should hek tht the shft to e used is suitle nd pproved f this purpose. Shfts tht were previously onneted to oil solid fuel oilers must e thoughly lened y himney sweep. Loose deposits omprising sulphur nd soot must not remin on the inside of the himney. If this is not possile, the ventiltion ir n e routed seprtely (see pge 1). lose off nd sel ny other onnetion pertures with pproprite mterils. This does not pply to ny lening test pertures tht re provided with himney lening overs nd to whih n pproprite test mrk hs een ffixed. hek pri to instlltion whether the shft runs stright from top to ottom if it is elled (hek with mirrs). If it is elled, we reommend the instlltion of flexile flue pipe (see pge 8). Inside the instlltion room, t lest one inspetion pt must e provided in the flue system f heking nd lening s well s f heking the pressure (if required). If the flue pipe is inessile from the roof, seond inspetion pt must e provided in the tti ehind the himney lening hth. Provide n inspetion pt t the se of the shft f heking the seondry ventiltion. Sfegurd the drining of the ondenste from the flue pipe to the oiler with fll of t lest º. The flue system must e routed to ove the roof (protrusion ove the roof ding to lol regultions). lterntive plsti flue pipes with uilding Regultion pprovl my e used, f exmple, if lrger pipe dimeter is required euse of greter flue length. The perfmne verifition to EN 18 should then e provided y the respetive flue mnufturer. If flue pipes other thn those offered s essies re used, the flue system must e heked f tightness y the flue gs inspet pri to ommissioning. This my e rried out, in dne with the flue system pprovl ertifite, y mesuring the O O vlue inside the nnulr gp. If this test results in O ontent of me thn 0. % n O ontent elow 0.6 %, hek the flue system. Internl shft dimensions Minimum shft dimensions to DIN V Note ding to the pprovl ertifite, internl shft dimensions smller thn shown in the tle my lso e used f lned flue opertion, if this is indited y the perfmne verifition to DIN EN 18. Externl dimeter; femle onnetion Minimum internl shft dimension squre retngulr round (sht side) mm (flexile) (flexile) G 10 VIESMNN VITOLDENS, VITORONDENS
11 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Redued internl shft dimensions Externl dimeter; femle onnetion Redued internl shft dimension squre retngulr round (sht side) mm Minimum dimension of shfts in whih flue my e used (positive pressure opertion) without seprte lultion. Flue, system size 80 nd 100 (omponents) (type 6x to TRÖI 009) 58 5 G D Illustrtion with the Vitoldens 00- Ventiltion ir Flue gs Inspetion pt D onnetion piee Rted heting output (kw) 1 oiler flue onnetion F lned flue opertion nd oxil lned flue routing (Prt of the stndrd oiler delivery) lned flue pipe With test pts (160 mm long) Stndrd shft pk (PPs, rigid) omprising: Suppt end Suppt ril Shft over (PPs) Spers (5 pe, mx. lerne 5 m) Stndrd shft pk (metl/pps, rigid) F twin flue himneys; one flue f solid fuel oilers omprising: Suppt end Suppt ril Shft over (metl) Terminl pipe (stinless steel) Spers (5 pe, mx. lerne 5 m) up to from /15 100/150 80/15 100/ Spers ( pe, mx. lerne 5 m) Pipe m long ( pe =.9 mm) 1.95 m long (1 pe) 1 m long (1 pe) 0.5 m long (1 pe) end (f use in elled himneys) º ( pe) 15º ( pe) Inspetion piee, stright (1 pe) lned flue inspetion piee, stright 80/15 100/150 (1 pe) 6 Wll ezel lned flue pipe 80/15 100/150 1 m long 0.5 m long 8 lned flue end 80/15 100/150 87º (1 pe) 5º ( pe) lned flue inspetion end 87º 80/15 (1 pe) lned flue inspetion tee 87º 100/150 (1 pe) 9 lned flue slide oupling 80/15 100/150 VITOLDENS, VITORONDENS VIESMNN 11
12 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Rted heting output (kw) up to 5. from.8 Fixing lmp, white (1 pe) 80/15 100/150 Stinless steel extension, 80 mm long f shft over, metl/pps, rigid Mx. totl length of the flue up to the oiler flue onnetion Rted heting output kw t system temperture 50/0 Mx. length f system size Ø 80 mm m Mx. length f system size Ø 100 mm m The following omponents re tken into onsidertion f the mximum flue lengths: lned flue onnetion pipe D 0.5 m long. 1 lned flue end 87º nd 1 suppt end 87º lned flue ends 5º nd 1 suppt end 87º Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: lned flue onnetion pipe 0.5 m long: 1 m lned flue onnetion pipe 1 m long: m lned flue ends 5º: 0.5 m lned flue ends 87º: 1 m lned flue inspetion tee: 1.5 m Note Oserve the speifitions regrding internl shft dimensions (see pge 10). Vitoldens in onjuntion with solid fuel oilers Routing plsti flue djent to shft t risk of himney fire from soot (e.g. two drught himney with wood urning stove) is generlly permitted. Sujet to the design of the himney top nd the opertion of the ondensing systems (open lned flue), fire regultions speify different mesures. Design the lned flue terminls so tht flue gs will not e drwn into the ir shft in dngerous mounts nd tht pressure flututions due to wind influene ffet the lned flue shft s evenly s possile. F the essentil steps, see the following setions: Ø D D Lg 00 Open flue opertion if the ventiltion ir is not supplied through the shft F fire sfety resons, the top setions of flmmle flue terminls should not e mde from flmmle mterils. The length of the flue pipe mde from non-omustile mterils in the setion proteted from het rdition Lg must e t lest 00 mm long. The length of the externl terminl pipe of the shft over must e t lest equivlent to the externl dimeter D of the internl flue pipe. The stndrd shft pk delivery (metl/pps) inludes stinless steel pipe (80 mm long). stinless steel extension (80 mm long) is ville s n dditionl essy. E D F Metl shft over End piee mde from non-omustile mteril Seondry ventiltion D Vitoldens flue E himney f solid fuel oilers F Minimum lerne to DIN V (see pge 10) lned flue opertion ventiltion ir is supplied through the shft Design the lned flue terminls so tht flue gs will not e drwn into the ir shft in dngerous mounts nd tht pressure flututions due to wind influene ffet the lned flue system s evenly s possile G 1 VIESMNN VITOLDENS, VITORONDENS
13 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) When using plsti shft over: The himney f solid fuel oilers must stnd t lest 1000 mm proud of the Vitoldens flue. F the himney extension, only use omponents tht re resistnt to soot fires. Ventiltion/seondry ventiltion D Vitoldens flue (rigid flexile) E himney f solid fuel oilers F Minimum lerne to DIN V (see pge 10) 1000 When using ommon downdrught plte: The flue end piee nd the shft over must e mde from nonomustile mteril (e.g. metl). x D Ø D D E D F himney extension mde from soot-resistnt nd fire-resistnt mteril Plsti shft over Ventiltion/seondry ventiltion D Vitoldens flue E himney f solid fuel oilers F Minimum lerne to DIN V (see pge 10) When using metl shft over: The himney f solid fuel oilers must stnd t lest x Ø D proud of the Vitoldens flue. F the himney extension, only use omponents tht re resistnt to soot fires. Ø D x D F E G himney extension mde from soot-resistnt nd fire-resistnt mteril End piee mde from non-omustile mteril Shft over (on-site) D Ventiltion/seondry ventiltion E Vitoldens flue F himney f solid fuel oilers G Minimum lerne to DIN V (see pge 10) The metl end piee nd shft over re prt of the stndrd shft pk (metl/pps). The stndrd shft pk (metl/pps) is ville s n essy. E D F 58 5 G himney extension mde from soot-resistnt nd fire-resistnt mteril Metl shft over VITOLDENS, VITORONDENS VIESMNN 1
14 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Flue, flexile, system size 80 nd 100 (omponents) (type 6x to TRÖI 009) D 1 9 qp Illustrtion with the Vitoldens 00- Ventiltion ir Flue gs Inspetion pt D onnetion piee 5 Rted heting output (kw) Stndrd shft pk (metl/pps, flexile) F twin flue himneys; one flue f solid fuel oilers. omprising: Suppt end Suppt ril Shft over (metl) Terminl pipe (stinless steel) Spers (5 pe, mx. lerne m) up to from Spers (5 pe, mx. lerne m) Flue pipe, flexile, s roll m onnetion piee F onneting residul lengths of the flexile flue pipe Pipe lowering tthment with 5 m rope 5 Inspetion piee, stright (1 pe) F instlltion into the flexile flue pipe 6 lned flue inspetion piee, stright 80/15 100/150 (1 pe) 7 Wll ezel lned flue pipe 80/15 100/150 1 m long 0.5 m long 9 lned flue end 80/15 100/150 87º (1 pe) 5º ( pe) lned flue inspetion end 87º 80/15 (1 pe) lned flue inspetion tee 87º 100/150 (1 pe) qp lned flue slide oupling 80/15 100/150 Fixing lmp, white (1 pe) 80/15 100/150 Stinless steel extension, 80 mm long f shft over, metl/pps, flexile Note Instll the flexile flue with mximum offset of 5 from the vertil. Rted heting output (kw) 1 oiler flue onnetion F lned flue opertion nd oxil lned flue routing (Prt of the stndrd oiler delivery) lned flue pipe With test pts (160 mm long) Stndrd shft pk (PPs, flexile) omprising: Suppt end Suppt ril Shft over (PPs) Spers (5 pe, mx. lerne m) up to from /15 100/150 80/15 100/ G 1 VIESMNN VITOLDENS, VITORONDENS
15 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Mx. totl length of the flue up to the oiler flue onnetion Rted heting output kw t system temperture 50/0 Mx. length f system size Ø 80 mm m Mx. length f system size Ø 100 mm m The following omponents re tken into onsidertion f the mximum flue lengths: lned flue onnetion pipe D 0.5 m long. 1 lned flue end 87º nd 1 suppt end 87º lned flue ends 5º nd 1 suppt end 87º Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: lned flue onnetion pipe 0.5 m long: 1 m lned flue onnetion pipe 1 m long: m lned flue ends 5º: 0.5 m lned flue ends 87º: 1 m lned flue inspetion tee: 1.5 m. Plsti (PPs) flue gs/ventiltion ir system f seprte ventiltion ir nd flue gs routing (type 8 to TRÖI 009) The Vitoldens my e operted with seprtely routed flue gs nd ventiltion ir in lned flue mode, sujet to the flue system meeting the following onditions: onnetion to himney tht is unsuitle f providing the omustion ir supply euse of deposits. onnetion to moisture-resistnt himney. The omustion ir is then supplied through seprte ventiltion ir pipe tht is routed seprtely from the flue pipe. Oserve the design infmtion to TRÖI 009, point 5.6. Up to 5. kw: Internl dimeter, lned flue pipe: Ø 80 mm From.8 kw: Internl dimeter, lned flue pipe: Ø 100 mm Mx. pipe length: Ventiltion ir pipe from the k edge of the oiler: 1 m Mx. numer of ends Flue pipe 87º: pe 5º: pe Ventiltion ir pipe 87º: pe 5º: 6 pe Mx. pressure drop in the ir supply pipe: 5 P. omustion ir temperture t the urner: min. 5 º/mx. 0 º. Instll n inspetion pt f heking nd lening the flue pipe G VITOLDENS, VITORONDENS VIESMNN 15
16 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) F 5 D 1 6 Rted heting output (kw) Stndrd shft pk (metl/pps, rigid) F twin flue himneys; one flue f solid fuel oilers omprising: Suppt end Suppt ril Shft over (metl) Terminl pipe (stinless steel) Spers (5 pe, mx. lerne 5 m) up to from Spers ( pe, mx. lerne 5 m) Pipe m long ( pe =.9 m) 1.95 m long (1 pe) 1 m long (1 pe) 0.5 m long (1 pe) Inspetion piee, stright (1 pe) end º (1 pe) 5º ( pe) 6 Ventiltion ezel (1 pe) end (f use in elled himneys) º ( pe) 15º ( pe) Inspetion tee 87º (1 pe) 80 Inspetion end 87º (1 pe) 100 Ventiltion ir dmper Stinless steel extension, 80 mm long f shft over, metl/pps, rigid E5 Mx. totl length of the flue pipe up to the oiler flue onnetion when routing through shft: 0 m Illustrtion with the Vitoldens 00-T Seondry ventiltion Flue gs Inspetion pt D onnetion piee E Ventiltion ir F Ventiltion ir perture, min. 150 m 75 m Rted heting output (kw) 1 oiler flue onnetion (prt of the stndrd oiler delivery) Stndrd shft pk (PPs, rigid) omprising: Suppt end Suppt ril Shft over (PPs) Spers (5 pe, mx. lerne 5 m) up to from The following omponents re tken into onsidertion f the mximum flue lengths: onnetion pipe D 0.5 m long. 1 end 87º nd 1 suppt end 87º ends 5º nd 1 suppt end 87º Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: onnetion pipe 0.5 m long: 0.5 m onnetion pipe 1 m long: 1 m end 5º: 0. m end 87º: 0.5 m Inspetion tee: 0. m 58 5 G 16 VIESMNN VITOLDENS, VITORONDENS
17 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.). Plsti (PPs) lned flue system f routing over externl wlls (type 5 to TRÖI 009) The Vitoldens my lso e onneted, without shft, to flue pipe tht is routed over n externl wll. The omustion ir is drwn in vi the ir inlet piee. The vertil outer pipe ts s protetion nd s therml insultion thnks to its stti ir gp. Up to 5. kw: Internl flue dimeter: Ø 80 mm Internl dimeter, ventiltion ir pipe: Ø 15 mm From.8 kw: Internl flue dimeter: Ø 100 mm Internl dimeter, ventiltion ir pipe: Ø 150 mm The flue f routing over externl wlls hs een tested s onentri lned flue system s single tehnil unit with the Vitoldens ondensing oiler. perfmne verifition ding to EN 18 is not required. 1 m D Illustrtion with the Vitoldens 00- Flue gs Ventiltion ir 6 qp qq 7 7 onnetion piee D Mximum length, externl wll flue Rted heting output (kw) 1 oiler flue onnetion F lned flue opertion nd oxil lned flue routing (Prt of the stndrd oiler delivery) lned flue pipe With test pts (160 mm long) lned flue inspetion end 87º (1 pe) lned flue inspetion tee 87º (1 pe) lned flue inspetion piee, stright (1 pe) nd up to from /15 100/150 80/15 100/150 80/15 100/150 80/15 100/150 lned flue end 87º (1 pe) 80/15 100/150 lned flue end 5º ( pe) 80/15 Inspetion piee f flues routed over 100/150 externl wlls, stright (1 pe) nd lned flue end 87º (1 pe) 100/150 lned flue end 5º ( pe) 100/150 lned flue slide oupling 80/15 100/150 lned flue pipe 80/15 100/ m long 1 m long (1 pe) 0.5 m long (1 pe) Externl wll pipe 100/ m long 1 m long (1 pe) 0.5 m long (1 pe) 5 Wll ezel Fixing lmp, white (1 pe) 80/15 100/150 7 Externl wll pk 80/15 100/150 omprising: lned flue end ir inlet piee Wll ezel 8 Externl wll terminl 80/15 100/150 F sht roof overhng 9 Universl over plte 80/15 100/150 qp lned flue roof outlet 80/15 100/150 olour: lk terrott ove-roof extensions, 80/15 100/ m long ville on request qq Universl roof tile 80/15 100/150 F Romn tiles, pntiles, plin tiles, slte nd other types of roof olour: lk terrott Pipe outlet f Klöer roof tiles olour: lk terrott (provide the responding Klöer tile on site to mth the roof outlet seleted f the prtiulr type of roof) 80/ G VITOLDENS, VITORONDENS VIESMNN 17
18 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Mx. totl length of the flue pipe Rted heting output kw t system temperture 50/0 Mx. length f system size Ø 80 mm m Mx. length f system size Ø 100 mm m x 87 lned flue ends re tken into onsidertion f the mximum flue lengths. Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: lned flue ends 5º: 0.5 m lned flue ends 87º: 1 m lned flue inspetion tee: 1.5 m. Plsti (PPs) lned flue system f routing through lightweight shft spe sving shft f redued temperture requirements my e retrofitted if the Vitoldens is instlled in the living spe with one me full steys ove nd there is no shft ville. Shft modules "UNIFIX" offered y Skoerne (mde from erted onrete) The shft used must omply with the requirements f domesti himneys to DIN V must e generlly pproved y the uilding inspette. mm mm Fire rting min min min min Ø "SKOIFIXnno" nd "SKOIFIXXs 0" shft profiles offered y Skoerne (mde from fomed ermis) 100 Ø Ø Fire rting 0 min. Skoerne offer shft system mde from reeze onrete fomed ermis with generl uilding Regultions pprovl [Germny]. ddress f Skoerne: Skoerne Shnsteinsysteme GmH Ostendstrsse 1 D-619 Pfungstdt nhing f roof outlets with shft profiles (Where the shft is run up to the roof skin) 58 5 G 18 VIESMNN VITOLDENS, VITORONDENS
19 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) ville from Skoerne: Roof outlet Universl roof tile Terminl shft profile D nhing of the roof outlet During instlltion, mth terminl shft profile to the roof pith. D Promt shft profiles d 100 PROMTET femle onnetion PROMTET profile Flue System size mm mm mm d mm Fire rting min min min min PROMTET femle onnetion PROMTET profile Flue Promt offer shft system mde from lium silite fire rriers with generl uilding Regultions pprovl [Germny]. ddress f Promt: Promt GmH Postfh D-085 Rtingen 58 5 G VITOLDENS, VITORONDENS VIESMNN 19
20 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Roof outlet f shfts with Promt profiles During instlltion, mth the terminl shft profile to the roof pith. Vertil oxil roof outlet (lned flue system) Universl roof tile Lightweight shft mde from PROMTET minerl fire profiles.5 Plsti (PPs) flue pipe f routing through shft with open flue opertion (type to TRÖI 009) Open flue opertion requires flue pipe s the onnetion piee etween the Vitoldens nd the shft s well s f the routing through the shft. The instlltion room must provide ventiltion ir perture with n unrestrited ross-setion of t lest 150 m 75 m. Up to 5. kw: Internl flue dimeter: Ø 80 mm From.8 kw: Internl flue dimeter: Ø 100 mm The flue system is onneted to the oiler flue onnetion. The omustion ir is drwn from the oiler instlltion room. F instlltion through shfts hnnels with longitudinl ventiltion meeting the requirements f domesti himney stks to DIN V , with fire rting of 90 minutes (L90), fire rting of 0 minutes (L0) f uildings in tegies 1 nd. Pri to instlltion, the flue gs inspet should hek tht the shft to e used is suitle nd pproved f this purpose. Shfts tht were previously onneted to oil solid fuel oilers must e thoughly lened y himney sweep. Loose deposits of sulphur nd soot must not remin on the inside of the himney. lose off nd sel ny other onnetion pertures with pproprite mterils. This does not pply to ny lening inspetion pertures tht re provided with himney lening overs nd tht re identified with n pproprite test mrk. Internl shft dimensions hek pri to instlltion whether the shft runs stright from top to ottom if it is elled (hek with mirrs). If it is elled, we reommend the instlltion of flexile flue pipe (see pge 6). The lol flue gs inspet should hek the system f tightness pri to ommissioning (where pplile). In the se of open flue opertion, this n only e done y mens of pressure test. Inside the instlltion room, t lest one inspetion pt must e provided in the flue system f heking nd lening s well s f heking the pressure. If the flue pipe is inessile from the roof, seond inspetion pt must e provided in the tti ehind the himney lening hth. Sfegurd the drining of the ondenste from the flue pipe to the oiler with fll of t lest º. Route the flue system to ove the roof (oserve the roof protrusion prllel to the roof inlintion ding to lol regultions). lterntive flue pipes with uilding Regultion pprovl my e used, f exmple, if lrger pipe dimeter is required euse of greter flue length. In tht se, the perfmne verifition to EN 18 should e provided y the relevnt flue pipe mnufturer G 0 VIESMNN VITOLDENS, VITORONDENS
21 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Minimum internl shft dimensions to DIN V Externl dimeter; femle onnetion Minimum internl shft dimension squre retngulr round (sht side) mm (flexile) (flexile) Mx. numer of ends: 87º: pe 5º: pe 0º: pe 15º: pe The nnulr gp must e t lest m wide t the shft inlet. Flue, system size 80 nd 100 (omponents) (type to TRÖI 009) E Inspetion pt D onnetion piee = ¼ of the vertil length mx. m E Seondry ventiltion E D E Rted heting output (kw) up to 5. from.8 1 oiler flue onnetion (prt of the stndrd oiler delivery) Stndrd shft pk (PPs, rigid) omprising: Suppt end Suppt ril Shft over (PPs) Spers (5 pe, mx. lerne 5 m) Stndrd shft pk (metl/pps, rigid) F twin flue himneys; one flue f solid fuel oilers omprising: Suppt end Suppt ril Shft over (metl) Terminl pipe (stinless steel) Spers (5 pe, mx. lerne 5 m) Spers ( pe, mx. lerne 5 m) Pipe m long ( pe =.9 m) 1.95 m long (1 pe) 1 m long (1 pe) 0.5 m long (1 pe) Inspetion piee, stright (1 pe) end º (1 pe) 5º ( pe) 6 Ventiltion ezel (1 pe) end (f use in elled himneys) º ( pe) 15º ( pe) Inspetion tee 87º (1 pe) 80 Inspetion end 87º (1 pe) G Illustrtion with the Vitoldens 00- Ventiltion ir perture, min. 150 m 75 m Flue gs VITOLDENS, VITORONDENS VIESMNN 1
22 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Rted heting output (kw) lned flue ir inlet dpt Ø 80/15 mm F instlling the oiler with lned flue pipe up to the shft inlet in n instlltion room where the omustion ir is supplied vi interonneted rooms Stinless steel extension, 80 mm long f shft over, metl/pps, rigid Mx. totl flue length: 0 m up to from Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: onnetion pipe 0.5 m long: 0.5 m onnetion pipe 1 m long: 1 m end 5º: 0. m end 87º: 0.5 m Inspetion tee: 0. m The following omponents re tken into onsidertion f the mximum flue lengths: onnetion pipe D 0.5 m long. 1 end 87º nd 1 suppt end 87º ends 5º nd 1 suppt end 87º 58 5 G VIESMNN VITOLDENS, VITORONDENS
23 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Flue, flexile, system size 80 nd 100 (omponents) (type to TRÖI 009) E E D 8 1 E 5 Rted heting output (kw) up to 5. from.8 1 oiler flue onnetion (prt of the stndrd oiler delivery) Stndrd shft pk (PPs, flexile) omprising: Suppt end Suppt ril Shft over (PPs) Spers (5 pe, mx. lerne m) Stndrd shft pk (metl/pps, flexile) F twin flue himneys; one flue f solid fuel oilers. omprising: Suppt end Suppt ril Shft over (metl) Terminl pipe (stinless steel) Spers (5 pe, mx. lerne m) Spers (5 pe, mx. lerne m) Flue pipe, flexile, s m roll onnetion piee f onneting residul lengths of the flexile flue Pipe lowering tthment with 5 m rope 5 Inspetion piee, stright (1 pe) f instlltion into the flexile flue 6 Inspetion piee, stright (1 pe) Ventiltion ezel (1 pe) Pipe m long (1 pe) 0.5 m long (1 pe) 9 end º (1 pe) 5º ( pe) Inspetion end 87º (1 pe) 100 Inspetion tee 87º (1 pe) 80 Stinless steel extension, 80 mm long f shft over, metl/pps, flexile Mx. totl flue length: 18 m Illustrtion with the Vitoldens 00- Ventiltion ir perture, min. 150 m 75 m Flue gs Inspetion pt D onnetion piee = ¼ of the vertil length mx. m E Seondry ventiltion Note Instll the flexile flue with mximum offset of 5 from the vertil. The following omponents re tken into onsidertion f the mximum flue lengths: onnetion pipe D 0.5 m long. 1 end 87º nd 1 suppt end 87º ends 5º nd 1 suppt end 87º Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: onnetion pipe 0.5 m long: 0.5 m onnetion pipe 1 m long: 1 m end 5º: 0. m end 87º: 0.5 m Inspetion tee: 0. m 58 5 G.6 Plsti (PPs) flue pipe f routing the flue over externl wlls (type to TRÖI 009) The Vitoldens my lso e onneted, without shft, to flue pipe tht is routed over n externl wll. VITOLDENS, VITORONDENS VIESMNN
24 Design nd sizing infmtion f the Vitoldens 00-, -T, nd Vitondens 00-T, -F (ont.) Up to 5. kw: Internl flue dimeter: Ø 80 mm Internl dimeter, externl pipe: Ø 15 mm From.8 kw: Internl flue dimeter: Ø 100 mm Internl dimeter, externl pipe: Ø 150 mm 9 7 qp 7 m 5 1 Illustrtion with the Vitoldens 00- Ventiltion ir Flue gs Inspetion pt qq qw Rted heting output (kw) up to 5. from.8 1 oiler flue onnetion (Prt of the stndrd oiler delivery) Pipe m long ( pe of 1.95 m =.9 m) 1.95 m long (1 pe) 1 m long (1 pe) 0.5 m long (1 pe) Inspetion piee, stright (1 pe) end º (1 pe) 5º ( pe) 5 Wll ezel (1 pe) 80/15 100/150 6 lned flue pipe 80/ m long (1 pe) 1 m long (1 pe) 0.5 m long (1 pe) Externl wll pipe 100/ m long (1 pe) 1 m long (1 pe) 0.5 m long (1 pe) 7 lned flue end 87º (1 pe) 80/15 5º ( pe) 80/15 Externl wll end 87º (1 pe) 100/150 5º ( pe) 100/150 8 Fixing lmp, white (1 pe) 80/15 100/150 (F lned flue nd pipe f routing over externl wlls) 9 Externl wll terminl 80/15 100/150 F sht roof overhng qp Universl over plte 80/15 100/150 qq lned flue roof outlet outside wll, 80/15 100/150 with fixing lmp olour: lk terrott ove-roof extensions, m long re ville upon request qw Universl roof tile F Romn tiles, pntiles, plin tiles, slte 80/15 100/150 nd other types of roof olour: lk terrott Pipe outlet f Klöer roof tiles olour: lk terrott (provide the responding Klöer tile on site to mth the roof outlet seleted f the prtiulr type of roof) 80/15 Mx. totl length of the flue pipe Rted heting output kw t system temperture 50/0 Mx. length f system size Ø 80 mm m Mx. length f system size Ø 100 mm m The following omponents re tken into onsidertion f the mximum flue lengths: onnetion pipe D 0.5 m long. ends 87º ends 5º Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: onnetion pipe 0.5 m long: 0.5 m onnetion pipe 1 m long: 1 m end 5º: 0. m end 87º: 0.5 m Inspetion tee: 0. m 58 5 G VIESMNN VITOLDENS, VITORONDENS
25 Design nd sizing infmtion f the Vitoldens 00-W nd -F.1 Plsti (PPs) lned flue system f routing through shft with lned flue opertion (type 6x to TRÖI 009) F lned flue opertion, oxil flue (internl pipe f flue gs, externl pipe f omustion ir) is required s onnetion piee etween the oiler nd the shft. Internl flue dimeter: Ø mm Internl dimeter, ventiltion ir pipe: Ø mm The onnetion piee is fitted to the oiler flue onnetion nd must provide n inspetion pt. F instlltion through shfts hnnels with longitudinl ventiltion meeting the requirements f domesti himney stks to DIN V , with fire rting of 90 minutes (L90), fire rting of 0 minutes (L0) f uildings in tegies 1 nd (mx. steys). Pri to instlltion, the flue gs inspet should hek tht the shft to e used is suitle nd pproved f this purpose. Shfts tht were previously onneted to oil solid fuel oilers must e thoughly lened y himney sweep. Loose deposits (in prtiulr sulphur nd soot deposits) must not remin on the inside of the himney. If this is not possile, the ventiltion ir n e routed seprtely (see pge 1). lose off nd sel ny other onnetion pertures with pproprite mterils. This does not pply to ny lening test pertures tht re provided with himney lening overs nd to whih n pproprite test mrk hs een ffixed. hek pri to instlltion whether the shft runs stright from top to ottom if it is elled (hek with mirrs). If it is elled, we reommend the instlltion of flexile flue pipe (see pge 8). In the instlltion room, t lest one inspetion pt must e provided in the flue system f inspetion nd lening s well s f testing the pressure (if required). If the flue pipe is inessile from the roof, seond inspetion pt must e provided in the tti ehind the himney lening hth. Provide n inspetion pt t the se of the shft f heking the seondry ventiltion. Sfegurd the drining of the ondenste from the flue pipe to the oiler with fll of t lest º. The flue system must e routed to ove the roof (protrusion ove the roof ding to lol regultions). lterntive plsti flue pipes with uilding Regultion pprovl my e used, f exmple, if lrger pipe dimeter is required euse of greter flue length. The perfmne verifition to EN 18 should then e provided y the respetive flue mnufturer. If flue pipes other thn those offered s essies (whih re pproved with the Vitoldens s one tehnil unit) re used, the flue system must e heked f tightness y the flue gs inspet pri to ommissioning. This my e rried out, in dne with the flue system pprovl ertifite, y mesuring the O O vlue inside the nnulr gp. If this test results in O ontent of me thn 0. % n O ontent elow 0.6 %, hek the flue system. Internl shft dimensions Minimum shft dimensions to DIN V Note ding to the pprovl ertifite, redued lernes my lso e seleted, if this is indited y the perfmne verifition to EN 18 (not pplile to flexile flue pipes). Externl dimeter; femle onnetion Minimum internl shft dimension squre retngulr round (sht side) mm (flexile) (flexile) G VITOLDENS, VITORONDENS VIESMNN 5
26 Design nd sizing infmtion f the Vitoldens 00-W nd -F (ont.) Redued internl shft dimensions Externl dimeter; femle onnetion Redued internl shft dimension squre retngulr round (sht side) mm Minimum dimension of shfts in whih flue my e used (positive pressure opertion) without seprte lultion. Flue, system size 60/100 nd 80/15 (omponents) (type 6x to TRÖI 009) D Ventiltion ir Flue gs Inspetion pt D onnetion piee oiler flue onnetion (prt of the stndrd oiler delivery) nd lned flue dpt Ø 80/15 mm to Ø 60/100 mm Stndrd shft pk (PPs, rigid) omprising: Suppt end Suppt ril Shft over (PPs) Spers (5 pe, mx. distne 5 m) Stndrd shft pk (metl/pps, rigid) F twin flue himneys; one flue f solid fuel oilers. omprising: Suppt end Suppt ril Shft over (metl) Terminl pipe (stinless steel) Spers (5 pe) 60/100 80/15 60 Spers ( pe, mx. distne 5 m) Flue pipe 1.95 m long ( pe =.9 m) 1.95 m long (1 pe) 1 m long (1 pe) 0.5 m long (1 pe) Flue end (f use in elled himneys) 0º ( pe) 15º ( pe) Inspetion piee, stright (1 pe) lned flue inspetion piee, stright (1 pe) Wll ezel Ø 15 mm lned flue pipe 1 m long 0.5 m long lned flue end 87º (1 pe) 5º ( pe) lned flue inspetion end 87º (1 pe) lned flue slide oupling Fixing lmp, white (1 pe) Stinless steel extension (Metl/PPs, rigid) 80 mm long f shft over, metl/pps, rigid 58 5 G 6 VIESMNN VITOLDENS, VITORONDENS
27 Design nd sizing infmtion f the Vitoldens 00-W nd -F (ont.) Mx. totl length of the flue up to the oiler flue onnetion Rted heting output kw 1.9/ /.5 t system temperture 50/0 Mx. length f system size 60/100 m 16 9 Mx. length f system size 80/15 m 7 11 The following omponents re tken into onsidertion f the mximum flue lengths: lned flue onnetion pipe D 0.5 m long. 1 lned flue end 87º nd 1 suppt end 87º lned flue ends 5º nd 1 suppt end 87º Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: lned flue onnetion pipe 0.5 m long: 1 m lned flue onnetion pipe 1 m long: m lned flue ends 5º: 0.5 m lned flue ends 87º: 1 m lned flue inspetion tee: 1.5 m Vitoldens in onjuntion with solid fuel oilers See pge G VITOLDENS, VITORONDENS VIESMNN 7
28 Design nd sizing infmtion f the Vitoldens 00-W nd -F (ont.) Flue, flexile, system size 60/100 nd 80/15 (omponents) (type 6x to TRÖI 009) 1 9 qp D Ventiltion ir Flue gs Inspetion pt D onnetion piee 5 1 oiler flue onnetion (prt of the stndrd oiler delivery) nd lned flue dpt Ø 80/15 mm to Ø 60/100 mm Stndrd shft pk (PPs, flexile) omprising: Suppt end Suppt ril Shft over (PPs) Spers (5 pe, mx. distne m) Stndrd shft pk (metl/pps, flexile) F twin flue himneys; one flue f solid fuel oilers. omprising: Suppt end Suppt ril Shft over (metl) Terminl pipe (stinless steel) Spers (5 pe, mx. distne m) 60/100 80/15 60 Spers (5 pe, mx. distne m) Flue pipe, flexile, s roll m onnetion piee F onneting residul lengths of the flexile flue pipe Pipe lowering tthment With 5 m rope Inspetion piee, stright (1 pe) 5 F instlltion into the flexile flue pipe lned flue inspetion piee, stright 6 (1 pe) Wll ezel 7 Ø 15 mm lned flue pipe 8 1 m long 0.5 m long lned flue end 9 87º (1 pe) 5º ( pe) lned flue inspetion end 87º (1 pe) qp lned flue slide oupling Fixing lmp, white (1 pe) Stinless steel extension (Metl/PPs, flexile) 80 mm long f shft over, metl/pps, flexile Note Instll the flexile flue with mximum offset of 5 from the vertil. Mx. totl length of the flue up to the oiler flue onnetion Rted heting output kw 1.9/ /.5 t system temperture 50/0 Mx. length f system size 60/100 m 16 9 Mx. length f system size 80/15 m 7 11 The following omponents re tken into onsidertion f the mximum flue lengths: lned flue onnetion pipe D 0.5 m long. 1 lned flue end 87º nd 1 suppt end 87º lned flue ends 5º nd 1 suppt end 87º 58 5 G 8 VIESMNN VITOLDENS, VITORONDENS
29 Design nd sizing infmtion f the Vitoldens 00-W nd -F (ont.) Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: lned flue onnetion pipe 0.5 m long: 1 m lned flue onnetion pipe 1 m long: m lned flue ends 5º: 0.5 m lned flue ends 87º: 1 m lned flue inspetion tee: 1.5 m. Plsti (PPs) lned flue system f routing flues over n externl wll (type 5x to TRÖI 009) The Vitoldens my lso e onneted, without shft, to flue pipe tht is routed over n externl wll. The omustion ir is drwn in vi the ir inlet piee. The vertil outer pipe ts s protetion nd s therml insultion thnks to its stti ir gp. Internl flue dimeter: Ø mm Internl dimeter, externl pipe: Ø mm Vrious routing options re ville sujet to the length of pipe protruding ove the roof. The flue f routing over externl wlls hs een tested s onentri lned flue system s single tehnil unit with the Vitoldens ondensing oiler. perfmne verifition ding to EN 18 is not required G VITOLDENS, VITORONDENS VIESMNN 9
30 Design nd sizing infmtion f the Vitoldens 00-W nd -F (ont.) qq 1 9 qp 7 qw qp,0 m 5,5 m qe qr qq qp qq oiler flue onnetion (prt of the stndrd oiler delivery) nd lned flue dpt Ø 80/15 mm to Ø 60/100 mm lned flue inspetion end 87º (1 pe) lned flue inspetion piee, stright (1 pe) nd 60/100 80/15 60 lned flue end 87º (1 pe) lned flue end 5º ( pe) lned flue slide oupling lned flue pipe 1.95 m long 1 m long (1 pe) 0.5 m long (1 pe) Wll ezel (Ø 15 mm) Fixing lmp, white (1 pe) Externl wll pk omprising: lned flue end ir inlet piee Wll ezel Externl wll terminl (with low protrusion ove the roof) Universl over plte lned flue roof outlet (F lrge roof overhng) olour: lk terrott Universl roof tile olour: lk terrott Pipe outlet f Klöer roof tiles F Romn tiles, pntiles, plin tiles, slte nd other types of roof olour: lk terrott (provide the responding Klöer tile on site to mth the roof outlet seleted f the prtiulr type of roof) Flue gs Ventiltion ir Elow in the externl wll flue, see pge Mx. totl length of the flue up to the oiler flue onnetion Rted heting output kw 1.9/ /.5 t system temperture 50/0 Mx. length f system size 60/100 m 18 9 Mx. length f system size 80/15 m 1 19 Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: lned flue ends 5º: 0.5 m lned flue ends 87º: 1 m lned flue inspetion tee: 1.5 m x 87 lned flue ends re tken into onsidertion f the mximum flue lengths G 0 VIESMNN VITOLDENS, VITORONDENS
31 Design nd sizing infmtion f the Vitoldens 00-W nd -F (ont.). Plsti (PPs) flue gs/ventiltion ir system f seprte ventiltion ir nd flue gs routing (type 8x to TRÖI 009) The Vitoldens my e operted with seprtely routed flue gs nd ventiltion ir in lned flue mode, sujet to the flue system meeting the following onditions: onnetion to himney tht is unsuitle f providing the omustion ir supply euse of deposits. onnetion to moisture-resistnt himney. The omustion ir is then supplied through seprte ventiltion ir pipe tht is routed seprtely from the flue pipe. Oserve the design infmtion to TRÖI 009, point 5.6. Internl flue dimeter: Ø mm Internl dimeter, externl pipe: Ø mm Internl dimeter, ventiltion ir pipe: Ø 15 mm Mx. pipe length: onnetion piee: m Ventiltion ir pipe: m Mx. numer of ends (flue pipe nd ventiltion ir pipe): 87º: pe eh 5º: pe eh Instll n inspetion pt f heking nd lening the flue pipe. s prt of the E pprovl test, it ws verified tht no surfe tempertures on the Vitoldens its lned flue system will exeed 85. The flue system f seprte ventiltion ir nd flue gs routing hs een tested s single tehnil unit with the Vitoldens ondensing oiler. perfmne verifition ding to EN 18 f the ventiltion ir side nd the onnetion piees is not required. 7 m mm Ventiltion ir Flue gs Inspetion pt D onnetion piee E Ventiltion perture F Shft L90 L0 G Flue 5 D 5 E G F oiler flue onnetion (prt of the stndrd oiler delivery) nd lned flue dpt Ø 80/15 mm to Ø 60/100 mm lned flue pipe 1 m long 0.5 m long lned flue end 87º (1 pe) 5º ( pe) 60/100 80/15 60 lned flue slide oupling lned flue inspetion piee, stright (1 pe) lned flue tee 8 with wll ezels Ventiltion ir pipe Ø 100 mm 1 m long (my e trimmed to size) 0.5 m long (my e trimmed to size) Ventiltion ir end Ø 100 mm 87º (1 pe) 5º ( pe) Ventiltion ir dmper Fixing lmp, white (1 pe) (lned flue pipe) 58 5 G Note Where the flue pipe is routed through n existing himney shft (not moisture-resistnt), use flue pipe omponents ding to pge 6. Mx. totl length of the flue up to the oiler flue onnetion Rted heting output kw 1.9/ /.5 t system temperture 50/0 Mx. length f system size 60/100 m 18 9 Mx. length f system size 80/15 m The following omponents re tken into onsidertion f the mximum flue lengths: onnetion pipe D 0.5 m long. 1 end 87º nd 1 suppt end 87º ends 5º nd 1 suppt end 87º Sutrt other ends, tees nd extension piees from the mximum length using the following vlues: onnetion pipe 0.5 m long: 0.5 m onnetion pipe 1 m long: 1 m end 5º: 0. m end 87º: 0.5 m Inspetion tee: 0. m VITOLDENS, VITORONDENS VIESMNN 1
VIESMANN. VITODENS, VITOSOLAR Flue systems for gas condensing boilers up to kw. Technical guide. Vitodens and Vitosolar flue systems
VIESMNN VITODENS, VITOSOLR Flue systems f gs ondensing oilers up to 50.0 kw Tehnil guide Vitodens nd Vitosolr flue systems G 5/08 Index Index. Flue systems. Flue systems... 4 System ertifition... 4. Room
More informationStainless Steel Floor Channels - Standard Channel Product Tables
Stinless Steel Floor Chnnels - Stndrd Chnnel Produt Tles Hrmer Stinless Steel stndrd floor hnnels re used to drin wste wter from the floor nd dishrge it diretly in to the sewge system. The high qulity
More informationPF-PT N MEMBRANE FILTER ELEMENTS FEATURES & BENEFITS. Compressed Air & Process Filtration PF-PT N
PF-PT N MEMBRANE FILTER ELEMENTS Compressed Air & Proess Filtrtion The Donldson LifeTe PF-PT N filter element is sterile grde, pleted high performne PTFE memrne filter. It provides the gretest ssurne of
More information7 mm Diameter Miniature Single-Turn Cermet Trimmer
7 mm Dimeter Miniture Single-Turn Cermet Trimmer A dust seled plsti se proteting qulity ermet trk gurntees high performne nd proven reliility. Adjustments re mde esier y the ler sle redings. is idelly
More informationDesign+ Flooring Installation instructions for the patented installation system UNI fit!
Design+ Flooring Instlltion instrutions for the ptented instlltion system UNI fit! DUAL SEAL Neessry testing nd preprtion / Su-floors 1. Neessry testing nd preprtions EGGER's Design+ flooring is mnuftured
More informationBALANCED FLUE SYSTEMS YELLOW SYSTEM, WHITE SYSTEM, GREEN SYSTEM, RED SYSTEM CONVENTIONAL FLUE SYSTEMS ORANGE SYSTEM, GREEN SYSTEM, BLUE SYSTEM
GRNT EZ-FIT FLUE GUIDE ll Grant flues are now E mark approved Universal EZ-Fit Flue Systems to suit all Grant ondensing oiler Ranges LNED FLUE SSTEMS ELLOW SSTEM, WHITE SSTEM, GREEN SSTEM, RED SSTEM ONVENTIONL
More informationHigh strength fine grained structural steel, thermo-mechanically rolled, for high temperature application
P420M HT High strength fine grined structurl steel, thermo-mechniclly rolled, for high temperture ppliction Specifiction DH-E52-D, edition April 2016 1 P420M HT is high strength thermomechniclly rolled
More informationPP100 N ABSOLUTE DEPTH FILTER ELEMENTS FEATURES & BENEFITS. Process Filtration
PP100 N ABSOLUTE DEPTH FILTER ELEMENTS Proess Filtrtion Donldson LifeTe PP100 N filters re solute rted depth type filters onstruted of 100% polypropylene. They ontin grded density polypropylene mirofier
More informationPES-BN ABSOLUTE MEMBRANE FILTER ELEMENTS FEATURES & BENEFITS. Process Filtration
PES-BN ABSOLUTE MEMBRANE FILTER ELEMENTS Proess Filtrtion The Donldson LifeTe PES-BN filter element is sterile grde rted, pleted high performne polyethersulfone memrne filter. It provides the gretest ssurne
More informationE112b.de. REVO 25 Variant. Access panel for wall and ceiling systems. Drywall Systems. Product Data Sheet
Note on English trnsltion / Hinweise zur englischen Fssung This is trnsltion of the technicl dt sheet vlid in Germny. All stted detils nd properties re in complince with the regultions of the Germn stndrds
More informationGuide 3: INSULATING CONCRETE FORMWORK (ICF) BUILDING LOW CARBON HOMES. Richards Partington Architects
Guide 3: INSULATING CONCRETE FORMWORK (ICF) ommissioned y: www.zeroronhu.org written y: Rihrds Prtington Arhitets www.rprhitets.o.uk in ssoition with: www.onreteentre.om Copyright Rihrds Prtington Arhitets
More informationTechnical data Sliding door fittings
M e t l A p p l i c t i o n s Technicl t Sliing oor fittings L o n g - l s t i n g q u l i t i y f o r h n g i n g n o t t o m - r u n n i n g o o r s Steel rollers n c st iron sliing oor rollers Contents
More informationDeveloper Services Construction Details
Developer Services onstruction Details pproved details Developer Services Detail 1 Manhole Type 1 Developer Services Detail 2 Manhole Type 2 Developer Services Detail 3 Manhole Type 4 Developer Services
More informationModel 3500 Transmitter (MVD) or Model 3300 Peripheral
Quik Referene Guide P/N 20000993, Rev. B August 2005 Model 3500 Trnsmitter (MVD) or Model 3300 Peripherl Instlltion Instrutions for Rk-Mount For tehnil support, phone the support enter nerest you: In the
More informationTotal Rewards: Vacation, Sick and Personal Leave for Full Time Employees
POLICY: 6Hx28:3D-03 Responsible Exeutive: Vie President, Orgniztionl Development & Humn Resoures Poliy Contts: Diretor, HR Poliy nd Compline Progrms Speifi Authority: 1001.61, F.S. Lw Implemented: 1001.64,
More informationSKYPORT HANGAR LOTS 8A & 9A PGA ARCHITECTS W E T A S K I W I N A L B E R T A SECTION AA HANGAR ONE SECTION BB. NOTE Heating - hydronic in-floor system
9'-0" SETION 80'-0" 8'-0" 4'-0" 11'-7" 6. 2x8 col. 7'-0" 60'-0" 38' x 8, x 4" conc apron 12.5M @ 16" e/w 2x10 @ 16" o.c. (with 1" fall) NOTE See elevations for windows at upper level 24'-0" future location
More informationOperation installation
Series Self-sution Type Non-logging Sewge Pump Opertion instlltion Plese refully red the opertion instrutions efore use of the produt. CONTENTS Generl, Rnge of pplition 01 Model mening, Aout the struture
More informationThe method of setting of heat consumption standard for buildings
The method o setting o het onsumption stndrd or buildings Levtsev Alexey Pvlovih Dotor o Tehnil Sienes Proessor Hed o Deprtment «Het nd Power Systems» Ntionl Reserh Mordovi Stte University o Srns 68 Bolshevistsy
More informationThermofoil PRO. Installation Guide YOUR STEP-BY-STEP GUIDE TO THE PERFECT INSTALLATION
PLESE ENSURE YOU HVE RED ND FULLY UNDERSTOOD THIS GUIDE EFORE INSTLLTION Thermofoil PRO Installation Guide YOUR STEP-Y-STEP GUIDE TO THE PERFET INSTLLTION TFPIG INSTLLTION GUIDE: THERMOFOIL PRO Thank you
More informationARGUS LEVEL REED. L520S ARGUS INDUSTRIAL & ATEX Exia VERTICAL REED LEVEL SWITCH FEATURES REED LEVEL
ARGUS LEVEL REED L520S ARGUS INDUSTRIAL & ATEX Exi VERTICAL REED LEVEL SWITCH This rnge of mgnet operted reed swithes re equipped with hermetilly seled reed ontts. The flot is fitted with n nnulr mgnet
More informationHigh efficiency walls & windows: High efficiency envelope: d,e
High efficiency walls & windows: High efficiency envelope: d,e High efficiency ceiling, windows & duct sealing: (annot be used with onservation Measure E) d,e b > ² High efficiency thermal envelope U:
More informationGRANT CLEARANCE FOR BALANCED FLUES. Ref Position mm
LNCED FLUE TERMINL POSITIONS CLERNCE FOR LNCED FLUES Ref Position mm elow a gutter or sanitary pipework *600 Horizontally from a door 600 C bove ground or balcony level 300 D elow gutters, eaves or balcony
More informationAPI6A MATERIAL SERVICE CATEGORIES & RATING LEVELS
ADELAIDE BRISBANE PERTH API6A MATERIAL SERVICE CATEGORIES & RATING LEVELS OVERVIEW STANDARDS Austrlin Pipeline Vlve (APV) stndrds comply with technicl specifiction API-6A. The description for APV equipment
More informationFeatures PAGE 1-2. Wide Range Restrained End Cap
www.romac.com 1-800-426-9341 RESTRINED JOINT RESTRINED JOINT Features PGE 1-2 Wide Range Restrained oupling ORIGINLLY RELESED IN THE SUMMER OF 2013, THE OUPLING INSTLLS IN OUT THREE MINUTES, ND OMMODTES
More informationReturn Temperature in DH as Key Parameter for Energy Management
Interntionl OPEN ACCESS Journl Of Modern Engineering Reserch (IJMER) Return Temperture in DH s Key Prmeter for Energy Mngement Normunds Tlcis 1, Egīls Dzelzītis 2, Agnese Līckrstiņ 2 *JSC Rīgs siltums
More informationBOWDEN planter. Street Design Limited Unit 35 Hayhill Industrial Estate Barrow upon Soar Leicestershire LE12 8LD
UK street furniture designers & mnufturers BOWDEN plnter As UK sed, designers nd mnufturers, Street Design n mnufture nd supply the Bowden, wethering steel, modulr plnters, to suit your speifi requirements.
More informationTABLE OF CONTENTS. Product Specification Sheet Basic Use Limitations Composition & Materials Technical Data Availability Guarantees Technical Services
TLE OF ONTENTS Product Specification Sheet asic Use Limitations omposition & Materials Technical Data vailability Guarantees Technical Services MEZ onnection Systems MEZ S Series Flanges MEZ I Series Flanges
More information6" MIN. GREEN INLET MARKER LOCATION CARTWAY STANDARD PENNDOT PRECAST CONCRETE INLET BOX GREEN HIGHWAY GRATE INLET
10'-0" CUR RESTORTION (TYP.) CUR PLCED ON TOP OF CTCH SIN STNDRD CUR 6" MIN. 1. LOCTE PIPE OPENINGS TO PROVIDE MINIMUM 4" OF CONCRETE ETWEEN TOP OF INLET OX ND TOP OF PIPE OPENING. (PENNDOT RC-46M). CUR
More informationSIDE ELEVATION SCALE: 1/4" = 1'-0" COMP. SHINGLES ON 15# FELT ALL 12/12 ROOF AREAS W/ CONT. RIDGE VENT HARDI LAP SIDING 6" EXPOSURE
/ ROOF RES W/ METL RIN P VINYL WINOWS T HEER HTS NOTE LL EXTERIOR OPENINGS TO E FLSHE " EXPOSURE W/ METL ORNERS OOR & WINOW TRIMS X PRE-PRIME SPRUE FLSH S ETILE WINOW & OOR HEER EXPOSE X POST '-0" FINISH
More informationSolatube SkyVault Series
Soltue SkyVult Series Soltue M74 DS Dylighting System Instlltion Instrutions Prts List Quntity Pre-Assemled Roof Assemly Options * (1) 1. M74 DS Single Dome Roof Assemly with Insulted Cur Cp Flshing *
More informationservice bulletin B.M.W. D190/D150 Models Overheating Check for Internal Engine Cooling Problems: Check The Following Points First:
servie ulletin TO: SERVICE MANAGER TECHNICIANS PARTS MANAGER B.M.W. D190/D150 Models Overheting The models listed ove re B.M.W. prodution for whih MerCruiser is responsile for servie. When experiening
More informationHORIZONTAL SLIDER - LARGE MISSILE IMPACT
HORIZONTL SLIDER - LRGE MISSILE 36" MX. SSH WIDTH GLSS DLO 7 /" WIDTH 7" MX. UNIT WIDTH GENERL NOTES:. THE PRODUCT SHOWN HEREIN IS DESIGNED ND MNUFCTURED TO COMPLY WITH THE FLORID UILDING CODE (FC), CURRENT
More informationAddress of Project: For Office Use Only. Customer Use
CHECKSHEET: SINGLE RESIDENTIAL DWELLING AND ACCESSORY BUILDING Inluding single stnd-lone dwellings, dwelling dditions nd/or ltertions, re-piling, grges, deks, gzeos, sheds, retining wlls et. Kpiti Cost
More informationElectrostatic vs covalent bond in modified Jeffamine: effect on the phase behaviour and on the templating of mesoporous silica
Eletroni upplementry Mteril (EI) for oft Mtter This journl is The Royl oiety of Chemistry 3 upporting Informtion Eletrostti vs ovlent ond in modified Jeffmine: effet on the phse ehviour nd on the templting
More informationICID Plus NEW mm Diameter Range Twin Wall Insulated System Chimney for Gas, Oil, Wood and Multi-fuel WARRANTY!
IID Plus mm Diameter Range Twin Wall Insulated System himney for Gas, Oil, Wood and Multifuel NEW now with LIFETIME WRRNTY! IID LIT SP Version 1 940002164 June 2017 Part of the RS MONIER UILDING GROUP
More informationIntrinsically Safe Industrial Measuring Probes for Humidity, Temperature, and Derived Variables
Delivery ddress: Mckenrodtstrße 14 36039 Fuld, Germny Postl ddress: 36035 Fuld, Germny Fx: +49 661 6003-607 Emil: mil@jumo.net Temple Bnk, Riverwy Hrlow, Essex CM 20 2DY, UK Fx: +44 1279 62 50 29 Emil:
More informationTable 2(a) Description of quantified economy-wide emission reduction target: base year a
Tle 2() Desription of quntified eonomy-wide emission redution trget: se yer Prty Bse yer /se period Emission redution trget Period for rehing trget % of se yer/se period % of 1990 Reporting y developed
More information6.1 Damage Tolerance Analysis Procedure
6. Dmge Tolernce Anlysis Procedure For intct structure the nlysis procedures for Slow Crck Growth nd Fil Sfe structure re essentilly the sme. An initil flw is ssumed nd its growth is nlyzed until filure
More informationMR405: Response of Young Black Spruce (Picea mariana (Mill.) B.S.P.) to a Mixture of Wood Ash and Secondary Papermill Sludge
The University of Mine DigitlCommons@UMine Misellneous Reports Mine Agriulturl nd Forest Experiment Sttion -997 MR45: Response of Young Blk Sprue (Pie mrin (Mill.) B.S.P.) to Mixture of Wood Ash nd Seondry
More information2016 Prelim Essay Question 2
216 Prelim Essy Question 2 In recent yers, the price of nturl fertilisers for orgnic brown rice production hs risen nd helthy living cmpigns re seeing more consumers switching from nonorgnic white rice
More informationAnnex. BAT conclusions for the Intensive Rearing of Poultry or Pigs
Ref. Ares(2015)3810877-15/09/2015 Annex BAT conclusions for the Intensive Rering of Poultry or Pigs 1.2 BAT conclusions for the intensive rering of pigs 1.2.1 Ammoni emissions from n niml house for pigs
More informationH. Randall Smith; Ph.D. Agronomy and Wayne Porter: Ph.D. Horticulture Mississippi State University Extension Service
Effect of SumGrow on growth, development nd yield of Irish pottoes (Solnum tuerosum) t the Beumont Reserch Sttion (Mississippi Stte University) during 217 H. Rndll Smith; Ph.D. Agronomy nd yne Porter:
More informationWeld Procedure and Welder Qualification Subcommittee Minutes of Meeting January 2017
Weld Proedure nd Welder Qulifition Suommittee Minutes of Meeting Jnury 2017 Attendne 40 Committee voting memers 15 Numer of Suommittee memers 25 Quorum ws estlished 1. Review of ITG meeting disussions
More informationTECHNICAL DATA TECHNICAL DATA CARBON & 410 STAINLESS STEEL 8-18 SELF-DRILLING DIMENSIONAL PROPERTIES A
TEHNIL DT RON & 410 STINLESS STEEL 8- SELF-DRILLING 10-16 SELF-DRILLING Head cross Flats.4 -.250 Major Diameter.161 -.166 Minor Diameter.116 -.1 Stress rea.00983 in. 2 TEHNIL DT FOR LELND VERGE VLUES SEE
More informationCORRELATION BETWEEN MELT POOL TEMPERATURE AND CLAD FORMATION IN PULSED AND CONTINUOUS WAVE ND:YAG LASER CLADDING OF STELLITE 6
Proceedings of the st Pcific Interntionl Conference on Appliction of sers nd Optics 4 CORREATION BETWEEN ET POO TEPERATURE AN CA FORATION IN PUSE AN CONTINUOUS WAVE N:YAG
More informationREFER TO PAVEMENT PATCHING DETAIL FOR REQUIREMENTS ABOVE FINISHED SUBGRADE EL. FIN. SUBGRADE ELEV. (DEPTH VARIES) BACKFILL DEPTH >14'
REFER TO PVEMENT PTCHING DETIL FOR REQUIREMENTS BOVE FINISHED SUBGRDE EL. MXIMUM LLOWBLE WIDTH OF PVEMENT PTCH, SEE MESUREMENT ND PYMENT SECTION OF SPECIFICTIONS REFER TO PVEMENT PTCHING DETIL FOR REQUIREMENTS
More informationLaboratory Plant for Studies Regarding the Behaviour of the Sintered Materials in Oxygen Isotopic Distillation
6th IASME/WSEAS Interntionl Conference on HEAT TRANSFER, THERMAL ENGINEERING nd ENVIRONMENT (HTE'08) Lortory Plnt for Studies Regrding the Behviour of the Sintered Mterils in Oxygen Isotopic Distilltion
More informationFeatures PAGE 1-2. Wide Range Restrained End Cap
RESTRINED JOINT RESTRINED JOINT Features PGE 1-2 Wide Range Restrained oupling ORIGINLLY RELESED IN THE SUMMER OF 2013, THE OUPLING INSTLLS IN OUT THREE MINUTES, ND OMMODTES UP TO 8 DEGREES OF DEFLETION
More informationSINGLE HUNG - LARGE MISSILE IMPACT
- LRGE MISSILE GENERL NOTES: 1. THE PRODUCT SHOWN HEREIN IS DESIGNED ND MNUFCTURED TO COMPLY WITH THE FLORID UILDING CODE (FC), CURRENT EDITION INCLUDING THE HIGH VELOCITY HURRICNE ZONE (HVHZ) ND IS RTED
More informationRetroceptor CHECKED DO NOT SCALE DRAWING
NOTES: UNER-THE-SINK GRESE INTEREPTOR. FOR GRVITY FLOW PPLITIONS ONLY. INSTLL IN ORNE WITH MNUFTURERS INSTRUTIONS. 3" NOMINL POLY PIPE STU INLET N OUTLET. ONNET INLET N OUTLET TO RIN PIPING USING FLEXILE
More informationOUTLET STANDARD: PDI-G 101 MANUFACTURER: GREEN TURTLE MODEL NO: RC-50 FLOW RATE: 50 GPM GREASE CAPACITY: 100 LBS INLET SIZE: 4.5 INCHES 24.
NOTES: UNER-THE-SINK GRESE INTEREPTOR. FOR GRVITY FLOW PPLITIONS ONLY. INSTLL IN ORNE WITH MNUFTURERS INSTRUTIONS. 4" NOMINL POLY PIPE STU INLET N OUTLET. ONNET INLET N OUTLET TO RIN PIPING USING FLEXILE
More informationCORROSION PROTECTION
SERVICE MANUAL NUMBER 28 Torque Speifitions................ 7A-2 Lurints / Selnts / Adhesives..... 7A-2 Speil Tools........................ 7A-2 Generl Informtion.................. 7A-4 Continuity Ciruit....................
More informationBEFORE THE CHRISTCHURCH REPLACEMENT DISTRICT PLAN INDEPENDENT HEARINGS PANEL. (Submitter 3397)
EFORE THE HRISTHURH REPLEMENT DISTRIT PLN INDEPENDENT HERINGS PNEL IN THE MTTER of the Resource Management ct 99 ('the ct') ND IN THE MTTER of the Proposed Replacement District Plan Natural and Historic
More informationThree-Phase Wound-Rotor Induction Machine with a Short- Circuited Rotor
Exercise 1 Three-Phse Wound-Rotor Induction Mchine with Short- Circuited Rotor EXERCISE OBJECTIVE When you hve completed this exercise, you will know how three-phse woundrotor induction mchine cn operte
More informationCITY of DALLAS. Standard Drawings. & Oregon Standard Drawing Amendments. Curbs, Sidewalks and Driveways Drawings
CITY of DLLS Standard Drawings & Oregon Standard Drawing mendments Curbs, s and Driveways Drawings RD700 () - Curbs RD720 () - s RD745 () - lternate Driveway Detail RD750 () - Standard Driveway Detail
More informationJob Description. Senior Lecturer. Electronic & Electrical Engineering. Education and Research. Head of Department/Group. Any research staff/students
Jo Desription Jo title Deprtment/Shool Jo fmily Senior Leturer Eletroni & Eletril Engineering Edution nd Reserh Grde 9 Reporting to Responsile for Lotion Hed of Deprtment/Group Any reserh stff/students
More informationIII. Adhesion Quality of Tin Plating on Aluminum: Thermal Shock and Adhesion Tests
Dt Bulletin Therml Aging Study of Tin Plting on Aluminum 0108DB0602 02/2007 Cedr Rpids, IA, USA Bell Chudnovsky* Vinent Pvgeu + Mihel Rpeux + Ali Zolfghri* Pierre Brdollet + *) Shneider Eletri North Ameri
More informationReport No
Certificte of Authoriztion 984 _ CREEK 175 Edinburgh Dr Tmp, FL 647 TECHNICAL SERVICES, LLC FLORIDA BUILDING CODE 5H EDITION (14) EVALUATION REPORT Mnufcturer: (81) 480-41 SHEFFIELD METALS INTERNATIONAL
More informationSTYLE 6039 CAN I/O MODULE INSTALLATION, OPERATION & MAINTENANCE MANUAL
STYLE 6039 N I/O MODULE INSTLLTION, OPERTION & MINTENNE MNUL 124860 TLE OF ONTENTS. SFETY SUMMRY... 3 PRODUT SPEIFITIONS... 4 6039 N I/O MODULE.... 4 INSTLLTION INSTRUTIONS... 4 TOOLS & MTERILS REQUIRED...
More informationFerrite EMI Cable Cores
Ferrite EMI able ores TLOGUE OUT LIRD TEHNOLOGIES Laird Technologies designs and manufactures customized, performance-critical products for wireless and other advanced electronics applications. The company
More informationICID Plus NEW mm Diameter Range Twin Wall Insulated System Chimney for Gas, Oil, Wood and Multi-fuel GUARANTEE!
IID Plus mm Diameter Range Twin Wall Insulated System himney for Gas, Oil, Wood and Multifuel NEW now with LIFETIME GURNTEE! IID LIT SP Version 2 940002164 September 2017 Part of MI Group Product Description
More informationElectromagnetic Interference Solutions
Ferrite EMI able ores Electromagnetic Interference Solutions Innovative Technology for a onnected World OUT LIRD TEHNOLOGIES Laird Technologies designs and manufactures customized, performance-critical
More informationGREEN SEAL S LINEAR FLUORESCENT LUMINAIRES
R E P O R T L SEPTEMBER OCTOBER 2000 LINEAR FLUORESCENT LUMINAIRES ighting energy use ounts for out qurter or more of the estimted one trillion kwh of energy yerly expended y the US ommeril nd industril
More informationPOSH BRISTOL TORBEX SHOWER BASE
page of imensions are nominal measurements only. SPEIFITIONS Recommended Use Material omestic, hotel and commercial Torbex High Strength omposite imensions mm x mm x 9mm mm x mm x 9mm 0mm x mm x 9mm mm
More informationBRICK LINTELS. ~2 cm STRETCHER COURSE BRICKWORK MOUNTING OF LINTELS UP TO 2 M BRICK LINTELS STRETCHER COURSE BRICKWORK
BRICK LINTELS STRETCHER COURSE BRICKWORK BRICK LINTELS STRETCHER COURSE BRICKWORK Lintel consist of t lest three courses of bricks bonded with mortr. The first course of bricks, ech verticl joint, hs nchors
More informationInstallation Instructions for Trantorque Keyless Bushings
Instlltion Instrutions for Trntorque Keyless Bushings A Trntorque Keyless Bushing offers flexile n esy instlltion while proviing exeptionl holing power. Referring to the series, plese follow these Instlltion
More informationSection 1 F Welding of Hull Structures Chapter 3 Page 1 5
II - Prt 3 Section 1 F Welding of Hull Structures Chpter 3 Pge 1 5 8. For welding of ustenitic stinless steels to one nother nd to hull structurl steels, welding consumbles nd uxiliry mterils shll be selected
More informationHigh performance, low cost thermoplastic coatings for dishwasher baskets and other domestic appliances
Applinces High performnce, low cost thermoplstic cotings for dishwsher bskets nd other domestic pplinces Low mteril prices, excellent customer service Introduction Plscot is the world leder in thermoplstic
More informationThermocouple temperature sensor omnigrad S TSC-266
Technicl informtion TI 248T/02/en 60017796 Thermocouple temperture sensor omnigrd S TSC-266 Thermometer with EEx d certifiction Lmintion nipple nd/or 3 elements coupling Thermowell mde from metl br The
More informationTHE ASHTON RETAIL FOR LEASE
THE SHTON RETIL FOR LESE 490 EL MINO REL, BELMONT, 9400 PROPERTY RENDERINGS MRKET ERIL HIGHWY 0-33,000 DT EL MINO REL - 33,000 DT RLSTON VENUE - 38,000 DT PROPERTY SUMMRY PROPERTY PROFILE vailable Space:
More informationRTD temperature sensor omnigrad S -TST 266
Technicl informtion TI 249T/02/en 60018851 RTD temperture sensor omnigrd S -TST 266 Thermometer with EEx d certifiction Lmintion nipple nd/or 3 elements coupling Thermowell mde from metl br The Omnigrd
More informationEffect of Dispersed Phase Particle Dispersion on the Thermal Stability of Recycled Poly(ethylene terephthalate)/polypropylene Blend
Effet of Dispersed Phse Prtile Dispersion on the Therml Stility of Reyled Poly(ethylene terephthlte)/polypropylene Blend Yew Wei Leong 1*, Hiroyuki Inoy 2, Supphorn Thumsorn 1 nd Hiroyuki Hmd 1 1 Deprtment
More information15V530AD-DC DRAWN BY DATE CHK SCALE SIZE
THIS COPY IS PROVIDED ON RESTRICTED SIS ND IS NOT TO E USED IN NY WY DETRIMENTL TO THE INTERESTS OF PNDUIT CORP. SLIDING DOORS MID-SPN POST END OF ROW CP INFORMTION NEEDED TO CONFIGURE UNIVERSL ISLE CONTINMENT
More informationSteels used in braking systems
Steels use in rking systems A report A mterils engineer is require to prepre report on the seletion of plin ron steels for use in the proution of vrious omponents for rke mnufturing ompny. Portions of
More informationSTRUCTURAL DESIGN CRITERIA
STRUTURL DESIGN RITERI 1) THE UILDING ODE REQUIREMENTS FOR 2012 INTERNTIONL UILDING ODE IS THE SI ODE DOUMENT USED IN THE PREPRTION OF THESE STRUTURL DOUMENTS. 2) -1ENGINEERING DESIGNED THE FOUNDTION FOR
More informationSUPPLEMENTARY INFORMATION
doi:10.1038/nture10924 no tg Lsm1-my Lsm2-my Lsm5-my Lsm6-my Lsm7-my Lsm8-my no tg Lsm1-my Lsm2-my Lsm5-my Lsm6-my Lsm7-my Lsm8-my kd 220 120 100 80 60 50 40 30 20 SeeBlue Mrker Mgi Mrk no tg Sm1-my Smd3-my
More informationA Fast Heuristic Scheduling Algorithm for Periodic ConcurrenC Models
A Fst Heuristi Sheduling Algorithm for Periodi ConurrenC Models Weiwei Chen nd Riner Doemer Center for Emedded Computer Systems University of Cliforni, Irvine Outline Introdution nd Relted Work ConurrenC
More informationChapter 16 Redox chemistry and corrosion
Worked solutions to textook questions 1 Chpter 16 Redox hemistry nd orrosion Q1. Identify eh of the following hlf equtions s involving either oxidtion or redution: N(s) N + (q) + e Cl 2 (g) + 2e 2Cl (q)
More informationConservation Tillage Strategies For Corn, Sorghum And Cotton
(93%) cotton nd percent lint ws similr in oth pickers. The 15-inch row system with 27 plnts/a gve higher lint yield (1491 l/a) compred to 4-inch row cotton with 5 plnts/a (136 l/a). Plnt cnopy closed 3
More informationTRENCH DETAILS MAXIMUM ALLOWABLE TRENCH WIDTH REFER TO STD. DWG. T-4 AND T-4A, SECTION 4.28 AND 4.29 FOR PAVEMENT RESTORATION DETAILS. (MIN.
UNTRVELLED RES TRVELLED RES MXIMUM LLOWBLE TRENCH WIDTH d/2+375+h/10 d/2+375+h/10 100 REFER TO STD. DWG. T-4 ND T-4, SECTION 4.28 ND 4.29 FOR PVEMENT RESTORTION DETILS. REFER TO SECTION 4.27 FOR SURFCE
More informationInstallation Guide. Tile Me Shower Bases
Instlltion Guide Tile Me Shower ses Thnk You For Choosing Vlley Acrylic We strive to provide the interntionl bth mrket with new nd innovtive bthroom products mnufctured to the highest stndrds. Locted in
More informationSuspended ceiling with visible T-sections
Suspended eiling with visible T-setions a E E E max. 300 mm a m Hanger spaing 1 Hanging system: Rihter System 11.2 D 2 E C 26 C Main setion spaing E A Suspended eiling with visible T-setions Produts Table
More informationfloating floor treatments
OUSTI FLOORING SYSTEMS 30, K30, 40 & 60 The versatile cradle and systems with unique, patented, recycled, rubber crumb cradles comply with Robust Detail FFT2. Widely used where Pre-ompletion Testing is
More information16" O.C. 1/2" COUPLER. PT 2x4 SILL PLATE. 4" CONC. SLAB W/ 6X6, W1.4 x W1.4 WWM (3) #5 CONT. 1' - 8"
5 SLOPE DN. ' - 6" 9' - 0" " ON. SL W/ 6x6, W.xW. WWM 6 MIL VPOR RRIER SMOOTH TROWEL " ON. SL W/ 6x6, W.xW. WWM 6 MIL VPOR RRIER SMOOTH TROWEL 6' - 5" 6' - " 6' - 5" 8' - " 6' - 8" 5' - 0" " ON. SL W/
More informationSilver-Tin Oxide. (Ag/SnO²)
Silver-Tin Oxide (Ag/SnO²) Silver Tin oxide (Ag/SnO² ) mterils. speterts or other rights of third prties re concemend. The informtion descries the type of mteril nd shll not e considered s ssured chrcteristics.
More informationTRENCH 1. CLAY WALL EXTENDS A MINIMUM OF 1'-0" INTO UNDISTURBED SOIL ON EACH SIDE AND ON BOTTOM OF TRENCH.
TRENCH ' ' CLY ERTH MTERIL PIPELINE 2 FT. OR S DETERMINED BY GEOTECHNICL ENGINEER LIMITS OF TRENCH '-0" PIPELINE LIMITS OF CLY CUT-OFF WLL ' 3' O-RING OR WTERSTOP GSKET REQUIRED WITH PVC PIPE NOTES:. CLY
More informationRELEASE 4/2/ A BODY INSTL-WINDOWS & VENTS WINDOW ASM-ATWOOD A WINDOW ASM-SE-GI A SCREW 0G (20)
8 7 6 4 2 RELESE REV DTE DWG NO 7069 094 WINDOW SM-TWOOD 64922-6-0 WINDOW SM-SE-GI 786-9-0 0G08-2-400 (20) REV ZONE REVISION REORD DTE DFTR-ORIG D 094 WINDOW SM-TWOOD 0469-8-0 WINDOW SM-SE-GI 786--0 0G08-2-400
More informationHAND HELD CALIBRATOR SUPPLEMENTAL. for Use in. Environments REVISION /18/14 LOOK FOR THESE MARKS ON OUR PRODUCTS I&M /14
HND HELD LIRTOR SUPPLEMENTL MNUL for Use in Hazardous Environments REVISION 0.4 06/18/14 LOOK FOR THESE MRKS ON OUR PRODUTS 1 I&M002-10212-06/14 2 Includes warnings and installation drawings for using
More informationMACROSCOPIC INVESTIGATIONS OF THE PRIMARY STRUCTURE OF CONTINUOUS CASTING INGOTS
Act Metllurgic Slovc, Vol. 20, 2014, No. 2, p. 146-151 146 MACROSCOPIC INVESTIGATIONS OF THE PRIMARY STRUCTURE OF CONTINUOUS CASTING INGOTS Zdzisłw Kudliński 1), Krystin Jniszewski 2)* 1) Silesin University
More information1. Supplementary Figures and Legends a b
doi:10.1038/nture09540 1. Supplementry Figures nd Legends Supplementry Figure 1. Scnning trnsmission electron microgrphs (STEM) of NCC., STEM prepred from fst evportion of dilute NCC suspension shows individul
More informationImpacts of Fe-Based Amorphous HB1 Core Transformers on Energy Efficiency and Environment Protection
Impcts of Fe-Bsed Amorphous HB1 Core Trnsformers on Energy Efficiency nd Environment Protection Chng-Hung Hsu, b, Yeong-Hw Chng Electricl Engineering, Chng Gung University, To-Yun, Tiwn, R.O.C. b Electric
More informationSINGLE-STAGE ELECTROMAGNETIC ELEVATOR MODELLING IN FEMM SOFTWARE
8th Interntionl DAAAM Blti Conferene "INDUSTRIAL ENGINEERING - 19-21 April 2012, Tllinn, Estoni SINGLE-STAGE ELECTROMAGNETIC ELEVATOR MODELLING IN FEMM SOFTWARE Lpkovskis, V., Mironovs, V. Astrt: In present
More informationISO 6947 INTERNATIONAL STANDARD. Welding and allied processes Welding positions. Soudage et techniques connexes Positions de soudage
Provläsningsexemplr / Preview INTERNATIONAL STANDARD ISO 6947 Third edition 2011-05-15 Welding nd llied processes Welding positions Soudge et techniques connexes Positions de soudge Reference number ISO
More informationHigh-voltage electric pulse welding of magnetic cores made of rings of magnetic soft alloy 49K2FA
IOP Conference Series: Mterils Science nd Engineering PAPER OPEN ACCESS High-voltge electric pulse welding of mgnetic cores mde of rings of mgnetic soft lloy 49K2FA To cite this rticle: A V Yudin et l
More informationSLIDING GLASS DOOR - NON-IMPACT
48 5/8" PNEL WIDTH 48 5/8" PNEL WIDTH 95 /2" OVERLL 93" PNEL SLIDING - O 45 OVERLL WIDTH 90.25 OVERLL WIDTH X X O 4 /2" GLSS DLO 4 /2" GLSS DLO C 85 /8" GLSS DLO 95 /2" OVERLL WIDTH 48 5/8" PNEL WIDTH
More informationFibre-reinforced plastic composites Declaration of raw material characteristics Part 4: Additional requirements for fabrics
CEN/TC 249 N493 Dte: 2010-02 pren xxxx-4:2010 CEN/TC 249 Secretrit: NBN Fibre-reinforced plstic composites Declrtion of rw mteril chrcteristics Prt 4: Additionl requirements for fbrics Einführendes Element
More informationDESIGN AND FLOW MODELLING OF BALLAST TANK IN-LINE EJECTOR
DESIGN AND FLOW MODELLING OF BALLAST TANK IN-LINE EJECTOR 1 Constntin DUMITRACHE, 2 Corneliu COMANDAR, 3 Bogdn HNATIUC 1,3 Mritime University of Constnt, Romni, 2 Ghe. Aschi Technicl University of Isi,
More informationSHEAR STRENGTH OF CONCRETE-ENCASED COMPOSITE STRUCTURAL MEMBERS
SHEAR STRENGTH OF CONCRETE-ENCASED COMPOSITE STRUCTURAL MEMBERS By C. C. Weng, 1 S. I. Yen, 2 nd C. C. Chen 3 ABSTRACT: This study investigtes the sher strength of omposite steel nd onrete members in whih
More information