1 Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009 Mike Rogalski, P.E. Chief, HHD Project Branch
2 Presentation Agenda Herbert Hoover Dike Project Background Adaptive Project Management Parallel Activities Funding Challenges
3 Orientation and location of Lake Okeechobee and Herbert Hoover Dike (HHD) Lake Okeechobee Lake Okeechobee is 720 square-miles twice the size of NYC Average water depth is 9 feet Water volume equal to 2.2 million Olympic-size pools Basin is 5,600 square-miles One foot of rain in the basin equates to a three to four-foot foot rise of the lake Lake can fill six times faster than water can be released
4 Purpose of the HHD Project Bring the Dike up to Dam Safety Requirements OKEECHOBEE 7 4 MOORE HAVEN Lake Okeechobee PAHOKEE BELLE GLADE CLEWISTON 2 LAKE HARBOR 3 PORT MAYACA SAND CUT CANAL POINT 1
5 Previously Observed Problems Sinkholes Heaves Piping Saturated Toe
6 Complex System 5 gated outlets 5 gated inlets 33 primary & secondary culverts 9 navigation locks 9 pump stations No overflow capacity
7 Findings and Solutions 1990s Corps studies prompted by evidence of damage 2000 Congress approves Corps proposal for fix; analysis and design begins 2005 Corps starts construction
8 More Recent Developments Hurricane Katrina strikes in 2005 Corps overhauls procedures for managing dams and levees (ongoing) Corps sponsors HHD repair evaluation with state and independent experts Consensus reached on a modified fix concept
9 Adaptive Project Management New Guidelines and Policies Dam Safety Guidance Evolution Risk Assessment DX Process Recent Weather Extremes Variations in Geology and Socio-economic Conditions Aging Dike Structure New Team Members Varying Local Interests New Projects by Others (lock, quarry, equestrian park, River of Grass)
10 Parallel Phases and Activities Major Rehabilitation Report and Supplemental Environmental Impact Statement Internal Communications and Reporting Interim Risk Reduction Piping Cut-off Wall Design Existing Culvert Analysis and Rehabilitation Community Outreach and Involvement Landside Rehabilitation Design Real Estate Acquisition Coordination Multiple On-going Construction Contracts
11 Herbert Hoover Dike - Organization Structure DR-H Branch Chief PM Support Budget Analyst Program Support Senior Project Manager PM Forward Community Outreach Planning Technical Lead Reach 1 Culverts Project Manager Engineer Technical Lead Interim Risk Reduction HHD Resident Engineer Reach 2&3 MRR Reach 1A Design Lead Reach 1B Design Lead Reach 1C Design Lead Reach 1 Seepage Berm Reach 1 CWTO #2 System Analysis SEIS Reach 2&3 MRR Design Lead Reach 1D Design Lead Engineering During Construction Lead Reach 1 CWTO #3 Reach 1 Quarry Fill Reach 1 CWTO #4
12 Landside Design Criteria Geotechnical engineering design is the initial criterion for analysis Each design is ranked based on reliability, resiliency and redundancy Other factors in the determining design solution - Initial cost Operations and maintenance Community resources Visual and human interest Flora and fauna Social factors Land use
13 Environmental and Public Involvement Processes Public meeting during review of Environmental Impact Statement (EIS) Design process description Design alternatives Recommended alternative Public comment is encouraged Final EIS and Record of Decision
14 Interim Risk Reduction Measures New lake regulation schedule Increased inspection frequency Emergency management Immediate actions Tree removal and filling the landside ditch
15 Funding Challenges Double Annual Funding 2007 thru 2012 Multiple Phases Competing for the Same Resources $ $ Competition for Dam Safety Funding With other Dams Throughout the USA $ $
16 Rehabilitation Schedule Out Year Estim mate Fundi ing Reach 1 Construction (on-going) Reach 2 Reach 3 Reaches 7-8
17 Program Manager s Perspective What works Competent staff and strong PM support Accountability Identification of resource needs Culture of identifying problems AND solutions Continuous and organized communication A healthy budget What we need to improve Communication Garnering support from Corps-wide programs Ability to resolve scarcity of resources
18 Questions?
C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration
C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration INTERCOL 9 June 7, 2012 Kenneth G. Ammon, P.E. Senior Vice President Overview South
More informationInner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting
Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting Dr. Martin Luther King Jr. Charter School for Science and Technology Wednesday, February 4, 2015 1 Open House 6:00 p.m. 6:30
More informationMoving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries
Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries Gary Goforth April 2014 Moving Forward Commend Corps and District for holding Lessons Learned workshops to identify
More informationChairman Betts requested the Coalition consider adoption of the agenda for the meeting of May 30, 2008.
Minutes of the County Coalition for Responsible Management of Lake Okeechobee St. Lucie and Caloosahatchee Estuaries Lake Worth Lagoon Friday, May 30, 2008 Meeting Time 10:00 AM Okeechobee Civic Center,
More informationReview Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas
Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas March 2016 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationCoal Combustion Facility Assessment Report. October 20, 2010
Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians
More informationChapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA)
Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-9 GEOTECHNICAL
More informationLessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation
Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood
More informationSea Level Rise: Impacts, Adaptation and Information Gaps
University of New Orleans ScholarWorks@UNO Coastal Resilience Workshop Coastal Resilience Workshop 2015 Oct 28th, 10:00 AM - 12:00 PM Sea Level Rise: Impacts, Adaptation and Information Gaps Jeffrey R.
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,
More informationReview Plan U.S. Army Corps of Engineers Northwest Division Kansas City District. Kanopolis Dam Emergency Gate Replacement
Review Plan U.S. Army Corps of Engineers Northwest Division Kansas City District Kanopolis Dam Emergency Gate Replacement April 2015 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This Review Plan is intended
More informationAtlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY
Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview
More informationSANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #
SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030015 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationAPPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study
Appendix F Section 404(b)(1) APPENDI F. SECTION 404(B)(1) EVALUATION SHORT VERSION Herbert Hoover Dike Dam Safety Modification Study HHD Dam Safety Modification Study EIS June 2016 E i Appendix F Section
More informationPRINCESS ANNE DISTRICT STORMWATER PROJECTS
PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds
More informationAPPENDIX A. Project Scoping
APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice
More informationFargo-Moorhead Metropolitan Area Flood Risk Management Project
Fargo-Moorhead Metropolitan Area Flood Risk Management Project 52ND ANNUAL IOWA ASCE ENVIRONMENTAL & WATER RESOURCES CONFERENCE 03 April 2014 Aaron W. Buesing Senior Hydraulic Engineer Corps of Engineers,
More informationUnited States Army Corps of Engineers. Addicks and Barker Dam Safety Update
United States Army Corps of Engineers Addicks and Barker Dam Safety Update COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers March 9, 2016 US Army Corps of Engineers
More informationIrrigation System. BWCDD Zanjero Training 2/13/2008
Irrigation System BWCDD Zanjero Training Session #7 2/13/2008 Irrigation System The (main) intake structure t directs water from the source of supply, such as a reservoir or a river, into the irrigation
More informationFarm Conditions that Characterize a BMP Plan Are All Farms Equal?
Farm Conditions that Characterize a BMP Plan Are All Farms Equal? Soil Types Ridge & Sandy Soils Flat & Sandy Soils Deep muck Shallow muck Seepage Farm Conditions that Characterize a BMP Plan Are All Farms
More informationPAPERWORK REDUCTION ACT A. GENERAL
U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE STRUCTURES FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form
More informationSummary of Field Observations Relevant to Flood Protection in New Orleans, LA
Summary of Field Observations Relevant to Flood Protection in New Orleans, LA Interim report to Task Force Guardian by the Interagency Performance Evaluation Task Force 5 December, 2005 Table of Contents
More informationPANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY
PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY Rachael V. Bisnett, P.E. 1 Wonnie Kim, P.E. 2 Donald J. Montgomery, P.E. 3 ABSTRACT The new Third Set of Locks for
More informationOutlet Structure Modeling
Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why
More informationTable of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10
Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions
More informationMeasured Water Losses of Lateral A in Hidalgo County Irrigation District No. 2
COLLEGE OF AGRICULTURE AND LIFE SCIENCES TR-74 011 Measured Water Losses of Lateral A in Hidalgo County Irrigation District No. By: Eric Leigh, Extension Associate and Guy Fipps, P.E., Extension Agricultural
More informationSMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY
SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY Phong Vo, Manager - Engineering/Gypsum, Mosaic Fertilizer, LLC. 13830 Circa Crossing Drive Lithia, Florida 33547, USA and Ashraf H. Riad, Ph.D., P.E.,
More informationLOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationOptions for Reducing Harmful Lake Okeechobee Discharges and Everglades Restoration
Options for Reducing Harmful Lake Okeechobee Discharges and Everglades Restoration The Florida Senate Appropriations Subcommittee on the Environment and Natural Resources January 11, 2017 Gary Goforth,
More informationHEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification
HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification OFMA 2017 Annual Conference September 19, 2017 Presented by: Jeff Doudrick, PE, ENV SP Project Manager HNTB Corporation Agenda Project
More informationManure Storage for Environmental Management Systems
WiMStor01 MStor Manure Storage for Environmental Management Systems Key: 1)Low Risk 2)Low-Moderate Risk 3)Moderate-High Risk 4)High Risk Location of Manure Storage Are the manure storage facilities in
More informationBest Management Practices (BMPs) Regulatory Program. Ximena Pernett, P.E. Bureau of Everglades Regulation September 25, 2014
Best Management Practices (BMPs) Regulatory Program Ximena Pernett, P.E. Bureau of Everglades Regulation September 25, 2014 Agenda What are best management practices (BMPs)? Why is there BMP regulatory
More informationLEVEE DEFICIENCY CORRECTION PROCEDURES
LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 26 JANUARY 2016 LEVEE SAFETY PROGRAM Revised 26 MARCH 2018 Deficiencies noted on the inspection checklist portion of the Periodic Inspection
More informationSouth Florida Water Management District Future Directions. Melissa Meeker, Executive Director
South Florida Water Management District Future Directions Melissa Meeker, Executive Director September 15, 2011 District Overview Oldest and largest of five water management districts Covers 18,000 square
More informationCoastal Restoration and Protection Projects - SLFPA-East and Vicinity
Coastal Restoration and Protection Projects - SLFPA-East and Vicinity committed to our coast committed to our coast 2012 Master Plan Project Details 2012 Master Plan Projects in SLFPA-East Projects in
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationWoodhills Bay Colony Stormwater Master Plan
Woodhills Bay Colony Stormwater Master Plan FREP Noon Network Fox Lake February 18, 2015 Michael E. Novotney, PE Water Resources Professional Stormwater Master Plan Presents an overall stormwater management
More informationEast St. Tammany Storm Surge Protection Project Request
East St. Tammany Storm Surge Protection Project Request Submitted to Coastal Protection & Restoration Authority of Louisiana (CPRA) August 2015 Contact Information: Thomas Nolan Thompson The East St. Tammany
More informationNOTICE OF PREPARATION
NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement
More informationKIEWIT FOUNDATIONS GROUP
KIEWIT FOUNDATIONS GROUP KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,
More informationMAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING
MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING Diego Cobos, Michelle Shriro, Nicholas Sitar, Jonathan Bray University of California, Berkeley 1 INTRODUCTION Mammal burrowing activity
More informationSLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA
SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA Deep Foundation Institute Slurry Wall Committee July 22,
More informationCERTIFIED. The Global Leader In Innovative Geotechnical Applications Using Synthetic Sheet Piling
Are you looking for a cost-effective, non-corrosive product that is environmentally friendly? The Global Leader In Innovative Geotechnical Applications Using Synthetic Sheet Piling CERTIFIED LEVEE/DIKE
More informationUpper Mississippi River Conference 2016 Action Agenda: Raise the Grade
Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade December 16, 2016 On Oct. 13 14, 2016, a partnership of river stakeholders hosted the ninth annual Upper Mississippi River Conference,
More informationChapter A-15. CID-MO Structural Analysis
Kansas Citys, Missouri and Kansas Flood Risk Management Feasibility Study Engineering Appendix to the Final Feasibility Study Chapter A-15 CID-MO Structural Analysis Chapter A-15 CID-MO Structural Analysis
More informationU. S. Army Corps of Engineers Charleston District Overview
U. S. Army Corps of Engineers Charleston District Overview Diane C. Perkins, AICP Charleston District Chief, Planning & Environmental Branch Diane.Perkins@usace.army.mil US Army Corps of Engineers General
More informationLOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationDAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety
DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township
More informationMetro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York
Metro-North s Response to Hurricane Irene Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York The Port Jervis Line Line is operated under a service agreement with
More informationKern Water Bank. Kern Water Bank Authority
Kern Water Bank Kern Water Bank Authority THE KERN WATER BANK Ensuring a Reliable Water Supply to the Southern San Joaquin Valley Providing for Exceptional Upland and Riparian Habitat Kern Water Bank Authority
More informationSCAMA / NOGALES WATER STORAGE STUDY APPRAISAL STUDY
Photo by John Hoffman. The Santa Cruz River between Nogales and Tumacácori SCAMA / NOGALES WATER STORAGE STUDY APPRAISAL STUDY Presentation to GCASE Milestone Workshop 2 November 20, 2013 Presentation
More informationHurricane Harvey. Fort Bend County Levee Improvement District No. 2
Hurricane Harvey Fort Bend County Levee Improvement District No. 2 1 Outline for this evening s meeting 1. Introductions 2. Levee 101 3. What FBC LID 2 does and doesn t do 4. Development and capabilities
More informationTraining on Roads for Water and Resilience
Training on Roads for Water and Resilience 1 DRAINAGE FROM UNPAVED ROADS Outline 3 1. 2. 3. 4. 5. 6. 7. Introduction Important considerations Drainage management Surface drainage features Subsurface drainage
More informationAPPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.
APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. 11-91360-001 ADVERTISED: November 5, 2010 MANDATORY PRE-BID MEETING:
More informationExtended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]
Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended
More informationDam Safety Inspection Checklist
Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing
More informationSTATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT
STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION
More informationMike Sarmento Senior Construction Manager Floodplain Management Program Urban Drainage and Flood Control District
Mike Sarmento Senior Construction Manager Floodplain Management Program Urban Drainage and Flood Control District Today s Objectives Understanding of the Maintenance Eligibility Program (MEP) Get us all
More informationGIWW Brazos River Floodgates and Colorado River Locks Feasibility Study
GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study Stakeholder Partnering Forum Modernizing of the GIWW August 4, 2016 Partnering Under a Systems Approach for Sustaining Commercial
More informationHydropower and Water Resources
Hydropower and Water Resources Hydropower and Water Resources The development, planning, design, and construction of hydropower as well as large-scale irrigation schemes and special hydraulic structures
More informationCHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS
CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS This chapter summarizes the results of feasibility level investigations undertaken to identify solutions to the water and related land resource problems
More informationAGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality
DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 April 11, 2017 AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental
More informationSAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE
More informationMay 12, Mr. Marvin Brunsell, Chairperson Clearwater River Watershed District PO Box 481 Annandale, MN 55302
May 12, 2010 Mr. Marvin Brunsell, Chairperson Clearwater River Watershed District PO Box 481 Annandale, MN 55302 Re: 2010 Project Inspection Report Wenck File # 0002-148 Dear Mr. Brunsell: This 2010 Project
More informationSEEPAGE TESTS IN L-D 1 BORROW CANAL AT LAKE OKEECHOBEE, FLORIDA STATE OF FLORIDA DEPARTMENT OF NATURAL RESOURCES
STATE OF FLORIDA DEPARTMENT OF NATURAL RESOURCES BUREAU OF GEOLOGY Robert O. Vernon, Chief INFORMATION CIRCULAR NO. 59 SEEPAGE TESTS IN L-D 1 BORROW CANAL AT LAKE OKEECHOBEE, FLORIDA By F. W. Meyer and
More informationReview of the Colorado FERC Pilot Project and the Hydropower Regulatory Efficiency Act
Review of the Colorado FERC Pilot Project and the Hydropower Regulatory Efficiency Act Kurt Johnson Telluride Energy 970-729-5051 kurt@tellurideenergy.com September 12, 2013 NW Hydro Association Small
More informationSEATTLE DISTRICT CIVIL WORKS PROGRAM
SEATTLE DISTRICT CIVIL WORKS PROGRAM Contents 04 Continuing Authorities Program 05 Section 14 Emergency Streambank Protection Section 103 Beach Protection Section 111 Mitigation of Shore Damage 06 Section
More informationUS Army Corps of Engineers
US Army Corps of Engineers Roles and Responsibilities in the BDCP 13 August 2009 USACE Roles in the Federal Family Slide 2 Primary USACE Responsibilities with BDCP Regulatory Program Protect the nation
More informationBethel Bank Stabilization
Bethel Bank Stabilization Condition of Improvements 30 December 2014 Bethel Bank Stabilization, Alaska (CWIS No. 012314, 075440) Authorization Public Law 99-662, under Section 202, 17 November 1986, as
More informationHUDSON TUNNEL PROJECT
HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen
More informationUS ARMY CORPS OF ENGINEERS ALASKA DISTRICT BUILDING STRONG. 21 September Coleman Chalup, P.E. Lead Engineer USACE Alaska District
US ARMY CORPS OF ENGINEERS ALASKA DISTRICT Chena River Lakes Flood Control Project/Moose Creek Dam, North Pole, Alaska - USACE Design, Cost, And Constructability Considerations For CSM Barrier Walls In
More informationChapter A-8 GEOTECHNICAL ANALYSIS FAIRFAX-JERSEY CREEK (JERSEY CREEK SHEET PILE WALL)
Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-8 GEOTECHNICAL
More informationThe Northern Waterfront Seawall History and Earthquake Performance Waterfront Plan Working Group Meeting April 13, 2016
The Northern Waterfront Seawall History and Earthquake Performance Waterfront Plan Working Group Meeting April 13, 2016 Steven Reel, PE - Project Manager, Engineering Division, Port 1 The Northern Waterfront
More information9. Levee Maintaining Agency Projects
9. Levee Maintaining Agency Projects 9.1. Overview This chapter summarizes the known deficiencies identified for each local levee maintaining agency (LMA) within the Regions. Note that although the focus
More informationPOOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL
MISSISSIPPI RIVER POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE GRANT COUNTY, WISCONSIN AND DUBUQUE COUNTY, IOWA U.S. ARMY CORPS OF ENGINEERS ENVIRONMENTAL MANAGEMENT PROGRAM HABITAT REHABILITATION AND ENHANCEMENT
More informationSW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN
SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type
More informationIMPLEMENTATION PHASE REVIEW PLAN
IMPLEMENTATION PHASE REVIEW PLAN FOR CHAMBERS GROVE PARK UPGRADE Initial MSC Approval Date 09 JAN 2015 Last Revision Date DDMM YYYY U.S. ARMY CORPS OF ENGINEERS DETROIT DISTRICT NOVEMBER 2014 Table of
More informationDES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE
DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE
More informationPeninsula Drainage District #2 Encroachment Evaluation Summary Report
Peninsula Drainage District #2 Encroachment Evaluation Summary Report Levee Ready Columbia / Peninsula Drainage District #2 / 1880 NE Elrod Drive, Portland, Oregon 97211 Table of Contents Contents Summary...
More informationAudit of Stormwater Management Utility
Audit of Stormwater Management Utility City Council Presentation Tuesday, October 3, 2017 Lyndon S. Remias, City Auditor Gretchen Hudome, Deputy City Auditor Tim Bell, Senior Auditor Tony Gonzalez, Senior
More informationJune 22, Francis E. Borcalli, P.E.
CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What! June 22, 2009 Francis E. Borcalli, P.E. CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What!
More informationGIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study
GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112
More informationAppendix D - Evaluation of Interim Solutions
Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner
More informationGreenfield Pond B Rehabilitation
Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...
More informationConstructed Wetland Pond T-8
Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands
More informationAmerica s Climate Choices Adaptation A Challenge to the Transportation Industry
America s Climate Choices Adaptation A Challenge to the Transportation Industry November 3, 2010 TRB Webinar H. G. Schwartz, Jr. 1 Major Factors Affecting Climate 2 MITIGATION Measures to reduce Greenhouse
More informationBayport, Texas August 27, 2012
Panama Canal Stakeholder Working Group Bayport, Texas August 27, 2012 Texas Ports - VALUE TO THE NATION Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers This briefing
More informationIn Your House and in Your Yard, Watch for Water, Be on Guard
In Your House and in Your Yard, Watch for Water, Be on Guard KEY TERMS Arroyo: A water-carved gully or a normally dry creek found in arid or desert regions. Dam: A barrier built across a river, stream
More informationStatement on Marine Transportation
Page 1 Introduction Statement on Marine Transportation The U.S. Marine Transportation System (MTS) consists of ports, coastal and inland waterways, the Great Lakes, and the St. Lawrence Seaway and is an
More informationNashville District October 2011 Update
Nashville District October 2011 Update Tom Cayce Chief of Programs and Project Management October 18, 2011 US Army Corps of Engineers Nashville District Value to the Nation LRN 12% of inland navigable
More informationHandout 5: Stormwater Cost of Service
Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service
More informationLinking TEK, Outreach, and Science to Protect Everglades Wetlands. Water Resources Department Marta Reczko, Water Resources Manager
Linking TEK, Outreach, and Science to Protect Everglades Wetlands Water Resources Department Marta Reczko, Water Resources Manager Everglades Facts The Everglades is a marsh, a region, a watershed, an
More informationENVIRONMENTAL ASSESSMENT SUPPLEMENT 3 CENTER HILL DAM SEEPAGE REHABILITATION PROJECT
DRAFT ENVIRONMENTAL ASSESSMENT SUPPLEMENT 3 CENTER HILL DAM SEEPAGE REHABILITATION PROJECT MAJOR REHABILITATION EVALUATION REPORT PREVIOUSLY APPROVED AND REVISED PLANS PROPOSED ROLLER COMPACTED CONCRETE
More informationTITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS
TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative
More informationRECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO
RECORD OF DECISION MAY 2 0 2014 RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO The Final General Reevaluation Report and Supplemental
More informationWATER CONTROL MANUAL
Mobile District WATER CONTROL MANUAL APPENDIX E WEST POINT DAM AND LAKE CHATTAHOOCHEE RIVER, GEORGIA AND ALABAMA U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT MOBILE, ALABAMA JUNE 97 Revised August 98 and
More informationOLMSTED LOCKS AND DAM
SITE REPORT OLMSTED LOCKS AND DAM IN-THE-WET 1 AS PART OF ONE OF THE FINAL PHASES OF THE OLMSTED LOCKS AND DAM PROJECT, A PUTZMEISTER CONCRETE PLACING SYSTEM IS PLACING UP TO 140,000 CUBIC YARDS (107,308M³)