Crater Lake Hwy inch Water Transmission Main Improvements CIP Addendum No. 1

Size: px
Start display at page:

Download "Crater Lake Hwy inch Water Transmission Main Improvements CIP Addendum No. 1"

Transcription

1

2 Crater Lake Hwy inch Water Transmission Main Improvements CIP Addendum No. 1 Item No. Specification Location and Description of Change Volume I (Specs) Volume I (Specs) Volume I (Specs) Contractors Prequalification Form (Page 1 of 4), Item 2. Delete: Prequalification requirements of ODOT. Form of Bid (Page 4 of 5). Add: Fifth: Traffic Delays ODOT (c) - Stopping or holding vehicles beyond the limits specified will inconvenience the traveling public and will be a cost to the Agency. (1) Traffic Delays Beyond 20 Minutes - It is impractical to determine the actual damages the Agency will sustain in the event traffic is stopped or held longer than the 20 minute limit listed in Therefore, the Contractor shall pay to the Agency, not as a penalty, but as liquidated damages, $500 per 20 minutes, or for a portion of 20 minutes, per lane, including shoulders for stopping or holding traffic longer than 20 minutes. In addition to the liquidated damages, any added cost for traffic control measures, including flagging, required to stop or hold traffic beyond the 20 minute time limit, will be at no additional cost to the Agency. The required traffic control measures will be as determined by the Engineer. Assessment of liquidated damages will be issued in writing and stop when the Engineer determines that traffic is no longer stopped or held beyond the 20 minute limit. ODOT is the approving agency/engineer for all TCP s submitted and traffic control requirements within the Crater Lake Hwy 62 right-of-way. Penalties will begin at 7:01 am. Detailed Specifications Section 1 (Page 1 of 33), Night Work. Add: Night work is required on this project. ODOT official night work hours are from 7pm to 7am. The Contractor shall notify, coordinate with, and obtain approval from ODOT for night work at least two (2) weeks in advance of the work. The Contractor shall plan, coordinate, and conduct the work so as to complete the roadway surface restoration with HMAC of all trench excavation by the end of each shift. Payment for night work shall be considered incidental to the work. CRATER LAKE HIGHWAY 62 ADDENDUM No INCH WATER TRANSMISSION MAIN IMPROVEMENTS - CIP Page 2 of 8

3 Crater Lake Hwy inch Water Transmission Main Improvements CIP Addendum No Volume II (Construction Drawings) Attachment to this Addendum Plan Sheets 2 & 3. Add: Trench Detail Hwy 62 & Whittle Avenue Crossing. See also attachments to this addendum: (1) Trench Detail Hwy 62 & Whittle Ave Crossings, and (2) Whittle Avenue Crossing, and Hwy 62 Trench Crossing. Additional Information to Bidders. ODOT Response to Contractor Questions from Pre-bid meeting. Regardless of ODOT s Response in the included Questions #1 & #3. All work will be performed during the hours of 7 pm 7 am. Whittle Avenue crossing will be performed per Item 4 of Addendum #1. CRATER LAKE HIGHWAY 62 ADDENDUM No INCH WATER TRANSMISSION MAIN IMPROVEMENTS - CIP Page 3 of 8

4

5 Conc. Median: Contractor to bring "Class 'E' CLSM Slurry" up flush with existing AC, then contractor to backcut slurry in median footprint to a depth of 3". Contractor to then form and place concrete median to ODOT Standards. Hwy 62 Trench Crossing Sawcut and AC Replacement Width: 72" For Bidding Purposes: 1.) Per ODOT Hwy 62 has 12" of existing AC paving from curb to curb. For Bidding Purposes: 2.) Per ODOT the existing PCC slab is 27' wide, 8" deep with variable depth AC cover, up to 12". The existing PCC base slab is approximately 10' south of the existing centerline of Crater Lake Hwy 62 to 37' south of said centerline.

6 Whittle Avenue Trench Crossing Sawcut and AC Replacement Width: 72"

7 Rodney L Grehn From: Sent: To: Cc: Subject: DAW William S <William.S.DAW@odot.state.or.us> Monday, March 10, :49 AM 'Rodney L Grehn' ALLEMAND Roger B; Jeff Bernardo (JBernardo@obec.com) (JBernardo@obec.com); FLETCHER Timothy W RE: Hwy inch Water Line Project - Construction Questions Rodney Please see my comments below in Red. Shawn W. Shawn Daw ODOT Sr. Project Inspector (541) Cell (541) Office From: Rodney L Grehn [mailto:rodney.grehn@cityofmedford.org] Sent: Thursday, March 06, :03 PM To: DAW William S Subject: Hwy inch Water Line Project - Construction Questions Shawn, Good afternoon. We had our mandatory pre-bid meeting today for the installation of the proposed 14-inch water line along the south side of Hwy 62 near Hubbard s Hardware and Lava Lanes Bowling Alley. Below is a list of contractor questions that came up in this pre-bid meeting. I ve attached our plans (bid set) and our project schedule for your reference. Could you please review these questions, then give me a call so we can discuss them over the phone. Our bid opening is on March 25 th, and I d like to respond to these contractor questions as soon as possible, hopefully next Monday if possible. 1. Will the crossing work be required to be done at night? The Whittle Ave crossing can be accomplished during the day with flaggers and appropriate TCDs. The installation across Hwy 62 will not be allowed between the hours of 7am and 7pm (typical Hwy 62 lane restrictions). In both cases, as with all phases of construction, the Contractor should provide a comprehensive TCP (Traffic Control Plan) showing all TCDs and closures, including Flagging stations and lights for night work. 2. Will slurry be required in the trench backfill or crushed rock? Our experience with pipes under/crossing roadways has led ODOT to prefer Class E CLSM slurry backfill above the pipe compaction zone (See RD300 and RD302) vs. a ¾-0 aggregate fill. For those areas outside of the roadway, aggregate backfill is standard 1

8 practice. Please note that there is a rapid set CLSM commercially available to assist the Contractor in reducing the time of lane closures. 3. Will trench plates be allowed or will paving be required each day? Trench Plates would be allowed on the Whittle crossing but NOT on the Crater Lake Hwy crossing. Trench Plates are not allowed on State Highways that have pre-construction posted speeds greater than 35mph (see Std Specification Section , bullet number 14). Please note this restriction includes the Highway shoulders. 4. If paving is required, how does slurry backfill work? Hopefully the contractor will stage the work using a highearly material that sets within 1 hour. The Contractor will need to contractor their supplier for specific material performance guidelines to determine what length of pipe can be installed for each 12hour shift. 5. What is the thickness of a.c. paving replacement required? Please refer to Std Dwg RD Does ODOT have off-site easement ( construction easements) on the adjacent properties and will the contractor be allowed to use the easements? Proposed construction easements are not in place at this time. The Contractor will need to contact Roger Allemand to determine if any easements are valid prior to construction. 7. Will ODOT allow the southerly bike lane/shoulder/drop lane to be closed during construction (utilized for construction trucks) of the water main? Closing the shoulder/bike lane would require a comprehensive TCP showing the TCDs and would most likely only be allowed between the hours of 7pm and 7am. Note the Contractor would also be required to provide alternate routing for Pedestrians and Bicycle users, including devices and signing. Thanks, Rodney L. Grehn, P.E. Staff Engineer Medford Water Commission 200 S. Ivy St. Rm. 177 Medford, Oregon Direct: Fax: Rodney.Grehn@cityofmedford.org 2

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project 5180 SOQUEL DR. SOQUEL, CA 95073 PO Box 1550 CAPITOLA, CA 95010 TEL 831-475-8500 FAX 831-475-4291 BOARD OF DIRECTORS To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project Dr. THOMAS LAHUE

More information

CITY OF TACOMA Tacoma Rail

CITY OF TACOMA Tacoma Rail CITY OF TACOMA Tacoma Rail ADDENDUM NO. 2 DATE: May 11, 2015 REVISIONS TO: Request for Bids Specification No.: TR15-0215F SR-509 TRACK UPGRADES NOTICE TO ALL BIDDERS: This addendum is issued to clarify,

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Traffic Control permits, notifications, mobilization, temporary signs, barriers, lights, flagging personnel, striping, markings, and demobilization and removal. 1.2 RELATED

More information

CITY OF MADRAS RIGHT-OF-WAY CONSTRUCTION & USE PERMIT 125 SW E Street, Madras, OR Telephone (541) Fax (541)

CITY OF MADRAS RIGHT-OF-WAY CONSTRUCTION & USE PERMIT 125 SW E Street, Madras, OR Telephone (541) Fax (541) CITY OF MADRAS RIGHT-OF-WAY CONSTRUCTION & USE PERMIT 125 SW E Street, Madras, OR 97741 Telephone (541)475-2344 Fax (541)475-1038 Permit type (may include multiple types, please provide detail in the the

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE14-00XXX Applicant: Job Description:

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

C i t y o f G r o v e r B e a c h DEPARTMENT OF PUBLIC WORKS

C i t y o f G r o v e r B e a c h DEPARTMENT OF PUBLIC WORKS Contact: Greg Ray, Public Works Dir/City Engineer Telephone: (805) 473 4520 Date: April 20, 2017 ADDENDUM NO. 01 For MEASURE K 14 STREET REHABILITATION AND REPAIR PROJECT CIP 2295 4 2016 1 BIDS OPEN: WEDNESDAY,

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R401: LINEAR GRADING R402: ITEM 209 - RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R404: DELETED R405: BARRIER REFLECTORS R406: PAVEMENT MARKING LANE WIDTHS R407: TYPE A ANCHOR ASSEMBLY

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019: ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents CITY OF TAMARAC PURCHASING AND CONTRACTS DIVISION 7525 NW 88 TH AVENUE TAMARAC, FL 33321 Committed to Excellence...Always ADDENDUM NO. 1 BID NO.13-19B BID NO. 13-20B CITY OF TAMARAC NW 108 TERRACE / NW

More information

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1 UPPER SKAGIT INDIAN TRIBE COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO. 1 (7 pages total) Issue Date: May 11, 2016 General: Recitations of each and every section of the bid documents impacted

More information

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:] SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated

More information

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

I. General Information. A. Project Team & Contacts: Role Company Name Phone  City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department I. General Information Civil Engineering Surveying Environmental Consulting Tysinger, Hampton & Partners, Inc. OPTIONAL PRE-BID MEETING MINUTES Austin Springs Road Water Line Replacement Project ITB #6190

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

CECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension

CECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 33 TRENCHING AND BACKFILL PART 1 GENERAL... 3 1.1 Description... 3 A. Excavation for Utilities Includes... 3 B. Suitable Fill Material...

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

CITY OF TACOMA Department of Public Utilities - Water Division

CITY OF TACOMA Department of Public Utilities - Water Division CITY OF TACOMA Department of Public Utilities - Water Division ADDENDUM NO. 1 DATE: October 12, 2015 REVISIONS TO: Request for Bids Specification No. WD15-0133F Water Main Replacement Project No. MRP 2014-27,

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project 140353 Addendum No. 1 PID No. 86675 MOT IR 75 11.75/11.80

More information

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section: SECTION 01 55 26 TRAFFIC CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Section covers requirements for traffic control during construction of the PROJECT. 1.02 REFERENCES A. The following is a list of

More information

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL... 12.1 12-2 FLAGGING... 12.1 12-2.01 Flaggers... 12.1 12-2.02 Flagging Costs... 12.1 12-3 TRAFFIC-HANDLING EQUIPMENT

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

ANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore

More information

June 5, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251)

June 5, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251) Addendum No. 3 to the Water Street Signal Planning And Striping Plan Concrete Sidewalk Phase Mobile, Alabama For the City of Mobile, Alabama Project No. 2017-2060-06 June 5, 2017 Prepared By: Thompson

More information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 General Provisions and Specifications - These provisions and specifications shall

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

DAVID RHODES NEWARK CITY DIRECTOR OF PUBLIC SERVICE

DAVID RHODES NEWARK CITY DIRECTOR OF PUBLIC SERVICE DAVID RHODES NEWARK CITY DIRECTOR OF PUBLIC SERVICE City Hall 40 West Main Street Newark, Ohio 43055-5531 www.newarkohio.net (740) 670-7703 drhodes@newarkohio.net CITY OF NEWARK TREE TRIMMING NOTICE TO

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION MAINTENANCE OF TRAFFIC NOTES 431606 - MOT Notes - Addendum 1.dwg; 10/22/15-3:25pm MAINTENANCE OF TRAFFIC MAINTENANCE OF TRAFFIC SEQUENCE: THESE PLANS ARE BASED ON THE FOLLOWING SUGGESTED SEQUENCE OF CONSTRUCTION.

More information

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.

More information

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring PERMIT# EXCAVATION/RIGHT OF WAY PERMIT ATE: NOTE: No permit shall be issued \vithout CURRENT Montana Contractors License, Insurance and Bonding on file with the Public Works epartment. It is the CONTRACTORS

More information

CITY OF WILSON. Public Services Engineering. Backfilling, Compaction, & Patching Policy on Existing Pavements

CITY OF WILSON. Public Services Engineering. Backfilling, Compaction, & Patching Policy on Existing Pavements CITY OF WILSON Public Services Engineering Backfilling, Compaction, & Patching Policy on Existing Pavements INTRODUCTION The City of Wilson recognizes that proper backfilling, compaction, and patching

More information

ADDENDUM No. 3 LRT MPOT RFP NUMBER: POTHOLING SERVICES FOR MESA EXTENSION. ADDENDUM NO: 3 DATE: August 4, 2010

ADDENDUM No. 3 LRT MPOT RFP NUMBER: POTHOLING SERVICES FOR MESA EXTENSION. ADDENDUM NO: 3 DATE: August 4, 2010 ADDENDUM No. 3 RFP NUMBER: RFP TITLE: LRT-11-157-MPOT POTHOLING SERVICES FOR MESA EXTENSION ADDENDUM NO: 3 DATE: August 4, 2010 CLARIFICATIONS / CORRECTIONS The following clarifications and/or corrections

More information

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018 Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA-2019-004 TMWA Capital Project No.: 10-0001.053 October 3, 2018 The following information, clarifications, changes and modifications are by reference

More information

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES F:\ENGR\bob\PIX\hccolorsea2.gif HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS UTILITY COMPANIES UTILITY COMPANY CONTACT PERSON CONTACT INFO HERNANDO COUNTY UTILITIES Brad Smith

More information

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair JANUARY 25, 2016 ADDENDUM NO. 3 FOR ORD Baggage Service Road Retaining Wall Repair Specifications and Contract Documents Number: 132110 CDA Project Number: H6163.15-02 For which bids are scheduled to be

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018 Control 6331-53-001 Project BPM - 633153001 Highway US0067 County TITUS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

May 31, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251)

May 31, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251) Addendum No. 1 to the Water Street Signal Planning And Striping Plan Concrete Sidewalk Phase Mobile, Alabama For the City of Mobile, Alabama Project No. 2017-2060-06 May 31, 2017 Prepared By: Thompson

More information

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED PROJECT 000P-151 US HWY 12 DAY COUNTY Construction of New Field Approach PCN i4g8 Sheet 1 of 11 ENVIRONMENTAL COMMITMENTS An Environmental

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS TABLE OF CONTENTS 31.01. SCOPE OF WORK... 1 31.02. REFERENCES... 1 31.03. DEFENITIONS... 1 31.04. MATERIALS... 2 31.05. EQUIPMENT... 3 31.06. CONSTRUCTION... 4 31.07. QUALITY ASSURANCE... 6 31.08. MEASUREMENT

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions,

More information

DOCUMENTATION WORKBOOK FY 2014

DOCUMENTATION WORKBOOK FY 2014 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2014 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

ADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed)

ADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed) ADDENDUM NO. 1 TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Construct Range Macon Training Site Macon, Missouri PROJECT NO. T1805-01 Bid Opening Date is: 1:30 PM, Thursday, September 14, 2017 (Not

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

HAWAII DEPARTMENT OF TRANSPORATION HIGHWAYS DIVISION PAVEMENT PREVENTIVE MAINTENANCE GUIDELINES JUNE 2003

HAWAII DEPARTMENT OF TRANSPORATION HIGHWAYS DIVISION PAVEMENT PREVENTIVE MAINTENANCE GUIDELINES JUNE 2003 HAWAII DEPARTMENT OF TRANSPORATION HIGHWAYS DIVISION PAVEMENT PREVENTIVE MAINTENANCE GUIDELINES JUNE 2003 Reviewed and accepted by FHWA on September 29, 2003 Note: Guidelines was revised on to correct

More information

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX Rev. 2016 STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX ARTICLE PAGE 1. Pavement Removal and Restoration... P-1 2. Street

More information

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal

More information

PERMITTING AND CONSTRUCTION MANUAL

PERMITTING AND CONSTRUCTION MANUAL PUBLIC RIGHT-OF-WAY CONTENTS PERMITTING AND CONSTRUCTION MANUAL 1. INTRODUCTION 2. PUBLIC SERVICE PROVIDER REGISTRATION 3. CONSTRUCTION PERMITTING PROCEDURE 3.1 Permitting Process 3.2 Permit Application

More information

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one) Des Plaines Utility Permit #: PUBLIC WORKS AND ENGINEERING 1420 Miner Street Des Plaines, IL 60016 P: 847.391.5390 F: 847.391.5619 desplaines.org CITY OF DES PLAINES UTILITY PERMIT APPLICATION All entities

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, July 25, 2014 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering CONFIRMATION OF RECEIPT OF ADDENDUM PROJECT:

More information

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 On Maintenance of Traffic Details Sheet No. 46 there is a note that states I-49 Stage Construction is to be Completed Prior to Beginning Work on Hwy.

More information

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND

More information

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014 Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District

More information

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines. SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and

More information

Protect Your Pavement Asset Like the Rest! Is Pavement on your Radar Screen? Parking Lots & Low Volume Facilities

Protect Your Pavement Asset Like the Rest! Is Pavement on your Radar Screen? Parking Lots & Low Volume Facilities Pavement Rocky Mountain Asphalt Conference & Equipment Show Managing Parking Lot Pavements Preventive Maintenance and Rehabilitation Options Landscaping Roofing February 18, 2009 Denver, CO Presented by:

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT PERMIT # DATE: Name Of Applicant Address City, State, Zip ( ) Fax: ( ) Email Telephone Number permit faxed (date) permit emailed (date) Permission is

More information

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania. CHAPTER 21 PART 2 TUNNELING AND EXCAVATIONS 201. Definitions. The following words and phrases, when used in this Part, shall have the meanings ascribed to them in this 201, except in those instances where

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

August 10, 2016 TRAFFIC CONTROL REQUEST TCRF Rev. 3

August 10, 2016 TRAFFIC CONTROL REQUEST TCRF Rev. 3 DETAILS OF INTENDED WORK SCOPE OF WORK: ADD L COMMENTS: EST. TOTAL WORK DAYS: 1 TRAFFIC CONTROL PLAN: 9-05-02 Hwy 46 on north side of Hwy 1 for paving of top lift 20 minutes stoppage WEATHER DEPENDENT:

More information

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 BIDDING AND CONTRACT DOCUMENTS FOR THE HORRY COUNTY SOLID WASTE AUTHORITY YARD WASTE MANAGEMENT AND COMPOSTING FACILITY HORRY COUNTY, SOUTH CAROLINA ****************************************************************************************************

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 11/03/2014

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 11/03/2014 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 11/03/2014 Control Project Highway County 0237-07-012, ETC. STP 2015(294), ETC. FM 133, ETC. DIMMIT, ETC. Ladies/Gentlemen: Attached please find an addendum

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 120625 Sale Date - 12/14/2012 ATB-76747 - IR-90-7.56, PART 1;ATB-90-13.60, PART 2 12/11/2012 8:03:55 AM Per Addendum 5 Item 184 was reduced drastically. With over 35,000 LF of new guardrail

More information

CITY OF EL MIRAGE Solicitation No.: EM12-ST03 & EM12-ST04. PRE-BID CONFERENCE MINUTES November 19, 2015, 1:00 PM

CITY OF EL MIRAGE Solicitation No.: EM12-ST03 & EM12-ST04. PRE-BID CONFERENCE MINUTES November 19, 2015, 1:00 PM CITY OF EL MIRAGE Solicitation No.: EM12-ST03 & EM12-ST04 INTRODUCTIONS: Thunderbird Road from 127 th Avenue to El Frio Street El Mirage Road from Cactus Road to Grand Avenue PRE-BID CONFERENCE MINUTES

More information

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH November 29, 2018 NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH To Holders of Bid Proposals: Please make the following clarifications, additions,

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

Chapter 21. Streets and Sidewalks

Chapter 21. Streets and Sidewalks Chapter 21 Streets and Sidewalks Part 1 Street Openings 21-101. Permit Required for Street Openings 21-102. Applications 21-103. Fees 21-104. Bond 21-105. Restoration 21-106. Borough Standards 21-107.

More information

SECTION 4 OBSTRUCTIONS AND INCIDENTAL CONSTRUCTION

SECTION 4 OBSTRUCTIONS AND INCIDENTAL CONSTRUCTION SECTION 4 OBSTRUCTIONS AND INCIDENTAL CONSTRUCTION 4.01 GENERAL. The work covered in Section 4 consists of incidental construction and clearing of obstructions to permit construction of public, developer,

More information

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/ Within DuPage County Highway Rights-of-Way NOTE: All construction shall be performed and materials specified/installed according to IDOT S Standard Specifications for Road and Bridge Construction (latest

More information

CITY OF KANSAS CITY, MISSOURI

CITY OF KANSAS CITY, MISSOURI KCMO Supplement April 2000 Document No. 000079 CITY OF KANSAS CITY, MISSOURI SUPPLEMENT TO APWA STANDARD SPECIFICATIONS AND DESIGN CRITERIA SECTION 2600 This is the Kansas City, Missouri Supplement to

More information

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $ Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation

More information

Application for Public Right-of-Way Excavation Permit Form #PWE002 (rev. 03/18)

Application for Public Right-of-Way Excavation Permit Form #PWE002 (rev. 03/18) FOR OFFICE USE ONLY Application for Public Right-of-Way Excavation Permit Form #PWE002 (rev. 03/18) Permit Number: Permit Exp: Started w/o permit: Y / N Total Permit Fee: $ If road closure requested, notify:

More information

UTILITY REGISTRATION, PERMITS, AND CONSTRUCTION

UTILITY REGISTRATION, PERMITS, AND CONSTRUCTION UTILITY REGISTRATION, PERMITS, AND CONSTRUCTION Revised 01/30/2006 Registration General City of Garland Directives Utility Registration, Permits, and Construction City of Garland All users constructing,

More information

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 503 TEMPORARY PAVEMENT RESTORATION SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with

More information

Job Order Sewer Repair Services

Job Order Sewer Repair Services Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.04 CLEANING AND PAINTING STEEL STRUCTURES - CIDER HILL ROAD UNDERPASS BRIDGE - MILE 6.2, CAPTAIN THOMAS ROAD UNDERPASS BRIDGE - MILE 14.8, ROUTE 126

More information

SECTION PAVING AND SURFACING

SECTION PAVING AND SURFACING SECTION 02500 - PAVING AND SURFACING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/07/2015

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/07/2015 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/07/2015 Control 6289-22-001 Project RMC - 628922001 Highway SH0208 County TOM GREEN Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

REQUEST FOR PROPOSAL Department of Public Works Highway Division

REQUEST FOR PROPOSAL Department of Public Works Highway Division REQUEST FOR PROPOSAL Department of Public Works Highway Division Town Office Location: 2417 Franklin Street Telephone: (802) 247-3635 Ext. 211 Pre-Bid Meeting: Monday, April 6 th Bid Opening: Monday, April

More information

Town of Sun Prairie Driveway Permits Standard Operating Procedure

Town of Sun Prairie Driveway Permits Standard Operating Procedure Town of Sun Prairie Driveway Permits Standard Operating Procedure A. Purpose To provide a standard procedure for issuing driveway access permits to town roads. To provide inspection of the construction

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON - April 24, 2017 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 25, 2017 in accordance

More information

STANDARDS FOR RIGHT-OF-WAY EASEMENT CONSTRUCTION

STANDARDS FOR RIGHT-OF-WAY EASEMENT CONSTRUCTION STANDARDS FOR RIGHT-OF-WAY EASEMENT CONSTRUCTION INTRODUCTION The ultimate purpose of these standards is to maintain high quality of restoration of public rightsof-way and easements, to avoid damage to

More information

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 Project: Coteau Street & Utility Improvements Bid Date: 1:00 P.M., Local Time, March 20, 2017 Bid Location: Office of the City Administrator/Clerk, City of Lake Benton 106 S. Center Street

More information

MADRAS MUNICIPAL AIRPORT TAXIWAY RECONSTRUCTION AIP NO PRE-BID CONFERENCE (VOLUNTARY) June 25, 2018 AGENDA

MADRAS MUNICIPAL AIRPORT TAXIWAY RECONSTRUCTION AIP NO PRE-BID CONFERENCE (VOLUNTARY) June 25, 2018 AGENDA MADRAS MUNICIPAL AIRPORT TAXIWAY RECONSTRUCTION AIP NO. 3-41-0035-010 PRE-BID CONFERENCE (VOLUNTARY) June 25, 2018 AGENDA (Pass around sign in sheet, fill in Name, Company, Phone #, Fax #) 1. INTRODUCTIONS

More information

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M401: ITEM 615 - PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M402: DELETED M403: DETOUR NOTIFICATION [ODOT] M404: DETOUR NOTIFICATION [CITY/COUNTY] M405: DELETED M406: DELETED M407: DELETED

More information