DSI FLAGSHIP PROJECTS SHOWCASE

Size: px
Start display at page:

Download "DSI FLAGSHIP PROJECTS SHOWCASE"

Transcription

1 DSI FLAGSHIP PROJECTS SHOWCASE Drake & Scull International

2 DRAKE & SCULL CONSTRUCTION 2

3 King Abdullah Petroleum Studies and Research Centre Project: King Abdullah Petroleum Studies and Research Centre Location: Riyadh, KSA Industry: education Developer: Saudi Aramco Consultant/Architect: Zaha Hadid Value: US $ 800 million King Abdullah Petroleum Studies and Research Centre (KAPSARC) is a future-oriented research and policy centre committed to energy and environmental exploration and production and analysis. The 887,000 sq feet KAPSARC campus is located in Riyadh, Saudi Arabia s capital and largest city. Headquartered in an iconic complex 8 Kms south of King Khalid International Airport and designed by world-renowned architect Zaha Hadid, the Centre is the first thing visitors see upon arriving in Riyadh and the last they will glimpse before leaving, by airplane. The Centre s construction employs a variety of sustainable building techniques and advanced technologies. Arranged to temper the light and heat of the desert environment, and utilize wind to cool facades and outdoor spaces, the design bathes interiors in carefully controlled, soft light. Building and landscaping mix with the dry-land ecosystem and take advantage of seasonal breeze to offer temperate zones and improve pedestrian comfort. Energy-efficient light sources such as LEDs, powered outside the grid using photovoltaic elements, give the landmark a crystal-like identity during the night. The Entire complex will be LEED Platinum Rated upon completion, which is the highest level achievable under U.S. Green Building Council specifications. Drake & Scull Construction are executing the Civil, Architecture, Interior Architecture, Electromechanical, External Road & Parking Facilities, Infrastructure Works, Site Works and Landscaping. Drake & Scull Construction are also undertaking the construction of the following project elements: Basement connecting the 3 main buildings with access tunnels 5 Core Buildings (Research Center, Conference Center, Library, Musalla & IT Center) Structural and Façade works Interface with Novated contractors PMT Offices 3

4 Lamar Towers Project: Lamar Towers Location: Jeddah, KSA Industry: Commercial Developer: Lamar Development Company Consultant/Architect: RMJM/Saudi Diyar Value: US $ 460 million The Word Lamar means liquid gold in Arabic, which describes the reflection of the golden glass in the waters of the gulf. The Lamar Towers are a pair of skyscrapers currently under construction in the city of Jeddah, Saudi Arabia. Located on Jeddah Corniche, Tower 1 will be 350 m (1,150 ft) tall with 72 floors above ground, and Tower 2 will be 301 m (988 ft) tall with 62 floors above ground. DSC was invited to complete the construction of the Lamar Towers and accelerate the project to completion. DSC is responsible to carry out the construction, completion, commissioning handover and maintenance of Civil, Architectural, Interiors, and External Works. The Lamar Towers were conceptualized to house a shopping mall, office blocks, Hotels and residential apartments for complete Mixed Use. Besides these, the towers will also offer a conference center, ballrooms, a spa and other related facilities. 4

5 Jabal Omar Project: Jabal Omar Location: Mecca, KSA Industry: Mixed Use Developer: Jabal Omar Development Company Consultant/Architect: ARCREA Studio/ Wilson Associates Value: US $ 350 million The Jabal Omar Development was set up to invest $3.2bn in projects located at the holy city of Mecca where it is headquartered. The company was created to oversee the construction of 40 residential towers to accommodate 160,000 Islamic pilgrims, and a prayer area for 200,000 worshippers. More than 600 properties have been seized for the project, which involves constructing two five-star hotels with 935 rooms, and six three-star hotels comprising 1,255 rooms, across an area spanning 244,800 sq m. Residential buildings reaching 20 storeys to accommodate 100,000 people, 520 restaurants and 4,360 commercial and retail units are also being built. The third phase of the Jabal Omar scheme will involve the construction of four hotel towers with a total built up area of 400,000 square metres. The Towers will also include a 5 star and 3 star hotel. DSC will carry out the complete construction of the main Podiums, car parking levels and commercial space. DSC will also install elevators, escalators and fire escape stairs for the podium area. DSC s scope of work also includes the construction of two 5 star and one 3 star hotel towers. Both towers are multi storied and will be able to accommodate more than 1000 guests at a time. When finished, the development will have air conditioned plazas for 100,000 worshippers, open courtyards for 120,000 people and a car park that can accommodate 10,000 vehicles. 5

6 Saraya Aqaba Project: Saraya Aqaba Location: Aqaba, Jordan Industry: Commercial Developer: Saraya Aqaba Real Estate Development Company Consultant/Architect: Arabtec Value: US $ 208 million The USD 1 billion Saraya Aqaba Project is a premier tourism and leisure destination, with a mixed-use themed development. Situated on the northern tip of the Gulf of Aqaba, the construction of the Saraya Aqaba Project and its man-made lagoon will add approximately 1.5 km of beachfront to the city of Aqaba. The Project comprises approximately 634,000 square meters of master-planned development, combining the splendor of an authentically styled ancient city with the modern luxuries of a world class resort. It features a number of 5-star hotels and boutique hotels, various residential options (beach front villas, townhouses, beach club duplexes and apartments), office space, a contemporary shopping district, an old souk, a water park, a convention centre, and an amphitheater. A bustling city within a city, uniquely designed in a culturally authentic manner; Saraya Aqaba is set in the midst of a rich and textured environment of lush gardens and sparkling waterways. DSC was awarded the General contracting scope of works to deliver Phase one of the Saraya Aqaba Development. Phase One of the development includes four international hotels managed by Jumeirah International and Starwood Hotels and Resorts Worldwide as well as Souk Saraya, a beach club, offices, a convention center and Wild Wadi water park managed by Jumeirah International, in addition to a part of the residential units, infrastructure, utility buildings and staff accommodation. 6

7 Algeria Complex Project: Algeria Complex Location: Algiers, Algeria Industry: Mixed Use Developer: Emiral Consultant/Architect: Hill International Value: US $ 111 million The Forum El Djazair is a massive tourism redevelopment project being developed in the Moretti region in Western Algeria. The Forum El Djazair (also referred to as Algeria Complex) is expected to become a prime tourist attraction post completion and a major boost to Algeria s tourism sector. The Forum El Djazair is envisioned as a massive complex hosting residential buildings, offices, shopping malls and designer villas. The Forum is divided into 6 zones. A Joint Venture consortium led by DSC was awarded the contract to undertake complete construction work on 4 main zones. Zone 01 DSC is undertaking the complete construction for Zone 1 which consists of four residential high-rise buildings, each comprising of 3 basement + Ground + Mezzanine + 22 floors + saloon terrace and each high-rise building comprising of 124 apartments. Zone 02 As part of its work on Zone 2, DSC is building three office buildings on 2 common basements and buildings with (Ground + 6 floors), (Ground + 8 floors) and (Ground + 10 floors) respectively. Zone 03 DSC is undertaking the construction of a mega shopping mall comprising of 2 basements + Ground + 1 floor. The shopping mall will feature a mix of both small and large outlets, as well as a massive food court area. Zone 04 DSC is also building 15 ultra-modern, high end residential villas that are designed to be tastefully built and furnished to the highest standards. The villas will be one of the most prominent features of the Forum El Djazair. 7

8 The Royal Amwaj Resorts & Spa Project: The Royal Amwaj Resorts & Spa Location: Dubai, UAE Industry: Mixed Use Developer: Seven Tides Limited/Asteco Development Management LLC Consultant/Architect: Seven Tides Value: US $ 107 million The Royal Amwaj Resort and Spa features 446 upscale residences and a five star 300 suites hotel and over 450 condominiums besides 293 guest rooms for visitors. DSC managed the following aspects on site: Structural works Package Structural work on the 5 star hotel Structural work for 18 premium Water villas Structural work on 42 villas Structural work on 15 Single storey villa s Structural work on 450 Apartments (G + 10 floors) Structural work on 14 Penthouses (both shell and core) Car Parking in the Basement area to accommodate 650 vehicles Two Tennis courts spread over an area of 1300m2 3 private Lagoons with an average depth 1.50 m Architectural works Package DSC undertook the complete façade finishing works on site, which consisted of teak wood which overlapped cladding with stained paint DSC also constructed the public area finishes as per the design plan Installation of the Decorative wooden pergolas in the common areas Installation of a GRP tip on the roof top external works Package on the lagoons External finish on 3 Lagoon pools, and creation of access paths from each villa to the pool DSC also installed a wide network of Storm water drainage for the Royal Amwaj project with 110 manholes located at vital points DSC also undertook the installation of External utility services like sewerage, water supply, cold & hot water and sewerage pump stations Logistics works Package DSC successfully acted as an interlocutor between the clients and the various subcontractor teams on site. DSC efficiently coordinated with the client, engineer s representative and other contractors. As part of its project management, DSC also provided the machinery i.e. hoisting & shifting the material within project limits. 8

9 The Mangrove Place Project: The Mangrove Place Location: Al Reem Island, Abu Dhabi, UAE Industry: Commercial Developer: Luxury Real Estate Development Consultant/Architect: UPA Value: US $ 100 million Mangrove Place is a mid-rise residential development set in the heart of the commercial business district of Shams Abu Dhabi adjacent to the prestigious Sky Tower. At 29 storeys height, the project offers a good mix of 1, 2 and 3 bedroom apartments with well-planned interior layouts and generous outdoor areas. The project includes the construction of direct waterfront on two aspects in a cosmopolitan downtown setting. The Mangrove place offers fantastic terraces and balconies with uninterrupted sea and canal views. Drake & Scull Construction s UAE subsidiary, Gulf Technical Construction Company (GTCC) was invited by Luxury Real Estate Development to undertake the main contracting responsibilities to bring the vision driving the Mangrove project to life. GTCC s work covered the entire construction cycle for the following major components of the Mangrove Project: 465 residential apartments of 1, 2, 3 bed room types, 13 town houses and 2 pent houses spread over 29 floors High class Luxury swimming pools, steam house and Jacuzzi World class fully equipped gym Private car parking for each tenant Environmental roof with mini landscape and foundation A unique Modern home automation system employed for the first time on Reem Island Water frontage cafes and restaurants Central reverse cycle air conditioning system GTCC assumed complete responsibility for the construction of a Total Built Up area of 77, m2 area, a sand stone elevation of 21,390 m2 and the installation of fiber optic technology for the data and voice management systems on the building 9

10 Laguna Tower Project: Laguna Tower Location: Dubai, UAE Industry: Mixed Use Developer: IFA Hotels Consultant/Architect: Al Gurg Consultants Value: US $ 50 million The Laguna Tower is a mixed use high rise tower located in a pivotal and commanding location in the Jumeirah Lake Towers area. DSC were chosen to carry out the Civil works, external landscaping and the MEP works for the entire Laguna Tower complex, which included 3 floors of basement Parking, one Ground floor, and the 40 storey Hotel & Residential Tower for a Total Built up area of around m 2. The Hotel space consists of the Ground reception area and the first eight storeys. The Laguna Hotel features 168 Rooms in total, spread over 7 Floors, with 28 deluxe Suites, 91King Rooms and 49 Twin Rooms. In addition to the guest rooms, the hotels also feature luxury Restaurant/ Bars, an exclusive Health Club, Swimming Pools and Meeting Rooms for the Hotel Guests. The space from the 9th Floor to 40th Floor is dedicated to residential living and consists of studio apartments; one, two and three Bedrooms Residential flats. The 41st Floor is exclusively devoted to the four Penthouses on top, each with dedicate Swimming Pools for their owners. The penthouses are offered in 2 and 3 bedroom options, with furnished fittings. The basement floor features an extensive kitchen area, with separate spaces for each of the international cuisine restaurants in the Tower. The three levels of basement car parking can accommodated a total of around 478 cars with excusive parking space for building owners and tower residents. The Concourse and Promenade Levels of the hotel consist of the 24 hour Coffee Shop, the All Day Dining bar, a private Dining area, the main bar, the Food & Beverages outlet. 10

11 Al Jawhara Tower Project: Al Jawhara Tower Start Date: 2010 Completion Date: Ongoing Location: Jeddah, Kingdom of Saudi Arabia Industry: Residential Developer: Damac Consultant/Architect: Salama Structural Engineering Consultants Value: US$ 100 Million The tower is a 48-storey structure of one-to-four-bedroom apartments and five-bedroom penthouse suites, along with three podium levels and one floor for parking and a health club. A unique aspect of the shape of the building is that it is not uniform. The interior layouts constantly change as the building rises, along with the façade curvature. The curvature resembles two separate curves that have been locked together, with the blue top curve cutting through and being supported by the white curve that is rooted to the ground. The end result is a structure that is top-heavy enough to appear gravity-defying. The complexity of the tower s external façade creates reflective panels which disperse and refract light, creating an illusionary effect. The dramatic exterior creates the framework for the spectacular interior design. The luxurious apartments will boast fixtures and fittings including modern kitchens and large balconies to make the most of the views on offer. The Basement floors consist of building services and car parking while the ground floor consists of the restaurant and retail stores. There are a total of 3 parking floors, a health club, and 42 apartment floors. Spread over 86,880 sq. M vertically, Al Jawhara is an iconic landmark of sophistication, with its grand reception area designer guest lounge and concierge. Drake & Scull Construction and its subsidiary International Centre for Civil Contracting (ICCC) are the Main Contractors responsible for All Structural, Finishes, and Coordination with all Client Nominated Sub-Contractors on the project. 11

12 Al Jawhara Tower This included the Residential and Retail Towers with a total land area 7, m2, and a Built up Area of 86, m2. The main features of the design include the Basement, the Ground floor hosting the reception, 3 levels of Parking, a Health Club, 31 levels of Non-Versace Apartments, 10 levels of the exclusive Versace Apartments and the Roof area, spanning a Total Height of 188 metres including the roof features. The Jawhara tower is designed to be a pioneering example of modern architectural styles, and has several unique aspects to it. These include the exclusive apartments with Versace Home interiors, an ultra modern Lift lobby with multiple smart elevators, high class Concierge services and 24-hour residents services, sophisticated Camera surveillance systems covering multiple floor parking levels, Separate male/female swimming pools and gymnasiums, as well as segregated sauna and steam rooms for the comfort of the residents. DSC/ICCC also undertook the installation of the modern Vertical Conveying systems, which covered the 6 Lift Cabins, which have very high levels of Fire Resistance, enhancing it from a safety point of view. The lifts are assigned to serve the building starting from the Basement Floor reaching up to Level 42. Designated Cabins will also be used as service Lifts for all other general purposes. 12

13 Water Injection Pump Stations (WIPS) Facilities Project: Water Injection Pump Stations (WIPS) Facilities Start Date: 2007 Completion Date: 2009 Location: Aindar & Hawiyah, Kingdom of Saudi Arabia Industry: Industrial Consultant and Developer: Saudi ARAMCO Consultant/Architect: SNC Lavalin /Canada Value: $35 Million Water injection is a relatively modern technique that is employed to ease the extraction of oil. Pumping stations inject pressurised jets of water into the oil wells, which provide additional pressure support to maintain reservoir capacity by pushing oil to the surface. This is also known as secondary recovery, and offers a stepwise improvement in pressure support and eases the displacement of oil from the outer edges of the oil field toward the central regions to sustain oil production. Saudi ARAMCO wanted to construct a modern Water Injection Pumping Station (WIPS) at the crucial oil wells at Ain Dar and Hawiyah. The Main Contractors for the project, a Joint Venture between Saipem & Snc- Lavalin, chose Drake & Scull Construction s KSA subsidiary International Centre for Civil Contracting (ICCC) to carry out the complete civil works for the massive industrial project. The WIPS projects required construction activity to be carried out at two different locations. The scope of work on each site was different, catering to the unique geographical nature and production capacities of each. The scope of work on the Ain Dar site covered: Construction of new underground drainage for new equipment (including septic tank, manholes, neutralizations pits, soak pits, valve boxes, catch basins, leach field system, sanitary and oily water sewer system, etc.) Fencing, gates and Site Preparation with Final Grading and Paving General Demolition Construction of Guard House, Prayer Shelter/Support Buildings Foundations for KO Drums, Pipeline Supports, Lube Oil, Potable Water Tank, Switchgear, Diesel Generators and IA Compressors 13

14 Construction of UPS & Battery Buildings, Maintenance Buildings, Control Buildings, Steel Platforms, Pipe Supports and Platform Supports Pavements & Asphalt Areas Construction of Pump Stations Foundation (including foundations for Air Cooler, Filter House, Control Cabin, Equipment Stack, Exhaust Stacks, Mineral Oil Mist Eliminator Skid, and Fuel Gas Skid) Modification of Foundations for Pumps Construction of Substation Buildings, New Transformer/ Switchgear, Maintenance Buildings, Construction of Water Tank Foundations Construction of Electrical Duct Bank and Pullboxes, Steel Structures, Cable Racks, Steel Pipe Supports, and Walkways The scope of works on the Hawiyah Site included: Construction of new underground drainage system for new equipment (including manholes, neutralization pits, catch basins, oily water system, sewage piping system, etc.) General Demolition Storage Buildings, Air Compressor Foundations, Kerosene Tank Foundations Pavements & Asphalt Areas, Evaporation Ponds, Fences and Gates Final Grading/Paving/Marl/Road Construction of Pumping Station Foundations (including foundations for Air Cooled Heat Exchanger, Filter House, Control Cabin, Equipment Stack, Exhaust Stack, Lube Oil Evaporation Separator, Fuel Gas Filter Skid and other Miscellaneous Foundations for CGT 9001) Construction of Instrument Air Compressors Foundations Construction of Lube Oil Storage Facilities & Pump Foundation Construction of New Storage Buildings Construction of Pipe Ways Foundations Construction of Surge Relief Skid Foundations Construction of Fuel Gas Filter Construction of CO2/Battery/Panel Buildings Construction of UPS Room (featuring an Extension Electrical Substation) Construction of Support Buildings and Miscellaneous Pipe Support Foundations Installation of Pressure Control Valves Construction of Temporary Instrument Air Compressors Installation of Structural Steel Works and Pipe Racks Construction of Instrument Air Receiver, Air Dryer and Air Compressor Sheds Surge Relief Skid Shed Pipe Supports 14

15 Khursaniyah Gas Plant Project: Khursaniyah Gas Plant Start Date: 2005 Completion Date: 2007 Location: Khursaniyah, KSA Industry: Petrochemial Developer: Saudi ARAMCO Value: US $20 Million The Khursaniyah Gas Plant was originally envisioned to process 1 billion standard cubic feet per day (scfd) of associated gas from the Abu Hadriya, Fadhili, Khursaniyah, Marjan, Safiniyah and Zuluf fields. The gas plant was to be integrated with Khursaniyah Central Oil Processing Facilities to minimize required utilities and capture synergies. The Khursaniyah Gas Plant then underwent an expansion in order to process gas from the offshore Karan field which was the first non-associated offshore gas field project being developed by Saudi Aramco in the Kingdom. To realise the construction of this complex gas plant, of vital importance to Saudi ARAMCO s regional strategy, Drake & Scull Construction s Saudi Arabian Civil Construction subsidiary, International Centre for Civil Contracting (ICC) were contracted to undertake the complete civil works for the gas plant. ICC undertook the following elements of work for the Khursaniyah Gas Plant: Complete execution of civil construction works including supply of required materials, labour and supervision to site The general works include temporary site facilities Earth works, earth (soil) improvement works and backfilling Civil and Architectural construction of buildings Complete Design, Installation, testing and commissioning of HVAC, plumbing, sanitary & drainage equipment Installation, testing and commissioning of fire fighting, fire protection & fire alarm systems Small power Systems Installation of outdoor foundations & trenches All other civil, building and structural works 15

16 Upstream Professional Development Center Project: Upstream Professional Development Center Start Date: 2008 Completion Date: 2011 Location: Dhahran, KSA Industry: Industrial Developer: Saudi ARAMCO Value: US $40 Million This four story building was designed to offer a state-ofthe-art classroom and training facility to foster collaborative learning along with high-tech drilling, virtual-reality, and hyper-dimensional simulators that enabled young Saudi Aramco professionals to equip themselves with the necessary knowledge to efficiently meet the needs of ARAMCO s network of clients and partners. The UPDC has proved to be a major success, having delivered a total of 297 course sessions, training 4,000 participants from eight upstream areas, including geology, geophysics, petro physics, reservoir, production, drilling and facilities engineering, and upstream computing. The UPDC is a major milestone in ICC and DSC s KSA history and a proof of their stellar project management skills. ICC s original contract scope required the construction and furnishing of the UPDC building. By design, the building was to facilitate the training of more than 550 upstream employees every day. ICC also had to undertake the civil works for 21 lecture theatres and Program Rooms, one Business Centre, eight team rooms, two display rooms, a library, 60 office spaces for staff, 94 cubicles for PDP s, two conference rooms, and one computer room. ICC s work was later expanded to also cover the Civil, Communication, Electrical and Mechanical works to complete the works on site. 16

17 Prince Salman Science Oasis Project: Prince Salman Science Oasis Start Date: 2009 Completion Date: 2013 Location: Riyadh, KSA Industry: Education Developer: High Commission for Development of Arriyadh Consultant/Architect: Arriyadh Development Authority Value: US $ 72 Million The Prince Salman Science Oasis project site is situated within the compound of the massive King Abdul Aziz city for science and technology (KACST) in its North - Western corner, occupying an area of around 200,000 square meters. Each of the permanent exhibitions is housed in Cubes that measure approximately 21x21 m. Besides the permanent exhibitions, the campus also hosts lecture rooms and auditorium located in the main 3 storey administrative building and an optional spherical building that will serve as a landmark for the main entrance. ICC also worked on the functional buildings, the administrative building and the optional sphere which were covered by a steel roof linking the building complex and provided a wide air conditioned sheltered space between the different buildings. The massive steel roof covered an area of approximately 13,000m2. A unique aspect of the roof and is the 80m high Solar Chimney (Power Station) which perfectly encapsulates the utilization of ecological energy concepts for the future. Another major work undertaken by ICC was the construction and installation of the main roof. The roof was triangular in shape, measuring 94m x 196m with a varying height between 16m at the edges to about 14.5m in the centre. The roof was divided into three segments by movement joints along two axis to allow for thermal expansion. One of these segments had a provision to allow the solar chimney to pierce through. ICC also setup a multi-purpose Auditorium in the shape of a sphere, located at the Eastern edge of the main roof. The Auditorium had a diameter of approximately 30m and was divided into two structural parts - a steel frame and a reinforced concrete shell. Another main feature constructed by ICC was the Impact & Issues Gallery, located in the internal space below the roof. This too was created in the shape of a sphere, similar to the Auditorium, with a diameter of approximately 9m. The gallery was designed to function as a general reference area. Finally, ICC also undertook the responsibilities of installing the external works on the site. These included the exterior furnishing, installation of exterior pavements, surfacing, exterior vegetation area and horticulture. 17

18 Dhahran Techno Valley Building Project: Dhahran Techno Valley Building Start Date: 2010 Completion Date: 2013 Location: Dhahran, KSA Industry: Commercial Developer: King Fahad University for Petroleum & Minerals (KFUPM) Consultant/Architect: Fahd Ali Reza Engineering Consultants Value: US $30 Million The King Fahd University of Petroleum & Minerals (KFUPM) is one of the most prestigious and respected educational institutions in Saudi Arabia. Specialising in the oil and gas sector, the KFUPM focuses on educating Saudi Arabian nationals for service in the petrochemical industry, as well as encourage research for the same. The Dhahran Technology-Valley (DTV) is a pet project initiated by KFUPM. The Techno Valley project is conceptualised to share space with the King Fahd University of Petroleum & Minerals (KFUPM) main campus, integrating it closely with the university. The techno valley will become a focused research-and-development bridge combining the university s expertise with that of national oil giant Saudi Aramco and the world s leading technology companies. An area measuring 13,422 m² was set aside to house the 15.0m tall, three-story structure which also includes a loading unloading facility in the building basement. Besides the central structure, the Techno Valley Building area spans around 20,247 m² in total. Another major aspect of the building would be the aesthetic interior landscape design area measuring 6,484 m². The 55-hectare site is intended to create an infrastructure to enhance cooperation and providing development, production and marketing support services. Innovation originating from academic research will be combined with industrial expertise to satisfy the needs of the Kingdom s substantial presence as the global hub for the oil, gas and petrochemical industries. The Dhahran Techno Valley project encompasses six major entities including King Abdullah Science Park (KASP); Sultan bin Abdul Aziz Science and Technology Center (SciTech); Innovation Center; Business Incubator; Liaison Office and Consultancy Services Center. ICC undertook the Lump sum Turn Key scope of works at the central building site. 18

19 The basement of the building was equipped with big loading and unloading areas, equipment storage rooms, server racks and control rooms etc. ICC also elevated the ground floor of the building to 1.35m from the walkway at ground zero level. The massive ground floor area consists of an elegant lobby (leading to offices of directors), an auditorium, a VIP lounge, business meeting rooms and a dining area with restaurants. ICC installed 6 passenger elevators, 2 freight Elevators, 2 service elevators and 8 staircases to connect all three floors seamlessly. Besides the main building, ICC also worked on the construction of a utility building located close to the yard next to the project site, serving the electrical, mechanical, HVAC, and fire fighting needs of the building. On the first floor, ICC constructed 12 dry labs, 88 offices, large business Incubator (to house technical and IT startups), mechanical, communication and electrical rooms. On the second floor, ICC constructed 19 IT labs, 3 wet labs, a Fitness centre and a VIP dining hall overlooking the atrium. 19

20 DRAKE & SCULL ENGINEERING 20

21 Jumeirah Beach Hotel Project: Jumeirah Beach Hotel Location: Dubai, UAE Industry: Hospitality Developer: Jumeirah Consultant/Architect: W.S. Atkins Value: USD 36 million The Jumeirah Beach Hotel is one of the most luxurious five star hotels on the Jumeirah Beach shoreline of Dubai. Part of the Jumeirah Beach Resort, it received the Condé Nast Traveler Award for being the No.1 Hotel in the World. This 26-storey tourist hotel, designed in the shape of a breaking wave, has 600 oceanfront rooms. Each room offers a minimum of 50 sq. meters which is larger in size compared to most international hotels. Drake & Scull International provided the complete design development, supply, installation, testing and commissioning of Mechanical, Electrical & Public Health Services for the 600 bedroom Tourist Hotel, Sports Complex, Laundry Building, Heating & Cooling of Pool, Automobile building and Gate House of seven star Burj Al Arab Tower Hotel. The entire hotel complex is controlled by an integrated Building Management System. The building services work for Hotel Resort and Sports Complex was completed in

22 Jumeirah Beach Residences Project: Jumeirah Beach Residences Location: Dubai, UAE Industry: District Cooling Plant Developer: TECOM Consultant/Architect: Mace International Value: USD 74 million DSI were appointed to undertake the design and construction of District Cooling System project for Jumeirah Beach Residence, a subsidiary of Dubai Technology Electronic Commerce and Media Free Zone Authority (TECOM) in Jumeirah, Dubai. The project plant has the capacity of producing a total of 60,000 tonnes of chilled water.dsi provided the supply of the distribution Energy Transfer Stations (ETS) for the connection of the system into numerous buildings utilizing the District Cooling System. DSI were responsible for the design and development of engineering drawings, plant & material selections, procurement, installation, commissioning and performance, validation of mechanical & electrical chilled water process plant for the District Cooling System. 22

23 King Abdullah University of Science and Technology Project: King Abdullah University of Science and Technology Location: Thuwal, Saudi Arabia Industry: Education Developer: ARAMCO Consultant/Architect: Saudi Oger Value: USD 257 million King Abdullah University of Science and Technology (KAUST) in Saudi Arabia is an international, graduatelevel research university dedicated to inspiring a new age of scientific achievement in the Kingdom that will also benefit the region and the world. KAUST is the realization of a decades-long vision of the Custodian of the Two Holy Mosques, King Abdullah Bin Abdulaziz Al Saud. KAUST s new campus is Saudi Arabia s first LEED-certified project, earning a LEED Platinum certification and is ranked as the largest LEED Platinum project in the world. altered conventionally used designs and installations and employed several innovative engineering techniques and products including designing a system to sustain a lifecycle of 100 years,maximising efficiency of installed systems and using specific special construction materials for the laboratory buildings, adopting photovoltaic cells for generating power, installing solar towers and solar water heaters, using low-emission sealants in addition to minimising construction waste and using recyclable materials wherever possible. The engineering office of DSI operated of Saudi Oger s engineering offices in Paris - France to ensure that the designs were being drafted and finalised as per the DSI team s input and technical requirements. In order to assure that KAUST was awarded the LEED Platinum level, DSI 23

24 Information and Technology Communications Complex Project: Information and Technology Communications Complex Location: Riyadh, KSA Industry: Commercial Developer: Saudi Arabian Public Pensions Agency Consultant/Architect: Dar Al Riyadh Value: USD 188 million The Information Technology and Communication Complex (ITCC) is a massive office project that attracts and hosts Information and communication technology companies to setup bases in the important Riyadh market in KSA. Developed on an area of more than 800,000 m2, The ITCC project supports and promotes the development of the IT sector in the region. The District Cooling Plant installed by DSI at the ITCC site has a capacity to deliver more than 35,000 Tonnes of cooling. The project was a major development from the Operations and Maintenance Perspective. DSI also undertook the construction and installation of the two TES tanks works with 40,000 TRH capacity. The complete construction includes aspects of civil, process and MEP services. The success of the DCP in the ITCC premises has helped to accelerate the adoption of District Cooling in KSA. Previously, Utility and District Cooling were not very popular in KSA but is now widely being adopted for major new developments. DSI s work in ITCC was also a fine example of Drake & Scull s vertical integration, as the DSI s MEP, Civil and Water and Power teams worked in parallel in a professional manner with efficient planning to take charge of all major aspects of construction. 24

25 Meydan Nad Al Sheba District Cooling Plant Project: Meydan Nad Al Sheba District Cooling Plant Location: Dubai, UAE Industry: District Cooling Plant Developer: Meydan LLC Consultant/Architect: TEO A King Design Consultants Sdn Bhd Value: USD 54 million Meydan is an urban development of luxury residences, business blocks and facilities in Nad Al Sheba, UAE. The four major developments of the city are the Racecourse, Horizons, Godolphin parks and the Metropolis. The Meydan racecourse hosts the Dubai World Cup, which is the richest horseracing event in the world, attended by nearly 60,000 people every year. Hotels, restaurants and cinemas form a part of the project to offer a remarkable experience for its visitors. DSI signed the contract agreement with M/S Meydan LLC to design, construct, commission and to provide two years operation for the central cooling plant at the Nad al Sheba race course development. The project team had to handle the complete design and construction of the chilled water generation plant, the associated cooling towers and thermal storage tanks, all civil and buried works including water, drainage and firefighting provisions, and the SCADA system. The central cooling plant consists of 20,000 TR (Tonnage Refrigeration a measurement of chiller capacity) chillers and associated equipment such as cooling towers, 11 KV and 400 V switchgears, MV/LV transformers, chilled and condenser water pumps, chilled and condenser water piping, associated MEP services and controls. In addition to the above, two make-up water tanks and two thermal storage tanks (capacity of 20,000 TR each) were part of plant equipment. Further, a provision for additional 20,000 TR in terms of civil, structural and architecture works including associated MEP services was constructed as per the client s request. 25

26 Dohaland Project: Dohaland Location: Doha, Qatar Industry: District Cooling Plant Developer: Mshreib Properties Consultant/Architect: Turner International Middle East Value: USD 59 million million Heart of Doha development is a mixed used complete urban redevelopment of a 35 hectare site within the center of Doha city. Msheirb development belongs to Dohaland which is a subsidiary of Qatar Foundation for education, science and community development lead by Her Highness Sheikha Moza Bint Vasser. Dohaland s vision is to lead innovation in urban living through sustainability and heritage. Dohaland s target is to build the first sustainable downtown regeneration project. DSI was appointed as the prime contractor for the district cooling system to design, construct and operate the District Cooling system. The scope of work covered: Mechanical, electrical and support equipment and systems for two independent central cooling plants PR1 & PR2 for a total capacity of 29,250 TR per plant. An interconnected sidewide reticulation network located inside service tunnel which takes off to 59 nos. energy transfer stations. Cooling tower make-up and blow down pipelines from PR1 to PR2. Water treatment plant using TSE water for the cooling tower make-up and development irrigation, water feature and toilet flushing for the development energy transfer station (ETS). P/C control panels, instrumentations programming, testing & commissioning. Operation and maintenance of the district cooling system for a period of seven years. Design life of 25 years for sea shore installation. 26

27 Kuwait State Audit Bureau Headquarters Project: Kuwait State Audit Bureau Headquarters Location: Kuwait Industry: Government Developer: Kuwait State Audit Bureau Consultant/Architect: The Associated Engineering Partnership Value: USD 93 million An important institution in Kuwait, the State Audit Bureau commissioned a new 30,000 m2 headquarters complex with state-of-the-art office space, IT-based auditing facilities, conference centre, training facilities and library in The project site with an area of 10,000 m² was located in Shuwaikh area, adjacent to the existing buildings of the Arab Organization Building and the Arab Shipping Company Headquarters and also included an adjacent site of 11,340 m². A car parking building for 950 cars and a civil defense shelter for 300 persons was also located on the adjacent site. The complex comprises three ten-storey office buildings linked by full-height atria and sky gardens with the complete façade fronted by a spectacular curved glazed perimeter wall. The project was envisaged as a high-quality office space, to accommodate a total of 800 personnel who required state of the art IT-based Auditing Facilities, a Conference Centre together with Training Facilities, Library, and Cafeteria. Drake & Scull undertook the Supply, Installation, Testing, and commissioning & maintenance of: Central Air Conditioning & Ventilation Systems Close-control Air Conditioning Systems Central Cooling Plants Domestic Water Supply and Drainage Fire Fighting systems Electrical Power Distribution and Lighting Uninterruptible Power Supply and Standby Power Fire Alarm and Security Systems Building Management Systems 27

28 West Bay 4 Seasons Project: West Bay 4 Seasons Location: Doha, Qatar Industry: Hospitality Developer: H.H. Sheikh Hamad Bin Jaber Al Thani Consultant/Architect: HALCRO Value: USD 38 million The West Bay area development was overseen by the Government of Qatar, and includes many modern buildings, shopping complexes, skyscrapers and luxury hotels. The West Bay Complex Project initially comprised of a new five star hotel in the shape of the Four Seasons Hotel, besides housing a 700 seat ballroom, a clubhouse, 100 berth marina, 20 town houses, two fully furnished apartment towers, one office tower and an exclusive beach. The crown in the jewel of the Project was the deluxe Four Seasons Hotel which consisted of 18 floors including Royal and Presidential Suites. The hotel was part of a multipurpose complex that also featured a dedicated residential complex and office complex. Drake & Scull were invited by the clients to undertake the complex MEP needs of the Four Seasons Hotel. DSI adopted a Parallel Tracks approach whereby the Project was divided into 6 modules or areas to facilitate easy allocation of resources and personnel. The 6 modules included: The Office tower consisting 28 floors and 20 town houses Five star hotel premises consisting 18 floors and the 700 seat ballroom Two apartment towers each spanning 22 floors Central District Cooling Plant and 3.3kV power backup system along with the domestic water pumps and the fire pumps Club House area 100 berth Marina complex To properly execute this unconventional division of site activities, DSI deployed a centralized Building Management System (BMS) to monitor and control equipment used for the project. This helped to monitor and plan the course of action correctly as well as lower the energy consumption and improve resource sustainability. 28

29 St Regis Nile Corniche Project: St Regis Nile Corniche Location: Nile Corniche, Egypt Industry: Hospitality Developer: Qatari Diar Real Estate Investment Company (CCC) Consultant/Architect: ARQUITECTONICA / Shaker Value: USD 128 million The Nile Corniche Project is a mixed use development which includes the construction of a Starwood Chain Hotel and Serviced Apartments, situated on the River Nile Corniche in Downtown Cairo. The Nile Corniche is a 197,000 m2 mixed-use development along the Corniche on the east bank of the Nile River in Cairo, Egypt. This Hotel marks the ultimate expression of contemporary luxury in Egypt s thriving capital city and will be an important component of a high-rise hospitality and residential complex. Drake & Scull s active scope of works includes: o The complete Heating, Ventilation and Air Conditioning system, including all Chillers, Heat Exchangers Cooling Towers, Boilers and Fuel systems o MV Power Supply distribution network including MV emergency distribution network & MV generators o Transformer substations in addition to the LV Normal Emergency Distribution Networks o The HV, MV, LV Systems including Busbars, Wiring Devices, UPS, Lighting and Lighting Control Systems o Extra low voltage systems including Security, TV MATV and IPTV), Data & Telephone, Vehicle Management, AV and Ambient music system o Security systems including CCTV, Access Control, Intercom, Search Scanning X-ray equipment, Guard Tour, Disabled Alarm System, Bollard Systems o Fire Detection, Alarm, Fighting, Suppression & Evacuation Systems, and Central Battery Emergency Lighting System. o All Plumbing and Drainage systems o The building BMS (Building Management Systems) and its interface with other core systems o Complete Utility installation including connections to existing services o Full coordination with the mandatory LPG Local subcontractor as per the latest codes and regulations of Egyptian authorities o Interconnecting Cables, Cable Trays, Trunking, Pipe Work And Engineering Coordination as required to connect to or from other sub-contract systems such as Lifts, Kitchen, Car park management systems etc o The Earthing system, Lighting Protection System, Navigation Lights and containment and wiring for Façade Lighting Systems 29

30 Mall of Qatar Project: Mall of Qatar Location: Doha, Qatar Industry: Commercial Retail Developer: Urbacon Construction Company Consultant/Architect: KEO International Value: USD 98 million The Mall of Qatar is a new 4,176,000 square foot (GBA) shopping center currently under construction in Qatar a country with the highest GDP in the world. Situated adjacent to a FIFA 2022 World Cup stadium, with a dedicated station on Doha s new metro line, Mall of Qatar will have over 1,750,000 square feet of retail leasable space on 3 levels in addition to underground and surface parking for 7,000 cars. The 400 shops from luxury to the world s leading powerhouse brands and an exciting array of food, beverage and entertainment will make this the premier destination in Qatar. The three-storey mall will feature a hypermarket, a multiplex, five department stores and at least 20 restaurants. DSI will execute the installation of Electromechanical works including Electrical, Plumbing, Heating, Ventilation and Air Conditioning (HVAC) Fire Fighting Fire Alarm Photovoltaic arrays Gas Installations Security and Access Control Audio-Video (AV), Lighting and Sanitary Fixtures with a built-up area of 422,000 sq. 30

31 King Fahad Medical City Project: King Fahad Medical City Location: Kingdom of Saudi Arabia Industry: Healthcare Developer: Al Latifah-Habtoor Leighton Consultant/Architect: RKD Architects Value: USD 70 million The King Fahad Medical City (KFMC) consists of four hospitals making up a total of 1,095 beds. Main hospitals, maternity hospital, pediatric hospital, rehabilitation center. In addition to the hospitals there are primary care clinics, Faculty of Medicine, Medical Centers which is Prince Salman Heart Center, Neuroscience Center, Prince Sultan Hematology &Oncology Center and Specialized Diabetes & Endocrine Center. DSI is providing turnkey MEP solutions for the National Institute of Neurosciences, and the Cancer & Cardiac Centers. Spanning a total built-up area of 234,000 m², the project includes the National Institute of Neurosciences Comprehensive Cancer Center, Cardiac Center, Laboratories and office building, Radiology Center, Cardiology Center, Underground Car Parks, Central Services Building and a Services Tunnel. KFMC is the largest medical facility in Saudi Arabia built at a cost of SR12.3 billion. According to Minister of Health Dr. Hamad ibn Abdullah Al-Manie in his inaugural address, it is expected to treat more than 50,000 in-house patients and more than 2,000,000 outpatients annually. 31

32 Louvre Museum Project: Louvre Museum Location: Abu Dhabi, UAE Industry: Commercial Developer: AsoLouvre JV Consultant/Architect: Buro Happold, Pascall+Watson, MERO-TSK Value: USD 58 million The Louvre Abu Dhabi is a planned museum, to be located in Abu Dhabi, UAE. This is part of a thirty-year agreement between the city of Abu Dhabi and the French government. The museum is to be located on the Saadiyat Island Cultural District, and will be approximately 24,000 square metres (260,000 sq ft) in size. DSI is involved in all MEP work and incidentals within the 64,000m2 complexes, which is made of a series of linked pavilions, plazas, alleyways and canals. A vast dome weighing around 7,000 tonnes and 180m in diameter will sit on top of four piers housing exhibitions. The permanent collection will occupy 6,000 square metres (65,000 sq ft), and the temporary exhibitions will take place over 2,000 square metres (22,000 sq ft). 32

33 Habtoor City Project: Habtoor City Location: Dubai, UAE Industry: Commerical Developer: Habtoor Leighton Group Consultant/Architect: Khatib & Alami Value: USD 54 million The Al Habtoor City in Dubai is a huge residential and hospitality development under construction costing Dh11 billion. Al Habtoor City will incorporate more than 3,000 hotel and residential units on one plot and will house three internationally branded hotels, operated by Starwood Hotels & Resorts: The St. Regis Dubai, W Dubai Sheikh Zayed Road and Westin Dubai - Sheikh Zayed Road. Besides this, a permanent Franco Dragone Entertainment Group water-themed production exclusively choreographed for the City will be built, along with three residential tower blocks to incorporate 1,460 luxury apartments, Eleven penthouses including two VIP penthouses over a 4-storey high podium, a tennis academy and club house with eight tennis courts including one covered air-conditioned court and a classical French-style landscaped garden. DSI is undertaking complete turnkey MEP scope of works on the Habtoor City development. 33

34 Cayan Tower Project: Cayan Tower Location: Dubai, UAE Industry: Mixed Use Developer: Cayan Investments Consultant/Architect: Khatib & Alami Value: USD 40 million The Cayan Tower s dynamic twisting shape challenges conventional architecture and redefines standards of luxury. Located at the entrance of Dubai Marina the 330 meters tall tower consists of 73 floors, each rotated at 1.08 degree. The individual floor rotations sum to a total of 90 degree over the entire height of the building, making it the tallest high rise building in the world with such structural rotation. The Tower provides a total of 505 apartments, including studios, one, two, three and four-bedroom duplexes and penthouses. A total of eight circular lifts serve the building, three of which can have a speed of 8 m/s over 330 meters of height. slabs also demanded a great degree of coordination between all project teams and a simultaneous execution of MEP and structural works. Due to the twist in the building design, the vertical and circular core of the building did not provide sufficient space for fresh air and busbar risers installation, and they had to be taken from the inner core to the outer twisted portion of the building. This posed severe problems as the risers are vertical whereas the outer part of the building has a rotation of 1.08 degree on every floor. The building s twist below complicated each floor s design for openings and sleeves. The structural 1.08 degree rotation rendered the MEP service locations different on every floor and the rotating 34

35 South Airfield Development and Rehabilitation Project: South Airfield Development and Rehabilitation Client / Owner: Abu Dhabi Airports Company Main Contractor: Lane Mideast Contracting Principal Consultant: Jacobs International Holdings Inc Contract Value: US $25 Million Start Date: 2013 Completion Date: 2014 The project comprises the upgrading and refurbishment of the existing runway 13R/31L and associated taxiways and aprons, including all related utilities and services. In addition, a new parallel taxiway system and midfield cargo apron will be realized. The Rehabilitation package consists of new taxiways, widening of the existing runway to 60 metres, the installation of storm drainage, the replacement of the existing ground lighting system at the South Airfield of the Abu Dhabi Airport. The project comprises of 10,900m2 area of concrete paving for the New Abu Dhabi International Airport Hardstand, Airfield Lighting, utilities storm water, domestic water. 35

36 ROSEWOOD Hotel Project: ROSEWOOD Hotel Location: Abu Dhabi, UAE Client / Owner: MUBADALA Main Contractor: Arabian Construction Company. (ACC) Principal Consultant: HANDEL ARCHITECTS, LLP Local Consultant: SEREX INTERNATIONAL (FRANCE) MEP Consultant: WSP Middle East Contract Value: $62 Million Start Date: 2009 Completion Date: 2012 The Rosewood Abu Dhabi is a new ultra-luxury business hotel that consists of luxury penthouses, guest rooms and serviced residences. Rosewood Abu Dhabi features 2,000 sqm of meeting space, a business center and extensive amenities and retail, including a premium health and beauty spa. 189 guest rooms 131 serviced apartments State of the art meeting facilities Extensive amenities including personal butler service Signature and all-day dining options featuring fine French Catalan fusion, Modern Lebanese and Modern Indian Sense, A Rosewood Spa : 1,800 sqm beauty, health and fitness retreat The inspiration for the Handel Architects-designed tower is derived from the glistening Arabian Gulf and the vast desert that surrounds Abu Dhabi city. The 34-story, 470 foot tall hotel is a dramatic modern structure covered with reflective glass, which was chosen for its daytime shimmer and its nighttime luminescence. 36

37 Fairmont Palm Hotel and Residences Project: Fairmont Palm Hotel and Residences Start Date: 2008 Completion Date: Ongoing Location: Dubai Industry: Mixed Use (Hotels and Residences) Developer: IFA Hotels & Resorts Consultant/Architect: M/s.DSA, M/s.MACE, M/s.CRK,M/s.Proleed, M/s.Aurecon Value: US $54 Million The Fairmont Palm Hotel and Residences is a 5 stars hotel project, located in the iconic Palm Jumeirah development in Dubai. A brainchild of the famous Fairmont group, renowned for high class, luxury hotels around the world, The Fairmont Palm Hotel and Residences is synonymous with tasteful aesthetics. The projects consist of 381 rooms and suites, spread over 14th floors, with a basement, Entrance and Beach Level. The first 10 floors consist of the king/queen Rooms, deluxe Suites, a privileged Gold Lounge, Presidential Suites, Restaurants, SPA areas and Swimming Pools. The Hotel and Residences premises occupy over 460 metres of beachfront on the trunk of the famous Palm Jumeirah, offering a spectacular view of Dubai s shoreline. isolated from the lower levels to deliver a unique ambience. DSI were contracted to undertake the complete MEP works for the lower levels of the Palm Hotel and Residences development. Due to DSI s strong performance, Fairmont extended the scope of work to include the upper levels, housing the deluxe penthouses. The time span was suitably extended to take into account the additional nature of work. Within two months of working on site, DSI were able to achieve significant progress on site. DSI completely finished the installation of 54 AHU s and 105 Fans, which was a significant milestone in MEP terms. The Palm Hotel and Residences also houses exclusive penthouses and PRCs which are located in the upper levels from 11th to 14th Floor. The 3 Penthouses and 10 PRCs are 37

38 Park Rotana Project: Park Rotana Start Date: 2007 Completion Date: 2010 Location: Abu Dhabi, UAE Industry: Mixed Use/Hospitality Developer: Al Mada Tourism Investment Company Consultant/Architect: Al-Salaam consulting Architects, Engineers & Planners Value: US $58 Million The Park Rotana Complex is a joint venture between TDIC and Al Mada Tourism Investment Company and is managed by Rotana. Sharing space with the famous Sheikh Zayed Mosque, the Abu Dhabi National Exhibition Centre and the Ministry of Labour, The Park Rotana complex comprises of 318 luxurious rooms and suites and 172 serviced hotel apartments. Besides these, the Park Rotana also offers a modern Business centre, 6 food and beverage venues, an Outdoor swimming pool, a Bodylines Leisure & Fitness centre, 6 meeting rooms for businesses, and a large Ballroom. Located 14km from downtown Abu Dhabi on the Eastern Ring Road, The Park Rotana has signature restaurants on the ground floor, that offer thematic grand interiors featuring Venetian masks, chandeliers and velvet curtains. Highlights of the restaurants include soft lighting and comfortable seating, with modern telecommunication systems available on all levels for the convenience of the guests. Drake & Scull s initial scope of work covered the provision of MEP facilities to the premises, which included The 5 Star Hotel Building (G+10) with 318 Guest rooms, The 5 Star Serviced apartment Building (G+10) with 172 Apartments, A Rental apartment Building (G+11) with 200 Apartments The Office Building (G+10) Two basement floors connected the entire area under the buildings while also containing 960 car parking spaces, the main service rooms like H.V/L.V rooms, AHU rooms, Pump rooms, boiler rooms, services operation rooms, main kitchen, laundry and the main control rooms. 38

39 In additional to the basic MEP services, Drake & Scull also had to undertake the installation of the following systems on site: Steam boilers and Steam Network to service Hot water Calorifiers and Laundry. Synthetic Natural Gas (SNG) System and distribution Network to service Kitchens and Steam boilers. Guest Room Management System for Hotel building. Hotel Inter Active system (HITV). Mobile radio system for Staff paging. The District Cooling Plant. The Public Address, Intercom, SMATV, structured Cabling system and CCTV system Access controls Gate Barriers, CO detection Lighting control & Dimming The District Cooling plant had its own scope which required Drake & Scull s extensive DCP experience to be utilized. Since the original design proved to be inadequate to the requirements, Drake & Scull undertook the complete Design, Build and installation of the DCP. The DCP s specifications were: 5 Chillers of 1000 TR each 3 Secondary Chilled Water Pumps 5 Primary Chilled Water Pumps 5 Condenser Water Pumps in the Basement floor H.V Switchgear, L.V switch gear, 2 Transformers and all necessary electrical systems. 39

40 Dubai Festival City Project: Dubai Festival City Start Date: 2005 Completion Date: 2007 Location: Dubai Industry: District Cooling Developer: Dubai Festival City Consultant/Architect: Shankland Cox Ltd Value: US $109 Million Dubai Festival City is a large residential, business and entertainment development in the heart of the city. Touted as a city-within-a-city, Dubai Festival City is the Middle East s largest mixed-use development: all elements for work, living, and leisure will be contained within the project. The Festival City comprises a series of residential communities, numerous hotels, malls, a golf course and other entertainment sites, and a full suite of public services, including schools. The project spans 3.8 kilometres (2.4 mi) of water frontage on the eastern bank of Dubai Creek and is 2 kilometers (1.2 mi) from Dubai International Airport. The Festival Waterfront Centre, is a retail power centre which includes IKEA, HyperPanda supermarket (first hypermarket outside of Saudi Arabia), Plug-ins ElectroniX and Ace Hardware (the largest outside North America). Drake & Scull s scope of work included the following aspects: Design and construct an 80,000TR District Cooling System for the entire DFC premise Supply and Installation of 10 Chiller packaged modules of 5,000TR each Installation of 10 Cooling Towers of 5,000 TR capacity each Build and Installation of a 6000 cubic meter water storage tank Laying a 28 km of 28 to 60 diameter preinsulated GRP reticulation pipework Construction and Installation of 74 Energy Transfer Stations and individual metering and billing system to approximately 1.6 million square meters mixed used development. Operation and Maintenance for eight years. The 80,000 tonnes District Cooling Plant at the Dubai Festival City included a chilled water generation plant, nearly 20 kms of network piping, multiple energy transfer stations, plus metering and monitoring systems. The design encompassed acoustics, thermal degradation, stress analysis, hydraulics and structural and architectural analysis. Designed, built and commissioned in a modular fashion, the innovative cooling plant s capacity matched the load demand created by new buildings when commissioned within the Festival City. 40

41 St Regis hotel, Amman, Jordan Project: St Regis hotel, Amman, Jordan Client / Owner: Al Maabar Real Estate Development Main Contractor: Arabtec Principal Consultant: Perkins Eastman Local Consultant: KEO Contract Value $43 Million Start Date: 2014 Completion Date: 2016 The St. Regis, Amman is a 16-storey tower featuring 260 luxuriously appointed guest rooms, which include 86 suites, 4 restaurants, a café, pool, fitness center, signature spa and private parking. The hotel will also offer an ultra-modern meeting and event space and a business center as well as exclusive boutiques featuring some of the most prominent international brands located at the podium level of the development. The St. Regis Amman will also be comprised of 2,800 sqm of ultra-modern meeting and event space and a business center. This mixed-use development project will also include exclusive boutiques featuring some of the most prominent international brands and will be located on the podium level of the development. The site area measures 18,000 sqm awith a built up area of 126,500 sqm. 41

42 CCP Meydaan, Nad Al Sheba Project: CCP Meydaan, Nad Al Sheba Start Date: November 2008 Completion Date: November 2009 Location: Nad Al Sheba, UAE Industry: District Cooling Developer: Meydaan LLC Consultant/Architect: TEO A King Design Consultants Value: US $55 million DSE signed the contract agreement with M/S Meydan LLC to design, construct, commission and to provide two years operation for the central cooling plant at the Nad al Sheba race course development. The DSE project team had to handle the complete design and construction of the chilled water generation plant, the associated cooling towers and thermal storage tanks, all civil and buried works including water, drainage and fire fighting provisions, and the SCADA system. The central cooling plant consists of 20,000 TR (Tonnage Refrigeration a measurement of chiller capacity) chillers and associated equipment such as cooling towers, 11 KV and 400 V switchgears, MV/LV transformers, chilled and condenser water pumps, chilled and condenser water piping, associated MEP services and controls. In addition to the above, two make-up water tanks and two thermal storage tanks (capacity of 20,000 TR each) were part of plant equipment. Further, a provision for additional 20,000 TR in terms of civil, structural and architecture works including associated MEP services was constructed as per the client s request. Part of the external chilled water piping network and the control of all energy transfer stations (ETS) at the Meydan racecourse itself were added to the scope of works of DSWP and constructed and installed to the satisfaction of M/s Meydan LLC. 42

43 Dubai Motor City District Cooling Plants 1&2 Project: Dubai Motor City District Cooling Plants 1&2 Project Location: Motor City, Dubai, United Arab Emirates Client: Emirates District Cooling Llc (Emicool) Consultant/Architect: Dc Pro Engineering Consultant Value: US $90.5 Millio Plant 1 is dedicated to supply chilled water to Autodrome, uptown and parts of Green Community. Plant 2 is dedicated to supply chilled water to show rooms, hotels, office towers, terrace apartments and parts of Green Community. The concept of District Cooling Plant is to centralize the production of chilled water and distribution to individual customers. To aide this large capacity water cooled chillers, each plant consists of 8 sets of chiller pairs of combine capacity 4,850 Tr. The chillers are located on the ground floor, where the MV switchgear are also positioned. The primary chilled water pumps ( 8 Nos.) and secondary chilled water pumps (12 Nos.) which aide the circulation of chilled water are located at the basement floor along with their motor control centre (MCC). The PCHWP s are fixed speed and works in tandem with the number of operational chillers, whereas SCHWP s are variable speed type controlled by the load conditions of the customers. The cooling of chillers are facilitated by 8 Nos. cooling tower which are located on the roof floor. The condenser pumps which circulate the water are located one floor below at the first floor, where the MCC of the same pump exists. The fans of the cooling towers are variable speed type and VFD for the same is located in first floor. A thermal energy storage task of capacity 6,000 TR hr (6 hours) is located in the ground floor. The volume of the TES tank is 14,150 m³. The bulk water storage (civil construction) tank of capacity 7,000m³ is located below the TES tank. One of the unique aspects of this District Cooling Plant is the TES tank (Thermal Storage Tank). The dimensions of the tank are 28 meter diameter and 23 meter height. The tank is constructed out of carbon steel plates whose thickness varies from 24mm to 8mm and are joined by welding. Approximately 80,000 m³ earth excavated for Plants 1 & 2. 55,000 dia inch pipe weld for Plants 1 & tons of structural steel for pipe and equipment in Plants 1 & 2 43

44 Aloft Hotel Abu Dhabi Project: Aloft Hotel Abu Dhabi Start Date: 2008 Completion Date: 2009 Location: ADNEC, Abu Dhabi, UAE Industry: Hospitality Developer: Abu Dhabi National Exhibition Centre Consultant/Architect: RMJM Value: US $ 40 Million The Aloft hotel in Abu Dhabi is a luxury hotel strategically located in UAE s capital city. Set in ADNEC (Abu Dhabi National Exhibition Centre) and located a short distance away from Abu Dhabi Airport and Abu Dhabi City s main highlights, the Aloft Hotel is designed to serve as the preferred choice of stay for visitors to UAE s glittering capital. Apart from the conference stations and the lodging rooms, the hotel also houses a unique Splash Garden on the 5th floor, which measures around 1500 sqm of premium dine & dance space housing a dedicated kitchen, bar and permanent stage that is able to entertain up to 1500 guests. Besides these, the Aloft hotel also features a modern lounge, with the latest audio equipment, soundproofing materials, colourful lighting, high performance acoustics. In addition to the 400 guestrooms, the hotel also houses a wedding hall, a selection of restaurants, bars and meeting rooms to serve the exhibition guests and the capital, in addition to an open swimming pool, gymnasium and spa. DSI were chosen by ADNEC to undertake the following aspects of the Aloft hotel: The Supply, Installation, Testing, and Commissioning of complete MEP works for the hotel, which included: Fresh Air Ventilation System and Extract Air Ventilation System Duct Work and AHUs, FCUs Chilled Water supply returns systems Chemical Dosing Systems ETS from District Cooling System Domestic Water Storage Tanks Hot & Cold Water distribution System Installation of Sanitary Fittings & Accessories Drainage System excluding pumps Fire Fighting Systems BMS Systems MV & LV Systems with Transformers Fuel Storage Tanks Bus bar System Electrical Cable and Containment System Light point wiring and Installation of luminaries Fire Alarm and Earthing Systems Lightning Protection System Containment for ELV (Extra Low Voltage) Systems Aircraft Warning Light Systems 44

45 Al Muneera Al Raha Beach Development Project: Al Muneera Al Raha Beach Development Start Date: 2009 Completion Date: 2012 Location: Al Raha Beach, Abu Dhabi, UAE Industry: Residential Developer: Aldar Properties Consultant/Architect: Waterman International Main Contractor: Al Futtaim Carillion Value: US $ 141 Million The Al Muneera project, located in the heart of the Al Raha Beach Development is a massive project in Abu Dhabi, with a total area of over 6 million m2 and 11 km of coastline, offering residents and visitors 43 km of dynamic waterfront living that includes hotels, marinas, parks, restaurants as well as leisure facilities. It consists of 11 precincts, each with their own distinct personalities and appeal. The Al Muneera project is made up of two distinct areas, island and mainland, divided by a canal. The two sections have an approximate 50/50 split with respect to built area/ cost, though the island is marginally larger in size. The site area is 146,000 m2, with a total built-up area of 594,000 m2. This is divided into 254,500 m2 of residential space, plus a 106,000 m2 of basement car parking and the island s podium level will be entirely free for pedestrian usage. The bulk of the residential space is comprised of 1286 apartments spread over 16 residential towers. Right down on the beach are 11 sea-facing villas, each with five bedrooms. The development also includes 148 canal-facing, fourbedroom townhouses, and an office tower besides six tall Island Towers. The scope of works included the installation, testing and commissioning of the following: Electrical distribution system including LV Switchgears, capacitor banks and distributions panel boards. Structured cabling and fire alarm system. Lighting control, Central battery and low current systems including CCTV, Digital Intercom, and Access control etc. Complete HVAC system including chilled water pumps, pipes, air handling units, fan coil units, ducting, fans etc. Building management systems, water supply systems including transfer and booster pumps, and above ground drainage system. Fire fighting systems including pumps and accessories, clean agent fire extinguishing system and gas distribution system. 45

46 Park Place, Park Plaza Project: Park Place, Park Plaza Start Date: 2005 Completion Date: 2007 Location: Dubai, UAE Industry: Mixed Use Developer: H.E. Humaid Bin Drai Consultant/Architect: CCD/ACC Value: US $18 Million The Park Place is a 56-floor mixed-use tower on Sheikh Zayed Road in Dubai, United Arab Emirates. The tower has a total structural height of m (768 ft), making it currently the 10th tallest building in Dubai. Designed to blend modern architecture style with corporate sensibilities, the skyscraper is a prominent feature on Dubai s skyline, with its unmistakable concrete Structure sheathed in the signature green glass facade. The curtain wall and exposed structure with light brown and light green hues give the 56 floors of the Park Place a modern presence on the Sheikh Zayed road. Featuring 20 office floors, 35 Residential floors, 4 Service levels and one Basement level, the Park Place is one of the most exclusive city addresses for corporate and residential purposes in Dubai. Each apartment has a louvered terrace, which can become an outdoor space in winter and an indoor space in hotter summer months. DSI were initially contracted to undertake the supply, install, test and commissioning of the following elements on site: Heat Exchanger and Chilled water pumps Fire fighting pumps & Fire fighting system Sewerage Lifting station pumps, Booster pumps and Irrigation pumps Sanitaryware and Water heaters LPG system, FAHU, AHU and FCU VAV and LV Switchgear and Control Panels D.G.Sets, Fuel Tanks, and UPS BMS system and Fire Alarm & Voice evacuation system Central battery Emergency system and Lighting control system Video Audio Intercom system and integration with CCTV System Access control and Paging system PA and Structured cabling system Light Fixture & Facade Lighting system ( Cold Cathode light) Earthing & Lightning protection system 46

47 Sultan Qaboos Grand Mosque,Oman Project: Sultan Qaboos Grand Mosque, Oman Start Date: 1995 Completion Date: 2001 Location: Muscat, Oman Industry: Government Developer: Diwan of the Royal Court, Oman Consultant/Architect: Tilney Simmons & Partners Value: US $12 Million In 1992 Sultan Qaboos directed that his country of Oman should have a Grand Mosque. A competition for its design took place in 1993 and after a site was chosen at Bausher construction commenced in Building work, which was undertaken by Carillion Alawi LLC took six years and four months. The Mosque is built from 300,000 tonnes of Indian sandstone. The main musalla (prayer hall) is square (external dimensions 74.4 x 74.4 metres) with a central dome rising to a height of fifty metres above the floor. The dome and the main minaret (90 metres) and four flanking minarets (45.5 metres) are the mosque s chief visual features. The main musalla can hold over 6,500 worshippers, while the women s musalla can accommodate 750 worshipers. The outer paved ground can hold 8,000 worshipers and there is additional space available in the interior courtyard and the passageways, making a total capacity of up to 20,000 worshipers. Work began on the construction of the Sultan Qaboos Grand Mosque complex on a site by a main road between Muscat and Seeb early in It was completed six years later and inaugurated by His Majesty the Sultan in May The developed part of the site, including the fully consolidated areas and landscaping, covers 416,000 square metres. The Mosque complex (covering 40,000 square metres) is constructed on a raised podium in keeping with the tradition of Omani mosques that were built elevated from street level. The whole interior of the Grand Mosque is panelled with offwhite and dark grey marble panelling clothed in cut tile work. Ceramic floral patterns adorn arch framed mural panels set in the marble forming blind niches in a variety of classical Persian, predominantly Safavid, designs. The ceilings are inspired by those of Omani forts. The mihrab in the main prayer hall is framed by a border of Quranic verses and a gilded ceramic surround. The dome comprises a series of ornate, engraved stained glass triangles within a framework of marble columns, and a Swarovski crystal chandelier with gold-plated metalwork hangs down for a length of 14 meters. A major feature of the main prayer hall is the hand-made Persian carpet consisting of. 1,700 million knots, weighing 21 tonnes and made in a single piece measuring 70 x 60 metres. From design stage it took 4 years complete and 600 female weavers from province of Khurasan in Iran were employed. 47

48 King Khaled Hospital Extension Project: King Khaled Hospital Extension Start Date: 2009 Completion Date: 2013 Location: Riyadh, KSA Industry: Healthcare Developer: King Saud University/ ABV Rock Consultant/Architect: Strategic Construction Program Value: US $50 Million ABV Rock was invited to undertake the construction of the expansion to the King Khalid University Hospital. The new extension would encompass an 85,000 sq. meter building, consisting of 2 basements, a ground floor, 5 upper floors, a roof and upper roof area. The new hospital would be a 570 beds hospital with 32 operation rooms. DSI installed the following systems on site: District Cooling Systems Chilled Water Pumps Medium Voltage Switch Gear & Transformers L.V Switch gear & Control panels Booster and Circulation Pumps Air Handling Units, FAHU, FCU and VAV systems Lighting, Emergency Lighting and Lighting Control Systems Earthing & Lightning Systems Central battery System, Access Control System and Dimming System Fire Alarm System Fire fighting pumps & Fire fighting system (featuring FM- 200 fire fighting system) and district fire water systems Public Address, SCADA and Building Management (BMS)Systems UPS and Generator back emergency power supply system In the first phase, (completed over 18 months), DSI was able to deliver complete MEP solutions to the site. In the next phase, DSI is undertaking complete integration of medical equipment data into the digital data and electrical systems, which is essential for electrical load calculations and for HVAC heat dissipation s calculations. DSI led the co-ordination efforts between the main contractors and consultants to obtain basic medical equipments information. DSI s Mechanical and Engineering teams also worked on expediting the approvals of recommendations and submissions, based on their decades of experience with healthcare projects. 48

49 New Muscat Airport Expansion (MC2) Project: New Muscat Airport Expansion (MC2) Start Date: 2010 Completion Date: 2014 Location: Muscat, Oman Industry: Airports/Aviation Developer: Ministry Of Transport and Communications, Oman Consultant/Architect: COWI Larsen JV Value: US $44 Million Oman s Ministry of Transport and Communications initiated an ambitious expansion programme of the country s two largest airports, Muscat and Salalah, both of which were inaugurated nearly 40 years ago Divided into several packages, Drake & Scull International Oman were invited to undertake the major MEP works for the second package (MC2). The MC2 package centred primarily on the construction of a new state-of-the-art 100m tall Air Traffic Control tower, and facilities for Crash Fire Rescue, air traffic management centre, data centre, as well as other facilities and services. The works involve construction of the following buildings: ATC Tower Data Centre Crash Fire Rescue Air Traffic & Meteorology complex Contingency &Training Guard House ATM Complex ATM Complex Utility Yard C&T Centre Utility Yard Drake & Scull International Oman were invited to develop and complete the concept design, procurement, manufacture, supervision, delivery to site, construction of the Works, erection, inspection, testing, trial operation, commissioning, maintenance of equipment for the MC2 package. Besides the MC2 package, DSI Oman also worked on the MEP works for: ATM Complex Guard House ATM Store Radio Station Checkpoint Building Airport Wide Area Network (AWAN) 49

50 Ocean Heights Project: Ocean Heights Client: DAMAC Main Contractor: ARABTEC Consultant: Engineering Consultant Group /Ian Banham Contract Value: US $32 Million Location: Dubai Marina Ocean Heights Tower is an 82 storey towering masterpiece with 680 apartments, strategically located at the entrance of Dubai Marina with easy access to nearby beachfront luxury hotels, including the 7-star Burj Al Arab, shopping malls, beach clubs, golf courses, and other leisure facilities such as the Wild Wadi water amusement park. Offering a choice of one, two and three-bedroom luxury condominiums, Ocean Heights is one of the most exclusive contemporary waterfront addresses in Dubai, designed for the most discerning individual seeking a lifestyle of luxury and pampering. The main power supply is fed from the Dubai Electricity (DEWA) network to the dedicated substation on the ground floor. There are 14 transformers rated 1500KVA each in the substation. The LV Room contains A MDB (LV Panel), with 11 of them being connected to a bus duct to feed power to different levels. One back-up generator of 1500KVA is provided for maintaining essential power supply in case of a main power supply failure. Various types of luminaries are used. The parking and podium area has fluorescent light fittings in use, whilst in the lift corridor down lights are utilized. Common area lights are controlled by a lighting control system. Exit and emergency lights are connected to a central battery emergency system. The fire alarm system is as per the requirement of civil defense authority, and is monitored by the civil defense through an auto-dialing network. The telephone network connection is from EITC (du), and design is as per EITC design guidelines. The low current system consists of CCTV, PA, a music system access control system, and a video intercom system. 50

51 District Cooling System - Residential Area Plant Industrial Area, Musafah Project: District Cooling System - Residential Area Plant Industrial Area, Musafah Client: The General Industrial Council of Abu Dhabi (GIC) Engineering & Design: EMCOR Drake &Scull Group plc., U.K. Consultant: W. S. Atkins & Partners Overseas Project Value: US $21 Million Project Location: Mussaffah, Abu Dhabi Drake & Scull International were responsible for engineering, procurement and construction of the Residential Area Plant to supply 7200 tons of chilled water to an 8000 person accommodation area presently being constructed at Mussaffah in Abu Dhabi. Distribution pipework consists of 1km of 750mm dia steel pre-insulated HDPE covered, 7km 500mm dia steel preinsulated HDPE coated and 35km of various sizes of HDPE pre-insulated HDPE covered pipes. Scope of Work: Drake & Scull International provided the complete engineering, procurement and construction services including the following: 11 KV Incomers (Standby Power) 11 KV/3.3KV Transformers 3.3KV/415V Transformers 6 MW Gas Engine Generators (Prime Power) 1 MW of Generation (Black Start) 6 x 1200 tons 3.3KV chillers 5.5 million litre Thermal Storage Tank Civil works includes ground improvement (vibro stone columns), piling (12m drilled reinforced concrete), reinforced concrete, structural steel, cladding and architectural finishes, roads and plantings, along with the trenching associated with the laying of 43km of underground pipework. 51

52 District Cooling Plant-Dubai Air Port Free Zone Authority Project: District Cooling Plant-Dubai Air Port Free Zone Authority Client: Government of Dubai Dubai Airport Free Zone Authority (DAFZA) Consultants: Parsons Brinckerhoff (M.E) LTD Architect: Brewer Smith & Brewer Gulf Chartered Architect Project Value: US $6.5 Million Drake and Scull International were appointed as main contractor to undertake the enhancement of the Dubai Airport Free Zone Authorities existing central cooling plant and provide a new central water storage facility to be utilized for domestic water and fire fighting requirements as well as irrigation. The main objective while carrying out the project was to ensure minimum disruption to the end users connected to the existing utility services. The plant installed under this contract has a capacity of producing 4,000 tons of chilled water. Drake & Scull International were responsible for the procurement, installation, and commissioning and performance validation of mechanical & electrical chilled water process plant for the District Cooling Plant. Drake & Scull s scope of work included the following: Installation of two new water cooled high voltage chillers 4000 TR capacity Installation of four new cooling tower cells Enhancement and modification of existing high and low voltage electrical systems Installation of new underground chilled water pipe work Installation of new pumped water storage facility with a capacity of over two million litres of domestic water and a capacity of more than one million litres for irrigation. Installation of new underground irrigation, domestic/ fire fighting and drainage services. Complete electrical services associated with the new water storage facility Construction of all associated civil works including services building, equipment bases, Manhole and service trenches. 52

53 Zayed University Project: Zayed University Client: Dubai Municipality Architect: Hok Consultant: Shankland Cox Main Contractor: ECC Project Value: US $38 Million Drake & Scull provided the complete mechanical, electrical and plumbing services installation to Zayed University building in Dubai al-rawyyah. The university is the Women s University which consists of 6 College Buildings for a Total Built up Area of 100,000 m2. The services provided by Drake & Scull International included the following: District Cooling Plant of 4x 1200ton = 4800tons Central air conditioning and ventilation systems. Domestic water services Sanitary and Drainage system Toilet handicapped system LPG System Fire fighting and protection Electrical power distribution (MV & LV) Lighting and Small Power Fire alarm and detection BMS control system MATV & SMATV system Central Dimming System Lighting Control System Central Emergency Lighting UPS System Access Control System Public Address System Clock System 500 KVA Diesel Generator. SCAD 53

54 Royal Abjar Hotel (Renaissance Hotel) Project: Royal Abjar Hotel (Renaissance Hotel) Client: Al Mulla Enterprises Private (Ltd) Architect: The Fraser Nag Partnership Consultant: Kennedy & Donkin (ME) Ltd Project Value: US $26 Million Drake & Scull International provided all Mechanical, Electrical and Plumbing services for the Royal Abjar - a 350 room, five star hotel in Dubai. The services include a computerized building managements system, air conditioning, ventilation, a fire fighting and detection system, domestic water systems, drainage, LPG, water treatment, steam and condensate, electric power, standby generation, lighting, lightning protection, data/ communications and security systems. Additional Notes: Drake & Scull s commitment to quality, efficiency and security remains paramount. Thus the engineering services are controlled by a sophisticated building management system which activated remote plant, monitors the operating of all the systems and registers running hours and maintenance schedules. The entire building is protected by a computerized analogue addressable fire alarm system installed in accordance with BS5839. In the event of a fire the system gives the exact location of the activated fire sensor. Additionally, all public area lighting is controlled by a programmable dimmer system. User-friendly, pre-programmed, lighting provides flexibility for different functions. Complex microprocessors ensure the integrity of the whole system and provide default lighting in case of a power failure. 54

55 Wafi Residential Complex Project: Wafi Residential Complex Client: MKM Services Architect: Holford Architects Main Contractor: Khansaheb Civil Engineering Consultant: Ewbank Preece International Project Value: US $18 Million Drake & Scull International provided the complete mechanical and electrical building services installation to the Wafi Residential Complex, located in the heart of Dubai. The development consists of the mail residential building, end block, multi- storey car park, service compound and external leisure area. The main residential building is 11 storey high with offices, coffee shop, retail outlets, business centre and staff accommodation on the ground and mezzanine floors. The 10 residential floors comprise 124 luxury apartments ranging from 1 to 4 bedrooms with 2 penthouses with roof gardens located on the 11th floor. Drake & Scull International provided the services comprised the complete mechanical, Electrical and plumbing installations including: Air conditioning Domestic water services Drainage Fire fighting systems Electrical power and lighting MATV system Fire alarm system Telephone system Building Management System 55

56 Dubai Internet City- Phase I Project: Dubai Internet City- Phase I Client: Dubai Internet City with participation by the Dubai Government Main Contractor: Al-Habtoor Engineering Enterprises Co. (LLC) Consultant: WS Atkins & Partners Overseas Project Value: US $20 Million Dubai Internet City is the biggest Information Technology Centre in the Middle East and has the largest new generation Internet protocol telephony system in the world. It is a perfect hub for new economy industry - established IT companies, multimedia businesses, telcos, Internet start-ups, service companies, remote service providers, incubators, venture capitalists and professional firms etc. The project is a public/private joint venture, which has more than 185 IT companies in four buildings covering 180,000 square feet of office space. In addition to IT companies office space, Dubai Internet City have Siemens Data Centre, Conference rooms, Public services like - Dome cafe, Food Court, Mini Market, Bank, Police Station and Cyber Cafes. These buildings are surrounded by beautiful landscaping, lakes with fountains and a big car parking. The 15-megawatt Internet City is the biggest IT building in the Middle East, and has the largest new generation internet protocol telephony system in the world. An additional 240,000 square feet of offices, including a standalone building for Microsoft and Compaq is to be built on the side of the man-made lake. The main highlights of the MEP Services provided by Drake & Scull included the following: Central air conditioning & Ventilation System Chilled water system Pressurisation system Hot and Cold water services Sewage drainage system Fire protection system Building Management System Electrical power & lighting system Fire detection and alarm system Cabling of data network system Intelligent control system Dimming control system Access control system CCTV system 56

57 Dubai Creek Golf and Yacht Club Project: Dubai Creek Golf and Yacht Club Architect: Godwin Austen Johnson Main Contractor: Al Naboodah Laing Consultant: Robert Matthew Johnson-Marshall (RMJM) Project Value: US $17.4 Million Drake & Scull provided services to all parts of the 180-acre Dubai creek golfing/yachting complex which encompasses a floodlit driving range, 9-hole practice course, shop and golfing academy, a 45meter high clubhouse with 5-star dining room, gymnasium and swimming pool. The complex also boasts a 115 berth marina that accommodates small dinghies to 80-foot Long Ocean going yachts. The Dubai golf and yacht club is a world class golfing facility in the heart of the city. The new course was built as part of Dubai s commitment to develop a tourism and leisure infrastructure as well as to confirm its reputation as a leading international golfing destination. For the distribution of water mains, telephone conduits and HV cables to 5 sub stations over the site was a major undertaking. The illumination of the driving range and 9-hole practice course alone involved the provision of 90,000 watts of lighting. The central plant for all services was housed in a separate energy building connected to the main club house by underground walkways. From these walkways the service areas feed up into the building through risers and false ceilings. Drake & Scull installed central Building Management System to control and monitor all the building services, ventilation, fire alarms, public address systems, gas leak detection and fire suppression systems, kitchen equipment, lifts and a full range of electrical services. 57

58 Dubai Chamber of Commerce & Industry Project: Dubai Chamber of Commerce & Industry Client: Dubai Chamber Of Commerce & Industry Main Contractor: Al Futtaim Wimpey (LLC) Architect: Hudson Lootah Buckle Consultant: Kennedy & Donkin (ME) Ltd Project Value: US $15 Million When the Dubai chamber of commerce and industry decided to relocate its headquarters, it was committed to constructing a landmark building to the highest quality. This they achieved in the unique design located on the creek side in the heart of Dubai. The 18-storey building comprises an exhibition hall, two conference centers with multilingual translation facilities. Executive offices on the upper floor and general offices, all with views of Dubai creek. The offices are air conditioned by a variable air volume conditioning system with the specialist areas served by close control dedicated plants. The main services plant rooms are located in the basement and on the 3rd and 15th floor levels with central services provided from a service compound. The whole building is under the control of a Building Management System. Drake & Scull provided the complete mechanical and electrical building services for the building including the following: Air conditioning Domestic water services Drainage Fire protection systems Power supplies Lighting Fire alarm Telephones Communication systems Security Building management systems 58

59 Emirates Golf Club Project: Emirates Golf Club Client: Government of Dubai Architect: Robert Matthew Johnson-Marshall (RMJM) Main Contractor: Al Naboodah Laing (llc) Consultant: Robert Matthew Johnson-Marshall (RMJM) Project Value: US $14 Million The legendary Emirates Golf Club has hosted the European PGA Dubai Desert Classic tournament since its inception and is the only Golf Club in the emirates with two 18-hole Championship grass courses. The Emirates Golf Club consists of the main clubhouse building designed in the style of a tent which houses the main club facilities. There are also ancillary buildings for administration, maintenance and other facilities. Drake & Scull International provided electrical, mechanical and plumbing services to all parts of the Emirates Golf Club. Drake & Scull International has maintained this Golf Club for many years and provided temporary MEP services for the club during the Dubai Desert Classic golf tournament. 59

60 The Jewels Project: The Jewels Client: Cayan Main Contractor: Al Seif Contracting Consultant: RMJM Project Value: US $13 Million The Jewels twin towers, located at the Dubai Marina Waterfront, rise to an imposing 20 storey, and will house 120 units and 5 villas. These include one, two, three bedroom apartments, duplexes, penthouses, lofts, retail shops and luxurious villas overlooking the spectacular marina. Complementing this wide array of residences is an amazing range of amenities - high-end finishes, full home automation, fully fitted kitchens and bathrooms, even a Jacuzzi in the master s bathroom. The jewels Twin Towers proved to be one of DSI s prestigious projects and remarkable triumph, as the project team faced a few difficulties during the execution of the project due to the towers unique curved design which is reflected on the interior of the building as well. The irregularity in the shape meant that none of the floors shared the same size and design. This variety presented a challenge in itself due to the different layout of each flat. In addition, each duplex, villa, and penthouse has a private swimming pool and an outdoor Jacuzzi in the penthouses only. Through team work and close cooperation between all parties involved in this project including the Client himself, Consultant, Project Manager, and the Contractor Drake & Scull International was able to complete all thejobs successfully and deliver the project on time. The strong dedication and hard work of the onsite Drake & Scull team delivered a project that is considered one of Dubai Marina s showcases. Drake & Scull International is very proud of having worked on this project and contributed to its success. 60

61 Accident and Emergency Trauma Centre, Rashid Hospital Project: Accident and Emergency Trauma Centre, Rashid Hospital Client: Dubai Health Authority Consultant: Ian Banham & Associates Project Value: US $12 Million The 120-bed state-of-the-art Accident and Emergency Trauma Centre is based in Dubai s Oud Metha area adjacent to Rashid Hospital. The advanced centre makes use of the latest technology and the newest principles in trauma centre architectural design. It is the largest and the most advanced freestanding trauma centre in the region. With a detailed disaster management plan in place, the trauma centre is built to cope with large-scale disasters and emergencies. The facilities spread over the 20,000m of a two storey building, include six operation theatres, three resuscitation departments, CT scanning facilities, an intensive care unit and two radiology departments. In terms of the demands on the MEP installation, hospital projects are among the most complex. The amount and the combination of services that are required are generally larger than in other buildings and consideration of the end-user plays a critical role. The products used in the project had to be carefully specified, with many specialist items needed, as hygiene is a top priority for the client. This scale and the need to maintain high levels of hygiene meant very close day-to-day coordination with the main and civil contractors was essential. All products installed were considered, from the largest plant down to manhole covers. Drake & Scull contract involved the supply, installation, testing, commissioning and operation of the MEP systems. 61

62 Indigo Tower Project: Indigo Tower Project Title: Indigo Tower Location: Jumeirah Lake Towers Client: Jumeirah Properties Investment Ltd Main Contractor: Arabtec Consultant: WS Atkins & Partners Overseas Project Value: US $12 Million Indigo Tower, within the high-rise waterfront development of Jumeirah Lake Towers, soars an impressive 35 floors. Amenities include a fully equipped gymnasium, steam room, lap pool, Jacuzzi, juice bar, a coffee shop,shopping boulevard, 24-hour security, covered car parking and six high-speed lifts: three for the residential floors and three for the commercial floors. Scope: DSI undertook the supply, installation, testing and commissioning of the complete HVCA, plumbing, drainage, fire fighting, electrical and small power plant Installations in a contract worth AED 43 million, DSI has is quite literally at the heart of one of Dubai s most prestigious buildings IndigoTower 62

63 Baynunah Hilton Tower Project: Baynunah Hilton Tower Client: H.H. Sheikh Mohammed Bin Zayed Al Nahyan Main Contractor: Six Construct (LLC) MEP Services Consultant: Kennedy & Donkin (ME) Ltd Project Value: US $11 Million Drake & Scull International, Abu Dhabi provided the complete Mechanical and Electrical services to the Baynunah Hilton Tower located on the Abu Dhabi Corniche. Panoramic views of the Arabian Gulf are provided from the tallest building in this area. The project was undertaken on the instructions of Sheikh Mohammed Bin Zayed Al Nahyan in cooperation with the Department of Social Services and Commercial buildings. The lower areas of the tower provide car parking for residents and a five star hotel, decorated in traditional Arab style and operated by the Hilton hotel group. The upper levels are luxury apartments from one to four bedrooms fitted to the highest standard, all fully serviced from the hotel. Leisure facilities are provided with a swimming pool and health club located on the 27th and 28th floors. The building is 160 meters high in total, capped by the Raydome which houses communication equipment, lift gear and water tanks. Drake & Scull International provided the following building services: Air conditioning Domestic water services Drainage Fire fighting systems Power & lighting Fire alarm Telephone Communication systems Security systems Building Management Systems 63

64 Emirates Aviation Training Centre Project: Emirates Aviation Training Centre Client: Emirates Airlines Architect: The Fraser Nag Partnership Architects & Town Planning Consultants Main Contractor: Al Nekhreh Contracting Co. LLC Consultant: Ian Banham & Associates Project Value: US $ 8.44 Million Drake & Scull International provided the complete mechanical, electrical and plumbing services for the Emirates Aviation Training Centre for the Emirates Airlines in Dubai. The building is located at Al Garhoud area near Dubai Airport, which comprises three main buildings namely Administration building, Simulator building and Car Park building. The Administration building comprises the main lobby, reception, an auditorium with a seating capacity of 400 persons, a restaurant and offices for different departments. The Simulator building consists of training Centres, class rooms, library and flight simulator training facility which houses 14 full motion flight simulators. The plantrooms are located in the Simulator building. The Car Park building is a 12 level multi-storey building to provide car parking for approximately 540 cars. The chillers are located on the roof of the Car Park building and the pump rooms are in the basement. The main highlights of the MEP services provided by Drake & Scull included the following: Central Air Conditioning & Ventilation System Chilled Water System Hot and Cold Water Services Sewage Drainage System Fire Protection System (including Fire Hose Reel and Wet Risers) Fully integrated Building Management System Electrical Power and Lighting Fire Alarm & HSSD Systems Earthing and lightning protection system Cable containment for lighting, small power, telephone & ELV (i.e. TV, BMS, Security). CCTV & PA Systems Access Control System UPS System Lighting Control System Compressed Air System Waste Drainage System Rainwater Drainage Kitchen Extract System 64

65 Wafi Shopping Complex (Wafi City) Extension Project: Wafi Shopping Complex (Wafi City) Extension Client: MKM Services Architect: John R Harris & Partners Main Contractor: Khansaheb Civil Engineering Consultant: Kennedy & Donkin (M.E.) Ltd Project Value: US $4.5 Million Drake & Scull provided the complete mechanical, electrical and plumbing services installation to the Wafi Shopping Complex Extension building in Dubai. The Shopping complex located in the heart of Dubai on the road towards Al Gharoud bridge. It provides the highest quality facilities for the retail shopping outlets and other commercial spaces. The entire development is fully air conditioned and finished to a very high standard. The services provided by Drake & Scull International, included the following: Central air conditioning and ventilation systems Domestic water services Sanitary and Drainage system Fire fighting and protection Electrical power distribution Lighting and Small Power Fire alarm and detection BMS control system MATV & CCTV system Central Dimming System Central Emergency Lighting Public Address and Music System Power Controls for Entertainment Areas 65

66 DAFZA Offices, Phase-2 Project: DAFZA Offices, Phase-2 Client: Government of Dubai, DAFZA Main Contractor: Al Nekhreh Contracting Company (LLC) Consultant: Rice Perry Ellis Consultant Project Value: US $4.3 Million Dubai Airport Free Zone Authority Offices consists of two five storey buildings (East & West) wings. It is located next to Dubai International Airport Terminal No.2. Various systems were integrated into the existing services provided under the Phase-I contract, such as Water Services and L.V. Systems. Drake & Scull International installed the complete HVAC, Plumbing, Electrical, Fire Alarm and Fire Fighting services including: V.A.V. Air Conditioning System Chilled Water Distribution System Domestic Hot & Cold Water System Sanitary and Drainage System Fire Fighting System Standby Power Generation System UPS System Emergency Lighting CCTV System MATV System SMATV System Lighting & Small Power Structured Cabling Fire Alarm System Building Management System 66

67 American Hospital Expansion - Pre-Phase 1 Project: American Hospital Expansion - Pre-Phase 1 Client: M/s. Mohamed & Obaid AlMulla Architect: Michel Aziz / Ellerbe Becket Consultant: Turner Construction - International LLC Main Contractor: Al Nekhreh Contracting Co. L.L.C. Project Value: US $3.2 Million Drake & Scull International provided the complete mechanical, electrical and plumbing services for the American Hospital expansion project for the Client Mohamed & Obaid AlMulla LLC. The expansion building comprises a four storey adjacent to the existing hospital building with a plant room on the third floor. The services provided by Drake & Scull, included the following: Air conditioning & ventilation systems Domestic water services Fire fighting and protection Electrical power and lighting Fire alarm and detection MATV & CCTV Hot & Cold water distribution Medical gas system Sanitary and drainage system Intercom system Nurse call system Structured cabling Voice & data system installation 67

68 TyCom Cable Station - Barnstaple Project: TyCom Cable Station - Barnstaple Client: TyCom Value: US $ 2 Million Start Date: 2000 Completion Date: 2001 Project Manager: Parsons Brinckerhoff Constructors Ltd Building Contractor: Roger Boulivant Architect: Parsons Brinckerhoff Built Environment DSI secured the mechanical, electrical and public health services contract with Parsons Brinckerhoff as part of the TyCom Global Network (TGN), the TelExchange centres including Point of Presence facilities and cable stations throughout the UK. TyCom Barnstaple was a new cable station intending to operate as a satellite station linking to a much larger station at Highbridge. The contract was completed ahead of programme and with minimal defects. Value engineering aspects included the replacement of sprinklers with a water misting system to prevent water damage to the client s equipment, stacking of air-handling units and fans to save space and reduce building costs and also the provision of a GRP enclosure to obviate the need to construct a high voltage switchroom. DSI secured the contract following the successful completion of the station at Highbridge. DSI carried out the design forging good working relationships with Parsons Brinckerhoff who highly commended the project team for their performance and proactive approach. The scope of services included: Fire Alarm CCTV Lighting Misting Security Barriers Sanitation Ventilation Air-conditioning Generators HV/LV Distribution 68

69 TyCom Cable Station - Highbridge Project: TyCom Cable Station - Highbridge Client: TyCom Value: US $ 8.1 Million Start Date: 2000 Completion Date: 2001 Project Manager: Parsons Brinckerhoff Constructors Building Contractor: Roger Boulivant Consultant: DSI Ltd Architect: Parsons Brinckerhoff Built Environment DSI secured the multi million pound contract with Parsons Brinckerhoff to carry out the Mechanical Electrical & Public Health services at the new cable station at Highbridge. As part of the Northern European operation this cable station was the first to be delivered as an operational unit forming a significant part of the TyCom Global Network (TGN), thus allowing data to pass between London and America at 2,700 gb per second. Highbridge was the first contract between TyCom and DSI and consisted of the complete design, build and commissioning of the M & E services package and was constructed within a fast track 16 week programme. Having achieved successful handover to the client, TyCom were then able to complete their fit out to achieve operational roll out for the 1st June Specialist engineering requirements included the following: Dual 2.5MVA HV & LV supplies, fully interlocked, providing 100% mains backup. Dual 2.5MVA Standby Generators, providing 100% emergency backup in the event of total mains failure. Comprehensive fire protection to all areas, comprising of 2 stage Inergen/Sprinkler systems fully integrated with the building Fire alarm system Fully integrated BMS system interlinked to the central control monitoring station within the USA. The scope of services included: HV and LV distribution Small Power, Lighting and Emergency lighting Fire Alarms, Security, Access Control & C.C.T.V. Unistrut primary support network Above ground drainage and Sanitary Ware Air-conditioning Units, Fresh Air and Extract Systems Building Management System (BMS) Full Stepover perimeter grounding network 69

70 Tycom Data Centre Paris Project: Tycom Data Centre Paris Client: TyCom Value: US $ 12.1 Million Start Date: 2001 Completion Date: 2001 Main Contractor: Parsons Brinckerhoff Contractors Ltd M & E Contractor: EMCOR Technologies Civil Contractor: Ballast Nedam DSI successfully completed the Electro-Mechanical Services associated with a Data Centre for Tycom in Paris. The 80,000ft² complex is located within a 300,000ft² telehouse building which was originally a papermill and is located in St. Denis close to the Stade de France, Paris. The contract was for the design, supply, installation and setting to work of the associated sophisticated mechanical and electrical services for the collocation areas, battery and transmission rooms, UPS rooms, including office facilities. The plant rooms were located on the roof, mezzanine and ground floors which besides the logistics of a detail design for N + 1, required careful co-ordination of the numerous systems to ensure access for maintenance. The project based on Tycom s performance specification and was completed in 7 months, could only be achieved with close alliance with the manufacturers for long lead items such as 3 x Generators (2,500 kva each), 3 x Chillers (1,000 kw cooling each), LV Distribution Board (18 meters long), 3 x 300 amp transformers and 2 x 800 kva UPS Systems. The scope of electrical services included: HV Switchgear and Installation LV Distribution Small Power and Lighting BMS System Fire Alarm System UPS System Telephone/Data and Cat 5 Cabling Intercom System and Critical Alarms Generator and Standby Sets Lightning Protection and Clean Earthing Systems Motor Control Centre (MCC) Power Distribution Boards (PDU) Trace Heating 5000 amp Bus Bar System The scope of mechanical services included: Chilled water, Chillers and associated pipework DX Cooling System and PAC Units Safety Showers, Ventilation and Extract Leak Detection and Smoke Extract Gas Suppression and Domestic Water Services Oil Storage and Distribution 70

71 TyCOM Point of Presence, Stratford, London Project: TyCOM Point of Presence, Stratford, London Client: TyCom Value: US $ 20 Million Start Date: 2000 Completion Date: 2001 Project Manager: Parsons Brinckerhoff Constructors Ltd Building Contractor: Mowlem Consultant: Hulley & Kirkwood Architect: Parsons Brinckerhoff Built Environment DSI secured a multi-million pound contract with Parsons Brinckerhoff to carry out the Mechanical, Electrical and Public Health design and installation services to an existing 1950 s retail department store located at Stratford Broadway in London. The building is required to support telecom network switching and datacom equipment within a Point of Presence environment. A PoP is described as a selfcontained network switching node and subscriber network access point. Over 60km of Power Cables were installed requiring an exceptional cable management system, utilising an intricate support system designed by DSI due to the structural limitations of the existing building. The construction programme of 5 months involved major installation challenges with a tight handover deadline. The scope of services included: Stand by Generators (3No. at 2.0MVA ea) Fire Alarm, Sprinkler and Inogen Systems 8 No. 500 kva Static UPS Units Power Wiring Lighting Air Conditioning Hot and Cold Water Public Health 71

72 Norwich Data Centre, England Project: Norwich Data Centre, England Client: Norwich Union Value: $76 Million Start Date: 2006 Completion Date: 2007 Project Manager: AYH London Building Contractor: EMCOR Consultant: WSP Architect: LSI Architects DSI partnered with WSP to convert an existing building shell into a fully-fledged modern data centre to serve Norwich. DSI undertook complete development of the data centre design post tender along with all coordination and installation information. DSI also managed the pre purchased long delivery equipment on behalf of Norwich Union. Transformers and Switchgears Earthing and Lightning protection Mechanical Services Fitouts Refrigeration Units RACU, BMS and Controls The entire process was completed in 14 months which was a major achievement in terms of the complexity of design and conversion. Drake & Scull s scope of MEP activities included the installation and testing of: Firefighting systems Instruments and Coatings Sanitaryware Gas suppression and sprinkler systems Uninterrupted Power Supplies (UPS) 72

73 DRAKE & SCULL PASSAVANT ENERGY & ENVIRONMENT 73

74 Wastewater Treatment Plant Braila Project: Wastewater Treatment Plant Braila Start Date: 2010 Completion Date: 2011 Location: Braila, Romania Industry: Wastewater Treatment Developer: Compania de Utilitati Publice Dunarea Braila (Braila Municipality) Main Contractor: Passavant Energy & Environment Value: US $65 million Passavant Energy & Enevironment, Drake & Scull International PJSC s specialised German water and wastewater global specialist fully-owned subsidiary was contracted by the Braila Municipality to undertake the Design, Supply and Installation of a Wastewater Treatment Plant with a total capacity of 100,000 m³/day, catering to a Population Equivalent of 270,000 people. As Main Contractor, PE&E was in charge for the mechanical, electrical and civil portions of the Braila Wastewater Treatment Plant. The wastewater treatment plant itself consists of: A Main pumping station to supply the collected wastewater to the treatment plant Rising Main section for transportation of the wastewater to the plant Mechanical Pre-treatment Unit (using both Coarse and Fine Screens) to remove large particles in the water Aerated Grit & Grease Removal Chamber to absorb oily layers and mineral particles (sand) contained in the wastewater stream Aeration Tank (Plug Flow Aeration) with Fine Bubble Aeration to provide dissolved oxygen for the biomass and to prevent sedimentation Final Sedimentation Tanks and Sludge Treatment with Mechanical Thickening and Dewatering of sediments. The dewatered sludge can be re-used to generate biogas. Flood Pumping Station using effluent pipes to discharge the cleaned water into the river 74

75 Sludge Treatment Plant - Bailonggang Project: Sludge Treatment Plant - Bailonggang Start Date: 2010 Completion Date: 2011 Location: Shanghai, China Industry: Wastewater and Sludge Treatment Developer: Shanghai Municipal Sewerage Company Ltd. Main Contractor: Shanghai Municipal Engineering Design General Institute Value: US $17.5 Million Bailonggang is a busy suburb located on the outskirts of Shanghai, also known as the commercial capital of China. Situated in relatively close proximity to the centre of Shanghai, the district of Bailonggang was home to a wastewater treatment plant that was struggling to cope up with the increase in population that accompanies the boom in Shanghai. Although the wastewater treatment plant design had included a sludge thickening line, a need was felt to expand the capabilities and capacity of the plant to better serve the needs of one of Asia s most populous urban agglomeration. (For comparison, The Bailonggang plant served the needs of a people equivalent of 4.3 million whereas metropolitan Shanghai houses 20 million, which creates a huge demand for Wastewater management.) The Wastewater Treatment plant at Bailonggang was funded by the International Bank for Reconstruction and Develpoment (IBRD), and Passavant-Roediger were chosen to undertake the contract for the extension of the mechanical sludge thickening plant was well as for the construction of the complete sludge digestion and drying plant. Passavant Roediger s official scope of work covered the following areas: Supply, Installation of Equipment and Civil Works for Sludge Mechanical Condensation, Digestion and Drying System at the Bailonggang Waste Water Treatment Plant. Installation of the following new main process units into the existing plant: Mechanical sludge thickening units Digestion Plant Sludge Transfer to Sludge Drying Plant / Sludge Silos Biogas Treatment Plant Return Water Treatment Facility Sludge Liquor Treatment Facility. Among the other major projects carried out by Passavant- Roediger in China are the Wastewater Treatment Plant in Beijing (Xiaohongmen with a daily flow of 600,000 m³), the WWTP at Shijiazhuang (with a capacity of 500,000 m³/d), Hangzhou (with a capacity of 600,000 m³/d), Sludge Treatment Plant (STP) at Wuhan (with a capacity of 300,000 m³/d ), and the Sludge Treatment Plant at Yantai (with a capacity of 240,000 m³/d). 75

76 DRAKE & SCULL OIL & GAS 76

77 Low Density Ammonium Nitrate Plant Project: Low Density Ammonium Nitrate Plant Start Date: 2011 Completion Date: 2015 Location: Ain Sokhna, Egypt Industry: Petrochemical Developer: Egypt Hydrocarbon Corporation S.A.E Main Contractor: ThyssenKrupp Uhde GmbH Value: US $21 Million Egypt Hydrocarbon Corporation S.A.E, one of Egypt s major petrochemical companies, envisioned the creation of a Low Density Ammonium Plant (LDANP) in Egypt. The purpose of the LDANP was to facilitate the production of Mining Grade Ammonium Nitrate which is used in the production of explosives for mining and other blasting applications, such as in construction. The project presents an opportunity for the private sector development in Egypt, foreign exchange earnings and revenues for the government. It is expected to provide employment opportunities for up 2000 Egyptian staff during the construction period and for up to 220 people during the facility operation. The Low Density Ammonium Nitrate Plant at Ain Sokhna (Egypt s industrial hub), consists of a nitric acid unit and ammonium nitrate unit; where the nitric acid is consumed in the production of ammonium nitrate. The ammonium nitrate unit uses a singlestage, neutralization process. The primary portion of Drake & Scull Oil and Gas works is to assume responsibility for the civil, mechanical and steel structure works. Drake & Scull s scope of works covers the Storage Tanks, Control Building, Piping, Steel Structure (which includes 5,000 tons of steel rebar), 6000 tonnes of mechanical erection and 40,000 m3 of concrete. Drake & Scull Oil and Gas has spearheaded the construction activities on site, taking a leadership role in co-coordinating the works between the various teams on site. Drake & Scull also undertake periodic evaluations of designs and offer their suggestions and recommendations to bolster the efficiency of construction operations on site. The efficient planning and contingency measures have allowed the project construction to progress briskly, overcoming sudden delays in delivery of material and engineering drawings, thanks to strong resourcing of material and equipment on site as well as fast track mobilization of crucial personnel. More than 1200 DSI employees and laborers work round the clock to accelerate the pace of progress on site. Drake & Scull Oil and Gas has already reached some major milestones during its time on site. These include: Almost m3 of concrete casted Almost 500 tonnes of tanks erected Almost 1200 m of underground pipes erected 77

78 DRAKE & SCULL RAIL 78

79 Channel Tunnel Rail Link Line Infrastructure Project: Channel Tunnel Rail Link Line Infrastructure Client: Union Railways (North) Value: $350 Million Start Date: 2002 Completion Date: 2006 The Channel Tunnel Rail Link (CTRL) Project was managed on behalf of Union Railways Network (URN) by Rail Link Engineering (RLE) a JV comprising Bechtel, Systra, Ove Arup partners, and Halcrows. The consortium entrusted Drake & Scull with the task of providing complete MEP engineering solutions for the Channel Tunnel Rail Link (CTRL) which provides a high speed rail link between St. Pancras Station in London and the Channel Tunnel portal near Folkestone in Kent. The CTRL has been split into two major sections by design. Section 2 of the CTRL consists of a new double track railway, which connects onto Section 1 of the CTRL at Southfleet Junction and runs to St. Pancras Station in London. The railway runs in the open from the Southfleet Junction up to Swanscombe, where it passes under the river Thames in single track tunnels (Thames Tunnel), emerging just to the east of the Queen Elizabeth II road bridge. From there it runs in the open to Barking, then in single-track tunnels (London Tunnels) to St. Pancras. The tunnels are located between Barking and Stratford (London Tunnel 2) and between Stratford and St. Pancras (London Tunnel 1). The London Tunnels West portal is located approximately 1.5 km outside St. Pancras Station. Overall there are 44 km of tunnel bore and 11 km of open route. There are 7 shafts and portal buildings equipped with tunnel ventilation fans and an additional 14 remote technical buildings. The engineering systems are essential to the operation of the railway including life safety in respect fire, communications and tunnel ventilation, which provides a safe haven and smoke control in the event of a tunnel fire incident, communications and fire systems. 79

80 Drake & Scull s contract involved the design, procurement, installation, testing and commissioning of all engineering systems required for Section 2 of the Channel Tunnel Rail Link. Included within the scope was the installation of the signaling and C&C equipment together with building works associated with the shaft, portals and technical buildings. Technical Solutions Engineering Management Systems Integration Engineering Assurance Interface Management Programme Scheduling and Controls Project Scope Life Safety Systems Tunnel Ventilation Fire Detection & Protection Lighting Telecommunications Containment Signaling Installation Cross Passage Doors Buildings & Structures Building Services 80

81 St Pancras Station Redevelopment - London, UK Project: St Pancras Station Redevelopment London, UK Client: Union Railways (North) Value: $245 Million Start Date: 2001 Completion Date: 2007 Drake & Scull Rail participated in the Redevelopment of the St. Pancras Railways station as a member of the CORBER integrated joint venture, for the Channel Tunnel Rail Link London Terminus. The station was built in 1869 and is a Grade 1 listed building rated as extremely important to the UK s historic heritage. The existing train Shed, which was retained, was the largest enclosed volume and largest unsupported structural span in its time and formed the basis for many station buildings in the United States. In addition to the existing train shed, the station had 250 m flat roof extension with 13 platforms to cater for 400 meterlong Eurostar trains. The Redevelopment Construction was completed in 2 phases. During Phase 1 the East Deck Extension, which formed the Interim Station of up to 6 platforms, was developed and made operational. Once the Interim Station was operational, Phase 2 works proceeded in order to excavate and build a Box for a new Thameslink underground station and to complete the West Deck Extension whilst refurbishing the existing train shed. Drake & Scull Rail s pioneering work on the project was greatly appreciated by the clients and widely lauded in the industry. Project Scope Electrical & Power Distribution Uninterrupted Power Supply Lighting Earthing& Bonding Fire Detection & Protection Public Address & Telecommunications Mechanical & Piped Services Natural Gas Air Conditioning Ventilation Automatic Controls Building Automation Security Technical Solutions Systems Design Systems Integration Engineering Assurance Interface Management Programme Scheduling and Controls 81

82 Jubilee Line Extension Project London, UK Project: Jubilee Line Extension Project London, UK Client: London Underground Ltd Value: $416 Million Start Date: 1994 Completion Date: 1999 The Jubilee Line Extension Project (JLEP) was one of the largest construction projects in Europe and comprised over 16 route kilometers serving 11 new stations, 3 overland and 8 underground. Of the 11 stations 5 were interchange stations linking the service to the existing London Underground system and 3 inter connect with Railtrack Stations providing easy access to the South East, South and North East of London to the expanding Docklands development area. The project also incorporated 10 ventilation/ emergency access shafts and 2 traction/intake sub stations. The line connects with the existing Jubilee Line at Green Park, passing under the River Thames four times before terminating at Stratford. Drake & Scull Rail were the mechanical and electrical services contractor for Contracts 205 (Station and Tunnel Ventilation), and Contract 206 (Station and Tunnel Services). Contract 205 comprised the design, supply, installation and commissioning of Tunnel Ventilation, which involved the provision of 46 large diameter fans, each having a minimum duty of 70 m³/sec. Heavy duty Public Area ventilation was provided which incorporated 12 fans providing both fresh air and smoke control in the stations at platform, concourse and connecting tunnel areas. In addition to the public area ventilation, air-conditioning systems were provided to vital equipment rooms and additional ventilation to all underground spaces within the station box. Contract 206 comprised of the design, supply, installation and commissioning of normal and emergency lighting, low voltage power supplies, fire detection and alarm systems, fire protection systems, compressed air and public health services. The contract award was made in November 1993 and DSR completed the design phase of the project late in Installation drawings for each of the 30 work locations were completed 12 months later in late An essential part of the design process was a review of the design of the critical life safety systems provided under the contract. DSR s in-house design team worked closely with London Underground s engineers using System Assurance techniques to eliminate unnecessary complexities and enhance overall safety and reliability standards. The use of System Assurance techniques on ventilation and service installations was a first for the rail industry, the process normally being used in automotive, military and rolling stock industries. 82

83 In order to ensure that the critical ventilation systems were designed to optimum levels, Drake & Scull Rail were responsible for undertaking a computer modeling of the system s performance, known as a Subway Environmental Simulation process. Extensive testing of proposed equipment was carried out during the design phase of the project and ventilation fans were tested to destruction at temperatures in excess of 250ºc. Fire rated ductwork formed a large part of the ventilation systems and after extensive deliberation and evaluation Durasteel was selected as the preferred ductwork of choice. The major deciding factor in the selection was the engineer s requirement that all services installed in the JLEP should have a 40 year life. The installation phase of the project commenced in January 1995 with the fit out of the grade stations at West Ham and Canning Town North London Line Platforms. These were handed over to Railtrack in August These successes were followed by the completion of Blue Ball Yard and West Ham Intake Stations. The company achieved the Power On milestone in line with the construction programme. The remaining installations, including all the major stations commenced generally in line with agreed construction schedules and were commissioned and handed over on a progressive basis. Installation work then started on North Greenwich (the largest of the 11 stations) and was successfully commissioned and accepted by Her Majesty s Inspector of Railways in time for the 1st phase passenger operation on 14 May The installation works within the tunnels called for a specialist approach and the positioning of 22 kilometers of fire hydrant main was a particular challenge. Specialist pipe handling equipment was mounted on works train flatbed wagons with demountable pipe magazines, an installation rate averaging 120 meters per shift was achieved within the tunnels from Canning Town Portal to Green Park Station, including the location of hydrants every 60 meters and tunnel isolation valves every 180 meters, while ensuring that connections were made to systems at every station. The lighting system within the tunnels also posed a challenge and a pre-assembled system was selected with plug in sockets every ten meters which enabled the light fitting assemblies to be prewired and required only a plug to connect the light. The commissioning of the completed installation was an enormous task and required to be undertaken in phases, each of the systems was pre-tested, tested and commissioned, and then proved to Her Majesty s Inspector of Railways. Smoke testing of each station was undertaken to prove the effectiveness of the installed systems. London Underground Ltd, as the final Client, was keen to have their staff trained in the operation of the unique systems within the London Underground environment. Drake & Scull Rail coordinated with the client to provide this in-depth training to their satisfaction. The completed Jubilee Line was opened in time for the millennium celebrations at thenorth Greenwich Dome and accommodated 10,000 passengers per hour, peaking at 17,000 per hour for special events. The Jubilee Extension was yet another fine showcase of Drake & Scull Rail s extensive Rail project capabilities and a major milestone in its history of achievements. Project Scope Tunnel Ventilation Smoke Control Fire Detection & Protection Lighting Telecommunications Drainage H&C Water Air Conditioning Power Public Health Services Technical Solutions Engineering Management System Design Systems Integration Engineering Assurance Interface Management Programme Scheduling and Controls 83

84 Siemens Traincare Facility Southampton, UK Project: Siemens Traincare Facility Southampton, UK Client: Siemens Transportation Systems Value: $6.4 Million Start Date: 2002 Completion Date: 2003 Drake & Scull Rail were involved in the development of a Traincare Facility in Southampton for Siemens Transportation Systems. This was designed to maintain the new trains built by Siemens and being introduced by Southwest Trains onto their network. The facility involved construction of a new depot and comprised a main maintenance shed, train wash building, Wheel lathe building and enabling works for connection to the railway infrastructure. Drake & Scull Rail were responsible for the design and installation of the Electrical, Mechanical, Public Health and Telecommunication Systems. The depot was the first to be built in partnership with Siemens Transportation Systems and Fitzpatrick Contractors. Drake & Scull Rail s performance on the project surpassed the client s expectations, who subsequently invited Drake & Scull Rail to carry out other Rail works in the future. Project Scope HV/MV Power LV Power Lighting Heating Ventilation and Air Conditioning Telecommunications Fire Detection & Protection Security Depot Protection Compressed Air Technical Solutions Systems Design Systems Integration Engineering Assurance Interface Management Programme Scheduling and Controls 84

85 Brixton Congestion Relief, London, UK Project: Brixton Congestion Relief, London, UK Client: Metronet BCV Value: $4 Million Start Date: 2001 Completion Date: 2003 The Brixton Congestion Relief Project was launched to address the congestion points that had been witnessed on the busy Rail line. Drake & Scull Rail were selected to carry out the complete MEP and Health & Communication works for the Brixton project, over a period of more than 2 years. The project works were carried out in two different sections. In the First section, Drake & Scull Rail undertook the design development, installation, testing and commissioning of the mechanical, public health, lighting, power and fire alarm systems within a new office building for the station staff which had to be built on top of the existing building. The office space had been built to current commercial standards and had to be capable of round the clock service. For the second section, Drake & Scull Rail had to revamp the works within the Brixton station area where it was assigned the responsibility for design development, installation and commissioning of the new lighting, power, telecommunications, security and fire detection systems within the modernised public areas of the underground station. The revamping operations also installed new lifts and escalators as part of the modernisation package. Drake & Scull Rail s stellar project execution capabilities allowed them to complete the project on time, and the installed works were compliant with the London Underground Section 12 standards of the day. Project Scope Mechanical Electrical Public Health Communications Fire Detection & Protection Technical Solutions Systems Design Systems Integration Engineering Assurance Interface Management Programme Scheduling and Controls 85

86 Bedford Depot Bedford, UK Project: Bedford Depot Bedford, UK Client: Fitzpatrick Contractors Ltd Value: $3.5 Million Start Date: 2004 Completion Date: 2004 The Bedford Rail depot was a 6 month fast track project that was launched to support Thameslink rail passenger services during the period of the blockade whilst St. Pancras station was being redeveloped. The depot works enabled the South Central rail network operator to maintain a fully functional service during the main works blockade and also provided a depot for the next 20 years, while ensuring that there was no disruption of the critical rail service for its numerous passengers. Drake & Scull Rail worked in partnership with Fitzpatrick Contractors Ltd, for a contract framework funded by HSBC Rail (UK) Ltd to design and build services for the Main Train Care Area and External Services at Bedford Cauldwell Depot. Drake & Scull Rail were responsible for the complete design and build of all mechanical, electrical and telecommunications systems. Drake & Scull Rail s meticulous planning and strong engineering skills enabled it to meet the stiff deadline to the client s satisfaction. Project Scope Lighting LV Power Telecommunications Air Conditioning Heating & Ventilation Public Health Security Technical Solutions Systems Integration Engineering Assurance Systems Design Interface Management Programme Scheduling and Controls 86

87 North Pole Depot London, UK Project: North Pole Depot London, UK Client: British Rail Value: $17.5 Million Start Date: 1990 Completion Date: 1990 Drake & Scull carried out the mechanical and electrical services for British Rail s Channel Tunnel rail depot located at Ladbroke Grove, London. The North Pole Depot posed a few unique challenges that Drake & Scull Rail s engineering teams were able to resolve in a professional manner. One of the major challenges faced during the execution of the North Pole depot was the installation of high level M & E works. To overcome this challenge, Drake & Scull Rail adopted an innovative design and construction of a high level rolling platform, mounted on specially procured flatbed railway bogies which solved the problem efficiently and swiftly. The other challenge was to ensure that the installed systems were fully compliant with the strict ISO standards, a non-negotiable requirement for the client. Drake & Scull Rail successfully installed all systems installed which have been managed in accordance with ISO 9001 Quality Accreditation ever since. Destined as a benchmark depot for future rolling stock maintenance, North Pole Depot benefited from Drake & Scull Rail s integrated quality and design capabilities and became a good example of Drake & Scull Rail s project capabilities. Project Scope Mechanical Services Building Management Electrical Services Depot Protection Systems Hot Air Blowers Circular Ductwork Distribution General Depot Lighting Building Services Power & Gas Technical Solutions Engineering Management Systems Integration Engineering Assurance Interface Management Programme Scheduling and Controls 87

88 Stratford & Ebbsfleet International Stations Kent, UK Project: Stratford &Ebbsfleet International Stations Kent, UK Client: Rail Link Engineering Value: $24 Million Start Date: 2004 Completion Date: 2006 Drake & Scull Rail undertook the design, procurement, installation; testing, systems integration, handover and bringing into use of all Engineering Systems for the CTRL interchange stations at Stratford and Ebbsfleet in the South- East of London, on Section 2 of the Channel Tunnel Rail Link (CTRL). Section 2 completed the new lines from Ebbsfleet into St. Pancras stations. Drake & Scull Rail worked closely again with the Architectural design team to incorporate the latest International rail systems engineering standards. The design-build contract included all interconnection and systems integration works with the North Kent line at Ebbsfleet. The award of this contract represented a further milestone in the ongoing successful relationship developed between Drake & Scull and RLE following the successful works at St Pancras and the Channel Tunnel Rail Link Line Infrastructure Contract. Project Scope Mechanical Electrical Public Health Communications Fire Detection & Protection Technical Solutions Systems Design Systems Integration Engineering Assurance Interface Management Programme Scheduling and Controls 88

89 Dubai Airport Passenger Movement Project: Dubai Airport Passenger Movement Client: Dubai Airports/Bombardier Value: $10 Million Start Date: 2014 Completion Date: 2015 The Dubai Civil Aviation Authority commissioned the construction of Concourse 4 at the Dubai International Airport which will be connected to Terminal 1 via an automated passenger mover system (APM). This facility comprises of a 1.6km elevated dual track guide way, a maintenance and storage facility, alighting and boarding stations in both the Concourse 4 and Terminal 1 buildings, operational and control facilities and all associated HV/LV & DC substations. Drake & Scull successfully tendered and won two separate packages of work from Bombardier, a smaller package labelled as the MEP package covered the installation of typical MEP building services such as the HVAC, Plumbing & lighting and small power systems and a second larger package labelled as the EI Package covered the installations of the APM systems specifically for the Airport People Mover system that Bombardier were providing. Under this package Drake and Scull provided the cable management systems, all cabling and terminations, substation equipment, traction power system including the DC power rails, signaling equipment, fiber optic cabling and connections and the entire control and signaling cabling network and terminations. All of which were to be installed within the new three story Concourse 4 APM building and the associated APM rooms within the Terminal 1 building. The scope of work includes the production and submission of shop/fabrication drawings, supply and installation of MEP services throughout the APM-associated locations, and provision of railway-specific services such as signals, traction power, maintenance of area power, compressed air and communication systems as well as minor construction works. ALEC (Al Jaber LEGT Engineering & Contracting), is the main contractor for development of the Concourse 4 at the Dubai International Airport while Bombardier Transportation Holdings USA Inc, is the prime entity responsible for rolling stock and rail technologies at the airport. 89

Project Case Study. Starwood Hotel at Nile Corniche, Cairo. Project: Starwood Hotel Start Date: 2010 Completion Date: Ongoing

Project Case Study. Starwood Hotel at Nile Corniche, Cairo. Project: Starwood Hotel Start Date: 2010 Completion Date: Ongoing at Nile Corniche, Cairo Project: Start Date: 2010 Completion Date: Ongoing Location: Egypt Industry: Hospitality / Hotel Developer: Qatari Diar Real Estate Investment Company Consultant / Architect: Engineering

More information

More than 135 years of delivering landmark projects around the world

More than 135 years of delivering landmark projects around the world Company Profile More than 135 years of delivering landmark projects around the world About Us Drake & Scull International PJSC (DSI) is a regional market leader delivering world class quality projects

More information

Project Case Study. Al Muneera Al Raha Beach Development. Project: Al Muneera Start Date: Industry: Residential. Value: US $ 141 Million

Project Case Study. Al Muneera Al Raha Beach Development. Project: Al Muneera Start Date: Industry: Residential. Value: US $ 141 Million Al Raha Beach Development Project: Start Date: 2009 Completion Date: 2012 Location: Al Raha Beach, Abu Dhabi, UAE Industry: Residential Developer: Aldar Properties Consultant/Architect: Waterman International

More information

Project Case Study. Park Rotana. Project: Park Rotana Start Date: 2007 Completion Date: 2010

Project Case Study. Park Rotana. Project: Park Rotana Start Date: 2007 Completion Date: 2010 Project: Start Date: 2007 Completion Date: 2010 Location: Abu Dhabi, UAE Industry: Mixed Use / Hospitality Developer: Al Mada Tourism Investment Company Consultant / Architect: Al-Salaam consulting Architects,

More information

Project Case Study. King Abdullah University for Science and Technology. Project: King Abdullah University. Completion Date: 2009

Project Case Study. King Abdullah University for Science and Technology. Project: King Abdullah University. Completion Date: 2009 King Abdullah University for Science and Technology Project: King Abdullah University Start Date: 2007 Completion Date: 2009 Location: Jeddah, Kingdom of Saudi Arabia Industry: Educational Developer: ARAMCO

More information

DRAKE & SCULL CONSTRUCTION People Innovation Passion

DRAKE & SCULL CONSTRUCTION People Innovation Passion DRAKE & SCULL CONSTRUCTION People Innovation Passion About DSI PJSC More than 130 years of delivering landmark projects around the world. International PJSC (DSI PJSC) is a multinational conglomerate headquartered

More information

ABU DHABI A Visionary City

ABU DHABI A Visionary City MEERA ABU DHABI 2030 A Visionary City Plan Abu Dhabi 2030 sets out the developmental steps that will propel Abu Dhabi forward to become the most desirable place to live and to do business in the Middle

More information

Project Case Study. Motor City DCP. Project: District Cooling Plant, Motor City Start Date: 2007 Completion Date: 2010

Project Case Study. Motor City DCP. Project: District Cooling Plant, Motor City Start Date: 2007 Completion Date: 2010 Project: District Cooling Plant, Motor City Start Date: 2007 Completion Date: 2010 Location: Dubai, UAE Industry: District Cooling Developer: Emicool Consultant/Architect: DC Pro Engineering Value: US

More information

Building Services / MEPF Scopes

Building Services / MEPF Scopes Building Services / MEPF Scopes Mechanical Air conditioning Refrigerant Plant Compression Chillers Absorption Chillers Heat Pumps (Chilled water and Hot Water) Cooling Towers Chemical Treatment Air Conditioning

More information

HAZEM SAMIR EL BANNA Contact address: Tel: , Mob:

HAZEM SAMIR EL BANNA Contact address: Tel: , Mob: HAZEM SAMIR EL BANNA Contact address: Tel: 02-6219934, Mob: 050-286 3837 E-mail: hazem_elbanna2000@yahoo.com 23 years of field experience in the construction industry Languages: Capable of fluently write

More information

Grand Egyptian Museum:-

Grand Egyptian Museum:- Grand Egyptian Museum:- Location: Elharam, Giza. Consultant: Ehaf and HELL international. Main Contractor: JV Orascom and Besix. MEP Contractor: Orascom. Scope of Works: Complete Commissioning of all MEP

More information

PROJECT CLOSE-OUT SERVICES

PROJECT CLOSE-OUT SERVICES PROJECT CLOSE-OUT SERVICES Contents 1.0 Introduction 2.0 Location and Areas Served by the Business 3.0 Company Address and Contact Details 4.0 Trade Licence 5.0 Services Provided 6.0 Key Staff & Organisation

More information

BUILDING DESCRIPTION

BUILDING DESCRIPTION BUILDING DESCRIPTION ARCHITECTURAL ENGINEERING SENIOR THESIS 1 Building Description Location: The Residences of Sherman Plaza are located in the diverse community of downtown Evanston, IL, just north of

More information

Quality specifications for my home

Quality specifications for my home Quality specifications for my home by 7 Benefits of a dospuntos home 2 Quality specifications Casa Banderas 01 02 Outside: Before you go in: Façades Your home will have a ceramic brick façade finished

More information

SABIC INITIATIVES IN GREEN LEED CERTIFIED BUILDING

SABIC INITIATIVES IN GREEN LEED CERTIFIED BUILDING SABIC INITIATIVES IN GREEN LEED CERTIFIED BUILDING ABDULLAH AL-REFAIE, PROGRAM DIRECTOR, HOME OF INNOVATION THE SAUDI INTERNATIONAL BUILDING & CONSTRUCTIONS TECHNOLOGY CONFERENCE 2015 - KACST 11 th 12

More information

Jericho GRA, Ibadan. Discover Serenity, Security and Satisfaction. Luxury Terrace Homes...

Jericho GRA, Ibadan. Discover Serenity, Security and Satisfaction. Luxury Terrace Homes... Jericho GRA, Ibadan Discover Serenity, Security and Satisfaction Luxury Terrace Homes... Discover the true meaning of satisfying convenience... CRIMSON COURT 01 SECURITY DETAIL At Crimson Court, professional

More information

REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE.

REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE. REEF RESIDENCE ON PLOT NO. JVC13JHRA002,, UAE. Status 31 August 2017 1 P a g e INDEX 1. PROJECT DESCRIPTION 2. PROJECT ORGANOGRAM 3. PROGRESS PHOTOGRAPHS 2 P a g e 1.0 PROJECT DESCRIPTION Project Detail:

More information

Builders Solution CIVIL & METAL WORK

Builders Solution CIVIL & METAL WORK Builders Solution CIVIL & METAL WORK P.O. BOX 5388 Jeddah, Saudi Arabia 94122 Tel:+966 2 261 5448 Fax:+966 2 261 0402 c o n s t r u c t i o n m a n a g e m e n t p r o f e s s i o n a l s e r v i c e q

More information

Energy Management Services (EMS) and Lockheed Martin Energy (LME) Innovative Solutions For Energy Independence Sustainable Communities

Energy Management Services (EMS) and Lockheed Martin Energy (LME) Innovative Solutions For Energy Independence Sustainable Communities Energy Management Services (EMS) and Lockheed Martin Energy (LME) Innovative Solutions For Energy Independence Sustainable Communities Jubail Energy Management Conference 5 6 December 2017 Energy Independence!

More information

Bayti Frequently Asked Questions

Bayti Frequently Asked Questions Q1: What is Bayti? Bayti meaning My Home in Arabic is a collection of spacious homes designed and built with the family in mind. Bayti is a collection of 162 villas with 118 being constructed in phase

More information

Kanoo Commercial Complex, Jeddah. Industrial:

Kanoo Commercial Complex, Jeddah. Industrial: Kanoo Commercial Complex, Jeddah Industrial: SAK Consultants have designed and supervised major industrial complexes throughout the Kingdom of Saudi Arabia including industrial cities and economic cities.

More information

CONSULTANT REGISTRATION SYSTEM (CRS) SPECIALISATION CATEGORY. CE - Civil Engineering Construction. - Building Construction

CONSULTANT REGISTRATION SYSTEM (CRS) SPECIALISATION CATEGORY. CE - Civil Engineering Construction. - Building Construction Capacity (RM) GRADE G1 not exceeding 100,000.00 G2 not exceeding 500,000.00 G3 not exceeding 1,000,000.00 G4 not exceeding 3,000,000.00 G5 not exceeding 5,000,000.00 G6 not exceeding 10,000,000.00 G7 not

More information

Highest Standards. Delivered.

Highest Standards. Delivered. Highest Standards. Delivered. Jeddah Factory 290, 22846, Saudi Arabia Metal Artwork Saudi Co. Empower Air Technologies Premco Ready Mix National Institute of Technology Bahra Cables Factory CPC Industrial

More information

October Post Show Report. Oman Convention & Exhibition Centre. Organized by

October Post Show Report. Oman Convention & Exhibition Centre.   Organized by Oman s 8th International Exhibition for Infrastructure, Construction & Industrial Projects Co - Located Events GCC SUPPLY CHAIN & LOGISTICS EXHIBITIO N & CO NFERENCE 8. 9. 10 October 2018 Oman Convention

More information

Jeddah, KSA. Phone: (Cell)

Jeddah, KSA. Phone: (Cell) Salaheddin Ramadan Jeddah, KSA Phone: +966-53-035-3728 1 / 9 ======================= SALAHEDDIN RAMADAN Jeddah, KSA Phone: +966-53-035-3728 (Cell) Email: salaheddin@ramadanarchitect.com Personal Web: www.ramadanarchitect.com

More information

Building on Strong Legacy and Expertise

Building on Strong Legacy and Expertise The 30th International Trade Exhibition for Construction Materials, Building & Environmental Technology Building on Strong Legacy and Expertise APPROVED INTERNATIONAL EVENT held concurrently 22 25 October

More information

www.gulffidelity.com introduction to GFSS Gulf Fidelity Security Services LLC (GFSS) is a security services company based in the United Arab Emirates (UAE). GFSS was established in October 2006 in Dubai

More information

GOOD LIVING STARTS HERE

GOOD LIVING STARTS HERE GOOD LIVING STARTS HERE THE LOCATION Located in Ain Alaq, at 700m above sea level and a mere 10 minute drive from Antelias, Red Roof Residence is a gated community that combines authentic Lebanese architecture

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Mastering the Challenges: Lessons from the Recent Past. Chris Harris, Operations Manager, Turner International Middle East Ltd

Mastering the Challenges: Lessons from the Recent Past. Chris Harris, Operations Manager, Turner International Middle East Ltd Mastering the Challenges: Lessons from the Recent Past Chris Harris, Operations Manager, Turner International Middle East Ltd Content 1. Introduction 2. Design Challenges 3. Construction Methodology 4.

More information

PROJECT CLOSE-OUT SERVICES

PROJECT CLOSE-OUT SERVICES PROJECT CLOSE-OUT SERVICES Contents 1.0 Introduction 2.0 Location and Areas Served by the Business 3.0 Company Address and Contact Details 4.0 Trade Licence 5.0 Services Provided 6.0 Key Staff & Organisation

More information

Facilities Management and Cleaning Market in Saudi Arabia

Facilities Management and Cleaning Market in Saudi Arabia 2030 Facilities Management and Cleaning Market in Saudi Arabia Table Of Content Saudi Vision 2030 05 Saudi Arabia Facilities Management Market Overview 06 Facilities Management Market in Saudi Arabia

More information

The 19 th Saudi Int l Building, Construction & Heavy Equipment Exhibition MARCH 2017

The 19 th Saudi Int l Building, Construction & Heavy Equipment Exhibition MARCH 2017 BUILDEX 2017 The 19 th Saudi Int l Building, Construction & Heavy Equipment Exhibition 06 09 MARCH 2017 DHAHRAN INTERNATIONAL EXHIBITIONS CENTER DAMMAM KINGDOM OF SAUDI ARABIA The Event Largest Construction

More information

Planning Rationale. A) Family Oriented Development

Planning Rationale. A) Family Oriented Development Planning Rationale A) Family Oriented Development The proposed building at 800 Montreal Road is a place designed to engage and stimulate the local community. The wide range of unit types provided offer

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

Saudi Aramco General Bid Slates (GBS)

Saudi Aramco General Bid Slates (GBS) Saudi Aramco General Bid Slates (GBS) Copyright 2015, Saudi Aramco. All rights reserved. Agenda Saudi Aramco Contracting Strategy Saudi Aramco General Bid Slate (GBS) General Bid Slate Work Types 2 Saudi

More information

Emerald Isle by L&T Realty in POWAI

Emerald Isle by L&T Realty in POWAI Emerald Isle by L&T Realty in POWAI deepakagrawal@openminds.co.in +91 9820166933 1 It s as lush as a garden fringed by a lake & as precious as a jewel. It is Emerald Isle by L&T Realty 2 Allow us to transport

More information

REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE.

REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE. REEF RESIDENCE ON PLOT NO. JVC13JHRA002,, UAE. Status 30 January 2017 1 P a g e INDEX 1. PROJECT DESCRIPTION 2. PROJECT ORGANOGRAM 3. PROGRESS PHOTOGRAPHS 2 P a g e 1.0 PROJECT DESCRIPTION Project Detail:

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Nortel. Strip back to shell & core of a 1980 s building and open up in order to improve natural light into the large footplates.

Nortel. Strip back to shell & core of a 1980 s building and open up in order to improve natural light into the large footplates. PROJECT EXPERIENCE Nortel Strip back to shell & core of a 1980 s building and open up in order to improve natural light into the large footplates. Regional Headquaters building 8,500 m2 Construction of

More information

THE INTEGRATED TRADE AND INDUSTRIAL HUB OF ABU DHABI

THE INTEGRATED TRADE AND INDUSTRIAL HUB OF ABU DHABI THE INTEGRATED TRADE AND INDUSTRIAL HUB OF ABU DHABI CONTENTS 04 04 The Capital Emirate 08 Connecting You to the World 06 The Pulse of Trade 12 Ready for Business CONTENTS 16 Tailored Solutions 22 Master

More information

Adani M2K Projects LLP

Adani M2K Projects LLP Adani M2K Projects LLP Site Sector 102 / 102A, off Dwarka Expressway, Gurgaon. INDIA. Sales Office Adani House, Plot No. 83, Sector 32, Gurgaon 122001. INDIA. For enquiries call: +91 124 2555168. Email:

More information

It's all about Networking. UnigazGroup. Corporate profile

It's all about Networking. UnigazGroup. Corporate profile It's all about Networking UnigazGroup Corporate profile We at Unigaz have a long history in the world of Gas that extends to more than 60 years. We started as a family business in Lebanon in 1957 and throughout

More information

Audio Visual & IT Projects

Audio Visual & IT Projects Audio Visual & IT Projects Company Profile AUDIO VISUAL / IT CONSULTANCY COMMERCIAL AV / IT INTEGRATION VIDEO WALL SOLUTIONS VIP BESPOKE INTEGRATION ENTERTAINMENT SYSTEM Almoe Overview Incorporated in

More information

105 مقر بتك - م سماخلا رودل -ايراجتلا فيرخلا زكرم-ةنيدملا قيرط

105 مقر بتك - م سماخلا رودل -ايراجتلا فيرخلا زكرم-ةنيدملا قيرط FIFTH STAR Co. for contracting, registered as FIFTH STAR Co. for Contracting and General Trade headquartered in Jeddah, was established in 1990, and registered again in 2011to the requirements of Saudi

More information

WHY? & HOW? Sustainable Mixed Use Communities Cairo Festival City September Cairo Festival City (CFC)

WHY? & HOW? Sustainable Mixed Use Communities Cairo Festival City September Cairo Festival City (CFC) Table Of Contents 1- The Development of Mixed Use Communities 2- CFC & New Cairo Master Plan Zoning Study Sustainable Mixed Use Communities Cairo Festival City September 2014 3- Planning & Sustainability

More information

ABOUT US.

ABOUT US. ABOUT US Arc De Triomphe is Grade A MEP contractor licensed from Qatar General Electricity & Water Corporation (KAHRAMAA) and certified from Qatar Civil Defence. Since its founding, Arc de Triomphe executives

More information

T h e D i f f e r e n c e i s C l e a r www.rafikelkhoury.com Rafik El Khoury & Partners C o n t e n t s The Firm 1 Our Assets 5 F i e l d s o f E x p e r t i s e 11 Services Provided 27... And BeyonD

More information

SEAMLESS DURABLE WATERTIGHT High Performance Structural Protection and Waterproofing

SEAMLESS DURABLE WATERTIGHT High Performance Structural Protection and Waterproofing SEAMLESS DURABLE WATERTIGHT High Performance Structural Protection and Waterproofing SYSTEM SOLUTIONS FOR BUILDING PERFORMANCE CONSTRUCTION CHEMICALS. TOTAL SOLUTIONS. Pidilite has a proven track record

More information

Available online at ScienceDirect. Energy Procedia 91 (2016 )

Available online at  ScienceDirect. Energy Procedia 91 (2016 ) Available online at www.sciencedirect.com ScienceDirect Energy Procedia 91 (2016 ) 824 831 SHC 2015, International Conference on Solar Heating and Cooling for Buildings and Industry LEED Platinum awarded

More information

Jewel Vijayalakshmi Estates, Kesarapalli, Vijayawada

Jewel Vijayalakshmi Estates, Kesarapalli, Vijayawada N HEMADURGA Jewel County @ Vijayalakshmi Estates, Kesarapalli, Vijayawada Move fast forward into future... Welcome to the Everlasting Charm of a Preferred Lifestyle at an Unmatched Location Vijayawada

More information

Bahrain / JW Marriott Hotel

Bahrain / JW Marriott Hotel Bahrain / 2015 JW Marriott Hotel PRESS CONTACT Communication Groupe-6 Caroline Paul, Head of Communication T + 33 (0)1 53 17 96 00 94 avenue Ledru-Rollin 75011 Paris caroline.paul@groupe-6.com In 2015,

More information

SCOPE HANDLED BY STED

SCOPE HANDLED BY STED Company Profile Overview STED Co Ltd. for Contracting of MEP and ELV systems with offerings of Engineering Services, Trading, contracting and Design of projects in MENA Region. STED Co Ltd. track record

More information

ESSENCE OF DILMUNIA 6PAGE 10PAGE TOPPED OFF!!! -BULLETIN- SUMMER 2016 NEWSLETTER PROGRESS UPDATE CONSTRUCTION GALLERY PART OF AHMED ALQAED GROUP

ESSENCE OF DILMUNIA 6PAGE 10PAGE TOPPED OFF!!! -BULLETIN- SUMMER 2016 NEWSLETTER PROGRESS UPDATE CONSTRUCTION GALLERY PART OF AHMED ALQAED GROUP ESSENCE OF DILMUNIA PART OF AHMED ALQAED GROUP -BULLETIN- SUMMER 2016 NEWSLETTER 6PAGE PROGRESS UPDATE 10PAGE CONSTRUCTION GALLERY TOPPED OFF!!! WELCOME TO THE SUMMER 2016 ESSENCE OF DILMUNIA NEWSLETTER

More information

Residencial Vila Park - "Viviendas desde *. Plaza y Trastero Incluido" Avda. Mestral s/n,

Residencial Vila Park - Viviendas desde *. Plaza y Trastero Incluido Avda. Mestral s/n, Experience the Mediterranean Inmobiliaria Osuna offers you a residential complex that matches your needs: Vila Park, where quality and comfort complement each other, hand in hand. Vila Park is a combination

More information

The House of Bahrain Press Heritage

The House of Bahrain Press Heritage Sustainable Development and Planning II, Vol. 2 1457 The House of Bahrain Press Heritage M. M. Sirriyeh Research and Development Directorate, Ministry of Municipalities and Agriculture Affairs, Manama,

More information

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

FROM THE CEO. Sameh Masry

FROM THE CEO. Sameh Masry An infrastructure utility Group of Companies specializing in the construction and operation & maintenance of water, power and transport systems. FROM THE CEO Sameh Masry Looking at the development and

More information

Holds a B. Sc. in Electrical Power & Machines Engineering and has over 13 years of experience working as Designer / Installation Supervisor.

Holds a B. Sc. in Electrical Power & Machines Engineering and has over 13 years of experience working as Designer / Installation Supervisor. 103290-ELE-CD-E-2001 Senior Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 13 years of experience working as Designer / Installation Supervisor. PERSONAL DATA

More information

EMergy is LIFE, Not a LIFESTYLE

EMergy is LIFE, Not a LIFESTYLE EMergy is LIFE, Not a LIFESTYLE INDEX We help our customers to be energy efficient, and we ensure we are energy efficient ourselves. Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

QATAR S INTERNATIONAL BUILDING & CONSTRUCTION EXHIBITION FEATURING 7 DEDICATED SECTORS SEPTEMBER 2019 #THEBIG5QATAR

QATAR S INTERNATIONAL BUILDING & CONSTRUCTION EXHIBITION FEATURING 7 DEDICATED SECTORS SEPTEMBER 2019 #THEBIG5QATAR 23-25 SEPTEMBER 2019 DOHA EXHIBITION & CONVENTION CENTER, QATAR #THEBIG5QATAR QATAR S INTERNATIONAL BUILDING & CONSTRUCTION EXHIBITION FEATURING 7 DEDICATED SECTORS PLANT MACHINERY & VEHICLES CONCRETE

More information

EMIRATES INTERNATIONAL FACILITIES MANAGEMENT llc

EMIRATES INTERNATIONAL FACILITIES MANAGEMENT llc EMIRATES INTERNATIONAL FACILITIES MANAGEMENT llc P.O. Box: 2286 Abudhabi UAE Tel: +9712-6436663Fax: +9712-6436660 Email:calibers@calibers.ae Contents Introduction Clients &Project Experience Facility Management

More information

The Hive Sustainability Trail - Supporting Notes

The Hive Sustainability Trail - Supporting Notes The Hive Sustainability Trail - Supporting Notes The Hive is full of sustainable design features, and we have developed the Sustainability Trail as a self-guided tour and teaching resource to raise awareness

More information

PILOT STUDY: HELLENIC HOTEL

PILOT STUDY: HELLENIC HOTEL PILOT STUDY: HELLENIC HOTEL Fig.1 South façade Fig.2 Northeast facade Location: Heraklion, Crete, Greece Year of construction: 1978 Environment: The building is a free standing, Orientation: The long axis

More information

PROJECT CLOSE-OUT SERVICES

PROJECT CLOSE-OUT SERVICES PROJECT CLOSE-OUT SERVICES Contents 1.0 Introduction 2.0 Location and Areas Served by the Business 3.0 Company Address and Contact Details 4.0 Trade Licence 5.0 Services Provided 6.0 Key Staff & Organisation

More information

BE THE BEST 2909 OFFICE SILVER TOWER BUSINESS BAY DUBAI BURJ KHALIFA DISTRICT DUBAI UNITED ARAB EMIRATES

BE THE BEST 2909 OFFICE SILVER TOWER BUSINESS BAY DUBAI BURJ KHALIFA DISTRICT DUBAI UNITED ARAB EMIRATES +971 55 206 8104 ferrutti@ferrutti.com BUILD THE BEST BE THE BEST 2909 OFFICE SILVER TOWER BUSINESS BAY DUBAI BURJ KHALIFA DISTRICT DUBAI UNITED ARAB EMIRATES BUILD THE BEST BE THE BEST TABLE OF CONTENT

More information

The Successful Construction of DC Plants: Saadiyat Island Case

The Successful Construction of DC Plants: Saadiyat Island Case The Successful Construction of DC Plants: Saadiyat Island Case A toolkit for overcoming challenges through Project Structuring, Value Engineering, Shared Expertise & Practical Minds 26/11/2013 ) Summary

More information

In house Testing and commissioning team for building services as a part of Facilities Management Strategies for Government owned properties in Oman

In house Testing and commissioning team for building services as a part of Facilities Management Strategies for Government owned properties in Oman In house Testing and commissioning team for building services as a part of Facilities Management Strategies for Government owned properties in Oman Badar Hamood Mubarak Al Rashdi, Government of Oman, Muscat

More information

ASIA - PACIFIC RESIDENCY

ASIA - PACIFIC RESIDENCY ASIA - PACIFIC RESIDENCY Where Your Dreams Meet Reality Welcome to Asia-Pacific Residency, a shining array of limited edition homes built for connoisseurs. Homes made on timeless neoclassical architecture.

More information

ENTRY FORM. DVASE 2017 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2017 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2017 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M X Buildings $2M-$10M Other Structures Under $5M Buildings

More information

PREQUALIFICATION MULTICHOICE ELECTRO-MECHANICAL CO. Tel: (+974) Fax: (+974) P.O. Box: Doha-Qatar

PREQUALIFICATION MULTICHOICE ELECTRO-MECHANICAL CO. Tel: (+974) Fax: (+974) P.O. Box: Doha-Qatar PREQUALIFICATION Tel: (+974) 44414700 Fax: (+974) 44414900 P.O. Box: 82155 Doha-Qatar Tel.: (+974) 44414700, Fax: (+974) 44414900,P.O. Box: 82155 Doha-Qatar 1 Introduction TABLE OF CONTENTS 2 Company Details

More information

High Rise Buildings and How They Affect Countries Progression

High Rise Buildings and How They Affect Countries Progression High Rise Buildings and How They Affect Countries Progression Dr. Akram Farouk, Assistant Professor Ain Shams University Faculty of Engineering Department of Architecture airoc,egypt High rise buildings

More information

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM APRIL 2012 ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM Abu Dhabi Education Council Infrastructure and Facilities Division Jyoti Sharma, Senior Architect, Design Section WHY SUSTAINABILITY IS IMPORTANT UAE

More information

Introduction Proposed Renderings. Concept Report. March 1,

Introduction Proposed Renderings. Concept Report. March 1, Introduction Proposed Renderings Concept Report 23 Concept Report Introduction Tower Features Penthouse Helipad Half Floor Units Single Floor Units Townhouse Amenity Deck 20 Entry / Lobby Retail/Parking

More information

Burj Khalifa Dubai, United Arab Emirates

Burj Khalifa Dubai, United Arab Emirates 21031 Burj Khalifa Dubai, United Arab Emirates Burj Khalifa Described as both a Vertical City and A Living Wonder, Burj Khalifa, at the heart of downtown Dubai, is also the world s tallest building. Developed

More information

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 BUSINESS REVIEW TOP CONTRACTORS 1 ENR NEW YORK TOP CONTRACTORS 18 ENR TOP 100 DESIGN-BUILD FIRMS 66 ENR TOP 400 CONTRACTORS 215 Corporate

More information

Al Raha Gardens Development Control Regulations

Al Raha Gardens Development Control Regulations Al Raha Gardens Development Control Regulations October 2015 1. Purpose THE PURPOSE OF THIS DOCUMENT IS TO OUTLINE BOTH THE RIGHTS AND OBLIGATIONS AN OWNER, TENANT OR USER OF AL RAHA GARDENS HAS WITH REGARD

More information

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds Responsibilities of University and Occupier of University Buildings (Schools) Below lists the University s responsibilities and your responsibilities as the Occupier of University buildings Area The University

More information

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds Responsibilities of University and Occupier of University Buildings (Schools) Below lists the University s responsibilities and your responsibilities as the Occupier of University buildings Area The University

More information

FACADE OPTIMIZATION. Architect Mike Matson Project Manager, Ratcliff. DE ANZA COLLEGE MEDIAL + LEARNING CENTER Photography David Wakely

FACADE OPTIMIZATION. Architect Mike Matson Project Manager, Ratcliff. DE ANZA COLLEGE MEDIAL + LEARNING CENTER Photography David Wakely There are a handful of passive downdraft buildings in service worldwide, but we believe the execution of the system at De Anza College s Media + Learning Center to be on a scale and level of sophistication

More information

Introduction. Construction Business

Introduction. Construction Business Introduction Kajima Corporation was founded in 1840 and quickly grew to become an industry leader in the field of construction, where it has remained as such ever since. Headquartered in Tokyo, Kajima

More information

Concepts. Products. Service. Providence Tower, London

Concepts. Products. Service. Providence Tower, London Concepts Products Service Providence Tower, London 1 Project Report Providence Tower, London New Providence is a luxurious residental tower in the London Docklands on the north end of Blackwall Tunnel.

More information

LPA Inc./Cris Costea Photography Inc.

LPA Inc./Cris Costea Photography Inc. A new community college student center takes advantage, and not-so-subtly displays the versatility and sustainability, of structural steel. Light as AIR BY BRYAN SEAMER, SE, AND DANIEL WANG, SE FEBRUARY

More information

Metal Fabrication

Metal Fabrication The Complete Solution for Metal Fabrication www.lamismetals.com LAMIS AT WORK FOR YOU FOCUS ON THE QUALITY OUR GOAL IS TO UNDERSTAND THE UNIQUE NEEDS OF EACH CLIENT & TO OFFER ECONOMIC & EFFECTIVE SOLUTIONS

More information

CAMPUS STANDARDS HANDBOOK

CAMPUS STANDARDS HANDBOOK CAMPUS STANDARDS HANDBOOK OFFICE OF PHYSICAL PLANNING AND CONSTRUCTION UNIVERSITY OF CALIFORNIA, SANTA CRUZ Italics indicate recent revisions. THESE STANDARDS ARE PROVIDED TO UCSC CONSULTANTS FOR GUIDANCE

More information

MEP Construction Tel: Fax: Mobile: P.O. Box Ajman, UAE

MEP Construction  Tel: Fax: Mobile: P.O. Box Ajman, UAE MEP Construction www.etlad.com Tel: +971-6-7413172 Fax: +971-6-7413172 Mobile: +971-50-2206838 Email: info@etlad.com P.O. Box 16872 Ajman, UAE INDEX Introduction Background Message from management Our

More information

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Lesky, Superintendent of Schools Board of School Directors Lewis F.

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness

More information

RAS AL HAMRA DEVELOPMENT PROJECT

RAS AL HAMRA DEVELOPMENT PROJECT RAS AL HAMRA DEVELOPMENT PROJECT Iain Liversage RAH Development Non Residential Construction Lead RAS AL HAMRA DEVELOPMENT PROJECT PHASE 1 PDO VISION To be renowned and respected for the excellence of

More information

Schedule B to By-law

Schedule B to By-law Schedule B to By-law 33-2009 Part A Fees Payable for Permits (Effective January 1, 2018) Floor Area Calculation Floor area shall: a) be calculated by measuring to the outer face of exterior walls and to

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

KENTUCKY STATE UNIVERSITY

KENTUCKY STATE UNIVERSITY KENTUCKY STATE UNIVERSITY Proposed Projects Involving the State General Fund (cash or bonds)* Priority Project Title / Description Total Budget 2004-2006 1 Hathaway Hall Renovation Phase II $11,200,000

More information

Laurel School Upper Campus Building Features

Laurel School Upper Campus Building Features Laurel School Upper Campus Building Features INTRODUCTION Laurel School Upper Campus is tucked into the Willows neighborhood in Menlo Park surrounded by residential housing on all sides. The oddly shaped

More information

Beijing Emirates International Construction Co. CORPORATE PROFILE

Beijing Emirates International Construction Co. CORPORATE PROFILE CORPORATE PROFILE At a Glance Beijing Emirates Company (BEC) is one of the leading construction companies in the kingdom of Saudi Arabia and the United Arab Emirates with a track-record of state-of-the-art

More information

Air Conditioning & Ventilation Equipments Car Park Ventilation Systems Smoke Management Systems Solar Water Heating & Plumbing Systems CFD Analysis &

Air Conditioning & Ventilation Equipments Car Park Ventilation Systems Smoke Management Systems Solar Water Heating & Plumbing Systems CFD Analysis & Air Conditioning & Ventilation Equipments Car Park Ventilation Systems Smoke Management Systems Solar Water Heating & Plumbing Systems CFD Analysis & Consulting Services METCO QATAR W.L.L. Metco qatar

More information

Minuteman Regional Vocational Technical School

Minuteman Regional Vocational Technical School Minuteman Regional Vocational Technical School List of Recommendations L1 AAB compliance: Improvements to front entrance (concrete ramps, railings, etc.) Required by AAB cost trigger L2 AAB compliance:

More information

INTRODUCTION. Al Laith International Al Laith Scaffolding

INTRODUCTION. Al Laith International Al Laith Scaffolding Oil & Gas Directory Middle East - 2013 71 Al Laith International INTRODUCTION Al Laith has been an established organisation in the United Arab Emirates since 1995. From its inception as a contract scaffolding

More information

Customer Solution. Communication. Customer Cost. Convenience

Customer Solution. Communication. Customer Cost. Convenience Customer Solution Communication Customer Cost Convenience P.O. Box: 237206, Dubai, United Arab Emirates, Tel. 04 2632080, Fax. 04 2632081 E-mail:, Website: INTRODUCTION AT THE HEART OF THE INDUSTRY VISION

More information