Productecture: Design for Remanufacturing. Masters Thesis: Harvard Design School 2002 by Andrea Korber. Thesis Model Photo - Productecture:
|
|
- Brooke Howard
- 5 years ago
- Views:
Transcription
1 Productecture: Design for Remanufacturing Masters Thesis: Harvard Design School 2002 Advisors: Michelle Addington, Laura Miller, Gary Rohrbacher Existing Conditions, Disposable Architecture. Given: At current rates of construction the entire developed world could be replaced in 100 years. Product stewardship should be brought to architecture. Productecture is a system that is non-disposable; it is designed for remanufacture. Thesis Model Photo - Productecture:
2 Diagram of bus modularity - the type of modularity employed in final Productecture design. One bus supports a variety of add-ons for customization, in this case: skylights and specialty architectural elements. Model photograph, final Productecture design A steel frame provides rugged durability and bolted connections for flexibility. Steel connections are designed to daisy chain, and allow for the maximum variety of openings. Wood wool slabs are attached to the exterior, exposing the construction to the interior. The skylights are designed as if microcosms of the system as a whole.
3 Axonometric - Platform Frame Trailor, from Site Visit, Factory Built Buildings, Thesis Preparatory Research. Steps to Building a Trailer: Chassis Manufactured Wire Electrical, Vapor Barrier/Rat Guard, (pull wire for applied to chassis tel-comm) Chassis wired for Electrical/Br Chassis Delivered eaks Interior Panels Applied 5/8" Gypsum applied if Firewall Walls Walls Framed Insulated cut openings for Apply exterior windows/doors siding, roofing, cut openings for Attach walls Attach roof windows/doors to floor (nails and straps) to walls (nails and straps) Apply exterior panels Plumb Mount HVAC unit Clean, Inspect, Test for shorts Deliver to Site Floor Framed Floor Insulated Mate Beam Built Mate Beam Glue-lam drying Install windows/doors Trim windows/doors, Sub-floor Installed Roof framed Tile or Carpet installed directly Installed Mate beam applied Air plenum built, installed Roof insulated Interior ceiling finish applied, panel + batton Unbuilding a standard platform frame Trailor Unit: Remove from Site HVAC Discarded WASTE GENERATED Roofing discarded Finish materials discarded Damaged joists discarded NEW MANUFACTURING Replace Replace Damaged interior and Studs/insulation exterior batting finishes Replace Trim Move to Site Unbuilding a Productecture Unit: Remove skylights for Reuse Remove from Site HVAC Refurb NO WASTE GENERATED NO NEW MANUFACTURING Sand surfaces. Switch and replace any columns or panels to make programmatic adjustments save the old components in factory. Install new skylight arrangement Move to new Site
4 Sample Deployment: The Growing Office, 2 phases of life for a growing office space. This is one example of common uses for Productecture which include: Office, Retail, Light Industry, Worship, and Classroom Phase II Roof Plan Phase II Plan Phase I Plan Phase I Roof Phase I/II Elevation Phase II Section Phase I Section Final model shows flexibilty of configurations: 2 base models side by side 2 base models stacked 2 base models end to end
5 Skylight Studies: Plan tests show variations of how parts attach to the frame and photographs of process models look at the spacial implications of canted skylights. The skylights aim to be flexible enough to capture sunlight from any direction, because the siting may include a poor relationship to the sun. They are designed to attach to the steel frame of the building below at several angles of the compass. Frame Configuration Studies: Model tests show variations of how frame could be constructed using standard steel shapes. The final version is a simple column and beam frame, although several structural systems were explored.
6 Disposable system to be replaced: Transverse Section final design Longitudinal Section final design Structure exposed for clarity and ease of disassembly. Bolts visible. New reusable, recyclable system: Wood-wool slabs reusable, recycleable material insulates and becomes walls. Chassis serves for road transport and for MEP systems delivery chase Pin foundations used for semi-temporary applications. Leaving the site relatively undisturbed.
7 Disposable Typology to be Replaced: Final Physical Model:
Structural Inspection
General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied
More informationAPPLICATION AND CERTIFICATE FOR PAYMENT
AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in
More informationDETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient,
DETAIL DRAWINGS RASTRA is a stay-in-place insulated concrete form that is structurally strong, energy-efficient, soundproof, resistant to fire, high wind, mold and rodents and is made from 85% recycled
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting September 20, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationWilliams Scotsman: The Mobile Space Solution
Williams Scotsman: The Mobile Space Solution Table of Contents Page INTRODUCTION..................................... 1 MOBILE OFFICES Models MO208 and MO248........................... 2 Model MO328......................................
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting October 25, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationNew Main Hospital, Site Park, and Underground Garage Construction Progress Update #16
New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16 Date: March 1, 2010 From: Gary Claar Engineering Services 355-1660 Gary.Claar@NationwideChildrens.org More and more
More informationSTERLING. Construction & Development Corporation MODULAR BUILD. Cost Competitive System
- Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System Easy Transportable Modular Build is a Pre-Fabricated highly Insulated Building System
More information4.1.3 Project Manual
4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01
More information1 AND 2 FAMILY DWELLING REQUIREMENTS
PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans
More informationPanel System. Industrial Wood Construction Puu Atsushi Takano
Panel System Industrial Wood Construction Puu 28.5010 Atsushi Takano 13.01.2016 Structure Components Design Construction Examples Contents Structure Plate structure Prefabricated wooden panels e.g. 60cm
More informationNAAHB Workgroup Index General Ledger Account
NAAHB Workgroup Index General Ledger Account 1000 Series Preparation/Preliminaries 1000 Permits/Fees 1010 Building Permits 1020 HBA Assessments 1030 Warranty Fees 1100 Architectural/Engineering 1110 Blue
More informationCARBON MONOXIDE ALARMS
7100 147 th Street West Telephone (952) 953-2588 Apple Valley, MN 55124-9016 www.cityofapplevalley.org BUILDING PERMITS - Are required for all porch additions. PORCH INFORMATION ELECTRICAL PERMITS - Are
More informationWatercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS
Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationBasic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.
Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial
More informationThe Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary
More informationSeattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
More informationJob Cost Summary 11/27/08
by Division with % Complete Job# = 186 Sample Company 2005 Job Cost Summary 186 Williams Post Office 1 General Requirements 1000.000 GENERAL REQUIREMENTS % COMPLETE 25 % COMPLETE % COMPLETE % COMPLETE
More informationTechnical Assignment 2
Chris Glinski Construction Management Faculty Advisor: Dr. Messner Columbia Heights Community Center 1480 Girard St. NW Washington, DC 20009 10-31-2005 Technical Assignment 2 Table of Contents A. Executive
More informationINTRODUCTION MOBILE OFFICES
PRODUCT CATALOG INTRODUCTION................. 04 MOBILE OFFICES Models MO208 and MO248............. 05 Model MO328............................ 06 Model MO3610........................... 07 Models MO4410
More informationSTRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225
GENERAL NOTES DESIGN NOTES (CONTINUED) FOUNDATION NOTES STRUCTURAL ABBREVIATIONS CONCRETE MASONRY NOTES DESIGN NOTES S-001 CONCRETE NOTES COLD-FORMED STEEL FRAMING NOTES PRE-ENGINEERED METAL BUILDING NOTES
More informationProject Estimate Summary
Project Estimate Summary Project Cost Evaluation Table 4 shows the Construction Cost, CC/SF, Total Cost, TC/SF, the Building Systems Cost, and Building Systems Cost/SF based on the budget for. Table 4
More informationCATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationPROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station
RETAIL FOR SALE 5990 Asheville Highway, Hendersonville, NC 28791 OFFERING SUMMARY SALE PRICE: $1,350,000 LOT SIZE: 0.75 Acres YEAR BUILT: 1980 BUILDING SIZE: 5,848 SF RENOVATED: 2018 C-2 Commercial ZONING:
More informationBuilding Systems and Design Elements included in SliDeRulE
Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation
More informationPRESENTATION CENTER SURREY, BC CANADA
PRESENTATION CENTER SURREY, BC CANADA 1 VIEW OF THE PROPOSED OPTIMA 3 TOWERS (AFTER OBTAINING THE HIGH DENSITY THAT IS UNDER STUDY) ALONG WEST WHALLEY RING ROAD 2 3 IHI WILL BUILD THE OPTIMA PRESENTATION
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationSub-construction for Wall-mounted Longlight
modular skylights Sub-construction for Wall-mounted Longlight Subconstruction for Wall-mounted Longlight at 5-40 pitch modular skylights in a wall-mounted longlight solution, can be installed on a sub-construction
More informationCONSTRUCTION COST BREAKDOWN THIS IS FORM CCB
CONSTRUCTION COST BREAKDOWN Property Owner s Name or Borrowers Name Brief Description of Project John Homeowner Build single family residence Property Address Property City Property Zip Code 4625 Jillbarr
More informationTHE SPENCER RESIDENCE J&S ARCHITECT
THE SPENCER RESIDENCE J&S ARCHITECT 75 POURED CONCRETE FOUNDATION WALL (0MPa) 97.94 50Ø WEEPER TILE C/W SOCK W/MIN. 50 GRANULAR COVER F.D. E.P.B. F.D. 00 POURED CONCRETE FOUNDATION WALL (0MPa) 475 X 00
More informationLather (Interior Systems Mechanic) Level 3
Level 3 Lather/Interior Systems Mechanic (ISM) Unit: B3 Blueprint Reading and Specifications 3 Duration: 35 hours 20 hours 15 hours This unit is designed to provide the apprentice with the knowledge and
More informationG703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project
Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor
More informationSub-construction for longlight
modular skylights Sub-construction for longlight Sub-construction for longlight at 5-25 pitch modular skylights installed in a longlight solution are build on a sub-construction made of wood, steel or
More informationMinneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C
2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 30 3 32 33 34 35 36 37 38 39 40 4 42 43 44 45 46 DIVISION 02 EXISTING CONDITIONS Demolition; Removal & Disposal: CMU Partitions AD Quan UM
More informationTYPICAL BEARING WALL FRAMING
BASIC WOOD FRAMING City of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code,
More informationTABLE OF CONTENTS Public Safety Building
DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary
More informationLather/Interior Systems Mechanic (ISM) Level 3
Level 3 B3 Blueprint Reading and Specifications 3 Duration: 35 hours 20 hours 15 hours This unit is designed to provide the apprentice with the knowledge and skills of blueprint reading and specifications.
More informationDESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards
Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize
More informationAGILITAS Property Development
Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development
More informationSTEEL STRUCTURAL SYSTEMS
STEEL STRUCTURAL SYSTEMS Steel elements are of two basic types: Structural steel shapes are formed into their final shapes by hot-rolling. This method produces such common elements as wide flange sections,
More informationPlan /Submission Requirements
Plan /Submission Requirements As a result of the Code changes additional information will be required at the building permit application stage to ensure compliance with new 2012 BCBC requirements. This
More informationStructural Condition Assessment
108 6 th Street, Garland, Texas Engineering Report Date: September 29, 2016 RLG No. : 16729 Prepared for: Mr. Jeff D. Bulls III AIA 3030 LBJ Freeway, Suite 1220 Dallas, TX 75234 PM: Harold F. Phillips
More informationFor Sale. $2,199,000 Office/Warehouse/ Manufacturing th Avenue Baldwin, WI 63 & 12
836 Minnesota Street S. Bayport, MN 55003 Website: www.greystone-commercial.com Email: info@greystone-commercial.com For Sale US HIGHWAYS 63 & 12 $2,199,000 Office/Warehouse/ Manufacturing Office/Warehouse/
More informationTECHNICAL EVALUATION REPORT No. 27/2008/2060
TECHNICAL EVALUATION REPORT No. 27/2008/2060 Sheet 1 of 16 Sheets This report is a correct record of the measurements and observations made. The report is intended for the private information of those
More informationDATE: 4/1/2014 SCALE: 3/16"=1'- 0" SHEET:
Terrace Level First Floor Second Floor Total Back Porch Front Porch Finished NA 1397 SF 743 SF 2140 SF 63 SF 195 SF Unfinished NOTES: All dimensions are framing dimensions, NOT finished dimensions Exterior
More informationOWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"
OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS Schedule "C" Building Code All Ready To Move (RTM) Homes are built according to the Alberta Building Code and National Building Code. Please note that
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More information10 EXTREME BASEMENT PANELS
10 EXTREME BASEMENT PANELS On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils are classified
More informationEcoSteel Pre-Engineered Steel Buildings provide the world s most advanced Eco friendly construction systems.
System Overview EcoSteel Pre-Engineered Steel Buildings provide the world s most advanced Eco friendly construction systems. In our ever extensive product line, we offer solutions for Commercial, Residential,
More informationFeature Zone IECC 2009 IECC
Feature Zone 3 2006 IECC 2009 IECC Window U factor 0.65 0.50 Skylight U factor 0.65 0.65 Window SHGC 0.40 0.30 Ceiling R value 30 30 Wood frame R value 13 13 Mass wall R value 1 5 5/8 Floor R value 19
More informationSub-construction for Atrium Ridgelight
modular skylights Sub-construction for Atrium Ridgelight Ny Ny Sub-construction for Atrium Ridgelight at 25-45 pitch modular skylights in an atrium ridgelight solution can be installed on a sub-construction
More informationNARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION
NARRATIVE REPORT 1.0 BUILDING INFORMATION Putnam Hall was originally constructed in 1905; there appears to have been several renovations, notably, a 1982 renovation throughout the basement and a 1983 renovation
More informationOne Project Driven by STEM
One Project Driven by STEM Surveyor Environmental Engineer Environmental Scientist Geotechnical Engineer Structural Engineer Civil Engineer Landscape Electrical Engineer Mechanical Engineer or Designer
More informationCOMPETENCY ANALYSIS PROFILE General Carpenter 403A. (All unshaded skill sets must be demonstrated/completed)
COMPETENCY ANALYSIS PROFILE General Carpenter 403A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Apply safety legislation Use personal protective equipment Apply safety
More informationPAULDING COLLEGE & CAREER ACADEMY
PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE
More informationSection 5 - Project Logistics
Section 5 - Project Logistics The project schedule for the Pearland Recreation Center and Natatorium begins with commencement of design on March 1, 2007 and ends with substantial completion on May 12,
More informationRESIDENTIAL BUILDING PLAN REQUIREMENTS
CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationSmokey Ridge, Christiansburg, Virginia
Smokey Ridge, Christiansburg, Virginia Outline Specifications Prepared by Community Design Studio, LLC Project # 1305, March 15, 2013 The following describes the Sections to be included in each Division
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07. Latrobe Elementary School. Greater Latrobe School District
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07 Latrobe Elementary School Greater Latrobe School District 08 January 2018 PROJECT SUMMARY Work Completed to date: Ductwork sealed off. Slab Prep in Main
More informationTitle: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)
Title: Building Construction for the Fire Service Time: 3 hours Teaching Materials: White board Building Construction for the Fire Service (PDF) Motivation: With the evolution of newer building construction
More informationINTERNATIONAL BUILDING CODE
INTERNATIONAL BUILDING CODE MODEL BUILDING CONDITIONS ASSESSMENT The Reid and Hughes building is a four-story, four-bay, brick building, constructed in 1869 with a later addition known as the Williams
More informationCONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15
CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15 Copyright 2004 CONSTRUCTION The following are twenty key construction components and basic facts that are to be considered high priority. Please refer
More informationExcellence in. Modular Building Design
Excellence in Modular Building Design 2008 & 2009 2010 2nd Place Honorable Mention Permanent Office Under 10,000 sq. ft. Pacific Mobile Marysville Branch Marysville, WA The factory was able to incorporate
More informationCITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS
CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS Update April 29, 2013 12 Permit application forms and contact information can be found on our website under Inspection Department
More informationBUILDING PERMIT APPLICATION CITY OF SIDNEY BUILDING INSPECTION DEPARTMENT
BUILDING PERMIT APPLICATION CITY OF SIDNEY BUILDING INSPECTION DEPARTMENT APPLICATION REQUESTED (check all that apply) Is this currently a: Permit # Addition-square footage Single Family Detached Permit
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More information6D-BUILDTECH Building Systems. Products and services. Introduction
6D-BUILDTECH Building Systems Products and services Introduction From single family residential housing to very large commercial properties, building construction technology and methods have changed very
More information9.0 TECHNICAL ANALYSIS
9.0 TECHNICAL ANALYSIS There is a long established tradition of a brick aesthetic in Pretoria, which began with the influence of Dutch architects who arrived in Pretoria in the late 1800 s. Since then
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationCity of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)
City of Hughson Building Safety Division 7018 Pine Street Hughson, CA 95326 (209) 883-4054 RESIDENTIAL ATTACHED PATIO COVERS Patio covers are one story roofed structures not more than 12 feet above grade,
More informationThermaSteel Corporation ASSEMBLY MANUAL
ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation
More informationDISTRICT SERVICES BUILDING
DISTRICT SERVICES BUILDING BUILDING DATA DISTRICT SERVICES BUILDING 1100 Longhorn Dr., Weatherford, TX 76086 Year Built 1993 No. of Buildings 1 No. of Portables 0 Approx. Total Square Footage Grades Served
More informationChristopher Glinski Construction Management. AE Senior Thesis Columbia Heights Community Center. Appendix B. Project Summary /Detailed Schedule
Christopher Glinski Construction Management AE Senior Thesis Appendix B Project Summary /Detailed Schedule 74 Task Name ation 1 Project 546 days Mon 5/3/04 Mon 6/26/06 29 Design 243 days Mon 5/3/04 Fri
More informationWhitley Shower Locker Toilet Facilities
Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.com Building Type Building Code Whitley Shower Locker Toilet Facilities
More informationPRELIMINARY STRUCTURAL INVESTIGATION REPORT
124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ
More informationExisting Site Aerial Frederick High School Feasibility Study September 5, 2012
Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap
More informationValues That Matter PLAN CERTIFICATION WORKSHEET
Values That Matter PLAN CERTIFICATION WORKSHEET Builder Name: Main Floor: sq. ft. Plan Name/Number: Upper Floor: sq. ft. Contact Person: Total: sq. ft. Phone: Email: For any item labeled as (option), you
More informationHAMBRO COMPOSITE FLOOR SYSTEM
HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.
More informationIntroduction to Canadian Residential Construction CANADIAN HOUSING IS ADAPTABLE, FLEXIBLE AND ACCOMMODATES DIVERSE CLIMATES.
CANADIAN HOUSING IS ADAPTABLE, FLEXIBLE AND ACCOMMODATES DIVERSE CLIMATES Course Outline CANADA S CLIMATIC RANGES... 3 To understand the range of climates that exist in Canada... 3 CANADIAN HOUSING IS
More informationCampusMaker ModPod. Mobile Modular s. The Flexible Solution for Sustainable Learning Spaces
Mobile Modular s CampusMaker ModPod The Flexible Solution for Sustainable Learning Spaces CampusMaker ModPod the state-of-the-art eco-friendly modular classroom. Adaptable Classrooms for Today s Changing
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More information2800 TRANS-CANADA MONTREAL POINTE-CLAIRE
Exceptional Head Office Leasing Opportunity! 2800 TRANS-CANADA COMMISSION BONUS! 65,000 SF and up $25,000 125,000 SF $50,000 Contact Leasing Director for details. Limited time offer. MONTREAL POINTE-CLAIRE
More informationAppendix 3G Wood First Matrix
Appendix 3G Wood First Matrix Project Co will use wood in the Design of the Acute Care Facility in accordance with the following table, using wood where it is marked as subject to any comments set out
More informationCopyrighted Home Plan 2011 Natural Element Homes, LLC
29'-0" SQUARE FOOTAGE 6'-0" PORCH 3'-0" 6'-0" 2'-0" 3'-6" 8'-0" 2'-4" 3'-8" 6'-7" 3'-11" BCD3756-2 BCA2420T 3-0 9LITE BATH WOOD STOVE 10'-0" 2-4 15'-10 1/2" 3'-11" 6'-0" 11'-9 1/2" 15 R. @ 7 5/8" 14 T.
More informationCONTENTS. Using Advanced CAD to Create 2D and 3D Objects in Chief Architect 1. Introduction..2
CONTENTS SECTION 1 Using Advanced CAD to Create 2D and 3D Objects in Chief Architect 1 Introduction..2 CHAPTER 1 THE BASIC EDIT TYPES 3 Steps: Working with the Different Edit Types...3 Can You Do It?...11
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationProud of its Heritage, Preparing for its Future
TUSTIN Proud of its Heritage, Preparing for its Future Revised August 2013 USER GUIDE FOR THE INSTALLATION OF RESIDENTIAL ROOM ADDITIONS OR ALTERATIONS PURPOSE This guide describes the City of Tustin s
More information