Review of lessons learned Standards 313, 634, 629

Size: px
Start display at page:

Download "Review of lessons learned Standards 313, 634, 629"

Transcription

1 Review of lessons learned Standards 313, 634, 629 Dean Sylla, NRCS Appleton Ralph Hemling, DATCP Richland Center WLWCA Conference March 11, 2014 Appleton, WI

2 Standard 313 Table 1 Site evaluation, construction, waivers Spec 300 review, borrow source evaluations 313 concrete construction

3 Site Evaluations for Table 1 Need to show separation distances Need to get soil samples from soils that will be left in place for liner Sample all the significant soil layers; don t know which will be needed to construct dikes and 1 recompacted layer Look for tile

4 Constructing the 1 Liner Basically over excavate the pit and recompact using the appropriate construction spec. Depth of over excavation required depends on the length of the teeth of the footed compactor to be used

5 For example: Need to end up with a 1 liner, so if the compactor feet are 4, then over excavate 8, compact the in-place soil that is there, and replace the 8 in two lifts to get 1. The reason for this is that the compactor teeth should fully penetrate the lift to get good clay compaction. If the teeth are 6, then over excavate 6, etc.

6 Since sideslopes are to be 2.5:1 or flatter, should be able to construct using bathtub method.

7

8

9

10 What to do with Table 1 pits built under previous standards??

11 Depends on: Permit requirements County, or both County and DNR? Cost sharing requirements; TRM, EQIP, Land and Water, or none? Whether or not the pit is causing a problem

12 Gather available info: Test pit logs, soil test results, etc As-built plans Private well logs Waste composition (% solids)

13

14

15

16 Maybe get more info: Test pit with soil samples to check PI, depth to saturation, get deep perm sample, etc. May be able to document pit meets specific discharge requirements and consequently the current standard.

17 Then evaluate the information

18 For example, if: Well logs in the area show water supplies are deep, and there are deep clays The P200 tests and PI tests from when the pit was built all exceeded the standard The original borings are deep and show good separation distances

19 Then there could be good reason to keep the existing pit as-is; and the information gathered could be used to justify a waiver request.

20 Or if the pit barely met the old standard(s) chances are that it will need to be upgraded.

21 Take home message: Answer the question Is the existing pit causing a problem, or not first, and The answer will guide you in navigating the permitting and design questions

22 Wisconsin Construction Specification 300 Clay Liners

23 Goals of the 300 Spec Ensure good materials are used in construction Ensure that these good materials are installed properly Document both of the above with tests

24 Good Materials. P200 must be as specified in the construction plans, so it now needs to be called out on the plans. This is because Table 1 requires 40% minimum P200 and Table 2 is 50% minimum P200.so in order to use spec 300 for both Table 1 and Table 2 projects, the P200 needs to be on the plans. Plasticity Index must be more than 12

25 Good Construction. Clay must be compacted to at least 95% of Standard Proctor dry density, or at least 90% of Modified Proctor dry density.at above optimum moisture. Clay liner permeability must be less than 1 x 10-7 cm/sec

26 Proctor Tests

27

28 Field Density Tests

29 Documentation. Material quality tests Construction quality tests

30 Documentation. Field Test Lab Tests

31 Documentation. Tests are generally done in the order listed One of these is done first, because the results Are used in the field to do this testing A shelby tube sample is taken out of the compacted liner and submitted to the lab to do these tests

32 Proctor Sample

33 Field Density Testing

34 Field Density Testing

35 Field Density Testing

36 Undisturbed sampling

37 Permeability Test

38 Perm Testing Equipment

39 Sequence Borrow source evaluation during design phase (designer) Proctor test sample to the lab when borrow pit opened up (contractor) Field density tests during construction

40 Shelby tube samples ( undisturbed samples ) obtained from the liner and taken to the lab Properly fill holes in liner with clay and bentonite

41 Assemble all the information into an as-built report Don t forget to document the liner thickness!! Best way is to survey subgrade beforehand and survey finished grade after

42 Borrow source evaluation From the 313 Standard:

43

44 Further insurance: Test samples from each pit for PI and P200 Consider testing a shallow and deep sample from each pit for questionable sources Also test samples for moisture content, this can be important during construction

45 Still more insurance: Do a Proctor test on a sample, and Run a permeability test at a proctor point that is wet of optimum

46 A job well done..

47 Standard 313 Liquid Tight Concrete

48 Standard 634 Pressure and Velocity Pressures usually low Velocities can be high, but OK if pipe/joints/etc can take it Use pump sizing spreadsheet to figure it out; need pump curve from Mfr

49 Pressure Testing Standard 634 Limited to severe service pipe Must use water, not air Be careful No agency experience Read more about it.references in 634 companion document

50 Standard 634 ASTM D2648 Drain pipe listed as pipe that DOES NOT MEET 634, in the 634 construction spec because recylced resins are used in making the pipe ASTM F 667, ASTM F2306, AASHTO M252, and AASHTO M294 meet the standard

51 Standard 634 Cleanout requirements recently changed NOT required now for pipes carrying wastewater, contaminated runoff, other low solids waste, or transfer pipes to cropland

52 Standard 634 Requirement for boring every 100 has been questioned, since Pipes may be installed in any location within the soil profile regardless of subsurface saturation or bedrock Maybe a change to the standard is warranted?...stay tuned

53 Standard 629 Focus on milking center wastewater and silage leachate criteria Constructed wetland criteria and vegetated treatment area criteria moved to their own standards Standard 635 has the criteria for milking center buffers and silage pad runoff treatment

54 Standard Silage Few agency people doing designs Not usually specifically addressed in county ordinances Need for systems driven by CAFO permits or EQIP resource concern

55 Standard Silage 629 requires all leachate to be collected and stored Feed pad liner criteria are in 629 Choices are soil, membrane, and concrete Most all are concrete

56 Standard Silage 635 has the criteria to size VTA based on how much first flush is collected and whether or not the flow in the VTA is less than 1 deep for 25% of the 25yr peak Spreadsheet was recently posted to help with these designs

57

58

59

60 Standard Silage Experience is that if a significant amount of first flush is collected, or if 25% of the 25 yr peak is collected nearly all of the annual runoff is collected So it might make sense to just collect all the runoff and not deal with a VTA

61 Standard 629 Milking Center Waste Criteria hasn t changed, it was just moved around. Constructed Wetland method moved to it s own standard (656) Vegetation part of the Buffer method went to the VTA standard (635) So for milking center waste, business as usual!

62 Thanks!

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Manure Storage for Environmental Management Systems

Manure Storage for Environmental Management Systems WiMStor01 MStor Manure Storage for Environmental Management Systems Key: 1)Low Risk 2)Low-Moderate Risk 3)Moderate-High Risk 4)High Risk Location of Manure Storage Are the manure storage facilities in

More information

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING SECTION 334701 - WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

(1) All sanitary landfill facilities, at a minimum, shall include the following:

(1) All sanitary landfill facilities, at a minimum, shall include the following: 3745-27-08 Sanitary landfill facility construction. (A) Applicability. The construction requirements for a sanitary landfill facility specified in this rule are applicable to a particular facility or permit

More information

Design and Operation of Landfills

Design and Operation of Landfills Design and Operation of Landfills Soils and hydrogeology Site selection criteria Site layout and landfill operations Liner design Water balance Biological reactions in landfills Leachate quality Gas production

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Avon Lake Municipal Landfill, Lorain County Ohio Administrative Code (OAC) Rule Authorization

Avon Lake Municipal Landfill, Lorain County Ohio Administrative Code (OAC) Rule Authorization State of Ohio Environmental Protection Agency STREET ADDRESS: MAILING ADDRESS: Lazarus Government Center TELE: (614) 644-3020 FAX: (614) 644-3184 P.O. Box 1049 122 S. Front Street www.epa.state.oh.us Columbus,

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

MAEAP GUIDANCE DOCUMENT FOR COMPREHENSIVE NUTRIENT MANAGEMENT PLANS

MAEAP GUIDANCE DOCUMENT FOR COMPREHENSIVE NUTRIENT MANAGEMENT PLANS MAEAP GUIDANCE DOCUMENT FOR COMPREHENSIVE NUTRIENT MANAGEMENT PLANS Michigan Agriculture Environmental Assurance Program Approved by MAEAP CNMP Committee April 22, 2015 (Blank Page) MAEAP GUIDANCE DOCUMENT

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES SPECIFICATION EO-1181 REVISION 6 May 2010 EFFECTIVE DATE June 1, 2010 GENERAL

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Section 25 Aggregate Subbase

Section 25 Aggregate Subbase Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

BACKFILL COMPACTION FOR VOLCLAY WATERPROOFING: An Essential Ingredient for a Successful Project

BACKFILL COMPACTION FOR VOLCLAY WATERPROOFING: An Essential Ingredient for a Successful Project BACKFILL COMPACTION FOR VOLCLAY WATERPROOFING: An Essential Ingredient for a Successful Project For several years, CETCO has required that soil backfill placed against a foundation wall with Volclay waterproofing

More information

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231. DRIVEWAYS, DRIVEWAYS & PATIOS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - CHARACTERISTICS CSA A231.2 TECHO-BLOC Compressive strength 50 MPa [7200 psi] min. 50 MPa [7200 psi] min. Absorption - 5 % max. Freeze-thaw

More information

Design Considerations. Pursuing Dynamic Compaction. waste considered. Pursuing Dynamic Compaction. Page 1 of6

Design Considerations. Pursuing Dynamic Compaction. waste considered. Pursuing Dynamic Compaction. Page 1 of6 Page 1 of6 waste considered. Pursuing Dynamic Compaction Waste Age Ali Khatami, Ph.D., Bruce Clark and Myles Clewner of SCS Engineers Fri, 2013-07-19 16:26 Rapid growth of development in metropolitan areas

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to

More information

VIRGINIA POLLUTION ABATEMENT PERMIT APPLICATION

VIRGINIA POLLUTION ABATEMENT PERMIT APPLICATION VIRGINIA POLLUTION ABATEMENT PERMIT APPLICATION FORM B ANIMAL WASTE Department of Environmental Quality VPA FORM B ANIMAL WASTE INSTRUCTIONS This form is to be completed by applicants requesting a VPA

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

THE FUTURE OF NUTRIENT MANAGEMENT IN WISCONSIN

THE FUTURE OF NUTRIENT MANAGEMENT IN WISCONSIN THE FUTURE OF NUTRIENT MANAGEMENT IN WISCONSIN Susan M. Porter 1 The Department of Agriculture, Trade and Consumer Protection (DATCP) is responsible for promulgating nutrient management rules in Wisconsin

More information

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Courtyard Marriott Phenix City, Alabama BHATE Project Number: 112263 October 9, 2012 SUBSURFACE EXPLORATION & GEOTECHNICAL

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

TURF-TEC 6 and 12 INCH INFILTRATION RINGS INSTRUCTIONS (IN7-W & IN8-W)

TURF-TEC 6 and 12 INCH INFILTRATION RINGS INSTRUCTIONS (IN7-W & IN8-W) TURF-TEC 6 and 12 INCH INFILTRATION RINGS INSTRUCTIONS (IN7-W & IN8-W) Outline of Uses The Turf-Tec Infiltration Rings was specifically designed to give infiltration readings directly on site. It can give

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas InTEC Project No. S161639 April 18, 2016 Leakey ISD P.O. Box 1129 Leakey, Texas

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following: SEGMENTAL BLOCK RETAINING WALLS PART 1 - GENERAL 1.01 SECTION INCLUDES Segmental Block Retaining Walls 1.02 DESCRIPTION OF WORK Constructing segmental block retaining walls. 1.03 SUBMITTALS Comply with

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1 SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 October 28, 2016 City of Vermillion 25 Center Street 57069 Attn:

More information

BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS

BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS DRAINAGE SOLUTIONS SINCE 1908 BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS PROTECT FOUNDATIONS IMPROVE HIGHWAY

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE SITE NOT TO SCALE 635-8-STOCKPILEPHGA- 00 SHEET: OF DRAWING INDEX: SHEET 2 OF 0 - NOTES SHEET 3 OF 0 - PLAN VIEW :000 SHEET 4 OF 0 - PLAN VIEW :000 WITH REFERENCE SHEET 5 OF 0 - PLAN VIEW :500 SHEET 6

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following:

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following: SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9072 - Combined Concrete Sidewalk and Retaining Wall PART 1 - GENERAL 1.01 SECTION INCLUDES COMBINED CONCRETE SIDEWALK AND RETAINING

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

VIA U.S. MAIL AND . Re: C & H Hog Farms, Inc. Regulation 5 Draft Permit - Number 5264

VIA U.S. MAIL AND  . Re: C & H Hog Farms, Inc. Regulation 5 Draft Permit - Number 5264 February 23, 2017 Ms. Becky Keogh Director Arkansas Department of Environmental Quality 5301 Northshore Drive Little Rock, AR 72118-5317 Email: keogh@adeq.state.ar.us VIA U.S. MAIL AND EMAIL Re: C & H

More information

Characterizing Engineering Properties of Foundry Sands

Characterizing Engineering Properties of Foundry Sands Characterizing Engineering Properties of Foundry Sands Craig H. Benson, PhD, PE Recycled Materials Resource Center University of Washington chbenson@u.washington.edu www.recycledmaterials.org Recycled

More information

GRAY WATER RECYCLING SYSTEMS

GRAY WATER RECYCLING SYSTEMS GRAY WATER RECYCLING SYSTEMS Note: Section P2601.2 of the International Residential Code requires all plumbing fixtures that receive water or waste to discharge to the sanitary drainage system of the structure.

More information

A Design Review of Waterproofing Codes

A Design Review of Waterproofing Codes A Design Review of Waterproofing Codes Section 1807 of Chapter 18 of the International Building Code addresses waterproofing under the section title of Dampproofing and Waterproofing. The section defines

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14 NGWA s Water Well Construction Standard: ANSI/NGWA 01-14 NGWA Standard Development Process as Approved by ANSI What is ANSI? The American National Standards Institute (ANSI), founded in 1918, promotes

More information

EINRIP. Specification and Construction Issues

EINRIP. Specification and Construction Issues EINRIP Specification and Construction Issues There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid

More information

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES This specification is intended for use as a GENERAL GUIDELINE for developing a specification for a specific project. It is NOT intended as a

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils

More information

Manure Management Manual Revisions

Manure Management Manual Revisions Manure Management Manual Revisions Jim Spontak PA DEP Farms In PA 63,136 farms in PA 33813 have livestock Average farm is 124 acres, about 75% under 200 acres Women as the primary farm operator increased

More information

SECTION MONITORING WELL ABANDONMENT

SECTION MONITORING WELL ABANDONMENT SECTION 027300 MONITORING WELL ABANDONMENT PART I GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 1 - GENERAL REQUIREMENTS,

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

R-TANK SPECIFICATIONS

R-TANK SPECIFICATIONS TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

Applications of Waste Tire Products in Civil Engineering

Applications of Waste Tire Products in Civil Engineering Applications of Waste Tire Products in Civil Engineering Introduction to Civil Engineering Design CSU, Chico Introduction Background Benefits of Using TDA Civil Engineering Applications Lightweight Fill

More information

Excavation for Natural Gas Mains and Services

Excavation for Natural Gas Mains and Services Excavation for Natural Gas Mains and Services Trench Padding & Backfilling Requirements for Mains General Install mains with a minimum of 36 of cover. Exceptions may be made within state and federal codes

More information

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -

More information

ONSITE SEWAGE SYSTEMS*

ONSITE SEWAGE SYSTEMS* GENERAL DESCRIPTIONS OF COMMON TYPES OF ONSITE SEWAGE SYSTEMS* *Some of the systems described are not permitted for new construction under the current code in Wisconsin. See individual descriptions for

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

Instructions for 12 IGT system

Instructions for 12 IGT system Instructions for 12 IGT system Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system. Since local soil and

More information

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall SWM MD-378 Pond Checklist Training 10/17/07 Ken Wolfe Warren Johnson USDA, NRCS Frederick, Maryland ROLES AND RESPONSIBILITIES Small Pond Approval MDE, WMA, Dam Safety Division Authority (COMAR 26.17.04.03)

More information

Building Code of New York State

Building Code of New York State Welcome Everyone My name is Christopher Paolini. I am a Licensed Professional Engineer. I am Member and a Principal Geotechnical Engineer of CME Engineering Group, PLLC. (CME). CME is a a Geotechnical

More information

GUIDE SPECIFICATION FOR CONSTRUCTION

GUIDE SPECIFICATION FOR CONSTRUCTION USACE / NAVFAC / AFCEC / NASA UFGS-02 35 27 (May 2010) ------------------------ Preparing Activity: USACE Superseding UFGS-02 35 27 (April 2006) GUIDE SPECIFICATION FOR CONSTRUCTION References are in agreement

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

1. ADD the attached test hole reports for Well Nos. 19 & 20 to the specifications.

1. ADD the attached test hole reports for Well Nos. 19 & 20 to the specifications. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax Arizona California Colorado Kansas Missouri Nebraska New Mexico Oklahoma Texas Utah 1 December 2017 ADDENDUM NO. 2 RE: City of Conway

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

Design Guideline for Gravity Systems in Soil Type 1. January 2009

Design Guideline for Gravity Systems in Soil Type 1. January 2009 Design Guideline for Gravity Systems in Soil Type 1 January 2009 This page is intentionally blank. Design Guideline for Gravity Systems in Soil Type 1 January 2009 For information or additional copies

More information

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES Handholes and pulling vaults perform several important functions: Provide drainage for the conduit system so that freezing water does not damage the conduit or wires. Provide a location for bending the

More information

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS INFORMATION BULLETIN / PUBLIC - PLUMBING CODE REFERENCE NO.: LAMC 94.1502.0 Effective: 01-01-2017 DOCUMENT NO.: P/PC 2017-012 Revised: Previously Issued As: P/PC 20014-012 GRAY WATER SYSTEMS FOR RESIDENTIAL

More information

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016 POST CLOSURE PLAN CFR 257.104(d) Landfill Pirkey Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company Pirkey Power Plant Hallsville, Texas Prepared by: American Electric

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado July 15, 2016 Terracon Project No. 20165057 Prepared for: Larimer

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

Sealing Leaking Ponds

Sealing Leaking Ponds 1 of 5 5/21/2004 12:47 PM Sealing Leaking Ponds Excessive seepage in ponds is generally due either to a poor site--that is, one in which the soils in the impounded area are too permeable to hold water--to

More information

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

Economics of Controlled Drainage and Subirrigation Systems

Economics of Controlled Drainage and Subirrigation Systems Economics of Controlled Drainage and Subirrigation Systems Prepared by: Robert Evans, Extension Agricultural Engineering Specialist Wayne Skaggs and Ronald E. Sneed Professors of Biological and Agricultural

More information

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d Design Data 6 Loads and Supporting Strengths Elliptical and Arch Pipe The hydraulic and structural characteristics of elliptical and arch shapes offer advantages, under certain conditions, over the circular

More information

MODULAR CONCRETE RETAINING WALL

MODULAR CONCRETE RETAINING WALL MODULAR CONCRETE RETAINING WALL PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing and construction of a KEYSTONE Retaining Wall System or equal in accordance with these specifications

More information

BMP #: Infiltration Basin

BMP #: Infiltration Basin Structural BMP Criteria BMP #: Infiltration Basin An Infiltration Basin is a shallow impoundment that stores and infiltrates runoff over a level, subtle, uncompacted, (preferably undisturbed area) with

More information

ORDINANCE NO. 1. A large concentrated animal feeding operation as described in Table 1 in Section 3.07.

ORDINANCE NO. 1. A large concentrated animal feeding operation as described in Table 1 in Section 3.07. ORDINANCE NO. AN ORDINANCE OF CLAY COUNTY, SD, AMENDING THE 2013 REVISED ZONING ORDINANCE FOR CLAY COUNTY BY AMENDING ARTICLE 2, DEFINITIONS, ARTICLE 3, GENERAL DISTRICT REGULATIONS AND ARTICLE 4, DISTRICTS

More information

Completing an NPDES or SDS Feedlot Permit Application

Completing an NPDES or SDS Feedlot Permit Application www.pca.state.mn.us Completing an NPDES or SDS Feedlot Permit Application These instructions will assist you in preparing a permit application for an animal feedlot or manure storage area which requires

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES NORTH SHORE SCHOOL DISTRICT 11 HIGHLAND PARK, ILLINOIS ECS PROJECT NO. 1:8 FOR NORTH SHORE SCHOOL DISTRICT 11 SEPTEMBER, 1 REPORT

More information

CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS

CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS Section Title Page 10.1 General... 10-1 10.1.1 Existing Streets...10-1 10.1.2 AASHTO Design...10-1 10.1.3 Pavement Type...10-1 10.1.4 Treated Subgrade...10-1

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information