Creek) Bridge Replacement with environmental, survey, and bridge design. Geotechnical work will be performed by ODOT.
|
|
- Henry Webb
- 6 years ago
- Views:
Transcription
1 HAN SR /5.76 Bridge replacement of two structures, each over Tiderishi Creek. Consultant services to include design, contract plan development, & possible RW plan development. ODOT will provide survey, geotechnical, & environmental. $1,344, WIL SR Bridge Repl Replace Structure (SFN ); perform necessary related work. Bridge Replacement with environmental, survey, and bridge design. Geotechnical work will be performed by ODOT D02 RW Survey TO FY2018/19 A RW Survey service type 2 task orders. RW Survey services Task Order. 24 month duration, total contract amount $250, LUC SR Bridge Repl Replace LUC bridge over Cedar Creek; perform necessary related work. Bridge Replacement with environmental, survey, and bridge design. Geotechnical work will be performed by ODOT D02 Constr. Inspection-Dist Wide A construction engineering inspection project for district wide use - 2 year contract FY19-FY20. District wide Construction engineering and inspection for Calendar Year Estimate needs 2 Project Inspectors, 2 Structure Insp. 1 Soil and Agg Insp. 1 CO Engineer Level month duration, total contract amount $2,000, D02 Gen Engr TO 1/2018 A general engineering service type 2 task orders for District General Engr Services Task Order for District 1 and and 2. month duration, total contract amount $500, LOR US BI FY2019 Bridge inspection of LOR US Years Autumn Bridge Inspection CY CY CY LOR SR BI FY2018 Bridge Inspection of LOR SR Years Inspections to be done Fall Calendar 2018 / 2019 / 2020 Bridge Inspection 01/01/21 $650,000 01/01/21 $900,000 EDGE Development Goal DBE 12% ERI US BI (2018/2020) Fracture Critical Inspection - 2 Years /2020 Bridge Inspection MED SR Bridge Deck Repair and OverlayMED Bridge Replacement 10/01/20 $750,000 DBE 8% HUR SR Replace SuperstructureHUR Bridge Replacement 10/01/19 $650, ASD US Bridge ReplacementASD (over Branch of Long Bridge Replacement Creek) 10/01/20 $758,000 DBE 8% LOR SR Baumhart Sfty Install Roundabout at LOR-SR / Baumhart Road(Safety App D03-02) Federal/State Safety funds for PE & RW 90%/10%Construction will be 80%/20% CEAO/LOR CO MED SR Build a single-lane roundabout at State Route 3 and State Route 162 east leg intersection in Montville Twp.Safety Application: D03-03 Design of a roundabout...environmental to be completed by District...Survey control and ROW lines to be provided. Roundabout Design..Environmental done by ODOT..ROW lines and control done by ODOT D04 SUE Task Order FY2018/19 Two year Sub-surface investigation task order. Consultant to provide Subsurface Utility Engineering services as part of a 24 month Task Order. Estimated fee is $300, /01/22 $2,259,230 $1,645,000 DBE Development goal 1 of 7
2 MAH IR /3.73 Redeck 2 structures on MAH 680. SFN MAH under four mile run road and SFN MAH under Belle-Vista Ave. Consultant to provide engineering services from PE (Stage 1 & 2) through FE (Final Tracings) including On-Going Services during Construction. Geotechnical Services, Environmental Services, and RW Acq services are not included in this agreement. 01/01/22 $2,400,000 DBE 8% POR SR Deck Replacement on SFN POR over SR 5/SR 44. Consultant to provide engineering services from PE (Stage 1 & 2) through FE (Final Tracings) including On-Going Services during Construction. Geotechnical Services, Environmental Services and RW Acq services are not included in this agreement. 04/01/22 $2,300, D04 Bridge Review FY Two year bridge review task order. $150,000 Consultant to provide Level 2 & 3 Bridge Design Plan Review & Bridge Constructability Review services as part of a 24 month task order. Estimated fee is $150, FAI SR /04.32 Replacement of two structures (FAI and FAI ) with new superstructures and substructures FRA IR (Noise Walls) Construct noise walls (NSA 1, 2, 7, 8) on both sides of IR 270 from south of E Broad St to north of Main St. and from south of Main St to north of Livingston Ave FAY SR Replace Culverts at FAY & 2.32, potential extension to eliminate the need for guardrail.gabion baskets at FAY require repair, replacement or grading & removal.r/w required D06 GENERAL ENGR FY18 B General engineering consultant services for various projects in D6 and CO ITS. Two year contract beginning in FY FRA IR Hard shoulder running installation (branded as SmartLane) on FRA-670 between 4th street and IR-270. Approximately between SLM. The project also includes improvements to the 670/270/62 interchange and along IR 270 NB to improve congestion and safety due to a weave. WB IR 670 will resurfaced with the project. Bridge design services for two structures to be replaced...see below FTP Site for reference files...ftp://ftp.dot.state.oh.us/pub/districts/d05/projects/fai/960 15%20FAI _04.32/..Non-Complex Roadway, Bridge- Level 1 and 2, Geotech Eng. Serv 07/01/19 $1,120,000 DBE 10% Perform Geotechnical Structure Exploration, prepare Structure Foundation Report, provide Noise Barrier foundation recommendations and prepare Soil Profile sheets. Consultant to provide environmental document, plans thru Stage 3/Final and R/W plans Consultant to provide general engineering services as requested by the District & CO ITS. Duration 24 months from authorization to proceed. Total contract amount $1,000,000. Plan Review for MAD Design Build project will be included. Provide construction inspection services for duration of project 04/18/19 $6,300,000 01/01/20 $921,424 06/07/18 $51,717,845 EDGE 12% 2 of 7
3 DEL US Reduce crashes and increase safety at the intersections of DEL US 36/SR 37 at Lackey Old State Rd (DEL CR 10) and at North Old State Rd/Dunham Rd (DEL-CR 10 & 10A).A safety study has recommended the installation of Restricted Crossing U Turn Intersections (RCUT) at both intersections by forcing all side road traffic to turn right, and then make a u turn at upgraded crossovers with turn lanes, lengthening and realigning the left turn lanes at North Old State Rd and adding a westbound right turn lane at North Old State Rd.This and other possible solutions will be evaluated. Provide evaluation of alternates, Stage 1, 2 & 3, and right of way plans and final plans including ongoing services DAR SR DAR Replace superstructure with composite box Consultant to deliver the following items associated with the beams and concrete wearing surface and minor patching to design of this project: AER, Stage 1, Stage 2, Stage 3, Final abutments and wingwalls. Tracings. Consultant shall also be available or Pre-Bid Activities and On Going Services during construction D07/D08 SURVEY SVCS FY 18/19/20 Surveying Services contract for use throughout District 7 and District MER SR 117/ /6.37/14.99 Culvert replacements.mer " CulvertMER " CulvertMER " Culvert Consultant to complete surveying tasks on various projects, mostly within District 7. The completion time will be 24 months from authorization. The contract limit will be $250,000. Consultant to prepare plans and submit for the following reviews: AER, Stage 1, Stage 2, Stage 3, & Final Tracings. Consultant shall also participate in Pre-Bid Activities and On Going Services during construction D07 CE FY18/FY19 District 7 general construction inspection services. Construction Inspection Task Order to perform construction inspection services on various projects within the district. Duration of 24 months, total contract amount $1,600, D08 CEINSP FY18 - FY 20 District wide general project and bridge painting inspection for FY18 - FY 20. Need 6 project inspectors (one paint certified). Three additional paint inspectors are needed for the first 120 days of the contract WAR SIGNS FY2020 Systematic sign upgrade of all signs on all routes in Warren County. Locations to be determined - to inlcude three (3) interchanges on I-75 Construction Inspection for District 8 Wide general project and bridge painting for FY18 - FY20. Duration of 24 months, total contract amount $2,000, /01/21 $360,000 10/01/20 $265,000 Collection and detailed construction plans to replace all signs on all routes in Warren County. Including 3 interchanges on I /01/20 $1,000,000 $1,000,000 DBE 8% SBE Set- Aside DBE 15% DBE 8% 3 of 7
4 PRE US Replace bridge deck and paint bridge PRE L that carries Westbound US 35 over consultant to prepare construction plans through final design for the bridge deck replacement and paint of PRE L. Preliminary info. available at: ftp://ftp.dot.state.oh.us/pub/districts/d08/programmatics/2 018-January/PID_100807_PRE / 10/01/20 $2,196, D08 OSS FY2018 Overhead Sign Support Inspections in the District. Consultant to provide Overhead Sign Support inspections for District 8. Inspection includes sign, signal, and highway lighting supports. EDGE 15% CLI SR 28/ /0547/0054 Replace Bridge Size Culverts CLI , and CLI Repair the CLI structure by replacing portions of the deteriorated slab and performing other minor repairs GRE US /2021 Replace Bridge GRE that carries US 42 over the Little Miami Bikepath and a private drive. Widen bridge to match approach roadway width. Bridge length may be reduced. Rehabilitate GRE over North Fork Massies Creek by installing a rigid overlay, updgrading the guardrail, and performing other minor rehabilitation items PRE SR /17.69 Replace bridge size culvert PRE over Aukerman Creek and rehabilitate bridge PRE over a tributary of Aukerman Creek by installing a concretre wearing surface, replacing the bearings, installing scour protection, upgrade guardrail patching the piers and strengthening with FRP. Consultant prepare complete construction and right of way plans as well as environmental work as needed. Information available at: ftp://ftp.dot.state.oh.us/pub/districts/d08/programmatics/2 018-January/PID_102731_CLI-28_ / Consultant to prepare complete construction and right of way plans as well as environmental work as needed...additional information at:..ftp://ftp.dot.state.oh.us/pub/districts/d08/programmatic s/2018-january/pid_102746_gre _2021/ Consultant to prepare complete construction and right of way plans as well as environmental work as needed. Information available at: ftp://ftp.dot.state.oh.us/pub/districts/d08/programmatics/2 018-January/PID_102767_PRE _ /01/21 $1,333,333 DBE Development goal 10/01/21 $2,333,000 DBE 10% 10/01/21 $1,350, SCI SR & Brdg Bridge Replacement on SCI SR & Survey, geotechnical services, hydraulic analysis, utility locations, design & right of way (if needed) plans and electronic files per ODOT Standards to be used to replace deficient structure. The District has some of the survey complete. 07/01/19 $2,900,000 DBE 10% SCI SR Brdg Replace Replace bridge at SCI (SFN ) Survey, geotechnical services, hydraulic analysis, utility locations, design & right of way (if needed) plans and electronic files per ODOT Standards to be used to replace deficient structure. 07/01/19 $720,000 DBE 8% 4 of 7
5 ADA SR Slide Repair Landslide repair on ADA Survey, geotechnical services, hydraulic analysis, utility locations, design & right of way (if needed) plans and electronic files per ODOT Standards to be used to remediate slip. The District has performed some of the survey work. 07/01/19 $486, D10 Paint Insp T.O. FY Paint Inspection Task Order for FY month, $250,000 district wide task order agreement for providing paint inspection services D11 CY2018/2019 Const Insp Two year Consultant Construction Inspection contract to assist the District Construction Inspectors for CY CUY IR /VAR CMP repair at 5 locations. Work may include a structural spray lining D12/D3 GES FY Survey District 3 & year Surveying Contract for SFYs This project is programmed to replace PID upon completion. 24 Month Construction Inspection contract, total contract amount $750,000. Prepare an alternatives report and construction contract plans for the rehabilitation of 5 large culverts. 2 year survey services. District General Engineering Services (GES) Survey contract for 2018 & Shared contract between D12 and D3. Contract amount $75,000 07/01/21 $2,000,000 DBE 12% CUY IR Superstructure Replace the superstructure (slab) of the IR-90 bridge over Replace the deck of the IR-90 bridge over Tuttle Creek in Tuttle Creek in Westlake. Westlake. 04/01/20 $1,900, CUY SR Replace the Royalton Rd (SR-82) bridge over Chippewa Creek located 0.57 miles west of SR-176 in Broadview Hts. Conduct a hydraulic analysis to determine the necessary Perform a drainage analysis and replace the existing structure. hydraulic opening. 01/01/22 $1,000,000 EDGE 5% CUY SR Rehabilitate the Whitehouse Crossing bridge (SR-14) over CSX RR in Garfield Hts. Part 1 is to prepare a life cycle cost analysis between rehabilitating the existing structure and 2 part contract to prepare an AER to compare rehab vs replacement of the Whitehouse Crossing bridge structure. replacing it. 10/01/24 $30,000,000 DBE 8% CUY IR Deck Replace the deck of the West 44th St bridge over I-90 in Replace Deck. Repair Abutment. Pier Repair. Cleveland. 04/01/20 $3,500, Amish Vehicle Study Create a current inventory of the routes that carry horse drawn vehicle traffic and document the amount of Amish traffic, the crash data associated with Amish vehicles, and the pavement conditions of these roadways. Once this data is collected it will assist in our decision making to address both safety issues and pavement preservation issues. Update former study. 5 of 7
6 Design Build Alt Projs Delivery a task order consultant contract to perform miscellaneous Design Build Consultant Services Task Order Contract to occur design-build scope development tasks, db scope review for in SFYs 2018 & specialty, design-build proposal development, request for qualification development, and db program management and program improvement forthe development and delivery of design-build construction projects. the consultant shall provide ongoing support (clerical/managerial) to the division of construction management and district office for the delivery of a various design-build as needed STW ENV Commitment Monitoring Monitoring of Environmental Commitments. OES will hire consultant to monitor environmental commitments on a task order basis. The maximum prime compensation shall not exceed $300k. Contract expiration will be 24 months after authorization to proceed STW Gen Eng Serv ORDC 2018 Design of railroad preempted traffic signals and minor associated roadway and sidewalk modifications, and miscellaneous design tasks, surveying, plan review and RR preemption related services to assist the ORDC on a task order basis. Request statewide design svcs for RR preempted traffic signals and minor assoc. roadway/sidewalk modifications, and misc. design, surveying, plan review and RR preemption related services to assist ORDC. Two-year, task order agreement, max $500, STW Preemption ORDC 2018 Consultant services for railroad traffic signal preemption for railroad grade crossing warning device projects. Two year contract with maximum compensation of $350,000. Consultant services for railroad traffic signal preemption for railroad grade crossing warning device projects. Two year contract with maximum compensation of $350, STW CEAO Task Order FY18-19 (2) OES Statewide Task Order Contract for districts to use for Environmental Services County Engineer's (CEAO) projects. This will be advertised with the January 2018 Programmatic STW 2018 Bike Ped Task Order 24-month Task Order Contract to assist communities with SRTS Detail Design and Environmental; School Travel Plan Development; and statewide bicycle and pedestrian initiatives, planning studies and education SPCC Plan FY18-19 ODOT's Office of Environmental Services will hold a task order contract for the implementation of ODOT s SPCC program. OES will hire consultant to perform environmental services for County Engineer's projects on a statewide task order basis. Maximum prime compensation shall not exceed $300, and completion is 24 months from authorization to proceed. 24-month Task Order Contract to assist communities with SRTS Detail Design and Environmental; School Travel Plan Development; and statewide bicycle and pedestrian initiatives, planning studies and education. OES will hold a task order contract for SPCC Plan Implementation. One firm will be awarded the contract. The maximum prime compensation shall not exceed $250,000 and the completion time will be 24 months from authorization to proceed. EDGE 15% DBE 12% 6 of 7
7 Aerial Engineering Services C Statewide Aerial Engineering Services Task Oder. This is an Option 2 task order (Encumbered on a project basis.) Mapping and Surveying services for first of two consultants Aerial Engineering Services C Statewide Aerial Engineering Services Task Oder. This is an Option 2 task order (Encumbered on a project basis.) mapping and surveying services for second of two consultants Research - Consultant This research PID is for the Consultant to assist the research program with tasks. FHWA has approved this for eligibility CV/AV Simulation Modeling Study Perform simulation modeling study on select Ohio highways to understand the impacts of various CV/AV technologies on operational performance. The simulation modeling will be performed on highway corridors to be determined by ODOT. Each corridor will be aseparate task. Act as the Research Contract Manager for the Office of Statewide Planning and Research in assisting with our mission to invest in innovative research that develops, maintains, and assists Ohio in establishing a world class transportation system. Task Order contract to perform simulation modeling of various CV/AV technologies for assigned corridors STW ATMS Replacement Replacement of current ATMS system Evaluate current ATMS traffic management system and recommend a replacement DriveOhio Outreach Activities to stand up "Drive Ohio" including outreach and PR efforts to advance smart mobility technologies DriveOhio Outreach TOTAL = 60 Agreements 7 of 7
Future Programmatic Date 09/04/2018 Sorted By District (Subject to Departmental Changes) Run Date 6/22/2018
Future Programmatic 09/04/2018 Sorted By rict (Subject to Departmental Changes) Run 6/22/2018 Prgmtc 1 09/04/2018 102864 D01/D02 ENV FY19 Task Order Environmental task order agreement for rict 1 and rict
More informationFuture Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)
Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 1 09/08/20 101082 D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform
More informationFuture Programmatic Beyond 05/06/2019 Sorted By District (Subject to Departmental Changes)
Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/2018 1 09/09/19 100972 D01 Const Insp FY20 / FY21 inspection contract in rict 1 for FY20 & FY21 24 month Inspection
More informationIMPROVING I 81 IN MARYLAND
IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I
More informationODOT DISTRICT CONSTRUCTION PROGRAM
ODOT DISTRICT 5 2017 CONSTRUCTION PROGRAM SERVING COSHOCTON, FAIRFIELD, GUERNSEY, KNOX, LICKING, MUSKINGUM, AND PERRY COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR SONJA R. SIMPSON,
More informationPCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities
PCL Definitions for the Local Program Projects that are administered by the Central Bureau of Local Roads. Engineering, utilities and land acquisition are coded with the PCL for the type of construction
More informationSTRUCTURE AND BRIDGE DIVISION
Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work
More informationHighway Construction Program
Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,
More informationSUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is
More informationAny discussions or marketing activities related to this specific project.
04-11-19 Posting Date South Sandusky Street Widening and Relocation PID No. Not Assigned City of Mount Vernon Response Due Date: 04-24-19 Communications Restrictions Please note the following policy concerning
More informationPUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)
PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) The Medina County Highway Engineer is soliciting statement of qualifications
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could
More informationAnnual Listing of projects with Obligated Federal Funding. Under federal law, TMACOG is responsible for producing an annual listing of federal
Annual Listing of projects with Federal Funding Under federal law, TMACOG is responsible for producing an annual listing of federal funds that are obligated in the previous fiscal year. In fiscal year
More informationOhio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director
Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S
More informationMEMORANDUM. Attachments:
MEMORANDUM To: Technical Advisory Committee, Board of Directors From: MVRPC Staff Date: November 8, 2017 Subject: SFY2018-SFY2021 Transportation Improvement Program (TIP) Amendment #4 Over the last few
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could
More informationNortheast Bridge Preservation Partnership Meeting
Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.
More informationEngineering Assessment Process: Keys to a Solid Engineer s Report
Engineering Assessment Process: Keys to a Solid Engineer s Report 89th Annual Purdue Road School March 26, 2003 Brad Steckler, P.E. Brad L. Steckler, P.E. Manager of Engineering Assessment Indiana Department
More informationCLA /10.54, PID Project Description:
Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway
More informationI-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017
I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),
More informationADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle
More informationMEMORANDUM. Attachments:
MEMORANDUM To: Technical Advisory Committee, Board of Directors From: MVRPC Staff Date: January 9, 2019 Subject: SFY2018-SFY2021 Transportation Improvement Program (TIP) Amendment #13 Over the last few
More informationTRANSPORTATION. Governmental Projects
TRANSPORTATION Governmental Projects Function: Activity: Category: Transportation Road & Street Facilities Arterial Roads Project No: 1618 Title: 118th Avenue Expressway Cost Center: 841418 Department:
More informationYear Pre Total County Debt (Bonds & BANS) Mitigation Fees
CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge
More informationCumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures
Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure
More informationCUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL
Notices 181004 Late CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL FOR IMPROVING VARIOUS SECTIONS IN CUYAHOGA COUNTY, OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING TREES
More informationTABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7
ii TABLE OF CONTENTS Manual Section Pages Introduction 1 Using This Manual 2-3 Administrative Actions 4-6 Road and Bridge Project Types 7 Road and Bridge Funding Programs 8-9 Project Planning and Eligible
More informationMAKING THE PAVEMENT MANAGEMENT SYSTEM WORK TO SUPPORT ASSET MANAGEMENT
MAKING THE PAVEMENT MANAGEMENT SYSTEM WORK TO SUPPORT ASSET MANAGEMENT Andrew Williams Office of Technical Services Andrew.Williams@dot.ohio.gov 1 TODAY S TOPIC How ODOT uses the Pavement Management System
More informationClear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School
Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Presented By: County of El Dorado Community Development Agency Transportation
More informationChapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction
Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the
More informationRED FLAG SUMMARY. Red Flag Summary Completed: January 2006
Purpose The purpose of this Red Flag Summary is to identify concerns that could cause revisions to the following: Anticipated design and construction scope of work Proposed project development schedule
More informationI-64 Capacity Improvements Segment I Financial Plan Annual Update
I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905
More informationConstruction Cost Estimation Preparation Manual for Preliminary Design (English Units)
10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents
More informationCleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016
Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for
More informationCOMMUNICATIONS RESTRICTIONS:
02-18-18 Posting Date SUM-SR 91 and SR 303/Ravenna Signal and Roadway Improvements PID No. 102692 City of Hudson Engineering Department Response Due Date: Friday, March 16, 2018 The City of Hudson s Engineering
More informationAREAWIDE BRIDGE REPLACEMENT AND REHABILITATION
CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally
More informationNOACA Board of Directors March 10,
NOACA Board of Directors March 10, 2017 Action Requested Request the Board of Directors adopt Resolution 2017-015 which: Approves the Transportation Asset Management Previous Action Recommended by the
More informationConstruction Cost Estimation Preparation Manual (Metric Units)
07/25/2001 Construction Cost Estimation Preparation Manual (Metric Units) July 2001 Prepared by Cost Estimating Unit Program Support Services 07/25/2001 Table of Contents Section Page 1.0 Introduction
More informationEngineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017
Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue
More informationIndiana ABC Experience
Introduction to the Milton-Madison Bridge Project Anne Rearick, PE INDOT Bridge Director Kevin Hetrick, PE INDOT Project Manager 10/14/2014 Slide 1 Indiana ABC Experience 2003 Bridge slide CSX RR over
More informationFall 2018 Engineer Trainee Recruitment Preference Sheet
Please indicate with an X your position preference. Please also indicate your preferred work location(s) for the postion(s) in which you are interested, by using 1 to indicate your first choice, 2 as your
More informationPRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT
PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT RFQ No. 21-9SDP5001 601CT0000003698 November 19, 2018 Safety Minute Purpose of Meeting
More informationASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves
More informationGEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects
GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway
More informationBRIDGE INSPECTION REPORT
NC DEPARTMENT OF TRANSPORTATION ATTENTION DIVISION OF HIGHWAYS BRIDGE MANAGEMENT UNIT BRIDGE INSPECTION REPORT INSPECTION TYPE: Routine Inspection COUNTY IREDELL BRIDGE NUMBER 480596 INSPECTION CYCLE 2
More informationMASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK
MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,
More informationTHE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY
THE COMMONWEALTH OF MASSACHUSETTS Number: P-92-010 Date: 10-08-92 - ) HIGHWAY DEPARTMENT FROM: NON-NHS BRIDGE R&R POLICY The purpose of this Engineering Directive is to formally notify Department Personnel
More informationRehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016
Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations
More informationConceptual Design Report
Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE
More informationVDOT s Strategic Approach to Bridge Management and Maintenance
ASCE Richmond Branch VDOT s Strategic Approach to Bridge Management and Maintenance Adam Matteo Assistant State Structure and Bridge Engineer Structure and Bridge Division October 13, 2015 Long Term Challenge
More informationCochran Mill Road Bridge over Tuscarora Creek
Cochran Mill Road Bridge over Tuscarora Creek July 15, 2014 Brian Morrison, P.E. NOVA District Senior Structural Engineer (703) 259-2606 brian.morrison@vdot.virginia.gov Purpose & Need Purpose Update project
More informationChapter 4 Bridge Program Drawings
Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles
More informationLehigh Valley Transportation Study
ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL
More informationInformation for File # RJH
Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;
More informationTown of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation
Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation OVERVIEW History of Events 2018 Bridge Redesign Construction Schedule 2 ACRONYMS AND TERMINOLOGY FHWA =
More informationSUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
Updated on May 19, 2014 VENANGO COUNTY SR 308(DOI) #96906 PROPOSAL:$13.44 PLANS:$3.96 For the bituminous milling and resurfacing of various state routes throughout VENANGO COUNTY, Commonwealth of Pennsylvania,
More informationProcedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE
Approved : Procedure No: 210-003(SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting Julie Ray, Deputy Director Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION
More informationATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page AGENCY (Requestor or Agency who'll open bids): Contact: Phone:
ATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page 1 1. AGENCY (Requestor or Agency who'll open bids): Contact: Phone: 2. AGENCY PRIORITY (Numerical): 3. PROJECT #: 4. ROUTE SYSTEM (e.g. TWP 108 or
More informationBurton Planning Services
Burton Company Overview & Staff Background Burton 252 Electric Avenue Westerville, OH 08 6-92-228 www.burtonplanning.com Sustainable & Environmental Solutions BPS Company Overview Burton was formed in
More informationBridge Asset Management City of Battle Creek Planning and Projects
Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.
More informationSECTION 1400 Review Submissions
1401 Design Review Process 1401.1 Introduction ODOT s Project Development Process (PDP) is a team-oriented approach to developing a transportation project from concept to completion. This section of the
More informationODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS
R401: LINEAR GRADING R402: ITEM 209 - RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R404: DELETED R405: BARRIER REFLECTORS R406: PAVEMENT MARKING LANE WIDTHS R407: TYPE A ANCHOR ASSEMBLY
More informationBALFOUR INTERCHANGE PHASE 1 CONSTRUCTION PRE-BID MEETING
BALFOUR INTERCHANGE PHASE 1 CONSTRUCTION PRE-BID MEETING WHO WE ARE The Contra Costa Transportation Authority (CCTA) is a public agency formed by Contra Costa County voters in 1988 to manage the county
More informationPlease note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process:
01-14-19 Posting Date PIK-CR50-3.32 PID No. 108129 Pike County Response Due Date: 02-22-19 Communications Restrictions Please note the following policy concerning communication between Consultants and
More informationAGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.
Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE
More informationEngineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida
Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South
More informationOverview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer
Overview of Maintenance and Construction Programs Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer March 3, 2015 Overview Maintenance and Construction State v.
More informationJoint Meeting- Stakeholder Committee & Technical Committee
Joint Meeting- Stakeholder Committee & Technical Committee Wednesday, February 26, 2014 Cobb County DOT Squad Room Cobb County Comprehensive Transportation Plan Update 2040 www.cobbinmotion.com - Guiding
More informationVENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.
VENETIAN CAUSEWAY (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE FM No. 422713-2-22-01 Efficient Transportation Decision Making (ETDM): 12756 Project
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Project/Plan Authorization and Approval Authority SPECIFIC SUBJECT:
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION
STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6)
More informationBoster, Kobayashi & Associates NEVIN Q. SAMS, P.E., T.E., P.T.O.E.
Boster, Kobayashi & Associates 59 Rickenbacker Circle Office: (925) 447-6495 P.O. Box 2049 Fax: (925) 447-6589 Livermore, CA 94551-2049 NEVIN Q. SAMS, P.E., T.E., P.T.O.E. Curriculum Vitae EDUCATION: B.S.
More informationNEW MEXICO LAND OF ENCHANTMENT
Bridges CENTENNIAL 1912-2012 NM C - NEW MEXICO LAND OF ENCHANTMENT Las Cruces viaduct; finishing floor. Source: NM Department of Transportation New Mexico Infrastructure Report Card 2012: 34 Overview:
More informationPROJECT DESCRIPTION PIK-CR PID 95402
PROJECT DESCRIPTION PIK-CR 85-0.91 PID 95402 It is proposed to rehabilitate the bridge over Sunfish Creek on CR 85 in Pike County, Ohio. The rehabilitation includes the replacement of the concrete deck,
More informationNational Bridge Inspection Program Risk-based, Data-driven FHWA Oversight
National Bridge Inspection Program Risk-based, Data-driven FHWA Oversight March 21, 2012 National Bridge Inspection Standards (NBIS) Metrics Metric #1: 23 CFR 650.307 Bridge inspection organization Metric
More information100 Design Controls and Exceptions
100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria...
More information2017 Highway Safety Improvement Program Call
2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public
More informationConstruction Forecast
Construction Forecast January 14, 2016 Agenda Opening Remarks Introductions Capital Program Anticipated Bid Schedule Project Descriptions Q & A Introductions Randy Cole, Executive Director Tony Yacobucci,
More informationJoint House and Senate Transportation Committee Update to the Ten Year Plan
Joint House and Senate Transportation Committee 2019 Update to the Ten Year Plan Federal and State Funding Sources 2 AFY19 Budget Revenue Estimates 3 FY19 Federal & State Funds Federal Funds 38% State
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION
STR 7004 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 4 3/4 MILE RD 43.5688 / -84.3455 56314H00009B010 Good
More informationODOT Bridge and Pavement Funding Allocation Business Process. Bruce Johnson 11 th IBSMC, Mesa Arizona 4/24/17
ODOT Bridge and Pavement Funding Allocation Business Process Bruce Johnson 11 th IBSMC, Mesa Arizona 4/24/17 ODOT s Construction Programs Fix It Preservation Program Purpose: The Preservation Program is
More informationI-65/I-70 North Split Project
I-65/I-70 North Split Project Public Open House October 10, 2018 Alternatives Development Process Define Problems Identify Context Gather Input Define Alternatives Balance Trade-Offs Select Alternative
More informationPlease note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process:
01-28-19 Posting Date PIK-CR50-3.40 PID No. 108463 Pike County Response Due Date: 03-08-19 Communications Restrictions Please note the following policy concerning communication between Consultants and
More informationextent feasible. Per the and low constructability,
RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful
More informationALTERNATIVE PROJECT DELIVERY DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:
More informationPinellas County Capital Improvement Program, FY FY2016 Project Summary Report
Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost
More informationWELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015
WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges
More informationSTIP Project Description Guidance Revised December 14, 2015
General Guidance The guidance below applies to all local and MnDOT projects shown in the STIP. STIP Project Description Guidance The project description must clearly identify the specific route, point
More informationDesign Constraints Railroad
Design Constraints Railroad 46 Design Constraints Railroad 47 Design Constraints 75 Interchange 48 Design Constraints MSD Lick Run Project 49 Alternatives - Rehabilitation 50 51 Alternatives - Rehabilitation
More informationANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:
ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls
More informationJoint Legislative Transportation Oversight Committee January 6, 2016 Maintenance Operations Performance Analysis Report (MOPAR) Kristin Barnes
Joint Legislative Oversight Committee January 6, 2016 Maintenance Operations Performance Analysis Report (MOPAR) Kristin Barnes Division 4 Staff Maintenance Engineer 1 Legislative Requirements (NCGS 136-44.3)
More informationPennDOT District 11 Bridge Asset Management. Louis J. Ruzzi, P.E. District 11-0 (Pittsburgh Area) Bridge Engineer
PennDOT District 11 Bridge Asset Management Louis J. Ruzzi, P.E. District 11-0 (Pittsburgh Area) Bridge Engineer Talking Points History of the PennDOT District 11-0 Bridge Program Bridge events and fiscal
More informationASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened
More informationPIC PID Const Project Pre Bid Meeting. April 25, 2013
PIC-674-4.21 PID 83958 Const Project 466314 Pre Bid Meeting April 25, 2013 1 Project Goals Complete Replacement of PIC-674-0430 structure Improve deficient sight distance by reconstructing vertical curves
More informationState of Ohio. Department of Transportation ~ Innovative Contracting Manual
State of Ohio Department of Transportation ~ Innovative Contracting Manual 4/10/2006 Copies of this manual and reference materials may be obtained at: Ohio Department of Transportation Division of Construction
More informationConstruction Forecast
Construction Forecast October 7, 2015 Agenda Opening Remarks Introductions Capital Program Anticipated Bid Schedule Project Descriptions Procurement Process MBE/DBE Break-out Discussions Housekeeping items
More information