1 Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School District to perform a facility assessment of its existing buildings. The intent of this assessment is to provide a basis to evaluate and make recommendations related to possible facility improvements. On January 8, January 14 and January 22 members of the team toured the district s facility The Evansville School District currently operates one facility in Evansville which currently houses approximately 69 Elementary students in Kindergarten through 5 th grade, and approximately 94 Middle School students in 6 th through 8 th grades. The Middle School includes students from the adjacent Brandon School District. Resident Evansville High School students attend school in Brandon, except that Metal Shop for both Evansville and Brandon High School students is taught in the Evansville building. The Evansville and Brandon Districts partner for athletics and events are split between the Evansville and Brandon facilities. General Building Data A. Evansville School 1. Grade Structure: PK-5 Elementary School, 6-8 Middle School 2. Building Ages: 1917, 1939, 1954, 1974 (Community Center) 3. Building Areas: ,163 SF (Basement) 4,100 SF (Floor 1) 4,100 SF (Floor 2) 10,363 SF Subtotal ,792 SF (Floor 1) 1,443 SF (Mezzanine) 1,850 SF (Floor 2) 9,085 SF Subtotal ,705 SF (Lower Level) 16,763 SF (Floor 1) 1,267 SF (Mezzanine) 22,735 SF Subtotal
2 ,492 SF (Lower Level) 8,449 SF (Floor 1) 28,942 SF Subtotal Total Building Area 71,124 SF 4. Site Acreage: Approx acres Building Deficiency Report The existing building was reviewed for deficiencies in the following areas: Regulatory Issues: Accessibility, Fire Marshal/Building Code (including Indoor Air Quality), Health Code, Title IX, etc. Building Maintenance Issues: Roofs, windows, mechanical and electrical systems, etc. Educational Issues. Deficiencies are noted, with recommended solutions to the deficiency noted where appropriate for consideration in the planning process. A. Regulatory Issues 1. Barrier-Free Accessibility (ADA) With a few exceptions, the School and Community Center buildings are not in compliance with current accessibility requirements (ADA) in several areas. The most glaring violation is the lack of a barrier free route from any building level to any other level. A complete accessible route serving all of the spaces currently used by the school would require at least 2 elevators and 3 wheelchair lifts (or extensive ramping), not including the Stage, Weight Room mezzanine and Small Gym bleachers. It should be noted that the majority of accessibility issues are in the 1917 and 1939 buildings. The following is a summary list of the current non-compliant accessible route issues: a. Main level to lower level (Community Center) not accessible. b. Stage not accessible. c. Weight Room mezzanine not accessible (and wood stair not in compliance). d. Main level to 1917 main level not accessible. e. Music Room not accessible. f main level to Small Gym level not accessible. g. Staff Lounge level (old Stage) not accessible. h. Ag CR level not accessible. i. Metal Shop level not accessible.
3 The following is a summary of additional accessibility issues that should be addressed by any facility project: a. The main building entrance next to the office is not accessible from the sidewalk (steps). b. The building is not accessible from the parking lot on the south and the play areas to the south are not accessible from the building without walking all the way around. c. The majority of the locker / toilet facilities are not accessible. (Community Center toilets and toilets across from the Media Center are compliant). d. The majority of the door hardware in the building is knobs, and should be updated to levers. e. No accessible work station at the Art Room and FACS Room. 2. Fire Marshal / Building Code / Life Safety The upper level of the 1917/1939 building can currently be used only for storage by Fire Marshal order due to both life safety and accessibility concerns. The floor and roof structures of the 1917 and 1939 buildings is predominantly wood framing and decking, and the only sprinklered areas of the building are the 1917 basement and the main hallway (due to open coat hooks). Under current codes the entire building would require a fire sprinkler system due to type of construction and non-fire rated corridors. In addition, the mechanical report addresses the failure to meet ventilation rates required by code in most of the building The following is a summary of the life safety issues that should be addressed by any facility project: a. Current building height, area and type of construction would require a fire sprinkler system throughout. This would alleviate the need for several significant (and more costly) corrections. b. Mechanical ventilation must be addressed in several areas. c. Open coat hooks in the main hallway would not be allowed in new construction (even with a sprinkler system). These should be replaced with lockers. d. The hallway outside of the Metal Shop /Ag CR is a dead end. e. The Cafeteria requires a second exit. f. The FACS Room requires a second exit. g. The single step at the Music Room door is not compliant and creates a trip hazard. 3. Other Regulatory Issues: Minor health code issues were noted in both the School and Community Center kitchens. The Boy s Locker Room is slightly larger than the Girl s Locker Room, which is not compliant with Title IX regulations. The following is a summary of the other regulatory issues that should be addressed by any facility project: a. School kitchen and food storage flooring is VAT (vinyl asbestos tile). Ceramic tile or similar flooring is required by Health Code. b. School kitchen and food storage room ceilings are glue-on acoustic tile. A washable ceiling such as vinyl coated ceiling tiles or painted gypsum board is required by Health Code.
4 c. The exhaust hood at the School kitchen is not compliant. d. Community Center kitchen flooring is VCT. Ceramic tile or similar flooring is required by Health Code. e. Boy s / Girl s Locker Room sizes. B. Building Maintenance Issues 1. Mechanical / Electrical Systems Per the Mechanical/Electrical assessment, the majority of the building systems are original to the area they are serving, and beyond their typical life expectancy; for some replacement parts are no longer available to adequately service the equipment. In addition, in most cases the systems are not energy efficient. Refer to the Mechanical/Electrical report for additional information. 2. Building Envelope The majority of the exterior building walls are brick in relatively good condition. The lower wall on the east side of the 1917 building has been covered with a concrete/plaster coating and is in poor condition and some of the stone sills at the 1917 building are also in poor condition. There are a few areas of exposed painted concrete block that will require ongoing painting and maintenance. The majority of the roofing is either ballasted or adhered membrane (rubber) roofing at least 10 years old. Regular maintenance work has been required to address miscellaneous leaks. Most windows are 4-track slider windows with single-pane glass in aluminum frames. These are better than the original windows, but not as good as window systems currently available with double-pane insulating glass. The hollow metal window system with panels at the Kindergarten / Preschool area are not energy efficient and require ongoing maintenance and painting. The following wall, roof and window areas should be addressed: a. Consider roof replacement in several areas. b. If 1917 building is retained, permanent wall restoration work will be needed. c. Exposed CMU at Community Center should be covered with insulation and flashing. d. Window wall system at Kindergarten/Preschool should be replaced with a masonry wall with aluminum windows. e. In general, flashing and caulking should be evaluated in more detail, and corrections made as needed as part of any facility project. 3. Interior Finishes and Equipment Interior finishes vary throughout the building, from relatively new flooring and ceilings to original wood and VAT floors / plaster ceilings. Likewise, casework and other equipment vary greatly. The following should be considered. a. Several areas still have VAT flooring. Any project should consider replacement. b. Carpet at Admin and Media is worn.
5 c. Ceiling grid in the 1974 building seems to be discolored (rusty?) in several areas. Any significant mechanical work will likely require replacement of existing plaster ceilings with lay-in acoustic ceilings. d. Mechanical improvements in the 1954 Classrooms will likely require removal of the existing bookshelves at the exterior wall. 4. Other Maintenance Issues The ramp and doors to the 1917 basement create a security and maintenance issues. A few sidewalks are spalling, probably in part due to salt required to prevent icing on the exterior slopes and steps C. Educational Issues The recent reorganized grade alignment due to the partnering with Brandon Schools has led to a few issues relative to delivery of educational programs. The most noticeable is the use of the Evansville Metal Shop for High School classes. The multiple levels at the junctures of the 1917, 1939 and 1954 buildings causes traffic flow and congestion issues. Most of the current classrooms are below the MDE recommended areas, however appear to be adequate in most areas for the current enrollment. The site size is also below MDE recommendations. Given recent events, the lack of a building security system with controlled access should be noted. We would recommend consideration of security issues be incorporated into any potential project.
HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School
HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story
More informationRAYMOND EDUCATION CAMPUS
INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationMAURY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationLASALLE - BACKUS EDUCATION CAMPUS
INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationDENNIS TOWNSHIP FEASIBILITY STUDY
DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT
More informationDAVIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-
More informationNALLE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationCollins Middle School
Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0
More informationSTUART-HOBSON MIDDLE SCHOOL
INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPOWELL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3
More informationCorsicana High School
Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0
More informationBALLOU SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE
More informationSEATON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSHEPHERD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationWILKINSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationExisting Site Aerial Frederick High School Feasibility Study September 5, 2012
Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap
More informationFacility Assessment Report, Montgomery Independent School District
NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2
More informationHERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School
HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has
More informationMADELEY RANCH ELEMENTARY SCHOOL
MADELEY RANCH ELEMENTARY SCHOOL CAMPUS DATA MADELEY RANCH ELEMENTARY SCHOOL 3500 Madeley Ranch Road, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 94,750 Pre-K - 4 th
More informationEASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923
INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More information3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSchool Without Walls
INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationPATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationWATKINS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationThe parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.
EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building
More informationLEWIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationTotal Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet
FLANDERS ELEMENTARY SCHOOL Located at 167 Boston Post Road, East Lyme, Connecticut the school s original structure was built in 1964 and replaced the Central Office Building as the elementary school. Two
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary
More informationDarlington Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Brunson-Dargan Observed By: Creed/Carter Principal: Mrs. Ada O Sindab
More informationGARFIELD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive
More informationDivision 09 FINISHES TABLE OF CONTENTS
Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING
More informationBRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW
HISTORIC PRESERVATION REVIEW submitted to: DC Historic Preservation Office Office of Planning ARCHITECTS ARCHITECTURAL NARRATIVE Bruce Monroe Elementary School at Park View is among the schools included
More informationAppendix J - Custom Uniformat for EDU Migration
Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations
More informationDarlington Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Cain Elementary School Observed By: Creed/Carter Principal: Grade
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationTimberglen Recreation Center Summary
Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,
More information4.1.3 Project Manual
4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01
More informationTable of Contents Hampton Dumont Community School District November 5, 2013
Table of Contents Hampton Dumont Community School District November 5, 2013 Facility Assessment Overview & Proposed Design Options 1. Option 1 Alleviate Congestion at South Side Elementary Existing Facility
More informationChenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017
Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections
More informationBENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY
BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY Prepared for the City of Benson, Minnesota by Widseth Smith Nolting May 2016 City of Benson, Minnesota CITY HALL/POLICE STATION
More informationBUILDING CONDITION: INTERIOR
Typical interior finishes at the Main Building consist of VCT flooring, plaster walls, and lay in ceilings at classrooms and instructional spaces Corridors have terrazzo flooring and partial height glazed
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: SAINT FRANCIS COLLEGE - BROOKLYN, 180 REMSEN STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-05
More informationHartsville Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade
More informationHartsville Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:
More informationMCER Study for Little Powder K-8
MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives
More informationUpdate on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More informationFACILITY COMPONENTS - MIDDLE SCHOOL
SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls
More informationUpdate on FCPS Construction/Renovation Projects. December 2015
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 54 MINISCHOOL - QUEENS, 86-02 127TH STREET, New York, 11418 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationDarlington Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Pate Elementary School Observed By: Creed/Carter Principal: Grade
More informationSchool Assessment Report
School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report
More informationNew Ringgold Middle School. Project Slideshow August 26, 2017
New Ringgold Middle School Project Slideshow August 26, 2017 Aerial Photo from West Provided by Hudson Group Taken 8.16.2017 Aerial Photo from North Provided by Hudson Group Taken 8.16.2017 Aerial Photo
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play
More informationThurgood Marshall Recreation Center Summary
Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: LAFAYETTE ACADEMIES - BRONX, 1231 LAFAYETTE AVENUE, New York, 10474 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-01-02
More informationCEFPI Monthly Meeting
CEFPI Monthly Meeting LISD School Construction Cost Information Background Information School Cost Information How Does LISD Compare? Other District Comparisons Background Information Cost Discussion Type
More informationMadison School District. Strategic Five-Year Facility Maintenance Plan
Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since
More informationDrexel Hill Middle School
150004 Drexel Hill Middle School Site Plan for Drexel Hill Middle School Floor Plan for Drexel Hill Middle School 2 150004; Drexel Hill Middle School. This school is located at 3001 State Road, Drexel
More information2016 BOND INFORMATION
2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,
More informationSite Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks
Site Bldg Fiscal Yr System Sub-System Site site 2014/15 Parking Paving Site site 2014/15 Sidewalks Skill Center L 2015/16 Architectural Partitions Site Site 2015/16 Parking Striping Arc Center M 2014/15
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20
More informationLOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN
INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS
More informationSchool Assessment Report
School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationHartsville Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Principal: Grade Levels: Site Size: Student Population: Staff Size:
More informationGFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1
GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationTABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS
AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding
More informationNOYES EDUCATION CAMPUS
INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 88 - QUEENS, 60-85 CATALPA AVENUE, New York, 11385 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 375 - BROOKLYN, 46 MCKEEVER PLACE, New York, 11225 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior
More informationHOMOGENEOUS AREAS LIST Asbestos
Elementary Campus 1985 Elementary uilding Wing (17,600 sq. ft.) uilding 12" floor tile (white/beige) and mastic 3,200 Square Feet Troughout building 2' x 2' ceiling tiles 10,000 Square Feet Gym (4,700
More informationBOWIE LEARNING CENTER
BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S./I.S. 266 - QUEENS, 74-10 COMMONWEALTH BLVD, New York, 11426 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: I.S. 364 AX (POOL&GYM)-BROOKLYN, 1540 VAN SICLEN AVE, New York, 11239 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationAl Behrman Elementary School
Mulberry Street Al Behrman Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior
More informationSYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community.
SYLVAN MIDDLE SCHOOL The mission of Sylvan Middle School is consistent with that of the San Juan Unified School District, which is to inspire each student tosucceed and responsibly contribute to a radically
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 290 - MANHATTAN, 311 EAST 82 STREET, New York, 10028 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior
More informationRECAPP Facility Evaluation Report
RECAPP Facility Evaluation Report Edmonton School District No. 7 Avonmore Elementary School B347A Edmonton Report run on: March 8, 211 1:28 AM Building Name: Address: Location: Building Id: Gross Area
More informationOverbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %
8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior
More informationLake Highlands North Recreation Center Summary
Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: REGION 1 ROC B - BRONX, 1 FORDHAM PLAZA, New York, 10458 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-26 11:52 AM 2018-04-27
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S.372 ANNEX - K, 215 FIRST STREET, New York, 11215 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-06
More informationSchool Assessment Report
School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:35:17 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: P.S. 65 - BROOKLYN, 158 RICHMOND STREET, New York, 11208 Inspection Id Inspection Type Time In Last Edited Architectural - Senior 2018-05-15 11:22 AM 2018-06-12
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: I.S. 323 (OLD IS 180) - QUEENS, 320 BEACH 104 STREET, New York, 11694 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationBARNARD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More information260,000 SF Building Profile
Expanding Your Development & Investment Perspectives 260,000 SF Building Profile Precast & Brick Exterior Finish 245,000 SF Production/Warehouse 7,500 SF Office & 7,500 SF Mezzanine 50 x 50 Bays, 24 Clear
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 214 - QUEENS, 31-15 140 STREET, New York, 11354 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-09
More informationUpdate on FCPS Construction/Renovation Projects. August 2015
Update on FCPS Construction/Renovation Projects Jessie Clark Middle -- Renovation Architect: General Contractor: Tate Hill Jacobs Architects Alliance Corporation GC Contract Sum: $18,041,500 Total Project
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls
More informationBelington Elementary School Grades PK 5
Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Belington Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Belington
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: P.S. 753 (OLD P85/STERLING HS) - K, 510 CLERMONT AVENUE, New York, 11238 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-22
More informationNYC Department of Education
Asset: P.S. 245 ECC (@ SENECA AVE) - Q, 378 SENECA AVE, New York, 11385 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20 12:21 PM 2018-06-12 6:51 PM AA : Architectural
More information