1 Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer

2 Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 5/400 to 7/800 Package - II at NTPC In-plant yard for construction of new Railway siding for M/s. NTPC Limited between Gadag - Hotgi section of South Western Railway at Kudgi (Bijapur - District, Karnataka - State)". Sr. No. Description of Items 1 Earthwork in cutting (Classified) in formation, trolley refuges, side drains, level crossing approaches, bridge approaches, platforms, catch water drains, diversion of nallah, & finishing to required dimension and slopes to obtain a neat appearance to standard approved profile inclusive of all labour, machine and materials and removing & leading all cut spoils either to make spoil dumps beyond 10m. from cutting edge or for filling in embankment (in layers) with all leads, lifts, ascent, descent, loading, unloading, all taxes / royalty, clearance of site and all incidental charges, bailing & pumping out water if required, etc., complete as per directions of the Engineer-in- Charge. The work is to be executed as per latest / updated edition of "Guidelines for Earthwork in Railway Projects" (Guideline No. GE:G-1 including correction slip no. 1, July 2003) issued by RDSO, Lucknow and as per Tender document conditions. Cut trees, if any, shall be property of Corporation / NTPC and to be deposited in Corporation / NTPC location as directed by Engineer-in- Charge. [Chainage 6/200 to 6/600 = 400 mtrs & Chainage 6/950 to 7/300 = 350 mtrs, Total Cutting length = 750 mtrs approximately]. Unit Rate in ( ) Quantity Amount in ( ) a In all conditions and classifications of soil except soft / hard rock and including filling in embankment at nominated locations between 3/800 to 7/800 or dumping / stacking at other locations including beyond NTPC land boundary and at Contractor s own / private locations / land as directed by Engineer-in-Charge. Cum ,300 27,85, Konkan Railway Corporation Limited Signature of Tenderer

3 b Soft rock not requiring blasting in all conditions and excavation done using breaker attachment or chiseling and including filling in embankment at nominated locations between km 3/800 to 7/800 or dumping / stacking at other locations including beyond NTPC land boundary and at Contractor s own / private locations / land c In hard rock excavation requiring blasting with explosives and blasting / drilling equipment Including all incidental works in all conditions. Rate includes cost of all explosive material. Cum ,250 1,16,59,768 Cum ,12,450 5,09,09,488 Note - (i) All usable earth arising from cut spoils shall be led into bank formation any where between km 3/800 to 5/400 or beyond this chainage upto km 7/800 where filling is required beyond km 5/400 and Unusable spoils shall be dumped / stacked with in NTPC land, if available. Otherwise contractor has to dump out side NTPC land boundary on private land and this dumping yard to be arranged by contractor on his own cost. (ii) All hard rock and boulders not fit for filling will be stacked by the contractor and will be the property of the NTPC. (iii) These items will be paid only after compaction of earth, if cutspoils are filled in embankment as per Schedule - 'C'. iv) No extra payment shall be made for filling (embankment) beyond km 5/400 upto 7/800 and rate includes all lead, lift, etc. (v) The Engineer-in-charge shall decide the classification based on strata conditions and shall instruct the contractor to execute the work under hard rock / soft rock items and payment under these items shall be made based on this prior instructions of Engineer-incharge only and the depth / level of the cutting quantity to be paid under these items shall be decided by Engineer-incharge (or higher authorities) which is final and binding. Proper and valid records / cross-sections are to be maintained by contractor as directed by Corporation. Total amount 6,53,54, Konkan Railway Corporation Limited Signature of Tenderer

4 I, we agree to carry out the works at (in figures) % (and in words ) at par / above / below the Scheduled rates of Schedule A. (Tick the applicable word / item and strike out which are not applicable). GM/Works 38 Konkan Railway Corporation Limited Signature of Tenderer

5 SCHEDULE - B (FILLING) Name of work: Limited tender for Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 5/400 to 7/800 Package - II at NTPC In-plant yard for construction of new Railway siding for M/s. NTPC Limited between Gadag - Hotgi section of South Western Railway at Kudgi (Bijapur - District, Karnataka - State)". Sr. No. Description of Items Unit Rate in Quantity Amount in 1 Earthwork in filling in embankment, through layers with specified thickness, guide bunds, around buried type abutments, bridge gaps, bridge approaches, trolley refuges, rain bunds if provided, platforms etc. as per RDSO's latest guidelines (Guideline No. GE:G-1 including correction slip no. 1, July 2003) and as per specifications / conditions of tender document including all leads, royalty, lifts, ascents, descents, crossing of nallahs or any other obstructions. The rates shall include all dressing of bank to final profile, demarcation and setting out of profile, site clearance, removing of shrubs, roots of vegetations growth, heavy grass, benching of existing slope of old bank, all handling / re-handling. taxes, octroi and royalty etc. as a complete job. Cut trees, if any, shall be property of NTPC and to be deposited in the NTPC godown / yard unless specified otherwise in the Special conditions of contract. [Chainage 5/400 to 6/200 = 800 mtrs, Chainage 6/600 to 6/950 = 350 mtrs & Chainage 7/300 to 7/800 = 500 mtrs, total length = 1650 mtrs] With Contractor s own earth Cum ,39,550 25,10,53,555 Note: (i). The filling in embankment is mainly with NTPC / Corporation earth (cutspoils) of around 50,000 Cum and to be done in both tendered Chainage between 3/800 to 5/400 and beyond tendered Chainage between 5/400 to 7/800 (Package - II Chainage) within NTPC In-plant yard and payment will be made as per the rate in item schedule A and as per awarded rate on this schedule. The rate includes leading of cutspoils beyond Chainage 39 Konkan Railway Corporation Limited Signature of Tenderer

6 5/400 and up to 7/800 with all lead, lift, ascent, descent, transportation, labour etc. (ii). This own earth item shall be paid only after execution of Schedule - 'C'. Total amount 25,10,53,555 I, we agree to carry out the works at (in figures) % (and in words ) at par / above / below the Scheduled rates. (Tick the applicable word / item and strike out which are not applicable). GM/Works 40 Konkan Railway Corporation Limited Signature of Tenderer

7 SCHEDULE - C (MECHANICAL COMPACTION) Name of work: Limited tender for Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 5/400 to 7/800 Package - II at NTPC In-plant yard for construction of new Railway siding for M/s. NTPC Limited between Gadag - Hotgi section of South Western Railway at Kudgi (Bijapur - District, Karnataka - State)". Sr. No. Description of Items Unit Rate in Quantity Amount in 1 Mechanical compaction of earth / cum ,25,450 2,64,40,367 blanketing material filled in embankment / cutting with dozing and contractor s rollers of suitable capacity, type and size to achieve specified density as per specification, taking core cutters on each layer as directed, testing as per IS codes including cost of water, Tools and Plants field lab equipments / instruments, consumable material and all labour as a complete job. The work including compaction is to be executed as per Latest edition of "Guidelines for Earthwork in Railway Projects" Guideline No. GE:G-1 including correction slip no. 1, July 2003, issued by RDSO, Lucknow and as per Tender document conditions. Total amount 2,64,40,367 I, we agree to carry out the works at (in figures) % in words (and in words ) at par / above / below the Scheduled rates. (Tick the applicable word / item and strike out which are not applicable). GM/Works 41 Konkan Railway Corporation Limited Signature of Tenderer

Special Conditions Of Contract

Special Conditions Of Contract Special Conditions Of Contract Part B 69 Konkan Railway Corporation Limited Signature of Tenderer 1. INTRODUCTION: SPECIAL CONDITIONS OF CONTRACT PART B 1.1 This section deals with the technical specifications

More information

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract) KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) TENDER NO. 39/OT/R/KBUNL-MTPP/Formation /PKG- II/2013 Dated 27.08.2013 Tender and Contract document for earthwork in

More information

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. QUOTED SL NO D E S C R I P T I O N OF ITEM UNIT Quantity IN Figures

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES 1 OF 7 01 Excavation for seating the dam, toe drains & appurtenant M 3 0 9110 21700 30810

More information

FOR SINGRAULI (M.P.) LIMITED. RITES LIMITED Enterprise) OFFICE, Tender. Name of Tenderer Address of Tendererr

FOR SINGRAULI (M.P.) LIMITED. RITES LIMITED Enterprise) OFFICE, Tender. Name of Tenderer Address of Tendererr NORTHERN COALFIELDS LIMITED TENDER AND CONTRACT DOCUMENT FOR NAME OF WORK: COMPLETE TRACK RENEWAL OF SPUR SIDING, NCL, SINGRAULI (M.P.) TENDER NO. : - RITES/RPO-LKO/ /5925/NCL/CTR-SPURR PART 2 FINANCIAL

More information

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants NTPC Ltd. KORBA OPEN TENDER NOTICE NO.RITES/GGM/NGP/T-07-2015, DATED 05.03.2015 Name of work: Earthwork in Drain Foundation, construction of minor bridges and RCC drain, P-Way works etc for the construction

More information

- Earthwork Operations & Equipments

- Earthwork Operations & Equipments - Earthwork Operations & Equipments Earthwork Operations Those construction processes that involve the soil or earth in its natural form and that precede the building of the pavement structure itself Basic

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

SCHOOL OF OPEN LEARNING (CAMPUS OF OPEN LEARNING) UNIVERSITY OF DELHI DELHI-7. Ref: SOL/Gen/2017/

SCHOOL OF OPEN LEARNING (CAMPUS OF OPEN LEARNING) UNIVERSITY OF DELHI DELHI-7. Ref: SOL/Gen/2017/ SCHOOL OF OPEN LEARNING (CAMPUS OF OPEN LEARNING) UNIVERSITY OF DELHI DELHI-7 Ref: SOL/Gen/2017/ Dated Sealed Percentage Rate Tenders are invited from the working contractors enlisted with CPWD, Railways,

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES (TOTAL 10 SHEETS EXCLUDING ABSTRACT & COVER PAGE) 1 OF 7 SCHEDULE-A BOQ FOR EARTHEN DYKES

More information

SCHEDULE OF RATES BIDDING DOCUMENT NO. 6907/106/OT/RITES-EIL/EXECUTION/PKG-I/ P a g e Signature of the bidder Under seal of the firm

SCHEDULE OF RATES BIDDING DOCUMENT NO. 6907/106/OT/RITES-EIL/EXECUTION/PKG-I/ P a g e Signature of the bidder Under seal of the firm EXECUTION PACKAGE I FOR RAIL INFRASTRUCTURE INCLUDING LAYOUT OF NAPHTHA UNLOADING YARD SCHEDULE OF RATES NAME OF WORK: EXECUTION PACKAGE I, FOR RAIL INFRASTRUCTURE INCLUDING LAYOUT OF NAPHTHA UNLOADING

More information

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability

More information

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee Sum 1 1.1.2 Common Law Liability

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) BID IDENTIFICATION NO. DRDA, SBP- 10/2013-14 GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT PRICE BID DOCUMENTS FOR THE WORK (Civil works) Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) ESTIMATED

More information

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES

Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES SCHEDULE OF RATES NAME OF WORK: EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL)

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge Sl.Pg.No.193 Name of Work : Construction of box culvert across 35 mtr. wide channel along 30 mtr. Wide road in Sector 17 & 18 at Ulwe Node. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA - 390 007 TENDER SPECIFICATION FOR Annual Contract (ARC) for Dismantling, Loading, Unloading, Transportation,

More information

CONSTRUCTION SPECIFICATION FOR CLEARING, CLOSE CUT CLEARING, GRUBBING, AND REMOVAL OF SURFACE AND PILED BOULDERS

CONSTRUCTION SPECIFICATION FOR CLEARING, CLOSE CUT CLEARING, GRUBBING, AND REMOVAL OF SURFACE AND PILED BOULDERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 201 NOVEMBER 2003 CONSTRUCTION SPECIFICATION FOR CLEARING, CLOSE CUT CLEARING, GRUBBING, AND REMOVAL OF SURFACE AND PILED BOULDERS TABLE OF CONTENTS

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT. Corrigendum No:III. No. INFRA/CIV/70/ Sept 2017

COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT. Corrigendum No:III. No. INFRA/CIV/70/ Sept 2017 COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT Corrigendum No:III No. INFRA/CIV/70/2017 16 Sept 2017 Name of Work: Ground Improvement Works for the New Dry Dock Project A layer of nonwoven geotextile

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1 SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate

More information

S C H E D U L E - "B"

S C H E D U L E - B NAME OF WORK :- S.R. TO ANKLESHWAR BURHANPUR ROAD SH-4 KM. 207/00 TO 209/00, 209/00 TO 209/600, TAL.SHIRPUR, DIST.DHULE S C H E D U L E - "B" Estimated quantity put to tender which may be more or less

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION DESCRIPTION 201.01 General Roadway and Drainage Excavation shall include all excavation and the construction of all embankments required for the formation of the roadbed, pullouts, parking areas and look-outs;

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C Notice of Amendment No.1 Addendum No.1 to the following Contract Packages has been made in the Bids, for which the first date notice was published in the Gorkhapatra daily on December 14, 2010 by Sanjen

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA d ÀA À ÀÆä E ÁS É WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA 1 -- 3 NOTES ON BASIC RATES 4 -- 4 DATA FOR SCHEDULE

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

General bids will be received at the Office of the Board of Selectmen/Town Manager, no later than 11:00 AM, Wednesday, October 12, 2011.

General bids will be received at the Office of the Board of Selectmen/Town Manager, no later than 11:00 AM, Wednesday, October 12, 2011. ADDENDUM No.5 October 6, 2011 Page 1 of 5 1. The GENERAL BID DATE IS REVISED AS FOLLOWS: General bids will be received at the Office of the Board of Selectmen/Town Manager, no later than 11:00 AM, Wednesday,

More information

Special Provision Item P-152 Excavation and Embankment

Special Provision Item P-152 Excavation and Embankment Special Provision Item P-152 Excavation and Embankment DESCRIPTION This item shall be constructed in conformity with FAA Standard Specification "Item P-152 Excavation and Embankment, except as herein modified

More information

TENDER NO- 02/2012/RAJ

TENDER NO- 02/2012/RAJ 1 TENDER NO- 02/2012/RAJ Installation of 3800 Sq.m. Coconut Coir Geotextile FC-700, its anchorage through Bamboo Sticks, placing of coir logs (3m x 15 cm) and its anchorage with 45 cm long bamboo stakes,

More information

Bihar State Power Generation Company Ltd. (BSPGCL)

Bihar State Power Generation Company Ltd. (BSPGCL) Bihar State Power Generation Company Ltd. (BSPGCL) Open Tender tice. 16/OT/BSPGCL-BTPS/Rly. Siding/PKG-II/2015 Dated 06.05.2015. Tender document for the work of Earthwork in formation including blanketing,

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF

More information

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT)

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT) RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) NIT : 07/OT/NTPC-LARA/ KRL-LARA SECTION /PKG-II C / 2016 Dated 03.08.2016 NAME OF WORK: Execution of Earthwork in formation, Construction of Minor Bridges,

More information

Sub Total for Demolishing

Sub Total for Demolishing A Cleaning of Jungle Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing

More information

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE)

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) NIT 02/OT/NTPC-LARA/MAJOR BRIDGE/PKG-III / 2015 Dated 01-12-2015 NAME OF WORK: Construction of Major Bridges (Package - III) 1 no Rail bridge across Kelo

More information

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt: Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2 BILL NO.1 : PRELIMINARY AND SUPERVISORY SERVICES 1.01 Allow a prime cost sum for material testing to be spent in whole or part as directed by the Resident Engineer. PC Sum 1 1,351.35 1,351.35 1.02 Contractor's

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Road Work

SCHEDULE A BILL OF QUANTITIES Part - I : Road Work Sl.Pg.No.193 Name of Work : Construction of 36.0 m. wide road and storm water drains along BPCL compound wall at Dronagiri, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Road Work 1. Demarcation

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

NOTICE INVITING QUOTATION

NOTICE INVITING QUOTATION Page 1 of 5 CONSTRUCTION CELL NEW MARKET COMPLEX CMC BUILDING(6 TH FLOOR) 15N,NELLIE SENGUPTA SARANI KOLKATA-700 087 No.CWC/CC-Kol/NIQ-AR&MO/CW-Mohania/2015-16/ Date- 08.09.2015 NOTICE INVITING QUOTATION

More information

RITES PROJECT OFFICE, KOLKATA 56 C R AVENUE, Kolkata

RITES PROJECT OFFICE, KOLKATA 56 C R AVENUE, Kolkata RITES PROJECT OFFICE, KOLKATA 56 C R AVENUE, Kolkata 700 012 No. RITES/RPO-KOL/DVC-RTPS/Civil & P Way/PKG-V/2014 Dated 01.05.2014 Sub: Minutes of the Pre-Bid Meeting held on 28.04.2014 in RITES Conference

More information

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS 205.1 DESCRIPTION Excavate, haul, place, remove and dispose of the specified materials. Construct the embankments as specified in the Contract Documents.

More information

TCN Ref: PSER:SCT:FKK-M717:TCN-01 Date:

TCN Ref: PSER:SCT:FKK-M717:TCN-01 Date: TCN - 01 Ref: PSER:SCT:FKK-M717:TCN-01 Date: 29-01-2007 Sub Tender change notice (TCN) 01. Job Material management package of boiler and aux, piping, TG & aux, C&I and other misc items for 1x500 MW unit

More information

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS. Common Excavation (Contractor-Furnished)

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS. Common Excavation (Contractor-Furnished) SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS 205.1 DESCRIPTION Excavate, haul, place, remove and dispose of the specified materials. Construct the embankments as specified in the Contract Documents.

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

ITEM 706 PIPE SLOPE DRAIN

ITEM 706 PIPE SLOPE DRAIN AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR GRADING 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 Not Used 206.05 Not Used 206.06 Not

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 NOVEMBER 2000 CONSTRUCTION SPECIFICATION FOR GRADING TABLE OF CONTENTS 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 SUBMISSION AND

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION STRUCTURE EXCAVATION AND EARTHWORK SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74

More information

G&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW.

G&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW. Page 1 of 4 WORK INSTRUCTIONS FOR ENGINEERS Compiled by Checked by Approved by KYW : : TYC : LSS OP-3-57. (ROCK EXCAVATION) Page 2 of 4 NO. CHECKLIST ITEMS PROJECT Project Name : Project No.: Checked By

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

January 2008 No. 500 INDEX FOR SPECIFICATIONS FOR GRADING SCOPE...1

January 2008 No. 500 INDEX FOR SPECIFICATIONS FOR GRADING SCOPE...1 January 2008 No. 500 INDEX FOR SPECIFICATIONS FOR GRADING 500. 1 SCOPE...1 1.1 Dimensions...1 1.2 Pre-Construction Meeting...1 1.3 Inspection of Equipment...1 1.5 Work Around Structures...1 1.6 Protection

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES EARTHWORKS C213 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C213 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...4

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Tender Schedule for the Work Construction of Staff qtrs. at Tainda S/S (1no.) 1.Amount put to Tender:- Rs 7,48,024/- 2.E.M.D. Required: - R 8,000/- 3. Class of contractor :- "D" & "C" 4. Cost of Tender Paper:- R 4,200/- Sl- No Tender Schedule for the Work "Construction of Staff

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION

SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION 203 203.01.01 GENERAL SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION A. This work shall consist of grading and excavating the roadway, excavating borrow pits, removing slide material, and excavating

More information

SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION

SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION 203 203.01.01 GENERAL SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION A. This work shall consist of grading and excavating the roadway, excavating borrow pits, removing slide material, and excavating

More information

TENDER FOR CIVIL WORK

TENDER FOR CIVIL WORK PROPOSED RECONSTRUCTION OF 10KMS INTERNAL ROADS OF KANJIKODE INDUSTRIAL DEVELOPMENT AREA AT KANJIKODE, PALAKKAD, KERALA. TENDER FOR CIVIL WORK KANJIKODE INDUSTRIES FORUM KIF HOUSE, KANJIKODE, PALAKKAD

More information

Special Provision No. 599S22 March 2001

Special Provision No. 599S22 March 2001 RETAINED SOIL SYSTEM, TRUE ABUTMENT - Item No. RETAINED SOIL SYSTEM, FALSE ABUTMENT - Item No. RETAINED SOIL SYSTEM, WALL/SLOPE, HIGH RETAINED SOIL SYSTEM, WALL/SLOPE, MEDIUM RETAINED SOIL SYSTEM, WALL/SLOPE,

More information

(Speed Post) Sir, Approx. Quantity 80 cu. m. S. No. Name of Works

(Speed Post) Sir, Approx. Quantity 80 cu. m. S. No. Name of Works भ क अन प - भ रत य म द एव जल स रक षण स स थ न ICAR Indian Institute of Soil & Water Conservation (Formerly known as CSWCRTI) अन स ध न क न द र, व सद - ३८८ ३०६, जजल आण द, ग जर त Research Centre, Vasad 388

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis.

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis. ESTIMATE OF QUANTITIES Bid Item Number Item Quantity Unit 009E0010 Mobilization Lump Sum LS 120E0100 Unclassified Excavation, Digouts 100 CuYd 260E1030 Base Course Salvaged 2,351.0 Ton 270E0040 Salvage

More information

Riprap must be placed uniformly and carefully to eliminate any weak area where erosion can get a start.

Riprap must be placed uniformly and carefully to eliminate any weak area where erosion can get a start. 10.1 Riprap - General Riprap is a protective layer of material used to protect earth slopes and channels from the effects of erosion by runoff or scour by stream flow. Riprap can be a hand placed layer

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

CAUTIOUS BLASTING IN CRITICAL AREAS AT RAMAGUNDAM SUPER THERMAL POWER STATION

CAUTIOUS BLASTING IN CRITICAL AREAS AT RAMAGUNDAM SUPER THERMAL POWER STATION CAUTIOUS BLASTING IN CRITICAL AREAS AT RAMAGUNDAM SUPER THERMAL POWER STATION A. Radhakrishna 1, V. Srikant 2 and N. Jayaraman 3 ABSTRACT: Addition of a 500 MW unit to the existing units at Ramagundum

More information

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor

More information

Appendix D General Earthwork and Grading Specifications for Rough Grading

Appendix D General Earthwork and Grading Specifications for Rough Grading Appendix D General Earthwork and Grading Specifications for Rough Grading LEIGHTON AND ASSOCIATES, INC. General Earthwork and Grading Specifications 1.0 General 1.1 Intent These General Earthwork and Grading

More information