1 Ms. Karol Akers, Hazardous Materials Manager Virginia Department of Transportation 1618 Swinton Lane Richmond, Virginia Subject: Subsurface Investigation Report Addendum Proposed Lewistown Road Improvements (Route 802) VDOT Project No.: (90347) Cardno MM&A Project No.: VRICH259 Cardno MM&A Richardson Road Ashland, VA Phone Fax Dear Ms. Akers: Cardno MM&A provides this Subsurface Investigation Report Addendum for the proposed Virginia Department of Transportation (VDOT) Lewistown Road (Route 802) improvement project in Hanover County, Virginia. VDOT previously assessed the project for environmental contamination concerns through a June 4, 2008 Subsurface Investigation Report (by MM&A) for traffic signals at Lewistown Road/Ramp D and a July 3, 2013 Subsurface Investigation Report (SIR) (by Cardno MM&A) for the entire project. The 2013 report described the following: Cardno MM&A s implementation of the VDOT developed sampling and testing program. Testing of samples from proposed project excavations such as stormwater drainage features, bridge piers, traffic signal pedestals, and in plan utility relocations. The comparison rationale/procedures to determine which soils were considered impacted (mainly shallow soils along drainage ditches upper one to two feet). PURPOSE VDOT conveyed that the design has been updated since the 2103 report. Thus VDOT requested Cardno MM&A to compare the prior testing data from both studies with the new plan sheets to re-evaluate to include proposed drainage installations, underdrains and cuts. SIR SUMMARY From the 2013 SIR, impacted soils were identified in the following areas: Boreholes near/in drainage ditches both east and west of the Travel Centers of America Truck Stop entrance from Lewistown Road from 0-1 feet (HA-01, HA-02, Lewistown Ditch N and ), see Figure 1. A surface ditch sample (Lewis Ditch S) southeast of Lewistown Road/Airpark Road, see Figure 1. Boreholes (NP and S) from 0 to 1 foot at the current and proposed bridge piers along I- 95 beneath Lewistown Road, see Figure 2. Australia Belgium Canada Colombia Ecuador Germany Indonesia Italy Kenya New Zealand Papua New Guinea Peru Tanzania United Arab Emirates United Kingdom United States Operations in 85 countries

2 DESIGN PLANS Cardno MM&A reviewed the current design, which has some changes to the plans in which the 2008 and 2013 studies were based. Changes include different municipal water and gas line alignments and elimination of new drainage under Lewistown Road. In comparison with the June 2008 SIR, no cuts/excavations are confirmed in the current design at those prior borehole locations. However, the updated plans as depicted on Figures 1-2 in Appendix A show construction features at impacted areas identified in the 2013 SIR (shown in orange), which is summarized as follows. The proposed installation of a new drainage ditch west of the Travel Centers of America Truck Stop entrance remains unchanged from the previous study. The length of the proposed ditch (39+86L 41+35L) in the impacted zone is 120 feet with an impacted depth of 2 feet. Located east of the entrance, plans still remain unchanged to remove the remaining drainage ditch (44+42L 45+10L) and install a new surface drainage ditch/pipe east of the truck stop entrance from structure 6-08 to 60 feet west of A new 12-inch diameter water line was previously proposed to include the drainage ditch area on the northeast corner of the truck stop entrance. New plans now have the proposed water line installed under Lewistown Road outside any impacted zones as shown on Figure 1. A new 2-inch gas line is now proposed to include the drainage ditch area on the northeast corner of the truck stop entrance as shown on Figure 1. However due to the small size of the gas line, it is expected that any soils excavated will be redeposited into the excavation. Similarly, traffic signal conduits 3-inches in diameter are also proposed through the same northeast corner. Any excavated soils for the small conduits are also expected to be redeposited back into the excavation. The existing storm drainage pipe underneath Lewistown Road east of the truck stop entrance will not be replaced, but instead lengthened (6-11 to 6-12), see Figure 1. This extension is approximately 45 feet long in an impacted area 2 feet deep. Plans for the excavation of new piers underneath the new proposed Lewistown Road Bridge over I-95 have been altered to include additional excavations for shoring. The new plan sheets still contain proposed stormwater piping and proposed pavement underdrains. The upper one foot of soil here was defined as impacted as shown on Figure 2.

3 MANAGEMENT OPTIONS Soil The July 2013 Subsurface Investigation Report described the various soil management options including replacing into the same excavation, potential re-use and disposal. Table 7 in the Subsurface Investigation Report provided a cost estimate for the transportation and disposal of the impacted soils to a disposal facility. Thus, VDOT requested an updated Table 7 to reflect changes to the disposal cost estimate. Note that impacted volumes are no longer separated by existing and proposed right-of-way (R/W), since R/W issues are no longer pertinent to the project. Updated Table 7 Disposal Cost Estimate Site Name Sample Detection Anticipated Impacted Extent Impacted Volume/Tonnage Disposal Cost Estimate* TA Truck Stop /Zn HA-01/02/ O&G & TPH- DRO, Cd, Zn Install new drainage ditch west of truck stop entrance (40+56L L) Remove remaining drainage ditch (44+42L-45+10L) and install new surface drainage ditch/pipe east of truck stop entrance from structure 6-08 to 60 feet west of ft length X 5ft width X upper 2ft depth 117 total ft length X 5ft width X upper 2ft depth 67 tons X $65/ton = $4, tons X $65/ton = $4,225 Southeast of Lewistown Rd/Airpark Rd Lewis Ditch S/TPH-DRO Downflow of existing pipe outlet to new proposed pipe (6-11 to 6-12) to 15ft south of ft total length X 10ft width X upper 2ft depth 50 tons X $65/ton =$3,250 I-95 Bridge Footprint NP and S/ Pb & Cd Excavate new piers with pier protection system Excavate drainage 5-02 to 5-11, 5-11 to 5-09, 5-03 to 5-09, 5-04 to 5-03, 5-09 to 5-10, 5-10 to 5-05, 5-05 to 5-07, 5-06 to 5-07, 5-07 to 17ft south (Main Station to ) Excavate two underdrains (UD-4) on north and south bound I-95 median side 190ft total length X 15ft width X upper 1ft depth 279ft total length X 3ft width X upper 1ft depth 245ft total length X 1ft width X upper 1ft depth X 2 UDs Conversions are as follows: Ft 3 /27 = yd 3 Yd 3 X 1.5 = tons TOTAL= 416 TONS $27,040 * Cost Estimate includes incidentals such as plastic sheeting based on 5% of the anticipated disposal fee. * Cost Estimate includes incidentals such as plastic sheeting based on 5% of the anticipated disposal fee. 159 tons X $65/ton =$10, tons X $65/ton =$3, tons X $65/ton =$1,820

4 RECOMMENDATIONS Based on the findings for this Subsurface Investigation Report Addendum of the proposed Lewistown Road improvement project, VDOT should consider the following. Update the special provisions with this analysis of the updated design. LIMITATIONS The summary represents an appropriate level of inquiry to satisfy the requirements as specified by VDOT and included in our work plan/opinion of probable cost (approved on September 3, 2014). The conclusions of this summary are based on the available data and the current plan sheets. Additionally, the limits of contaminated materials expected in excavations are estimates based on available data. Should road plans change such as modified construction details, then the conclusions should be re-evaluated. Cardno MM&A is pleased to serve as VDOT s environmental consultant for this project. Please do not hesitate to contact us should you have any questions or concerns. We look forward to working with you on future projects. Sincerely, Joshua P. Shrader Project Scientist for Cardno MM&A Direct Line josh.shrader@cardno.com James T. Martin, Jr., P.G. Senior Scientist for Cardno MM&A Direct Line james.t.martin@cardno.com Enclosures

5 Subsurface Investigation Report Addendum APPENDIX A FIGURES Error! Reference source not found. Cardno MM&A 5

6 12" W B /TW-01 SOIL BORING/TEMPORARY WELL LOCATION SOIL BORING LOCATION LEWIS DITCH S HAND AUGER LOCATION B PROPOSED SIGNAL PEDESTAL IMPACTED ZONE WATER LINE SEWER LINE GAS LINE 50' 0 50' SCALE: 1" = 50' Note: Base map from VDOT Plan Sheets 5 & 6; Project E GAS 12" W Travel Centers of America C HA-01 HA-02 LEWIS DITCH S D 8" S LEWIS DITCH N HA /TW-01 MG LEWISTOWN ROAD 3, LLC 8" S 8" S 12" W 12" W Shell Station DESIGNED: JPS Figure 1 Virginia Department of Transportation Lewistown Road Phase II Hanover County, Virginia DRAWN: CHECKED: DATE: SCALE: FILE NO.: PROJECT NO.: DES JTM 09/17/2014 AS SHOWN VRICH259_Site Map.dwg VRICH259 Prepared For: OFFICE LOC.: Ashland, VA. USA

7 S S S Bridge Bridge Footprint Footprint SP I-95/Lewistown I-95/Lewistown Road Road N N NP N NP HAND AUGER LOCATION (Composite Sample) IMPACTED ZONE 50' 0 50' SCALE: 1" = 50' Note: Base map from VDOT Plan Sheet 5; Project DESIGNED: JPS Figure 2 Virginia Department of Transportation Lewistown Road Phase II Hanover County, Virginia DRAWN: CHECKED: DATE: SCALE: FILE NO.: PROJECT NO.: DES JTM 09/24/2014 AS SHOWN VRICH259_Site Map.dwg VRICH259 Prepared For: OFFICE LOC.: Ashland, VA. USA

July 3, Prepared for: Ms. Karol Akers Virginia Department of Transportation 1618 Swinton Lane Richmond, Virginia 23238

July 3, Prepared for: Ms. Karol Akers Virginia Department of Transportation 1618 Swinton Lane Richmond, Virginia 23238 Phase II Environmental Site Assessment Proposed Improvements (Route 802) VDOT Project Number 0095-042-716 (90347) Hanover County, Virginia July 3, 2013 Prepared for: Ms. Karol Akers Virginia Department

More information

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2 Project: APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) PROJECT: 0029-005-130, C501, B645 RFP QUESTIONS AND ANSWERS-REVISION 2 Date: 12/04/09 Approaches and Bridge over Tye River (Rte. 29 NBL) Subject:

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

November 9, Tredyffrin Township Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA

November 9, Tredyffrin Township Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA November 9, 2017 Tredyffrin Township Attn: Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA 19312-1079 Scientists, Engineers & Environmental Planners Designing Innovative Solutions for

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E. LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert

More information

SHOULDER DETAIL CONCRETE CURB SHOULDER DETAIL ASPHALT CURB SHOULDER DETAIL PAVEMENT JOINT DETAIL PAVEMENT JOINT DETAIL NORMAL SECTION COMMON AND ASPHALT ALTERNATE NOTES ITEM LEGEND EX. ITEM LEGEND CONCRETE

More information

Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area

Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area CITY OF ANAHEIM Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area JANUARY 2006 VOLUME 1 Table of Contents VOLUME 1 1. Executive Summary... 1 1.1 General... 1 1.2

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019: ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

Project: Developer/Designer: Reviewer:

Project: Developer/Designer: Reviewer: City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;

More information

Preliminary Engineering Report. For the. Foxglove Trail. Prepared for: The City of Moore. Prepared By:

Preliminary Engineering Report. For the. Foxglove Trail. Prepared for: The City of Moore. Prepared By: Preliminary Engineering Report For the Foxglove Trail Prepared for: The City of Moore Prepared By: Certificate of Authorization No. CA#5714 Expires June 30, 2016 CE Project #264 May 2016 City of Moore

More information

Special Research Study. Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County

Special Research Study. Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County Special Research Study Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County Client: American Chemistry Council BCC Research 49 Walnut

More information

Re: South Regional Park Tributary: Minor Storm Event Outfall System Comments City of Thornton, Adams County, & UDFCD

Re: South Regional Park Tributary: Minor Storm Event Outfall System Comments City of Thornton, Adams County, & UDFCD March 15, 2017 Tim Semones, PE Civil Engineer Development Engineering City of Thornton 9500 Civic Center Drive Thornton, CO 80229-4326 Phone: (303) 538-7634 Fax: (303) 538-7373 Re: South Regional Park

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96 General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

A MULTIPLE-LINES OF EVIDENCE APPROACH & MEDIA REUSE GUIDANCE TO EVALUATE TPH & CADMIUM IMPACTED SOIL IN A PROPOSED VDOT ROADWAY IMPROVEMENT CORRIDOR

A MULTIPLE-LINES OF EVIDENCE APPROACH & MEDIA REUSE GUIDANCE TO EVALUATE TPH & CADMIUM IMPACTED SOIL IN A PROPOSED VDOT ROADWAY IMPROVEMENT CORRIDOR A MULTIPLE-LINES OF EVIDENCE APPROACH & MEDIA REUSE GUIDANCE TO EVALUATE TPH & CADMIUM IMPACTED SOIL IN A PROPOSED VDOT ROADWAY IMPROVEMENT CORRIDOR PRESENTED BY: CHRIS LALLI TRB 2016 Summer Workshop Program

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

Route 7 Truck Climbing Lane. RFQ Information Meeting

Route 7 Truck Climbing Lane. RFQ Information Meeting Route 7 Truck Climbing Lane From West Market Street to Route 9 RFQ Information Meeting November 9, 2012 Mark Gibney, PE District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

April 19, 2017 Vicente Valeza, P.E. NOVA District Senior Structural Engineer (703)

April 19, 2017 Vicente Valeza, P.E. NOVA District Senior Structural Engineer (703) UPC 110498 Rehabilitation of John G. Lewis Memorial Bridge on Route 673 (Featherbed Lane) over Catoctin Creek Loudoun County, VA 5th Stakeholder Meeting April 19, 2017 Vicente Valeza, P.E. NOVA District

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

12 DRAINAGE General Administrative Requirements Standards

12 DRAINAGE General Administrative Requirements Standards 12 DRAINAGE 12.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with drainage, including culverts, bridge hydraulics, roadway ditches, and closed storm

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Background. Pre-Design Investigation Scope. Thomas Campbell Project Manager. May 30, 2012

Background. Pre-Design Investigation Scope. Thomas Campbell Project Manager. May 30, 2012 Thomas Campbell Project Manager May 30, 2012 Mr. William Ports, P.E. New York State Department of Environmental Conservation Division of Environmental Remediation 625 Broadway, 12th Floor Albany, New York

More information

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4 TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA This report was prepared to present development information (Utility availability, Development Regulations, Flood Plain information,

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: January 18, 2017 DRCC #: 16-3020C Latest Submission Received: January 10, 2016 Applicant: PVP Franklin, LLC 769 Northfield Avenue,

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH November 29, 2018 NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH To Holders of Bid Proposals: Please make the following clarifications, additions,

More information

If a new residence s electrical service is not located within 200 feet of existing

If a new residence s electrical service is not located within 200 feet of existing Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close

More information

Table Related Arlington County Standards, Specification and Policies

Table Related Arlington County Standards, Specification and Policies 2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

Cost Estimate for Removal and Disposal of Contaminated Soil

Cost Estimate for Removal and Disposal of Contaminated Soil 14432 SE Eastgate Way, Suite 100 Bellevue, WA 98007 tel: 425-519-8300 Mr. Mark Menard Sound Transit 401 South Jackson Street Seattle, Washington 98104-2820 Subject: Cost Estimate for Disposal of Contaminant-Impacted

More information

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

I-64 Capacity Improvements Segment III RFQ Information Meeting

I-64 Capacity Improvements Segment III RFQ Information Meeting I-64 Capacity Improvements Segment III RFQ Information Meeting April 5, 2017 Janet Hedrick, P.E. Design Project Manager Joseph Clarke, P.E. APD Project Manager and POC I-64 Capacity Improvements Segment

More information

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

AECOM (805) tel 1220 Avenida Acaso (805) fax Camarillo, CA 93012

AECOM (805) tel 1220 Avenida Acaso (805) fax Camarillo, CA 93012 AECOM (805)388-3775 tel 1220 Avenida Acaso (805)388-3577 fax Camarillo, CA 93012 March 27, 2012 John Zhao, PE Las Virgenes Municipal Water District 4232 Las Virgenes Road Calabasas, CA 91302 Subject: Yager

More information

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs.

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs. 19 May 2017 City of Thornton Attn: Nate Hatleback 9500 Civic Center Drive Thornton, CO 80229 Re: Initial Review Response to 05/16/17 Letter Dear Mr. Hatleback: This letter is in response to technical comments

More information

Re: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California

Re: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California Date: August 4, 2015 Project No.: 608-4-2 Prepared For: Mr. Sajeev Madhaven, AIA SAN FRANCISCO UNIFIED SCHOOL DISTRICT 135 Van Ness Avenue - Room 207a San Francisco, California 94102 Re: Geotechnical Consultation

More information

2.1.4 PROJECT CONSTRUCTION

2.1.4 PROJECT CONSTRUCTION Alignment 2C Alignment 2C is the preferred alternative. The new 36-inch force mains would follow the existing alignment along the existing utility road within the OCSD easement from the Bitter Point Pump

More information

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date April 24, 2015

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date April 24, 2015 PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do

More information

Project Description and Environmental Conditions. Hennepin County. CSAH 81 Reconstruction Project Brooklyn Park, Minnesota.

Project Description and Environmental Conditions. Hennepin County. CSAH 81 Reconstruction Project Brooklyn Park, Minnesota. Project Description and Environmental Conditions CSAH 81 Reconstruction Project Brooklyn Park, Minnesota Prepared for Hennepin County Project B1511287 December 3, 2015 Braun Intertec Corporation Table

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

CECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension

CECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

HDPE PERFORATION GUIDE PERFORATIONS PER AASHTO M252/M294

HDPE PERFORATION GUIDE PERFORATIONS PER AASHTO M252/M294 PERFORATIONS GENERAL Lane s perforated pipe offerings follow the AASHTO classification system and conform to AASHTO requirements for size, spacing and placement of the perforations. It is not the intent

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 July 29, 2011 Revisions

More information

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required. Overview of Section 9 9.0 The GESC Permit Section provides a description of the Small Utility GESC Permit Program. Step 1. Determine if a GESC Permit is Applicable and if a Project Specific GESC Plan is

More information

Oil Lines and Wells Utilities and Service Systems. Solid Waste Affected Environment Electricity. Natural Gas.

Oil Lines and Wells Utilities and Service Systems. Solid Waste Affected Environment Electricity. Natural Gas. Affected Environment, Environmental 2.1.4 Utilities and Service Systems This section addresses the potential impacts to public utilities and service systems within the project area as a result of project

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 November 18, 2013

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

CONTRIBUTION OF THE ETHANOL INDUSTRY TO THE ECONOMY OF THE UNITED STATES

CONTRIBUTION OF THE ETHANOL INDUSTRY TO THE ECONOMY OF THE UNITED STATES CONTRIBUTION OF THE ETHANOL INDUSTRY TO THE ECONOMY OF THE UNITED STATES Prepared for the Renewable Fuels Association by John M. Urbanchuk Technical Director February 2011 2010 was a year of continued

More information

If you have any questions during the review of the enclosed materials, please call me at (207) or me at

If you have any questions during the review of the enclosed materials, please call me at (207) or  me at October 21, 2016 Ms. Amanda Lessard Town Planner Town of Windham 8 School Road 04062 RE: Response to Comments - Minor Site Plan Application Dear Ms. Lessard: St.Germain Collins has prepared responses to

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS 175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS June 2012 Prepared by: Public Works Department City of Overland Park, KS EXECUTIVE SUMMARY... 2 INTRODUCTION...

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

Coal Combustion Residual Landfill Annual Inspection Report Corrective Actions Resolution. Boardman Generating Facility

Coal Combustion Residual Landfill Annual Inspection Report Corrective Actions Resolution. Boardman Generating Facility Coal Combustion Residual Landfill Annual Inspection Report Corrective Actions Resolution Prepared by: Mathew Quigley, P.E. April 2018 Contents Introduction... 1 Corrective Actions Undertaken... 2 Introduction

More information

SECTION 10 UTILITIES

SECTION 10 UTILITIES SECTION 10 UTILITIES Virtually every highway construction project in the State of New Jersey impacts utility facilities. The Designer shall examine and seek alternatives to minimize or eliminate the impact

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS

More information

APPENDIX D INDEX, REFERENCES AND BIBLIOGRAPHY

APPENDIX D INDEX, REFERENCES AND BIBLIOGRAPHY APPENDIX D INDEX, REFERENCES AND BIBLIOGRAPHY TABLE OF CONTENTS PAGE # INDEX... D-3 REFERENCES... D-7 BIBLIOGRAPHY... D-9 Appendix D - 1 (This page has intentionally been left blank) Appendix D - 2 INDEX

More information

VISUAL SITE INSPECTION REPORT

VISUAL SITE INSPECTION REPORT VISUAL SITE INSPECTION REPORT - 2016 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00318 DECEMBER 20, 2016 PREPARED

More information

CNR Milton Mobility Hub Environmental Impact Statement (EIS) EXPERT REPORT ON GEOTECHNICAL ASPECTS

CNR Milton Mobility Hub Environmental Impact Statement (EIS) EXPERT REPORT ON GEOTECHNICAL ASPECTS CNR Milton Mobility Hub Environmental Impact Statement (EIS) EXPERT REPORT ON GEOTECHNICAL ASPECTS Prepared by: Mehdi Mostakhdemi and Dan Dimitriu of Amec Foster Wheeler Environment and Infrastructure

More information

MEMORANDUM JILL MCPEEK, CAPITAL IMPROVEMENT PROJECT MANAGER

MEMORANDUM JILL MCPEEK, CAPITAL IMPROVEMENT PROJECT MANAGER MEMORANDUM TO: FROM: BY: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR JILL MCPEEK, CAPITAL IMPROVEMENT PROJECT MANAGER SUBJECT: CONSIDERATION OF AN AWARD OF CONTRACT TO INSITUFORM TECHNOLOGIES, LLC

More information

ROVER PIPELINE LLC. Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN

ROVER PIPELINE LLC. Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN ROVER PIPELINE LLC Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN April 2015 Section TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PLANNED HDD CROSSINGS... 1 3.0 MONITORING PROCEDURES...

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

ROVER PIPELINE LLC. Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN

ROVER PIPELINE LLC. Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN ROVER PIPELINE LLC Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN February 2015 Section TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PLANNED HDD CROSSINGS... 1 3.0 MONITORING PROCEDURES...

More information

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION APPENDIX I BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION South Bay Salt Pond Restoration Project Phase 2 July 2015 Draft Environmental Impact Statement/Report 2185 N. California Blvd., Suite

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

Equipment Guide shorten restoration times underground

Equipment Guide shorten restoration times underground Dominion Energy Virginia s Strategic Underground Program is a system-wide initiative to shorten restoration times following major storms by placing certain outage-prone overhead electric distribution lines

More information

April 17, Dear Mr. Stella:

April 17, Dear Mr. Stella: April 17, 1998 Mr. Micheal Stella, P.E. Associate Civil Engineer City of Fremont Development and Environmental Services Department 39550 Liberty Street P.0. Box 5006 Fremont, CA 94537-5006 RE: Proposal

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

FOR SALE / LEASE 420,000 SF AC

FOR SALE / LEASE 420,000 SF AC FOR SALE / LEASE 420,000 SF 20.27 AC 200,000 SF AVAILABLE 2350 W.O. Smith Drive Lawrenceburg, TN 38464 For additional information, please contact: Michael Reid Senior Managing Director Cell: 404-307-6900

More information

3.2 INFILTRATION TRENCH

3.2 INFILTRATION TRENCH 3.2 INFILTRATION TRENCH Type of BMP Priority Level Treatment Mechanisms Infiltration Rate Range Maximum Drainage Area LID Infiltration Priority 1 Full Retention Infiltration, Evapotranspiration (when vegetated),

More information

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL TECHNICAL SUPPORTIVE SERVICES IN IDOT DISTRICTS 2 & 3 FOR CERTIFIED

More information

Remediation Plan. for. Creek County Landfill Site. E/2 SE NW 28-18N-12E Creek County, OK

Remediation Plan. for. Creek County Landfill Site. E/2 SE NW 28-18N-12E Creek County, OK Remediation Plan for Creek County Landfill Site in E/2 SE NW 28-18N-12E Creek County, OK Draft Remediation Plan Table of Contents 1.0 GENERAL... 3 1.1 Location... 3 1.2 Site Boundaries... 3 1.3 Background...

More information

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R401: LINEAR GRADING R402: ITEM 209 - RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R404: DELETED R405: BARRIER REFLECTORS R406: PAVEMENT MARKING LANE WIDTHS R407: TYPE A ANCHOR ASSEMBLY

More information

TRANSPORTATION INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

TRANSPORTATION INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL TRANSPORTATION INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL CADBURY-SCHWEPPES SITE FINAL CONCEPT-LEVEL STRATEGY REPORT I. Introduction The purpose of this report is to recommend infrastructure

More information

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008 2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008 The following is a complete list of special design IMPERIAL insertable sheets that will be used with the

More information

> Recommendations for any management actions associated with aquatic habitat and biota and future monitoring.

> Recommendations for any management actions associated with aquatic habitat and biota and future monitoring. Our Ref: Contact: 59917114_R004: DP Dan Pygas South32 Illawarra Coal Level 3, Enterprise 1 Innovation Campus, Squires Way North Wollongong NSW 2500 Attention: Josh Carlon Dear Josh, LONGWALL 707 END OF

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

SECTION GRAVITY WASTEWATER LINES

SECTION GRAVITY WASTEWATER LINES SECTION GRAVITY WASTEWATER LINES 1. DESCRIPTION This specification shall govern all work required for furnishing, handling and installing gravity wastewater lines required to complete the project. 2. MATERIALS

More information

CLOSURE PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond

CLOSURE PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond CLOSURE PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond CLOSURE PLAN Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022 Submitted By: Golder Inc. 2108 W. Laburnum

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Information for File # MVP MHK

Information for File # MVP MHK Information for File # MVP-017-04353-K Applicant: Corps Contact: Town of Brookfield Marie Kopka Address: 50 N. Sunnyslope Road, Suite 96, Brookfield, WI 53005 E-Mail: Phone: (651) 90-5733 Primary County: