CITY OF ELKO BID TABULATION FOR Sports Complex

Size: px
Start display at page:

Download "CITY OF ELKO BID TABULATION FOR Sports Complex"

Transcription

1 CITY OF ELKO BID TABULATION FOR Sports Complex NAME Granite Construction Great Basin Engineering Contractors Road & Highway Builders CLEARING EARTHWORK Per Lump Sum 1 LS 845, , , , ,105, ,105, SWPPP - Includes 10'X10' basin below existing storm water outflow pipe includes filter fence around soil 2 City Standard and fill stockpile Per Lump Sum. 1 LS 200, , , , , , Site Cleaning, Grubbing to be stockpiled on site in future phase area, concrete and other manmade debris to be removed from the site., Concrete curb cutting/removal covered in Civil schedule, Includes clearing wetland/restoration Per Acre Acres 2, , , , , Topsoil Stripping and Stockpile 6" depth Includes wetland/restoration area includes future work areas Includes fine grading of landscape Per Acre Acres 4, , , , , , Topsoil Placement Includes placement of 6" of topsoil to all planted areas Includes 6" topsoil placement on wetland / restoration per Cubic Yard. 16,671 Cubic Yards , , , Excavation and Rough Grading Includes wetland & restoration cut (approx. 40,000 yards) Includes stockpile of excess fill material (approx. 20,000 per Cubic Yards 136,000 Cubic Yards ,156, ,213, ,720, ELECTRICAL UTILITIES

2 7 Section E Electrical Service Connection, Include transformer and concrete per Lump Sum. 1 LS 130, , , , , , Section E (P-2) Parking Lot Lighting, Includes pole base, conduit, conductor, junction box, Includes trenching, backfill, Per Each. 4 Each 6, , , , , , Section E 10 Section E (P-1) Parking Lot Lighting - Includes pole base, conduit, conductor, junction box Includes trenching, backfill, per Each. (R-1) Roadway Lighting Includes pole base, conduit, conductor, junction box includes trenching, backfill, per Each. 7 Each 7, , , , , , Each 6, , , , , , Section E (W-1) Walkway Lighting- Includes pole base, conduit, conductor, junction box, includes trenching, backfill, per Each. 10 Each 8, , , , , , Section E (R-1) Roadway Lighting (Pole Base Only) Includes pole base, conduit & pull string, junction box Includes trenching, backfill, per Each. 4 Each 5, , , , , , Section E (W-1) Walkway Lighting (Pole Base Only) includes pole base, conduit, & pull string, junction box includes trenching, backfill, per Each 4 Each 4, , , , , , Section E Scoreboard Power - Includes conduit, conductor junction box and connection to scoreboard- Includes trenching, backfill, per Lump Sum. 1 LS 18, , , , , , Section E Dugout Power (6 Dugouts) Includes receptacle, conduit, conductor junction box includes trenching, backfill, per Lump Sum. 1 LS 16, , , , , ,000.00

3 16 Section E Irrigation Pump Station Power - Includes conduit, conductor junction box Includes trenching, backfill, per Lump Sum. 1 LS 6, , , , , , Section E Security Camera - Includes excavation, pole base and per Lump Sum. 1 LS 15, , , , , , Section E Flagpole Lighting - Includes conduit, conductor, junction box includes trenching, backfill, per Each. 3 Each 2, , , , , , Section E Sports Lighting Components - Includes conduit, pull strings, junction boxes, no conductor. Includes trenching, backfill, and per Each. SITE CONCRETE /ASPHALT (EXCLUDING ROADS OR PARKING Retaining Planter Wall (Center of complex) Includes subgrade excavation preparation and fine grading includes foundation, agg.base, reinforcing steel, and skate per Cubic Yard. 15 Each 3, , , , , , CY , , , , , Per Detail Concrete Stairs, Cheek walls, Handrails includes subgrade excavation preparation and fine grading - Includes foundation, agg.base, reinforcing steel, and hand rail per Cubic Yard. 16 CY 1, , , , , " Concrete Flatwork - Includes subgrade excavation preparation and fine grading includes 4" type 2 agg. Per Square Foot. 6" Colored Concrete Flatwork - Includes subgrade excavation preparation and fine grading Includes 4" type 2 Per Square Foot. 28,148 SF , , , ,220 SF , , , " Concrete flatwork - Includes subgrade excavation preparation and fine grading Includes 4" type 2 agg. Per Square Foot. 6,867 SF , , ,601.00

4 25 Per Detail 26 Per Detail Concrete mow curb 6"X6" at main entry includes subgrade excavation preparation and fine grading Includes, reinforcing steel and 4" type 2 agg. per Lineal Foot. 6' Precast Concrete Fence - Includes grading, footings for posts and agg. per Lineal Foot. 72 LF , , , ,950 LF , , , SITE FURNISHINGS / AMENITIES 27 Per Detail 28 Per Detail Removable Steele Bollards - Includes footing, sleeve, and agg. Per Each. Permanent Steel Bollard - Includes footing, and per Each. 3 Each 1, , , , , , Each 1, , , , , , Seating Area Shade Canopy - Includes engineered shop drawings Includes excavation, footings, and per Each. 3 Each 29, , , , , , Per Detail 31 Per Detail Vehicle Swing Gates - Includes engineered shop drawings includes excavation, footings, and per Each 8" CMU Dumpster Enclosure - Includes excavation, footing and agg.base Includes steel doors, engineered shop drawing required for per Lump Sum 1 Each 24, , , , , , LS 18, , , , , , Per Detail 40' Flag Pole & Paver Path to Pole - Includes concrete base and pad Includes integration of flagpole power and light fixtures in pad - Includes 4" type 2 agg. per Lump Sum. 1 LS 9, , , , , , PLAYING FIELDS 33 Section C Baseball Playing Field 325' (natural grass) Includes all materials and systems included in SR series per Each. 2 Each 1,060, ,120, ,362, ,724, ,200, ,400,000.00

5 34 Section C Baseball Playing Field 250' (natural grass) Includes all materials and systems included in SR series per Each. 1 Each 800, , , , , , Scoreboard - Includes engineered shop drawings Includes excavation, footings, and per Each. Sports per Lump Sum. PLANTING AND MULCH (EXCLUDES PLAYING FIELDS) 3 Each 22, , , , , , Each 25, , , , , , Lawn Area (excluding playing fields and central lawn area) Furnish and install hydro-mulch turf per Square Foot. Native Area - Furnish and install border zone hydromulch per Acre. 93,630 SF , , , Acres 15, , , , , , Per Detail Rock Mulch in Drain Channel: 3"-8" Cobble 8" per Cubic Yard. Landscapes Boulders in Drain Channel: 1'x1' - 3'x3' Furnish and install boulders per detail/plans@ per each. 150 CY , , , Each , , , Bottom of Detention Basins Furnish and install wetland hydro-mulch per Acre. IRRIGATION (EXCLUDES PLAYING FIELDS) Lawn area outside of playing fields (excludes lateral irrigation for central lawn area) Includes mainline, point of connection equipment, irrigation clock, communication wire, and associated Per Square Foot Acres 41, , , , , ,630 SF , , , Planted Beds (Drip Zones) Includes all equipment for non-turf drip per Square Foot. 20,000 SF , , ,000.00

6 Native Area (Point Source Emitter Zones Only) Includes all areas receiving native border zone seed includes valves, pipe, emitters based on plant quantities and per Each. Water Source to Wetlands 2" PVC pipe and per Lineal Foot 646 Each , , , LF , , , Per Detail Pump Station Includes engineered shop drawings by vendor Includes offloading and set station, tie in to water source, connection to power stub, start up and testing Includes concrete pad and cabinet as per Lump Sum. 1 LS 170, , , , , , WETLAND MITIGATION AND RESTORATION AREA Wetland Seed Mix per Acre. Upland Seed Mix per Acres Transition Seed Mix per Acre. Deciduous Trees: 1" Caliper Furnish and install trees per plan and per Each. Shrubs: 1 Gallon - Furnish and install shrubs per plan and per Each. 4.9 Acres 6, , , , , , Acres 5, , , , , , Acres 5, , , , , , Each , , , Each , , , Willow Whips - Furnish and install willow whips per plan and per Each 3900 Each , , , Sedge and Rush Seedlings - Furnish and install wetland seedlings per plan and per Each. ARCHITECTURE 54,200 Each , , , Section D Comfort Station / Lump Sum. 1 LS 780, , , , , ,000.00

7 CIVIL WORK Sawcut Existing AC Errecart per Lineal Foot. 100 LF , , Remove Existing AC - Errecart per Square Yard. 10" Aggregate Base: Future Road & per Square Yard. 6" Aggregate per Square Yard. 217 SY , , , ,740 SY , , , ,000 SY , , , Track per Square Yard 2,000 SY , , , Plant mix per Square Yard Plant mix (AC per Square Yard Parking Lot & Road Striping and per Lump Sum. 10,000 SY , , , ,000 SY , , , LS 10, , , , , , Pavement Markings ADA access per Lump Sum. 1 LS , , Traffic Control - Phase per Lump Sum. 1 LS 7, , , , , , New Permanent Signs - per MUTCD (Stop & handicap signs)@ Per Square Foot. 80 SF , , , Concrete Curb and Gutter Type 1 (includes 6" Agg per Lineal Foot Concrete Median Curb (Includes 6" Ty 2 per Lineal Foot. 1,396 LF , , , ,300 LF , , , Concrete Sidewalk - 5' width (includes 4" Type 2 Ag Base) Access per Square Yard. 310 SY , , , SY , , , Concrete Valley per Square Yard ADA Ramp in Parking area Detail sheet C-27 w / per Square Yard. 60 SY , , , Grading of 2' Depth Drainage per 100 Feet. 9 STA (100') 2, , , , ,300.00

8 Grading of 4' Depth Drainage per 100 Feet. 6 STA (100') 2, , , , , " Drainage junction Each. 24" Drainage Junction per Each 6 inch dia. Corrugated PP N-12 storm Per Lineal Foot. 10"dia. Corrugated PP N-12 storm drain per Lineal Foot. 1 Each 4, , , , , , Each 4, , , , , , LF , , , LF , , , inch dia. Corrugated PP N-12 storm drain per Lineal Foot 40 LF , , , " Dia. Corrugated PP N-12 storm drain per Line Foot. 990 LF , , , " dia. Corrugated PP N-12 Storm drain Lineal Foot. 840 LF , , , " dia. Corrugated PP N -12 storm per Lineal Foot. 330 LF , , , " dia. Corrugated PP N-12 storm per Lineal Foot. 950 LF , , , " dia. Corrugated PP N-12 storm per Lineal Foot. 540 LF , , , Concession & Field drainage per Each. Grading Fill - per Cubic Yards. Rock Riprap inlet and outlet per Square Yard. 6 Each 3, , , , , , CY , , , SY , , , Grouted per Square Yard. 300 SY , , ,000.00

9 Type 4R drainage per Each 4 Each 7, , , , , , " dia. Storm Drain per Each 48" dia. Sanitary Sewer per Each. 12" dia. PVC SDR-35 Sanitary Sewer per Lineal Foot. 8" dia. PVC SDR-35 Sanitary Sewer Service per Lineal Foot. 6" Concrete CIP slab on per Square Foot. 12" AWWA C900 Class 150 SDR 18 PVC Pressure per Lineal Foot. Cut 12" line, cap 12" line & remove valve per Lump Sum. 12" X 12" X 12" Waterline per Each 12" Dia. Isolation Gate Valves Each End of per Each 2" Backflow Prevention per Each. 5 Each 8, , , , , , Each 6, , , , , , ,035 LF , , , LF , , , SF , , , ,115 LF , , , LS 1, , , , , , Each 8, , , , , , Each 5, , , , , , Each 7, , , , , , THIS ITEM HAS BEEN REMOVED 99 THIS ITEM HAS BEEN REMOVED " ips, 200 psi Polly Water Service Line (includes per Lineal Foot. 6" AWWA C900 Fire Service per Lineal Foot. Fire Hydrant Assembly (includes 1 6" per Each. Special Construction Utility per Each. 460 LF , , , LF , , , Each 12, , , , , , Each 2, , , , , ,000.00

10 104 Remove and dispose of 12" diameter water per Lineal Foot. 1,000 LF , , , Total Base s 12,035, ,633, ,282, Minor keying error on item #47 Minor keying error on Add.Alt # 12 ADDITIVE ALTERNATE #1 1 Sports Light Plans Sports Light Poles and precast pole bases (owner provided poles and control equipment)-install per light pole provider per Each 15 EA 15, , , , , , Total Additive Alterative #1 234, , , Section E ADDITIVE ALTERNATE #2 Sports Field Lighting (wire only)-includes installation of conductor for sports light per Lump Sum 1 LS 33, , , , , , Total Additive Alterative #2 33, , , ADDITIVE ALTERNATE #3 1 Section E (W-1) Light Pole fixtures and conductor only - Pole base, conduit, junction boxes are included in base per Each. 4 Each 6, , , , , , Total Additive Alterative #3 26, , , Section E ADDITIVE ALTERNATE #4 (R-1) Light pole fixtures and conductor only - Pole base, conduit, junction boxes are included in base per Each. 4 Each 4, , , , , , Total Additive Alterative #4 17, , ,400.00

11 ADDITIVE ALTERNATE #5 1 Section E Fiber Optic Data (Conduits Only) - Includes conduit & pull string, trenching, backfill, per Lineal Foot. 2,110 LF , , , Total Additive Alterative #5 84, , , ADDITIVE ALTERNATE #6 4" Concrete Flatwork areas excluded from Base - Install type 2 agg.base up to finish grade (8" Total)- Includes subgrade excavation, preparation and fine grading. 21,876 SF , , , Total Additive Alterative #6 87, , , ADDITIVE ALTERNATE # "Concrete Flatwork areas excluded from Base s- Install concrete flatwork - Includes subgrade excavation, preparation and fine grading-includes 4" type 2 per Square Foot. 21,876 SF , , , Total Additive Alterative #7 229, , , ADDITIVE ALTERNATE # " Concrete Flatwork areas excluded from Base - Install type 2 agg. Base up to finish grade (10"total)- Includes subgrade excavation, preparation and fine per Square Foot. 3,361 SF , , , Total Additive Alterative #8 15, , , ADDITIVE ALTERNATE # " Concrete Flatwork areas exclude from Base - Install concrete flatwork - Includes subgrade excavation, preparation and fine grading - Includes 4" type 2 agg. per Square Foot. 3,361 SF , , , Total Additive Alterative #9 36, , , ADDITIVE ALTERNATE #10

12 Asphalt Trail agg.base only - Includes subgrade excavation, preparation and fine grading - Install type 2 agg.base up to finish grade (9" per Square Foot. 3,566 SF , , , Total Additive Alterative #10 17, , , ADDITIVE ALTERNATE # Asphalt Trail install Plant mix (AC 3") - Includes subgrade excavation preparation and fine grading - Includes 6" type 2 agg.base 3,566 SF , , , Total Additive Alterative #11 12, , , ADDITIVE ALTERNATE # Central Lawn Area - Furnish and install irrigation system per per Square Foot. 176,673 SF , , , Total Additive Alterative #12 123, , , ADDITIVE ALTERNATE # Lawn Area (excluding playing fields and central lawn) - Furnish and install per Square Foot. 93,630 SF , , , Total Additive Alterative #13 159, , , ADDITIVE ALTERNATE # Sports Fields Lawn Area - Furnish and install per Square Foot. 153,740 SF , , , Total Additive Alterative #14 276, , , ADDITIVE ALTERNATE #15

13 Native Area (Rotor Zones) - Includes all areas receiving native border zone per Square Foot. 169,000 SF , , , Total Additive Alterative #15 67, , , Per Detail ADDITIVE ALTERNATE #16 Concrete mow curb 6"X6" (Central Lawn Area) - Includes subgrade excavation preparation and fine grading - Includes, reinforcing steel and 4" type 2 per Lineal Feet 175 LF , , , Total Additive Alterative #16 6, , , ADDITIVE ALTERNATE #17 1 Per Detail Temporary 3' v ditch - Includes rock apron structures, coir log check dams, and see application - 10X10 basin included in base per Lineal Feet 718 LF , , , Total Additive Alterative #17 7, , , ADDITIVE ALTERNATE #18 1 Per Detail Temporary 2' v ditch- Includes rock apron structures and seed per Lineal Foot 1,838 SF , , , Total Additive Alternative #18 11, , , Minor written error on item #47 - Wrote 29, on bid tab form, should be 29, Minor written error on Add.Alt # 12 Wrote 123, Should be 123,671.10

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

CITY AND COUNTY OF DENVER

CITY AND COUNTY OF DENVER 2-1.1b REMOVE COMBINATION CONCRETE CURB, GUTTER AND SIDEWALK (3'-11") 2-1.2a REMOVE 6" CONCRETE CURB AND/OR GUTTER S Holly: See near STA: 25+56 S Poplar 300 LF 25 LF 2-1.4 REMOVE HANDICAP CONCRETE CURB

More information

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000.

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000. LAS VEGAS PAVING CORP. CONTRI CONSTRUCTION COMPANY AGGREGATE INDUSTRIES-SWR, INC. TAB CONTRACTORS, INC. ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

College Station, TX. Legislation Details (With Text)

College Station, TX. Legislation Details (With Text) City Hall 1101 Texas Ave 77840 Legislation Details (With Text) File #: 18-0233 Version: 1 Name: Veterans Park and Athletic Complex Build Out Phase 1 Construction Contract Type: Contract Status: Consent

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance To: Project Name: Bidding Company Site Work Project Contact: Address: Various Phone: Fax: Bid Number: Project Location: Various, Anywhere, PA Bid Date: 7/16/2014 Clarifications: This takeoff does not include

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 28, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO

2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO July 27, 2018 2018 Roadway Erosion Control ADDENDUM NUMBER TWO This Addendum Number Two supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON - April 24, 2017 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 25, 2017 in accordance

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT

CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT OHLONE GREENWAY BART STATION AREA ACCESS, SAFETY, AND PLACEMAKING IMPROVEMENTS City Project No. C3076 Federal Project No. CML-5239 (025) ADDENDUM NO. 1 TO: All

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

TENDER WELLCOX ACCESS ROAD ADDENDUM 1

TENDER WELLCOX ACCESS ROAD ADDENDUM 1 TENDER 2336-2019 WELLCOX ACCESS ROAD ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2336-2019. Revisions supersede the information

More information

DOCUMENT ADDENDUM No. 2

DOCUMENT ADDENDUM No. 2 DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 - PART 1 GENERAL 1.01 THE REQUIREMENT A. Payment for various items of the Bid Schedule, as further specified herein, shall include all compensation to be received by the CONTRACTOR for furnishing

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO

IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO. 2016-002 AND LIFORNIA 94571 REVISIONS VICINITY MAP No. Description NTS CONTACTS SHEET INDEX SHEET NO. SITE MAP 1"=50' COVER SHEET R MLP

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : GRADING, BIT MILL & SURFACING, LIGHTING AND UTILITIES CONTRACT LOCATION: LOCATED ON TH 210 FROM 100 FT WEST OF GRAND AVE TO SIXTH STREET IN CARLTON RECOMMENDATION: AWARD

More information

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances 2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to

More information

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

GENERAL NOTES AND CONDITIONS STORM SEWER 1. ALL EARTHWORK, GRADING AND PAVING SHALL BE PERFORMED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION IN ILLINOIS, STATE OF ILLINOIS

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD Schedule 5 Page 1 GENERAL DETAILS G1 General Legend for Contract Drawings Deleted (Per City A-size Drawing Block) G2 Legend for Materials

More information

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6 SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced

More information

MONROE STREET CONTRACT NO DATE: 12/21/17

MONROE STREET CONTRACT NO DATE: 12/21/17 Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $100,000.00 $100,000.00 $48,300.00 $264,800.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 510.00 $15.00 $7,650.00 $10.00

More information

33rd Street Outfall (Curtis to Lafayette) Schedule A

33rd Street Outfall (Curtis to Lafayette) Schedule A 01-21.23.01 ALLOWANCE ACCOUNT - SEE PROJECT SPECIAL PROVISIONS Add'l Info: For coordination and installation of power supply to upgraded traffic signals at MLK and Downing and MLK and Marion. Please see

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

MAY 11, 2017 T-MC-107A & T-MC-107B1

MAY 11, 2017 T-MC-107A & T-MC-107B1 Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05

More information

CITY OF ROCKLIN STANDARD DRAWINGS

CITY OF ROCKLIN STANDARD DRAWINGS CITY OF ROCKLIN STANDARD DRAWINGS November 2016 Table of Contents Page # Section 1 Section 2 Section 3 General Notes and Review Boxes 01-01 Signature Blocks... 1 01-02 General Notes (Sheet 1 of 8)... 2

More information

General Water Bid Items Item No.

General Water Bid Items Item No. BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

ATTACHMENT 8 STIPULATED UNIT PRICES

ATTACHMENT 8 STIPULATED UNIT PRICES ATTACHMENT 8 STIPULATED UNIT PRICES 1. Work Package Item Prices (2 pages) 2. General Description of Work Items (3 pages) PQOC SMALL SIDEWALK CONTRACTORS LIST STIPULATED UNIT PRICES City of Los Angeles

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS Section Title Page 20.1 General... 20-1 20.2 Units and Costs... 20-1 20.2.1 Erosion Control...20-1 20.2.2 Street Improvements...20-1 20.2.3

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

Improvement Plan Cost Estimate

Improvement Plan Cost Estimate Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or

More information

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction

More information

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS QUESTIONS & ANSWERS ITB 017-030 HELEN MCCALL PARK IMPROVEMENTS QUESTION: Site Lighting. The prints show that the existing site lighting structures are to be relocated on site. Is this the only site lighting

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents General Figure 2.3.1 16 Revise Revised Figure 2.3.1: New Development Areas where Secondary Suites Apply to include two new areas (#4 and 5). Water 3.3.2 Watermains 31 Add Added wording in Section 3.3.2.3

More information

Tabulation of Bids 8 September 2017 MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF PROJECT

Tabulation of Bids 8 September 2017 MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF PROJECT SCHEDULE 1 BASE BID: PROJECT-WIDE ITEMS All work exclusive of Items listed separately, including tunnel between Station 8+00 and 1 1 LS Station 271+85 $191,675,695.00 $191,675,695.00 $190,592,000.00 $190,592,000.00

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

Kaysville Parks and Recreation Department Request For Bids Pioneer Park Phase I RFB 10-17

Kaysville Parks and Recreation Department Request For Bids Pioneer Park Phase I RFB 10-17 The total construction s shall be broken down into the categories indicated below to provide the Owner with a comparable analysis of each proposal submitted and a method for determining value engineering

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

City of Town & Country Wirth Tract Development

City of Town & Country Wirth Tract Development ENGINEER'S OPINION SUMMARY OF PROBABLE COSTS // BASED ON PRELIMINARY PLAN DATED // City of Town & Country Wirth Tract Development SUMMARY TOTAL GRADING AMOUNT,0. TOTAL SANITARY SEWER AMOUNT,0.0 TOTAL STORM

More information

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF 30051 FURNISH AND INSTALL AGGREGATE SLURRY BACKFILL 589 CY 50.00 29,450.00 55.00 32,395.00 50.00 29,450.00 30584 FURNISH AND INSTALL 8" CRUSHED AGGREGATE DRIVEWAY APPROACH BASE 480 SF 0.75 360.00 0.85

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40 PART A - ROADWAY - EOC 2461 201(A) CLEARING AND GRUBBING LSUM 1.00 $500,000.00 $500,000.00 202(A) UNCLASSIFIED EXCAVATION CY 651,706.00 $4.00 $2,606,824.00 202(D) UNCLASSIFIED BORROW CY 7,500.00 $8.00

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

BASE BID FORM FY 2015

BASE BID FORM FY 2015 BASE BID FORM FY 2015 STORMWATER TREATMENT AREA - BASE BID (FY2015) THE LUMP SUM (LS) PRICES FOR ITEMS 1-6 SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND ALL APPLICABLE

More information

EXHIBIT E SCHEDULE OF UNIT PRICES

EXHIBIT E SCHEDULE OF UNIT PRICES SCHEDULE OF UNIT PRICES TO ACCOMPANY THE BID OF (Bidder/Contractor) ON CALL UTILITY SERVICES AND MISCELLANEOUS CONSTRUCTION FOR SEWER AND WATER LINES SOLICITATION NO.: IFB SA1703 Any bidder who enters

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 MEASUREMENT AND PAYMENT PART 1 -- GENERAL 1.1 SCOPE A. The Contractor shall receive and accept the compensation as provided in the Bid Form as full payment for furnishing all materials, labor,

More information

REVISED PER ADDENDUM No. 1 - Unit Price Bid Schedule

REVISED PER ADDENDUM No. 1 - Unit Price Bid Schedule 1. Mobilization, Insurance, Bonds, General Requirements, BMPs, Record Drawings, Testing Requirements, Utility Location, Demobilization and Site Maintenance. 1 L.S. 2. Supply and install complete 384,238

More information

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Prepared By: 3800 Via Del Rey Bonita Springs, FL 34134 July 2015 Table of Contents Name Section Bid Schedule Project Description

More information

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) CONTRACT ITEM NO. CONTRACT ITEM UNIT BUCKHORN ROAD UPPER SECTION BUCKHORN ROAD LOWER SECTION PROJECT TOTALS PLAN AS CONST. PLAN AS CONST.

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION

More information

SECTION 1500 REMOVALS

SECTION 1500 REMOVALS SECTION 1500 REMOVALS REMOVALS PART 1 GENERAL 1.01 Section Summary A. Removal of structures, obstructions, surfacing, and miscellaneous items. 1.02 Related Sections A. Section 1800 Excavation and Embankment

More information

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. 2017-1 43 SOUTH GRANVILLE WATER AND SEWER AUTHORITY H STREET BY-PASS

More information

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone Entllus DUMPSTER PAD AND REPLACE WITH NEW BETWEEN THESE TWO POINTS SAWCUT ALONG DEMO LINE REMOVE PARKING SPOTS CURB, GUTTER, ASPHALT AND LANDSCAPING, WITHIN HATCHED AREA FOR NEW ADDITION CURB & GUTTER

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

C. W. Matthews Contracting Co., Inc. (L)

C. W. Matthews Contracting Co., Inc. (L) BID TABULATION Page 1 of 5 E.R. Snell Contractor, 001 Photograph Documentation 8 MO $110.00 $880.00 $250.00 $2,000.00 $97.17 $777.36 $1,250.00 $10,000.00 002 Traffic Control Project No. F-1056 1 LS $192,000.00

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

SPRINKLER SYSTEM Job Ready Checklist

SPRINKLER SYSTEM Job Ready Checklist Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Permit card is clearly posted. Readable

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

COST ESTIMATE STREET IMPROVEMENTS (Off Site) STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter

More information

LJA Engineering, Inc.

LJA Engineering, Inc. BID OPENING DATE: TABULATION DATE: LJA JOB NO. 2085-0114D (9.2) BIDDER'S NAME TOTAL BID AMOUNT 1) CROSTEX CONSTRUCTION, INC. $535,000.00 2) BLAZEY CONSTRUCTION SERVICES, LLC $552,212.70 3) R CONSTRUCTION

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1 UPPER SKAGIT INDIAN TRIBE COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO. 1 (7 pages total) Issue Date: May 11, 2016 General: Recitations of each and every section of the bid documents impacted

More information