1 5, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/ CONTRACT ID: : NH 2012(513) CONTRACT: AWARD : $778, ED : $778, ADJ. ED : $783, CONTRACT: CONTRACTOR: BIO LANDSCAPE & MAINTENANCE, INC. HIGHWAY: VA DISTRICT NAME: Houston COUNTY: HARRIS AREA ENGINEER: John Elam, P.E. AREA NUMBER: 056 ESTIMATE NUMBER: 0040 LETTING DATE: 05/03/2012 ESTIMATE PAID: AWARD DATE: 05/31/2012 ESTIMATE PERIOD: 09/01/2015 to 09/04/2015 NOTICE TO PROCEED DATE: 06/11/2012 ESTIMATE TYPE: FINL WORK BEGIN DATE: 06/15/2012 % COMPLETE: 10 ACCEPTED DATE: 09/04/2015 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS PARTICIPATING NON-PARTICIPATING RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS PAID TO CONTRACTOR CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/ ENGINEER DATE
2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 5 CONTRACT TIME STATEMENT WORK BEGIN DATE: 06/15/2012 ASSESSED LIQ DAMAGES: 0 TIME CHARGES BEGIN: 06/27/2012 LIQ DAMAGE RATE: $61 DAYS: 90 LIQUIDATED DAMAGES: 0 C. O. ADJUSTED DAYS: 75 DAYS AT CURRENT DAYS: 165 PER DAY $61 DAYS CHARGED : 139 TOTAL: PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date or Charged Credited 09/01/ Awaiting District Acceptance. 09/02/ Awaiting District Acceptance. 09/03/ Awaiting District Acceptance. 09/04/ WORK ACCEPTED Diary Adjustment Date or PERIOD SUMMARY Charged Credited OTHER - SEE RMRKS 3 WORK ACCEPTED 1
3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 5 WORK PERFORMED THIS PERIOD NH 2012(513) CONTROL CATEGORY 001 ALL S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date PLANT MAINTENANCE CYC 24, $24, MOBILIZATION LS 64, $6, TOTAL EARNINGS THIS ESTIMATE
4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 5 CONTRACT S CATEGORY NH 2012(513) CONTROL ALL S SUPP NET CO $ PREPARING ROW (TREE) (6" TO 24" DIA) EA , EROSION CONTROL COMPOST CY , GENERAL USE COMPOST CY , PLANT MATERIAL (5-GAL) EA , PLANT MATERIAL (15-GAL) EA , MULCH CY , , , PLANT MATERIAL (3 GAL) (SHRUB) EA , ,90 15, PLANT BED PREP (TYPE III) SY , , , PLANT MAINTENANCE MO 7, , PLANT MAINTENANCE CYC 24, , PLANT REPLACEMENT (SEEDLING) EA , ,00 39, MOBILIZATION LS 64, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , LANDSCAPE SOIL AMENDMENT (TYPE I) SY , , LANDSCAPE SOIL AMENDMENT (TYPE II) SY , , LANDSCAPE SOIL AMENDMENT (TYPE III) SY , ,90 2, LANDSCAPE SOIL AMENDMENT (TYPE V) SY , , , BIODGRD EROSION CONTROL LOGS (12" DIA) LF ,80 5,88 Category Subtotal NH 2012(513) CONTROL CATEGORY 001 ALL S SUPP NET CO ($) MATERIAL ON HAND DOL CONTRACTOR FORCE ACCOUNT 1 DOL LANE CLOSURE ASSESSMENT FEE Category Subtotal TOTAL EARNINGS THIS CONTRACT
5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 5 CONSTRUCTION ESTIMATE COMBINED ($) PREPARING ROW (TREE) (6" TO 24" DIA) EA , EROSION CONTROL COMPOST CY , GENERAL USE COMPOST CY , PLANT MATERIAL (5-GAL) EA , PLANT MATERIAL (15-GAL) EA , MULCH CY , , , PLANT MATERIAL (3 GAL) (SHRUB) EA ,90 2,900 15, PLANT BED PREP (TYPE III) SY ,75 7, , PLANT MAINTENANCE MO 7, , PLANT MAINTENANCE CYC 24, , PLANT REPLACEMENT (SEEDLING) EA ,00 80,000 39, MOBILIZATION LS 64, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , LANDSCAPE SOIL AMENDMENT (TYPE I) SY ,75 7, LANDSCAPE SOIL AMENDMENT (TYPE II) SY ,75 8, LANDSCAPE SOIL AMENDMENT (TYPE III) SY ,90 2,900 2, LANDSCAPE SOIL AMENDMENT (TYPE V) SY ,90 2, , BIODGRD EROSION CONTROL LOGS (12" DIA) LF ,800 5,88 TOTAL EARNINGS
CONTRACTOR'S ESTIMATE PACKAGE
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 3/11/19 16 CONTRACT ID: 6325121 : RMC - 6325121 CONTRACT: 518131 AWARD : $29,229.4 ED : $29,232.4 ADJ. ED : $29,232.4 CONTRACT: CONTRACTOR: BRYDL CONTRACTING,
More informationPROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co
PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port
More informationMasterson 24-Inch Water Main Extension Solicitation Number: CO Job No.: ADDENDUM 2 July 3, 2018
Masterson 24-Inch Water Main Extension Solicitation Number: CO-00177 Job No.: 18-1018 ADDENDUM 2 July 3, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to
More informationCity of Grand Island
City of Grand Island Tuesday, June 08, 2004 Council Session Item G18 #2004-140 - Approving Certificate of Final Completion and Setting Board of Equalization Hearing Date for Street Improvement District
More informationITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P
BID FORM (continued) DAYTON INTERNATIONAL AIRPORT TERMINAL APRON RECONSTRUCTION PHASE 2 21% DBE PARTICIPATION) FEDERAL CONSTRUCTION FUNDS) ITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P-101-5.1.1 FULL
More informationNOTICE TO BIDDERS. August 24, 2016 ADDENDUM NO. 1. Gosling Road Pedestrian, Bike & Related Improvements
NOTICE TO BIDDERS August 24, 2016 ADDENDUM NO. 1 Gosling Road Pedestrian, Bike & Related Improvements TO ALL FIRMS OF RECORD: This addendum forms a part of and modifies the bidding and contract documents
More informationA D D E N D U M N O. 4
A D D E N D U M N O. 4 TO: PROJECT: All Prospective Bidders (T78) Drainage Improvements TxDOT CSJ No. Klotz Project No. 0500.041.002 ISSUE DATE: January 30, 2017 The following information is provided to
More informationFor Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned
More informationThe table below summarized the currently estimated total cost for the project.
MEMORANDUM TO: FROM: SUBJECT: Programs, Projects, and Operations Subcommittee Eric Williams, Natural Resources Planner Bids for Elkhorn River 240 th Street Bank Stabilization Project DATE: January 7, 2016
More informationCity of Town & Country Wirth Tract Development
ENGINEER'S OPINION SUMMARY OF PROBABLE COSTS // BASED ON PRELIMINARY PLAN DATED // City of Town & Country Wirth Tract Development SUMMARY TOTAL GRADING AMOUNT,0. TOTAL SANITARY SEWER AMOUNT,0.0 TOTAL STORM
More informationYour cooperation in this matter is greatly appreciated. If you have any questions or need further assistance you may contact:
We will stop accepting bids at 10:30 both on the Internet and in drop-boxes. Drop-boxes will be sealed and left at the guard s desk in public view. We will start opening the bids at 11:30 a.m. Reading
More informationBASE BID Description Written & Numeric Price
PROPOSAL Proposal TxDOT CSJ No. Project : Airfield drainage improvements to alleviate storm water conveyance issues at in Liberty, TX. The improvements include: re-grading of existing concrete lined infields,
More informationMAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S
MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE
More informationBID PROPOSAL PROPOSAL OF, corporation, a partnership consisting of, an individual doing business as,
Access Roads BID PROPOSAL PROPOSAL OF, corporation, a partnership consisting of, an individual doing business as, THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the
More informationTarrant County Community Development Community Development Block Grant 43 rd Year PY 2017 PROJECT PROPOSAL FORM
Tarrant County Community Development Community Development Block Grant 43 rd Year PY 2017 PROJECT PROPOSAL FORM Part 1: City Information City Name City Contact Name(s) Chris Barker, Assistant City Manager
More informationSan Antonio Water System ADDENDUM NO. 1
San Antonio Water System ADDENDUM NO. 1 Historic Mission Reach, Phase IV ADDENDUM NO. 1 To Bidder of Record: February 26, 2010 This addendum, applicable to work referenced above, is an amendment to the
More informationSAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6
SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced
More informationItem Description Qty Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
City of Irving, Texas Response Summary ITB Name: Rock Island Road Bike and Pedestrian Facility ITB Number: 179D-16F Purchasing Supervisor, Darlene Humphries, 972-721-3752 Closing Date: August 31, 2016
More informationRiverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO
Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO. 2017-031 WELCOME PUBLIC MEETING NO. 2 February 21, 2018 CITY OF ANN ARBOR RIVERVIEW DRIVE SANITARY SEWER AND WATER
More informationCUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,
CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page
More informationMaine Turnpike Authority
Company Name Total Bid Amount Scott Construction Corporation - Portland, ME $918,886.00 CPM Constructors - Freeport, ME $1,059,738.71 Wyman & Simpson Inc. - Richmond, ME $1,084,545.00 Page 1 of 7 Scott
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 6/18/2002
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 6/18/2002 Control 6080-50-001 Project RMC - 608050001 Highway PA1502 County BEXAR Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016
ADDENDUM 3 Contractor Questions IFB 2016-154-01 Responses Issued March 30, 2016 Sealed Bids are due no later than 3:00 PM, April 4, 2016 at the Essex County Purchasing Office, 202 S. Church Lane, Tappahannock,
More informationADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF
ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds
More informationDRAFT TECHNICAL SPECIFICATIONS FOR
DRAFT TECHNICAL SPECIFICATIONS FOR DETROIT RIVER AOC STONY ISLAND HABITAT RESTORATION PROJECT THE DETROIT RIVER, WAYNE COUNTY, MICHIGAN FOR INFORMATION JANUARY, 2016 Prepared for: FRIENDS OF THE DETROIT
More informationAddendum No: 3 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO.3. Closing Time: 2:00 P.M., December 18, 2018 Opening Time: 2:01 P.M., December 18, 2018
CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-8405 Fax: 254 / 750-8063 www.waco-texas.com Date: 12/18/2018 RFB No: 2018-078 Commodity: South 26 th Street Improvements
More informationRenovations & Addition Carroll County, Kentucky BG RTA 1233 CONTRACT DATE: March 24, 2014 CONTRACT FOR: General Construction
CHANGE ORDER DATE: 7/25/2014 CO #: 04 (FOUR) TO: Marrillia Design and Construction 259 West Short Street, Suite 325 Lexington, KY 40507 PROJECT: Carroll County Middle School Renovations & Addition Carroll
More informationADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013
ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 BIDDING AND CONTRACT DOCUMENTS FOR THE HORRY COUNTY SOLID WASTE AUTHORITY YARD WASTE MANAGEMENT AND COMPOSTING FACILITY HORRY COUNTY, SOUTH CAROLINA ****************************************************************************************************
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More information2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form
2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork
More informationADDENDUM NO. 1 NOVEMBER 8, 2016
SAN ANTONIO WATER SYSTEM C_13 BROADWAY CORRIDOR PROJECT SEWER REHABILIATION PACKAGE 2.C AND 4.C SAWS JOB NO. 15-45111 (2.C) & 15-4514 (4.C) SOLICITATION NO. CO-00097 ADDENDUM NO. 1 NOVEMBER 8, 2016 TO
More informationBID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction
More informationADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF
ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 1/04/2019
NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 1/04/2019 Control 6338-58-001 Project RMC - 633858001 Highway FM0383 County RUNNELS Ladies/Gentlemen: Attached please find an addendum on the above captioned
More information2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO
July 27, 2018 2018 Roadway Erosion Control ADDENDUM NUMBER TWO This Addendum Number Two supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge
More informationOverview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations
Overview of the Project Development Process Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overall Project Development Process The time it takes to produce a project varies significantly
More informationOAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No
PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City
More informationNew Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS
PAGE : 107-1 CONTRACT TIME : 08/31/12 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-078-5(110) ROUTE I-78 RAMP C OVER BEAVER BROOK DECK REPLACEMENT AND RESURFACING CONTRACT NO.019113160
More informationCYPRESS Forest LINEAR PARK MASTER PLAN. CYPRESS FOREST PUBLIC UTILITY DISTRICT September, 2008
CYPRESS Forest LINEAR PARK MASTER PLAN CYPRESS FOREST PUBLIC UTILITY DISTRICT September, 2008 (5&3-)4(. 7 INTRODUCTION % 3 -)4( + 59 2 $ -ILES 'LEN $ "OUDREAUX & - 9 %!3 4 &7 HOUSTON ',//0 5, & &7 3 (
More informationPROSEPECTIVE BIDDER S INQUIRIES
CSJ: 0072 06 074 Bid Opening Date: April 3, 2019 No. QUESTION DATE QUESTION RECEIVED 1 Can you please provide the cross sections, XSR Files, Geotechnical Report, and construction schedule? 2 Can you provide
More informationNew Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS
PAGE : 409-1 CONTRACT TIME : 02/28/13 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STATE ROUTE 45 ROADWAY DRAINAGE IMPROVEMENT CONTRACT DP 12409 BOROUGH OF WESTVILLE, GLOUCESTER COUNTY VENDOR
More informationRFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered
RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater
More informationAddendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018
155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated
More informationCOST ESTIMATE STREET IMPROVEMENTS (Off Site)
STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter
More informationForsyth County Procurement
August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank
More informationTimber Sale Appraisal More Cow Bell Sale FG W
Timber Sale Appraisal Sale FG-341-2019-W00542-01 District: Forest Grove Date: January 24, 2019 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,048,273.85 $10,164.42 $2,058,438.27 Project
More informationADDENDUM NO. 3 APRIL 9, 2018 CITY OF LUCAS. PARKER ROAD WATER LINE PHASE 2 (Bid ) (FROM LEWIS LANE TO EAST OF SANTA FE TRAIL)
ADDENDUM NO. 3 APRIL 9, 2018 CITY OF LUCAS PARKER ROAD WATER LINE PHASE 2 (Bid 013-18) (FROM LEWIS LANE TO EAST OF SANTA FE TRAIL) This Addendum forms a part of the Contract Documents and Specifications.
More informationDRAFT Foothills District Framework Plan PRELIMINARY District-Wide Cost Summary July 11, 2011
DRAFT Foothills District Framework Plan PRELIMINARY DistrictWide Cost Summary July 11, 2011 USES FOOTHILLS DISTRICT 10 POTENTIAL SOURCES North District B Avenue East of Foothills $ 4,052,453 TIF, LID,
More informationLJA Engineering, Inc.
BID OPENING DATE: TABULATION DATE: LJA JOB NO. 2085-0114D (9.2) BIDDER'S NAME TOTAL BID AMOUNT 1) CROSTEX CONSTRUCTION, INC. $535,000.00 2) BLAZEY CONSTRUCTION SERVICES, LLC $552,212.70 3) R CONSTRUCTION
More informationFeasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017
Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Prepared By: Introduction The purpose of this report is to determine the feasibility
More informationBID FORM. Alt. Bid: Additional extension of proposed taxiway from STA: to TW F/G intersection, approximately 1,095 feet.
BID FORM TxDOT CSJ 1812CONRO Project Description: TW Extension, Lighting and Signage Improvements Base Bid: The project consists of the extension of existing 50 TW approximately 2,640 feet. The proposed
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationMaine Turnpike Authority
Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson
More informationCONTRACT ID : COMPLETION DATE : 09/15/08 =========
PAGE : 1 COMPLETION DATE : 09/15/08 PROJECT(S): ER-1453(310)X LOCATION(S): YORK, CULVERT REPLACEMENT MAINE STATE DEPARTMENT OF TRANSPORTATION A TRUE COPY : TITLE : ATTEST : CONTRACT DESCRIPTION : YORK,
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 3/06/2009
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 3/06/2009 Control Project Highway County 0917-19-043, ETC. BR 2006(448), ETC. CR WASHINGTON Ladies/Gentlemen: Attached please find an addendum on the above
More informationApril 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS
April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009
More informationPublic Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT
Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Prepared By: 3800 Via Del Rey Bonita Springs, FL 34134 July 2015 Table of Contents Name Section Bid Schedule Project Description
More informationCITY OF EL CERRITO PUBLIC WORKS DEPARTMENT
CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT OHLONE GREENWAY BART STATION AREA ACCESS, SAFETY, AND PLACEMAKING IMPROVEMENTS City Project No. C3076 Federal Project No. CML-5239 (025) ADDENDUM NO. 1 TO: All
More informationINVITATION TO BIDDERS. Solicitation No. CO-00157
INVITATION TO BIDDERS Solicitation No. CO-00157 Sealed bids are requested by the San Antonio Water System for the construction of approximately 5,900 LF of 6 to 8-inch of water main and approximately 3,000LF
More informationADDENDUM 1 OF SOLICITATION
1. SOLICITATION NO.: IFB-2018-13 2. ADDENDUM NO.: CITY OF SAFETY HARBOR (THE CITY) ADDENDUM 1 OF SOLICITATION 1 3. EFFECTIVE DATE: 11/07/2018 5. REVISED OFFER SUBMISSION DUE DATE AND TIME: REVISED AS FOLLOWS:
More informationADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders
ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS TO: All Plan Holders and Prospective Bidders TITLE: Hills of Cedar Creek East Phase 2 PROJECT NO: LOCATION: OWNER: EGA181011 Council Bluffs, IA. City
More information**BID OPENING DATE CHANGE Bid Open Date: Thursday, March 29, 2018 at 11:00 AM
WESLIE Engineering Group PROJECT: Douglas County Stateline Flowage Dam Reconstruction Project Addendum #1 Date: Tuesday, March 20, 2018 To: Prospective Bidders **BID OPENING DATE CHANGE Bid Open Date:
More informationSnow Removal Equipment Storage Building
June 6, 2011 ADDENDUM 2 (Rev.1) For Snow Removal Equipment Storage Building URS Project No. 25338534 Prepared For 2933 Airport Blvd. Abilene, TX 79602 Prepared By URS Corporion 1950, North Stemmons Freeway
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/15/2016
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/15/2016 Control Project Highway County 0070-04-035, ETC. NH 2017(328), ETC. US 87, ETC. CONCHO, ETC. Ladies/Gentlemen: Attached please find an addendum
More informationCollege Station, TX. Legislation Details (With Text)
City Hall 1101 Texas Ave 77840 Legislation Details (With Text) File #: 18-0233 Version: 1 Name: Veterans Park and Athletic Complex Build Out Phase 1 Construction Contract Type: Contract Status: Consent
More informationSUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor
More informationSample. Bid Proposal. Not Valid for Use
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions Invitations to Bidders, the undersigned proposes
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/05/2017
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/05/2017 Control 6318-81-001 Project RMC - 631881001 Highway SH0191 County ECTOR Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT
ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT December 7, 2017 Please find the following addendum to the below mentioned BID. Addendum No.: 3 Bid#: 622-95-17-61-2 Project Name: Bedico Timberlane
More information10 Stockton 4. Guard Rail and Impact Attenuator Installation. HSIP Cycle 7
10 Stockton 4 Guard Rail and Impact Attenuator Installation HSIP Cycle 7 2015 Form Date: April 26, 2015 HSIP Cycle 7 Application Form APPLICATION FOR CYCLE 7 HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) APPLICATION
More informationCity of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO#
City of Kettering Bid Tabulations 05-117 2017 SWR PROJECT Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # 5212-77750 PO# Engineer's Estimate (1) America's Decorative Concrete (2) RA
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division. CONTRACT NO PROJECT NAME: 2018 Citywide Contract Overlay
CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division CONTRACT NO. 201841976 PROJECT NAME: 2018 Citywide Contract Overlay ADDENDUM NO. 3 TO CONTRACT DOCUMENTS Bidders are hereby instructed
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/19/2007
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/19/2007 Control 6159-96-001 Project RMC - 615996001 Highway SH0044 County JIM WELLS Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationQ18-06 REQUEST FOR PROPOSALS REPAINT EPOXY PAVEMENT MARKINGS ON S. MAIN STREET. RFP Issuance Date: April 17, 2018 Proposal Due Date: May 8, 2018
Q18-06 REQUEST FOR PROPOSALS REPAINT EPOXY PAVEMENT MARKINGS ON S. MAIN STREET Engineering Department RFP Issuance Date: April 17, 2018 Proposal Due Date: May 8, 2018 The City of West Bend (City) is requesting
More informationINSTRUCTIONS FOR COMPLETING SCHEDULE OF PRICES, ESTIMATE FOR VOUCHER, RETENTIONS SUMMARY, AND CONTRACTOR'S INVOICE
INSTRUCTIONS FOR COMPLETING SCHEDULE OF PRICES, ESTIMATE FOR VOUCHER, RETENTIONS SUMMARY, AND CONTRACTOR'S INVOICE 1. Print out these instructions first, then follow them in completing the worksheets.
More informationC I T Y O F S A N A N G E L O
Avenue P Street & Drainage Improvement Project - Summary Description Base Bid $ 2,956,661.00 $ 2,784,170.54 Alterenate 1 $ 3,045,242.00 $ 2,616,242.60 Alterenate 2 $ (100,000.00) $ (190,900.00) Alterenate
More informationPractices and Perceptions of Urban Forest Waste Generation and Utilization in Virginia
Practices and Perceptions of Urban Forest Waste Generation and Utilization in Virginia P. Eric Wiseman, Ph.D. Associate Professor of Urban Forestry Department of Forest Resources & Environmental Conservation
More informationCECIL COUNTY, MARYLAND
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 11/01/2013
NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 11/01/2013 Control 0148-04-023, ETC. Project STP 2014(218) Highway US 377, ETC. County KIMBLE, ETC. Ladies/Gentlemen: Attached please find an addendum on the
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationDEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA
Charles A. Kilpatrick, P.E. Commissioner DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 October 21, 2014 Order No.: G12 Route: 0027 Project: (NFO) 0027-000-102, C501,
More informationAGENDA BILL. Beaverton City Council Beaverton, Oregon BUDGET IMPACT AMOUNT BUDGETED $48,000*
AGENDA BLL Beaverton City Council Beaverton, Oregon SUBJECT: Change Order in Contract for Construction of the 114th Avenue (Canyon Road-McBride Place) 12-inch Waterline (CP 4139) to nclude CP 4083 - Duncan
More informationBID FORM. TxDOT CSJ No. 1507JNCTN. Project Description: T-Hangar Development Project. Bid by: Name of Bidder. Address: Address:
BID FORM TxDOT CSJ No. 1507JNCTN Project Description: T-Hangar Development Project Bid by: Name of Bidder Address: Telephone: FAX: Email Address: To the Texas Department of Transportation hereinafter called
More informationCITY OF TACOMA Department of Public Utilities Tacoma Power
CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL
More informationEnclave at Black Point Marina Community Development District. 1 st Supplemental Engineer s Report Infrastructure Improvements
Enclave at Black Point Marina Community Development District 1 st Supplemental Engineer s Report Infrastructure Improvements Prepared for Enclave at Black Point Marina Community Development District Board
More information2311 Egg Harbor Road Susan Shin-Angulo Lindenwold, NJ Freeholder Liaison Phone Fax
Jackson Rd (CR 534) Reconstruction Project Between NJSH RT #73 (MP 12.67) To Atco Ave. (MP 14.92) Townships of Berlin & Waterford County of Camden, New Jersey Bi-Weekly Progress Report Monday 4/23/18 thru
More informationBruce Powers, Park Analyst / Project Manager Parks & Recreation Department
6.1 TO: FROM: SUBJECT: Kent Studebaker, Mayor Members of the City Council Bruce Powers, Park Analyst / Project Manager Parks & Recreation Department East Waluga Sports Fields Replacement Project DATE:
More informationRFQ ADDENDUM #5. Request for Qualifications #KY Kayenta Township Community Development Department
RFQ Request for Qualifications #KY-17-007-01 Kayenta Township Community Development Department 928.697.8451 NOTE: Attach to Original RFQ. However, if Proposal has already been returned, complete this amendment
More informationMONTGOMERY STREET. Construction Manager at Risk (CMAR) Services
2 nd PRE-PROPOSAL CONFERENCE March 6, 2015 MONTGOMERY STREET (City Project #02432) Construction Manager at Risk (CMAR) Services PROCUREMENT MARCH 19, 2015 1 Michael Weiss, P.E. City of Fort Worth Project
More informationPROJECT ITEMS CHECK LIST Project No.
PROJECT ITEMS CHECK LIST Project No. Action Required Action Completed Form No Action or Form Name Responsible for work 1 Obtain plans, proposals and cross sections from the Construction. and/or 2 Check
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationWHEREAS, a new Global Headquarters has the potential to add to the City's
NOVEMBER 8, 2017 17-534 RESOLUTION CARRIED 6-1P LOST LAID OVER WITHDRAWN PURPOSE: APPROVE PROPOSED TERMS AND CONDITIONS FOR THE SALE OF A PORTION OF LAKESHORE MUNICIPAL GOLF COURSE AND DEVELOPMENT AGREEMENT
More informationProject Delivery. Rodger Rochelle, PE Technical Services Administrator. Mike Holder, PE Chief Engineer
Project Delivery Rodger Rochelle, PE Technical Services Administrator Mike Holder, PE Chief Engineer NC : Project Delivery - Preconstruction Overview of Project Delivery Process Review of Other States
More informationAnnual 2012 Asphalt Overlay Work Order Construction Contract Job No Solicitation No. B MR BID PROPOSAL. PROPOSAL OF, a corporation a
Job No. 12-0101 Solicitation No. B-12-013-MR BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction
More informationSUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT
CALL FOR BIDS KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT BID OPENING: DATE: FEBRUARY 27, 2018 TIME: 11:00 AM Sealed
More informationTRENCHLESS CULVERT REHAB-2017
TRENCHLESS CULVERT REHAB-2017 Project Number: NA Bid Number: 25-08JUN17 CONSTRUCTION BIO REQUEST Contract Documents, General Specifications, Technical Specifications, and Special Provisions BOONE COUNTY
More information..fj~ S~l,(7,., Richard C. Herrmann, P.E. Steven K. Leavitt, P.E. Date: Thomas B. Gibson. P.E. Date:
BID TABULATION Bid : 7270 Roser Park Drive Ret Wall #3 and Creek Wall Improvements Ph 3 Project : 00083310 Engineering & Capital Improvements Department, City of SI. Petersburg, Florida Bid date:.. [A;piri...=...=......117.
More informationSAN ANTONIO WATER SYSTEM S. Flores St. 48-inch and 60-inch Outfall Rehab Project SAWS Job No Solicitation No. CD-B DB ADDENDUM NO.
Addendum No. III S. Flores St. 48-inch and 60-inch Outfall Rehab Project SAWS Job No.13-4808 SAN ANTONIO WATER SYSTEM S. Flores St. 48-inch and 60-inch Outfall Rehab Project SAWS Job No. 13-4808 ADDENDUM
More informationEL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02
EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El
More informationReplace BID SCHEDULE with attached revised BID SCHEDULE.
CONTRACT ADDENDUM Project: 9 st Ave SE & 4 th Street SE Sidewalk Improvements Project No: 00 Addendum No: Date: 0 September 0 Addendum: Replace BID SCHEDULE with attached revised BID SCHEDULE. Section
More information