1 5.5 AUDITORIUM (ASSEMBLY ROOM) auditorium for presentations, seminars with projection room behind east wall access behind west wall (stage wall) to basement stairs and exterior 6 rubber base 1/4 mahogany plywood paneling, 1 x 2 strapping, 1 styrofoam insulation vinawood fabric and cedar slats (north, south walls) painted plaster at stage mahogany slats on mahogany plywood on west wall at stage cedar slats on mahogany plywood over insulation on east wall Assembly room (auditorium), main floor partial plan, Joseph B. Singer, November 1965 Auditorium looking northwest painted acoustic tile stage with oak steps, oak nosing and mahogany slats projection openings (2) at projection room with solid cedar and built-in shelves mahogany slat doors with hollow metal frames on west wall (2) slab doors with engraved door handles and mahogany frames on east wall (2) Other Features 212 theatre seats with desks auditorium clock accessibility ramp Features of Interest: 1. Mahogany and cedar slats 2. Mahogany slat doors (2) 3. Mahogany slab doors with engraved door handles (2) cove lighting around perimeter copper wall sconces linear diffusers around perimeter diffusers in east wall behind mahogany wood slats Wood slat door at auditorium stage; auditorium room looking east 17

2 5.6 ASSESSMENT CENTRE (INSTRUCTIONAL AIDS CENTRE) two level assessment centre with stacks and study space on main floor, study carrels and offices in basement tile flooring 6 rubber base exterior walls - plaster on 1-1/2 styrofoam insulation, 10 concrete block acoustic plaster assessment centre millwork including control desk, display cases, reserves shelving, reference bookshelves, typical bookcases, kitchenette millwork reflected skylight screen - 1 x 6 cedar members glued and nailed to 1 x 8 cedar members and secured in place by 3/4 steel rods welded to roof structure with 12 ga steel c support screwed to alternating 1 x 8 cove lighting around perimeter aluminum framed windows (14) entrance double doors circular skylight Other Features cast-in-place concrete stairs with carpet, with laminated wood handrails and chrome plated tube balusters anchored into steel inserts in concrete. Assessment centre (instructional aids centre) plan and section, Joseph B. Singer, November 1965 Features of Interest: 1. Reflected skylight screen 2. Assessment centre millwork including control desk, display cases, reserves shelving, reference bookshelves, typical bookcases Assessment centre looking east Assessment centre skylight screen; assessment centre control desk 18

3 5.6 ASSESSMENT CENTRE (INSTRUCTIONAL AIDS CENTRE) two level assessment centre with stacks and study space on main floor, study carrels and offices in basement tile flooring 6 rubber base exterior walls - plaster on 1-1/2 styrofoam insulation, 10 concrete block acoustic plaster shelves - 3/4 mahogany plywood shelves with solid mahogany edging and wood doors wood doors valiance lighting at carrels and shelves Assessment centre (instructional aids centre) plan, Joseph B. Singer, November 1965 Features of Interest: 1. Stand alone assessment centre millwork including shelves Assessment centre stair Assessment centre basement 19

4 5.7.1 OFFICES, SECOND, THIRD, SIXTH FLOORS private offices and open workstations kitchenettes, closets and storage space vinyl tile flooring 6 black vinyl base painted concrete modular partition system plaster office millwork aluminum framed windows walnut faced doors perimeter radiant heating strip lighting Second floor plan, existing conditions, March 2012 Sixth floor offices Third floor plan, existing conditions, March 2012 Sixth floor plan, existing conditions, March

5 5.7.2 OFFICES AND SUITES, FOURTH AND FIFTH FLOORS private offices and open workstations kitchenettes, closets and storage space suites from superintendents - suites consist of an office with built in cabinets, washroom with shower vinyl tile flooring 6 black vinyl base painted concrete plaster office millwork aluminum framed windows walnut faced doors perimeter radiant heating strip lighting Fourth floor plan, existing conditions, March 2012 Fourth floor superintendant office suite Fifth floor plan, Joseph B. Singer, November 1965 Fourth floor superintendant office suite 21

6 5.8 CORE CIRCULATION (ELEVATORS, STAIRS AND CORRIDORS) core circulation for office tower including stairwells (2), elevators (2), reception and waiting area, mechanical duct men s and women s washrooms are found adjacent to core circulation on every floor sheet flooring 6 black vinyl base vinyl fabric on plaster luminous ceiling in reception and waiting area Stairs 1/2 square steel balusters welded at top and bottom to 1-1/4 x 1/2 steel channels 6 x 3 x 3/16 tube section newel secured to landing 2 precast terrazzo treads with non-slip inserts on steel panels 3 thick reinforced terrazzo landing Core circulation looking west Core circulation looking east Stair details, Joseph B. Singer, November 1965 Stair section, Joseph B. Singer, November

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Edmonton Seventh Street Plaza (North Tower) B9771B Edmonton Report run on: March 18, 213 1:33 AM Building Name: Address: Location: Building Id:

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

CONSULTING PROJECT LOCATION

CONSULTING PROJECT LOCATION LOCATION Drawing Index: GENERAL NOTES: COVER SHEET Drawing Cover Sheet INDE D Drawing Index O.B.C. Matrix ARCHITECTURAL DRAWINGS A0 First Floor Plan, Basement Plan, Washrooms A0 Second Floor Plan, Washrooms

More information

Appendix 3G Wood First Matrix

Appendix 3G Wood First Matrix Appendix 3G Wood First Matrix Project Co will use wood in the Design of the Acute Care Facility in accordance with the following table, using wood where it is marked as subject to any comments set out

More information

New Raised Courtyard Terrace Pavers and Retaining Walls. Line of Steps Above. New Wood Framed Stair

New Raised Courtyard Terrace Pavers and Retaining Walls. Line of Steps Above. New Wood Framed Stair Building Program Wall Construction to Remain Religious Education New Wall Construction New Furring on Wall Construction, See Partition Types, Community Room New Galvanized Steel Window Well Patch Wall

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Avonmore Elementary School B347A Edmonton Report run on: March 8, 211 1:28 AM Building Name: Address: Location: Building Id: Gross Area

More information

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

Why do we need to learn about Stairs

Why do we need to learn about Stairs STAIRS 1 Why do we need to learn about Stairs Interconnectivity of space Accessibility Circulation / Flow Fire escape Functional requirements Design considerations Types of Stairs OBJECTIVES 1. State the

More information

Scope of Work. Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015)

Scope of Work. Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015) Scope of Work Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015) 1. Technical Specifications 1.1 The United Nations University Computing

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

Addendum #4 July 13, 2015

Addendum #4 July 13, 2015 Five Counties Children s Centre Addition 872 The Dutton Firehouse Road Complex Addendum #4 Peterborough, 721 Monaghan ON Road, K9H Peterborough, 7G1 ON K9J 5J8 Page 1 Addendum #4 July 13, 2015 The following

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Lather (Interior Systems Mechanic) Level 3

Lather (Interior Systems Mechanic) Level 3 Level 3 Lather/Interior Systems Mechanic (ISM) Unit: B3 Blueprint Reading and Specifications 3 Duration: 35 hours 20 hours 15 hours This unit is designed to provide the apprentice with the knowledge and

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Norwood Elementary School B3234A Edmonton Report run on: January 11, 213 1:17 AM Building Name: Address: Location: Building Id: Gross Area

More information

Price, plans and specifications are subject to change without notice. Revised 01/2018

Price, plans and specifications are subject to change without notice. Revised 01/2018 CEDARPOST SQUARE THE OAK 2,1 2 5 SQ.FT. FIRST FLOOR SECOND FLOOR THIRD FLOOR OAK - 2,125 SQ.FT. Starting at $364,900 ARBOR 2,241 SQ.FT. 3 BEDROOMS 2.5 BATHS 2 STORIES FIRST FLOOR SECOND FLOOR ASPEN 2,327

More information

Lather/Interior Systems Mechanic (ISM) Level 3

Lather/Interior Systems Mechanic (ISM) Level 3 Level 3 B3 Blueprint Reading and Specifications 3 Duration: 35 hours 20 hours 15 hours This unit is designed to provide the apprentice with the knowledge and skills of blueprint reading and specifications.

More information

Building Systems and Design Elements included in SliDeRulE

Building Systems and Design Elements included in SliDeRulE Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation

More information

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31 Contents Preface to the Sixth Edition xi 1 Making Buildings 3 Learning to Build 4 Buildings and the Environment 5 The Work of the Design Professional 11 The Work of the Construction Professional 19 Trends

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

Sheet List. First Floor Plan Mezzanine Floor Plan

Sheet List. First Floor Plan Mezzanine Floor Plan No. Description Sheet List Sheet Name Sheet Number Plan Floor Plan Elevations Elevations Site Plan Building Section Stair Details Exterior Details Reflected eiing Plan Wall Sections Reflected ieling Plan

More information

Fundamentals of Building Construction: Materials and Methods

Fundamentals of Building Construction: Materials and Methods Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of

More information

GENERAL PROVISIONS

GENERAL PROVISIONS 09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

GENERAL PROVISIONS

GENERAL PROVISIONS 09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

260,000 SF Building Profile

260,000 SF Building Profile Expanding Your Development & Investment Perspectives 260,000 SF Building Profile Precast & Brick Exterior Finish 245,000 SF Production/Warehouse 7,500 SF Office & 7,500 SF Mezzanine 50 x 50 Bays, 24 Clear

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

F.C.L. INTERIOR FINISHES CHECK LIST 2010 PRODUCT SELECTION - FLOORING GENERAL ITEMS PRODUCT SELECTION GENERAL ITEMS

F.C.L. INTERIOR FINISHES CHECK LIST 2010 PRODUCT SELECTION - FLOORING GENERAL ITEMS PRODUCT SELECTION GENERAL ITEMS INTERIOR FINISHES CHECK LIST 2010 Project: Project Number: Wil-Spec # This should not take long to go through, most questions below are listed as options, all you have to do is check off those answers

More information

Hawthorn Plan - Aspen Hills

Hawthorn Plan - Aspen Hills Hawthorn Plan - Aspen Hills Plan Information Floorplans Beds: 4 Baths: 2.5-4 Floors: 2 Basement: Standard Living space: 2,416 sf - 3,420 sf Garage: 2-4 Car Starting at: $319,900 Elevations Page 1/6 Page

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Metal & EIFS Exterior Finish 150,000 SF Production/Warehouse 4,500 SF Office & 4,500 SF Mezzanine 50 x 50 Bays, 24 Clear

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

Reva and David Logan Center for the Arts Chicago, IL

Reva and David Logan Center for the Arts Chicago, IL Reva and David Logan Center for the Arts Chicago, IL Faculty Advisor: Dr. Houser 9/9/2013 Page 1 of 6 Introduction The lighting proposal memo describes about four spaces to study for the lighting portion

More information

STANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author

STANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author STANDARD CONSTRUCTION PACKAGE Addendum A REV 7-3-18 SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state authorities Excavate material to pour footings and foundation

More information

Thurgood Marshall Recreation Center Summary

Thurgood Marshall Recreation Center Summary Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August

More information

1. Adequate framing details, sizing, spacing and technical information shall be indicated on the documents.

1. Adequate framing details, sizing, spacing and technical information shall be indicated on the documents. DIVISION 9 - FINISHES 09100 - METAL SUPPORT SYSTEMS 1. Adequate framing details, sizing, spacing and technical information shall be indicated on the documents. 2. Fire-rated assemblies and acoustic rating

More information

Whitley Shower Locker Toilet Facilities

Whitley Shower Locker Toilet Facilities Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.com Building Type Building Code Whitley Shower Locker Toilet Facilities

More information

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good. EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building

More information

C ID-2.00 ISSUE DATE: SCALE: 1/2" = 1'-0" BUILT IN BENCH "NOOK" SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS.

C ID-2.00 ISSUE DATE: SCALE: 1/2 = 1'-0 BUILT IN BENCH NOOK SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS. CD W BUILT IN BENCH "NOOK" SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS. B ID-2.00 A ID-2.00 ST-01 BUILT IN SHELVING SEE ELEVATIONS FOR DETAILS C ID-2.00 [ST-01] CAESARSTONE COUNTERTOP, COLOR

More information

Former Special Needs Facility For Sale 110 Stephen Hands Path, Wainscott Town of East Hampton, NY

Former Special Needs Facility For Sale 110 Stephen Hands Path, Wainscott Town of East Hampton, NY Former Special Needs Facility For Sale, Wainscott Town of East Hampton, NY Exclusive Agent EXECUTIVE SUMMARY: JLL has been retained to sell, a 22,204 square foot asset located on 10.4 acres in Wainscott,

More information

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing GENERAL INFORMATION Policy Number: Insured Name: Property Address: Property Zip: Agent: Branch: Current Coverage: _ Account Number: _ PROPERTY

More information

ATTACHMENT 2 DRC Page 1 of 13

ATTACHMENT 2 DRC Page 1 of 13 Page 1 of 13 CLEAR GLASS 7' - 6" SPANDREL GLASS CLEAR GLASS SOLID PHENOLIC PANEL MEAT PREP 206 EMPLOYEE LOCKERS 181 VARIES 8' - 1" 2' - 9" 3' - 1" 2' - 8" 2' - 5" 0'-0" 19' - 6" SECTION @ SOUTH WALL Scale:

More information

75) Which of the following decorative surfaces are the Peakes responsible for?

75) Which of the following decorative surfaces are the Peakes responsible for? 75) Which of the following decorative surfaces are the Peakes responsible for? A. Blinds B. Fabric Wall paint Wallpaper 76) Which of the following specifications would satisfy the Peakes' request? A. Built-in;

More information

K and V HOMES. Client Questionnaire. Location. (Skip to page 3) Tree Removal Required. Yes No. Entrance

K and V HOMES. Client Questionnaire. Location. (Skip to page 3) Tree Removal Required. Yes No. Entrance K and V HOMES Client Questionnaire Location Rural Lot City Lot (Skip to page 3) Tree Removal Required Yes No Entrance Existing Does it need to be modified (widened) Yes No New Entrance Needed Is a culvert

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550

More information

Renovation Progress. May 12 18, Week 32

Renovation Progress. May 12 18, Week 32 Renovation Progress May 12 18, 2012 Week 32 May 12 Furring strips along back wall of Sisters new Dining Area completed; projection room holes to be covered up when sheetrock is installed May 12 Another

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 092216 - COLD FORMED STEEL FRAMING - NON-STRUCTURAL (CFSF-NS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 ACTION

More information

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

WOOD USE IN NONCOMBUSTIBLE BUILDINGS INTRODUCTION The National Building Code of Canada (NBCC) 1 requires that some buildings be of noncombustible construction under its prescriptive requirements. Its use in certain types of buildings such

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092650 - GYPSUM BOARD SHAFT WALL ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Donnan Elementary / Junior High School B391A Edmonton Report run on: March 8, 211 1:35 AM Building Name: Address: Location: Building Id:

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

COMPETENCY ANALYSIS PROFILE General Carpenter 403A. (All unshaded skill sets must be demonstrated/completed)

COMPETENCY ANALYSIS PROFILE General Carpenter 403A. (All unshaded skill sets must be demonstrated/completed) COMPETENCY ANALYSIS PROFILE General Carpenter 403A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Apply safety legislation Use personal protective equipment Apply safety

More information

RESIDENTIAL GRADE FACTORS

RESIDENTIAL GRADE FACTORS RESIDENTIAL GRADE FACTORS FOUNDATION TYPE: 1. PIERS OR RUBBLE 2. FROST WALL OR FULL STONE / SLAB 3. 8 CONCRETE OR BLOCK / GOOD GRANITE 4. 8 REINFORCED CONCRETE 5. 10 REINFORCED CONCRETE OR 12 BLOCK 6.

More information

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits 3. Development and Septic Fees 4. Tarion New Home Warranty

More information

Monteleone Homes, Inc Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet

Monteleone Homes, Inc Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet Monteleone Homes, Inc. 4408 Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet Dear Homeowner: A builder s reputation for quality and value should be a prime consideration for you. It is important

More information

TULANE PLAN ,486 SQ.FT.

TULANE PLAN ,486 SQ.FT. PLAN 1486-1,486 SQ.FT. From the mid $200s FIRST FLOOR SECOND FLOOR PLAN 1498-1,498 SQ.FT. From the mid $200s FIRST FLOOR SECOND FLOOR PLAN 1499-1,499 SQ.FT. FIRST FLOOR SECOND FLOOR FEATURES & SPECIFICATIONS

More information

J.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT

J.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT J.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT Using a Multidisciplinary Approach to Projects for Over 0 Years Project 5 Mapleview Terrace Apartments, 59 South Pelham Road, Welland Addendum

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Hazeldean Elementary School B3146A Edmonton Report run on: April 7, 211 5:2 PM Building Name: Address: Location: Building Id: Gross Area

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

THE FLORIDA BUILDING CODE

THE FLORIDA BUILDING CODE THE FLORIDA BUILDING CODE 1. According to the Florida Building Code, spiral stairway treads must all be identical and rise must be sufficient enough to provide a headroom of minimum. A. 6'- 4" B. 6'- 6"

More information

2. In moist areas, portland cement plaster should be used if a more permanent material is not within budget limits.

2. In moist areas, portland cement plaster should be used if a more permanent material is not within budget limits. UDIVISION 9 FINISHES 09 00 00 FINISHES 09 20 00 PLASTER AND GYPSUM BOARD PLASTER 1. Major partitions are to extend to underside of structure as required by code. Allow for structural deflection. Provide

More information

REMEDIAL WORKS REQUIRED. Allow to clean down brickwork and repoint/repair brick elevations.

REMEDIAL WORKS REQUIRED. Allow to clean down brickwork and repoint/repair brick elevations. 2.0 SCHEDULE OF DILAPIDATIONS External Areas 2.1 Rear elevation 2.1.1 Rear brickwork elevations 3.5 Brickwork is lightly soiled and stained at low level with some minor repointing required. Allow to clean

More information

SECTION 11 Architectural and Nonstructural Elements Field Investigation

SECTION 11 Architectural and Nonstructural Elements Field Investigation SECTION 11 Architectural and Nonstructural Elements Field Investigation Types of Data to Be Collected and Recorded Research in these fields should be directed at determining the effect that architecture

More information

Plan /Submission Requirements

Plan /Submission Requirements Plan /Submission Requirements As a result of the Code changes additional information will be required at the building permit application stage to ensure compliance with new 2012 BCBC requirements. This

More information

Appendix 3 Treads. design elements

Appendix 3 Treads. design elements Appendix 3 s design elements A3 42 rise 165 Appendix 3 s A3 design This is a reference guide to standard treads used in the Arden Elements range. Many custom staircases will demand their own unique tread

More information

WORK SPECIFICATION BUILDING COMPONENT: STAIRCASE DENISA-MARIA BUCUROIU 4TH BK INTERNATIONAL

WORK SPECIFICATION BUILDING COMPONENT: STAIRCASE DENISA-MARIA BUCUROIU 4TH BK INTERNATIONAL WORK SPECIFICATION BUILDING COMPONENT: STAIRCASE DENISA-MARIA BUCUROIU 4TH BK INTERNATIONAL Chapter : 1. Works specification Chap. Pg. : 1.-1/2 Contents Date : 12/05/2014 1. Contents 2. Extent 2.1. General

More information

BUILDING SPECIFICATIONS

BUILDING SPECIFICATIONS BUILDING SPECIFICATIONS FOUNDATION AND STRUCTURE Foundations using reinforced concrete slabs, according to the data of the geotechnical study, complying with building standard CTE-DB-SE-C. Concrete walls

More information

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 01 Project Title Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 00 21

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

Building Condition Assessment Report

Building Condition Assessment Report Asset Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Report Date Riverview Lands, 260 Lougheed Highway, Coquitlam, BC. V5C 4J2 959. 80,505 Hospital, 4-8 Story with Face

More information

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS BME Lepel, Adrienn PhD Claddings Place in the sequence of activities 13Constructing roof LB structure (carpentry) 14Roof tiling (waterproofing, battens,

More information

Chapter 13 - Finish Framing

Chapter 13 - Finish Framing Chapter 13 - Finish Framing Contents Chapter 13 - Finish Framing... 13-1 Timing & Prerequisites... 13-2 Remove Bottom Plates in Doorways... 13-2 Post LVLs and Girder Trusses... 13-2 Install Framing for

More information

C ID-2.00 E ID-2.1 ISSUE DATE: 12/30/2016 SCALE: 1/2" = 1'-0" BUILT IN BENCH "NOOK" SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS.

C ID-2.00 E ID-2.1 ISSUE DATE: 12/30/2016 SCALE: 1/2 = 1'-0 BUILT IN BENCH NOOK SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS. CD W BUILT IN BENCH "NOOK" SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS. B ID-2.00 A ID-2.00 ST-01 BUILT IN SHELVING SEE ELEVATIONS FOR DETAILS C ID-2.00 [ST-01] CAESARSTONE COUNTERTOP, COLOR

More information

GardenView Residential Development. Class 'C' Construction Cost Estimate (Rev #2)

GardenView Residential Development. Class 'C' Construction Cost Estimate (Rev #2) GardenView Residential Development Dartmouth, Nova Scotia Job No: 100123 Class 'C' Construction Cost Estimate (Rev #2) EXECUTIVE SUMMARY The 'Hard' Construction Cost Estimate can be summarized as follows

More information

Section : 100 TRESHOLD STAIRS DEPARTMENT NGL HALLWAY TOWARDS MUSEUM FFL DISABLED WC FEMALE WC MALE WC FFL 95.

Section : 100 TRESHOLD STAIRS DEPARTMENT NGL HALLWAY TOWARDS MUSEUM FFL DISABLED WC FEMALE WC MALE WC FFL 95. Section 3-3 1 : 100 TRESHOLD STAIRS DEPARTMENT NGL 100.000 FEMALE WC DISABLED WC MALE WC HALLWAY TOWARDS MUSEUM FFL 98.100 FFL 95.400 GROUND WATER COLLECTIONAND PUMP ROOM LOWER DOORS TO AUDITORIUM LOWER

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

NAAHB Workgroup Index General Ledger Account

NAAHB Workgroup Index General Ledger Account NAAHB Workgroup Index General Ledger Account 1000 Series Preparation/Preliminaries 1000 Permits/Fees 1010 Building Permits 1020 HBA Assessments 1030 Warranty Fees 1100 Architectural/Engineering 1110 Blue

More information

Airport Vicinity Acoustic Insulation

Airport Vicinity Acoustic Insulation PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Airport Vicinity Acoustic Insulation By-law No. 6419/94 of the City of Winnipeg to establish minimum acoustic insulation requirements for buildings within

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

ADDENDUM NO. 1. Kapuskasing District High School Interior Upgrades. ADDENDUM NO. 1 November 9, 2018

ADDENDUM NO. 1. Kapuskasing District High School Interior Upgrades. ADDENDUM NO. 1 November 9, 2018 Kapuskasing District High School Kapuskasing District High School JLR No.: 27729-032 Owner No.: 7587 Page 1 of 4 This Addendum forms part of the Contract Documents and amends the original drawings and

More information

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing DIVISION 05 METALS 05 00 00 METALS 05 01 00 Maintenance of Metals 05 01 10 Maintenance of Structural Metal Framing 05 10 20 Maintenance of Metal Joists 05 10 30 Maintenance of Metal Decking 05 10 40 Maintenance

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1964 3,035 Page 1 of 27 1. Architectural / Structural & Site Exec Summary Warnica Public School is a one storey structure of masonry construction

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Avalon Junior High School B346A Edmonton Report run on: April 7, 211 4:56 PM Building Name: Address: Location: Building Id: Gross Area (sq.

More information

THE SPENCER RESIDENCE J&S ARCHITECT

THE SPENCER RESIDENCE J&S ARCHITECT THE SPENCER RESIDENCE J&S ARCHITECT 75 POURED CONCRETE FOUNDATION WALL (0MPa) 97.94 50Ø WEEPER TILE C/W SOCK W/MIN. 50 GRANULAR COVER F.D. E.P.B. F.D. 00 POURED CONCRETE FOUNDATION WALL (0MPa) 475 X 00

More information

The following report that you are about to view was an actual claim.

The following report that you are about to view was an actual claim. Time and material reports can be difficult to understand. Basically each item that is to be repaired or remodeled is listed. The costs of the material and the labor costs to install or removal of that

More information

Demolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.

Demolition Plan A1 A3. Scale: 3/32 = 1'-0 Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender. inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Private Sector Landlord MHRH - Regional Resource Centre B9559B Medicine Hat Report run on: April 7, 214 2:21 PM Building Name: Address: Location: Building Id: Gross Area

More information

RESIDENTIAL COMPONENT TECHNOLOGY

RESIDENTIAL COMPONENT TECHNOLOGY GENERAL INFORMATION Policy Number: Insured Name: Property Address: Property Zip: Agent: Branch: Current Coverage: _ Account Number: _ Number of Families: 1 2 3 4 PROPERTY DATA Main Section Wing 1 Wing

More information