Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project. The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009

Size: px
Start display at page:

Download "Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project. The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009"

Transcription

1 Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009 Mike Rogalski, P.E. Chief, HHD Project Branch

2 Presentation Agenda Herbert Hoover Dike Project Background Adaptive Project Management Parallel Activities Funding Challenges

3 Orientation and location of Lake Okeechobee and Herbert Hoover Dike (HHD) Lake Okeechobee Lake Okeechobee is 720 square-miles twice the size of NYC Average water depth is 9 feet Water volume equal to 2.2 million Olympic-size pools Basin is 5,600 square-miles One foot of rain in the basin equates to a three to four-foot foot rise of the lake Lake can fill six times faster than water can be released

4 Purpose of the HHD Project Bring the Dike up to Dam Safety Requirements OKEECHOBEE 7 4 MOORE HAVEN Lake Okeechobee PAHOKEE BELLE GLADE CLEWISTON 2 LAKE HARBOR 3 PORT MAYACA SAND CUT CANAL POINT 1

5 Previously Observed Problems Sinkholes Heaves Piping Saturated Toe

6 Complex System 5 gated outlets 5 gated inlets 33 primary & secondary culverts 9 navigation locks 9 pump stations No overflow capacity

7 Findings and Solutions 1990s Corps studies prompted by evidence of damage 2000 Congress approves Corps proposal for fix; analysis and design begins 2005 Corps starts construction

8 More Recent Developments Hurricane Katrina strikes in 2005 Corps overhauls procedures for managing dams and levees (ongoing) Corps sponsors HHD repair evaluation with state and independent experts Consensus reached on a modified fix concept

9 Adaptive Project Management New Guidelines and Policies Dam Safety Guidance Evolution Risk Assessment DX Process Recent Weather Extremes Variations in Geology and Socio-economic Conditions Aging Dike Structure New Team Members Varying Local Interests New Projects by Others (lock, quarry, equestrian park, River of Grass)

10 Parallel Phases and Activities Major Rehabilitation Report and Supplemental Environmental Impact Statement Internal Communications and Reporting Interim Risk Reduction Piping Cut-off Wall Design Existing Culvert Analysis and Rehabilitation Community Outreach and Involvement Landside Rehabilitation Design Real Estate Acquisition Coordination Multiple On-going Construction Contracts

11 Herbert Hoover Dike - Organization Structure DR-H Branch Chief PM Support Budget Analyst Program Support Senior Project Manager PM Forward Community Outreach Planning Technical Lead Reach 1 Culverts Project Manager Engineer Technical Lead Interim Risk Reduction HHD Resident Engineer Reach 2&3 MRR Reach 1A Design Lead Reach 1B Design Lead Reach 1C Design Lead Reach 1 Seepage Berm Reach 1 CWTO #2 System Analysis SEIS Reach 2&3 MRR Design Lead Reach 1D Design Lead Engineering During Construction Lead Reach 1 CWTO #3 Reach 1 Quarry Fill Reach 1 CWTO #4

12 Landside Design Criteria Geotechnical engineering design is the initial criterion for analysis Each design is ranked based on reliability, resiliency and redundancy Other factors in the determining design solution - Initial cost Operations and maintenance Community resources Visual and human interest Flora and fauna Social factors Land use

13 Environmental and Public Involvement Processes Public meeting during review of Environmental Impact Statement (EIS) Design process description Design alternatives Recommended alternative Public comment is encouraged Final EIS and Record of Decision

14 Interim Risk Reduction Measures New lake regulation schedule Increased inspection frequency Emergency management Immediate actions Tree removal and filling the landside ditch

15 Funding Challenges Double Annual Funding 2007 thru 2012 Multiple Phases Competing for the Same Resources $ $ Competition for Dam Safety Funding With other Dams Throughout the USA $ $

16 Rehabilitation Schedule Out Year Estim mate Fundi ing Reach 1 Construction (on-going) Reach 2 Reach 3 Reaches 7-8

17 Program Manager s Perspective What works Competent staff and strong PM support Accountability Identification of resource needs Culture of identifying problems AND solutions Continuous and organized communication A healthy budget What we need to improve Communication Garnering support from Corps-wide programs Ability to resolve scarcity of resources

18 Questions?

C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration

C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration INTERCOL 9 June 7, 2012 Kenneth G. Ammon, P.E. Senior Vice President Overview South

More information

Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting

Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting Dr. Martin Luther King Jr. Charter School for Science and Technology Wednesday, February 4, 2015 1 Open House 6:00 p.m. 6:30

More information

Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries

Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries Gary Goforth April 2014 Moving Forward Commend Corps and District for holding Lessons Learned workshops to identify

More information

Chairman Betts requested the Coalition consider adoption of the agenda for the meeting of May 30, 2008.

Chairman Betts requested the Coalition consider adoption of the agenda for the meeting of May 30, 2008. Minutes of the County Coalition for Responsible Management of Lake Okeechobee St. Lucie and Caloosahatchee Estuaries Lake Worth Lagoon Friday, May 30, 2008 Meeting Time 10:00 AM Okeechobee Civic Center,

More information

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas March 2016 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA)

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-9 GEOTECHNICAL

More information

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood

More information

Sea Level Rise: Impacts, Adaptation and Information Gaps

Sea Level Rise: Impacts, Adaptation and Information Gaps University of New Orleans ScholarWorks@UNO Coastal Resilience Workshop Coastal Resilience Workshop 2015 Oct 28th, 10:00 AM - 12:00 PM Sea Level Rise: Impacts, Adaptation and Information Gaps Jeffrey R.

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

Review Plan U.S. Army Corps of Engineers Northwest Division Kansas City District. Kanopolis Dam Emergency Gate Replacement

Review Plan U.S. Army Corps of Engineers Northwest Division Kansas City District. Kanopolis Dam Emergency Gate Replacement Review Plan U.S. Army Corps of Engineers Northwest Division Kansas City District Kanopolis Dam Emergency Gate Replacement April 2015 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This Review Plan is intended

More information

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview

More information

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030015 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study Appendix F Section 404(b)(1) APPENDI F. SECTION 404(B)(1) EVALUATION SHORT VERSION Herbert Hoover Dike Dam Safety Modification Study HHD Dam Safety Modification Study EIS June 2016 E i Appendix F Section

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Fargo-Moorhead Metropolitan Area Flood Risk Management Project Fargo-Moorhead Metropolitan Area Flood Risk Management Project 52ND ANNUAL IOWA ASCE ENVIRONMENTAL & WATER RESOURCES CONFERENCE 03 April 2014 Aaron W. Buesing Senior Hydraulic Engineer Corps of Engineers,

More information

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update United States Army Corps of Engineers Addicks and Barker Dam Safety Update COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers March 9, 2016 US Army Corps of Engineers

More information

Irrigation System. BWCDD Zanjero Training 2/13/2008

Irrigation System. BWCDD Zanjero Training 2/13/2008 Irrigation System BWCDD Zanjero Training Session #7 2/13/2008 Irrigation System The (main) intake structure t directs water from the source of supply, such as a reservoir or a river, into the irrigation

More information

Farm Conditions that Characterize a BMP Plan Are All Farms Equal?

Farm Conditions that Characterize a BMP Plan Are All Farms Equal? Farm Conditions that Characterize a BMP Plan Are All Farms Equal? Soil Types Ridge & Sandy Soils Flat & Sandy Soils Deep muck Shallow muck Seepage Farm Conditions that Characterize a BMP Plan Are All Farms

More information

PAPERWORK REDUCTION ACT A. GENERAL

PAPERWORK REDUCTION ACT A. GENERAL U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE STRUCTURES FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form

More information

Summary of Field Observations Relevant to Flood Protection in New Orleans, LA

Summary of Field Observations Relevant to Flood Protection in New Orleans, LA Summary of Field Observations Relevant to Flood Protection in New Orleans, LA Interim report to Task Force Guardian by the Interagency Performance Evaluation Task Force 5 December, 2005 Table of Contents

More information

PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY

PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY Rachael V. Bisnett, P.E. 1 Wonnie Kim, P.E. 2 Donald J. Montgomery, P.E. 3 ABSTRACT The new Third Set of Locks for

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10 Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions

More information

Measured Water Losses of Lateral A in Hidalgo County Irrigation District No. 2

Measured Water Losses of Lateral A in Hidalgo County Irrigation District No. 2 COLLEGE OF AGRICULTURE AND LIFE SCIENCES TR-74 011 Measured Water Losses of Lateral A in Hidalgo County Irrigation District No. By: Eric Leigh, Extension Associate and Guy Fipps, P.E., Extension Agricultural

More information

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY Phong Vo, Manager - Engineering/Gypsum, Mosaic Fertilizer, LLC. 13830 Circa Crossing Drive Lithia, Florida 33547, USA and Ashraf H. Riad, Ph.D., P.E.,

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

Options for Reducing Harmful Lake Okeechobee Discharges and Everglades Restoration

Options for Reducing Harmful Lake Okeechobee Discharges and Everglades Restoration Options for Reducing Harmful Lake Okeechobee Discharges and Everglades Restoration The Florida Senate Appropriations Subcommittee on the Environment and Natural Resources January 11, 2017 Gary Goforth,

More information

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification OFMA 2017 Annual Conference September 19, 2017 Presented by: Jeff Doudrick, PE, ENV SP Project Manager HNTB Corporation Agenda Project

More information

Manure Storage for Environmental Management Systems

Manure Storage for Environmental Management Systems WiMStor01 MStor Manure Storage for Environmental Management Systems Key: 1)Low Risk 2)Low-Moderate Risk 3)Moderate-High Risk 4)High Risk Location of Manure Storage Are the manure storage facilities in

More information

Best Management Practices (BMPs) Regulatory Program. Ximena Pernett, P.E. Bureau of Everglades Regulation September 25, 2014

Best Management Practices (BMPs) Regulatory Program. Ximena Pernett, P.E. Bureau of Everglades Regulation September 25, 2014 Best Management Practices (BMPs) Regulatory Program Ximena Pernett, P.E. Bureau of Everglades Regulation September 25, 2014 Agenda What are best management practices (BMPs)? Why is there BMP regulatory

More information

LEVEE DEFICIENCY CORRECTION PROCEDURES

LEVEE DEFICIENCY CORRECTION PROCEDURES LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 26 JANUARY 2016 LEVEE SAFETY PROGRAM Revised 26 MARCH 2018 Deficiencies noted on the inspection checklist portion of the Periodic Inspection

More information

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director South Florida Water Management District Future Directions Melissa Meeker, Executive Director September 15, 2011 District Overview Oldest and largest of five water management districts Covers 18,000 square

More information

Coastal Restoration and Protection Projects - SLFPA-East and Vicinity

Coastal Restoration and Protection Projects - SLFPA-East and Vicinity Coastal Restoration and Protection Projects - SLFPA-East and Vicinity committed to our coast committed to our coast 2012 Master Plan Project Details 2012 Master Plan Projects in SLFPA-East Projects in

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Woodhills Bay Colony Stormwater Master Plan

Woodhills Bay Colony Stormwater Master Plan Woodhills Bay Colony Stormwater Master Plan FREP Noon Network Fox Lake February 18, 2015 Michael E. Novotney, PE Water Resources Professional Stormwater Master Plan Presents an overall stormwater management

More information

East St. Tammany Storm Surge Protection Project Request

East St. Tammany Storm Surge Protection Project Request East St. Tammany Storm Surge Protection Project Request Submitted to Coastal Protection & Restoration Authority of Louisiana (CPRA) August 2015 Contact Information: Thomas Nolan Thompson The East St. Tammany

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

KIEWIT FOUNDATIONS GROUP

KIEWIT FOUNDATIONS GROUP KIEWIT FOUNDATIONS GROUP KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,

More information

MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING

MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING Diego Cobos, Michelle Shriro, Nicholas Sitar, Jonathan Bray University of California, Berkeley 1 INTRODUCTION Mammal burrowing activity

More information

SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA

SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA Deep Foundation Institute Slurry Wall Committee July 22,

More information

CERTIFIED. The Global Leader In Innovative Geotechnical Applications Using Synthetic Sheet Piling

CERTIFIED. The Global Leader In Innovative Geotechnical Applications Using Synthetic Sheet Piling Are you looking for a cost-effective, non-corrosive product that is environmentally friendly? The Global Leader In Innovative Geotechnical Applications Using Synthetic Sheet Piling CERTIFIED LEVEE/DIKE

More information

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade December 16, 2016 On Oct. 13 14, 2016, a partnership of river stakeholders hosted the ninth annual Upper Mississippi River Conference,

More information

Chapter A-15. CID-MO Structural Analysis

Chapter A-15. CID-MO Structural Analysis Kansas Citys, Missouri and Kansas Flood Risk Management Feasibility Study Engineering Appendix to the Final Feasibility Study Chapter A-15 CID-MO Structural Analysis Chapter A-15 CID-MO Structural Analysis

More information

U. S. Army Corps of Engineers Charleston District Overview

U. S. Army Corps of Engineers Charleston District Overview U. S. Army Corps of Engineers Charleston District Overview Diane C. Perkins, AICP Charleston District Chief, Planning & Environmental Branch Diane.Perkins@usace.army.mil US Army Corps of Engineers General

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township

More information

Metro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York

Metro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York Metro-North s Response to Hurricane Irene Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York The Port Jervis Line Line is operated under a service agreement with

More information

Kern Water Bank. Kern Water Bank Authority

Kern Water Bank. Kern Water Bank Authority Kern Water Bank Kern Water Bank Authority THE KERN WATER BANK Ensuring a Reliable Water Supply to the Southern San Joaquin Valley Providing for Exceptional Upland and Riparian Habitat Kern Water Bank Authority

More information

SCAMA / NOGALES WATER STORAGE STUDY APPRAISAL STUDY

SCAMA / NOGALES WATER STORAGE STUDY APPRAISAL STUDY Photo by John Hoffman. The Santa Cruz River between Nogales and Tumacácori SCAMA / NOGALES WATER STORAGE STUDY APPRAISAL STUDY Presentation to GCASE Milestone Workshop 2 November 20, 2013 Presentation

More information

Hurricane Harvey. Fort Bend County Levee Improvement District No. 2

Hurricane Harvey. Fort Bend County Levee Improvement District No. 2 Hurricane Harvey Fort Bend County Levee Improvement District No. 2 1 Outline for this evening s meeting 1. Introductions 2. Levee 101 3. What FBC LID 2 does and doesn t do 4. Development and capabilities

More information

Training on Roads for Water and Resilience

Training on Roads for Water and Resilience Training on Roads for Water and Resilience 1 DRAINAGE FROM UNPAVED ROADS Outline 3 1. 2. 3. 4. 5. 6. 7. Introduction Important considerations Drainage management Surface drainage features Subsurface drainage

More information

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. 11-91360-001 ADVERTISED: November 5, 2010 MANDATORY PRE-BID MEETING:

More information

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]] Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended

More information

Dam Safety Inspection Checklist

Dam Safety Inspection Checklist Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION

More information

Mike Sarmento Senior Construction Manager Floodplain Management Program Urban Drainage and Flood Control District

Mike Sarmento Senior Construction Manager Floodplain Management Program Urban Drainage and Flood Control District Mike Sarmento Senior Construction Manager Floodplain Management Program Urban Drainage and Flood Control District Today s Objectives Understanding of the Maintenance Eligibility Program (MEP) Get us all

More information

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study Stakeholder Partnering Forum Modernizing of the GIWW August 4, 2016 Partnering Under a Systems Approach for Sustaining Commercial

More information

Hydropower and Water Resources

Hydropower and Water Resources Hydropower and Water Resources Hydropower and Water Resources The development, planning, design, and construction of hydropower as well as large-scale irrigation schemes and special hydraulic structures

More information

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS This chapter summarizes the results of feasibility level investigations undertaken to identify solutions to the water and related land resource problems

More information

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 April 11, 2017 AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental

More information

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE

More information

May 12, Mr. Marvin Brunsell, Chairperson Clearwater River Watershed District PO Box 481 Annandale, MN 55302

May 12, Mr. Marvin Brunsell, Chairperson Clearwater River Watershed District PO Box 481 Annandale, MN 55302 May 12, 2010 Mr. Marvin Brunsell, Chairperson Clearwater River Watershed District PO Box 481 Annandale, MN 55302 Re: 2010 Project Inspection Report Wenck File # 0002-148 Dear Mr. Brunsell: This 2010 Project

More information

SEEPAGE TESTS IN L-D 1 BORROW CANAL AT LAKE OKEECHOBEE, FLORIDA STATE OF FLORIDA DEPARTMENT OF NATURAL RESOURCES

SEEPAGE TESTS IN L-D 1 BORROW CANAL AT LAKE OKEECHOBEE, FLORIDA STATE OF FLORIDA DEPARTMENT OF NATURAL RESOURCES STATE OF FLORIDA DEPARTMENT OF NATURAL RESOURCES BUREAU OF GEOLOGY Robert O. Vernon, Chief INFORMATION CIRCULAR NO. 59 SEEPAGE TESTS IN L-D 1 BORROW CANAL AT LAKE OKEECHOBEE, FLORIDA By F. W. Meyer and

More information

Review of the Colorado FERC Pilot Project and the Hydropower Regulatory Efficiency Act

Review of the Colorado FERC Pilot Project and the Hydropower Regulatory Efficiency Act Review of the Colorado FERC Pilot Project and the Hydropower Regulatory Efficiency Act Kurt Johnson Telluride Energy 970-729-5051 kurt@tellurideenergy.com September 12, 2013 NW Hydro Association Small

More information

SEATTLE DISTRICT CIVIL WORKS PROGRAM

SEATTLE DISTRICT CIVIL WORKS PROGRAM SEATTLE DISTRICT CIVIL WORKS PROGRAM Contents 04 Continuing Authorities Program 05 Section 14 Emergency Streambank Protection Section 103 Beach Protection Section 111 Mitigation of Shore Damage 06 Section

More information

US Army Corps of Engineers

US Army Corps of Engineers US Army Corps of Engineers Roles and Responsibilities in the BDCP 13 August 2009 USACE Roles in the Federal Family Slide 2 Primary USACE Responsibilities with BDCP Regulatory Program Protect the nation

More information

Bethel Bank Stabilization

Bethel Bank Stabilization Bethel Bank Stabilization Condition of Improvements 30 December 2014 Bethel Bank Stabilization, Alaska (CWIS No. 012314, 075440) Authorization Public Law 99-662, under Section 202, 17 November 1986, as

More information

HUDSON TUNNEL PROJECT

HUDSON TUNNEL PROJECT HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen

More information

US ARMY CORPS OF ENGINEERS ALASKA DISTRICT BUILDING STRONG. 21 September Coleman Chalup, P.E. Lead Engineer USACE Alaska District

US ARMY CORPS OF ENGINEERS ALASKA DISTRICT BUILDING STRONG. 21 September Coleman Chalup, P.E. Lead Engineer USACE Alaska District US ARMY CORPS OF ENGINEERS ALASKA DISTRICT Chena River Lakes Flood Control Project/Moose Creek Dam, North Pole, Alaska - USACE Design, Cost, And Constructability Considerations For CSM Barrier Walls In

More information

Chapter A-8 GEOTECHNICAL ANALYSIS FAIRFAX-JERSEY CREEK (JERSEY CREEK SHEET PILE WALL)

Chapter A-8 GEOTECHNICAL ANALYSIS FAIRFAX-JERSEY CREEK (JERSEY CREEK SHEET PILE WALL) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-8 GEOTECHNICAL

More information

The Northern Waterfront Seawall History and Earthquake Performance Waterfront Plan Working Group Meeting April 13, 2016

The Northern Waterfront Seawall History and Earthquake Performance Waterfront Plan Working Group Meeting April 13, 2016 The Northern Waterfront Seawall History and Earthquake Performance Waterfront Plan Working Group Meeting April 13, 2016 Steven Reel, PE - Project Manager, Engineering Division, Port 1 The Northern Waterfront

More information

9. Levee Maintaining Agency Projects

9. Levee Maintaining Agency Projects 9. Levee Maintaining Agency Projects 9.1. Overview This chapter summarizes the known deficiencies identified for each local levee maintaining agency (LMA) within the Regions. Note that although the focus

More information

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL MISSISSIPPI RIVER POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE GRANT COUNTY, WISCONSIN AND DUBUQUE COUNTY, IOWA U.S. ARMY CORPS OF ENGINEERS ENVIRONMENTAL MANAGEMENT PROGRAM HABITAT REHABILITATION AND ENHANCEMENT

More information

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type

More information

IMPLEMENTATION PHASE REVIEW PLAN

IMPLEMENTATION PHASE REVIEW PLAN IMPLEMENTATION PHASE REVIEW PLAN FOR CHAMBERS GROVE PARK UPGRADE Initial MSC Approval Date 09 JAN 2015 Last Revision Date DDMM YYYY U.S. ARMY CORPS OF ENGINEERS DETROIT DISTRICT NOVEMBER 2014 Table of

More information

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

Peninsula Drainage District #2 Encroachment Evaluation Summary Report

Peninsula Drainage District #2 Encroachment Evaluation Summary Report Peninsula Drainage District #2 Encroachment Evaluation Summary Report Levee Ready Columbia / Peninsula Drainage District #2 / 1880 NE Elrod Drive, Portland, Oregon 97211 Table of Contents Contents Summary...

More information

Audit of Stormwater Management Utility

Audit of Stormwater Management Utility Audit of Stormwater Management Utility City Council Presentation Tuesday, October 3, 2017 Lyndon S. Remias, City Auditor Gretchen Hudome, Deputy City Auditor Tim Bell, Senior Auditor Tony Gonzalez, Senior

More information

June 22, Francis E. Borcalli, P.E.

June 22, Francis E. Borcalli, P.E. CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What! June 22, 2009 Francis E. Borcalli, P.E. CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What!

More information

GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study

GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

Greenfield Pond B Rehabilitation

Greenfield Pond B Rehabilitation Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...

More information

Constructed Wetland Pond T-8

Constructed Wetland Pond T-8 Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands

More information

America s Climate Choices Adaptation A Challenge to the Transportation Industry

America s Climate Choices Adaptation A Challenge to the Transportation Industry America s Climate Choices Adaptation A Challenge to the Transportation Industry November 3, 2010 TRB Webinar H. G. Schwartz, Jr. 1 Major Factors Affecting Climate 2 MITIGATION Measures to reduce Greenhouse

More information

Bayport, Texas August 27, 2012

Bayport, Texas August 27, 2012 Panama Canal Stakeholder Working Group Bayport, Texas August 27, 2012 Texas Ports - VALUE TO THE NATION Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers This briefing

More information

In Your House and in Your Yard, Watch for Water, Be on Guard

In Your House and in Your Yard, Watch for Water, Be on Guard In Your House and in Your Yard, Watch for Water, Be on Guard KEY TERMS Arroyo: A water-carved gully or a normally dry creek found in arid or desert regions. Dam: A barrier built across a river, stream

More information

Statement on Marine Transportation

Statement on Marine Transportation Page 1 Introduction Statement on Marine Transportation The U.S. Marine Transportation System (MTS) consists of ports, coastal and inland waterways, the Great Lakes, and the St. Lawrence Seaway and is an

More information

Nashville District October 2011 Update

Nashville District October 2011 Update Nashville District October 2011 Update Tom Cayce Chief of Programs and Project Management October 18, 2011 US Army Corps of Engineers Nashville District Value to the Nation LRN 12% of inland navigable

More information

Handout 5: Stormwater Cost of Service

Handout 5: Stormwater Cost of Service Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service

More information

Linking TEK, Outreach, and Science to Protect Everglades Wetlands. Water Resources Department Marta Reczko, Water Resources Manager

Linking TEK, Outreach, and Science to Protect Everglades Wetlands. Water Resources Department Marta Reczko, Water Resources Manager Linking TEK, Outreach, and Science to Protect Everglades Wetlands Water Resources Department Marta Reczko, Water Resources Manager Everglades Facts The Everglades is a marsh, a region, a watershed, an

More information

ENVIRONMENTAL ASSESSMENT SUPPLEMENT 3 CENTER HILL DAM SEEPAGE REHABILITATION PROJECT

ENVIRONMENTAL ASSESSMENT SUPPLEMENT 3 CENTER HILL DAM SEEPAGE REHABILITATION PROJECT DRAFT ENVIRONMENTAL ASSESSMENT SUPPLEMENT 3 CENTER HILL DAM SEEPAGE REHABILITATION PROJECT MAJOR REHABILITATION EVALUATION REPORT PREVIOUSLY APPROVED AND REVISED PLANS PROPOSED ROLLER COMPACTED CONCRETE

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

RECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO

RECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO RECORD OF DECISION MAY 2 0 2014 RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO The Final General Reevaluation Report and Supplemental

More information

WATER CONTROL MANUAL

WATER CONTROL MANUAL Mobile District WATER CONTROL MANUAL APPENDIX E WEST POINT DAM AND LAKE CHATTAHOOCHEE RIVER, GEORGIA AND ALABAMA U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT MOBILE, ALABAMA JUNE 97 Revised August 98 and

More information

OLMSTED LOCKS AND DAM

OLMSTED LOCKS AND DAM SITE REPORT OLMSTED LOCKS AND DAM IN-THE-WET 1 AS PART OF ONE OF THE FINAL PHASES OF THE OLMSTED LOCKS AND DAM PROJECT, A PUTZMEISTER CONCRETE PLACING SYSTEM IS PLACING UP TO 140,000 CUBIC YARDS (107,308M³)

More information