1 d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 4 SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : CONTENTS PAGES REFERENCE DATA NOTES ON BASIC RATES DATA RATES ANNEXURES zàgà ÀnÖ À«Äw ÄAzÀ ÀjµÀÌj À ànözé REVISED BY SCHEDULE OF RATES COMMITTEE

2

3 CANAL CROSS DRAINAGE WORKS -- REFERENCE DATA FOR THE YEAR : COST OF MATERIALS : 1 Acetyline gas per cum `: Air hose 25 mm dia per Rm. `: Bentonite per kg `: Binding wire per kg `: Burnt stone slab 100 mm thick per sqm `: Cement 43 Gr per kg `: Coarse aggregate mm per cum `: Coarse aggregate mm per cum `: Coarse aggregate mm per cum `: Coarse aggregate mm per cum `: Concrete admixture ( Super Plasticizer ) per ltr `: Detonating fuse coil per Rm `: Detonator electric per No. `: Detonator electric short delay per No. `: Detonator ordinary per No. `: Empty cement bag per No. `: Explosive( small dia Kelvex-220 ) per kg `: Fine aggregate/ sand ( screened ) per cum `: Fine aggregate/ sand ( unscreened ) per cum `: GI pipe 40 mm dia B class per Rm `: Hectometre stone one line dressed per No. `: Hemp yarn per kg `: J- Bolts for fixing soldiers per No. `: Jack hammer drill rod 1.5 m per No. `: Kilometre stone one line dressed per No. `: M.S Bolts and Nuts per kg `: Murum per cum `: Oxygen gas per cum `: Reinforcement steel per kg `: Red oxide primer paint per ltr `: Size stone 250 mm height per No. `: Shutter oil per ltr `: Stone chips at quarry per cum `: Structural steel angle / channel / beam / bar per kg `: Structural steel plate / flat per kg `: Synthetic Enamel paint 1st quality per ltr `: Through stone ( Header ) 200 x 200 x 450 mm per No. `: Un-coursed rubble stones at quarry per cum `: Welding electrode ( general purpose ) per No. `: Wire mesh 20 guage 50 x 50 mm opening per sqm `: Wire rope per kg `: LEAD, LOADING & UNLOADING CHARGES: 1 km lead Loading Unloading 1 Earth/ Sand per cum `:

4 HIRE CHARGES OF MACHINERY: Hire charge Fuel charge Crew charge 1 Air compressor 8.5 cmm ( diesel) / hour `: Batching plant 15 cum / hour ( incl power charges) `: Batching plant 15 cum / hour ( excl power charges) `: Bentonite slurry pump 10 hp ( diesel ) / hour `: Bending machine per hour `: Concrete pump 60 hp / hour ( incl power charges) `: Concrete pump 60 hp / hour ( excl power charges) `: Concrete mixer 300 / 200 ltr (diesel ) / hour `: Concrete mixer 600 / 400 ltr (diesel) / hour `: Diesel generating set 50 KVA / hour `: Diesel road roller 8-10 tonne per hour `: Jack hammer per hour `: Mobile crane 8 t per hour `: Needle Vibrator 40 mm / hour( incl power charges) `: Needle Vibrator 40 mm / hour( excl power charges) `: Needle Vibrator 40 mm dia (petrol) / hour `: Needle Vibrator 60 mm dia (petrol) / hour `: Pile boring rig with accessories `: Pump 5 hp (diesel) per hour `: Shovel 0.5 cum per hour `: Water tanker 8000 ltr per hour `: Welding transformer per hour `: Transit concrete mixer 4 cum per hour `: Note: For Batching plant, Concrete pump and Needle vibrator only oil / lubricant charges are proposed in view of use of DG sets to supply power to run these plants. ROYALTY CHARGES: Per tonne 1 Earth / Soil / Murum per tonne `: Fine aggregate / Sand per tonne `: Stone / Coarse aggregate per tonne `: WAGES OF WORKERS: Per day 1 Bar bender `: Carpentor Cl II `: Cartman with double bullock cart `: Crowbarman `: Fitter shuttering works `: Foreman `: Helper blasting `: Licensed Blaster `: Maistry `: Mason Cl-I `: Mason Cl-II `: Mazdoor ( Heavy) `: Mazdoor ( Light ) `: Painter Class- I `:

5 15 Painter Class II `: Stone breaker ( Hammerman ) `: Stone chiseller Cl - I `: Stone chiseller Cl - II `: Str. Steel fabricator / Erecter `: Welder / Gas cutter / Mechanic Cl I `: OTHER DATA : 1 Contractor's Overheads on Materials / Machinery / Labour % Contractor's Profit on Materials / Fuel & Energy charges / Labour % Hidden cost on Labour % Rate of interest % / annum Small Tools & Plant on Materials / Machinery / Labour % Structural steel fabrication cost per kg `: Sundries ( lump sum rate for unquantified inputs ) `: Cost of Other enabling works ( Annexure - 1 at the end ) %

6 NOTES ON SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : All notes under General Notes on Schedule of Rates and Notes on Lead, Lift, Loading and un-loading Charges are applicable to Canal Cross Drainage Works also to the extent they are relevant. 2. Unless otherwise specified the basic rates are inclusive of all lifts. 3. Unless otherwise specified the basic rates are inclusive of standard finish required for concrete surface. 4. The basic rates for concrete items include cleaning the top surface of previous lift and providing cement mortar layer before placing concrete for next lift. The proportion of cement mortar shall be same as that of mortar portion in concrete. 5. A weightage of 25 percent over the rates in the SR is permissible for all items of works involved in the modernization of canals and which are to be carried out during the canal closure period of about 3-4 months and less. In the estimates for modernization, the items of work shall appear based on the rate in SR without the permissible weightage. Below the respective items, the weightage permissible for the item is to be included. Further, the payment of weighatage is permissible only when the contractor completes a minimum of 90 percent of the work entrusted in a single closure period. Failing which the contractor foregoes the advantage of weightage. Payment of RA bills shall be made at rates excluding the weightage. It is only in the last RA bill / final bill, payment for weightage is to be released subject to above condition. 6. Cement content specified for cement concrete works in the item description is based on theoritical design mix computations and is exclusive of wastage and requirement for any incidentals. The actual cement content may vary based on trial mix studies. A suitable clause shall be included in tender for regulating payment for any upword or downword variation in cement content. 7. The quantities of materials including wastage, requirements for incidentals etc., for working out additional lead charges shall be as per the statement of requirement of materials under this section. 8. The basic rates are exclusive of cost of site clearance and river diversion arrangements such as coffer dams, bunds, diversion channels etc. Separate item rate or lump-sum provisions, wherever required, may be included in the estimate for these works. 4

7 CANAL CROSS DRAINAGE WORKS - DATA RATES SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.1 ITEM: Excavation in all kinds of soil including boulders upto 0.60 m dia.(0.113 cum) for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed including cost of all materials, machinery, labour etc., complete with lead upto 50 m and lift upto 1.5 m. DATA:Out turn of one heavy and one light mazdoor 4.5 to 5.00 cum per day. Consider 100 cum excavation in soil for rate analysis. 1. Requirement of materials: No materials involved in the work. 2. Requirement of machinery : No machinery considered. 3. Requirement of workforce : Heavy mazdoor ( 100 / 4.75 ) : 21 Nos Light mazdoor ( 100 / 4.75 ) : 21 Nos Stone breaker Maistry RATE ANALYSIS UNIT : cum A. MATERIALS: 1 NIL Total `: 0.00 Add for small Tools and 1% `: 0.00 Add for Contractor's 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total cost of Materials : `: 0.00 B. MACHINERY: 1 NIL Total `: 0.00 Add for small Tools and 1% `: 0.00 Add for Contractor's Profit on DPOL / 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total hire charges of Machinery : `: 0.00 C. LABOUR: 1 Maistry Day Stone breaker Day

8 C. LABOUR ( ) : 3 Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: 0.00 B. Hire charges of Machinery `: 0.00 C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.2 ITEM: Excavation in soft rock without blasting including boulders upto 0.60 m dia. ( cum ) for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed including cost of all materials,machinery,labour etc.,complete with lead upto 50 m and lift upto 1.5 m. DATA:Out turn of 1 crowbarman & 0.25 stone breaker 9 cum / day for loosening soft rock. Out turn of one heavy and one light mazdoor 4.5 cum per day for disposal. Consider 100 cum excavation in soil for rate analysis. 1. Requirement of materials: No materials involved in the work. 2. Requirement of machinery : No machinery considered. 3. Requirement of workforce : Crowbarman ( 100 / 9 ) : 11 Nos. Stone breaker ( 100 x 0.25 / 9 ) : 3 Nos. Heavy mazdoor ( 100 / 4.5 ) : 22 Nos Light mazdoor ( 100 / 4.5 ) : 22 Nos Maistry RATE ANALYSIS UNIT : cum A. MATERIALS: 1 Sundries LS

9 A. MATERIALS ( ) : Total `: Add for small Tools and 1% `: 0.45 Add for Contractor's 10% `: 4.50 Add for Contractor's 5% `: 2.25 Total cost of Materials : `: B. MACHINERY: 1 NIL Total `: 0.00 Add for small Tools and 1% `: 0.00 Add for Contractor's Profit on DPOL / 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total hire charges of Machinery : `: 0.00 C. LABOUR: 1 Crowbarman Day Stone breaker Day Maistry Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: 0.00 C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.3 ITEM: Excavation in soft rock requiring blasting including boulders upto 0.60 m dia. ( cum ) for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed including cost of all materials,machinery,labour etc.,complete with lead upto 50 m and lift upto 1.5 m. 7

10 DATA:For excavation in soft rock requiring blasting the spacing of holes depends on the extent of weathering of rock in the excavation area. However, for the purpose of rate analysis average grid spacing at 1.5 times the grid spacing adopted for hard rock is considered. Depth of drilling per hole : 1.40 m Effective depth of pull : 1.25 m Grid spacing of holes : 1.5 x 1.8 m Area covered by one hole ( 1.50 x 1.80 ) : 2.70 sqm Consider 100 cum excavation in soft rock requiring blasting for rate analysis. 1. Drilling and Blasting : Area for 100 cum SR requiring blasting for 1.25 m pull ( 100 / 1.25 ) : 80 sqm Nos. of holes for 80 sqm area ( 80 / 2.7 ) say : 30 Nos. Depth of drilling ( 30 x 1.4 ) : 42 m Rate of drilling in soft rock per hour : 10 m Rate of drilling in SR with 50 min / hour working ( 10 x 50 / 60 ) say : 8.3 m Time required for drilling with 2 jack hammers ( 42 / 8.3 / 2 ) say : 2.5 hours 2. Disposal of blasted soft rock : By manual labour. Out-put of 1 heavy and 1 light mazdoor assumed at 4.5 cum / day. 3. Requirement of materials: Quantity of Explosive at 0.20 kg / cum ( 100 x 0.2 ) : kg Electric detonators at 1 per hole : 30 Nos. Detonating fuse coil : 55 Rm Jack hammer drill rod : 42 m drilling 4. Requirement of machinery : Deploy 1 air compressor 8.5 cmm capacity for 2.5 hours with 50 min / hour working. Deploy 2 jack hammers for 2.5 hours. 5. Requirement of workforce ( other than machinery crew ) : Maistry Blaster : 0.5 No. Helper blaster : 0.5 No. Crowbarman for loosening blasted SR Stone breaker for breaking large fragments Heavy mazdoor for 4.5 cum / day ( 100 / 4.5 ) : 22 Nos. Light mazdoor for 4.5 cum / day ( 100 / 4.5 ) : 22 Nos. 6. Use rate of materials : Cost of drill rod 1.5 m `: / Each `: The life of drill rod is assumed at 1.5 times the life for drilling in hard rock. Life of drill rod for drilling in soft rock requiring blasting ( 1.5 x 150 ) : 225 m Use rate of drill rod per m drilling ( cost / life ) `: Length of air hose for drilling per jack hammer : 50 m Cost of 25 m air hose 25 mm `: / Rm `: Life of air hose : 800 hours Use rate of air hose per hr ( cost / life ) `: 6.28 RATE ANALYSIS UNIT : cum A. MATERIALS: 1 Use rate of drill rod 1.5 m length Rm Reconditioning 10 %

11 A. MATERIALS ( ): 2 Use rate of air hose 2 Nos. Hour Explosive small dia ( Kelvex-220 ) kg Electric detonators Nos Detonating fuse coil Rm Sundries LS Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 Air compressor 8.5 cmm ( diesel ) Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Air compressor Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Crowbarman Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `:

12 C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: ITEM: Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia. ( cum ) for foundations of canal cross drainage and other appurtenant structures deploying jack hammers for drilling holes and placing the excavated hard rock neatly in specified dump area or stack yard as directed including cost of all materials, machinery, labour etc., complete with lead upto 50 m and lift upto 1.5 m. DATA:32 mm dia jack hammer drilling assumed. Generally, the excavation for foundations of CD works in hard rock is limited to removal of top skin material to expose fresh foundation rock. Therefore, depth of hole for drilling in hard rock is assumed at 0.9 m for rate analysis. Consider 100 cum excavation for analysis. 1. Drilling and Blasting : Effective depth of pull ( ) : 0.80 m Grid spacing of holes say : 1.00x1.20 m Area covered by one hole ( 1.00 x 1.20 ) : 1.20 sqm Area of excavation for 100 cum ( 100 / 0.8 ) : 125 sqm Nos. of holes for 125 sqm area ( 125 / 1.20 ) : 104 Nos. Depth of drilling ( 104 x 0.9 ) : 93.6 m Add drilling for secondary 5 % : 4.7 m Total : 98.3 m Rate of drilling in hard rock per hour : 6.00 m With 50 min / hr working rate of drilling ( 6 x 50 / 60 ) say : 5 m Time required for drilling with 2 jack hammers ( 98.3 / 5 / 2 ) say : 10 hours 2. Disposal of blasted soft rock : By manual labour. Out-put of 1 heavy and 1 light mazdoor assumed at 4 cum / day. 3. Requirement of materials: Quantity of explosive small dia at 0.3 kg / cum ( 100 x 0.3 ) : 30 kg Add for secondary 5% ( 30 x 0.05 ) say : 2 kg Electric detonators at 1 per hole for main blast ( 104 x 1 ) : 104 Nos. Ordinary detonators for secondary blasting : 8 Nos Detonating fuse coil : 120 Rm Jack hammer drill rod : 98.3 m drilling 4. Requirement of machinery : Deploy 1 air compressor 8.5 cmm capacity for 10 hours with 50 min / hour working. Deploy 2 jack hammers for 10 hours. 5. Requirement of workforce ( other than machinery crew ) : Maistry Blaster Helper blaster Crowbarman for loosening blasted 25 cum / day ( 100 / 25 ) : 4 Nos. 10

13 Stone breaker for breaking large 25 cum/ day ( 100 / 25 ) : 4 Nos. Heavy mazdoor for 4.5 cum / day ( 100 / 4.5 ) : 22 Nos. Light mazdoor for 4.5 cum / day ( 100 / 4.5 ) : 22 Nos. 6. Use rate of materials : Cost of drill rod 1.5 m `: / Each `: Life of drill rod for drilling in hard rock with reconditioning : 150 m Use rate of drill rod per m drilling ( cost / life ) `: Length of air hose for drilling per jack hammer : 50 m Cost of 25 m air hose 25 mm `: / Rm `: Life of air hose : 800 hours Use rate of air hose per hr ( cost / life ) `: 6.28 RATE ANALYSIS UNIT : cum A. MATERIALS: 1 Explosive small dia ( Kelvex-220 ) kg Ordinary detonator No Electric detonator No Detonating fuse coil Rm Use rate of air hose 2 Nos. Hour Use rate of drill rod 1.5 m long Rm Reconditioning 10 % Sundries Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 Air compressor 8.5 cmm ( diesel ) Hour Fuel / Energy charges Hour Jack hammer 2 Nos Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Air compressor Hour Crew for Jack hammer Hour Blaster licensed Day

14 C. LABOUR ( ) : 4 Helper blasting Day Maistry Day Crowbarman Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: ITEM: Excavation in hard rock of all toughness including boulders above 0.6 m dia. ( cum ) by approved controlled blasting methods for foundations of canal cross drainage and other appurtenant structures adopting only jack hammers for drilling holes and using delay detonators for control of vibrations and by making muffling arrangements for control of fly-rock and by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques to minimise damage to rock beyond excavation line and placing the excavated hard rock neatly in approved dump area as directed including cost of all materials, machinery, labour etc., complete with lead upto 50 m and lift upto 1.5 m. DATA:32 mm dia jack hammer drilling assumed. Work requires: - Limiting the depth of holes and use of delay detonators to minimise explosive energy to reduce ground vibrations. - covering blasting area with chain link mesh or waste conveyor belts or waste tyres and sand bags to prevent flying of rock fragments during blasting. Generally, the excavation for foundations of CD works in hard rock is limited to removal of top skin material to expose fresh foundation rock. Therefore, depth of hole for drilling in hard rock is assumed at 0.9 m including 0.1 m sub-drilling for rate analysis. Consider 100 cum excavation for analysis. 1. Drilling and Blasting : Effective depth of pull ( ) : 0.80 m 12

15 The burden ( distance of hole from free face of excavation ) is considered at 30 times diameter of hole and spacing of holes is considered at 1.20 times burden. Burden for 32 mm dia jack hammer holes say : 1.00 m Spacing of 1.20 times burden : 1.20 m Grid spacing of holes say : 1.00x1.20 m Drilling and Blasting pattern : Pattern of holes : Staggered Hole initiation : Bottom Initiation system : Short delay detonators Delay system : 25 ms interval Initiation pattern : Straight line row by row Area covered by one hole ( 1.00 x 1.20 ) : 1.20 sqm Area of excavation for 100 cum ( 100 / 0.8 ) : 125 sqm Nos. of holes for 125 sqm area ( 125 / 1.20 ) : 104 Nos. Number of rows : 7 rows Depth of drilling ( 104 x 0.9 ) : 93.6 m Add drilling for secondary 5 % : 4.7 m Total : 98.3 m Rate of drilling in hard rock per hour : 6.00 m With 50 min / hr working rate of drilling ( 6 x 50 / 60 ) say : 5 m Time required for drilling with 2 jack hammers ( 98.3 / 5 / 2 ) say : 10 hours 2. Muffling arrangements: For controlling flying of rock fragments during blasting consider covering the blasting area with 20 guage 50 x 50 mm opening chain link mesh and sand bags. Consider spreading chain link mesh for 10 % area beyond excavation area. Area of chain link mesh say : 125 sqm Add for 10 % say : 10 sqm Total : 135 sqm Sand bags at 1 per hole : 104 Nos. Add for additional sand bags along edge of wire 10 % say : 11 Nos Total : 115 Nos 3. Disposal of blasted soft rock : By manual labour and lead upto 50 m.. Out-put of 1 heavy and 1 light mazdoor assumed at 4.5 cum / day. 4. Requirement of materials: Jack hammer drill rods for drilling : 98.3 m drilling Air hose for supplying air to 2 jack hammers ( 10 x 2 ) : 20 hours Quantity of 0.3 kg / cum for 100 cum : kg Explosive at 0.20 kg / cum for 5% secondary blast ( 100x0.05x0.2 ) : 1.00 kg Ele.short delay detonators at 1 per hole for 104 holes ( 104 x 1 ) : 104 Nos. 1 per hole for 8 secondary holes ( 8 x 1 ) : 8 Nos. Detonating fuse coil : 120 Rm 50 x 50 mm wire mesh : 140 sqm Sand bags 115 Nos. 5. Requirement of machinery : Deploy 1 air compressor 8.5 cmm capacity for 10 hours with 50 min / hour working. Deploy 2 jack hammers for 10 hours. 13

16 6. Requirement of workforce ( other than machinery crew ) : Maistry Blaster Helper blaster Crowbarman for loosening blasted 25 cum / day ( 100 / 25 ) : 4 Nos. Stone breaker for breaking large 25 cum/ day ( 100 / 25 ) : 4 Nos. Heavy mazdoor for 4.5 cum / day ( 100 / 4.5 ) : 22 Nos. Light mazdoor for 4.5 cum / day ( 100 / 4.5 ) : 22 Nos. 7. Use rate of materials : Cost of drill rod 1.5 m `: / Each `: Life of drill rod for drilling in hard rock with reconditioning : 150 m Use rate of drill rod per Rm drilling ( cost / life ) `: Length of 25 mm dia air hose for drilling for each jack hammer : 25 m Cost of 25 m air `: / Rm `: Life of air hose : 800 hours Use rate of 25 mm dia air hose per hr ( cost / life ) `: 6.28 Cost of 20 gauge wire `: / sqm `: Less salvage 10 % ( - ) `: Total `: Add for replacement of damaged 25% `: Total `: Life of wire mesh : 3 uses Use rate of wire mesh / use / sqm ( cost / life ) `: Cost of empty cement `: 3.00 `: 3.00 Cost of sand / bag for `: / cum `: Add for 1 km lead / loading / unloading charges for cum `: 3.83 Filling / 2 heavy mazdoors per 100 bags/ day `: 5.47 Total cost per bag `: Life of sand bag : 1 use Use rate of sand bag / use / bag ( cost / life ) `: RATE ANALYSIS UNIT : cum A. MATERIALS: 1 Use rate of drill rod 1.5 m length Rm Reconditioning 10 % Use rate of 25 mm dia air hose 2 Nos. Hour Use rate of 20SWG chain link wiremesh sqm Use rate of sand bag Nos Explosive small dia. kg Ordinary detonators Nos Electric short delay detonators Nos Fuse coil Rm Sundries LS Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `:

17 B. MACHINERY: 1 Air compressor 8.5 cmm ( ele ) 1 No Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Air compressor Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Crowbarman Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.5 ITEM: Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rod with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod, etc., complete with lead upto upto 50 m and all lifts. DATA:Consider 10 anchor rods for analysis. 15

18 Depth of drilling for 10 holes of 1.25 m depth each : m Rate of drilling in hard rock for 32 mm dia hole with 50 min / hr working : 6 m / hr Time required for drilling with 2 jack hammers say : 1.00 hour Cement for grouting at 0.5 kg per hole 1. Requirement of materials: 25 mm dia rods 2.50 m long ( 10 x 2.5 x 3.8 x ) : kg Cement for grouting at 0.5 kg per hole ( 10 x 0.5 x 1.01 ) : 5.10 kg Jack hammer drill rod : 12.5 m drilling 2. Requirement of machinery : Deploy 1 air compressor 8.5 cmm capacity for 1 hours with 50 min / hour working. Deploy 2 jack hammers for 1 hours. 3. Requirement of workforce ( other than machinery crew ) : Maistry : 0.5 No. Bar bender : 0.5 No. Mason Cl- II : 0.5 No. Heavy mazdoor 4. Use rate of materials : Cost of 1.5 m drill rod 32 mm `: / Each `: Life of drill rod with reconditioning : 150 m Use rate of drill per Rm drilling ( cost / life ) `: Cost of 25 mm dia air hose 50 `: / Rm `: Life of air hose : 800 hours Use rate of air hose / hour ( cost / life ) `: RATE ANALYSIS UNIT : Nos A. MATERIALS: 1 Cement for grouting kg mm dia steel rod kg Use rate of 32 mm dia drill rod 1.5 m long Rm Reconditioning 10% Use rate of air hose Hour Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 Air compressor 8.5 cmm ( diesel ) Hour Fuel / Energy charges Hour Jack hammer 2 Nos Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `:

19 B. MACHINERY ( ) : Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Air compressor Hour Crew for Jack hammer Hour Mason Class-II Day Bar bender Day Maistry Day Heavy mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for Nos. `: Rate per Each `: Rate approved per Each `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.6 ITEM: Providing, fabricating and placing in position reinforcement steel bars for RCC works including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required, tying with 1.25 mm dia soft annealed steel wire etc., complete with lead upto 50 and all lifts. DATA:Lap jointing considered assuming all reinforcement below 28 mm dia. Quantity of binding wire per tonne : 10 kg Wastage of steel : 2.5 percent Consider fabrication and placing 1 tonne steel for rate analysis. 1. Requirement of materials: Reinforcement steel with 2.5 % wastage ( 1 x ) : tonne Binding wire 1.25 mm 10 kg / t ( 1 x 10 ) : 10 kg 2. Requirement of machinery : No machinery required. 17

20 3. Requirement of workforce ( other than machinery crew ) : Cleaning and straightening : 2 Bar benders & 2 Heavy mazdoors Marking, cutting, bending and stacking : 2 Bar benders & 4 Heavy mazdoors Placing in position and tying : 2 Bar benders & 4 Heavy mazdoors Checking, correcting & misc. works : 1 Bar bender & 1 Heavy mazdoor Maistry RATE ANALYSIS UNIT : kg A. MATERIALS: 1 Rein.Steel with 2.5 % wastage kg Binding wire 1.25 mm dia kg Sundries ( chairs / spacers etc ) LS Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 NIL Total `: 0.00 Add for small Tools and 1% `: 0.00 Add for Contractor's Profit on DPOL / 10% `: 0.00 Add for Contractor's 5% `: 0.00 Total hire charges of Machinery : `: 0.00 C. LABOUR: 1 Maistry Day Bar bender Day Heavy mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `: 0.00 C. Cost of Labour `: TOTAL `:

21 Add for enabling 1.10% `: Total cost for kg `: Rate per kg `: Rate approved per kg `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.7 ITEM: Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x 100 x 10 mm angle and 250 x 12 mm plate for sinking foundation wells including cost of all materials, machinery, labour, cleaning, cutting, bending, welding, providing anchors etc., complete with lead upto 50 m and all lifts. DATA:Consider 4.50 m outer dia. well kerb for analysis. Well kerb Anchors 4.50 m dia. Concrete steining Angle 100x100x10 Plate 250x12 DETAILS OF FOUNDATION WELL CUTTING EDGE Length of 100 x 100 x 10 mm angle : m Length of 250 x 12 mm plate : m Weight of kg / m ( x ) : kg Weight of kg / m ( x ) : kg Add for 10 percent of weight of angle and plate say : kg Total (say) : kg Approximate length of welding for 4.5 m dia ring : 30 m No of electrodes per Rm welding : 10 Nos. Consider fabrication and placing in position of 1 cutting edge ( 600 kg ) for well for rate analysis. 1. Requirement of materials: Str. steel angle with 2.5 % wastage ( 211 x ) : kg Str. steel plate with 2.5 % wastage ( 334 x ) : kg Steel for anchors with 2.5 % wastage ( 55 x ) : kg Welding electrodes with 2.5 % wastage ( 30 x 10 x ) : 308 Nos Actyline 0.5 cum / tonne ( 600 x 0.5 / 1000 ) : 0.30 cum Oxygen gas 1.6 cum / tonne ( 600 x 1.5 / 1000 ) : 0.90 cum 2. Requirement of machinery : Deploy 1 bending machine for 8 hours for bending plate and angle Deploy 1 welding transformer for 30 1 m welding per hour 3. Requirement of workforce ( other than machinery crew ) : Str. Steel fabricator Welder / Gas cutter Maistry Heavy mazdoor : 5 Nos : 5 Nos 19

22 RATE ANALYSIS UNIT : kg A. MATERIALS: 1 Str.Steel angle with 2.5 % wastage kg Str.Steel plate with 2.5 % wastage kg Steel for anchors kg Acetyline gas cum Oxygen gas cum Welding electrodes ( ordinary ) Nos Sundries LS Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for Contractor's 5% `: Total cost of Materials : `: B. MACHINERY: 1 Bending machine Hour Fuel / Energy charges Hour Welding transformer Hour Fuel / Energy charges Hour Sundries LS Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for bending machine Hour Str. Steel fabricator Day Welder / Gas cutter Day Maistry Day Heavy mazdoor Day Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `: ABSTRACT: A. Cost of Materials `: B. Hire charges of Machinery `:

23 C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for kg `: Rate per kg `: Rate approved per kg `: SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.8 ITEM: Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface. ( Cement content : 240 kg / com for use of super plasticiser ) Cost of shuttering materials : Annexure: A Consider one shutter and one soldier set : Shutter size : 900 mm x 1200 mm Length of soldier : 2.3 m Shutter area : 1.20 sqm 4 mm thick plate kg / sqm : kg 50 x 50 x 6 mm angle 6.6 m 3.8 kg / m : kg 50 x 6 mm flat 1.8 m 2.35 kg / m : 4.23 kg ISLC- 100 length kg / m : kg 6 mm plate kg / sqm : 1.41 kg Cost of 4 mm plate `: / kg `: Cost of 6.6 m angle `: / kg `: Cost of 1.8 m flat 4.23 `: / kg `: Cost of 2.3 m soldier `: / kg `: Cost of 6mm plate 1.41 `: / kg `: Total `: Add for 2.5 % `: Add for bolts & nuts 0.5 kg / `: / kg `: Add for fabrication of `: / kg `: Total `: Deduct salvage 15% ( - ) `: Total `: Use rate of shutters: Use rate of shutters considering average 40 uses `: Add for repairs / replacements / catwalks 15% `: Add for binding wire / temperary supports 5% `: 5.40 Add 2 J-bolts/sqm for fixing `: / Each `: Add for shutter oil at 0.2 ltr / `: / ltr `: 7.00 Total `: Effective area of shutter & soldier with 100 mm margin at top & bottom : 1.00 sqm Cost of shuttering for concrete / use / sqm ( considering 40 uses ) `: ( Excluding T & P / Profit / Overheads) Use rate of shutters considering average 30 uses `: Add for repairs / replacements / catwalks 15% `: Add for binding wire / temperary supports 5% `:

24 Add 2 J-bolts/sqm for fixing `: / Each `: Add for shutter oil at 0.2 ltr / `: / ltr `: 7.00 Total `: Effective area of shutter & soldier with 100 mm margin at top & bottom : 1.00 sqm Cost of shuttering for concrete / use / sqm ( considering 30 uses ) `: ( Excluding T & P / Profit / Overheads) Annexure: B Cost of Erection & Dismantling shuttering : 2 Fitters, 1 Carpentor Cl-II and 5 mazdoors erect 50 sqm shuttering / day. Cost of dismantling assumed at 50 % of erection charges. Area of shuttering with supports considered. : 100 sqm Cleaning, conveying, erecting and oiling: Fitter shuttering 4 `: / day `: Carpentor Cl -II 2 `: / day `: Heavy mazdoor 10 `: / day `: Dismantling and stacking: Fitter shuttering 2 `: / day `: Carpentor Cl -II 1 `: / day `: Heavy mazdoor 5 `: / day `: Total `: Labour charges for erecting and dismantling shuttering per sqm `: ( Excluding T & P / Profit / Overheads / Hidden costs ) DATA:For 1 cum CC :- Coarse aggregates : 0.86 cum Blending ratio : 50 :30 : 20 Fine aggregate : 0.42 cum Cement content : 240 kg Super plasticizer : 0.75 ltr Wastage : 1 % for cement and 2 % for coarse & fine aggregates. Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 40 mm down CA. Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching CA & FA. 1. Quantity of concrete per shift : Cycle time for batching / mixing / unloading 1 mix : Batching mm CA ( 0.09 cum ) : 3.50 min Batching mm & 10 mm below CA parellel activity : --- Batching fine aggregate parellel activity : --- Batching cement parellel activity : --- Loading mixer drum & miscellaneous : 1.00 min Mixing and unloading parellel activity : --- Add for possible delays in any of the activity : 0.50 min Total : 5.00 min No. of mixes per day with 50 min / hr working ( 50 x 8 / 5 ) : 80 mixes Output of CC for 80 mixes ( 80 x 50 / 240 ) say : cum Consider cum concrete for rate analysis. 2. Requirement of materials: Cement for mix with 1 % wastage ( x 240 x 1.01 ) : 4036 kg Cement for incidental 3 kg / cum ( x 3 ) : 50 kg Coarse aggregate mm size range ( x 0.86 x 0.5 x 1.02 ) : 7.30 cum Coarse aggregate mm size range ( x 0.86 x 0.3 x 1.02 ) : 4.38 cum Coarse aggregate mm size ( x 0.86 x 0.2 x 1.02 ) : 2.92 cum Fine aggregate ( x 0.42 x 1.02 ) : 7.13 cum Super plasticiser ( x 0.75 x 1.02 ) : ltrs 22

25 3. Requirement of machinery : Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete. Deploy 1 Needle vibrater 40 mm dia for 8 hours for vibrating concrete. Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc. Deploy 1 Water tanker 8000 ltr capacity for 1 hour for water required for concrete / curing etc. 4. Formwork & scaffolding : Consider normal shuttering as concrete is laid in smaller lifts. Shuttering at 1 sqm / cum of concrete considered for foundation filling works sqm per cum of concrete ( x 1 ) : sqm Scaffolding / supports for foundation concreting 10 % of cost of shuttering. 5. Requirement of workforce ( other than machinery crew ) : Consider batching of materials and conveyance & laying of concrete by manual labour. Maistry Mason Cl I Heavy mazdoor: For batching cement : 2 Nos. For batching CA : 3 Nos. For batching & CA : 3 Nos. For batching FA : 3 Nos. For remixing & filling mortar pans : 2 Nos. For loading mortar pans : 2 Nos. For unloading mortar pans : 2 Nos. For assisting Mason Light mazdoor: For conveying 1 per cum : 17 Nos. For cleaning, curing & miscellaneous Labour for shuttering per sqm ( Annexure-B above `: Labour for erecting & dismantling 10 % of cost of labour for shuttering. 6. Use rate of materials : Use rate of shuttering per sqm for 40 uses ( Annexure-A above `: RATE ANALYSIS UNIT : cum A. MATERIALS: 1 Cement for mix kg Cement for 3 kg / cum kg Coarse aggregate mm cum Coarse aggregate mm cum Coarse aggregate 10 mm below cum Fine aggregate cum Super Plasticizer ltr Use rate of shuttering for 40 uses sqm % of shuttering Sundries LS Total `: Add for small Tools and 1% `:

26 A. MATERIALS ( ) : Add for Contractor's 10% `: Add for Contractor's 5% `: Add Royalty charges on ( Included in material rates ) `: 0.00 Add Royalty charges on ( Included in material rates ) `: 0.00 Total cost of Materials : `: B. MACHINERY: 1 Concrete mixer 300 / 200 ltr ( diesel ) Hour Fuel / Energy charges Hour hp pump ( diesel ) Hour Fuel / Energy charges Hour Water tanker 8000 ltr Hour Fuel / Energy charges Hour Needle vibrator 40 mm dia ( petrol ) Hour Fuel / Energy charges Hour Total `: Add for small Tools and 1% `: Add for Contractor's Profit on DPOL / 10% `: Add for Contractor's 5% `: Total hire charges of Machinery : `: C. LABOUR: 1 Crew for Concrete mixer Hour Crew for Pump Hour Crew for Water tanker Hour Crew for Needle vibrator Hour Maistry Day Mason Class-I Day Heavy mazdoor for batching materials Day for loading mortar pans Day for laying Day Light mazdoor for conveying concrete Day for cleaning / washing / curing Day Labour cost for shuttering sqm Labour cost for 10 % Total `: Add for small Tools and 1% `: Add for Contractor's 10% `: Add for hidden cost on 15% `: Add for Contractor's 5% `: Total cost of Labour : `:

27 ABSTRACT: A. Cost of Materials including royalty charges `: B. Hire charges of Machinery `: C. Cost of Labour `: TOTAL `: Add for enabling 1.10% `: Total cost for cum `: Rate per cum `: Rate approved per cum `: Note: For every 1.5 m additional depth below 1.5 m from surface add / cum `: ( Considered at 50 % of the lift charges worked out under Item : 13 ) SECTION: CANAL C.D WORKS. YEAR : ITEM No: WRD: 4.9 ITEM: Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with lead upto 50 m and depth of foundation upto 1.5 m from surface. ( Cement content : 210 kg / cum with use of super plasticiser ) DATA:For 1 cum CC :- Coarse aggregates : 0.96 cum Blending ratio : 35 :30 : 20 : 15 Fine aggregate : 0.37 cum Cement content : 210 kg Super plasticizer : 0.65 ltr Wastage : 1 % for cement and 2 % for coarse & fine aggregates. Consider 600 / 400 ltr capacity mixer and 100 kg cement per mix for use of 80 mm down CA. Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching CA & FA. 1. Quantity of concrete per shift : Cycle time for batching / mixing / unloading 1 mix : Batching mm & 10 mm below CA ( cum ) : 9.00 min Batching mm & mm below CA parellel activity : --- Batching fine aggregate parellel activity : --- Batching cement parellel activity : --- Loading mixer drum & miscellaneous : 1.50 min Mixing and unloading parellel activity : --- Add for possible delays in any of the activity : 0.50 min Total : min No. of mixes per day with 50 min / hr working ( 50 x 8 / 11 ) : 36 mixes Output of CC for 36 mixes ( 36 x 100 / 210 ) say : cum Consider cum concrete for rate analysis. 2. Requirement of materials: Cement for mix with 1 % wastage ( x 210 x 1.01 ) : 3638 kg Cement for incidental 3 kg / cum ( x 3 ) : 52 kg Coarse aggregate mm size ( x 0.96 x 0.35 x 1.02 ) : 5.88 cum Coarse aggregate mm size ( x 0.96 x 0.3 x 1.02 ) : 5.04 cum Coarse aggregate mm size ( x 0.96 x 0.2 x 1.02 ) : 3.36 cum Coarse aggregate mm size ( x 0.96 x 0.15 x 1.02 ) : 2.52 cum Fine aggregate ( x 0.37 x 1.02 ) : 6.47 cum Super plasticiser ( x 0.65 x 1.02 ) : 11.4 ltrs 25

28 3. Requirement of machinery : Deploy 600 / 400 ltr capacity concrete mixer for 8 hours for production of concrete. Deploy 1 Needle vibrater 60 mm dia for 8 hours for vibrating concrete. Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc. Deploy 1 Water tanker 8000 ltr capacity for 1 hour for water required for concrete / curing etc. 4. Formwork & scaffolding : Consider normal shuttering as concrete is laid in smaller lifts. Shuttering at 1 sqm / cum of concrete considered for foundation filling works sqm per cum of concrete ( x 1 ) : sqm Scaffolding / supports for foundation concreting 10 % of cost of shuttering. 5. Requirement of workforce ( other than machinery crew ) : Consider batching of materials and conveyance & laying of concrete by manual labour. Maistry Mason Cl I Heavy mazdoor: For batching cement : 2 Nos. For batching mm & mm CA : 3 Nos. For batching mm & mm CA : 3 Nos. For batching FA : 3 Nos. For remixing & filling mortar pans : 2 Nos. For loading mortar pans : 2 Nos. For unloading mortar pans : 2 Nos. For assisting Mason Light mazdoor: For conveying 1 per cum : 17 Nos. For cleaning, curing & miscellaneous Labour for shuttering per sqm ( Annexure-B Item-8 `: Labour for erecting & dismantling scaffolding per 10 % of cost of labour for shuttering. 6. Use rate of materials : Use rate of shuttering per sqm for 40 uses ( Annexure-A Item-8 `: RATE ANALYSIS UNIT : cum A. MATERIALS: 1 Cement for mix kg Cement for 3 kg / cum kg Coarse aggregate mm cum Coarse aggregate mm cum Coarse aggregate mm cum Coarse aggregate 10 mm below cum Fine aggregate cum Super Plasticizer ltr Use rate of shuttering for 40 uses sqm % of shuttering Sundries LS Total `: Add for small Tools and 1% `:

REVISED BY SCHEDULE OF RATES COMMITTEE

REVISED BY SCHEDULE OF RATES COMMITTEE d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 4 SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : 2018-19 CONTENTS PAGES REFERENCE DATA 1 -- 3 NOTES ON BASIC RATES 4 -- 4 DATA RATES

More information

SCHEDULE OF RATES DAM AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES

SCHEDULE OF RATES DAM AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR SCREEN ON OPENING THIS FILE CLICK

More information

WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA d ÀA À ÀÆä E ÁS É WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA 1 -- 3 NOTES ON BASIC RATES 4 -- 4 DATA FOR SCHEDULE

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES FOR THE YEAR : 2018-19 CONTENTS PAGES REFERENCE DATA 1 -- 4 NOTES ON BASIC RATES 5 -- 5 DATA RATES 6 -- 154 ANNEXURES 155--160

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA! -- 4 NOTES ON BASIC RATES

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS REFERENCE DATA! -- 4 NOTES ON BASIC RATES d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER - WRD: 5 SCHEDULE OF RATES LIFT IRRIGATION WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA! -- 4 NOTES ON BASIC RATES 5 -- 5 DATA RATES 6

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 2 SCHEDULE OF RATES DAM AND ALLIED WORKS FOR THE YEAR :

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 2 SCHEDULE OF RATES DAM AND ALLIED WORKS FOR THE YEAR : d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 2 SCHEDULE OF RATES DAM AND ALLIED WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA 1 -- 4 NOTES ON BASIC RATES 5 -- 6 DATA FOR SCHEDULE

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH

PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH ANALYSIS OF RATES FOR ROAD AND BRIDGE WORKS 2010 ZERO LEAD BASED: (EXCLUDING CARTAGE COST) PUBLISHED UNDER THE AUTHORITY OF THE CHIEF ENGINEER (DESIGN & PLANNING)

More information

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Tender Schedule for the Work Construction of Staff qtrs. at Tainda S/S (1no.) 1.Amount put to Tender:- Rs 7,48,024/- 2.E.M.D. Required: - R 8,000/- 3. Class of contractor :- "D" & "C" 4. Cost of Tender Paper:- R 4,200/- Sl- No Tender Schedule for the Work "Construction of Staff

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC

More information

Est. Cost : Rs.40,000/-

Est. Cost : Rs.40,000/- 3) Sl. No. 1 Description of Item Unit Nos. L B D Qty Rate Amount KSRB 2-1.1: Earthwork in surface excavation in ordinary soil for leveling and lowering the ground manually (other than foundation of buildings,

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C Notice of Amendment No.1 Addendum No.1 to the following Contract Packages has been made in the Bids, for which the first date notice was published in the Gorkhapatra daily on December 14, 2010 by Sanjen

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A

DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A 1 DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A VOLUME-II PRICE BID Downloading of tender documents (Start Date): Dt 30/05/2017 from 11.00 hrs. On line submission of tender (End Date): Dt. 01/07/2017

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD.

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD. GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD. Name of Work: Construction of foundation for Transformer bay, fire protection wall & ancillary civil work at 220

More information

AFD: Civil: Inq: April 23, 2016

AFD: Civil: Inq: April 23, 2016 AFD: Civil: Inq: 20160402 April 23, 2016 To, Sub: - Inquiry for Civil work for Granite flooring and miscellaneous repairs work at ADMN Corridor at Amulfed Dairy, Gandhinagar. We invite your most competitive

More information

Sl No. Sqm Sqm Sqm Cum Cum 0.73

Sl No. Sqm Sqm Sqm Cum Cum 0.73 BOQ Name of Work: Repairing & repainting works at the adjunct room between Old block and New Extension Building in Second floor of Chemistry Department. Sl No 1 2 3 4 Desription of Item Unit Qnty Rate

More information

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I S.No. Description Unit Qty RATE Amount PART-I CIVIL WORKS B-PLAIN AND REINFORCED CEMENT CONCRETE : Notes : ( the following

More information

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) BID IDENTIFICATION NO. DRDA, SBP- 10/2013-14 GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT PRICE BID DOCUMENTS FOR THE WORK (Civil works) Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) ESTIMATED

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA)

TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA) TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA) Content: 1. Introduction. 2. BOQ 3. Details of Tender & Tender notice. 4. General Terms and Conditions. 5. Technical

More information

TENDER DOCUMENT. TENDER No.: BHI/PI-(S)/675/1005 FOR

TENDER DOCUMENT. TENDER No.: BHI/PI-(S)/675/1005 FOR TENDER DOCUMENT TENDER No.: BHI/PI-(S)/675/1005 FOR Tender for Construction of Civil works above pile cap for 5 Nos of RCC Mixing Bins (Silos) of Storage Capacity 500MT (each) and columns, beams independent

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SCHEDULE OF RATES SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT 1 Excavation for foundation in earth all types of soils like clay,

More information

Est. Cost : Rs.35,000/- Sl. No.

Est. Cost : Rs.35,000/- Sl. No. Note:-1) The execution of these model estimates is subjected to compliance / adherence to 60:40 : : Wage: material ratio at Grampanchayat as a UNIT 2) These model estimates shall be locally approved (technically)

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES (TOTAL 10 SHEETS EXCLUDING ABSTRACT & COVER PAGE) 1 OF 7 SCHEDULE-A BOQ FOR EARTHEN DYKES

More information

CIVIL WORKS Mahesh G. Nair

CIVIL WORKS Mahesh G. Nair MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil

More information

Sub Total for Demolishing

Sub Total for Demolishing A Cleaning of Jungle Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish

More information

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1 ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Tender No. NERO/MMD/57/ Date: 27..208 Tender for Construction of Border Road works from BP NO FROM 822/2S to 825/M at Panisagar sector along

More information

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt: Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of

More information

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Item No. Civil Works:- BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Description Qty. Unit Rate Amount 1 Granite Cladding near entrance. Providing and fixing to the 110 wall after preparing

More information

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of BILL OF QUANTITIES Name of Work: Beautification of Adalatganj Talab, Patna, Bihar S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of specified

More information

Construction of Shopping Complex at MNIT campus.

Construction of Shopping Complex at MNIT campus. Name of work:- Construction of Shopping Complex at MNIT campus. G-Schedule S.No Qty Items Unit Rate Amount 1 253 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation

More information

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA AT PLOT NO. IIA/35, ACTION AREA IIA, NEW TOWN, KOLKATA, WEST BENGAL 700 157 Pages (1 5)

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of

More information

PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK

PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK (For Building & Area Development Work) 1.0 INDIAN STANDARDS: Work shall be carried out to Indian Standards and Code of practices. In absence International

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES 1 OF 7 01 Excavation for seating the dam, toe drains & appurtenant M 3 0 9110 21700 30810

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

UNIT III Earthwork Estimation & Reinforcement Estimation

UNIT III Earthwork Estimation & Reinforcement Estimation SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech

More information

SPECIAL SPECIFICATION 4491 Type CAC Concrete

SPECIAL SPECIFICATION 4491 Type CAC Concrete 2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.

More information

Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres

Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres Version 2 Revised October 2008 Design Guidance for TAB-Deck Composite Slabs using SMD Metal

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge Sl.Pg.No.193 Name of Work : Construction of box culvert across 35 mtr. wide channel along 30 mtr. Wide road in Sector 17 & 18 at Ulwe Node. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

More information

Providing and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22.

Providing and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22. 1 CG0001 Clearing grass including removal of rubbish within 50m of site 91.00 m² 2 EW0001 Surface dressing of ground, including removal of vegetation and inequalities < 150mm deep, disposal of rubbish

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Construction of Parking Shed at Main Campus,

More information

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM :

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM : NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI- 620015 ESTATE MAINTENANCE DEPARTMANT SCHDULE OF WORK Name of Work :Renovation of Geotechnical Lab and Environmental lab in Civil Engineering Departemnt

More information

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. QUOTED SL NO D E S C R I P T I O N OF ITEM UNIT Quantity IN Figures

More information

Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL TENDER SCHEDULE

Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL TENDER SCHEDULE Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL Sl.no. Qty Description TENDER SCHEDULE 1 10000 m2 Clearing the grass and other

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

SUMMER 16 EXAMINATIONS Subject Code: Model Answer- Estimating and costing Page No. 01 /19

SUMMER 16 EXAMINATIONS Subject Code: Model Answer- Estimating and costing Page No. 01 /19 Subject Code: 17501 Model Answer- Estimating and costing Page No. 01 /19 Important Instruction to Examiners:- 1) The answers should be examined by key words & not as word to word as given in the model

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

( B ) CEMENT CONCRETE ( PLAIN & REINFORCED ) RS. ( F ) DOORS, WINDOWS AND VENTILATORS RS. ( J ) STRUCTURAL STEEL WORK & ROOFING RS.

( B ) CEMENT CONCRETE ( PLAIN & REINFORCED ) RS. ( F ) DOORS, WINDOWS AND VENTILATORS RS. ( J ) STRUCTURAL STEEL WORK & ROOFING RS. PROJECT : CONSTRUCTION OF ISOLATION SHED AT G.NO 314 TILEKARWADI OWNER : BAIF DEVELOPMENT RESEARCH FOUNDATION SCHEDULE OF QUANTITIES AND RATES * SUMMARY STATEMENT :- ( A ) EXCAVATION, FILLING AND SOLING

More information

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR FINANCIAL BID Item DSR Item Description Qty Units No No. Total 1.1.1 Excavating trenches of

More information

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR Approximate estimate of renovation extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR 2013-14 SL Description of the work No 1 DISMANTLING Unit quantity Rate Amount 1.1

More information

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND

More information

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2 BILL NO.1 : PRELIMINARY AND SUPERVISORY SERVICES 1.01 Allow a prime cost sum for material testing to be spent in whole or part as directed by the Resident Engineer. PC Sum 1 1,351.35 1,351.35 1.02 Contractor's

More information

General Technical Specification

General Technical Specification GENERAL For calculating the requirements of cement in various items of work the following standards will be adopted. Over the above theoretical quantity of cement, additional allowance upto plus or minus

More information

भ रत य प रब धन स स थ न न गप र

भ रत य प रब धन स स थ न न गप र भ रत य प रब धन स स थ न न गप र INDIAN INSTITUTE OF MANAGEMENT NAGPUR Tender No : IIMN/CAO/12/2018-19 dated 30-08-2018 Name of Work :Provision of toilet, extension of washing shade and Stainless steel railing

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at

More information

NOTICE INVITING QUOTATION

NOTICE INVITING QUOTATION Page 1 of 5 CONSTRUCTION CELL NEW MARKET COMPLEX CMC BUILDING(6 TH FLOOR) 15N,NELLIE SENGUPTA SARANI KOLKATA-700 087 No.CWC/CC-Kol/NIQ-AR&MO/CW-Mohania/2015-16/ Date- 08.09.2015 NOTICE INVITING QUOTATION

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

PRIDE CONSULTING ENGINEERS LOURDES TOWER CHS. LTD.,

PRIDE CONSULTING ENGINEERS LOURDES TOWER CHS. LTD., SECTION A: CIVIL REPAIRS A1 Scaffolding a Providing & erecting sturdy Bamboo Scaffolding from ground to terrace parapet level to reach any place of work, including approaches, extension, making proper

More information

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department NAIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPALLI - 620015 DEPARTMENT OF ESTATE MAINTRNANCE SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

More information

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1 PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing

More information

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for

More information

Pre Bid Queries & Clarifications Furnished

Pre Bid Queries & Clarifications Furnished Construction of High Level Bridges Across Palar River At km: 76/000 in East Coast Road, Chennai, Tamil Nadu Pre Bid Queries & Clarifications Furnished S No 1 We request you to clarify the status of land

More information

Rak Production Technology of Concrete Structures (2015) Concrete Reinforcement

Rak Production Technology of Concrete Structures (2015) Concrete Reinforcement Rak-82-2121 Production Technology of Concrete Structures (2015) Concrete Reinforcement 09.10.2015 1 Learning Outcomes To acquaint the student with concrete reinforcement 2 Reinforcement The of concrete

More information

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7 The Contractor shall consider in his price all costs or expenses of all requirements stipulated

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

STATE BANK OF INDIA-NUAGAON ADB SCHEDULE OF RATES FOR THE FACE LIFTING OF THE BRANCH BUILDING

STATE BANK OF INDIA-NUAGAON ADB SCHEDULE OF RATES FOR THE FACE LIFTING OF THE BRANCH BUILDING STATE BANK OF INDIA-NUAGAON ADB SCHEDULE OF RATES FOR THE FACE LIFTING OF THE BRANCH BUILDING Sl. No. Description of the Works Unit Quantity Rate Amount 1 DISMANTLING WORKS Surface cleaning of roof by

More information

Sl No. Rate. Hct By manual means In area of light jungle

Sl No. Rate. Hct By manual means In area of light jungle BILL OF QUANTITIES Name of Work : Extension of NH 37 from its dead end near Saikhowaghat in Assam ending near Roing in Arunachal Pradesh under Trans Arunachal Highway programme. SH: Strengthening of Shantipur

More information

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur-760010 Sl. No-IWD / NIQ / PE / 2017-18 /07 Date:- 16.06.17 Notice Inviting Tender The Project Engineer (E),

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

BILL OF QUANTITY. Estimated: - Rs. 1, 83, 650/- Time of Completion:- Class of Contractor:- D & above

BILL OF QUANTITY. Estimated: - Rs. 1, 83, 650/- Time of Completion:- Class of Contractor:- D & above BILL OF QUANTITY Name of Work:- Estimate for renovation of S.D.O, No.I Office, Old Control Room of accommodation of E.E, BNED, Bhadrak for Latrine & Bathroom. PART-A Estimated: - Rs. 1, 83, 650/- Time

More information

NATIONAL SEEDS CORPORATION LTD. (A Govt. of India Undertaking-"Mini-Ratna Company")

NATIONAL SEEDS CORPORATION LTD. (A Govt. of India Undertaking-Mini-Ratna Company) NATIONAL SEEDS CORPORATION LTD. (A Govt. of India Undertaking-"Mini-Ratna Company") SR. NO. 1 2 ITEM OF WORK QTY. UNIT RATE Surface dressing of the ground including removing vegetation and inequalities

More information

Construction of fencing on sui and vershamedi side at port Navlakhi.

Construction of fencing on sui and vershamedi side at port Navlakhi. Construction of fencing on sui and vershamedi side at port Navlakhi. VOLUME-II PRICE BID Downloading of tender doents (Start Date): Dt. 7-2 -2018 from 13.00 hrs. On line submission of tender: Dt 28-2-2018

More information

Percentage BoQ. Validate Print Help. Tender Inviting Authority: S.K. Gupta, Manager (Civil)

Percentage BoQ. Validate Print Help. Tender Inviting Authority: S.K. Gupta, Manager (Civil) Validate Print Help Percentage BoQ Tender Inviting Authority: S.K. Gupta, Manager (Civil) Name of Work: Repair works at F & B outlets as K4, K6, K7, K8,K10 & Food Court-II and Hall -20 Contract No: Bidder

More information

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR ANISO9001&14001COMPANY TENDER DOCUMENT TENDER No: NERO/CON/TU/659/325 dated 20.09.2018 FOR TENDER FOR CONSTRUCTION OF UPGRADATION OF CENTRAL ROAD INCLUDING LANDSCAPE LIGHTING BY MUSHROOM TYPE LED BOLLARD

More information

I N D E X. Page No. Report. Check List for Disaster Management. Cost Estimate. Investment Plan. Operation and Maintenance. Pert Chart.

I N D E X. Page No. Report. Check List for Disaster Management. Cost Estimate. Investment Plan. Operation and Maintenance. Pert Chart. I N D E X Page No. Report. Check List for Disaster Management. Cost Estimate. Investment Plan. Operation and Maintenance. Pert Chart. Abstract Cost Estimate. Detailed Estimate. 1 7 8 12 13 13 14 15 16

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Supervision of Piling Works

Supervision of Piling Works Page 1 of 7 Supervision of Piling Works Sayeed Ahmed Assistant Director (Planning & Development) Independent University Bangladesh, Dhaka, Bangladesh e-mail ABSTRACT Supervision is utmost important in

More information

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer

More information

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants NTPC Ltd. KORBA OPEN TENDER NOTICE NO.RITES/GGM/NGP/T-07-2015, DATED 05.03.2015 Name of work: Earthwork in Drain Foundation, construction of minor bridges and RCC drain, P-Way works etc for the construction

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

BILL OF QUANTITY PART-III CIVIL WORKS ITEM NO. DESCRIPTION UNIT QTY RATE AMOUNT

BILL OF QUANTITY PART-III CIVIL WORKS ITEM NO. DESCRIPTION UNIT QTY RATE AMOUNT Page 1 BILL OF QUANTITY PART-III CIVIL WORKS ITEM NO. DESCRIPTION UNIT QTY RATE AMOUNT 1 Providing and fixing door Closer/Bottle type Each 10 2 Providing and fixing door Stopper Each 10 Providing and placing

More information

I N D E X. Page No. Report. Check List for Disaster Management. Cost Estimate. Investment Plan. Operation and Maintenance. Pert Chart.

I N D E X. Page No. Report. Check List for Disaster Management. Cost Estimate. Investment Plan. Operation and Maintenance. Pert Chart. I N D E X Page No. Report. Check List for Disaster Management. Cost Estimate. Investment Plan. Operation and Maintenance. Pert Chart. Abstract Cost Estimate. Detailed Estimate. 1 8 9 13 14 14 15 16 17

More information

KAIRA DIST.-CO-OPERATIVE MILK PRODUCER'S UNION LTD. AT ANAND. PROJECT :- ENTRANCE GATE ( Area = 115 sqm)

KAIRA DIST.-CO-OPERATIVE MILK PRODUCER'S UNION LTD. AT ANAND. PROJECT :- ENTRANCE GATE ( Area = 115 sqm) SECTION 1 : EARTH WORK 1.1 Excavation for foundation in earth, soil of all types, sand, gravel and murrum with Manual and Mechanical means and preparing the bed for foundation, trenches etc. including

More information