1 STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION TFMA Spring Conference May 23, 2013T F M A Spring Conference 2013
2 INTRODUCTIONS ALYSHA GIRARD, P.E., CFM Storm Water Program Manager City of Round Rock RYAN BEARDMORE, CFM Storm Water Program City of Round Rock KIM PATAK, P.E., CFM, CPESC Freese and Nichols, Inc. Project Engineer
3 OVERVIEW Tropical Storm Hermine TCEQ Dam Safety Rules and Regulations Size Classification Hazard Classification Design Alternatives Evaluation Final Design Recommendation Design and Construction
4 TROPICAL STORM HERMINE
5 BACKGROUND T F M A S p r i n g C o n f e r e n c e 2013
6 NWS RADAR COUNTY RAINFALL ESTIMATES T F M A S p r i n g C o n f e r e n c e 2013
7 RAINFALL DATA FROM UBC WCID GAUGES Rainfall Total (inches) Dam MAX 12 hr hr Rainfall Intensity (inches/hr) 1/4 Hr hr
8 DEPTH-DURATION FREQUENCY OF PRECIPITATION NonStorm Event Exceedance (Return Period) Probability Storm Duration (hours) % % % % % % % % % PMF Values in the table represent regional parameters near the center of the District. Values will vary slightly across the District
9 EROSION IDENTIFIED
10 STATE OF FACILITY
11 TCEQ DAM SAFETY RULES AND REGULATIONS
12 DAM SIZE M i n i m u m D a m H e i g hts Intermediate S I Z E C L A S S I F I C A T I O N Category Small Impoundment Maximum Storage (Acre-feet) 15 and < 1, and < 1,000 Height (Feet) 25 and < 40 6 and less than 40 Intermediate 1,000 and < 50, and < 100 Large 50, T F M A S p r i n g C o n f e r e n c e 2013
13 HAZARD CLASSIFICATION
14 DESIGN FLOOD DETERMINATION HAZARD (relating to Hazard Classification Criteria) Low Significant High Hydrologic Criteria for Dams C L A S S I F I C A T I O N SIZE (relating to Size Classification Criteria) Small Intermediate Large Small Intermediate Large Small Intermediate Large MINIMUM DESIGN FLOOD HYDROGRAPH (expressed as a percentage of the PMF) 25% PMF 25% PMF 50% PMF 50% PMF 75% PMF 50% PMF 50% PMF 75% PMF 75% to 100% PMF 75% PMF 75% to 100% PMF 100% PMF When a range is given, the minimum flood hydrograph must be determined by straight-line interpolation within the given range. Interpolation must be based on either height of dam or maximum storage capacity, whichever results in the highest percentage of PMF. The interpolation for large, low-hazard dams for height must be between end points of 100 feet and 50% PMF and 200 feet and 75% PMF. The interpolation for large, low-hazard dams for maximum storage capacity must be between the end points of 50,000 acre-feet and 50% PMF and 30,000 acre-feet and 75% PMF. The interpolation for large, significant-hazard dams for maximum storage capacity must be between end points of 50,000 acre-feet and 75% PMF and 300,000 acre-feet and PMF. T F M A S p r i n g C o n f e r e n c e 2013
15 DESIGN ALTERNATIVES EVALUATION
16 DESIGN ALTERNATIVES REHABILITATION DECOMMISSION Full Partial T F M A S p r i n g C o n f e r e n c e 2013
17 ALTERNATIVE IMPACTS REHABILITATION DECOMMISSION PROS CONS PROS CONS Maintain Flood Detention Water Quality Lifetime Maintenance More Expensive Municipal Liability Public Safety No Woody Vegetation Lifetime Inspections Return Stream Bank Back to Natural Flow Regime Declassify the Dam Less Expensive Lose Flood Storage Potential Mitigation Requirement T F M A S p r i n g C o n f e r e n c e 2013
18 REHABILITATION $317,000 T F M A S p r i n g C o n f e r e n c e 2013
19 FULL DECOMMISSION $229,000
20 PARTIAL DECOMMISSION $135,000
21 PARTIAL DECOMMISSION Hydrologic Design Point 1% Ult Peak Q (cfs) Existing Partial Decom. Flow DS of Stone Oak Dam Confluence with OB Trib % 1,225 1,403 13% FM ,061 1,145 7% Confluence with OB Trib 3 1,362 1,518 9% T F M A S p r i n g C o n f e r e n c e 2013
22 PARTIAL DECOMMISSION T F M A S p r i n g C o n f e r e n c e 2013
23 FINAL DESIGN RECOMMENDATION
24 DESIGN RECOMMENDATION REHABILITATION DECOMMISSION Full Partial Costs $317,000 $229,000 $135,000 Pros Flood Detention Declassify Dam Declassify Dam Cons Lifetime Maintenance Lose Flood Storage Lose Flood Storage Decision Points High Risk Status Downstream Culvert Watershed Maturity Modeling Confidence Watershed Maturity Modeling Confidence Unknown and Timing Haul-off Costs Least Disruption T F M A S p r i n g C o n f e r e n c e 2013
25 DESIGN AND CONSTRUCTION
26 PARTIAL DECOMMISSION FINAL DESIGN Contractor s Low Bid Price: $101,000
27 POST-CONSTRUCTION
28 Q UESTIONS? ALYSHA GIRARD, P.E., CFM RYAN BEARDMORE, CFM 2008 Enterprise Dr. Round Rock, Texas KIM PATAK, P.E., CFM, CPESC Jollyville Road Bldg. 4, Ste. 100 Austin, Texas
Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007
Modernization of High Hazard Dams in Austin, Texas TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas City of Austin Glen Taffinder, P.E. Stormwater Pond Dam Safety
More informationDESIGN CRITERIA FOR TERMINAL STORAGE RESERVOIRS
DESIGN CRITERIA FOR TERMINAL STORAGE RESERVOIRS Joint Booster Pump Station #3 Reservoir Nicole Rutigliano, P.E. May 29, 2014 PROJECT BACKGROUND Integrated Pipeline Project 149 miles of pipeline 3 booster
More informationBreach Analyses of High Hazard Dams in Williamson County
Breach Analyses of High Hazard Dams in Williamson County John R. King 1, P.E., Kim Patak 2, P.E., Blaine Laechelin 3, E.I.T. Abstract The Upper Brushy Creek WCID operates 23 dams in the Upper Brushy Creek
More informationStream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM
Stream Buffers Sharpest Tool in the SWM Toolbox 1 Tom Hegemier, PE, D.WRE, CFM www.apaienv.com Stream Buffers - Overview 2 Why stream buffers? Floodplain management and other benefits Existing regulatory
More informationDRAFT Upper Brushy Creek Watershed Flood Protection Plan
DRAFT Upper Brushy Creek Watershed Flood Protection Plan Williamson County, Texas September 2014 Prepared by: EXECUTIVE SUMMARY Background The Upper Brushy Creek Watershed Control and Improvement District
More informationChapter 4 "Hydrology"
Chapter 4 "Hydrology" Revised TxDOT Hydraulics Manual Jorge A. Millan, P.E., CFM TxDOT Design Division/Hydraulics 2012 Transportation Short Course October 17, 2012 Chapter 4 Sections 1 Hydrology s Role
More informationCase Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification
Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering
More informationA Tale of Two Dams and a dry river. November 1, 2011 Planning, Resources and Technology Committee Mojave Water Agency
A Tale of Two Dams and a dry river November 1, 2011 Planning, Resources and Technology Committee Mojave Water Agency The Mojave River Headwaters San Bernardino Mountains Terminus (mouth) Soda Lake (Baker,
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationLooking at Dam Safety from a Resiliency Perspective. February 23, 2017
Looking at Dam Safety from a Resiliency Perspective February 23, 2017 1 Discussion Outline Dam Safety 101 (10 min) Fort Hood Overview (5 min) Resiliency Framework (5 min) Fort Hood Dam Safety Program (15
More informationTitle Advanced Hydraulic Modeling to Support Emergency Action Plans
Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a
More informationDRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.
\ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,
More informationPeak discharge computation
Ia/P 4 Peak Dischage Method Graphical Peak Discharge Method This chapter presents the Graphical Peak Discharge method for computing peak discharge from rural and urban areas. The Graphical method was developed
More informationDrainage Analysis. Appendix E
Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for
More informationCost-Effective Stormwater Management Retrofit Device
Cost-Effective Stormwater Management Retrofit Device Dr. Jim Goodrich 1 Dr. Bob Hawley 2, Matt Wooten 3, Craig Frye 3, and Mark Jacobs 4, Dr. Jake Beaulieu 1, Nora Korth 2 1 United States Environmental
More informationHYDROLOGY WORKSHEET 1 PRECIPITATION
HYDROLOGY WORKSHEET 1 PRECIPITATION A watershed is an area of land that captures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed where the
More informationStormwater Local Design Manual For Houston County, Georgia
Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.
More informationSection 6: Stormwater Improvements
Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the
More information3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part
More informationMODEL Stormwater Local Design Manual. City of Centerville
MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationLake Houston Dam Comprehensive Evaluation of an Ambursen Dam
Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam ASDSO September 10, 2008 John Rutledge - Freese & Nichols, Inc. Chuck Easton - Freese & Nichols, Inc. Janis Murphy - Freese & Nichols, Inc.
More informationSECTION IV WATERSHED TECHNICAL ANALYSIS
A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It
More informationAppendix G Preliminary Hydrology Study
Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014
More informationWatersheds, Hydrology and Flooding
Watersheds, Hydrology and Flooding Greg Karlovits, P.E., CFM Hydrologist US Army Corps of Engineers Rock Island District US Army Corps of Engineers Outline of Topics Before lunch: Watersheds and basics
More informationIntroduction to Hydrology, Part 2. Notes, Handouts
Introduction to Hydrology, Part 2 Notes, Handouts Precipitation Much of hydrology deals with precipitation How much? How frequently/infrequently? What form? How quickly? Seasonal variation? Drought frequency?
More information4. Present Activities and Roles
4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified
More informationWatershed Response to Water Storage. 8/1/2012 Paul Wymar Scientist Chippewa River Watershed Project
Watershed Response to Water Storage 8/1/2012 Paul Wymar Scientist Chippewa River Watershed Project Chippewa River Watershed 1.3 Million Acres Largest tributary watershed in the Minnesota River Basin 7
More informationCamp Creek: Tackling Erosion and Improving Water Quality in a Recreational Playground Mitchellville, Iowa
Camp Creek: Tackling Erosion and Improving Water Quality in a Recreational Playground Mitchellville, Iowa Rachel Conrad, PE, CFM IAFSM March 10 th, 2016 Outline Project Background and Goals Modeling Results
More informationWho s in Charge!? 8/9/2018. Houston Geological Society Presents. Peak Floods Brays Bayou
Houston Geological Society Presents An Informational Workshop Flooding and Floodplains in the Houston Area: Past, Present, and Future: Part 1 Presented May 18, 2018 Dr. William R. Dupre Professor Emeritus
More informationStormwater: Too Simple?
Stormwater: Too Simple? Getting Closer to Advertised Level of Service Brandon Klenzendorf, Ph.D., P.E. 13 December 2017 - CWEA Fall Seminar Introduction Traditional approaches to solving stormwater problems
More informationPRELIMINARY DRAINAGE STUDY
PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,
More informationThe Beckett s Run Experience. Fort Wayne, Indiana
The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little
More informationTECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design
TECHNICAL MEMORANDUM FROM: Ken MacKenzie and Ryan Taylor SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design DATE: June 7, 2012 The purpose of this memorandum
More informationSTEELE COUNTY MEDFORD RAIN GARDENS. Water of Concern Cannon River TMDL. Impairment Turbidity. CWL Funding by Category
STEELE COUNTY MEDFORD RAIN GARDENS Water of Concern Cannon River TMDL Impairment Turbidity CWL Funding by Category Technical Assistance Funds SSTS Funds Engineering $40,000 Hired Positions Total TA Funds
More informationSOUTHEAST TEXAS CONTINUING EDUCATION
EXAM No. 118 FLOOD - RUNOFF ANALYSIS 1. Information gained from flood - runoff analysis includes which one: A. Stage, discharge, volume. B. Measure depth, volume. C. Velocity, depth, storm occurrence.
More informationAlternatives for Willow Creek Flood Mitigation Study
Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP ms consultants, inc. June 22, 2016 Presentation Overview Introduction Project Background Willow Creek
More informationND Detention Project Development Update
ND Detention Project Development Update Upper Red River Basin Halstad, MN = 8 Upstream Subwatersheds Fargo, ND = 3 Upstream Subwatersheds Halstad, MN Fargo, ND Wild Rice Otter Tail Bois de Sioux Upstream
More informationCENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT
CENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT Planning Area Boundary: The Central Assiniboine planning area covers the reach of the Assiniboine River from just
More informationGeorgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood
WATER RESOURCES Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood Charles Crowell, PE Stormwater Section Manager October 2016 WATER RESOURCES The Old Traditional Stormwater
More informationDRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:
DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any
More informationWatershed Management Ordinance
Watershed Management Ordinance Resilient Chicago September 30, 2014 Presented by: John Murray, P.E., CFM WMO Objective Establish uniform, minimum, and comprehensive countywide stormwater management regulations
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationWarner Robins Stormwater Local Design Manual
Warner Robins Stormwater Local Design Manual Prepared for Houston County City of Warner Robins City of Perry City of Centerville May 17, 2005 Version 4 (As presented with adopted Stormwater Ordinance)
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo
More informationMUD CREEK WATERSHED STUDY PUBLIC MEETING NOVEMBER 7, 2013
MUD CREEK WATERSHED STUDY PUBLIC MEETING NOVEMBER 7, 2013 AGENDA Purpose of Study Hydrology Hydraulics Floodplain Mapping Floodplain Management Options PURPOSE OF STUDY Upstream Development Near I-80 Bondurant
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationLDS Technical Guidance
May 21, 2008 The following was provided to County staff as internal guidance for reviewers in applying the adequate outfall requirements of the Public Facilities Manual (PFM). A number of private sector
More informationTABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method
More informationActivity Calculating Property Drainage
Page 1 of 5 Activity 2.3.11 Calculating Property Drainage Introduction When a property is developed, it is important to understand that changes to watershed characteristics (i.e., land use, slope, soil
More informationPonds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.
POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made
More informationDetention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges
Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental
More informationKrista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities
Krista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities Agenda 1. Evolution of Water Quality Facilities 2. Regulatory Response/MS4 Permit Requirements 3. Change
More informationRainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area
Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural
More informationCoal Combustion Residuals Inflow Design Flood Control System Plan
gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment
More informationSabine River Basin Big Sandy Creek Watershed Characterization Report 2015
67. Big Sandy Big Sandy Creek at White Oak Road Station 16011 Sabine River Basin Big Sandy Creek Watershed Characterization Report 2015 Prepared in Cooperation with the Texas Commission on Environmental
More informationPennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines
Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles
More informationCEE3430 Engineering Hydrology
CEE3430 Engineering Hydrology Practice Exam (There are multiple practice questions here A 110 min test will likely not have more than four questions) 1. Water Balance Write the water balance as Δ Where
More informationA Hydrologic Study of the. Ryerson Creek Watershed
A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2
More informationProject Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that
US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF MISSOURI Application Number: SWL 2013-00260 Date: April 15, 2014 Comments Due: May 6, 2014 TO WHOM IT MAY
More informationDry Creek Flood Control Improvement Project
Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)
More informationSTORM DRAINS AND IRRIGATION
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.
More informationCHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.
CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted March 29, 2010 Table of Contents Page Part 1 Introduction...3 4-1 Title..................3 4-2
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationEngineering Bulletin 11-02
ENGINEERING, SURVEYING & PERMIT SERVICES DEPARTMENT CHARLES LACKEY, P.E., DIRECTOR 2700 M STREET, SUITE 570 BAKERSFIELD, CA 93301-2370 Phone: (661) 862-8603 Fax: (661) 862-5149 E-mail: esps@co.kern.ca.us
More informationChehalis Basin Strategy Causes of Extreme Flooding. October 11, 2016 Policy Workshop
Chehalis Basin Strategy Causes of Extreme Flooding October 11, 2016 Policy Workshop Agenda Hydrology o Precipitation o Flow Climate Change Effects Land Use o Channel straightening and incision o Riparian
More informationEngineering Hydrology Class 3
Engineering Hydrology Class 3 Topics and Goals: I.Develop s (estimate precipitation) II.Develop simple constant intensity design storm III.Develop SCS design storm Ocean s Why do we want to derive the?
More informationMurphy s Law? A perfect storm of circumstances
Murphy s Law? A perfect storm of circumstances Mark Bailey, PE Hydraulics Manager, INDOT Dale Sedler, PE Sr. Hydraulic Engineer, INDOT Road School 2016 Murphy s Law (modern form): Anything that can possibly
More information5/11/2007. WinTR-55 for Plan Reviewers Small Watershed Hydrology Hydrology Terms and Definitions
WinTR-55 for Plan Reviewers Small Watershed Hydrology Hydrology Terms and Definitions 1 Course Outline Overview Review of Hydrology Terms and Definitions Modeling Single Sub-area Watersheds Multiple Sub-area
More informationNorman Maclean Snowmelt Flow rate Storm flows fs (c flow m a tre S
Eventually, all things merge into one, and a river runs through it. Norman Maclean Understanding Streamflow ADEQ SW Short Course June 13, 213 Phoenix, AZ Hydrographs Discharge (Q) USGS flow data & plots
More informationSTORM DRAINAGE DESIGN MANUAL
Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated
More informationArkansas Natural Resources Commission* Rules Governing Design and Operation of Dams Title 7 (Effective October, 1993)
Arkansas Natural Resources Commission* Rules Governing Design and Operation of Dams Title 7 (Effective October, 1993) *In 2005, the agency known as Arkansas Soil and Water Conservation Commission was renamed
More informationBasic Hydrology Runoff Curve Numbers
Basic Hydrology Runoff Curve Numbers By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District The SCS Runoff Curve Number The RCN (Runoff Curve Number) method was originally established
More informationCITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California
CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationExtended Detention Basin Design
Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationCommon causes and real solutions
Common causes and real solutions your voters can support John A. Miller, P.E., CFM, CSM Associate; Water Resources Engineer Princeton Hydro, LLC L i l ti C itt Ch i Legislative Committee Chair New Jersey
More information5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description
Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon TEXAS FLOODPLAIN MANAGEMENT ASSOCIATION April 27, 2017 PROJECT LOCATION PROJECT VICINITY MAP Lumpkin Road Overall Description
More informationInstream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas
450,000 400,000 350,000 300,000 250,000 200,000 150,000 Instream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas 100,000 50,000 0 Jan-48 Jan-51 Jan-54 Jan-57 Jan-60 Jan-63 Jan-66 Jan-69
More informationCulvert Sizing procedures for the 100-Year Peak Flow
CULVERT SIZING PROCEDURES FOR THE 100-YEAR PEAK FLOW 343 APPENDIX A: Culvert Sizing procedures for the 100-Year Peak Flow A. INTRODUCTION Several methods have been developed for estimating the peak flood
More informationFROM ROOFTOP TO DRAIN NON-TRADITIONAL APPLICATIONS OF HEC-RAS 2D FROM ROOFTOP. Calibration: A Hands-On Approach to Making a Model Reflect Reality
FROM ROOFTOP TO DRAIN NON-TRADITIONAL APPLICATIONS OF HEC-RAS 2D Andrew C. Yung, PE, CFM Andres A. Salazar, PhD, PE April 26, 2017 1 FROM ROOFTOP 2 Amphitheater: 97,000 SF flexible engineered fabric roof
More informationCRS Activity 450: Stormwater Management
CRS Activity 450: Stormwater Management Activity 450 within the Community Rating System (CRS) is focused on preventing increases in flood frequencies, durations, peak flows, sediment and negative impacts
More informationDusty Myers, P.E. Chief, Dam Safety Division
Dusty Myers, P.E. Chief, Dam Safety Division Impoundment Permitting Statute 51-3-1 Declaration of policy on conservation of water resources -Excerpt All water, whether occurring on the surface of the ground
More informationLocal Stormwater Design Manual. City of Fairburn
APPENDIX D LOCAL STORMWATER DESIGN MANUAL Local Stormwater Design Manual City of Fairburn May 2008 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS...
More informationCHOLLA POWER PLANT FLY ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_InflowFlood_002_
CHOLLA POWER PLANT FLY ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_InflowFlood_002_20161017 This Inflow Design Flood Control System Plan (Plan) document has been prepared specifically for the Fly
More informationIstokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project. May 23, 2012
STORMWATER INFORMATION AND CALCULATIONS FOR ENVIRONMENTAL RESOURCE PERMIT Istokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project Prepared by Chastain-Skillman, Inc. Prepared for
More informationExamining the Effectiveness of Check Structures in reducing Flood Discharge of Kotok Watershed in Khuzestan Province in Iran
AENSI Journals Advances in Environmental Biology ISSN1995756 EISSN1998166 Journal home page: http://www.aensiweb.com/aeb/ Examining the Effectiveness of Check Structures in reducing Flood Discharge of
More informationStormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.
Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1 Geoffrey A. Cerrelli 1, P.E. 1 Hydraulic Engineer USDA/NRCS, One Credit Union Place,
More informationInflow Design Flood Control System Plan
Inflow Design Flood Control System Plan Scrubber Ponds Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.14 17:54:29-05'00' 234 West Century Avenue
More informationHYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006
HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS
More informationNRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD
Dec, 2015 NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD NRCS - Natural Resource Conservation Service (formerly known as SCS Soil Conservation
More informationPA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS
1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN
More informationSECTION III: WATERSHED TECHNICAL ANALYSIS
Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater
More informationCVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.
CVEN 339 Final Exam 120 minutes allowed 36 Students No curve applied to grades Median 70.6 Mean 68.7 Std. Dev. 13.7 High 88 Low 24.5 Name: CVEN 339 Water Resources Engineering Summer Semester 2009 Dr.