CITY OF SAFETY HARBOR ENGINEERING

Size: px
Start display at page:

Download "CITY OF SAFETY HARBOR ENGINEERING"

Transcription

1 CITY OF SAFETY HARBOR ENGINEERING

2 The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys, drainage problem solutions, environmental monitoring, and processing of Right-of-Way permits. The Engineering Department also manages the Capital Improvement Program, which includes the identification, prioritization, scheduling, budgeting, contract administration and construction inspection of capital construction projects when permitting and design preparation are performed by consultants, and includes the permitting and design preparation when the project is performed totally in-house. CAPITAL PROJECTS ACTIVE DURING th Avenue South - Brick Street Reconstruction: The project scope included construction of new water and sewer facilities, underdrain system, removal and reinstallation of granite curb and replacement of brick. The original design also included sidewalk on the west side of 11th Avenue South, however that portion of the project was eliminated due to the excessive steepening of driveways that would have resulted. Construction began on June 19, 2006 and the road was re-opened December 4th. In the interest of efficiency and expediency, two additional projects were added as change orders. Both were located at Safety Harbor City Park. The first was to accomplish the site work for the boundless playground and was added in October The Construction Phase 11th Avenue South boundless playground will offer amenities for all ages and abilities, and is the first of its kind to be installed in Pinellas County. The second, for installation of a basketball court and picnic shelter, was added in December Both projects are on schedule and are to be completed in April of Area-Wide Sewer, Water, and Sidewalk Improvements: The project included: Boundless Playground at Safety Harbor City Park Replacement of sanitary sewer serving Avon Drive Installation of sidewalk at Fairview Street Installation of water line at Fairview Street, Philippe Dr. & N. Bayshore Dr. Completed Project 11th Avenue South Construction began in August 2006 and was scheduled for completion in March 2007; however, the project was completed ahead of schedule and was placed in service in December 2006.

3 State Road 590 South - McMullen-Booth Road to Main Street: The Florida Department of Transportation (FDOT) is planning reconstruction of State Road 590 from McMullen-Booth to Main Street consisting of drainage improvements and resurfacing of roadway. The City has water and sewer lines in the road right-of-way that are in conflict with the proposed improvements and must be relocated to avoid all conflicts. SR 590, West toward McMullen-Booth Rd The strategy agreed upon by the city and state is for the city to include the drainage work for the state in the city s plans for the utility relocations and thereby accomplish all underground construction together. The drainage work accomplished by the city s contractor will be at the state s expense. After all underground work is completed the state s contractor will move in and accomplish the asphalt paving for the state. The construction plans have been completed and the city s target construction completion date is June State Road 590 North - Enterprise Road to State Road 580: SR 590 North toward SR 580 The Florida Department of Transportation (FDOT) is planning reconstruction of State Road 590 from Enterprise Road to State Road 580. The City has water and sewer lines that are in conflict with the proposed improvements and must be relocated to avoid all conflicts. Unlike the preceding 590 South project, The FDOT contractor will accomplish all of the work and the city will reimburse the state for the cost of the city s utility relocations. The project is to be let in July of Gabion walls being constructed along Bishop Creek in Harbor Woods Village Bayfront Manor Lift Station Replacement: The project includes replacement of an existing lift station adjacent to Shore Drive. The project design is complete and is being reviewed. This project is anticipated to be advertised in the spring of 2007 and completed in the Summer of Erosion Control Measures Bishop Creek at Harbor Woods: The project will provide erosion control via rock-filled wire baskets along a 300-foot section of Bishop Creek, from the termination point of a previous project downstream to North City Park. The work began late in October and is scheduled for completion in June The project is partially funded through grants from the Florida Department of Environmental Protection and the Southwest Florida Water Management District/Pinellas-Anclote River Basin Board.

4 Traffic Analysis and Implementation (Traffic Calming): Pavement markings are one example of traffic calming measures This process provides for the installation of traffic calming devices approved per the traffic calming procedures established as official city policy. During 2006, traffic calming devices (speed tables) were placed at the following locations: Seventh Avenue South - 2nd Street to 7th Street Woodcrest Avenue - Marshall Street to Bramblewood Street Swan Lane - North Bay Hills Blvd. to Egret Terrace Egret Terrace - North Bay Hills Blvd. to Turnstone Drive North Bay Hills Blvd. - Swan Lane to SR 590 Also reversed stop signs at three locations and installed new stop signs at two locations. Downtown Traffic Study: A study of downtown traffic including recommendations and implementation strategies was completed in December of A public information meeting and presentation informing the public of the results of the study related to possible traffic improvements was held on August 16, Public comments from that meeting were presented to the city commission at a workshop on November 28. The creation of a gateway feature at the bridge over Mullet Creek at Philippe Parkway was factored into the downtown mobility study by the city commission as a possible element of that program. City staff has developed an implementation plan whereby the generally-accepted features of the study alternatives and improvements at the Mullet Creek bridge will constitute the initial phase with a gradual movement into the more dramatic features in subsequent phases. Stormwater Master Plan: An update of the City of Safety Harbor s Stormwater Master Plan providing for identification of needed projects and programs for stormwater improvements throughout the city was completed in The study was a joint effort between the city and the Southwest Florida Water Management District (SWFWMD). The study will serve as a basis for identifying needed future projects related to stormwater management. Marina Deck Replacement: This project consists of construction to replace decking, piles and stringers in the boat basin area of the city marina property. Work began in Marina Docks before November 2006 and is due to be completed in February This project is partially funded through a grant from the Florida Fish and Wildlife Conservation Commission/Florida Boating Improvement Program. Marina Docks after

5 Erosion Control Measures Bishop Creek at Rainbow Farms Phase I: An erosion control project from Rainbow Farms Drive downstream to the Bishop Creek Mitigation pond and incorporating bank stabilization methods to be accomplished in two phases. Phase I is the downstream section, which is anticipated to begin in the summer of 2007 and be substantially complete in the winter of Phase II runs from Rainbow Farms Drive downstream to the Phase I project. Phase II design is to begin in the summer of 2007 and be complete in the fall of Library Addition: The project includes the construction of a 9,000 square foot addition to the library, the renovation of the 15,000 square feet existing facility, the construction of a new covered entryway and site work, landscaping and parking. New furniture and equipment are included in the project budget. The design phase is complete. A Construction Manager At-Risk has been selected. Construction is anticipated to start in the spring of 2007 with completion early in Traffic Light at McMullen-Booth Road & Briar Creek Boulevard: Safety Harbor Library Building The contract for construction was awarded in August 2006; however, the contractor could not procure the mast arms and signals until January Work started February 1st upon delivery of materials. Substantial completion is scheduled for March Bridge Maintenance and Repair: The project consists of repair work at the following bridges: North Bayshore Drive over Mullet Creek South Bayshore Drive over Alligator Lake Spillway Philippe Parkway over Mullet Creek 9th Avenue North over Mullet Creek Bids were received in amounts considerably higher than the engineer s estimate and were rejected by the City Commission in October The project will be re-scoped, re-designed and advertised in Remodel and Expand Fire Station 53: The station will receive a 1,050 square foot addition and the renovation of the existing facility. A design-build contract was awarded at the January 2, 2007 city commission meeting and work is underway with completion scheduled for August Fire Station 53, McMullen-Booth Road

6 SITE PLAN REVIEWS 3rd Avenue Townhomes Alliance Office Center Bay-to-Bay Properties (2nd Avenue South Development) Five lot development at Philippe Parkway & Irwin Street Harbor Key Townhomes Intercit Buildings R and Z Main Street Car Wash Meerco Parkview at Safety Harbor CONSTRUCTION MONITORING 7th Street Pond 3rd Avenue Townhomes Alliance Office Center Bay-to-Bay Properties (2nd Avenue South Development) Channelside at Safety Harbor Harbor Del Mar Harbour Pointe Walgreens ENVIRONMENTAL MONITORING Stormwater Pond Environmental Maintenance & Monitoring Maintenance and/or monitoring events were performed for the Bishop Creek Attenuation Pond, Mullet Creek Channel D (SWIM) Pond and the 7th Street Pond per Southwest Florida Water Management District (SWFWMD) permit requirements. Stormwater Systems Operations & Maintenance Inspections Operation and maintenance inspections were performed for the Public Works Facility Paving in compliance with permitting agency requirements: PERMITS AND INSPECTIONS Right of Way/Easement Use Permits Issued: 70 Excavation & Fill Permits Issued: 5 Driveway Inspections Performed: 25

7 SUMMARY SHEET The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys, drainage problem solutions, environmental monitoring, and processing of Right-of-Way permits. The Engineering Department also manages the Capital Improvement Program, which includes the identification, prioritization, scheduling, budgeting, contract administration and construction inspection of capital construction projects when permitting and design preparation are performed by consultants, and includes the permitting and design preparation when the project is performed totally in-house. 5.5 Full-time Equivalent Employees Assist Public with Right-of-Way or Easement information Assist Contractors with technical questions regarding projects within the city relating to Engineering issues such as drainage, water and sewer. Capital Projects Design, Permitting and Administration Capital Projects Grant Administration Projects using In-House Design Services Administration of Traffic Calming Program Site Plan Review Services Construction Plan Review & Approvals Construction Inspection Services for Capital Projects and commercial and residential developments within the city. Right-of-Way/Easement Use Permitting Excavation & Fill Permitting Technical assistance to Code Enforcement Officer Fiscal Year 2006/07 Total Operating Budget: $397,294 Key Staff William C. Baker, P.E. City Engineer/Capital Projects Manager Virginia Stewart Administrative Secretary Deborah Todd Drees Civil Designer Mark Crellin Engineering Assistant Carl Davis Drafting/Design Technician Moe Battle Construction Inspector Barry Hill GIS Coordinator

Community Development Department

Community Development Department City of Safety Harbor Community Development Department TO: CHAIRMAN AND MEMBERS, PLANNING AND ZONING BOARD FROM: MATT McLACHLAN, AICP, COMMUNITY DEVELOPMENT DIRECTOR DATE: MARCH 3, 2011 RE: ANNUAL UPDATE

More information

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost

More information

TRANSPORTATION. Governmental Projects

TRANSPORTATION. Governmental Projects TRANSPORTATION Governmental Projects Function: Activity: Category: Transportation Road & Street Facilities Arterial Roads Project No: 1618 Title: 118th Avenue Expressway Cost Center: 841418 Department:

More information

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT FY 15-20 CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT Department of Public Works Robert B. Boxer, Director PROJECT MODEL PROFESSIONAL SERVICES STUDIES FEASIBILITY CLAIMS 1- PROJECT DEFINITION 2-

More information

HURON RIVER BOAT RAMP & PARKING LOT

HURON RIVER BOAT RAMP & PARKING LOT 2010 National Award as Best Large Boating Access Facility States Organization for Boating Access (SOBA) 2010 Quality Asphalt Paving Awards Flexible Pavements of Ohio AWARD WINNING PROJECT Location Huron,

More information

PUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE

PUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE PUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE TJERNE PLACE CHAIN LAKE ROAD TO WOODS CREEK ROAD This project involves extending Tjerne Place from Chain Lake Road to Woods Creek

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

ENGINEERING DEPARTMENT

ENGINEERING DEPARTMENT ENGINEERING DEPARTMENT Additional information about the Engineering Department may be obtained by calling Tim Bailey, P.E., Director of Engineering, at (919) 469-4030, through email at tim.bailey@townofcary.org

More information

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University. 13. 6C-21.208 CONSERVATION ELEMENT Information Sources George F. Young, Interview notes, June 2002 Sasaki Associates, Inc., interview notes, April, 2000 Interviews between DRMP Staff and USF Staff, May,

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/ CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA 34695 PHONE: 727/724-1555 FAX: 727/724-1566 RIGHT-OF-WAY / EASEMENT USE PERMIT DATE SUBMITTED: EXPIRATION DATE: Submit the following to the

More information

ENGINEERING DEPARTMENT

ENGINEERING DEPARTMENT ENGINEERING DEPARTMENT ADMINISTRATION Engineering Services/ Traffic and Transportation Engineering Services/ Stormwater Engineering Services/ Utilities Engineering Technical Services Engineering Field

More information

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017 Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue

More information

Capital Improvement Plan (CIP) Adopted Oct. 17, 2016

Capital Improvement Plan (CIP) Adopted Oct. 17, 2016 2017-2021 Capital Improvement Plan (CIP) Adopted Oct. 17, 2016 Fiscal Year 2017 Adopted Capital Improvement Plan Table of Contents Page Description CIP Project Category Start Timeline N/A 1 Introduction

More information

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

TAMPA BAY NEXT MAJOR PROJECTS UPDATE TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

ENGINEERING UPDATE MAY 16, 2016

ENGINEERING UPDATE MAY 16, 2016 ENGINEERING UPDATE MAY 16, 2016 CRAN BE RRY TO WNSHI P, PENNSYL V ANI A Jason Kratsas, P.E., Director of Engineering 724-776-4806 x 1148 PROJECT: GRANTS, PERMITS & REPORTS Timeline: June through September

More information

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL Construction Engineering and Inspection Services to Silver Shores Boulevard Broward County, FL R L I N O. R 2 11 4 0 8 0 P 1 I. Experience and Qualifications with Roadway Construction a. Eisman & Russo

More information

CONSULTANT OF THE YEAR

CONSULTANT OF THE YEAR CONSULTANT OF THE YEAR 1 P a g e HISTORY Stone Engineering Group, in business since 1989, is an outgrowth of the firm, H.C. Stone, founded in 1973. Stone Engineering Group began in 1989 as Stone Joca

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 21, 2007 DATE: April 20, 2007 SUBJECT: Approve the Award of a Contract to Sagres Construction Corp. for the construction of Phase I

More information

ENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner.

ENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner. ENGINEERING DEPARTMENT MISSION STATEMENT: Provide engineering and public improvements in the most economical manner. The Engineering Department performs the following services to maintain and improve the

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Capital Improvement Summary by Fund

Capital Improvement Summary by Fund Capital Improvement Summary by Fund Central Services Fund Desciption F Y 2017 F Y 2018 F Y 2019 F Y 2020 F Y 2021 Total 2017-2021 Cost Revenues: Pay as you Go 1,000,000 1,000,000 Vehicle Leases - 1,250,000

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

study for 2018 include:

study for 2018 include: MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION

More information

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION OCTOBER 7, 2016 1 INTRODUCTION Rubonia Neighborhood (Rubonia) is located in northern

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

Engineering Status Report

Engineering Status Report Prepared By: Derek Kiss, E.I. and Dustin P. Doherty, P.E. Date: VILLAGE PROJECTS ODNR Dam Failure Emergency Action Plan (EAP) The Village is under official notice by the ODNR to develop an emergency action

More information

City of Jacksonville Development Guide Building Permits

City of Jacksonville Development Guide Building Permits City of Jacksonville TX City of Jacksonville Development Guide Building Permits A publication to help understand the Building Permit process in the City Jacksonville. Building Department 2011 J Revised

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE 4567 Route 9 North, 2 nd Floor Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 414-3243 Howell, NJ 07731-0580 Web: www.twp.howell.nj.us

More information

ENGINEERING DEPARTMENT UPDATE

ENGINEERING DEPARTMENT UPDATE To: Date: Public Works Committee Safety & Public Properties Committee Month ending July 31, 2018 RESIDENTIAL & COMMERCIAL REVIEWS AND PERMITTING A. Summary of Permits Type July Submitted 2018 YTD Submitted

More information

The Beckett s Run Experience. Fort Wayne, Indiana

The Beckett s Run Experience. Fort Wayne, Indiana The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

Current Construction Projects in Progress. Thru January 31, 2016

Current Construction Projects in Progress. Thru January 31, 2016 Current Construction Projects in Progress Thru January 31, 2016 Orange Ave Pump Station Improvements Before After Project consist of the removal of the existing pumps, housing and piping. Remove and replace

More information

Stantec LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS

Stantec LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS Stantec Prepared for: Lakewood Ranch Stewardship District 14400 Covenant

More information

Public Works designs, manages and builds more than $4 billion in construction projects across San Francisco. DOING BID ON OUR PROJECTS. JOIN THE CITY TEAM. BUSINESSwith BUILDINGS PLAYGROUNDS STREET RESURFACING

More information

BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure

BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure BROWARD COUNTY Solicitation Bid #V2114585P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure YOUR CEI SOLUTION YOUR PARTNERS Cory Nichols, P.E Quality Assurance Quality Control

More information

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINISTRATOR MARCH 27, 2018

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINISTRATOR MARCH 27, 2018 QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINISTRATOR MARCH 27, 2018 Aragona Drainage Improvements D A S H B O A R D Ashville Park Drainage Improvements

More information

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

Request for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018

Request for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018 Request for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018 The City of Glendale, Wisconsin is requesting engineering proposals from qualified consultants for the design

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

Stormwater Control and Treatment

Stormwater Control and Treatment Stormwater Control and Treatment EXISTING CONDITIONS The topography of Pinellas County is mostly flat to gently sloping, characterized by sandy soils and high groundwater levels. Elevations range from

More information

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

HILLS CITY OF BEVERLY HILLS BEVERLY PUBLIC WORKS DEPARTMENT MEMORANDUM. Public Works Commission TO: FROM: Rob Welch, Acting City Engineer

HILLS CITY OF BEVERLY HILLS BEVERLY PUBLIC WORKS DEPARTMENT MEMORANDUM. Public Works Commission TO: FROM: Rob Welch, Acting City Engineer April 18, 2018 MEMORANDUM PUBLIC WORKS DEPARTMENT HILLS BEVERLY CITY OF BEVERLY HILLS Public Works Commission Rob Welch, Acting City Engineer Capital Projects Update Capital Improvement Projects Update

More information

Memorandum. Corey Mathisen, MPCA

Memorandum. Corey Mathisen, MPCA Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: CC: From: Corey Mathisen, MPCA Diane Hankee, WSB

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-17 Effective: May 5, 2015 Subject: Encroachment Permits References: S.C. Code of Laws, Sections 57-3-110, 57-5-1080,

More information

Site Development Permit Application Procedures and Guidelines

Site Development Permit Application Procedures and Guidelines Site Development Permit Application Procedures and Guidelines This handout is to help provide guidelines and answer basic questions regarding the Village s Site Development Permit Application procedure.

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS 1. TITLE AND LOCATION (City and State) Professional Services as Governed by Florida Statute 287.055 A. CONTRACT INFORMATION

More information

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINISTRATOR JUNE 26, 2018

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINISTRATOR JUNE 26, 2018 QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINISTRATOR JUNE 26, 2018 Aragona Drainage Improvements D A S H B O A R D Central Resort District Drainage

More information

STAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program

STAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program STAFF REPORT DATE: November 14, 2017 TO: Bryan Montgomery, City Manager Approved and Forwarded to the City Council FROM: SUBJECT: Kevin Rohani, P.E. Public Works Director/City Engineer FY 2017/18 First

More information

CIP-01: Stream Channel Stabilization, Silver Creek

CIP-01: Stream Channel Stabilization, Silver Creek CIP-01 CIP-01: Stream Channel Stabilization, Silver Creek HIGHEST PRIORITY This project consists of stream channel stabilization to address channel incision and the replacement of two cross-culverts. Preferred

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary

More information

PUBLIC WORKS. Public Works

PUBLIC WORKS. Public Works PUBLIC WORKS Department includes CIP and Production, Operations, Transportation, and Finance divisions Overall, 66 positions eliminated in FY2010 Details on the two largest divisions follow; representative

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information

INDIVIDUAL PROJECT ORDER NUMBER 2 January 5, 2010

INDIVIDUAL PROJECT ORDER NUMBER 2 January 5, 2010 INDIVIDUAL PROJECT ORDER NUMBER 2 January 5, 2010 Describing a specific agreement between Kimley-Horn and Associates, Inc. ( KHA or the Consultant ), and The Village Center Community Development District

More information

Highway 15 Project Hutchinson, MN

Highway 15 Project Hutchinson, MN Highway 15 Project Hutchinson, MN Adjacent Properties and Businesses Meeting Hutchinson Area Chamber of Commerce 1 Agenda Topic 1) Introduce the project scope 2) Project goals and benefits 3) Project timeline

More information

PUBLIC FACILITIES REPORT

PUBLIC FACILITIES REPORT PUBLIC FACILITIES REPORT For the: RIVERS EDGE COMMUNITY DEVELOPMENT DISTRICT ST. JOHNS COUNTY, FLORIDA July 18, 2018 Prepared by: PROSSER, INC. Project No. 113094.60 1 July 18, 2018 Board of Supervisors

More information

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS For general information concerning submittal requirements, please refer to Village Code 7-9-4 (c.).

More information

Indigo Community Development District. Public Facilities Report

Indigo Community Development District. Public Facilities Report Indigo Community Development District Table of Contents Purpose and Scope...1 General Information...1 Existing Public Facilities...1 Proposed 7 Year Expansion Plan...2 Replacement of Facilities...2 Figure

More information

Permeable Pavement Fact Sheet

Permeable Pavement Fact Sheet DEPARTMENT OF THE ENVIRONMENT Rushern L. Baker, III County Executive Permeable Pavement Fact Sheet What is permeable pavement? When rainwater falls on conventional pavement, such as concrete, it accumulates

More information

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and

More information

Public Works Master Project List for July 2012

Public Works Master Project List for July 2012 Project Public Works Master Project List for July 2012 Description Comp. Plan Goal Original Est. Completion Date Current Est. Completion Date Latest Update 2012 Gulf Blvd. Street Paving Project 2011-2012

More information

PUTNAM COUNTY Public Works Department Projects For Additional Information Call Public Works at PH ROADWAY IMPROVEMENT PROJECTS

PUTNAM COUNTY Public Works Department Projects For Additional Information Call Public Works at PH ROADWAY IMPROVEMENT PROJECTS ROADWAY IMPROVEMENT PROJECTS CR 216 From SR 100 to US 17, FDOT CIGP project. Pomona Park SCOP Roads Moody Rd/St. Johns Re- Alignmnet Feagle Ave (Resurface), Keown (Resurface), Lake Street (Resurface),

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO. 2017-031 WELCOME PUBLIC MEETING NO. 2 February 21, 2018 CITY OF ANN ARBOR RIVERVIEW DRIVE SANITARY SEWER AND WATER

More information

LAKE + FOREST CONSTRUCTION TIMELINE

LAKE + FOREST CONSTRUCTION TIMELINE LAKE + FOREST CONSTRUCTION TIMELINE Below is a construction timeline in connection with the project at Lake Street and Forest Avenue. All dates are approximate and subject to change based on weather and

More information

Quarterly Transportation Report

Quarterly Transportation Report Prince William County Government Quarterly Transportation Report 2 nd Quarter 2011 Transportation Headlines Contracts Awarded University Blvd. PPTA (Design-Build) Awarded on February 1, 2011 Awarded to

More information

STORMWATER UTILITY ANNUAL REPORT

STORMWATER UTILITY ANNUAL REPORT CITY OF ARVADA 2002 STORMWATER UTILITY ANNUAL REPORT Produced by the City of Arvada Public Works Department March 2003 CALENDAR YEAR 2002 CITY OF ARVADA S STORMWATER UTILITY ANNUAL REPORT As of 2002, the

More information

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINSTRATOR MARCH 26, 2019

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINSTRATOR MARCH 26, 2019 QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. STORMWATER ENGINEERING CENTER ADMINSTRATOR MARCH 26, 2019 D a s h b o a r d Aragona Drainage Improvements, 7-400 Ashville Park Drainage

More information

Stevenson Creek Watershed Plan and Project Implementation

Stevenson Creek Watershed Plan and Project Implementation Stevenson Creek Watershed Plan and Project Implementation 1999-2007 Stevenson Creek Watershed Management Plan (WMP) Project Site The Watershed Management Plan was completed in 2001 with cooperative funding

More information

ENGINEERING MEMORANDUM

ENGINEERING MEMORANDUM ENGINEERING MEMORANDUM March 12, 2018 TO: FROM: City Council Mike Payne, City Engineer SUBJECT: Consideration and action to award contracts for Bid Schedule B - 2018: C2018-1 Monterey Area Removal and

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.

EXHIBIT A County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640. EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.00 SECTION I PURPOSE This document describes the scope of work and the

More information

Public Works Department Five Year Capital Improvement Plan FY PROPOSED

Public Works Department Five Year Capital Improvement Plan FY PROPOSED Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted

More information

Quarterly Transportation Report 1 st Quarter 2015 March 10, Thomas Blaser Director Department of Transportation

Quarterly Transportation Report 1 st Quarter 2015 March 10, Thomas Blaser Director Department of Transportation Quarterly Transportation Report 1 st Quarter 2015 March 10, 2015 Thomas Blaser Director Department of Transportation Burwell Rd./Fitzwater Dr. Improvements Brentsville Magisterial District Out of five

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

Application for Public Right-of-Way Excavation Permit Form #PWE002 (rev. 03/18)

Application for Public Right-of-Way Excavation Permit Form #PWE002 (rev. 03/18) FOR OFFICE USE ONLY Application for Public Right-of-Way Excavation Permit Form #PWE002 (rev. 03/18) Permit Number: Permit Exp: Started w/o permit: Y / N Total Permit Fee: $ If road closure requested, notify:

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

VDOT UPDATE Hampton Roads Local Damage Prevention Committee - VA811 Membership Meeting

VDOT UPDATE Hampton Roads Local Damage Prevention Committee - VA811 Membership Meeting VDOT UPDATE Hampton Roads Local Damage Prevention Committee - VA811 Membership Meeting April 22, 2015 Michael T. Wilder Southeast Regional Utilities Manager VDOT Mission Statement Our mission is to plan,

More information

CHAPTER 8 TRANSPORTATION ELEMENT

CHAPTER 8 TRANSPORTATION ELEMENT CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized

More information

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. DATE ADDRESS OF INSTALLATION OWNER ADDRESS CITY STATE ZIP CODE NATURE OF WORK: (check

More information

The Year Ahead: ARLINGTON COUNTY, VIRGINIA

The Year Ahead: ARLINGTON COUNTY, VIRGINIA The Year Ahead: ARLINGTON COUNTY, VIRGINIA Locality Information Upcoming A&E Contracts- Multimodal Annual Services On-Call Contract Renewal: Planning Complete Streets Engineering and Design Bicycle and

More information

Supersizing of Wake County s Solid Waste Convenience Centers

Supersizing of Wake County s Solid Waste Convenience Centers Supersizing of Wake County s Solid Waste Convenience Centers Roy Baldwin Wake County Solid Waste Management Jeffrey Murray, PE, BCEE HDR NC SWANA Spring 2016 Technical Conference Greensboro, North Carolina

More information

LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT

LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT 2017 LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT 1 Low Impact Development Interim Guidance City of Barrie 1 Introduction This document was prepared to provide interim design guidance and the requirements

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Prepared By: 3800 Via Del Rey Bonita Springs, FL 34134 July 2015 Table of Contents Name Section Bid Schedule Project Description

More information

APPLICATION FOR A SITE CONSTRUCTION PERMIT

APPLICATION FOR A SITE CONSTRUCTION PERMIT CITY OF KLAMATH FALLS PUBLIC WORKS ENGINEERING 226 S. 5 th St., Klamath Falls, OR 97601 Phone (541) 883-5368 Fax (541) 883-5287 APPLICATION FOR A SITE CONSTRUCTION PERMIT For City Use Only: APPLICATION

More information

Shadow Lake Woods HOA

Shadow Lake Woods HOA A Regional Transportation Solution Shadow Lake Woods HOA November 22, 2016 WEKIVA PARKWAY Project Description $1.6 Billion Completion of Central Florida s Beltway 25-mile Toll Road Non-Toll Road Improvements:

More information

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE EDGE OF PAVEMENT EXIST SIDEWALK PROPOSED SIDEWALK PROPOSED SIDEWALK EXIST PIPE DBI SD 12 FT 12 FT LANDSCAPING LANDSCAPING EXIST DITCH TO BE REMOVED EXISTING PLAN (RIGHT SIDE SHOWN, LEFT SIDE SIMILAR) PROPOSED

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA This report was prepared to present development information (Utility availability, Development Regulations, Flood Plain information,

More information

CITY OF SOUTH HAVEN NORTH SHORE DRIVE RECONSTRUCTION PROJECT PROGRESS MEETING AGENDA SRF # ACI Project No.: November 30, :30am

CITY OF SOUTH HAVEN NORTH SHORE DRIVE RECONSTRUCTION PROJECT PROGRESS MEETING AGENDA SRF # ACI Project No.: November 30, :30am CITY OF SOUTH HAVEN NORTH SHORE DRIVE RECONSTRUCTION PROJECT PROGRESS MEETING AGENDA SRF #5602-01 ACI Project No.: 14-0890 8:30am Attendees: Kyle Ellis Corey A. Kandow, PE Mike Schultz Bill Hunter Larry

More information

City of San Juan Capistrano PROJECT UPDATE ORTEGA HIGHWAY (SR-74) CITY- SEGMENT WIDENING PROJECT (CIP 14107) December 15, 2015 FOR THE

City of San Juan Capistrano PROJECT UPDATE ORTEGA HIGHWAY (SR-74) CITY- SEGMENT WIDENING PROJECT (CIP 14107) December 15, 2015 FOR THE City of San Juan Capistrano PROJECT UPDATE FOR THE ORTEGA HIGHWAY (SR-74) CITY- SEGMENT WIDENING PROJECT (CIP 14107) CITY COUNCIL MEETING 1 TONIGHT S RECOMMENDATIONS Receive and file a project update presentation.

More information

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overview of the Project Development Process Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overall Project Development Process The time it takes to produce a project varies significantly

More information