WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

Size: px
Start display at page:

Download "WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA"

Transcription

1 d ÀA À ÀÆä E ÁS É WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : CONTENTS PAGES REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES DATA FOR ENABLING WORKS z Àg À ÀnÖ À«Äw ÄAz À Àjµ ÀÌj À ànöz É FINILISED BY SCHEDULE OF RATES COMMITTEE

2

3 CANAL AND ALLIED WORKS - REFERENCE DATA FOR THE YEAR: COST OF MATERIALS : 1 Air hose 25 mm dia per Rm `: Air hose 50 mm dia per Rm `: Asphalt 80 / 100 and 85 / 25 Gr per kg `: Binding wire per kg `: Cement per kg `: Coarse aggregate mm per cum ( at quarry ) `: Coarse aggregate mm per cum ( at quarry ) `: Coarse aggregate mm per cum ( at quarry ) `: Curing Compound per ltr `: D - cord per Rm `: Detonating fuse coil per Rm `: Detonator delay type per No. `: Detonator electric per No. `: Detonator ordinary per No. `: Diesel oil per ltr `: Empty cement bags per No. `: Explosive ANFO high strength booster per kg `: Explosive ANFO per kg `: Explosive small dia.( Kelvex-220 ) per kg `: Extension rod with coupling sleeve per Rm `: Filter fabric 200 gsm per sqm `: Filter fabric 250 gsm per sqm `: Fine aggregate / Sand per cum ( Un-screened at quarry ) `: Fine aggregate per cum ( Screened at quarry ) `: G I pipe 50 mm dia A class per Rm `: Jack hammer Drill rod 1.5 m length per No. `: LDPE sheet 500 micron thick per sqm `: LDPE sheet 750 micron thick per sqm `: LDPE sheet 1000 micron thick per sqm `: Murum per cum ( at quarry ) `: Paving Cylinder per Each `: PVC sealing strip per Rm `: Reinforcement steel per kg `: Rough stone 200 x 200 x 750 mm per No. ( at quarry ) `: Shahabad stone slab per sqm `: Shutter oil per ltr `: Size stone mm height per No. ( at quarry ) `: Size stone mm height per No. ( at quarry ) `: Size stone mm height per No. ( at quarry ) `: Stone chips per cum ( at dump yard ) `: Stone chips per cum ( at quarry ) `: Structural steel angle / beam / channel / bar per kg `: Structural steel plate / flat per kg `: Super Plasticiser per ltr `: Tarfelt jointer filler board 12 mm thick per sqm `: Tarfelt jointer filler board 20 mm thick per sqm `:

4 49 T.C Cross bit 100 mm dia per No. `: Through stone 200 x 200 x 300 mm per No. ( at quarry ) `: Through stones 250 x 250 x 450 mm per No. ( at quarry ) `: Turfing sods per sqm `: Un-coursed rubble stones per cum ( at dump yard ) `: Un-coursed rubble stones per cum ( at quarry ) `: Wire mesh 50 x 50 mm 20 guage per sqm `: LEAD CHARGES FOR 1 km REHANDLING LEAD: Unloading 1 Earth/ Sand `: Stone/ Coarse aggregates `: Cement `: Reinforcement steel `: ROYALTY CHARGES: Per tonne 1 Earth / Soil / Murum `: Stone / Coarse aggregate `: Fine aggregate / Sand `: HIRE CHARGES OF MACHINERY : Hire charge Crew charge 1 Air compressor 8.5 cmm ( diesel ) / hour `: Angle dozer 90 hp per hour `: Batching plant 15 cum / hr rated capacity `: Concrete hand mixer 45 / 30 ltr per hour `: Concrete mixer 300 / 200 ( diesel ) / hour `: Concrete mixer 600 / 400 ( diesel ) / hour `: Diesel generating set 30 KVA per hour `: Diesel generating set 50 KVA per hour `: Diesel road roller per hour `: Jack hammer per hour `: Mechanical concrete paver per hour `: Needle Vibrator 40 mm ( petrol ) per hour `: Pump 5 hp ( diesel ) per hour `: Shovel 0.85 cum per hour `: Shovel 0.50 cum per hour `: Tipper 5 cum per hour `: Transit mixer 2 cum per hour `: Vibratory pad foot roller per hour `: Waggon drill per hour `: Water tanker per hour `: WAGES OF WORKERS Per day 1 Bar bender `: Blaster ( Licensed ) `: Carpentor Class II `: Cartman with double bullock cart `: Crowbarman `: Electrician `: Helper blasting `: Maistry `: km lead Loading Fuel charge

5 9 Mason Class I `: Mason Class II `: Mazdoor heavy `: Mazdoor light `: Mechanic / Fitter / Welder `: Pipe fitter `: Rollerman with bullock roller `: Stone breaker `: Stone chiseller Cl- I `: Stone chiseller Cl- II `: OTHER DATA : 1 Contractor's Overheads on Materials / Machinery / Labour % Contractor's Profit on Materials / Fuel & Energy charges / Labour % Hidden cost on Labour % Rate of interest per annum % Small Tools & Plant on Materials / Machinery / Labour % Structural steel fabrication per kg `: Sundries ( lumpsum rate for unquantified inputs ) `: Cost of Other enabling works ( as per Annexure-1 at the end ) %

6 NOTES ON SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : All notes under ' General Notes on Schedule of Rates ' and Notes on Lead, Lift, Loading and un-loading Charges are applicable to Canal and Allied Works also to the extent they are relevant. 2. Unless otherwise specified the basic rates are inclusive of all lifts. 3. For earth / rockfill embankment works 1 km initial lead is considered in the basic rates. As no storing / stacking and re-handling of materials is involved for these works lead charges for additional lead shall be worked out for total lead including initial lead of 1 km and then the cost of first km lead shall be deducted. No loading and un-loading charges shall be added as the additional lead does not involve re-handling of materials. Example : Total lead for soil from approved borrow area : 2 km Initial lead included in the basic rate in the SR : 1 km Additional lead charges : Lead charges for 2 km `: Less Lead charges for 1 km `: Additional lead charges `: No loading and un-loading charges shall be added. 4. Cement content specified for cement concrete works in the item description is based on theoritical design mix computations and is exclusive of wastage and requirement for any incidentals. The actual cement content may vary based on trial mix studies. A suitable clause shall be included in the tender for regulating payment for any upward or downward variation in cement content. 5. A weightage of 25 percent over the rates in the SR is permissible for all items of works involved in the modernization of canals and which are to be carried out during the canal closure period of about 3-4 months and less. In the estimates for modernization, the items of work shall appear based on the rate in SR without the permissible weightage. Below the respective items, the weightage permissible for the item is to be included. Further, the payment of weighatage is permissible only when the contractor completes a minimum of 90 percent of the work entrusted in a single closure period. Failing which the contractor foregoes the advantage of weightage. Payment of RA bills shall be made at rates excluding the weightage. It is only in the last RA bill / final bill, payment for weightage is to be released subject to above condition. 6. The quantities of materials including wastage, requirements for incidentals etc., for working out additional lead charges shall be as per the statement of requirement of materials under this section. 4

7 CANAL AND ALLIED WORKS - DATA RATES SECTION: CANAL AND ALLIED WORKS. YEAR : ITEM No: WRD: 3.1 ITEM: Excavation in all kinds of soil including boulders upto 0.6 m diameter ( cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and depth of cut upto 18 m. DATA:Capacity of shovel bucket Capacity of shovel bucket under heaped condition Capacity of tipper Lead for disposal of excavated soil Speed for loaded tipper under canal excavation condition Speed for empty tipper under canal excavation condition Turning and unloading time Shovel digging and loading cycle per bucket : 0.85 cum : 1.00 cum : 5.00 cum : Upto 1 km : 15 km / hr : 15 km / hr : 2.00 min : 20 sec 1. Quantity of excavation : In-situ quantity / bucket for 20 % bulkage on unloading ( 1 /1.20 ) : 0.83 cum In-situ quantity per load for 20 % bulkage of soil ( 5 /1.2 ) : 4.16 cum Number of buckets per load ( 4.16 / 0.83 ) say : 5 buckets Corrected Quantity of in-situ soil per load ( 5 x 0.83 ) say : 4.16 cum Ideal cycle time for loading 5 buckets ( 5 x 20 / 60 ) : 1.67 min The ideal cycle time for shovel requires spotting of a tipper within 1.67 minutes near the shovel. However, in practice for canal excavation the space available may not permit positioning of the tippers on either side of the shovel. Generally, one tipper has to move after loading to position the next tipper for loading. Assuming one cycle time extra the corrected cycle time for the shovel will be : ( 6 x 20 / 60 ) : 2.00 min Round trip cycle time for tipper: Corrected cycle time of shovel for digging & loading : 2.00 min Time for ( av ) 0.75 km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for ( av ) 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and spotting : 0.50 min Total : min No.of tippers to match corrected cycle time of shovel ( 10.50/ 2.00 ) : 5.25 Nos Output of tipper / hr with 50 min working / hr ( 50 x 4.16 / ) : cum Output for 5 tippers per day ( 5 x x 8 ) : 792 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming the canal to final profile by manual labour the daily progress of excavation will be : ( 792 / 0.9 ) say : 880 cum Consider 880 cum for rate analysis. 2. Requirement of materials: No materials involved in the work. 3. Requirement of machinery : Deploy 0.85 cum capacity shovel for 8 hours for digging and loading 792 cum insitu soil. Deploy 5 tippers of 5 cum capacity for 8 hours for disposal of 792 cum insitu soil. 5

8 4. Requirement of workforce ( other than machinery crew ) : Average output of 1 heavy & 1 light mazdoor assumed at 5 cum / day for trimming and disposal. Deploy 18 heavy and 18 light mazdoors for trimming and disposal of 88 cum soil. Deploy 1 maistry. RATE ANALYSIS UNIT : cum A. MATERIALS: Sl No Perticulars in `. in `. 1 NIL Total `: 0.00 Add for small Tools and 1% `: 0.00 Add for Contractor's 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total cost of Materials : `: 0.00 B. MACHINERY: in `. in `. 1 Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Tippers 5 cum capacity ( 5 ) Nos Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Shovel Hour Crew for Tipper Hour Maistry Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: 0.00 B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `:

9 Add for other enabling 1.00% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: Note: For depth of cut exceeding 18 m from ground level increase the basic rate by 5 percent for the quantity of excavation beyond 18 m depth. SECTION: CANAL AND ALLIED WORKS. YEAR : ITEM No: WRD: 3.2 ITEM: Excavation in all kinds of soil including boulders upto 0.60 m diameter ( cum ) for field channels, seating of embankment for field channels and placing the excavated stuff neatly for formation of service road / field channel embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 10 m and lift upto 2 m. DATA:Capacity of shovel bucket : 0.50 cum Capacity of shovel bucket under heaped condition : 0.57 cum Lead for disposal of excavated soil : Upto 10 m In view of shallow depth of digging for field channels the cycle time for digging and disposal by shovel is assumed at 1.5 times the cycle time considered for canal. Shovel digging and loading cycle per bucket ( 1.5 x 20 ) : 30 sec 1. Quantity of excavation : In-situ qty / bucket for 15 % bulkage of soil ( 0.57 / 1.15 ) : 0.50 cum Output of shovel with 50 min./ hr working ( 50 x 60 x 0.5 / 30 ) : 50 cum / hr Daily output of excavation ( 8 x 50 ) : 400 cum As the excavated soil is dumped by the side of field channel within the reach of shovel boom no tippers are considered in the rate analysis for disposal of excavated soil. Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming bed and sides of channels / trenches to final profile by manual labour, the daily output will be : ( 400 / 0.90 ) say : 445 cum Consider 445 cum for rate analysis. 2. Requirement of materials: No materials involved in the work. 3. Requirement of machinery : Deploy 0.5 cum capacity shovel for 8 hours for digging and loading 400 cum. 4. Requirement of workforce ( other than machinery crew ) : Average output of 1 heavy & 1 light mazdoor assumed at 5 cum / day for trimming and disposal. Deploy 9 heavy and 9 light mazdoors for trimming and disposing 45 cum soil. Deploy 1 maistry. RATE ANALYSIS UNIT : cum A. MATERIALS: Sl No Perticulars 1 NIL Total `: 0.00 Contd 7

10 A. MATERIALS ( Contd ) : Sl No Perticulars Contd Add for small Tools and 1% `: 0.00 Add for Contractor's 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total cost of Materials : `: 0.00 B. MACHINERY: 1 Shovel 0.50 cum capacity Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Shovel Hour Maistry Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: 0.00 B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for other enabling 1.00% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: SECTION: CANAL AND ALLIED WORKS. YEAR : ITEM No: WRD: 3.3 ITEM: Excavation in soft rock without blasting including boulders upto 0.6 m diameter ( cum ) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road as directed including cost of all materials, machinery,labour, dressing bed and sides to required level and profile etc., 8

11 complete with lead upto 1 km and depth of cut upto 18 m. DATA:Capacity of shovel bucket Capacity of shovel bucket under heaped condition Capacity of tipper Lead for disposal of excavated soft rock Speed for loaded tipper under canal excavation condition Speed for empty tipper under canal excavation condition Turning and unloading time Shovel digging and loading cycle per bucket : 0.85 cum : 1.00 cum : 5.00 cum : Upto 1 km : 15 km / hr : 15 km / hr : 2.00 min : 30 sec 1. Quantity of excavation : In-situ qty / bucket for 30 % bulkage on unloading : 0.77 cum In-situ quantity / load for 5 cum of soft rock ( 5 / 1.30 ) : 3.85 cum Number of buckets per load ( 3.85 / 0.77 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 30 / 60 ) : 2.50 min The ideal cycle time for shovel requires spotting of a tipper within 2.50 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position the next tipper for loading. Assuming one cycle time extra the corrected cycle time for digging and loading one tipper by shovel will be : ( 6 x 30 / 60 ) 3.00 min Round trip cycle time for tipper: Corrected cycle time of shovel for digging & loading : 3.00 min Time for ( av ) 0.75km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and spotting : 0.50 min Total : min No.of tippers to match corrected cycle time of shovel ( 11.50/ 3.00 ) say : 3.83 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.85 / ) : cum Output for 4 tippers per day ( 3.83 x x 8 ) say : 513 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming of bed / sides to final profile by manual labour the daily output will be : ( 513 / 0.9 ) say : 570 cum Consider 570 cum for rate analysis. 2. Requirement of materials: No materials involved in the work. 3. Requirement of machinery : Deploy 0.85 cum capacity shovel for 8 hours for digging and loading 513 cum. Deploy 4 tippers of 5 cum capacity for disposal of 513 cum. 4. Requirement of workforce ( other than machinery crew ) : Output of 1crowbarman, 1 heavy and 1 light mazdoor assumed at 5 cum per day for trimming. Deploy 11 heavy and 11 light mazdoors for trimming and disposal of 57 cum soft rock. Deploy 11 crowbarman for trimming. Deploy 1 maistry. 9

12 RATE ANALYSIS UNIT : cum A. MATERIALS: Sl No Perticulars 1 NIL Total `: 0.00 Add for small Tools and 1% `: 0.00 Add for Contractor's 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total cost of Materials : `: 0.00 B. MACHINERY: 1 Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Tippers 5 cum capacity ( 4 ) Nos Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Shovel Hour Crew for Tipper Hour Maistry Day Crowbarman Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: 0.00 B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for other enabling 1.00% `: Total cost for cum `: Rate per cum `: Rate approved per cum `:

13 Note: For depth of cut exceeding 18 m from ground level increase the basic rate by 5 percent for the quantity of excavation beyond 18 m depth. SECTION: CANAL AND ALLIED WORKS. YEAR : ITEM No: WRD: 3.4 ITEM: Excavation in soft rock without blasting including boulders upto 0..6 m diameter ( cum) for field channels, seating of embankment for field channels etc., and placing the excavated soft rock neatly for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 10 m and lift upto 2 m. DATA:Capacity of shovel bucket Capacity of shovel bucket under heaped condition Lead for disposal of excavated soil : 0.50 cum : 0.57 cum : Upto 10 m In view of shallow depth of digging for field channels the cycle time for digging and disposal by shovel is assumed at 1.5 times the cycle time considered for canal. Shovel digging and loading cycle per bucket ( 1.5 x 30 ) : 45 sec 1. Quantity of excavation : In-situ qty per bucket for 25 % bulkage of soil ( 0.57 / 1.25 ) : 0.45 cum Output of shovel with 50 min./ hr working ( 50 x 60 x 0.45 / 45 ) : 30 cum / hr Daily output of excavation ( 8 x 30 ) say : 240 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming the canal to final profile by manual labour, the daily progress of excavation in soft rock will be : ( 240 / 0.9 ) say : 265 cum Consider 265 cum for rate analysis. 2. Requirement of materials: No materials involved in the work. 3. Requirement of machinery : Deploy 0.85 cum capacity shovel for 8 hours for digging and loading 240 cum. 4. Requirement of workforce ( other than machinery crew ) : Output of 1 crowbarman, 1 heavy & 1 light mazdoor assumed at 5 cum per day. Deploy 5 crowbarman, 5 heavy and 5 light mazdoors for trimming and disposal of 25 cum. RATE ANALYSIS UNIT : cum A. MATERIALS: Sl No Perticulars 1 NIL Total `: 0.00 Add for small Tools and 1% `: 0.00 Add for Contractor's 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total cost of Materials : `:

14 B. MACHINERY: 1 Shovel 0.50 cum capacity Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Shovel Hour Maistry Day Crowbarman Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: 0.00 B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for other enabling 1.00% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: SECTION: CANAL AND ALLIED WORKS. YEAR : ITEM No: WRD: 3.5 ITEM: Excavation in soft rock requiring blasting including boulders above 0.6 m upto 1..2 m dia. for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated rock in dump area or for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc.,complete with lead upto 1 km and depth of cut upto 18 m. DATA:Capacity of shovel bucket Capacity of shovel bucket under heaped condition Capacity of tipper Lead for disposal of excavated soft rock Speed for loaded tipper under canal excavation condition Speed for empty tipper under canal excavation condition : 0.85 cum : 1.00 cum : 5.00 cum : Upto 1 km : 15 km / hr : 15 km / hr 12

15 Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 40 sec 1. Quantity of excavation : In-situ qty / bucket for 35 % bulkage on unloading ( 1 / 1.35 ) : 0.74 cum In-situ quantity / load for 5 cum of soft rock ( 5 / 1.35 ) : 3.70 cum Number of buckets per load ( 3.70 / 0.74 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 40 / 60 ) : 3.33 min The ideal cycle time for shovel requires spotting of a tipper within 3.33 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position the next tipper for loading. Assuming one cycle time extra the corrected cycle time for digging and loading one tipper by shovel will be : ( 6 x 40 / 60 ) : 4.00 min Round trip cycle time for tipper: Corrected cycle time of shovel for digging & loading : 4.00 min Time for ( av ) 0.75 km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and spotting : 0.50 min Total : min No.of tippers to match corrected cycle time of shovel ( / 4.00 ) : 3.12 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.70 / ) : cum Output for 3 tippers per day ( 3 x x 8 ) say : 355 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming of bed and sides to final profile by manual the daily output will be : ( 355 / 0.9 ) say : 395 cum Consider 395 cum excavation in soft rock requiring blasting for rate analysis. 2. Drilling and Blasting : Depth of drilling per hole : 1.40 m Effective depth of pull : 1.25 m Grid spacing of holes for soft rock requiring blasting depends on the nature of soft rock at any perticular location. For the purpose of rate analysis holes at average spacing of 1.5 times the spacing considered for hard rock is assumed. Grid spacing of holes : 1.50 x 2.00 m Area of excavation for 395 cum ( 395 / 1.25 ) : 316 sqm Nos. of holes for 316 sqm area 316 / ( 1.5 x 2.0 ) : 105 Nos. Depth of drilling for 105 holes ( 105 x 1.4 ) say : m Add for secondary blasting LS : 3.00 m Total depth of drilling : 150 m Rate of drilling in soft rock per hour : 12 m With 50 min / hour working rate of drilling ( 12 x 50 / 60 ) : 10 m Time required for drilling with 2 jack hammers ( 150 / 2 / 10 ) : 7.50 hours 3. Requirement of materials : Jack hammer drill rod : 150 m drilling Quantity of Explosive ( Kelvex-220 ) at 0.2 kg / cum ( 395 x 0.2 ) : 79 kg Explosive for secondary blasting LS : 1 kg Ordinary detonators for secondary blasting 5 holes : 5 Nos. Electric detonators at 1 per hole for main blast : 105 Nos. Fuse coil : 175 Rm 4. Requirement of machinery : Deploy 0.85 cum capacity shovel for 8 hours for digging and loading 240 cum. 13

16 Deploy 3 tippers 5 cum capacity for 8 hours for disposal of 240 cum. Deploy 1 air compressor 8.5 cmm capacity for 7.5 hours. Deploy 2 jack hammers for 7.5 hours for drilling. 5. Requirement of workforce ( other than machinery crew ) : Output of 1 heavy & 1 light mazdoor assumed at 5 cum per day for trimming and disposal. Deploy 2 crowbarman, 2 stone breaker, 8 heavy and 8 light mazdoors for 40 cum. Deploy 1 blaster and 1 blasting helper for loading and blasting. Deploy 1 maistry for supervision. 6. Use rate of materials : Cost of drill rod 1.5 m `: / Each `: Life of drill rod for drilling in soft rock with reconditioning : 200 m Use rate of drill rod per Rm drilling ( cost / life ) `: Length of air hose for drilling for each jack hammer : 50 m Cost of 25 mm dia air hose 50 `: / Rm `: Life of air hose : 800 hours Use rate of 25 mm dia air hose per hr ( cost / life ) `: RATE ANALYSIS UNIT : cum A. MATERIALS: Sl No Perticulars 1 Use rate of Jack hammer drill rod 1.5 m Rm Reconditioning 10 % Use rate of 50 m air hose 2 Nos Hour Explosive small dia ( Kelvex-220 ) kg Ordinary detonators Nos Electric detonators Nos Fuse coil Rm Sundries LS Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Tippers 5 cum capacity 3 Nos. Hour Fuel / Energy charges Hour Air compressor 8.5 cmm ( diesel ) Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `:

17 C. LABOUR: 1 Crew for Shovel Hour Crew for Tipper Hour Crew for Air compressor Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Crowbarman Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for other enabling 1.00% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: Note: For depth of cut exceeding 18 m from ground level increase the basic rate by 5 percent for the quantity of excavation beyond 18 m depth. SECTION: CANAL AND ALLIED WORKS. YEAR : ITEM No: WRD: ITEM: Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia. ( cum ) for canals, cut-off trench of embankment, filter / catch water drains etc., minimising damage to side slopes of canal in water prism area by adopting any one or combination of line drilling /pre-splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials,machinery, labour, levelling bed etc., complete with lead upto 1 km and depth of cut upto 18 m. DATA:Excavation for canal in hard rock can be by using jack hammers or by using waggon drills or by combination of both depending on the depth of cut, width of canal and side slope. In case of waggon drill the rate of drilling will be faster and yeild per hole will be more due to wider spacing of holes. For jack hammer drill the yeild per hole will be less due to closer spacing of holes. As both the systems have advantages as well as disadvantages it is proposed to work out rates using both the systems and include average rate in the Schedule of Rates. 15

18 I. By using Jack hammers for drilling : Assume m width of canal at the bench level and 1.25 m average depth of cutting. Assume side slopes of 0.25 horizontal to 1 vertical. Generally, the length of canal bench to be excavated per blast shall not be more than 7 m to avoid tight muck pile requiring higher digging time for shovel. Sectional area of excavation ) x 0.5 x 1.25 : sqm Consider 7 burden distance for excavation per blast. Number of rows considered : 7 No. Length of canal for 7 rows ( 7 x 1.00 ) : 7.00 m Quantity of excavation for 7 m length ( x 7.00 ) say : cum 8.4 m m m m m 1.2 m 7.00 m Free face SKETCH SHOWING DRILLING & BLASTING PATTERN 1. Drilling and Blasting: Consider drilling by Jack hammers and mucking by combination of Shovel and Tippers. The burden ( distance of hole from free face of excavation ) is considered at 25 to 30 times dia of hole and spacing of holes is considered at 1.20 to 1.25 times burden. Burden distance for 32 mm dia jack hammer holes ( x 30 ) say : 1.00 m Spacing of holes ( x 30 x 1.25 ) : 1.20 m Grid spacing of holes for 32 mm dia jack hammer holes : 1.00 x 1.20 m Depth of drilling per hole : 1.40 m Effective depth of pull considering 10 % sub-drilling : 1.25 m Rate of drilling by jack hammer in hard rock per hour : 8.00 m Rate of drilling per hour with 50 min / hour working ( 8 x 50 / 60 ) say : 6.5 m No.of holes in 7 m interval staggered ( 4x8 + 3x ) : 75 Nos Length of drilling for m per hole ( 75 x 1.4 ) : 105 m Add drilling for secondary blasting for 5% 0.6 m / cum say : 3 m Total : m 16

19 Time for drilling 108 m for 2 jack hammers ( 108 / 2 / 6.5 ) : 8.30 hours Drilling and Blasting pattern : Pattern of holes : Staggered Hole initiation : Bottom Initiation system : Ele detonators Initiation pattern : All rows 2. Disposal of excavated rock : Quantity of excavation ( in-situ ) : cum Capacity of shovel bucket : 0.85 cum Capacity of shovel bucket under heaped condition : 1.00 cum Capacity of tipper : 5.00 cum Lead for disposal of excavated rock : Upto 1 km Speed for loaded tipper under canal excavation condition : 15 km / hr Speed for empty tipper under canal excavation condition : 15 km / hr Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 45 sec In-situ qty / bucket for 40 % bulkage of hard rock ( 1 /1.40 ) : 0.71 cum In-situ qty per load for 40 % bulkage of hard rock ( 5 /1.40 ) : 3.57 cum Number of buckets per load ( 3.57 / 0.71 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 45 / 60 ) : 3.75 min The ideal cycle time for shovel requires spotting of a tipper within 3.75 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position next tipper for loading. Assuming one loading cycle extra, the corrected cycle time for shavel will be ( 6 x 45 / 60 ) 4.50 min Round trip cycle time for tipper: Cycle time of shovel for digging & loading : 4.50 min Time for (av ) 0.75 km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and spotting : 0.50 min Total : min No.of tippers to match corrected cycle time of shovel ( / 4.50) : 2.9 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.57 / ) : cum Deploy 0.9 cum shovel and 3 tippers for disposal of excavated rock. Output of 1 shovel & 3 tippers per hour ( in-situ qty ) ( x 2.9 ) : cum Out of the total blasted rock some residual muck at the bed needs to be removed by deploying manual labour. Assume residual muck at bed at 0.10 cum / sqm of bed area. Quantity of muck to be disposed by shovel ( x 70 ) 85 cum Time for disposal of 85 cum by shovel ( 85 / ) : 2.2 hours For levelling 85 cum muck in dump yard deploy 1 dozer for : 0.25 hour Quantity of muck to be disposed by manual labour ( ) 7 cum 3. Requirement of materials : Jack hammer drill rod : 108 m drilling Quantity of Explosive ( Kelvex-220 ) at 0.3 kg / cum ( 92 x 0.3 ) : kg Add for secondary 0.2 kg / cum ( 92 x 0.05 x 0.2 ) : 0.90 kg Total : kg Ordinary detonators for secondary blasting 8 holes of 0.6 m each : 8 Nos. Electric 1 per hole for main blast : 75 Nos Detonating fuse coil : 120 Rm 17

20 4. Requirement of machinery : Deploy 0.85 cum capacity shovel for 2.2 hours for digging and loading 85 cum. Deploy 3 tippers 5 cum capacity for 2.2 hours for disposal of 85 cum. Deploy 1 air compressor 8.5 cmm capacity for 8.5 hours. Deploy 2 jack hammers for 8.5 hours for drilling. Deploy 1 angle dozer for 0.25 hour for levelling muck in dump area. 5. Requirement of workforce ( other than machinery crew ) : Deploy 1 Crowbarman, 1 Stone breaker for 1 day for levelling bed. Deploy 2 heavy and 2 light mazdoors for disposal of 9 cum residual muck at bed level and for other miscellaneous works. Deploy 1 blaster and 1 blasting helper for loading and blasting. Deploy 1 maistry. 6. Use rate of materials : Cost of drill rod 1.5 m `: / Each `: Life of drill rod for drilling in hard rock with reconditioning : 150 m Use rate of drill rod per Rm drilling ( cost / life ) `: Length of air hose for drilling for each jack hammer : 50 m Cost of 25 mm dia 50 m air `: / Rm `: Life of air hose : 800 hours Use rate of 25 mm dia air hose per hour ( cost / life ) `: RATE ANALYSIS UNIT : cum A. MATERIALS: Sl No Perticulars 1 Use rate of Jack hammer drill rod 1.5 m Rm Reconditioning 10 % Use rate of 50 m air hose 2 Nos. Hour Explosive small dia. (Kelvex-220 ) kg Ordinary detonators Nos Electric detonators Nos Fuse coil Rm Sundries LS Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 Shovel 0.85 cum capacity Hour Fuel / energy charges Hour Angle dozer 90 hp Hour Fuel / Energy charges Hour Tippers 5 cum capacity 3 Nos. Hour Fuel / Energy charges Hour in `. in `: 18

21 B. MACHINERY ( Contd ) : Contd 4 Air compressor 8.5 cmm ( diesel ) 1 Nos Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Shovel Hour Crew for Dozer Hour Crew for Tipper Hour Crew for Air compressor Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Crowbarman Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for other enabling 1.00% `: Total cost for cum `: Rate per cum `: II. By using waggon drills for drilling : Assume m width of excavation at bench level and 5.40 m depth of cutting in hard rock. Assume side slopes of 0.25 horizontal to 1 vertical. 19

22 1. Drilling and Blasting: Consider drilling by Waggon drill and mucking by combination of Shovel and Tippers. For good fragmentation to facilitate easy loading by 0.85 cum capacity shovel the bench height to burden ratio shall be more than 3. The burden ( distance of hole from free face of excavation ) is considered at 20 times diameter of hole and spacing of holes is considered at 1.25 times burden. Burden distance for 100 mm dia holes ( 0.10 x 20 ) : 2.00 m Spacing of holes at 1.25 times burden ( 0.10 x 20 x 1.25 ) : 2.50 m Grid spacing of holes for 100 mm dia Waggon drill holes : 2.00 x 2.50 m Consider 3 burden distance for excavation per blast. Depth of drilling per hole : 6.00 m Effective depth of pull considering 10 % sub-drilling say : 5.40 m Rate of drilling in hard rock per hour by Waggon drill : m Rate of drilling per hour with 50 min per hour working ( 12 x 50 / 60 ) : 10 m m m m m m 2.0 m 2.5 m 6.00 m Free face SKETCH SHOWING DRILLING & BLASTING PATTERN Sectional area of excavation ( ) x 0.5 x 5.40 : sqm Length of canal for excavation ( 3 x 2.00 ) : 6.00 m Quantity of excavation for 6.0 m length ( x 6.00 ) : 368 cum No. of blast holes in 3 rows ( 2 x x x 4 ) : 24 holes 20

23 Length of drilling for 24 holes ( 11 x x 6.2 ) say : 147 m Drilling for secondary blasting for 5% 0.6 m / cum : m No.of blast holes for secondary 0.6 m / hole ( 11 / 0.6 ) : 18 holes Consider 2 waggon drills for drilling holes. Time for drilling 147 m for 2 Waggon 10 m / hour : 7.33 hours Consider 368 cum hard rock excavation for rate analysis. 2. Disposal of excavated rock : Capacity of shovel bucket : 0.85 cum Capacity of shovel bucket under heaped condition : 1.00 cum Capacity of tipper : 5.00 cum Lead for disposal of excavated rock rock : Upto 1 km Speed for loaded tipper under canal excavation condition : 15 km / hr Speed for empty tipper under canal excavation condition : 15 km / hr Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 45 sec In-situ qty / bucket for 40 % bulkage of hard rock ( 1 / 1.40 ) : 0.71 cum In-situ qty per load for 40 % bulkage of hard rock ( 5 / 1.40 ) : 3.57 cum Number of buckets per load ( 3.57 / 0.71 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 45 / 60 ) : 3.75 min The ideal cycle time for shovel requires spotting of a tipper within 3.75 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position next tipper for loading. Assuming one loading cycle extra, the corrected cycle time for shovel will be ( 6 x 45 / 60 ) 4.50 min Round trip cycle time for tipper: Cycle time of shovel for digging & loading : 4.50 min Time for (av ) 0.75 km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and spotting : 0.50 min Total : min No.of tippers to match corrected cycle time of shovel (13.00 / 4.50) say : 2.9 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.57 / ) : cum Output of 2.7 tippers per hour ( x 2.9 ) : cum Out of the total blasted rock some residual muck at the bed needs to be removed by deploying manual labour. Assume residual muck at bed at 0.10 cum / sqm of bed area. Quantity of muck to be disposed by shovel ( x 60 ) : 362 cum Time required for disposal of 362 cum ( 362 / ) say : 9 hours For levelling 362 cum muck in dump yard deploy 1 dozer for : 1.00 hour Quantity of muck to be disposed by manual labour ( ) : 6 cum 3. Requirement of materials : 100 mm dia TC bit : 147 m drilling Extension rods with sleeve : 147 m drilling Jack hammer drill rod : 11 m drilling Quantity of 0.5 kg / cum for 368 cum : kg Consider 20 % high strength ANFO booster for priming ANFO. : kg Consider 80 % ANFO mixed with diesel oil for colunm. : kg Diesel 180 ml per kg of ANFO : ltrs Quantity of 0.2 kg / cum for secondary blast : 4 kg Ordinary detonators for secondary blasting : 18 Nos. 21

24 Detonating cord for 24 holes in 3 rows Detonating fuse coil for secondary blasting : 210 Rm. : 20 Rm 4. Requirement of machinery : Deploy 0.85 cum capacity shovel for 9 hours for digging and loading 362 cum. Deploy 3 tippers 5 cum capacity for 9 hours for disposal of 362 cum. Deploy 2 air compressors 8.5 cmm capacity for 7.5 hours. Deploy 2 waggon drills for 7.5 hours for drilling main blast holes. Deploy 1 air compressor 8.5 cmm capacity for 1 hour. Deploy 2 jack hammers for 1 hour for drilling secondary blast holes. Deploy 1 angle dozer for 1 hour for levelling muck in dump area. 5. Requirement of workforce ( other than machinery crew ) : Deploy 1 Crowbarman, 1 Stone breaker for 1 day for levelling bed. Deploy 2 heavy and 2 light mazdoors for disposal of 9 cum residual muck at bed level. Deploy 1 blaster and 1 blasting helper for loading and blasting. Deploy 1 maistry. 6. Use rate of materials : Cost of T.C bit 100 mm `: / Each `: Life of drill bit for drilling in hard rock : 80 m Use rate of T.C bit per Rm drilling ( Cost / Life ) `: Cost of extn rod with sleeve 4.5 `: / Rm `: Life of extension rod : 1500 m Use rate of extension rod per Rm drilling ( Cost / Life ) `: Cost of 1.5 m drill `: / Each `: Life of drill rod for drilling in hard rock with reconditioning : 150 m Use rate of drill rod per Rm drilling ( Cost / Life ) `: Length of air hose for drilling for each jack hammer : 50 m Cost of 50 m air hose 25 `: / Rm `: Life of air hose : 800 hours Use rate of air hose per hr ( Cost / Life ) `: Cost of 50 m air hose 50 mm `: / Rm `: Life of air hose : 800 hours Use rate of air hose per hr ( Cost / Life ) `: RATE ANALYSIS UNIT : cum A. MATERIALS: Sl No Perticulars 1 Use rate of T.C bit 100 mm dia Rm Use rate of Extension rod with sleeve Rm Use rate of Jack hammer drill rod 1.5 m Rm Reconditioning 10 % Use rate of air hose for waggon drill Hour Use rate of 25 m air hose for JH 2 Nos Hour High strength ANFO booster kg ANFO kg Diesel oil ltr Explosive small dia ( Kelvex-220 ) kg Contd 22 in `. in `:

25 A. MATERIALS ( Contd ) : Sl No Perticulars Contd 9 Ordinary detonators Nos D-cord Rm Detonating fuse coil Rm Sundries LS Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 Tippers 5 cum capacity Hour Fuel / Energy charges Hour Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Angle dozer Hour Fuel / Energy charges Hour Air compressor 8.5 cmm ( diesel ) Hour Fuel / Energy charges Hour Waggon drill Hour Fuel / Energy charges Hour Jack hammer Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Tipper Hour Crew for Shovel Hour Crew for Dozer Hour Crew for Air compressor Hour Crew for Waggon drill Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Crowbarman Day Stone breaker Day Contd 23 in `. in `:

26 C. LABOUR ( Contd ) : Contd 12 Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for other enabling 1.00% `: Total cost for cum `: Rate per cum `: Assuming use of Jack hammers & Waggon drills in 50 : 50 ratio Rate per cum `: Rate approved per cum `: Note: For depth of cut exceeding 18 m from ground level increase the basic rate by 5 percent for the quantity of excavation beyond 18 m depth. SECTION: CANAL AND ALLIED WORKS. YEAR : ITEM No: WRD: ITEM: Excavation in hard rock of all toughness including boulders above 0.6 m diameter(0.113 cum) for canals, cut-off trench of embankments, filter / catch water drains and other appurtenent structures by approved controlled blasting methods including control of vibrations by use of delay detonators and control of fly-rocks by muffling arrangements and adopting only jack hammers for drilling holes and minimising damage to side slopes of canal in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques including cost of all materials, machinery, labour, placing excavated rock neatly in approved dump area as directed etc., complete with lead upto 1 km and depth of cut upto 18 m. DATA:Work requires: - use of delay detonators to reduce ground vibrations. - covering blasting area with chain link mesh or waste conveyor belts or waste tyres and sand bags to prevent flying of rock fragments during blasting. Drilling and Blasting pattern : Pattern of holes : Staggered Hole initiation : Bottom Initiation system : Short delay detonators Delay system : 25 ms interval Initiation pattern : Straight line row by row 24

SCHEDULE OF RATES DAM AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES

SCHEDULE OF RATES DAM AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR SCREEN ON OPENING THIS FILE CLICK

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 2 SCHEDULE OF RATES DAM AND ALLIED WORKS FOR THE YEAR :

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 2 SCHEDULE OF RATES DAM AND ALLIED WORKS FOR THE YEAR : d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 2 SCHEDULE OF RATES DAM AND ALLIED WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA 1 -- 4 NOTES ON BASIC RATES 5 -- 6 DATA FOR SCHEDULE

More information

REVISED BY SCHEDULE OF RATES COMMITTEE

REVISED BY SCHEDULE OF RATES COMMITTEE d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 4 SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : 2018-19 CONTENTS PAGES REFERENCE DATA 1 -- 3 NOTES ON BASIC RATES 4 -- 4 DATA RATES

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA! -- 4 NOTES ON BASIC RATES

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA! -- 4 NOTES ON BASIC RATES d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA! -- 4 NOTES ON BASIC RATES 5 -- 5 DATA RATES 6

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES FOR THE YEAR : 2018-19 CONTENTS PAGES REFERENCE DATA 1 -- 4 NOTES ON BASIC RATES 5 -- 5 DATA RATES 6 -- 154 ANNEXURES 155--160

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 4 SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : REFERENCE DATA

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 4 SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : REFERENCE DATA d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 4 SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA 1 -- 3 NOTES ON BASIC RATES 4 -- 4 DATA RATES

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH

PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH ANALYSIS OF RATES FOR ROAD AND BRIDGE WORKS 2010 ZERO LEAD BASED: (EXCLUDING CARTAGE COST) PUBLISHED UNDER THE AUTHORITY OF THE CHIEF ENGINEER (DESIGN & PLANNING)

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES 1 OF 7 01 Excavation for seating the dam, toe drains & appurtenant M 3 0 9110 21700 30810

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES (TOTAL 10 SHEETS EXCLUDING ABSTRACT & COVER PAGE) 1 OF 7 SCHEDULE-A BOQ FOR EARTHEN DYKES

More information

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of

More information

Est. Cost : Rs.40,000/-

Est. Cost : Rs.40,000/- 3) Sl. No. 1 Description of Item Unit Nos. L B D Qty Rate Amount KSRB 2-1.1: Earthwork in surface excavation in ordinary soil for leveling and lowering the ground manually (other than foundation of buildings,

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

Sub Total for Demolishing

Sub Total for Demolishing A Cleaning of Jungle Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish

More information

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C Notice of Amendment No.1 Addendum No.1 to the following Contract Packages has been made in the Bids, for which the first date notice was published in the Gorkhapatra daily on December 14, 2010 by Sanjen

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC

More information

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL BILL NO 17 CONCRETE WORK (All Provisional) 17/1 Clear site of all obstacles and dispose as directed by the Engineer on site. SM 500 200 100,000.00 17/2 Set out works over land and water ITEM 1 50000 50,000.00

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for

More information

Est. Cost : Rs.35,000/- Sl. No.

Est. Cost : Rs.35,000/- Sl. No. Note:-1) The execution of these model estimates is subjected to compliance / adherence to 60:40 : : Wage: material ratio at Grampanchayat as a UNIT 2) These model estimates shall be locally approved (technically)

More information

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. QUOTED SL NO D E S C R I P T I O N OF ITEM UNIT Quantity IN Figures

More information

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Tender Schedule for the Work Construction of Staff qtrs. at Tainda S/S (1no.) 1.Amount put to Tender:- Rs 7,48,024/- 2.E.M.D. Required: - R 8,000/- 3. Class of contractor :- "D" & "C" 4. Cost of Tender Paper:- R 4,200/- Sl- No Tender Schedule for the Work "Construction of Staff

More information

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SCHEDULE OF RATES SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT 1 Excavation for foundation in earth all types of soils like clay,

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A

DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A 1 DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A VOLUME-II PRICE BID Downloading of tender documents (Start Date): Dt 30/05/2017 from 11.00 hrs. On line submission of tender (End Date): Dt. 01/07/2017

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD.

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD. GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD. Name of Work: Construction of foundation for Transformer bay, fire protection wall & ancillary civil work at 220

More information

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

Sl No. Rate. Hct By manual means In area of light jungle

Sl No. Rate. Hct By manual means In area of light jungle BILL OF QUANTITIES Name of Work : Extension of NH 37 from its dead end near Saikhowaghat in Assam ending near Roing in Arunachal Pradesh under Trans Arunachal Highway programme. SH: Strengthening of Shantipur

More information

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2 BILL NO.1 : PRELIMINARY AND SUPERVISORY SERVICES 1.01 Allow a prime cost sum for material testing to be spent in whole or part as directed by the Resident Engineer. PC Sum 1 1,351.35 1,351.35 1.02 Contractor's

More information

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal EARTHWORKS Excavation for foundations 5E343.2 In class III material m³ 1,260 Max. Depth: 0.50 1 m For disposal 5E334.2 In class III material m³ 720 Max. Depth: 1 2 m For disposal Filling Ancillaries 5E723.0

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt: Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

UNIT III Earthwork Estimation & Reinforcement Estimation

UNIT III Earthwork Estimation & Reinforcement Estimation SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Pre Bid Queries & Clarifications Furnished

Pre Bid Queries & Clarifications Furnished Construction of High Level Bridges Across Palar River At km: 76/000 in East Coast Road, Chennai, Tamil Nadu Pre Bid Queries & Clarifications Furnished S No 1 We request you to clarify the status of land

More information

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1 ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Tender No. NERO/MMD/57/ Date: 27..208 Tender for Construction of Border Road works from BP NO FROM 822/2S to 825/M at Panisagar sector along

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

SUMMER 16 EXAMINATIONS Subject Code: Model Answer- Estimating and costing Page No. 01 /19

SUMMER 16 EXAMINATIONS Subject Code: Model Answer- Estimating and costing Page No. 01 /19 Subject Code: 17501 Model Answer- Estimating and costing Page No. 01 /19 Important Instruction to Examiners:- 1) The answers should be examined by key words & not as word to word as given in the model

More information

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of BILL OF QUANTITIES Name of Work: Beautification of Adalatganj Talab, Patna, Bihar S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of specified

More information

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) BID IDENTIFICATION NO. DRDA, SBP- 10/2013-14 GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT PRICE BID DOCUMENTS FOR THE WORK (Civil works) Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) ESTIMATED

More information

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND

More information

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT 2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT SECTION 501 PORTLAND CEMENT CONCRETE PAVEMENT 501.01 GENERAL. This item consists of constructing a concrete pavement (with or without reinforcement)

More information

NOTICE INVITING QUOTATION

NOTICE INVITING QUOTATION Page 1 of 5 CONSTRUCTION CELL NEW MARKET COMPLEX CMC BUILDING(6 TH FLOOR) 15N,NELLIE SENGUPTA SARANI KOLKATA-700 087 No.CWC/CC-Kol/NIQ-AR&MO/CW-Mohania/2015-16/ Date- 08.09.2015 NOTICE INVITING QUOTATION

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR GRADING 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 Not Used 206.05 Not Used 206.06 Not

More information

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability

More information

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee Sum 1 1.1.2 Common Law Liability

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge Sl.Pg.No.193 Name of Work : Construction of box culvert across 35 mtr. wide channel along 30 mtr. Wide road in Sector 17 & 18 at Ulwe Node. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

More information

PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK

PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK (For Building & Area Development Work) 1.0 INDIAN STANDARDS: Work shall be carried out to Indian Standards and Code of practices. In absence International

More information

Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL TENDER SCHEDULE

Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL TENDER SCHEDULE Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL Sl.no. Qty Description TENDER SCHEDULE 1 10000 m2 Clearing the grass and other

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

PILING WORKS FOR PROPOSED NEW BUILDING OF IIT MADRAS RESEARCH PARK AT KANAGAM ROAD, TARAMANI, CHENNAI

PILING WORKS FOR PROPOSED NEW BUILDING OF IIT MADRAS RESEARCH PARK AT KANAGAM ROAD, TARAMANI, CHENNAI PILING WORKS FOR PROPOSED NEW BUILDING OF IIT MADRAS RESEARCH PARK AT KANAGAM ROAD, TARAMANI, CHENNAI- 600 113 PRE MID MEETING DATE OF MEETING:- 07-5-2013 DECISIONS MADE IN THE MEETING Note : These decisions

More information

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA AT PLOT NO. IIA/35, ACTION AREA IIA, NEW TOWN, KOLKATA, WEST BENGAL 700 157 Pages (1 5)

More information

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability

More information

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR ANISO9001&14001COMPANY TENDER DOCUMENT TENDER No: NERO/CON/TU/659/325 dated 20.09.2018 FOR TENDER FOR CONSTRUCTION OF UPGRADATION OF CENTRAL ROAD INCLUDING LANDSCAPE LIGHTING BY MUSHROOM TYPE LED BOLLARD

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

SPECIFICATION 1035 M

SPECIFICATION 1035 M MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 NOVEMBER 2000 CONSTRUCTION SPECIFICATION FOR GRADING TABLE OF CONTENTS 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 SUBMISSION AND

More information

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department NAIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPALLI - 620015 DEPARTMENT OF ESTATE MAINTRNANCE SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing

Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing 1 2 Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30

More information

Construction Price Survey Form

Construction Price Survey Form International Comparison Program [04.05] Construction Price Survey Form 3 rd Regional Coordinators Meeting October 21-22, 2010 Washington DC Table of Contents 1. Form... 3 2. Purpose of the survey... 3

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres

Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres Version 2 Revised October 2008 Design Guidance for TAB-Deck Composite Slabs using SMD Metal

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC certified)

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC certified) Important Instructions to Examiners: MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC -270001 2005 certified) 1) The answer should be examined by keywords and not as word-to-word as

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit ANNEX AGR I - 7 Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects Priority within the Sector: First Total requested fund : Code Item Description

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

CATCHMENT STRUCTURE 13M X 15M

CATCHMENT STRUCTURE 13M X 15M BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

9 Concrete Pavement Patching

9 Concrete Pavement Patching 9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA)

TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA) TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA) Content: 1. Introduction. 2. BOQ 3. Details of Tender & Tender notice. 4. General Terms and Conditions. 5. Technical

More information

CW 3615 RIPRAP TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS December 2014 SPECIFICATION CW 3615 R4 CW 3615 RIPRAP TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 General... 1 5.2 Rock... 1 5.3 Random Stone Riprap... 1 5.4

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7 The Contractor shall consider in his price all costs or expenses of all requirements stipulated

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Road Work

SCHEDULE A BILL OF QUANTITIES Part - I : Road Work Sl.Pg.No.193 Name of Work : Construction of 36.0 m. wide road and storm water drains along BPCL compound wall at Dronagiri, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Road Work 1. Demarcation

More information

B.O.Q. Two Laning Of Pasighat-Mariyang- Yingkiong Road from Km 0.00 to Km in the State Of Arunachal Pradesh

B.O.Q. Two Laning Of Pasighat-Mariyang- Yingkiong Road from Km 0.00 to Km in the State Of Arunachal Pradesh B.O.Q Two Laning Of Pasighat-Mariyang- Yingkiong Road from Km 0.00 to Km 19.887 in the State Of Arunachal Pradesh 1 BILL NO. 1. SITE CLEARANCE AND DISMANTLING 1.01 201 Cutting of Trees, including cutting

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

Name of work Estimated cost Time allowed for completion of work 1. Construction of PVC coated Chain Link fencing at Megapode Resort. Sl. No.

Name of work Estimated cost Time allowed for completion of work 1. Construction of PVC coated Chain Link fencing at Megapode Resort. Sl. No. The Andaman & Nicobar Islands Integrated Development Corporation Ltd, Vikas Bhawan, Post Box. No.180, Port Blair 744 101 Phone: 232098 Fax 03192-240615 F.No. 7-37/ANIIDCO/95/1231/2018 Dated the 16 th April

More information