1 Project Number: C Building Number: C11000 Fire Station #11 Grounds Background: The finish of the fire hose drying tower is peeling and the tower exhibits some corrosion. Scope: Prepare and repaint hose drying tower. Assumptions: Priority: 1 Project Description: Prepare & Paint Hose Drying Tower 1 Prepare and paint hose drying tower $2,000 Total: $2,000 Priority 1
2 Project Number: C Building Number: C11000 Fire Station #11 Grounds Project Description: Repair Dumpster Fence Background: The wood fencing that surround the dumpster area located in front of the fire station duplexes has some broken slats and a corner post is leaning a good deal. Scope: Remedy the leaning section of wood fencing and replace broken slats. Assumptions: 1 Repair wood fence $400 Total: $400
3 Project Number: C Building Number: C Fire Station #11 Grounds Project Description: Repair Asphalt Parking Lot Background: The asphalt parking lots in the front and back of the fire station exhibit significant degradation. The front parking lot shows extensive alligator cracking and raveling. The back parking lot has alligator cracking and a cracked and broken curb. Full depth reclamation of the parking lots is recommended. Scope: Perform full depth reclamation, seal coat and restripe parking lot asphalt. Assumptions: Priority: 1 8,900SF Full depth reclamation $83, LF Restripe $200 Total: $84,100 Priority 1
4 Project Number: C Building Number: C Fire Station #11 Project Description: Repair & Paint Exterior Background: The painted wood board between the two metal louvers on the back side of the building is degrading at the surface. The landing exhibits surface failure and the paint of the steps is peeling. The painted exterior wood door at the landing is blistered and peeling and is lacking a complete seal around the frame. Also, some of the wood soffit panels are unfinished or have peeling paint and small areas of the stucco are blistering and cracking. Lastly, the entrance door is in need of weatherstripping at the base and an outside electrical outlet should be replaced. Scope: Repair and paint louver trim board, wood stairs, landing, wood exterior door, wood soffit panels, and stucco siding. Install weatherstripping under the front door and replace outside electrical outlet. Assumptions: Priority: 1 1 Repair stairway, stucco siding, wood soffit panels, and trim board and paint exterior $90,000 1 Replace second-floor exterior wood door and outside electrical outlet and install weatherstripping under front door $1,300 Total: $91,300 Priority 1
5 Project Number: C Building Number: C Fire Station #11 Project Description: Repair Miscellaneous Interior Issues Background: There are a number of small areas inside the building that are in need of minor to moderate repairs. The threshold of the men s restroom of the first floor has come loose and needs to be reattached with preparatory work done to the joint. The men s restroom sink on the left hand side needs caulking and the adjacent wood of the counter has begun to warp, possibly as a result of this. An electrical fixture and outlet lack covers and the wood ceilings of the second floor have some water spots. Scope: Repair men s restroom threshold and counter. Caulk the sinks, install covers to electrical fixture and outlet, and repair wood paneled ceiling. Assumptions: 1 Prepare and reattach threshold $300 1 Repair wood counter and caulk sink $300 1 Repair wood paneled ceiling and put covers on electrical fixture and outlet $500 Total: $1,100
6 Project Number: C Building Number: C Fire Station #11 Project Description: Clean Carpet & Repair Interior Walls h Background: The carpet on the second floor is dirty and stained, but has no noticeable damage. There are a number of problems with the drywall, mainly on the second floor where there are some stress cracks and unfinished remodeling to the walls. Left undone in the remodeling are sections of drywall that need painting and an area of exposed framing. Scope: Clean carpet, patch cracked and damaged drywall, install surface covering to exposed framing, and paint areas in need. Assumptions: 1 Clean carpet and prepare drywall $700 1 Install covering to exposed areas of framing and paint drywall $1,000 Total: $1,000
7 Project Number: C Building Number: C11000 Fire Station #11 Project Description: Investigate Roof Leaks Background: The wood paneled ceiling has water stains at several locations which raise concerns about the roof having multiple leaks. Scope: Thoroughly inspect the roof for leaks and make necessary repairs. Assumptions: Cost of repairs to the roof will be estimated after the extent of required repair is determined. Priority: 1 1 Inspect roof for leaks $400 Total: $400 Priority 1
8 Project Number: C Building Number: C12001 Fire Station #12 Project Description: Clean Efflorescence & Seal Brick Wall Background: A considerable amount of efflorescence has developed on the interior of the generator room s brick walls. Scope: Clean efflorescent build-up utilizing chemicals and seal brick walls. Assumptions: No structural issues exist. 1 Remove efflorescence and seal brick walls $800 Total: $800 Priority 1
9 Project Number: C Building Number: C12001 Fire Station #12 Project Description: Inspect Building s Structure & Replace Roof Background: Wood rot and damage was seen that indicates leaking and possible termite problems in the garage bay roof. The roof should be replaced. Also,kfkqa ridge beam appears to be sagging slightly and there are stress cracks in the drywall of the firehouse. A thorough inspect of the buildings structure should be carried out in order to make certain that there are no serious problem developing within the structure. Scope: Replace asphalt roof and inspect wood framing of the fire station. Assumptions: Priority: 1 lot Inspect building s structure and replace asphalt roof $38,000 Total: $38,000 Priority 1
10 Project Number: C Building Number: C13000 Fire Station #13 Grounds Project Description: Grounds Asphalt Driveways and Parking Lots Background: The parking lots and asphalt driveways of some of the Fire Station #31 Grounds exhibit signs of deterioration past the point of seal coating. These include raveling, alligator cracks and linear cracks in excess of ½. Some cracks are interconnected forming small pieces of asphalt 6 or less in size. Scope: Clean and prepare the surface. Cut out severely deteriorated sections and repair. Perform 2 inch mill-and-overlay. Assumptions: The sub-base is sufficient to support excessive strain of large vehicle loads. Priority: SF Repair including 2 inch mill-and-overlay $25, LF Striping $300 Total: $25,300 Priority 1
11 Project No.: C Building Number: C13001 SB Fire Station #13 Engine House Background: Interior drywall replaced and never finished. Project Description: Patch, Prep and Paint Interior Drywall Scope: Make walls finished by patching and painting or taping, floating, painting. Assumptions: None Lot Finish interior drywall where painting matches surrounding areas Total: $600
12 Project No.: C Building Number: C13001 SB Fire Station #13 Engine House Background: Some of windows allowing water penetration. Seal and prep and paint. Scope: Seal leaking windows and prep and paint around windows. Assumptions: None Project Description: Seal windows to prevent leaking. Patch and re-paint. Lot Inspect all windows, seal water leaks in windows and prep and paint Total: $400
13 Project No.: C Building Number: C13001 SB Fire Station #13 Engine House Background: New exterior door installed. Removed stucco to install. Replace stucco and paint to match existing. Scope: Install stucco and paint to match existing or provide painted molding to hide missing stucco. Assumptions: None Project Description: Finish with installation of new exterior door. Lot Patch and paint stucco to match existing Total: $300
14 Project No.: C Building Number: C13001 SB Fire Station #13 Engine House Background: A sewer gas smell is coming from more than one bathroom. Identify problem and replair. Scope: Identify why sewer gas smell in bathrooms and repair. Assumptions: None Project Description: Identify and repair problem arising from sewer gas smell in multiple bathrooms. Lot ID and repair to remove sewer gas smell. 1, Total: $1,400
15 Project No.: C Building Number: C13001 Fire Station #13 Project Description: Paint Interior and replace carpeting. Background: Interior walls can t be cleaned and carpeting needs replacement. Scope: Paint interior and replace carpeting. Assumptions: None. lot Paint interior and replace carpeting. $26, Total: $26,800
16 Project No.: C Building Number: C13001 Fire Station #13 Project Description: Paint Exterior Background: Exterior needs cleaning up and painting. Scope: Pressure wash and paint exterior. Assumptions: None. lot Pressure wash and paint exterior. $91, Total: $91,000
17 Project No.: C Building Number: C13002 SB Fire Station #13 Generator Shed Background: Exterior wood trim paint is peeling. Prep and re-paint. Project Description: Prep and paint exterior wood trim Scope: Prep and paint exterior wood trim. Assumptions: None Lot Sand, prep and paint exterior wood trim Total: $200
18 Project Number: C Building Number: C14000 Fire Station #14 Grounds Project Description: Repair Asphalt Pavement Background: There are two areas of asphalt pavement located on the grounds. The parking lot on the west side of Fire Station #14 is roughly 4,800 square feet and shows block cracking and spalling. The recommended treatment for this parking lot is 2 inch mill-and-overlay. About 8,500 square feet of the larger parking lot is also part of the grounds and has fatigue cracking with a section of upheaval caused by tree roots. A thin HMA overlay and full depth patching for the section of upheaval is recommended for this pavement. Both pavements will need restriping as well. Scope: Use 2 inch mill-and-overlay for west parking lot asphalt pavement. Apply an HMA overlay and partial depth patch east parking lot. Restripe both parking lots. Assumptions: 4,800SF 2 inch mill $1,500 4,800SF 2 inch HMA overlay $28,700 8,500SF Thin HMA overlay $6, SF Full depth patch $1, LF Stripe $300 Total: $38,000 Priority 1
19 Project Number: C Building Number: C14001 Fire Station #14 Project Description: Fill Cracks in Concrete Pavements Background: The concrete apron in front of the garage and the walkway that surrounds the building have cracks that need to be filled. There are also two joints in the walkway that show heaving. These joints should be ground down so that they are no longer a tripping hazard. Scope: Fill cracks in concrete apron and walkway of Fire Station #14. Grind down heaving concrete joints. Assumptions: Priority: 1 30LF Fill cracks in concrete pavement $400 2 Repair heaving concrete joints $200 Total: $600 Priority 1
20 Project Number: C Building Number: C14001 Fire Station #14 Grounds Project Description: Repair Wood Fence Background: The fence at the east side of the building has partially rotten and damaged railing and panels. Patching and additional minor repairs are needed. Sections of the fence should be repainted as well. Scope: Prepare, patch, make minor repairs, and repaint areas of wood fence. Assumptions: 1 Prepare, patch, make minor repairs, and paint fence $400 Total: $400
21 Project Number: C Building Number: C14001 Fire Station #14 Project Description: Replace Composition Roof Background: The composition roof shingles are worn, peeling, and there are leaks. The entire roof should be replaced. Scope: Replace asphalt shingle roof. Assumptions: Priority: 1 2,900SF Replace asphalt shingle roof $32,100 Total: $32,100 Priority 1
22 Project Number: C Building Number: C14001 Fire Station #14 Project Description: Replace Condenser Background: The 3.5-ton condenser behind the building is aging, but appears to be in fair condition. It will need to be replaced in 5-7 years. Scope: Replace 3.5-ton condensing unit. Assumptions: 1 Replace 3.5-ton condensing unit $3,000 Total: $3,000
23 Project Number: C Building Number: C14001 Fire Station #14 Project Description: Replace Wood Exterior Door Background: The exterior door to the garage has water damage and finish failure. This door should be replaced with a painted steel door. Scope: Replace flush wood door with a painted steel exterior door. Assumptions: 1 Replace exterior wood door with painted steel door $900 Total: $900
24 Project No.: C Building Number: C13001 Fire Station #14 Project Description: Paint Exterior Background: Exterior needs cleaning up and painting. Scope: Pressure wash and paint exterior. Assumptions: None. lot Pressure wash and paint exterior. $26, Total: $26,800
25 Project No.: C Building Number: C13001 Fire Station #14 Project Description: Replace Carpet. Background: Carpet beyond cleaning and repair. Scope: Replace carpeting. Assumptions: None. lot Replace carpeting. $26, Total: $26,800
26 Project Number: C Building Number: C14001 Fire Station #14 Project Description: Repair Wood Exterior & Replace Gutters Background: The station s wood siding has small area of damage and the paint appears old. The wood siding and trim should have repairs done and be given a fresh coat of paint. There are also issues with the building s metal gutters, which will need to be replaced. In addition to this, the exterior door to the garage has water damage and finish failure. This door should be replaced with a painted steel door. Scope: Repair and paint entire wood exterior and replace steel gutters. Replace flush wood door with a painted steel exterior door. Assumptions: lot Repair and paint exterior walls and replace steel gutters $6,000 1 Replace exterior wood door with painted steel door $800 Total: $6,800
27 Project Number: C Building Number: C14001 Fire Station #14 Project Description: Replace Carpeting Background: The carpeting of the fire station is dirty and worn. The baseboards also have some surface damage. All of the carpet should be replaced ant the baseboard should be repaired and repainted. Scope: Replace all carpeting and prepare and paint baseboard. Assumptions: lot Replace carpeting and prepare and paint baseboard $3,500 Total: $3,500
28 Project Number: C Building Number: C14002 Fire Station #14 Generator House Project Description: Replace Double Door Background: The building s louvered double door has holes and other damage. The door should be replaced so that the generator is fully protected from the elements. Scope: Replace louvered wood double door. Assumptions: Priority: 1 1 Replace louvered wood double door $700 Total: $700 Priority 1
29 Project No.: C Building Number: C15000 Fire Station #15 Grounds Project Description: Crack Seal, Surface Coat & Surface Seal Background: The site comprises asphalt pavement consisting of approximately 7,500 square feet. See pictures below. Scope: The treatment recommendation is a crack seal, surface coat and surface seal. Assumptions: None 1000lf Crack Seal $ ,500sf Surface Coat/Surface Seal $14, Total: $15,500
30 Facility Condition Assessment 4 Project No.: C Building Number: C15001 Fire Station #15 Project Description: Patch and paint stucco settling cracks. Background: A few minor settling cracks in the stucco exterior. Scope: Patch and paint stucco settling cracks. Assumptions: Will be able to blend in paint with existing. Lot Patch and paint stucco settling cracks. $ Total: $500
31 Project No.: C Building Number: C15001 Fire Station #15 Project Description: Re-finish door Background: Door s paint has peeled off. Scope: Re-finish door surface. Both sides. Assumptions: None Lot Patch and paint stucco settling cracks. $ Total: $200
32 Project No.: C Building Number: C15001 Fire Station #15 Project Description: Replace beams of pergola on front and sides. Background: Exterior exposed wood is rotting due to dry rot and/or termite damage. Scope: Replace exposed wood beams and posts surrounding building. Assumptions: None. lot Replace exposed wood beams and posts surrounding building. $37, Total: $37,500
33 Project No.: C Building Number: C15001 Fire Station #15 Project Description: Roof replacement or replace missing or broken tiles. Background: Many Spanish Tiles are broken or missing. Scope: Roof replacement if necessary or replace missing or broken tiles. Assumptions: None. lot Roof replacement if necessary or replace missing or broken tiles. $16, Total: $16,100
34 Project No.: C Building Number: C18000 Fire Station #18 Grounds Project Description: 2 mill HMA Overlay and Crack Seal, Surface Coat & Surface Seal Background: The site comprises asphalt parking and pavement consisting of approximately 31,175 square feet. See pictures below. Scope: The front can get by with a Surface Coat and Surface Seal. The back will need the 2 HMA Overlay. Assumptions: None 13,125sf 2 mill $4, ,125sf 2 mill HMA Overlay $78, ,050sf Surface Coat/Surface Seal $35, lf Stripping $ Total: $118,100
35 Project No.: C Building Number: C18000 Fire Station #18 Grounds Project Description: Replace water tanks and all piping. Background: Water no longer being used as drinking water. One tank is rusting and other also not safe to drink from. Scope: Replace water tanks, piping and pumps to Fire Station. Assumptions: None Lot Replace water tanks, piping and pumps to Fire Station. $8,500, Total: $8,500,000
36 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Prep and paint rusting metal surfaces. Background: A few areas of exposed metal surfaces that are rusting. Scope: Prep and paint metal surfaces where rust is showing. Assumptions: None Lot Prep and paint rusted metal surfaces. $2, Total: $2,200
37 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Clean Carpets. Background: Carpets have stains and built in dirt. Scope: Professionally clean carpets. Assumptions: None Lot Professionally clean carpets. $ Total: $600
38 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Drywall Patch & Paint Background: Area where drywall missing and area that need patching and painting. Scope: Patch and paint drywall. Assumptions: None Lot Patch and paint drywall. $ Total: $200
39 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Replace light fixtures with low wattage. Background: Light fixtures in hallway of dorms can t be turned off. The bulbs are too hot and burn a hole in the light cover lenses. Scope: Replace with fixtures that use lower wattage bulbs. Assumptions: None Lot Replace with fixtures that use lower wattage bulbs. $1, Total: $1,400
40 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Move water bottles to different location. Background: 5 Gallon water bottles are being stored where main electrical service is also located. Bottles located right next to Electrical Service. Scope: Move water bottles to a different location away from electrical service. Assumptions: This is a safety hazard Priority: 1 Lot Move water bottles to a different location away from electrical service. $0.00 Total: $0 Priority 1
41 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Repair or replace kitchen cabinet doors. Background: Kitchen sink cabinet is damaged. Scope: Repair or replace kitchen cabinet doors. Assumptions: Not all need to be replaced. Lot Repair or replace damaged kitchen cabinet doors. $ Total: $800
42 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Replace damaged exterior light fixtures and parking lights due to corrosion. Background: Most of the exterior light fixtures are corroded from the ocean moisture. Scope: Replace damaged exterior light fixtures and damaged parking lights. Assumptions: None. lot Replace damaged exterior light fixtures and damaged parking lights. $37, Total: $37,500
43 Project No.: C Building Number: C18001 Fire Station #18 Project Description: Paint Exterior Background: Most of the exterior needs painting due to corrosion from the ocean moisture. Scope: Paint Exterior. Assumptions: None. lot Paint Exterior. $69, Total: $69,600
44 Project No.: C Building Number: C18003 Fire Station Gen/Storage Bldg. Background: A few areas of exposed metal surfaces that are rusting. Project Description: Prep and paint rusting metal surfaces. Scope: Prep and paint metal surfaces where rust is showing. Assumptions: None Lot Prep and paint rusted metal surfaces. $ Total: $700
45 Project No.: C Building Number: C18003 Fire Station Gen/Storage Bldg. Background: The wood structure needs to be painted. Project Description: Prep and paint wood surfaces. Scope: Sand, prep and paint wood surfaces. Assumptions: None Lot Sand, prep and paint wood surfaces. $1, Total: $1,100
46 Project No.: C Background: Drywall on ceiling needs repair. Building Number: C18003 Fire Station Gen/Storage Bldg. Project Description: Repair and paint drywall. Scope: Repair, patch and paint drywall. Assumptions: None Lot Repair, patch and paint drywall. $ Total: $400
47 Project No.: C Building No.: C21000 Fire Station # 21 Grounds Project Description: Repair/Rebuild Retaining Wall Background: The retaining wall wrapping around the West, North and East end of the property is failing. Scope: Remove failing portions of the wall and rebuild with 4 foot high wall, waterproofed with proper drainage. Assumptions: None. Priority: LF Labor and material to demo existing, construct 4' wall, backfill void $32,400 Total Cost $32,400 Priority 1
48 Project No.: C Building No.: C Fire Station #21 Grounds Background: The asphalt parking area on Gray Street is cracked, weathered. Project Description: Repair and Resurface Gray St Parking Scope: Repair and resurface approximately 2,200 square feet of asphalt paving on the East side (Gray Street) of Station 21. Assumptions: 200 SF Labor and material to repair and resurface 2,200 square feet of asphalt paving $2,800 Total: $2,800
49 Project No.: C Building No.: C21000 Fire Station # 21 Grounds Project Description: Remove Unused Fire Hose Drying Tower Background: Fire hose drying tower/rack is unused and posing a liability issue. Scope: Remove hardware at the top of the poles, remove poles and fill holes. Assumptions: None. Priority: 1 Qty Description Budgetary Cost Lot Labor and material to remove hardware and poles, backfill holes $1,000 Total Cost $1,000 Priority 1
50 Project No.: C Building No.: C21001 Fire Station 21 Building Project Description: Repair Damaged Roof Structure, Replace Roof Background: Roof is degraded and leaking. Fascia boards and rafter tails are dry rotted and infested with termites and acoustic ceiling tile show evidence of leaks. Scope: Repair damaged wood roof structure elements, install 1" polyiso roof board and 60 mils, 0,40 psf EDPM cool roof on entire building. Assumptions: Majority of roof structure is in good condition. Priority: 1 Qty Description Total Cost Lot Demo old roofing material, repair damaged structural elements, install flashing, polyiso board, EDPM roofing (mechanically fastened), $70,000 Total Cost $70,000 Priority 1
51 Priority 1
52 Project No.: C Building No.: C Fire Station #21 Building Project Description: Replace Damaged Ceiling Tile Background: The roof has leaked in the past, damaging some acoustic ceiling tile in the office, kitchen and other living spaces. Scope: Remove and replace approximately 150 square feet of 5/8 inch acoustic ceiling tile after the roofing is replaced. Assumptions: Replacement tile of similar style/pattern as existing can be obtained. 200 SF Labor and material to replace 150 square feet of 5/8 inch acoustic ceiling tile $300 Total: $300
53 Project No.: C Building No.: C Fire Station #21 Building Project Description: Install New Protective Floor Coating in Apparatus Bay Background: The epoxy flooring in the Apparatus Bay is damaged, with the epoxy chipping and flaking in numerous areas throughout the space. Scope: Grind floor to remove all damaged epoxy, fill cracks and install approximately 1,800 square feet of textured polyaspartic floor coating. Assumptions: 1,800 SF Labor and material to install approx 1,800 SF of textured polyaspartic flooring $31,700 Total: $31,700
54 Project No.: C Building No.: C Fire Station #21 Building Project Description: Replace Apparatus Bay Space Heating Unit Background: The Reznor heating unit is aging with an LCR of 4-6 years. The unit exhibits corrosion and should be replaced before failure. Scope: Remove and replace the existing unit heater with a properly sized natural gas-fired infrared heater. Assumptions: The replacement unit will be of similar size, weight and capacity. 1 Natural gas-fired infrared heating unit plus installation labor $1,800 Total: $1,800
55 Project No.: C Building No.: C21001 Fire Station # 21 Project Description: Install Weathertight Rollup Door in Air Room. Background: The rollup door to the Air Room allows water penetration and flooding of the adjacent Day Room during heavy storms. This causes damage to the carpet in the Day Room as well as the opportunity for mold/fungus growth. Scope: Replace the rollup door or provide adequate sealing to deter water penetration. Assumptions: Lot Labor and material to remove existing door and install weathertight rollup door $900 Total Cost: $900
56 Project No.: C Building No.: C Fire Station #22 Grounds Project Description: Mill/Overlay/Restripe Parking Lot Background: The asphalt paving comprises approximately 5,550 square feet of the site and exhibits edge cracking, longitudinal cracking, raveling and weathering, exacerbated by over-irrigation drainage. Parking space stripping/handicap designation is in poor condition. Scope: The treatment recommendation for this parking lot is HMA mill and overlay of 2 inches. This treatment should address the cracking and weathering distress. The parking lot will also need to be restriped. Assumptions: Lot drainage is adequate. 5,500 SF 2 inch Mill $800 5,500 SF 2 inch HMA Overlay $30, LF Striping $400 Total: $31,500
57
58 Project No.: C Building No.: C Fire Station #22 Project Description: Replace Damaged Barge Rafters/Header Facings on South Side of Building Background: The barge rafters and door header facings over the Apparatus Bay doors on the South side of the buildings are damaged from ultra violet exposure and should be replaced. Scope: Replace approximately 225 lineal feet (LF) of 2x8 barge rafters and 25 LF of 2x10 door header facing and paint to match existing. Assumptions: Lot Labor and material to replace barge rafters and door header facings $2,900 Total: $2,900
59 Project No.: C Building No.: C Fire Station #22 Project Description: Replace Forced Air Furnace Background: The living space heating system has 5-7 years of life remaining and will then have to be replaced. Scope: Replace natural gas fired forced air heating system. Assumptions: The is no asbestos components in or connected to the furnace. Priority: 3 Lot Labor and material to replace natural gas-fired forced air furnace $1,500 Total: $1,500 Priority 3
60 Project No.: C Building No.: C Fire Station #22 Project Description: Regrout Ceramic Tile in Showers Background: The grout in the showers in both restrooms is opening at the wall and floor joints and needs to be cleaned out and regrouted. Scope: Clean all joints of old grout and scale, replace grout with matching colored grout, seal. Assumptions: Tile in the field is not loosed from thinset base. Lot Labor and material to clean and regrout ceramic tile in showers $500 Total: $500
61 Project No.: C Building No.: C Fire Station #22 Vehicle Garage Project Description: Replace Space Unit Heater with Infrared Heater Background: The ceiling mounted space heating unit in the Apparatus Bay is aging with an LCR of 4-6 years. The unit should be replaced before failure. Scope: Remove and replace the existing unit heater with a properly sized natural gas-fired infrared heater. Assumptions: The replacement unit will be of similar weight and capacity. 1 Natural gas-fired infrared heating unit plus installation labor $1,800 Total: $1,800
62 Project Number: C Building Number: C Fire Station #23 Grounds Project Description: Mill/Overlay/Restripe Parking Lot Background: The asphalt paving comprises approximately 7,650 square feet of the site and exhibits edge cracking, longitudinal cracking, raveling and weathering. Scope: The treatment recommendation for this parking lot is HMA mill and overlay of 2 inches. This treatment should address the cracking and weathering distress. The parking lot will also need to be restriped. Assumptions: Lot drainage is satisfactory. 7,650SF 2 inch Mill $2,500 7,650SF 2 inch HMA Overlay $42,100 1,000LF Striping $500 Total: $45,100
63
64 Project No.: C Building No.: C Fire Station #23 Storage Building Project Description: Repair Foam Tender Enclosure Gate Background: Foam tender enclosure gate is sagging due to hinges failing and possibly corner fence post loosening and unable to carry weight of gate, which is now stuck and difficult to open Scope: Replace fence corner post with steel tubing in 4 feet of concrete. Replace gate hinges and hardware with heavy duty gear. Repaint Assumptions: Priority: 1 Lot Heavy duty fencing hardware, material, steel, post, labor $2, Total: $2, Priority 1
65 Project No.: C Building No.: C Fire Station #23 Vehicle Garage Project Description: Replace Space Heating Unit w/infrared Heater Background: The Reznor heating unit is aging, with an LCR of 4-6 years. The unit exhibits corrosion and should be replaced before failure. Scope: Remove and replace the existing unit heater with a properly sized natural gas-fired infrared heater. Assumptions: The replacement unit will be of similar size, weight and capacity. 1 Natural gas-fired infrared heating unit plus installation labor $1,800 Total: $1,800
66 Project No.: C Building No.: C23001 Fire Station #23 Vehicle Garage Project Description: Replace Fiberglas Skylights Background: Fiberglass skylights in apparatus bay are of original construction and are cracked from ultraviolent light. Replacement is recommended to ensure water tightness and availability of natural light. Scope: Remove and replace 14 skylights. Assumptions: Priority: 3 14 Labor and material to replace 14 corrugated translucent fiberglass panels $3,400 Total: $3,400 Priority 3
67 Project No.: C Building No.: C Fire Station #23 Vehicle Garage Project Description: Replace Damaged Roof Insulation Background: Roof insulation cover is damager, exposing fiberglass. Replacement is recommended in 1-3 years. Scope: Remove and replace roof insulation in the vehicle garage. Assumptions: None Lot Remove and replace insulation $16,100 Total: $16,100
68 Project No.: C Building No.: C Fire Station #23 Station House Project Description: Install Water Softener on Main Water Supply Background: Fire Station 23 obtains its water for the local water district, whose supply is primarily well water. This water is very hard and quickly scales faucets and shower heads. The firemen have replaced one shower head with a "brush nozzle" after replacing two shower heads in four months due to scale. Scope: Replace warped, damaged trim, prep and paint building exterior. Assumptions: None. Lot Labor and material to install a water softener on main water supply $2,700 Total: $2,700
69 Project No.: C Building No.: C Fire Station #23 Storage Building Project Description: Repair Wood Trim, Paint Building Exterior Background: The Storage Building exterior has a couple of warped and/or damaged wood trim pieces and the siding is in need of a protective coat of paint. Scope: Replace warped, damaged trim, prep and paint building exterior. Assumptions: None. Lot Labor and material to replace/repair trim, prep and paint bldg exterior $1,900 Total: $1,900
70 Project Number: C Building Number: C24000 Fire Station #24 Grounds Project Description: Grounds Asphalt Driveways and Parking Lots Background: The parking lots and asphalt driveways of all the Fire Station #24 Grounds exhibit signs of deterioration past the point of seal coating. These include raveling, alligator cracks and linear cracks in excess of ½. Some cracks are interconnected forming small pieces of asphalt 6 or less in size. Scope: Clean and prepare the surface. Cut out potholes and severely deteriorated sections and repair. Install 2 top coat. Assumptions: The sub-base is sufficient to support excessive strain of large vehicle loads. Priority: SF Apply Top Coat and Repair Damaged Areas $50,000 Total: $50,000 Priority 1
71 Project No.: C Building Number: C24000 Fire Station #24 Grounds Project Description: Retaining Wall Needed Background: During the assessment, the firemen explained how a retaining wall is needed to keep erosion of land into the river basin at the edge of the property. During rainy season, the small cliff erodes into the basin and a retaining wall is needed. Firemen have been using random items to stop erosion. Scope: Install a retaining wall. Assumptions: 300 LF Install a 8 Cast-in-Place Retaining Wall $132,000 Total: $132,000
72 Project No.:C Building Number: C24000 Fire Station #24 Grounds Project Description: Prepare and Paint Fire Hose Drying Tower Background: The fire hose drying tower is exhibiting peeling paint and substantial corrosion. Painting is recommended to ensure the structural integrity and prolong the life of the tower. Scope: Prepare and paint the entire tower. Assumptions: A lift will be necessary to reach to the top of the tower. Priority: 1 1 Lift Rental $900 5 MH Prepare and Paint Tower $600 Total: $1,500 Priority 1
73 Project No.:C Building Number: C24001 Fire Station #24 Project Description: Steel Door Replacement Background: The steel door leading out of the back of the apparatus bay exhibits corrosion and needs to be replaced. Scope: Remove and replace the existing steel door. Assumptions: The steel door is beyond repair. 1 Removal and Replacement of Steel Door $850 Total: $850
74 Project No.:C Building Number: C24001 Fire Station #24 Project Description: Prepare and Paint Gas Lines and Generator Background: Gas lines around the building and the generator exhibit severe corrosion and need to be prepared and painted to avoid failure. Scope: Prepare and paint gas lines surrounding the building and the generator. Assumptions: 7 MH Prepare and Paint Gas Pipes and Generator (GS24) $500 Total: $500
75 Project No.:C Building Number: C24001 Fire Station #24 Project Description: Roof Needs Replacement Background: Roof is showing signs of corrosion and leaking. With an LCR of 1-2 years, a replacement is recommended in the near future. Scope: Remove and replace the existing roof. Assumptions: Lot Removal and Replacement of Metal Roof 3,440 SF 17,500 Total: $ 17,500
76 Project No.:C Building Number: C24001 Fire Station #24 Project Description: Linear Cracking and Faulting Concrete repairs. Background: Several instances of high severity for linear cracking in the concrete. Scope: Cut and patch. Assumptions: Lot Concrete repair 5,500 Total: $5,500
77 Project No.:C Building Number: C24001 Fire Station #24 Project Description: Interior patch and paint. Background: A few areas of patching and painting needed on interior. Scope: Patch and paint where needed on interior. Assumptions: Lot Patch and paint $ Total: $800
78 Project No.:C Building Number: C24001 Fire Station #24 Project Description: Interior electrical box covers Background: Electrical boxes in attic are missing covers. Possible fire hazard. Scope: Put electrical covers on electrical boxes. Assumptions: Priority: 1 Lot Install covers on electrical boxes. $ Total: $100 Priority 1
79 Project No.: C Building Number: C24001 Fire Station #24 Project Description: Rebuild wooden staircase in the apparatus bay. Background: Staircase in apparatus bay is not OSHA approved, undersized and unstable. Scope: Remove and rebuild staircase. Assumptions: None. lot Remove and rebuild staircase. $16, Total: $16,100
80 Project No.:C Building Number: C24001 Fire Station #24 Garage/Storage Background: Wood siding building. Several areas of structure that needs patching and painting. Scope: Patch and paint exterior. Assumptions: Project Description: Exterior wood patch and paint. Lot Patch and paint $ Total: $700
81 Project No.:C Building Number: C24001 Fire Station #24 Garage/Storage Background: It looks like the 4 vertical support beams on each corner has been rotted out at bottom. Scope: Replace rotten wood with new, seal to prevent further damage. Assumptions: Will cause patching and painting on inside and outside of building. Project Description: Exterior Support Posts repair Lot Repair vertical support posts. $ Total: $1,900
82 Project No.:C Building Number: C24001 Fire Station #24 Garage/Storage Background: A few areas of patching and painting plus installing electrical receptacle plates. Scope: Patch and paint. Install missing electrical plates. Assumptions: None Project Description: Miscellaneous patch, paint, electrical Lot Miscellaneous patch and paint on interior plus install missing plug plates. $ Total: $200
83 Project No.: C Building Number: C24004-Fire Station #24 Duplex Store Shed 1 Background: Exterior has multiple signs of wood rot. Project Description: Replace rotting wood Scope: Cut away damaged rafter tail and damaged wood and replace. Will have to redo part of roof. Assumptions: No wood damage extends to the bearing point of the roof rafters. lot Remove and Replace Damaged Wood. Will have to redo section of roof $4,800 Total: $4,800
84 Project No.: C Building Number: C24004-Fire Station #24 Duplex Store Shed 1 Background: Exterior needs to be repainted to protect wood. Project Description: Patch and Paint Exterior Scope: Patch and paint entire structure to protect Assumptions: This would be done after rotted wood replaced. lot Patch and paint entire structure $1,100 Total: $1,100
85 Project No.: C Building Number: C24005-Fire Station #24 Duplex Store Shed 2 Project Description: Patch and Paint Exterior Background: Exterior needs to be repainted to protect wood. Scope: Patch and paint entire structure to protect Assumptions: None lot Patch and paint entire structure $,400 Total: $400
86 Project No.: C Building Number: C24006-Fire Station #24 Duplex Project Description: Patch and Paint Exterior Background: Exterior needs to be repainted to protect wood. More time will be spent on Unit#2. Scope: Patch and paint entire structure to protect. Fill in holes in rafter end posts before painting. Assumptions: None lot Patch and paint entire structure $21,400 Total: $21,400
87 Project No.: C Building Number: C24006-Fire Station #24 Duplex Project Description: Replace vinyl floor tile with like product Background: Floor tile needs replacing in 3 rooms of Unit 2. Scope: Replace floor tiles with vinyl flooring. Assumptions: None lot Remove vinyl floor tiles and replace with vinyl flooring. $2, Total: $2,800
88 Project No.: C Building Number: C24007-Fire Station #24 Shop #2 Background: Exterior wood has not been painted. It is deteriorating Project Description: Prep and Paint Exterior Wood Scope: Prep and paint exterior wood Assumptions: None lot Prep and paint wood $400 Total: $400
89 Project No.: C Building Number: C24007-Fire Station #24 Shop #2 Background: Window has broken pane. Replace. Remove rust from both windows and paint. Scope: Replace broken window glass and prep and paint both windows metal trim. Assumptions: None Project Description: Repair Broken Window and prep paint metal frame on both windows. lot Replace glass prep and paint frames of both windows $200 Total: $200
90 Project No.: C Building Number: C24009-Fire Station #24 Apt- Storage Project Description: Prep and Paint all Exterior including wood and metal siding Background: Exterior wood has not been painted and is deteriorating. The metal siding was painted but hasn t been refreshed. Scope: Prep and paint exterior of building. Caulk all windows. Seal all holes in sheet metal siding. Assumptions: None lot Prep and paint exterior. Patch all holes in sheet metal and caulk windows first. $1, Total: $1,700
91 Project No.: C Building Number: C31000 Fire Station #31 Grounds Project Description: Prepare and Paint Fire Hose Drying Tower Background: The fire hose drying tower is exhibiting peeling paint and substantial corrosion. Painting is recommended to ensure the structural integrity and prolong the life of the tower. Scope: Prepare and paint the entire tower. Assumptions: A lift will be necessary to reach to the top of the tower. Priority: 1 1 Lift Rental $900 5 MH Prepare and Paint Tower $600 Total: $1,500 Priority 1
92 Project No.: C Building Number: C31000 Fire Station #31 Grounds Background: Several instances of high severity for linear cracking in the concrete. Scope: Cut and patch. Assumptions: Project Description: Linear Cracking and Faulting Concrete repairs. Lot Concrete repair 5, Total: $5,300
93 Project Number: C Building Number: C31000 Fire Station #31 Grounds Project Description: Grounds Asphalt Driveways and Parking Lots Background: The parking lots and asphalt driveways of some of the Fire Station #31 Grounds exhibit signs of deterioration past the point of seal coating. These include raveling, alligator cracks and linear cracks in excess of ½. Some cracks are interconnected forming small pieces of asphalt 6 or less in size. Scope: Clean and prepare the surface. Cut out potholes and severely deteriorated sections and repair. Perform 2 inch mill-and-overlay on damaged area. Seal coat remaining pavement. Assumptions: The sub-base is sufficient to support excessive strain of large vehicle loads. Priority: SF 2 inch mill-and-overlay and patch $35,000 27,500SF Seal coat $5,500 1,000LF Striping $500 Total: $41,000 Priority 1
94 Project No.: C Building Number: C31000 Fire Station #31 Buellton Bldg Background: When back-up generator is run, diesel fumes get into the building. Project Description: Move Generator Scope: Move back-up generator away from building. Run new electrical lines to building. Assumptions: None Lot Move back-up generator away from building. $5, Total: $5,600
95 Project No.: C Building Number: C31000 Fire Station #31 Buellton Bldg Background: Carpet is beyond repair or cleaning. Project Description: Carpet replacement Scope: Replace carpet. Assumptions: Can t be repaired. Lot Replace carpet. $16, Total: $16,100
96 Project No.: C Building Number: C31000 Fire Station #31 Buellton Bldg Background: May overload circuit that computer equipment plugged into. Project Description: Run separate circuit for computer equipment. Scope: Run separate circuit for computer equipment. Assumptions: Will not need to run new conduit Lot New electrical circuit $ Total: $300
97 Project No.: C Background: Carpet needs replacing Building Number: C31004 Fire Department Operations Project Description: Remove and replace carpet Scope: Remove and replace carpeting with 24 x 24 35ox. Carpet squares. Assumptions: None 700sf Remove and replace carpet $4, Total: $4,000
98 Project No.: C Background: Need interior painting Building Number: C31004 Fire Department Operations Project Description: Replace all baseboards and trim and paint all of interior Scope: Replace all baseboards and trim and paint all of interior. Assumptions: None Lot Replace all baseboards and trim and paint all of interior. $16, Total: $16,100
99 Project No.: C Building Number: C31004 Fire Department Operations Background: Multiple types of floor tile that is beyond repair. Project Description: Remove and replace floor tiles with solid sheet vinyl flooring Scope: Remove and replace floor tiles with vinyl floor sheeting. Install in kitchen area also. Assumptions: None Lot Remove and replace floor tile with vinyl sheeting. Install in Kitchen area also. $1,600 Total: $1,600
100 Project No.: C Building Number: C31004 Fire Department Operations Background: All exterior needs patching, prep and paint. Includes all exterior doors and trim. Scope: Patch, prep and paint exterior. Assumptions: None Project Description: Patch Prep and Paint all Exterior Lot Prep and paint exterior of building including all doors and trim. $16,100 Total: $16,100
County of Santa Barbara, California Facility Condition Assessment 2014
Project No.: P05000.001 Building Number: P05000 Lompoc VMB Grounds Project Description: Overlay, Seal Coat and Restripe Parking Lots Background: The asphalt paving comprises approximately 135,600 square
More informationCounty of Santa Barbara, California Facility Condition Assessment Total: $238,124. Appendix 1 Probable Cost Estimates Detail
Project No.:P03000.001 Building Number: P03000-Lompoc County Offices Grounds Project Description: Mill and Overlay with some Partial Depth Patching Background: The site comprises asphalt pavement for the
More informationCounty of Santa Barbara, California Facility Condition Assessment 2014
Project Number: D42000.001 Building Number: D42000 Goleta Beach Grounds Project Description: Repair Asphalt Pavements Background: The site comprises asphalt pavement for the parking areas and travel lanes
More informationSITE AND BUILDING INSPECTION CHECKLIST
PARISH BUILDING Page 1 of 6 SITE AND GROUNDS DATE INIT COMMENTS DATE INIT COMMENTS Ramps & Provisions for Handicap Designated parking spaces for Handicap Has soil dropped or heaved Is there standing water
More informationInspection Report. Property Address:
Inspection Report provided by: Safe Side Home Inspection Inspector: Corey Stuart TN License # 778 434 Margaret Circle McMinnville, TN 37110 safesideinspection@blomand.net Property Address: 1234 Anywhere
More informationHome Condition Checklist
Home Condition Checklist What to bring: 1. Flashlight 2. Pen 3. Paper 4. Gloves 5. Old Clothes/shoes 6. This list Start with the exterior of the home and work in one direction, with enough distance to
More informationRental Inspection Checklist
Rental Inspection Checklist Address: Date: NOTE: The water, gas and/or electrical services were off at the time of inspection. A re-inspection at a later date SHALL BE required to inspect these items.
More informationProperty Inspection Checklist
Property Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are
More informationExterior structures (fences, sheds, decks, retaining walls, detached garages) in good condition, no evidence of termite damage or rotted wood
Please Note: This checklist should not be relied upon as a home inspection report, nor should it be considered a substitute for a home inspection. This list is representative, but NOT exhaustive. If you
More informationInspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011
Inspection Report Prepared for: Gil Turiel Property Address: Loganville, GA 30052 Date: July 17, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT
More informationArts Center- Building needs
Arts Center- Building needs Built in 1928 Last renovated in 1986 Priority 1- fascia repair Loose, rotting and missing fascia needs to be replaced to prevent water intrusion. There are seven different pieces
More informationInspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011
Inspection Report Prepared for: Yossi Berg Property Address: Sugar Hill, GA. Date: July 20, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT &
More informationTEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,
More informationTotal Home Inspection Checklist
TOTAL HOME INSPECTION CHECKLIST Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and
More informationK.B. Polk Recreation Center Summary
K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016
More informationPre-Listing Home Inspection Checklist
Pre-Listing Home Inspection Checklist Charles Guth P.A. Homeward R.E. CharlesGuth.com 727-709-4663 Prior to putting your home on the market it is a recommended that you have your home pre-inspected to
More information1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) S Pioneer
1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 125 S Pioneer 1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 CRITICAL IMPROVEMENTS Framing Demo Tin Fence Exterior
More informationWorld Inspection Network
64725 Acanto Dr Guest house Carriage garage Exterior pool Interior pool Cracked tiles in the Master bath Sauna Page 1 of 16 Moisture damage on the West gym wall outside the Sauna Improper plumbing connection
More informationGROUNDS Grading General Grading, slope and drainage: Satisfactory N/A See Notes. Grading and slope at house wall
GROUNDS Grading General Grading, slope and drainage: Satisfactory Grading and slope at house wall Satisfactory (within 5 feet from building) Sidewalk Concrete Brick Flagstone Other Patio stones Driveway
More informationInspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012
Inspection Report Prepared for: Tonia Mann Property Address: Dacula, GA 30019 Date: March 01, 2012 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT
More informationInspect Hawaii. Property Inspection Report
Cover Page Property Inspection Report 96744 Inspection prepared for: John Doe Date of Inspection: 11/6/2014 Inspector: Oscar Libed ASHI License #257117 Honolulu, HI 96825 Email: oscar@inspecthawaii.com
More information1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) N Richard
385 N Richard CRITICAL IMPROVEMENTS Windows, Doors, Cabinets Replace Crtitically Broken Windows Recommended to Finish Windows, Doors, Cabinets Replace Broken Windows 1065 N Canyon St, Ste. 8, Hildale,
More informationNew Home Warranty Handbook
New Home Warranty Handbook Cabinets CB 1 Warping of doors and drawer faces should not exceed ¼ inch. Warping is measured from the face of the frame to the point of maximum warpage, with the door or drawer
More information1234 Main St. Buyer Name. Table of Contents
AMERICAN PROFESSIONAL HOME INSPECTION 719.648.4098 drew@americanprofessionalhomeinspection.com http://www.amproinspection.com RESIDENTIAL REPORT 1234 Main St. Colorado Springs CO 80903 Buyer Name 10/02/2017
More informationKEYSTONE PACIFIC PROPERTY MANAGEMENT, INC. Monarch Hills Condominium Association Dana Point, CA. Annual Maintenance Review.
KEYSTONE PACIFIC PROPERTY MANAGEMENT, INC. Monarch Hills Condominium Association Dana Point, CA January 19, 2016 LJP Project # 15-3149 TABLE OF CONTENTS 1. Assignment... 3 2. Summary of Existing Conditions...
More informationAlabama Home Inspections
Cover Page Property Inspection Report 1000 Sample Dr., Sampletown USA Inspection prepared for: Report Sample Inspection Date: 1/21/2010 Time: 400pm Size: Approx. 2,200sf Weather: Cloudy 62 Inspector: Bobby
More informationDr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018
G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake
More informationProperty Inspection Report
DAVID A. MEACHAM Professional Inspection & Construction Services Property Inspection Report Prepared for David Smith Property Address 1154 Gulf View Drive Tampa Bay, Florida Inspection Date Friday, October
More informationNational Property Inspections
Monday, August 22, 2011 Inspector Joe Smith 548-254-3658 Page 1 of 33 GENERAL INFORMATION GENERAL CONDITIONS AT TIME OF INSPECTION : No Property Occupied : Property Faces : North South East þ West Year(s)
More informationInspection Report. Prepared for: Tonia Mann. Property Address: 56 Riverview Place Douglasville, GA Date: September 19, 2012
Inspection Report Prepared for: Tonia Mann Property Address: Douglasville, GA 30134 Date: September 19, 2012 Inspector: Charles Mann Edifice Inspections, Inc. (770) 594-2222 www.edificeinspections.com
More informationMadison's Home Inspections
Cover Page Madison's Home Inspections Property Inspection Report my street, Clarksville TN, 37043 Inspection prepared for: Gary Mann Agent: gary mann - Madison's Inspection Date: 0/4/2009 Time: 12 pm Age:
More informationSection I Jalama Beach Park Executive Summary
Section I Jalama Beach Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Jalama
More informationHome Inspection Checklist
Home Inspection Checklist Property Address 4003 Paloma Cir, Austin, TX 78734, USA Conducted on 24 Oct 2018 05:52 PM Prepared by Adam Alexander Prepared for Dianna Stevens Completed on 24 Oct 2018 06:05
More informationCollins Middle School
Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0
More informationThe Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits
The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits 3. Development and Septic Fees 4. Tarion New Home Warranty
More informationTown Office Building, 17 School Road, Community Room, addition completed 2007
Town Office Building, 17 School Road, Community Room, addition completed 2007 Existing Conditions and Needed Improvements: Poor acoustics in the room; No internet connection, no guest WIFI; No generator
More informationPLYMOUTH CREEK HOME OWNERS ASSOCIATION
Page 1 of 8 PLYMOUTH CREEK HOME OWNERS c/o Omega Management, Inc. 15350 25th Avenue North #108 Plymouth, MN 55447 MAINTENANCE SERVICE POLICY In general, the common facilities which are available for use
More informationInspection Report. Prepared for: Yaron Sternberg. Property Address: 926 Hemingway Road Stone Mountain, GA. Date: April 15, 2011
Inspection Report Prepared for: Yaron Sternberg Property Address: Stone Mountain, GA. Date: April 15, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS
More informationAnderson Inspection Method (AIM) Tool (Page 1 of 5)
Anderson Inspection Method (AIM) Tool (Page 1 of 5) I. Exterior & First Impression Circle the most fitting answer for each line: Good Fair Poor Quality of neighborhood and street Neighboring Homes to each
More informationCHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD
TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of
More informationMills Elementary School Site Summary
1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF
More informationWalnut Creek Mutual Seventy
Appliances: Dishwashers, Refrigerators, Disposals, Ranges, Ovens, Vents, Hoods, Fireplaces, Washing Machines, Dryers, etc. All appliances are the owner s property; all maintenance and repair is the owner
More informationFacility Assessment Report, Montgomery Independent School District
ATHLETIC FACILITY CAMPUS DATA ATHLETIC FACILITY 22628 Hwy 105 West, Montgomery TX 77356 1 MASTER PLAN 2 CIVIL - SITE General Existing Conditions and Deficiencies Overall concrete site paving: Good Overall
More informationInspection Report. Prepared for: Tonia Mann. Property Address: 1295 Greyland Hills Drive Lawrenceville, GA Date: April 24, 2012
Inspection Report Prepared for: Tonia Mann Property Address: Lawrenceville, GA 30046 Date: April 24, 2012 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS
More informationREHABILITATION WORK WRITE-UP. Physical Address: Administrator: Grantee:
HO-6A REHABILITATION WORK WRITE-UP Owner: Date: Physical Address: City State Zip Code Administrator: Grantee: Formatted in conjunction with the Uniform Physical Condition Standards Checklist SITE FENCING
More informationCountry Village Maintenance Responsibility Guidelines BUILDING - EXTERIORS AND INTERIORS
BUILDING - EXTERIORS AND INTERIORS Building Interior / Framework Blocking Braces Foundation and Interior Slab Rafters Ridge Boards Studs Trusses Internal portion of exterior walls & roofing (i.e. interior
More informationThe Inspector. Property Inspection Report
Cover Page The Inspector Property Inspection Report Inspection prepared for: ******** ******* Date of Inspection: 11/18/2013 Time: 12PM Age of Home: unknown Size: 2000sf Weather: overcast / 40 Inspector:
More informationWork Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free
/ / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary
More information3D Home Improvement and Inspection Services, Inc
Property Inspection Report Cover Page ABC Disney Lane, Winter Garden FL, 34787 Inspection prepared for: John Doe Inspection Date: 7/15/2010 Time: 11:00 am Age: 6 Years Size: 3,378 LSF / 4,427 TSF Weather:
More informationMcAllen House Restoration, April 2016 through April 2018
McAllen House Restoration, April 2016 through April 2018 Primary Contractor: Heinemann Construction LCC Renovations performed in this time period include: Gas brought from Cedar Rd. to the House Upgraded
More informationThurgood Marshall Recreation Center Summary
Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August
More informationFINEGAN INSPECTION SERVICES, INC.
FINEGAN INSPECTION SERVICES, INC. TERRY FINEGAN 76 WEST FOSTER MAINEVILLE ROAD MAINEVILLE, OHIO 45039 683-0733-PHONE 697-0163-FAX Email- finegan @ fuse.net CLIENT: 1/14/08 Mr. BUILDING LOCATION As in all
More informationProperty: Operator Info: Operator: Estimator: Sales/Estimator. Labor Efficiency:
Client: Property: SAMPLE Operator Info: Operator: Estimator: Title: Company: Sales/Estimator Simply Additions Price List: Labor Efficiency: CTHA5R7D Remodel Proposed Main Level Main Level 2" x 4" x 92
More informationQuality Inspection 8618 London Heights San Antonio, TX Phone: (210)
Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address
More informationHome Inspection Report
Home Inspection Report Example Home Inspection Report. Page 1 of 17 Table of Contents Definitions 2 Company Information 2 General Information 2 Lots and Grounds 3 Exteriors 3 Garage/Carport 4 Roof 5 Attic
More informationREO Client Safety Hazard Requirements
REO Client Safety Hazard Requirements Safety Hazards Safeguards clients are continually reporting missing safety hazards or allowables across the nation and it is jeopardizing our relationship with our
More informationFACILITY COMPONENTS - MIDDLE SCHOOL
SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls
More informationWindbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart
Building Maintenance Roof Repair and restoration of interior damage caused by roof leak; repair or replacement of structural supports under the roof decking and sheathing (i.e. trusses). Siding Repair
More informationRAYMOND EDUCATION CAMPUS
INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationToronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI
BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached
More informationSite Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks
Site Bldg Fiscal Yr System Sub-System Site site 2014/15 Parking Paving Site site 2014/15 Sidewalks Skill Center L 2015/16 Architectural Partitions Site Site 2015/16 Parking Striping Arc Center M 2014/15
More informationHILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School
HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story
More information1234 Main St Denver CO 80210
BEST HOME INSPECTIONS 555-555-5555 best@inspections.com https://www.spectora.com HOME INSPECTION REPORT 1234 Main St Denver CO 80210 NOVEMBER 21, 2016 Inspector John Smith sample@spectora.com Buyer Michael
More informationInspection Report. 1 of 8
Inspection Report Dayvolt's Home Inspections L.L.C. Date&Time of Inspection: 5/9/17, 12:10 PM Inspector's Name: Dustin Dayvolt Building Address: Sample City: State: Zip Code: Type of property inspected:
More informationMoonlight Architecture, Inc. Architecture Interior Design Site Planning
Moonlight Architecture, Inc. Architecture Interior Design Site Planning 22 May 2018 18057 Mr. Michael J. Petit de Mange, County Administrator Kent County Levy Court 555 Bay Road Dover, DE 19901 RE: Facilities
More informationHandyman & Maintenance Cost Estimator
Handyman & Maintenance Cost Estimator 2013 Quickly & Accurately Estimate Small Jobs Compiled & Edited by Bill O'Donnell ISBN 978-1-300-58228-1 Copyright 2013 by RemodelMAX, Inc. Printed in the United States
More informationSUMMARY 792 Youngfield Ct., Lakewood CO Frank Oz January 13, 2018
SUMMARY 792 Youngfield Ct., Lakewood CO 80228 Frank Oz January 13, 2018 Christopher Grabbe internachi Certified Professional Inspector FirePower Inspections 7204645889 info@firepowerinspections.com 2.1.1
More informationCHECKLIST Inspecting a Garage
CHECKLIST Inspecting a Garage By Ben Gromicko This section deals with the details of the garage or carport inspection that may be performed. At the end of this section, you shall be able to: describe the
More informationFriendly Inspection Services
Cover Page Friendly Inspection Services Property Inspection Report Inspection prepared for: Sample Report Date of Inspection: 4/15/2015 Time: 12:30 Start, 3:15 finish Age of Home: 1986 Weather: Sunny,
More informationNIR Home Inspections
Cover Page NIR Home Inspections Home Inspection Report Inspection prepared for: John Europe Date of Inspection: 2/16/2017 Time: 9:30am Age of Home: 52 Size: 1112 sq ft Weather: Snowing, snow on roof Bungalow
More informationWindbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart
Windbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart Building Maintenance Roof Repair and restoration of interior damage caused by roof leak; repair or replacement of structural
More informationHERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School
HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has
More informationBELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY
BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY The list below contains those building elements most commonly found in buildings found in a condominium
More informationSureHome Inspection Company. Home Inspection. Grant st Street Omaha, NE 68048
Home Inspection Grant 7142 21st Street Omaha, NE 68048 Page 1 of 13 Table of Contents Definitions 2 General Information 2 Roof 3 Exterior 4 Grounds 5 Attic 5 Garage 6 Bathroom 6 Interior 7 Kitchen 7 Laundry
More informationHOUSECHARLOTTE MINIMUM HOUSING INSPECTION
HOUSECHARLOTTE MINIMUM HOUSING INSPECTION The primary objective of a minimum housing inspection is to ensure the City s housing stock is safe and sanitary. Please note Effective March 2014 Tenant occupied
More informationWILKINSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station
RETAIL FOR SALE 5990 Asheville Highway, Hendersonville, NC 28791 OFFERING SUMMARY SALE PRICE: $1,350,000 LOT SIZE: 0.75 Acres YEAR BUILT: 1980 BUILDING SIZE: 5,848 SF RENOVATED: 2018 C-2 Commercial ZONING:
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 309 EWING STREET PRINCETON, NEW JERSEY EXTERIOR Garage Doors: * One 16 x7 steel insulated, tan door. * Two garage openers, 1 keypad * Steel insulated with embossed panels with
More informationProperty Condition Assessment. Summary Report
www.real-estate-inspections.com Property Condition Assessment Summary Report Subject Property Prepared for: Client in Detroit File Number: 05-15-005 Inspector: Craig Milliken, PE CPM Real Estate Inspections,
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 505 EWING STREET PRINCETON, NEW JERSEY EXTERIOR Garage Doors: * One 16 x7 steel insulated, tan door. * Two garage openers, 1 keypad * Steel insulated with embossed panels with
More informationCorsicana High School
Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0
More informationDavis Frame Co., Inc. Construction Budget Considerations
Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability
More informationFacility Condition Assessment Dr. Harry L. Halliwell Memorial School
Dr. Harry L. Halliwell Memorial School October 2016 Address: 358 Victory Highway, Slatersville, RI 02876 D R AF T Report Generated: October 06, 2016 MඵAඵPඵPඵ^ Ξ :ĂĐŽďƐ ϮϬϭϲ 1 Dr. Harry L. Halliwell Memorial
More informationV.I. Inspections Page 1 of 15 21:04 September 18, 2018
Page 1 of 15 #1 4135 32nd Ave SW, Seattle. #2 Moderate displacement in driveway due to root intrusion. #3 No water to garage hose bib at time of inspection. #4 Evidence of water intrusion in S soffit of
More informationEXHIBIT B MAINTENANCE MATRIX
EHIBIT B MAINTENANCE MATRI The following is a listing of the items within the Project for which Owners and the Association are responsible for the routine maintenance, repair and replacement duty, in accordance
More informationBuildingAdvisor.com Estimating Checklist
BuildingAdvisor.com Estimating Checklist GENERAL REQUIREMENTS Plans and specifications Plan review Permits: Zoning, building, environmental, other Survey Impact fee Administrative costs Financing costs
More informationBELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY
BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY The list below contains those building elements most commonly found in buildings found in a condominium
More informationProposal. Lexington, MA. Price Work Description
PROPOSAL Assumptions Sample Client Lexington, MA The is based on plans dated 3/3/15, with Sally's list of adjustments The price assumes the owners will be living in the house The owners will be responsible
More informationA 1 Professional Home Inspection 14 Brevoort Pl. Deer Park, NY Jamaica, NY 11434
14 Brevoort Pl. Deer Park, NY 11729 Jamaica, NY 11434 Page 1 of 30 Definitions NOTE: All definitions listed below refer to the property or item listed as inspected on this report at the time of inspection
More informationCity of Maryland Heights. Residential Occupancy Permits & Home Inspection Process
City of Maryland Heights Residential Occupancy Permits & Home Inspection Process Residential Occupancy Permits An occupancy permit is required when there is: Any change of ownership or representation of
More informationFENCES AND RAILING All types of fences wood, vinyl, chain link PVC, Aluminum & wrought iron Installation and repair.
FENCES AND RAILING All types of fences wood, vinyl, chain link PVC, Aluminum & wrought iron Installation and repair. Exterior painting with DURATION paint, which has a lifetime warranty against peeling
More informationSUMMARY 1234 Main St.Loudon TN Buyer Name 08/28/2018 9:00AM
SUMMARY 1234 Main St.Loudon TN 37774 Buyer Name 08/28/2018 9:00AM Dusty Jameson TN Home Inspector License #00123, TN WDI License #104158 Inspector Cluseau's Home Inspection Service 865-691-6158 dustyjameson@gmail.com
More informationFeasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.
Feasibility Report Property Inspection Engineers, Inc. (248) 644-8798 Inspection ate: 10/27/2010 Consultant's Job No: Consultant: Christopher J. aggy Applicant ark Beard Property Address 405 Fairgrove
More informationRSH ENGINEERING, INC. END OF BUILDERS WARRANTY INSPECTION REPORT INSP#: K00001 DATE: 00/00/11 PAGE #: 1
PAGE : 1 1 2 3 4 LEFT SIDE OF HOUSE: SEE. 3 TO. 10 FOR DETAILS. LEF T SIDE OF HOUSE: GENERAL NOTE: SOFFIT VENTS ARE MISSING AND/OR IS INADEQUATE ADD SOFFIT VENTS. PROVIDE ADEQUATE OF SOFFIT VENTS TO MEET
More informationFriendly Inspection Services
Cover Page Friendly Inspection Services Property Inspection Report Inspection prepared for: Sample Report Date of Inspection: 4/6/2015 Time: 8:45 Start, 11:10 finish Age of Home: 1950 Weather: cloudy,
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 28 HILLSIDE ROAD PRINCETON, NJ 08540 EXTERIOR Garage Doors: * Two 8 X7 steel insulated, tan door * Two garage openers, 1 keypad * Steel insulated with embossed panels with windows
More informationHome Inspection Report
Pfeifer Home Inpsection, LLC 8332 Crystal Pointe Lane Indianapolis, Indiana 46236 317-340-1734 Lic #HI01700103 Home Inspection Report Indianapolis, IN 46236 Page 1 of 24 Table of Contents Definitions 2
More informationORDER OF AN EXECUTIVE OFFICER
Environmental Public Health ORDER OF AN EXECUTIVE OFFICER To: Albert K K Wong and Lolita W W Wong the Owner RE: Those housing premises located in Calgary, Alberta and municipally described as: 1509 Edmonton
More information