ASSEMBLY.

Size: px
Start display at page:

Download "ASSEMBLY."

Transcription

1 ASSEMBLY

2 ASSEMBLY SECTION Points to Consider These assembly instructions are generic and may not apply to all applications. If you have questions regarding specific applications contact Proscaf. All users should be familiar with Proscaf s Safety Guidelines. The instructions relate to original Proscaf components. We accept no liability for damages resulting from use of non-proscaf components. Inspect all equipment prior to erection for condition. Do not use damaged equipment. Inspect all Access Decks prior to erection for mechanical damage, deformation and rot or other deterioration. Proscaf must be erected, shifted and dismantled only under supervision of a qualified/ competent* person. All persons erecting, moving, dismantling or using the scaffolding must wear hard hats and appropriate clothing. The metric dimensions used in the Erection Manual are exact. *Qualified/competent person: one capable of identifying existing and predictable hazards in the surrounding or working conditions.

3 The Wedge Head Connection Take the ledger to the standard. Bring the wedge head hard against it. Place the wedge head in one of the 4 holes of the disc (for rectangular structures). Secure with a hammer Using the rosette s narrow openings automatically centres the ledgers at right angles. The wide openings allow ledgers to be aligned at variable angles. They can also be used for diagonal braces. A maximum of 8 components can be connected to one rosette. NOTE: Wedges must be properly seated and couplers fully tightened. Failure to do so could cause INJURY or DEATH.

4 ASSEMBLY SECTION Overview of the Main Components 1. Adjustable base plate 2. Base collar 3. Vertical standard 4. Transom (bearer) 5. Ledger (runner) 6. Diagonal brace 7. Guardrail (runner) 8. End Guardrail (bearer) 9. Toeboard 10. Deck 11. Access deck 12. Wall tie NOTE: Anchorages are an important requirement for scaffolding stability.

5 Typical Erection Process Step 1 Lay longitudinal ledgers in a row according to the required bay length. Place sole boards at the ends of the ledgers. Put adjustable base plates on the sole boards followed by the base collars, with the thinner tube downwards, onto the adjustable base plates (see detail in diagram below*). The recommended height for the adjustable base plate extension is 20 cm. Begin erecting at the ground s highest point. In the first bay connect the transoms (bearers) and longitudinal ledgers (runners) to the small holes of the base collars. Check the assembled frame and ensure that it is level. Install longitudinal and transversal ledgers in consecutive bays and check their levels. NOTE: DoL requires employers to have a qualified/ competent person overseeing the erecting and dismantling of scaffolds. Employers are required to provide fall protection for employees erecting or dismantling supported scaffolds. See Proscaf Safety Guidelines.

6 ASSEMBLY SECTION Typical Erection Process Step 2 Cover the first level of ledgers with steel decks or wooden planks to create a safer structure and safer workplace/environment. Place the vertical standards over the adjustable base plates onto the base collars. Starting at the first bay, install the transverse ledgers at a 2m height (4 rosette spacings). This is made easier by standing on the first decked level. With the installation of the transom (bearers), the rosettes of the vertical standards are automatically adjusted, allowing the longitudinal ledgers to be installed without adjusting the standards. By working on the platform level, the ledgers can be installed bay by bay at a 2m height. This way the assembly can be completed by one person.

7 Typical Erection Process Step 3 Install the plan bracing, after installing the longitudinal and transversal ledgers and the vertical diagonal braces (if required). Tubes and couplers can also be used for installing plan bracing. The minimum requirement for all diagonal braces is: 1 diagonal brace for every 5th bay. Decking the upper platform level can be done from the lower platform level. If Proscaf fabricated decks with lift off locks are used, longitudinal ledgers are not required at board level. With wooden plank platforms, ensure that planks overlap sufficiently, and that they are secured against tipping. NOTE: In some cases longitudinal ledgers are required at board-level. After installing the 3-part lateral fall protection (top-rail, mid-rail and toe board) on the platform level, install the diagonals, and then the longitudinal and transversal ledgers of the next level. After the first platform level, anchorages must be installed (see page EM-12). Top rails must be installed on every level. NOTE: Anchorages are an important requirement for scaffolding stability.

8 ASSEMBLY SECTION Typical Erection Process Step 4 Repeat steps 2 & 3 (on page EM-6), to the required height of the scaffold. Vertical standards must extend at least 1m (2 rosette spacings) over the highest working level, so that the 3-part lateral protection, (top-rail, mid-rail and toe-board), can be installed on the outside face and the ends. NOTE: Install the 3-part lateral protection system on all working levels. The top platform level must be anchored at every standard. TIP: When putting the standards on top of each other, turn them so that they can, (if necessary), be connected to one another with Proscaf locking pins.

9 Access Scaffolding ladders provide access to working platforms. Proscaf stocks access decks with or without integrated ladder and platform stair towers. Internal ladder access: Proscaf has standard ladders as well as those suitable for distances larger than 2m between the working platforms. Scaffolding ladders are secured by couplers and a transverse tube (as shown), or by connecting the ladder with a coupler to a longitudinal ledger (runner). Ladders must be secured top and bottom. NOTE: All ladder access openings are to be guard railed.

10 ASSEMBLY SECTION Access continued Scaffolding with internal access ladders and access decks using integrated access ladders. Access bays must be equipped with 3-part lateral protection on 3 sides. Platform stair towers: Install decks in the access bay and equip the bay with the 3-part lateral protection. Construct additional bays (in transverse direction). Connect the stairway stingers to the rosettes of the additional bays and mount the guardrails. Install the required 3-part lateral protection around the stair platforms. NOTE: Drive home wedges on all connections.

11 Cantilever Brackets To widen working levels of single scaffold bays, use cantilever brackets, ledgers and vertical standards. Install a ledger at the required height of the cantilever bracket connection (the ledger connection). Cantilever bracket for a 0.32m wide deck. A support for the cantilever bracket is not required. Cantilevers using ledgers, standards and diagonal brace: Install ledgers at the height of the working platform and at 0.5m below. Connect a vertical post to the ledgers, and install the diagonal or a support using tubes and couplers. Cantilevers using ledgers, vertical standards and brace. Cantilever bracket 0.73m for two decks 0.32m, or one deck 0.61m wide. The cantilever bracket must be supported by a brace. Alternatively, this support can be made from tubes and couplers. NOTE: Drive home the wedge from the main platform, NOT from the cantilever platform. In many cases cantilever platforms cause uplift forces in the vertical standard, so it is important to compensate for this.

12 ASSEMBLY SECTION Scaffold Anchorage Use wall ties and plastic inserts to anchor the scaffold to the wall. Wall ties must be connected by couplers to both vertical standards/ledgers. The plastic inserts used depend on the wall structure and the anchor forces. Alternatively, tie a ledger to an eyebolt. Place the wedge head centrally over the eyebolt (as with the connection to a rosette), and insert into the eye of the bolt. NOTE: Check that the anchors load-bearing capacity will cope with the applied forces. Anchoring is one of the most important requirements for scaffold stability. Tying the scaffold to horizontal elements (e.g. beams) can be achieved using tubes and couplers. If forces are transmitted in the longitudinal direction of the horizontal elements, the connection must be secured against movement in this direction. Use tubes and couplers to tie scaffolding to vertical steel or concrete members. NOTE: Check that the anchors load-bearing capacity will cope with the applied forces. Anchoring is one of the most important requirements for the scaffold s stability.

13 Scaffold Anchorage An 8m anchor pattern staggered about 4m in height. External standards are tied every 4m. Internal standards must be anchored as shown in picture 1 every 8m, while the adjacent axis of the standards should be anchored staggered 4m in height. Anchor pattern 4m in every axis of the standards. The scaffold is anchored every 4m in every axis of the standards. Anchor pattern 2m in every axis of the standards. With tarpaulin-clad scaffold, huge forces develop at the anchors and must be tied safely to the supporting structure. Such forces can be reduced by a tight anchor pattern. NOTE: Only tie scaffolding to walls or structures that have sufficient load-bearing capacity. Facade or similar scaffolds should be anchored by eye bolts and plastic inserts. There are three anchor patterns: the one used depends on post spacing, the height of the scaffold and whether or not the scaffold will be clad by debris nets or tarpaulins. Anchor forces should be calculated according to local codes or regulations and depend especially on the wind forces on the scaffold.

14 ASSEMBLY SECTION Load Bearing Capacities of Main Components Allowable loading of decks: Steel decks that connect with tubular ledgers Bay length Duty Live Load 0.73 metre 6.6 kn / Bay (Heavy Duty) 1.09 metre 6.6 kn / Bay (Heavy Duty) 1.57 metre 6.6 kn / Bay (Heavy Duty) 2.07 metre 6.6 kn / Bay (Heavy Duty) 2.57 metre 6.6 kn / Bay (Heavy Duty) 3.07 metre 6.6 kn / Bay (Heavy Duty) DO NOT EXCEED THE LOADINGS SHOWN IN THE ABOVE TABLE COMPLIES WITH AS/NZ REQUIREMENTS FOR HEAVY DUTY LOAD Allowable loading of decks: Steel decks that connect with U transoms Bay length Duty Live Load 0.73 metre 6.6 kn / Bay (Heavy Duty) 1.09 metre 6.6 kn / Bay (Heavy Duty) 1.57 metre 6.6 kn / Bay (Heavy Duty) 2.07 metre 6.6 kn / Bay (Heavy Duty) 2.57 metre 6.6 kn / Bay (Heavy Duty) 3.07 metre 6.6 kn / Bay (Heavy Duty) DO NOT EXCEED THE LOADINGS SHOWN IN THE ABOVE TABLE COMPLIES WITH AS/NZ REQUIREMENTS FOR HEAVY DUTY LOAD

15 Allowable Loading of Cantilever Brackets Tubular cantilever brackets 0.39m for 1 steel deck 0.32m wide. Note: For steel decks with hooks that connect with tubular ledgers. Bay length Duty Live Load 0.73 metre 2.2 kn / Bay (Light Duty) 1.09 metre 2.2 kn / Bay (Light Duty) 1.57 metre 2.2 kn / Bay (Light Duty) 2.07 metre 2.2 kn / Bay (Light Duty) 2.57 metre 2.2 kn / Bay (Light Duty) 3.07 metre 2.2 kn / Bay (Light Duty) DO NOT EXCEED THE LOADINGS SHOWN IN THE ABOVE TABLE COMPLIES WITH AS/NZ REQUIREMENTS FOR LIGHT DUTY LOAD U cantilever brackets 0.73m for 2 steel decks 0.32m wide. Bay length Duty Live Load 0.73 metre 2.2 kn / Bay (Light Duty) 1.09 metre 2.2 kn / Bay (Light Duty) 1.57 metre 2.2 kn / Bay (Light Duty) 2.07 metre 2.2 kn / Bay (Light Duty) 2.57 metre 2.2 kn / Bay (Light Duty) 3.07 metre 2.2 kn / Bay (Light Duty) DO NOT EXCEED THE LOADINGS SHOWN IN THE ABOVE TABLE COMPLIES WITH AS/NZ REQUIREMENTS FOR LIGHT DUTY LOAD

16 NZ freephone: AUS freephone: PO Box 62, Maungaturoto Northland, New Zealand proscaf.com

USER S MANUAL HAKI CONTINENTAL

USER S MANUAL HAKI CONTINENTAL USER S MANUAL HAKI CONTINENTAL HAKI AB 2003 HAKI User s Manual and product liability applies only to scaffolding containing components manufactured and supplied by HAKI. Building scaffolding using components

More information

USER S MANUAL HAKI COMPACT STAIR TOWER

USER S MANUAL HAKI COMPACT STAIR TOWER USER S MANUAL HAKI COMPACT STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made

More information

USER S MANUAL HAKI STAIR TOWER

USER S MANUAL HAKI STAIR TOWER USER S MANUAL HAKI STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made and supplied

More information

Safety Documents > Safety Manual > Scaffolds

Safety Documents > Safety Manual > Scaffolds Safety Documents > Safety Manual > Scaffolds D. Scaffolds 1. General Requirements for All Scaffolds a. Scaffolds shall be furnished and erected in accordance with this standard for persons engaged in work

More information

USER S MANUAL. HAKI Loading Tower

USER S MANUAL. HAKI Loading Tower USER S MANUAL HAKI Loading Tower HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made and

More information

USER S MANUAL HAKI PUBLIC ACCESS STAIR

USER S MANUAL HAKI PUBLIC ACCESS STAIR USER S MANUAL HAKI PUBLIC ACCESS STAIR HAKI AB 2017 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made

More information

PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades

PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades Product Brochure * If approval is required for the scaffolding system PERI UP Easy to be placed on the market in a country,

More information

Systems Scaffold Tubular Scaffold Access Unit Installation Instructions

Systems Scaffold Tubular Scaffold Access Unit Installation Instructions Systems Scaffold Tubular Scaffold Access Unit Installation Instructions 2 Tubular Scaffold Access Unit Installation Instructions LTUB7 Galvanized: 24.1 lb Label 7112A0003 NOTICE Please read and follow

More information

USER S MANUAL HAKI COMPACT STAIR TOWER

USER S MANUAL HAKI COMPACT STAIR TOWER USER S MANUAL HAKI COMPACT STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

USER S MANUAL HAKI UNIVERSAL

USER S MANUAL HAKI UNIVERSAL USER S MANUAL HAKI UNIVERSAL International version HAKI AB 2015 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have

More information

Metal Scaffolds. (1) Metal scaffolds shall be designed to support all dead, live, and wind loads to which they will be subjected.

Metal Scaffolds. (1) Metal scaffolds shall be designed to support all dead, live, and wind loads to which they will be subjected. Metal Scaffolds 1644 May 2016 (a) General. (1) Metal scaffolds shall be designed to support all dead, live, and wind loads to which they will be subjected. (2) No metal scaffold equipment that is broken

More information

USER S MANUAL HAKI UNIVERSAL ALUMINIUM

USER S MANUAL HAKI UNIVERSAL ALUMINIUM USER S MANU HAKI UNIVERS UMINIUM HAKI AB 2005 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components that have been made

More information

USER S manual HAKI UNIVERSAL. International version

USER S manual HAKI UNIVERSAL. International version USER S manual HAKI UNIVERSAL International version HAKI AB 2014 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components

More information

USER S MANUAL HAKI PUBLIC ACCESS STAIR

USER S MANUAL HAKI PUBLIC ACCESS STAIR USER S MANUAL HAKI PUBLIC ACCESS STAIR HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made

More information

Modular Scaffolding MEKA 48

Modular Scaffolding MEKA 48 Modular Scaffolding MEKA 48 MODULAR SCAFFOLDING MEKA 48 MODULAR SCAFFOLDING The Modular Scaffolding MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a wide range

More information

scaffoldings/ coverings

scaffoldings/ coverings scaffoldings/ coverings 198 MDS 222 temporary covers Scaffoldings / Coverings 197 SCAFFOLDINGS / COVERINGS MDS MDS multidirectional scaffolding The MDS multidirectional scaffolding is the modern solution

More information

Universal Panels & Accessories

Universal Panels & Accessories Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every

More information

Modular Scaffold MEKA 48

Modular Scaffold MEKA 48 Modular Scaffold MEKA 48 Imperial units NA MODULAR SCAFFOLD MEKA 48 MODULAR SCAFFOLD The Modular Scaffold MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a

More information

distribution Modular Scaffolding

distribution Modular Scaffolding Modular Scaffolding Modular scaffolding PDM Universal scaffolding system plettac-pl PDM Application A characteristic feature of plettac PDM system is the use of wedge joint which provides quick and safe

More information

Scaffolding. Safety Guide. STOP! Before you climb

Scaffolding. Safety Guide. STOP! Before you climb Scaffolding Safety Guide Printed FEB 2015 rebr. AUG 2016 Contents Safety Guide Disclaimer... 1 Safety Guide Objectives... 2 Roles & Responsibilities of Workplace Parties Employers, Supervisors, Workers...

More information

Sectional Scaffold. Scaffold Access Unit Installation Instructions

Sectional Scaffold. Scaffold Access Unit Installation Instructions Sectional Scaffold Scaffold Access Unit Installation Instructions 2 Scaffold Access Unit Installation Instructions SAU6 Painted: 18.3 lb Galvanized: 20.2 lb Label 7112A0003 NOTICE Please read and follow

More information

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017 DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING

More information

Safety Requirements for Scaffolding: OSHA Standard

Safety Requirements for Scaffolding: OSHA Standard ABE178 Safety Requirements for Scaffolding: OSHA Standard 1910.28 1 Carol J. Lehtola, William J. Becker and Chris Eversole 2 The Impact of Safety on Florida Agriculture Florida agriculture, including forestry

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS Multifunction Rolling Scaffold Towers 6, 12 and 18 READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This manual provides

More information

LEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014

LEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014 LEGAL SUPPLEMENT 43 to the Government Gazette of Mauritius No. 13 of 8 February 2014 Government Notice No. 16 of 2014 THE OCCUPATIONAL SAFETY AND HEALTH ACT Regulations made by the Minister under section

More information

SafeDeck Supported Scaffold System

SafeDeck Supported Scaffold System SafeDeck Supported Scaffold System Table of Contents Origination 1 Range of Motion 1 Installation Efficiency 2 Third-Party Testimonial 2 SafeDeck Specifications 3 Competent Person 4 Tools Required 4 Components

More information

K stage System Scaffold

K stage System Scaffold K stage System Scaffold Product Manual Coronet Group Suzhou Co.,Lt Email : Coronet@coronet scaffold.com TEL :+86 512 85557000 400 770 9995 FAX :+86 512 85557111 Addres:#1505 SIFC,SIP,SUZHOU,CHINA Coronet

More information

HeIGHT ACCESS SOLUTIONS EQUIPMENT CATALOGUE

HeIGHT ACCESS SOLUTIONS EQUIPMENT CATALOGUE HeIGHT ACCESS SOLUTIONS EQUIPMENT CATALOGUE EDITION 1.3 ROOF SAFETY RAIL SYSTEMS Ever wished that roof edge protection could be used for more than stopping staff from falling? Look no further... The Easy

More information

Contents 2017 VR ACCESS SOLUTIONS ALL RIGHTS RESERVED.

Contents 2017 VR ACCESS SOLUTIONS ALL RIGHTS RESERVED. Issue 1 February 2017 Contents Introduction... 1 NASC Compliance... 2 Safety Information... 3 Component Details... 4 Component Load Capacities... 7 Deck Arrangements... 9 Bracing and Tying... 11 Safe Working

More information

Issue Date: 3.2. Bearer: A horizontal member of a scaffold upon which the platform rests and which may be supported by ledgers.

Issue Date: 3.2. Bearer: A horizontal member of a scaffold upon which the platform rests and which may be supported by ledgers. 1.0 Policy It is the Company s policy to follow national and corporate standards and guidelines for scaffold safety. This policy shall apply to all site employees and contractors. 2.0 Purpose The purpose

More information

Allround Scaffolding

Allround Scaffolding .. Allround Scaffolding I n g e n i o u s. S t r o n g. L i m i t l e s s. Faster. Stronger. Safer. More Profitable. Introduction Layher s Allround scaffolding makes an ideal propping system: being both

More information

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15 Erection manual Tube-Lock Concept 2013-02 Page: 1 of 15 Contents Subject Page Illustration of Tube-Lock Concept 3 Parts of Tube-Lock concept 4 Legislation 5 Erecting a Tube-Lock Concept scaffold 6 Technical

More information

USER S Manual. HAKI Bridge System (HBS)

USER S Manual. HAKI Bridge System (HBS) USER S Manual HAKI Bridge System (HBS) HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made

More information

RINGLOCK Introduction Ringlock is world most widely used scaffold system. It is a fully galvanized multi purpose steel scaffold system suitable for pr

RINGLOCK Introduction Ringlock is world most widely used scaffold system. It is a fully galvanized multi purpose steel scaffold system suitable for pr RINGLOCK ACCESS SCAFFOLD SYSTEM 9 RINGLOCK Introduction Ringlock is world most widely used scaffold system. It is a fully galvanized multi purpose steel scaffold system suitable for providing general access

More information

ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE

ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE Approval No. Z-8.1-864 Standard Version (as of ) C O N T E N T S 1. General...1 2. Erecting the scaffold...3 2.1 General requirements...3 2.2 Erecting the

More information

Instructions for erection and use of the RUX-SUPER 65 Rapid-Erection Scaffolding. - Standard Design - Rapid-Erection Scaffolding RUX-SUPER 65

Instructions for erection and use of the RUX-SUPER 65 Rapid-Erection Scaffolding. - Standard Design - Rapid-Erection Scaffolding RUX-SUPER 65 Rapid-Erection Scaffolding RUX-SUPER 65 Instructions for erection and use of the RUX-SUPER 65 Rapid-Erection Scaffolding - Standard Design - Status: January 2007 Attention! Any instructions for erection

More information

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT Construction Safety Education Forum 6 March 2013 Scaffolding Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT SRWSD in confidence 1 Presentation Outline Introduction

More information

Sales Hire Erections

Sales Hire Erections LTD www.scafhire.ie Sales Hire Erections Scaffolding Specialists Company History Since its modest inception in 1980 Scafhire Ltd has progressed to a position of very high prominecnce and respectability

More information

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage limited one bay kwikstage stair unit user guide One Bay Stair Tower used in conjunction with Kwikstage System Scaffolding and designed to conform to all current British and European Standards. With only

More information

FALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES

FALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES ROYALFRAME50 SLAB SHORING SYSTEM ROYAL FRAME 50 ROYALframe50 is a lightweight, improved alternate formwork shoring frame. It has galvanised tube legs, each with a 51mm outside diameter and a safe work

More information

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans Layher Allround Bridging System Instructions for Assembly and Use Modular truss system for wide spans Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Allround Scaffolding } CONTENT 1. Introduction...3

More information

Uniscaff User Guide. Uniscaff. George Roberts Total Reliability of Supply. George Roberts Total Reliability of Supply

Uniscaff User Guide. Uniscaff.   George Roberts Total Reliability of Supply. George Roberts Total Reliability of Supply George Roberts Total Reliability of Supply User Guide George Roberts Total Reliability of Supply www.scaffoldingsales.co.uk Tubes Scaffold Staircases Beams Formwork Fencing K-Lok User Guide Contents Introduction

More information

NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES

NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES element 10: WORKING AT HEIGHT - HAZARDS AND RISK CONTROL

More information

PORTABLE LADDER SAFETY

PORTABLE LADDER SAFETY LADDER AND SCAFFOLD SAFETY PLAN Ladder & Scaffold Safety Falls can result in serious injury or death. Falls from a higher elevation account for approximately 10% of workplace fatalities and 5.2% of nonfatal

More information

Scaffolds. OSHA Office of Training & Education 1

Scaffolds. OSHA Office of Training & Education 1 Scaffolds OSHA Office of Training & Education 1 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds -- platforms supported by rigid, load bearing members, such

More information

Scaffolds. OSHA Office of Training & Education 1

Scaffolds. OSHA Office of Training & Education 1 Scaffolds OSHA Office of Training & Education 1 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds -- platforms supported by rigid, load bearing members, such

More information

TAKING YOU TO NEW HEIGHTS IN SAFETY...

TAKING YOU TO NEW HEIGHTS IN SAFETY... limited one bay cuplok Stair Unit user guide One Bay Stair Tower used in conjunction with Cuplok System Scaffolding and designed to conform to all current British and European Standards. With only five

More information

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004: Instructions for ssembly and Use Mobile working platforms according to DIN EN 00:00-03 Working platform 0.7 x.8 m max. working height: indoors.3 m outdoors.3 m Rolling Towers Load bearing capacity.0 kn/m

More information

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004: Layher Rolling Towers Uni Wide Safety Structure Instructions for Assembly and Use Mobile working platforms to DIN EN 1004:2005-03 Working platform 1.5 x 2.85 m Rolling Towers max. working height: indoors

More information

QUICK ALLY SCAFFOLD SPECIFICATIONS Standards: 1.0 m, 1.5 m, 2.0 m, 2.5 m, 3.0 m, 4.0 m. Ledgers: 0.5 m, 0.7 m, 1.2 m, 1.8 m, 2.4 m, 3.0 m. Polypropylene platforms: 0.7 m, 1.2 m, 1.8 m, 2.4 m, 3.0 m. Also

More information

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Configuration User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Open the configuration...

More information

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003 ASSEMBLY AND USER S INSTRUCTIONS Custers Camino CHIMNEY SCAFFOLDING 9505.903.001 ENG / (9505.202.015/016) Nov. 2003 CUSTERS HYDRAULICA B.V. Smakterweg 33, 5804 AE VENRAY NL Telephone : +31 (0) 478 55 30

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one access scaffolding Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one of the major players in the scaffolding and formwork industry in South

More information

LAYHER ALLROUND SCAFFOLDING INSTRUCTIONS FOR ASSEMBLY AND USE

LAYHER ALLROUND SCAFFOLDING INSTRUCTIONS FOR ASSEMBLY AND USE LAYHER ALLROUND SCAFFOLDING INSTRUCTIONS FOR ASSEMBLY AND USE Edition 05.2013 Ref. No. 8116.230 Quality management certified according to DIN EN ISO 9001:2008 by TÜV-CERT CONTENTS 1. Introduction... 4

More information

EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL

EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL EMSLC-TSM-1001 Engineering Approval: Lance Smith Manual Release Date: 04/25/2017 Release Authorization: ECN EMSLC-0191 Revision: AK TABLE OF

More information

Erecting, altering and dismantling scaffolding

Erecting, altering and dismantling scaffolding Erecting, altering and dismantling scaffolding Part 1: Prefabricated steel modular scaffolding A guide on health and safety standards November 2010 Disclaimer This publication may contain occupational

More information

Table of Contents Big expertise. Real convenience. Concrete commitment.

Table of Contents Big expertise. Real convenience. Concrete commitment. Table of Contents General Shoring Safety Rules As Recommended By The Scaffolding, Shoring And Forming Institute... 1 General Guidelines... 1 Single And Independent Post Shore System Safety Rules As Recommended

More information

No. S 518 WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (SCAFFOLDS) REGULATIONS 2011

No. S 518 WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (SCAFFOLDS) REGULATIONS 2011 1 First published in the Government Gazette, Electronic Edition, on 9th September 2011 at 5:00 pm. No. S 518 WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (SCAFFOLDS) REGULATIONS

More information

Multidirectional_scaffolding MP

Multidirectional_scaffolding MP Multidirectional_scaffolding MP 162 Company Projects Products Scaffoldings and Coverings MP MULTIDIRECTIONAL SCAFFOLDING The MP multidirectional system is the modern solution that reflects in an industrialized

More information

Assembly Instructions

Assembly Instructions MULTI-FUNCTIONAL SCAFFOLD UNIT + STABILIZER LEGS 1. SCAFFOLD 2. LADDER 3.TRESTLE 2 1 3 Assembly Instructions CODE: 126431 Parts List Specifications: - Width: 1.2m - Length: 1.6m - Scaffold Height: 3.4m

More information

USER S MANUAL HAKI UNIVERSAL

USER S MANUAL HAKI UNIVERSAL USER S MANUAL HAKI UNIVERSAL Suspended scaffolding HAKI AB 2012 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components

More information

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE SAFETY RULES and INSTRUCTIONS FOR AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE INTERIOR or EXTERIOR USE ! WARNING! Improper assembly, dismantling or use of Multi-Use Scaffold may result in serious

More information

OSHA Rules for Scaffolding

OSHA Rules for Scaffolding OSHA Rules for Scaffolding A) Objectives: 1. 2. 3. Don t let the scaffold fall. Don t fall off the scaffold. Don t let the material fall off the scaffold. Name of Competent Person: Name of Qualified Person:

More information

modular scaffolding R+

modular scaffolding R+ modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates

More information

2017 AT-PAC RINGLOCK SAFETY MANUAL & USER GUIDES UNITED KINGDOM

2017 AT-PAC RINGLOCK SAFETY MANUAL & USER GUIDES UNITED KINGDOM 2017 AT-PAC RINGLOCK SAFETY MANUAL & USER GUIDES UNITED KINGDOM Table of Contents INTRODUCTION... 4 RINGLOCK QUALITY FACTORS... 5 DESIGNATION OF RINGLOCK... 5 SAFETY GUIDELINES AND SAFE USE... 6 NEVER...

More information

Rosette Modular Scaffolding System

Rosette Modular Scaffolding System Rosette Modular Scaffolding System The rosette modular security scaffolding system to be used in facades, has been produced in accordance with the structural design conditions stated by the following applicable

More information

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40 PRODUCT BROCHURE INDEX introduction 4 access scaffolding 5 selflock system 16 wall system 17 column boxes 29 slab system 31 props 36 contact details 40 INTRODUCTION Augusta Manufacturing was established

More information

Scaffolding Procedures

Scaffolding Procedures Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This

More information

Combisafe Site Stairway the safe temporary access solution

Combisafe Site Stairway the safe temporary access solution Combisafe Site Stairway the safe temporary access solution Combisafe Site Stairway the safe temporary access solution Regulations and Standards There has been a general move within Regulations to promote

More information

3T - Through The Trapdoor Method

3T - Through The Trapdoor Method ALTO MEDIUM DUTY STAIRWELL TOWER Aluminium Access Tower ISSUE 3 Instruction Manual EN 1298-IM-EN The ALTO MD Stairwell Tower 3T - Through The Trapdoor Method Lakeside Industries Ltd www.altoaccess.com

More information

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS Garnsworthy Square 46, 62 & 64 Garnsworthy St Springvale rth Victoria 3171 Updated on 22/02/08 STC105 Name BASIC SCAFFOLDING KNOWLEDGE QUESTIONS THE PROFESSIONAL Scaffold Tools Scaffold Belts Couplers

More information

SAFESTAND Ltd. SafeStand Training Guide

SAFESTAND Ltd. SafeStand Training Guide SAFESTAND Ltd SafeStand Training Guide 1 CONTENTS SafeStand Components Page 4 Before Commencing Page 5 Erection Guide Page 6 Inspection Page 20 Dismantling Guide Page 21 SafeStand Gate Page 30 SafeStand

More information

SAFE WORK PROCEDURE LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: Leon Prevost Brent Vandenbosch

SAFE WORK PROCEDURE LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: Leon Prevost Brent Vandenbosch Page 1 of 6 LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: All Schools L. Carriere Lorne Turner Leon Prevost Brent Vandenbosch June 12, 2013 July 7, 2017 HAZARDS PRESENT Pinch points Falling

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS Frame Scaffolding Towers Rolling & Stationary 5, 10, 15 and 20 High READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This

More information

Allround Scaffolding System

Allround Scaffolding System Quality management certified according to ISO 9001:2008 by German TÜV-CERT L i m i t l e s s. S t r o n g. 8116.221 I n g e n i o u s. Catalogue Edition 01.04.2012 Allround Scaffolding System Layher Allround

More information

Supported Scaffold Inspections

Supported Scaffold Inspections Supported Scaffold Inspections May 2016 Inspect scaffolds and scaffold parts daily, before each work shift, and after any event that may have caused damage. Check to see if power lines near scaffolds are

More information

Elevated Work Safety Meeting

Elevated Work Safety Meeting Elevated Work Safety Meeting 1 Elevated Work There are many jobs that require working at heights This requires the use of walking working surfaces such as ladders, scaffolds and stairways Safety in elevated

More information

PLETTAC METRIX USER GUIDE

PLETTAC METRIX USER GUIDE PLETTAC USER GUIDE Providing quality products and services at a competitive price. Valid Only For Genuine Equipment DISCLAIMER: Whilst TRAD Hire & Sales Ltd and the author have made every reasonable effort

More information

Scaffolding Safety. Scaffolding

Scaffolding Safety. Scaffolding Scaffolding Safety Scaffolding 1926.450 - Scope, Application Covers all scaffolds used in workplaces Does not apply to crane or derrick suspended personnel platforms, which are covered by 1926.550(g) Aerial

More information

Scaffolding Safety Awareness Program

Scaffolding Safety Awareness Program Page 1 of 6 Sect: 1.0 Purpose 2.0 Scope While Ardent employees do not erect or modify scaffolding, it is essential that they understand and follow standard industry scaffold tagging procedures when accessing

More information

Allround Scaffolding

Allround Scaffolding Layher Allround Scaffolding Modular System Allround Steel General Building Authority Approval Z-8.22-64 Quality management certified according to DIN EN ISO 9001:2000 by German TÜV-CERT Member of the IIOC.

More information

CUPLOK SGB CUPLOK SGB Group

CUPLOK SGB CUPLOK SGB Group CUPLOK USER S MANUAL CONTENTS Page Introduction 5 The CUPLOK locking procedure 6 CUPLOK safety information 7 General site safety 9 Core components 11 Scaffold system components 12 Ancillary components

More information

Citations in brackets are from Title 8 of the California Administrative Code.

Citations in brackets are from Title 8 of the California Administrative Code. SAFETY WALKAROUND CHECKLIST SCAFFOLDS 2001 Date Prepared: Project Name/No: By: Location: Check the box if the statement is true. Fill in the blanks where the appears. Citations in brackets are from Title

More information

Scaffold Inspection Procedures for the Competent Person. Merle Errthum

Scaffold Inspection Procedures for the Competent Person. Merle Errthum Scaffold Inspection Procedures for the Competent Person Merle Errthum 2014 an elevated work platform. What is a Scaffold? What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported

More information

Genlok User Guide.

Genlok User Guide. Leaders in the supply of non-mechanical access equipment and builder s products to the construction industrial sectors User Guide www.generationhireandsale.co.uk index Page Duration: Two Days Overview:

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

TRAD HIRE & SALES SCAFFOLDING SUPPLIER USER GUIDE PLETTAC METRIX FOCUSSED ON SERVICE

TRAD HIRE & SALES SCAFFOLDING SUPPLIER USER GUIDE PLETTAC METRIX FOCUSSED ON SERVICE TRAD HIRE & SALES SCAFFOLDING SUPPLIER PLETTAC USER GUIDE FOCUSSED ON SERVICE DISCLAIMER: Whilst TRAD Hire & Sales Ltd and the author have made every reasonable effort to ensure that the information contained

More information

ESSENTIAL STANDARD no.17. Scaffolding

ESSENTIAL STANDARD no.17. Scaffolding ESSENTIAL STANDARD no.17 Scaffolding KEY MESSAGES Check that scaffolding meets the standards in this guidance. Ensure that regular inspections are carried out on scaffolding by a suitably qualified person.

More information

CAL SCAFFOLD USER GUIDELINES COURSE SUMMARY

CAL SCAFFOLD USER GUIDELINES COURSE SUMMARY CAL SCAFFOLD USER GUIDELINES COURSE SUMMARY The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Scaffold Safety. This guide

More information

Layher Allround Scaffolding

Layher Allround Scaffolding Faster. Stronger. Safer. More Profitable. Allround Scaffolding Comparison with Kwikstage Faster. Superior system technology. 59% Savings in Time Savings in time from superior system technology: 8 hole

More information

Safety Policy and Procedure

Safety Policy and Procedure Safety Policy and Procedure Policy Number: 026 Authorized By: The Cianbro Companies Alan Burton Title: Scaffold Safety is Everyone s Responsibility Effective Date: 06/01/97 Page 1 of 17 1 Status 1.1 Update

More information

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m

More information

Introduction. Estimated length: 30 minutes Audience: construction workers

Introduction. Estimated length: 30 minutes Audience: construction workers Introduction Scaffold User Training Welcome! The purpose of this Click Safety course is to provide instruction for basic safety provisions when using scaffolds in construction activities. Estimated length:

More information

Generation Hop up brackets to be removed and boards moved to lift above.

Generation Hop up brackets to be removed and boards moved to lift above. Denotes Ladder for Access from 2nd Lift to Extenda Bracket Generation Hop up brackets to be installed to manufacturer's instructions. Installed at 1200mm c/c max & 1050mm down from top of wall section.

More information

Scaffolding and Raised Platforms

Scaffolding and Raised Platforms Standard Operating Procedures Scaffolding and Raised Platforms Last Modified: JAN 2013 1 of 7 Scaffolding and Raised Platforms I Purpose To provide a guideline for personnel who work around or on stationary

More information

Acrow Cuplok Scaffolding System

Acrow Cuplok Scaffolding System SCAFFOLDING PRODUCT TECHNICAL GUIDE Acrow Cuplok Scaffolding System Genuine Safety. Outstanding Service. Disclaimer 80 5 00 500 500 500 500 2 20 8 0 00 500 500 500 500 420 150 CUPLOK Functional design

More information

PERI UP Flex Staircase 75. Instructions for Assembly and Use Standard Configuration

PERI UP Flex Staircase 75. Instructions for Assembly and Use Standard Configuration PERI UP Flex Staircase 75 Edition 05 2016 Content Overview Main components 1 Key 2 Presentational reference 2 Introduction Target groups 3 Additional technical documentation 3 Intended use 4 Instructions

More information

Layher. Keder Roof and Keder Hall. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use

Layher. Keder Roof and Keder Hall. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use Layher Keder Roof and Keder Hall Instructions for Assembly and Use Certification as per DIN ISO 9001/EN 29 001 by TÜV-CERT Keder Roof and Keder Hall Layher More Possibilities. The Scaffolding System. CONTENTS

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information