1 PRELIMINARY OUTLINE SPECIFICATIONS for Neelytown Road, Montgomery, NY The Project This outline specification prepared by Panattoni Construction Incorporated (Contractor), defines the preliminary and base scope of work for the design and construction of warehouse and distribution space at Neelytown Road, Montgomery, Orange County, New York. DESIGN CRITERIA: Building Footprint: 455,053 SF Warehouse Area: 445,952 SF Office Area (actual TBD): 9,101 SF Approx. Dimensions: 510 x 900 Bay Size (actual TBD): 50-0 x 50-0 Trailer Parking: 100 spaces Vehicle Parking: 191 spaces Clear Height: 36 (to underside of lowest structural member at first column) Exterior Wall Height: Approximately 43 The Contractor shall have a complete set of certified, final working drawings and specifications prepared in conformance with these outline documents and shall furnish all labor, materials, equipment and supervision necessary for the execution and completion of the work. DIVISION 1: GENERAL REQUIREMENTS LAWS, ORDINANACES, RULES AND REGULATIONS The Contractor shall be responsible for complying with all building codes and dimensional requirements of zoning ordinances applicable to the building including local city ordinances, Americans with Disabilities Act, and the Occupational Safety and Health Act Provisions applicable to construction sites IMPACT, PERMITS AND CONNECTION FEES: This proposal includes giving to the proper authorities all notices as required by law relative to the work of this project; apply and pay for all building permits (other than environmental permits if required for Client's operation) and Contractor's licenses as are required for construction FIELD ADMINISTRATION PERSONNEL The field administration personnel shall consist of a project manager and a project superintendent.

2 Page 2 of 10 Sub-contractors to provide adequate manpower to maintain the project schedule and safety TESTING The Contractor shall develop and employ a field testing program for quality control during the course of the project. The Contractor's testing program shall include soils, cast-in-place concrete, bituminous pavements and structural steel. The Client shall have the right to perform additional independent tests on all materials and equipment furnished for the project at any time QUALITY/TRAINING/SAFETY/PROGRAMS Quality assurance shall be met through direct supervision, specialized testing and certification by an independent laboratory. Panattoni Construction will maintain safety standards in accordance with state, local safety and insurance standards MOBILIZATION/DEMOLIZATION As work is commenced, temporary utilities and facilities will be procured as required. Panattoni Construction will be responsible for providing and/or coordinating equipment and materials TEMPORARY CONSTRUCTION FACILITIES Temporary restrooms, staging and yard area and job-site trailer will be provided by Panattoni Construction. Temporary facilities will be removed and/or relocated as the job progresses CLEANUP AND PUNCH LIST The Contractor shall be responsible at all times to keep the premises free from excessive accumulations of waste materials and/or rubbish. Periodically, the Contractor shall remove all rubbish and waste materials from the building and the construction site, and at the completion of the project, all debris, tools, scaffolding and surplus materials shall be removed and the project shall be left in "broom-clean" condition. DIVISION 2: SITE WORK CLEAR AND GRUB Clear site of trees, stumps, debris, surface vegetation and soil of organic materials GRADING AND EXCAVATION Grading and earthwork will include the necessary excavation, backfill and rough and fine grading necessary to accomplish the building construction. Earthwork operations will be performed in accordance with the recommendations and under the supervision of a qualified Soils Engineer. Final site design to achieve balanced site.

3 Page 3 of 10 Areas to receive bituminous and concrete paving outside the areas of the building structure shall be cut and filled to the grades designed by the Civil Engineer of record. Fill work in these areas will be with on-site material, compacted to 95% Proctor density UNDERGROUND UTILITIES All items shall be designed to meet state and local requirements Sanitary Sewer - A 6" gravity sanitary sewer line will be installed from 5 of the exterior of the building and connected to the septic field per the approved site plan. Water A 10" combination domestic and fire protection water service will be brought to the building from a private, potable water well located on site. Contractor assumes the water main at the property line will have adequate water flow and pressure to supply the needs of an ESFR fire sprinkler system with an electric pump. Storm Sewer - Storm water drainage will be by means of surface runoff to an onsite storm sewer system and drainage basins per the approved site plans. Drainage systems, to the maximum extent possible, will utilize surface drainage. Telephone - An empty conduit stub will be installed through the exterior wall to provide access into the building and dial tone demarcation panel. Cost of the telephone service will be borne by the Client. Natural Gas High-pressure natural gas will be brought to the building by the natural gas utility, Central Hudson Gas & Electric ASPHALT PAVING The Contractor shall furnish and install all bituminous paved parking lots, driveways, and fire lanes. Trucking areas will consist of 4 bituminous stabilized base and 2 F.A.B.C. topping. Automobile parking will consist of 2 ½ bituminous stabilized base and 1 F.A.B.C. topping SITE CONCRETE This proposal includes curbs located at the car parking area, the entrance drives. A broom- finished concrete sidewalk is included at the main office entrance. Truck dock apron shall be 7 thick concrete, broom-finished paving over 4 granular fill. All concrete to be 4,000 psi compressive strength in 28 days. Three (3) concrete on-grade drive-in ramps are included. The on grade ramps shall be 7 thick unreinforced concrete broom-finished paving.

4 Page 4 of 10 DIVISION 3: CONCRETE BUILDING FOUNDATIONS FLOOR SLABS 7 thick unreinforced concrete floor slab on 4 thick compacted granular fill, all concrete to be 4,000 psi compressive strength in 28 days. The floor slab concrete will be placed with a laser screed, finished with a hard machine trowel finish and installed to floor flatness and floor levelness FF45/FL35 tolerances. The floor will be measured in accordance with Random Access floor tolerances utilizing Allen Face & Associates testing standards. Contractor will provide an independent testing laboratory report stating that the floor slab has been installed in accordance with this outline specification and floor finish tolerances. The floor slab will be cured with a quality membrane-curing compound. The floor slab will have control joint spacing not to exceed approximately 15 x 15 and control joints will be sawn with soft cut blade method. Control joints are to be filled with MM-80 Series Epoxy. The floor will be constructed to perform in accordance with ACI Class 5 (modified) specifications. The exposed floor will be machine troweled, finished, and cured with Super Aqua-Cure VOX as manufactured by Euclid TILT-WALL The building exterior shall consist of smooth Tilt-wall concrete panels finished with accent reveals at the office. The exterior walls of the office and warehouse areas will be 9 1/4 load bearing Tilt-wall panels. Tilt-wall panels will be of sufficient height to allow for an interior clear height of 36-0 from finish floor to underside to steel bar joist at the first column line. DIVISION 5: STRUCTURAL STEEL AND METALS STRUCTURAL STEEL The building system will conform to the standards of ACI, ASTM, SJI, and applicable building regulations. The general construction will be steel columns, beams, and steel bar joists carrying metal deck. The finish on all steel will be gray primer paint. Bay size will be approximately 50-0 x 50-0, or as determined by the structural engineer. Exposed roof deck will be provided with factory prime painted "off white" finish METAL STAIRS, LADDERS AND MISCELLANEOUS A total of twenty-five (25) concrete-filled pipe bumpers are included at exterior egress doors, electrical panels and fire suppression piping as required.

5 Page 5 of 10 One (1) steel vertical ladder is included inside the building to provide access to the roof through and one (1) 2-6 x 2-6 roof hatch. Stairs with handrails will be provided as required at the truck dock areas and egress doors. DIVISION 6: CARPENRTY MISCELLANEOUS CARPENTRY All miscellaneous carpentry shall be performed, where applicable, to provide the client with a professional finish. DIVISION 7: THERMAL AND MOISTURE PROTECTION INSULATION Roof Structure to receive 2 mechanically fastened insulation with an average R value of 14.3 located above the roof deck EXTERIOR INSULATION AND FINISHING SYSTEM Underside of entrance feature to receive EIFS system TPO ROOFING A single-ply 45 mil non-reinforced TPO membrane mechanically attached roof system will be provided. The roof will be pitched (¼") to exterior drains and leaders connected to the storm water system. Miscellaneous flashing, pitch pockets, coping and drains will be provided ARCHITECTURAL SHEET METAL 24 ga. Prefinished metal coping to be provided for roof coping ROOF SPECIALTIES AND ACCESSORIES Provide roof access via interior steel ladder and roof hatch. Ladder to meet all applicable codes MISCELLANEOUS CAULKING Provide all caulking required to establish a watertight seal between building components. DIVISION 8: OPENINGS EXTERIOR DOORS

6 Page 6 of 10 Furnish and install twenty-five (25) exterior exit personnel doors in building or as required by code. Doors are to be 1-3/4" hollow metal doors, set in hollow metal door frames, and exterior painted to match the exterior façade. All door hardware shall be as manufactured by Schlage, Yale, Sargent or an equal commercial grade with its function appropriate for its intended usage. Weather-stripping and door closers will be provided at all exterior doors OVERHEAD DOORS Up to Ninety-nine (99) overhead doors to be provided in a cross dock configuration. The overhead doors will be 9 x 10 manual, insulated sectional vertical lift doors at the exterior truck docks. Sixty (60) to be installed. Three (3) 12 x 14 drive-in doors to be provided. Doors to be manually operated insulated sectional overhead doors at the on-grade drive in ramps. Drive in doors shall have one (1) 5 x 30 vision light in the third panel GLASS AND GLAZING Office windows shall be 1" thick thermopane set in anodized black aluminum frames with a thermobreak design. All exterior glass shall be insulated units with the exterior glass tinted gray and the interior light clear. All window units shall be fixed sash, punched openings. The main exterior entrance door shall be 3 x 7 anodized aluminum and glass to match windows. Exterior glass occurring in doors and sidelights shall be tinted, all interior glass shall be clear. Aluminum thresholds shall be provided for all exterior doors. Exterior glass doors shall have 1" insulated glass. DIVISION 9: FINISHES Thirteen Thousand (9,101) square feet of office fit-up is included at an allowance of $50.00 per square feet. The Office Area is to be constructed on the slab and actual square footage to be determined METAL FRAMING AND SHEETROCK Metal stud framing and sheet rock to be located at the fire pump room only. Tenant improvement framing and drywall is part of office Allowance CEILINGS The building is to be left open to roof deck except in Office Areas.

7 Page 7 of FLOOR COVERINGS The warehouse concrete floor slab will receive a single coat application of Ashford Formula hardener WALL PAINTING Exterior walls will be painted with an elastrometric paint. Exterior metal to be painted with enamel paint. Interior walls will not be painted. DIVISION 11: EQUIPMENT DOCK EQUIPMENT Up to Ninety-nine (99) 35,000-pound capacity, 7' x 8' mechanical dock levelers with bumpers will be provided. Sixty (60) to be installed. Compressible, foam-type dock seals and bumpers will be provided at the 9 x 10 exterior overhead doors. DIVISION 13: SPECIAL CONSTRUCTION FIRE PROTECTION A complete fire protection sprinkler system is provided throughout the facility. The system will be designed in accordance with NFPA Standards, and applicable local codes. The Office Area fire sprinkler system will be designed and constructed via the office build-out allowance. The warehouse area will be provided with an ESFR system. Sprinkler riser, fire pump and fire department valves, flow switches, and alarms as required by code. Sprinkler risers shall be fed from the fire protection pump room inside the warehouse area. Fire hose cabinets and ABC type, 20 lb. fire extinguishers are included at the ratio of 1 unit per 10,000 square feet. It shall be the Client's responsibility to verify with his insurance underwriter that the above coverage will satisfy their specific needs. A water tank of approximately 200,000 gallons is provided along with freeze protection to serve the needs of the facility and the fire suppression system.

8 Page 8 of 10 DIVISON 15: MECHANICAL PLUMBING: Provide domestic water service from 5 feet outside the building to the main office area shown on drawings. Provide PVC sanitary sewer from 5 feet outside the building to the main office area shown on the drawings. Roof drains will be piped from the roof to the storm drain system from the exterior. All work to be per local code. Additional plumbing is to be a tenant improvement item HVAC The building will have a 2 domestic water service. The warehouse area heating will be provided by Cambridge type heaters. Ventilation of the warehouse will be in compliance with State and Local Code requirements. No provision has been made for air conditioning in the warehouse area. Exhaust will be provided as per code. Anti-stratification fans in the warehouse will be employed to conserve energy for heating in the warehouse area. Design conditions are as follows: Warehouse Office Winter/Summer Winter/Summer Outdoor 11 F/- 0 / 95 deg F Indoor 55 F/- 72 / 75 deg F All office area HVAC systems shall be designed and constructed via the office build-out allowance DIVISION 16: ELECTRICAL ELECTRICAL I. Electrical Distribution Equipment: Contractor will provide an electrical service at 2,000 amp, 277/480 volt, 3-phase, 4-wire. All panels, switchboards, transformers, fuses and contacts will be supplied as per Code. The service has been sized based on certain assumptions: All electric to be provided as follows: A. Emergency lighting (high efficiency) and exit lights will be per National Electric and Fire Safety Code.

9 Page 9 of 10 B. Site lighting is included and will be designed to comply with code requirements. C. Include fire alarm system in all areas as per code. D. General warehouse lighting to be 25-foot candles at eye level with T5 high output linear fluorescent six (6) lamp fixtures based upon an open floor plan. II. Site Lighting: Work will conform to all authorities having jurisdiction watt Metal Halide wall packs located at truck docks. III. Interior Lighting: - T5 high output linear fluorescent six (6) lamp fixtures IV. Miscellaneous: - Egress/EM combo units with battery back up. - 1 Connections to HVAC units. - 2 Connection to electric heater in pump room. - 1 GFI in pump room foot strip light in pump room. - 1 Dedicated outlet for irrigation controller. V. Site Utility: - 1 Transformer Pad. The electrical installation for the warehouse area will be complete from the utility company supplied transformers to power and lighting panels, switches, and/or circuit breakers throughout the building to supply heating, lighting, convenience outlets, and other items of this specification. Office area electrical work shall be designed and constructed via the office build-out allowance. VI. EMERGENCY & EGRESS LIGHTING: Emergency and exit lighting fixtures will be provided to meet all code requirements. VII. EXTERIOR LIGHTING: Parking Lot - The parking lot and truck dock area will be lighted by means of wall mounted lighting fixtures. VIII. LIGHTING CONTROLS: Warehouse area lighting to be circuit breaker switched at electrical distribution panels.

10 Page 10 of 10 IX. FIRE ALARM EQUIPMENT: One (1) fire alarm control panel with area annunciation, emergency standby battery powered, and provisions for central tie-in. Fire pump monitoring system to be provided. EXCLUSIONS - In-rack sprinklers. - Special floor coating and floor striping other then that stated in this document. - Field painting of structural steel, bar joists, or decking. - Office furnishings, demountable partitions, drapes, lockers, telephone system, intercom system, central time clock, and music system. - Data wiring or raceways, computer system, and/or U.P.S. system, computer flooring. - Furnishing or installing racking system. - Painting of any exposed piping. - Supplying fork truck battery chargers. - Dock lock equipment. - Electrical panels and distribution and connections to Client s assembly, packaging, distribution. - Security System - Fencing - Guardhouse - Building signage other than directional and park signage - Smoke vents and skylights - Surface slab hardeners/densifiers - Special computer room equipment - Explosion-proof construction at any area - Electrical Ground loop - Emergency generator and secondary back up electrical connections to provide second point of contact to the power grid. - Fire walls and tunnels - Aisle warehouse lighting - Fire alarm system as required by tenant - Telephone or data systems, conduit or wiring

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Seasons Business Center New Construction!

Seasons Business Center New Construction! Seasons Business Center New Construction!...Seasons Business Center Stow, Ohio 114,188 SF of High Bay Space 32 Clear Height 80 480 ESFR Sprinklers Tax Abatement Available 8 Reinforced Concrete Floor 271

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours Basic Edition Standard Estimate Report Page 1 Name 1000 General Conditions 1107 Professional Consultant 10 Surveying 1.00 day 600.000 /day 600 - - - - - - 600 Professional Consultant 600 600 8.00 hours

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet 1.0 DESIGN SPECIFICATIONS 1.1 Size of Building and Tract: The facility is approximately 439,350 square feet, located on a 21.86-acre parcel on Wood Dale Road in Wood Dale, Illinois. 1.2 Size of Building

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

4. Number of drawings required: ( ) Locations of nearest streets

4. Number of drawings required: ( ) Locations of nearest streets CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:

More information

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) 1420 Miner Street Des Plaines, IL 60016 P: 847.391.5380 desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) Five sets of stamped plans and specifications (six sets if food establishment),

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST Page 1 SECTION 00 72 00 - GENERAL CONDITIONS BILL NO. 1 GENERAL ITEMS 1 Bonds... $ 2 Insurance... $ 3 Permits and fees... $ 4 Warranty certificates... $ 5 Supervision... $ SECTION 01 32 17 - SCHEDULE 6

More information

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50 Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed

More information

The Homeowner s Building Application Checklist for Constructing a Residential Addition

The Homeowner s Building Application Checklist for Constructing a Residential Addition The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential

More information

DIVISION PARKING STRUCTURES

DIVISION PARKING STRUCTURES DIVISION 13 00 40 PARKING STRUCTURES 1. Design Requirements 1.1. A parking design professional must be used to provide the functional and structural design of the facility. 1.2. A traffic analysis is required

More information

Application for Commercial Plan Review and Building Permit. Address:

Application for Commercial Plan Review and Building Permit. Address: City of Warrenton 200 West Booneslick Warrenton, MO 63383 : 636-456-3535 Fax: 636-456-1336 www. war r ent o n- mo.org Application for Commercial Plan Review and Building Permit PERMIT# Purpose: Commercial

More information

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised 02011 Soil Boring Data (Create for each site) (05/15) 02050 Demolition (Create for each existing building)

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

Construction Cost Estimate - DRAFT

Construction Cost Estimate - DRAFT Construction Cost Estimate - GATRA / Town of Plymouth Plymouth Intermodal Transit Center Plymouth, MA Prepared for: Fennick McCredie Architecture 65 Franklin Street, Boston, MA 02110 June 3, 2015 Project

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

PART 5 WATER SYSTEMS

PART 5 WATER SYSTEMS PART 5 WATER SYSTEMS Abbreviations and Symbols Plan 501 Abbreviations and symbols for water... 205 Concrete Boxes and Hardware 502 27" Frame and cover... 207 503 38" Frame and cover... 209 505 Concrete

More information

COLUMN SPACING TRUCK ACCESS/DOORS EAVE HEIGHT UTILITIES PARKING & DRIVES

COLUMN SPACING TRUCK ACCESS/DOORS EAVE HEIGHT UTILITIES PARKING & DRIVES LOCATION & ACCESS Akron Business Centre I and II 4.2 acre site at Opportunity Parkway (Wooster Avenue) & Pier Drive Located in Downtown Akron Adjacent to Innerbelt Expressway (Route 59) and just north

More information

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca

More information

THE CONSTRUCTION SUPERVISOR

THE CONSTRUCTION SUPERVISOR City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor

More information

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

RESIDENTIAL BUILDING PLAN REQUIREMENTS

RESIDENTIAL BUILDING PLAN REQUIREMENTS CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

Building Program Example. Eric Anderson

Building Program Example. Eric Anderson Building Program Example Eric Anderson MINIMUM SPATIAL/FUNCTIONAL REQUIREMENTS SPACE NUMBER OF OCCUPANTS USE TYPE Activity Room 100-200 Assembly Meeting Rooms (5) Referenced at Room Descriptions Business

More information

SECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , "Building Code Requirements for Reinforced Concrete".

SECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , Building Code Requirements for Reinforced Concrete. SECTION 13120 PRECAST CONCRETE BUILDING PREFABRICATED PART I - GENERAL 1.01 SUMMARY Contractor to furnish precast concrete building. Building to be field erected on customer prepared crushed stone foundation

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

DESIGN DEVELOPMENT PHASE

DESIGN DEVELOPMENT PHASE UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

10 EXTREME BASEMENT PANELS

10 EXTREME BASEMENT PANELS 10 EXTREME BASEMENT PANELS On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils are classified

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

2010 National Building Code Adoption and Associated Process Changes

2010 National Building Code Adoption and Associated Process Changes Building Inspection City of Moncton 655 Main Street Moncton, NB E1C 1E8 Phone: (506) 856-4375 Fax: (506) 856-4348 Bulletin No. 14 From: Randy Richard Date: February 9, 2015 Subject: 2010 National Building

More information

MINIMUM SPECIFICATIONS

MINIMUM SPECIFICATIONS MINIMUM SPECIFICATIONS A) GREENHOUSE STRUCTURE: (EDUCATOR) 30 X 96 Galvanized Steel Frame Consisting of: A. Column Post: Allied 2 x 4 Rectangle 6 Spacing B. Bows: Allied 2 x 3 Rectangle 6 Spacing C. Trusses:

More information

Distribution Center 1 + 2

Distribution Center 1 + 2 BELGIUM Distribution Center 1 + 2 www.prologis.com Prologis Park Boom consists of a modern logistics facility located in Industrial Park Krekelenberg I and a new logistics development of approximately

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA Atlanta, GA LOCATED AT CAMP CREEK PARKWAY AND CAMPBELLTON ROAD For Sale or Lease Single units start at 1,176sf and can be combined to exact specification Custom Designed Medical and Professional finishes

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

STATE PROJECT NUMBER TZ MnDOT

STATE PROJECT NUMBER TZ MnDOT 1.1 NOTICE TO RESPONDERS ADDENDUM NUMBER SIX DATED 24 October 2014 MnDOT LITTLE FALLS TRUCK STATION 15038 Pine Avenue, Little Falls MN 56345 STATE PROJECT NUMBER TZ 90468 WIDSETH SMITH NOLTING 610 Fillmore

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

Inspection of New One- and Two- Family Dwellings

Inspection of New One- and Two- Family Dwellings Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

How to estimate the cost of new air conditioning system to an existing storage warehouse.

How to estimate the cost of new air conditioning system to an existing storage warehouse. How to estimate the cost of new air conditioning system to an existing storage warehouse. 1 How to estimate the cost of new air conditioning system to an existing storage warehouse. Table of Contents Section

More information

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL SECTION 321200 - PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The Contractor for this work shall be held to have read all of the Bidding Requirements, the Proposal Forms, the General Conditions of

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

Davis Frame Co., Inc. Construction Budget Considerations

Davis Frame Co., Inc. Construction Budget Considerations Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Executive Summary: 200 Minuteman Park currently stands as a three story commercial building. The original design was limited to three stories by an industrial zoning law in Andover, Massachusetts. If this

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

VPL-3200B Residential Vertical Platform Lift Technical Specifications

VPL-3200B Residential Vertical Platform Lift Technical Specifications Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

A. Submit product data sheets and literature verifying physical properties of materials.

A. Submit product data sheets and literature verifying physical properties of materials. I. GENERAL ACRYSHIELD ROOF MANAGEMENT SYSTEM Installation Guide Specification For Preserving EPDM Roofs 07500 Saving Money, Safeguarding the Environment One Roof at a Time. 1.01 SUMMARY A. Provide labor,

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION 1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the

More information

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. City of Gibraltar Pre-Sale Inspection Report Checklist FLATWORK: Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. EXTERIOR PROPERTY: Fences/Sheds/Retaining walls: Repair,

More information

ALL-ALUMINUM DOOR & WINDOW FRAMING

ALL-ALUMINUM DOOR & WINDOW FRAMING ALL-ALUMINUM DOOR & WINDOW FRAMING WITH INTEGRATED ALUMINUM DOOR STOP SECTION 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES: A. Prefinished aluminum

More information

Table of Contents. Page Title

Table of Contents. Page Title Page Title Table of Contents 1 Floor plan/ Room utilization 2 Elevation (EAST) 3 Elevation (SOUTH) 4 Elevation (WEST) 5 Elevation (NORTH) 6 Foundation plan details 7 Foundation cross sections A Main grade

More information