1 FY Virginia Beach Budget Response to Council Questions Question Number: FY19 70 Question: Building on my question number FY19 69 above, under the column heading Budgeted for FY 2019 please provide the planned obligation and expenditures by fiscal year and the material deliverables for those obligations by fiscal year. Date Requested: April 11, 2018 Requested By: Councilman Moss Department: Public Works-Storm Water Response: We have updated the Capital Improvement Program for / FY Summary of s for All Active City Projects worksheet for the Stormwater projects to reflect the current project balances and to show the remaining current year expenditures (attachment). Additionally the notes section has been updated to provide a brief status update regarding current remaining funding for each. Funding and future program expenditures for each are defined in the FY Capital Improvement Program Resources Management Plan.

2 Note to Section and Project Managers: show the project balances for all your active projects in InSITE (i.e. projects that are not yet closed out). The best report to use for this exercise is the "FSG- BUILDINGS (or other section) PROJECTS", which shows for each section one line of InSITE. See Budget and Management Services Beachnet page for how to run this report). Summary of s for All Active City Projects (Excludes Schools) in the City's Financial System Storm Water 7400 Aragona Drainage Improvements 3,760,000 3,218,902 0 This project delayed construction improvements to coordinate with the cleaning and CCTV inspections of the existing neighborhood storm drain system. Anticipate using total funds on two project phases. First phase to be advertised in Summer 3,218, Ashville Park Drainage Improvements 2,000,000 1,271,940 0 This is a new project in FY The Project will receive $9.0 Million over the next 3 years to construct the initial phases. The project will be divided into two construction phases. The less complex storm drainage improvement will be constructed in the first phases and the complex improvement, including those that will require property acquisition and / or environmental 1,271,940 permitting, will be constructed in the latter phase Baker Road Culvert & Ditch Improvements 450, This project is being managed by the SGA Department in coordination with the Burton Station Rd. improvements and the Burton 467 Station SGA improvements. Anticipate construction beginning in Summer Project will use all funding Bellamy Manor Outfall Ditch 750,000 19,305 10,000 9,305 The project is currently under construction. Anticipated construction completion in July Central Resort District Drainage Improvements 300, ,800 0 This funding provides seed funding for further evaluating the alternative concepts previously developed. The project is anticipated to exceed $100 M. The first phase of this multiple phase projct is to improve the existing drainage culverts located along the drainage channel from MOCA to Beach Garden Park. Future considerations are to direct approximately 15 to 25 acres from 21st Street to Baltic Ave. instersecton to the existing 16th Street Pump Station as a way to address roadway and property 270,800 flooding within this locatlized area. The comprehensive Citywide sea level rise / recurrent flooding analysis has completed the majority of the risk analysis city-wide. Work is well underway on the second phase of the project to develop strategies and engineering responses to mitigate that risk Citywide Sea Level Rise/Recurrent Flooding Analysis 3,844,447 $ 1,458, , ,300 The remaining funding will be used to complete watershed level response plans, including budgetary planning College Park/Level Green Drainage Improvements 498,687 $ 286,186 0 The initial evaluation is complete and the project is coordinating cleaning and CCTVing existing storm drain pipe sections to 286,186 better define areas for improvements. Design will begin in FY 19 and construction is anticipated to begin in FY Eastern Shore Drive Drainage 14,139,356 $ 9,737,871 3,800,000 The project is in the design phase. It will include the installation of multiple sluice gates, pump stations and storm drain pipe systems which will be installed in multiple phases to coordinate with the impacts to the neighborhoods and transportation roadway system. An initial phase was completed in late summer 2017, which included installing tide gates at specific locations to provide protection from minor storm events until the major improvements can be installed. This project is anticipated to be a $80 M plus potential project. Design is underway for Phase I Section 1 (Lynnhaven Colony and Vista Circle area) and Section 2 5,937,871 (Cape Story by the Sea) Bradford Lake / Chubb Lake 1,084,100 $ 899, ,000 This is a new project in FY Project is in the initial study phase which will develop the program scope and better define the estimated project cost. The project will include box culverts under major arterial roadways; drainage improvements for Bradford Lake / Chubb Lake; and drainage ditch improvements to the existing outfall ditch system that drains through Expeditionary Base - 599,284 Little Creek. Current project estimate is $32 M. 4/27/2018 V:\Departments\Management Services\FY19\Council & MLT\Council Questions\FY19 70a- Storm Water Management Section.xlsx Page 1 of 6

3 Note to Section and Project Managers: show the project balances for all your active projects in InSITE (i.e. projects that are not yet closed out). The best report to use for this exercise is the "FSG- BUILDINGS (or other section) PROJECTS", which shows for each section one line of InSITE. See Budget and Management Services Beachnet page for how to run this report). Summary of s for All Active City Projects (Excludes Schools) in the City's Financial System 7413 Neighborhood Storm Water Infrastructure Improvements - II 4,049, , ,000 This project is funding multiple minor drainage improvements that went to construction in winter and summer Remaining funding will be used to fund future neighborhood SD improvements located throughout the City. This project also funded the preliminary evaluation / engineering report of Ashville Park and Sherwood Lakes. Current projects include Country Club Rd. 71,679 Drainage Improvements, 50th/ 51st Street Drainage Improvements and Goodspeed Road pump station improvement evaluation North Lake Holly Watershed 18,671,135 $ 1,485,767 50,000 Four phase of construction have been completed with the fourth phase being complete in Jan Three more phases are scheduled for construction between January 2018 and Winter An additional $4.8 M will be allocated to this project to 1,435,767 assist with these construction cost Princess Anne Plaza Drainage Area 2,000, , ,000 This is a new project in FY The Project was broken out of the Windsor Woods Drainage Improvement Project. The project is in the initial study phase which will develop the program scope and better define the estimated project cost. Current project 77,501 estimate is $66 Million Sherwood Lakes Drainage Improvements 1,000,000 $ 562,944 0 This is a new project in FY The project will receive $2.0 Million in FY 19 which will be used to construct the pump station for the North Lake and an interconnecting storm drain pipe between the South Lake and North Lake. The improvements will help maintain the normal water surface elevation in both lakes between elevation 3.0 and 4.0 feet which will provide storm drainage storage capacity for major rainfall events. Anticipate advertising the pump station and interconnecting SD pipe in May 2018 and 562,944 construction NTP in Aug South Lake Holly Watershed 16,609,587 $ 1,526,629 50,000 Three phases of construction are complete. The last phase began construction in October 2017 and is anticipated to be 1,476,629 complete by December Southern Canal/Lead Ditch and Culvert Improvements 2,350, , ,000 The project completed three major culvert improvements in The next phase addresses undersized pipes and ditches in the 485,644 Charity Neck Rd and Pleasant Ridge Road area SWM Master Planning, Analysis, and Inventory 8,070,906 $ 3,487,423 1,200,000 This project funds activities associated with the new Virginia Stormwater Management Act for water quantity control. It is updating the comprehensive storm water master plans to link with the City's GIS system to meet the maintenance and water quality needs dictated by the City's VPDES permit. Currently 5 watersheds are complete; 14 watersheds are in the modeling 2,287,423 phase; and 12 watersheds remain to be modeled The Lakes Drainage Improvements 2,000,000 $ 1,048, ,000 This is a new project in FY The Project was broken out of the Windsor Woods Drainage Improvement Project. The project is in the initial study phase which will develop the program scope and better define the estimated project cost. Current project 548,662 estimate is $28 Million Windsor Woods Drainage $ 11,177,237 $ 5,714,787 $ 1,400,000 Maintenance drainage improvements for Windsor Woods /Presidential Canal and North Gate channel are anticipated to be completed by July The Project is in the initial study phase which will develop the program scope and better define the estimated project cost. Current project estimate is $35 Million. An additional $5.3 M was allocated to the project in March 2018 (from FEMA reimbursement funding) to fund 3 initial drainage projects. Additionally an early implementation drainage phase 4,314,787 (Club House Road Drainage Improvement) is under design and anticipates beginning construction in January Elizabeth River TMDL Implementation Plan 7,500,000 2,752, ,000 The Kemps Lake BMP Retrofit Project is anticipated to begin construction in July 2018 pending completion of acquisition. The Chatham Hall Pond Retrofit is in the initial design phase and will be funded from this project. Both of these project will expend 2,548,310 the available balances by June The balance will be used to complete design and construction of projects identified to address TMDLs in the watershed. Two projects have begun design in FY18 for the Bayville Park Pond Retrofit and the Lynnhaven Park Retrofit projects. The remaining 7153 Lynnhaven Watershed Restoration 6,176,582 $ 1,486,014 $ 766, ,014 project balance will be used for the construction of both of these projects which are anticipated to be completed in FY19. 4/27/2018 V:\Departments\Management Services\FY19\Council & MLT\Council Questions\FY19 70a- Storm Water Management Section.xlsx Page 2 of 6

4 Note to Section and Project Managers: show the project balances for all your active projects in InSITE (i.e. projects that are not yet closed out). The best report to use for this exercise is the "FSG- BUILDINGS (or other section) PROJECTS", which shows for each section one line of InSITE. See Budget and Management Services Beachnet page for how to run this report). Summary of s for All Active City Projects (Excludes Schools) in the City's Financial System 7410 Southern River TMDL Implementation Plan 900,000 $ 451,171 $ 100,000 The remaining balance will be used to perform project identification and evaluation to address TMDLs in the watershed. It will 351,171 also be used to construct the identified projects in FY Storm Water Quality Enhancements - II 9,365,254 $ 2,574,327 $ 191,000 Funding will be used for the implementation of the projects and programs identified during FY18 for the local TMDL action plan development. The funding will be used for construction of the projects identified in the action plan, which will be scheduled in 2,383,327 FY Surface Water Regulatory Compliance 5,031,942 $ 1,557,292 $ 450,000 The remaining funding will be used to continue regulatory compliance activities for the dry weather screening program, industrial inspections program, illicit discharge program, stormwater awareness training program, and public outreach strategy 1,107,292 implementation. The funding is allocated to meet the City's Cost Participation agreement with the Army Corps of Engineers for the construction of the Lynnhaven River Ecosystem Restoration Project. Funding for the cost share by the Army Corps of Engineers has been delayed Water Quality and Restoration Participation Projects II 1,516,773 $ 1,516,773 $ - 1,516,773 This project is anticipated to begin construction in FY Severe Repetitive Loss Grant Program 1,847, , ,205 Work continues on resolving final construction claim issues for this Grant. Construction bids received exceeded funding. Currently working with FEMA and induvial home owners to through dept of emrgcy mngmnt 7411 Oceanfront Storm Water Facilities Maintenance 3,858,000 $ 843,132 $ 818,000 This work to protect and maintain the Federal/City Hurricane Protection Project at the Oceanfront includes replacing the stormwater outfall piping flap gates at $200K in Winter 2017/18 to Spring 2018, Seawall Construction Joint Sealings at $25K during non tourist times, Seawall Structure Sealing at $35K during non tourist times, Stair Nosing repairs for the steps down to the beach from the Boardwalk to protect pedestrian feet at $300K during non tourist times, Oceanfront Stormwater Pump Station Maintenance repairs at $50K during non tourist times, Full Depth Boardwalk Repairs at $75K during non tourist times, and various smaller projects to support this vital infrastructure as well as a small remainder to carry over into the next FY for other 25,132 programming needs. Note that all of this work is also heavily weather dependent Flood Mitigation Assistance Grant Program 1,227,144 1,014, ,014,214 This Federal Emergency Management Agency Grant program is under review and revision. Funds are to be carried over to the next FY until review is completed. (Construction bids received exceeded funding and the Department of Emergency Management is working with FEMA and the induvial home owners to see if an agreement can be reached to help move the project forward.) This Federal Emergency Management Agency Grant program is under review and revision. Funds are to be carried over to the next FY until review is completed. (Construction bids received exceeded funding and the Department of Emergency Management 7044 Flood Mitigation Grant Program II 874,061 $ 726,232 $ - 726,232 is working with FEMA and the induvial home owners to see if an agreement can be reached to help move the project forward.) 4/27/2018 V:\Departments\Management Services\FY19\Council & MLT\Council Questions\FY19 70a- Storm Water Management Section.xlsx Page 3 of 6

5 Note to Section and Project Managers: show the project balances for all your active projects in InSITE (i.e. projects that are not yet closed out). The best report to use for this exercise is the "FSG- BUILDINGS (or other section) PROJECTS", which shows for each section one line of InSITE. See Budget and Management Services Beachnet page for how to run this report). Summary of s for All Active City Projects (Excludes Schools) in the City's Financial System 7415 Lake Management II 27,260,128 $ 5,700,655 $ 3,415,000 Projects include Whitehurst Dredged Materials Management Area Haul Road Extension Construction $150K anticipated Spring 2018, New Dredged Materials Management Area Site Permits and Engineering for New Dredged Materials Management Area Site $75K Spring 2018, Green Run 2 Dredging Construction at $1.3M in Fall 2017, Green Run 3 Dredging Design $200K Spring 2018, Green Run 4 Dredging $500K Summer 2018, Green Run 5 Dredging $500K Summer 2018,, Windsor Oaks West Dredging Canals 1 and 2 at $1.3M started in Winter 2016/17, Windsor Okas West 3 dredging summer 2018 $700K. State Mandated BMP/Lake Inspections at $300K started in Winter 17, Minority Mowing Contractor BMP Maintenance $200K continues Spring 2018, Remainder is contingency and carried over for following FYs for multiple large expenditures scheduled for out years including remainder of FY 18 Construction at $1.6M per Top 50 Lake Dredging schedule as well as multiple other lake dredging 2,285,655 projects at $3.1+M SW Infrastructure Rehabilitation & Improvements II 33,106,982 $ 3,045,757 $ 1,700,000 Projects include Fleet Terrace Anticipated Construction $100K Fall 2018, Magic Hollow Storm Drain CCTV and Design $400K Spring 2017, Malibu CCTv Designa nd Construction 350K spring 2018, Landstown lakes CCTV Design and Construction 250K Spring 2018, Bellamy manor CCTV Design and Construction 400K Summer Various Corrugated Steel Pipe Repairs (partial-ferrell Parkway Ph 1) at $500K in Summer 2018, Lakeview Drive Construction $1.4M Fall 2018, 22nd at Cypress Emergency Repair $550K Winter 17(under construction), Dam Neck Road Phase IIA Construction (complete), Century Drive Storm Pipe Extension at $350K (complete), Green Run Bike Path Drainage Improvements at $110K in Winter 2018, Green Run / Princess Anne Road Berm Drainage Improvements at $55K in Winter 2018, Various Sites CCTV for stormwater pipe inspection and cleaning throughout the City at $750K continuously, Various Stormwater Pipe Cave-In repairs throughout the City at $1M continuously, with remaining 1,345,757 small projects throughout the FY and is contingency and to be carried over to next FY Stormwater Operations Modular Building 890, , ,050 This project was substantially completed in Spring Remaining funds will be transferred to Storm Water Pump Station Modifications 5,025,229 $ 447,072 $ 412,000 Projects include pump station electrical work $150K throughout FY 18, 16th street stormwater pump station improvements (complete) 42nd Street stormwater pump station repair/rehab $40K(complete), Cape Story stormwater pump station (interim work) $25K, 61st stormwater pump station modifications $75K Summer 2018, stormwater pump station controls (SCADA) $125K for 79th street(complete), stormwater wet well cleaning and inspections $20K throughout FY 18, and various or miscellaneous unplanned repairs necessary to keep stormwater pump stations in operation. SCADA system completion 350K(complete). 35,072 Remainder of funds will be rolled over to next FY. Projects include Independence Blvd at Shoreline Court Pipe and Ditch construction $600K (complete), Off Road Ditch clearing - contract 1 $500K throughout FY 18, Hungarian Road Off Road Ditch and Culvert drainage improvements $125K (complete) FY 18 Off Road Ditch design and environmental permitting $150K Spring 2018, Off Road Ditch cleaning - Contract 2 $500K throughout FY 18, and small remainder to carry over to next FY. Note the off road ditch work is heavily weather and crop schedule 7023 Primary System Infrastructure Improvements II 8,350,000 $ 777,800 $ 750,000 27,800 dependent. 4/27/2018 V:\Departments\Management Services\FY19\Council & MLT\Council Questions\FY19 70a- Storm Water Management Section.xlsx Page 4 of 6

6 Note to Section and Project Managers: show the project balances for all your active projects in InSITE (i.e. projects that are not yet closed out). The best report to use for this exercise is the "FSG- BUILDINGS (or other section) PROJECTS", which shows for each section one line of InSITE. See Budget and Management Services Beachnet page for how to run this report). Summary of s for All Active City Projects (Excludes Schools) in the City's Financial System 7026 Residential Drainage Cost Participation Program II 250,000 $ 37,057 $ 19,000 The spending plan for this program is based on requests from citizens for participation in the program. In FY 2015/16, City Council authorized expanding this program to include Citizen cost-participation for treatment of aquatic plant and nuisance and algae control. s expected to draw down this account to zero dollars or near-zero dollars each FY as Citizen knowledge of 18,057 this program becomes widely disseminated. Fy17-Fy 18 expenditures 25K for the treatment of several lakes within the city Primary System Infrastructure Improvements 437,556 9,478 9,478 0 This funding will be expended down to zero dollars with other related program projects and then closed out the end of FY Dam & Spillway Structural Improvements 585, , ,251 This funding will be for Hydro surveys to support the pending regulated dams and spillways per the new regulations established by the DCR in Project remaining funds will also support Kingston Lake Dam Design and Construction spillway elevation change from +7.4 to (Summer 2018)with remainder expended down to zero dollars with other related program projects and 0 then closed out the end of FY 18. 4/27/2018 V:\Departments\Management Services\FY19\Council & MLT\Council Questions\FY19 70a- Storm Water Management Section.xlsx Page 5 of 6

FY STORMWATER UPDATE TO CITY COUNCIL

FY STORMWATER UPDATE TO CITY COUNCIL FY 2017-2022 STORMWATER UPDATE TO CITY COUNCIL MARCH 8, 2016 1 OVERVIEW Fund Summary Functional Components Closing Discussion 2 FUND SUMMARY 3 FY17 PROPOSED REVENUE ERU Daily Fee = $0.433 ERU Annual Fee

More information

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN o Execution of New and Expanded Flood Control Projects o Program Options PHILLIP A. DAVENPORT DIRECTOR OF PUBLIC WORKS APRIL 25, 2017 FLOOD CONTROL PROJECTS

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

ASHVILLE PARK STORMWATER UPDATE

ASHVILLE PARK STORMWATER UPDATE ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

Office of the City Auditor. Audit of Stormwater Management Utility

Office of the City Auditor. Audit of Stormwater Management Utility eport ate: September 29, 2017 Office of the City Auditor 2401 Courthouse rive, oom 344 Virginia Beach, Virginia 23456 757.385.5870 Promoting Accountability and Integrity in City Operations Contact Information

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information

Storm Water & Drainage Projects 2011 Program Update

Storm Water & Drainage Projects 2011 Program Update Storm Water & Drainage Projects 2011 Program Update Calf Run Montgomery Woods Owls Nest New Castle County Department of Special Services County Storm Water & Drainage Programs Waterway maintenance NPDES

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS Public Information Meeting ~ May 2, 2018 Public Works Stormwater Management Division OVERVIEW Surface Water Quality Protection Municipal

More information

Audit of Stormwater Management Utility

Audit of Stormwater Management Utility Audit of Stormwater Management Utility City Council Presentation Tuesday, October 3, 2017 Lyndon S. Remias, City Auditor Gretchen Hudome, Deputy City Auditor Tim Bell, Senior Auditor Tony Gonzalez, Senior

More information

Stormwater Control and Treatment

Stormwater Control and Treatment Stormwater Control and Treatment EXISTING CONDITIONS The topography of Pinellas County is mostly flat to gently sloping, characterized by sandy soils and high groundwater levels. Elevations range from

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci and Alan Cohn

PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci and Alan Cohn PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci (PBalci@dep.nyc.gov) and Alan Cohn (AlanC@dep.nyc.gov) if you intend to use any of these slides, and indicate where and when

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

PINELLAS COUNTY RESTORE ACT DIRECT COMPONENT PROJECTS IDEAS SUBMITTED TO PINELLAS COUNTY

PINELLAS COUNTY RESTORE ACT DIRECT COMPONENT PROJECTS IDEAS SUBMITTED TO PINELLAS COUNTY RESTORE ACT DIRECT COMPONENT S DATE RECEIVED: 7/7/14 NAME: : Tides Golf Course Acquisition & Restoration Purchase ~90 acre property, retrofit stormwater systems, restore habitat, create trials and boardwalks.

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT FY 15-20 CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT Department of Public Works Robert B. Boxer, Director PROJECT MODEL PROFESSIONAL SERVICES STUDIES FEASIBILITY CLAIMS 1- PROJECT DEFINITION 2-

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Rocky Hill. Challenges

Rocky Hill. Challenges Rocky Hill Rocky Hill is located in the southern portion of the Capitol Region. Its land area covers 13.9 square miles with an estimated 2010 Census population of 19,703. Elevation in Rocky Hill ranges

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection Montgomery County Maryland Municipal Separate Storm Sewer Systems (MS4) Implementation Craig Carson Montgomery County Department of Environmental Protection Montgomery County, Maryland 500 sq. miles 970,000

More information

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element

More information

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type

More information

East St. Tammany Storm Surge Protection Project Request

East St. Tammany Storm Surge Protection Project Request East St. Tammany Storm Surge Protection Project Request Submitted to Coastal Protection & Restoration Authority of Louisiana (CPRA) August 2015 Contact Information: Thomas Nolan Thompson The East St. Tammany

More information

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment)

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment) BCWMC Capital Improvement Program 2020 2024 (approved April 19, 2018; pending minor Plan amendment) Project Name City Number 2019 2020 2021 2022 2023 2024 2025 Totals Medicine Lake Rd and Winnetka Ave

More information

SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION

SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION 7.1 PROJECT FEASIBILITY The determination of project feasibility is based upon several criteria established

More information

The Village of Wellington NPDES Guidance/Reference Document

The Village of Wellington NPDES Guidance/Reference Document The Village of Wellington NPDES Guidance/Reference Document The following Permit Compliance Guidance/Reference Document has been compiled to assist the copermittee in fulfilling the requirements of the

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

V. DRAINAGE IMPROVEMENTS

V. DRAINAGE IMPROVEMENTS V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements

More information

FY 2015 Project Rollout

FY 2015 Project Rollout CAPITAL IMPROVEMENTS PROGRAM FY 2015 Project Rollout FEBRUARY 18, 2014 Welcome. TERRY LEEDS, DIRECTOR OF WATER SERVICES Agenda About Kansas City Water Services FY 2014 Highlights Water Services 5 Year

More information

Rainy Season Preparation & Storm Channel Maintenance

Rainy Season Preparation & Storm Channel Maintenance Rainy Season Preparation & Storm Channel Maintenance City Efforts Thorough Review of the storm water system Documentation of system conditions Now part of selection criteria or maintenance Full public

More information

AGENDA. 1) Introductions 6:30 (10 min) 2) Review Meeting Goals 6:40 (5 min)

AGENDA. 1) Introductions 6:30 (10 min) 2) Review Meeting Goals 6:40 (5 min) WMP APPENDIX B-1 WATERSHED MANAGEMENT PLAN CITYWIDE PUBLIC MEETING January 21, 6:30 pm to 8:00 pm North Berkeley Senior Center, Multipurpose Room 1901 Hearst Ave (at MLK, Jr. Way) AGENDA 1) Introductions

More information

PUBLIC WORKS. Public Works

PUBLIC WORKS. Public Works PUBLIC WORKS Department includes CIP and Production, Operations, Transportation, and Finance divisions Overall, 66 positions eliminated in FY2010 Details on the two largest divisions follow; representative

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action

More information

Sea Level Rise Adaptation Strategy for San Diego Bay. Brian Holland, AICP, Climate Program Manager City of San Diego EESTF June 29, 2011

Sea Level Rise Adaptation Strategy for San Diego Bay. Brian Holland, AICP, Climate Program Manager City of San Diego EESTF June 29, 2011 Sea Level Rise Adaptation Strategy for San Diego Bay Brian Holland, AICP, Climate Program Manager City of San Diego EESTF June 29, 2011 Five Milestones for Climate Adaptation Adapted from Preparing for

More information

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Cokato Lake (86-263) Wright County. Hydrologic Investigation Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Problem Statement In recent years, heavy rainfall has

More information

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

Appendix C. BMPS, Measurable Goals, and Implementation Schedule Appendix C BMPS, Measurable Goals, and Implementation MCM 1 Public Education, Outreach and Involvement Public Education and Outreach Residents BMP 1.1 Utility Bill Insert Continue implementation of existing

More information

Kane County Natural Hazards Mitigation Committee

Kane County Natural Hazards Mitigation Committee Kane County Natural Hazards Mitigation Committee Annual Report For 2004 TO: Members of the Kane County Board FROM: Kane County Natural Hazards Mitigation Committee SUBJECT: Annual Report for 2004 Date:

More information

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Verbal Interim Progress Report Jim Beever October 25, 2017

Verbal Interim Progress Report Jim Beever October 25, 2017 Verbal Interim Progress Report Jim Beever October 25, 2017 The Southwest Florida Regional Planning Council (SWFRPC) is assisting the City of Bonita Springs in developing a City of Bonita Springs Flooding

More information

Virginia Department of Transportation Pollutant Discharge Elimination System

Virginia Department of Transportation Pollutant Discharge Elimination System Virginia Department of Transportation Pollutant Discharge Elimination System General Permit for Stormwater Discharges from Small Municipal Separate Storm Sewer Systems Serving the Urbanized Areas of Virginia

More information

Public Utilities - Sewer

Public Utilities - Sewer County of Henrico, Virginia Capital Improvement Program FY 2017-18 through FY 2021-22 Fund 51 Enterprise Fund - W&S Request Request Request Request Request Project/Work Phase Priority FY 17-18 FY18-19

More information

DALLAS FLOODWAY PROJECT

DALLAS FLOODWAY PROJECT DALLAS FLOODWAY PROJECT DRAFT FEASIBILITY REPORT and DRAFT ENVIRONMENTAL IMPACT STATEMENT PUBLIC MEETING Rob Newman Director, Trinity River Corridor Project, Fort Worth District 8 May 2014 US Army Corps

More information

Stormwater Improvement for St. Armands Key

Stormwater Improvement for St. Armands Key Stormwater Improvement for St. Armands Key Michael A. Hanson, P.E. Senior Engineer Boyle Engineering Corporation 5971 Cattleridge Boulevard, Suite 200 Sarasota, Florida 34232 Rajaraman Jayakrishnan, Ph.D.

More information

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 21-17 June 27, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

KRISTOPHER J. KRZYSTON, CEI, CEM

KRISTOPHER J. KRZYSTON, CEI, CEM PERMITTING IN NEW JERSEY KRISTOPHER J. KRZYSTON, CEI, CEM Kristopher J. Krzyston Rutgers graduate 1994 B.S. Environmental Planning Certificate in G.I.S. Assistant Division Manager Environmental Science

More information

ALMY POND TMDL MANAGEMENT PLAN

ALMY POND TMDL MANAGEMENT PLAN ALMY POND TMDL MANAGEMENT PLAN PUBLIC WORKSHOP Presented by: City of Newport Department of Utilities And Pare Corporation May 7, 2014 Presentation Overview Introduction to Almy Pond Project Introduction

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Ohio Water Environment Association 2016 Technical Conference & Expo June 29, 2016 Objective To create a Stormwater

More information

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE I Bob STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE Permit Years 1through 5 (June 1, 2013 to June 1, 2018) Submitted to Maine DEP December 2013 Revised April 2014 Table of Contents

More information

SECTION 6: MITIGATION STRATEGIES

SECTION 6: MITIGATION STRATEGIES SECTION 6: MITIGATION STRATEGIES This section presents mitigation actions for Onondaga County to reduce potential exposure and losses identified as concerns in the Risk Assessment portion of this plan.

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE

More information

ENGINEERING REPORT ANALYSIS OF CLOSURES. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1. ANSONIA and DERBY, CONNECTICUT

ENGINEERING REPORT ANALYSIS OF CLOSURES. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1. ANSONIA and DERBY, CONNECTICUT ENGINEERING REPORT ANALYSIS OF CLOSURES HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 ANSONIA and DERBY, CONNECTICUT December 2010 MMI #1560-119 and #3118-03 Prepared for: City

More information

Wakefield Lake TMDL Public Meeting 3/17/2014. Jen Koehler, PE Barr Engineering

Wakefield Lake TMDL Public Meeting 3/17/2014. Jen Koehler, PE Barr Engineering Wakefield Lake TMDL Public Meeting 3/17/2014 Jen Koehler, PE Barr Engineering Outline Project Contacts Introduction to Wakefield Lake Thoughts/Questions/Concerns About TMDL Studies Lake Water Quality and

More information

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Synergy: Addressing Combined Sewer Overflows and Nitrogen District of Columbia Water and Sewer Authority Briefing on Synergy: Addressing Combined Sewer Overflows and Nitrogen to Anacostia Steering Committee August 27, 2009 1 Introduction Background Addressing

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Conditions of Section 401 Certification for Nationwide Permits and General Conditions. General Condition 12 (Soil Erosion and Sediment Controls)

Conditions of Section 401 Certification for Nationwide Permits and General Conditions. General Condition 12 (Soil Erosion and Sediment Controls) Conditions of Section 401 Certification for Nationwide Permits and General Conditions General Condition 12 (Soil Erosion and Sediment Controls) Erosion control and sediment control BMPs described in Attachment

More information

Watershed master planning, City of Griffin, Georgia, USA

Watershed master planning, City of Griffin, Georgia, USA Water Resources Management VII 3 Watershed master planning, City of Griffin, Georgia, USA J. K. Kaplan & B. J. Watson Tetra Tech, Water Resources Group, Atlanta, Georgia, USA Abstract Tetra Tech has assisted

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

REQUEST FOR CONSTRUCTION BIDS May 23, 2017 REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge

More information

Richard V. Busche, P.E., CFM

Richard V. Busche, P.E., CFM Florida Stormwater Association EXCELLENCE AWARDS STORMWATER PROGRAMS & PROJECTS 2015 NOMINATION FORM I. Nomination Information Nomination Category (please check only one box): Program (Department/Division)

More information

Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan

Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan CITY OF VIRGINIA BEACH Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan FINAL APRIL 5, 2018 osemont Road Extent London Bridge Creek Windsor Woods Canal

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION SBSA PROJECT TITLE: KRSM095002, wo54127 Construct Clubhouse near Bldg 720; KRSM150043, wo54127 Replace Piping Utilities near Bldg 720, KRSM130012, wo54127 Demo Golf Clubhouse Bldg 720. General: DATE: 31

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2015-04077-MVM Applicant: Preferred Properties and Management, LLC Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail:

More information

ISO-9001:Quality Management System Progress Report

ISO-9001:Quality Management System Progress Report ISO-9001:Quality Management System Progress Report Department of Street Services May 2, 2007 Purpose Provide an overview of the Department of Street Services Provide background of ISO 9001 certification

More information

Bijou Area Erosion Control Project

Bijou Area Erosion Control Project Join the City of South Lake Tahoe for a Ribbon Cutting Ceremony for the Bijou Area Erosion Control Project Thursday, October 30th at 3:30pm Ceremony will be held at the cul-de-sac at the end of Bal Bijou

More information

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531

More information

SFPUC Flooding Workshop Tuesday, February 9, 2016

SFPUC Flooding Workshop Tuesday, February 9, 2016 Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year

More information

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit) CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Central Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the

More information

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis San Antonio Water System enhancement. This recommendation was based on limited water quality data provided by SAWS and using a free-water surface constructed wetland with approximately 112 acres of wetted

More information

Greenfield Pond B Rehabilitation

Greenfield Pond B Rehabilitation Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

BOROUGH OF HIGHLANDS STRATEGIC RECOVERY PLANNING REPORT. September 2014

BOROUGH OF HIGHLANDS STRATEGIC RECOVERY PLANNING REPORT. September 2014 BOROUGH OF HIGHLANDS September 2014 Why do a Strategic Recovery Planning Report? (SRPR) To access state $$ for plans/ordinance re-writing To assist in decision-making To educate about risks & vulnerability

More information

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]] Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended

More information

TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY #

TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY # TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY # 375353 Since the last application for continued participation in the Community Rating System

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

AGRICULTURAL DRAINAGE

AGRICULTURAL DRAINAGE AGRICULTURAL DRAINAGE ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING True Expertise + Sustainable Solutions Facing the Challenges Together With over 40 years of experience, ISG is focused on improving

More information

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MaryLynn Lodor MSD of Greater Cincinnati Sharon Jean-Baptiste CH2M HILL April 4, 2013 Overview MSD s Environmental

More information

City of Virginia Beach Urban Tree Canopy Implementation Plan. Susan French, City Arborist Barbara Duke, Senior Planner

City of Virginia Beach Urban Tree Canopy Implementation Plan. Susan French, City Arborist Barbara Duke, Senior Planner City of Virginia Beach Urban Tree Canopy Implementation Plan Susan French, City Arborist Barbara Duke, Senior Planner Urban Tree Canopy Implementation Plan Motivation In 2012: PAR began active development

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

ACTION PLAN FOR RETROFITTING STRUCTURAL BEST MANAGEMENT PRACTICES Storm Water Management Plan

ACTION PLAN FOR RETROFITTING STRUCTURAL BEST MANAGEMENT PRACTICES Storm Water Management Plan ACTION PLAN FOR RETROFITTING STRUCTURAL BEST MANAGEMENT PRACTICES Storm Water Management Plan Marine Corps Base Hawaii NPDES Permit No. HI 000007 Prepared by: Marine Corps Base Hawaii August 2015 Table

More information

Coastal Restoration and Protection Projects - SLFPA-East and Vicinity

Coastal Restoration and Protection Projects - SLFPA-East and Vicinity Coastal Restoration and Protection Projects - SLFPA-East and Vicinity committed to our coast committed to our coast 2012 Master Plan Project Details 2012 Master Plan Projects in SLFPA-East Projects in

More information

Model Results Operation and Maintenance (O& M) Results Cost-Benefit Analysis Results Conclusions

Model Results Operation and Maintenance (O& M) Results Cost-Benefit Analysis Results Conclusions BMP Performance and Outline Background Model Results Operation and Maintenance (O& M) Results Results Conclusions Melissa Baker, Water Resource Technician Capitol Region Watershed District, St. Paul, MN