Tarrant County Community Development Community Development Block Grant 43 rd Year PY 2017 PROJECT PROPOSAL FORM
|
|
- Willis Doyle
- 5 years ago
- Views:
Transcription
1 Tarrant County Community Development Community Development Block Grant 43 rd Year PY 2017 PROJECT PROPOSAL FORM Part 1: City Information City Name City Contact Name(s) Chris Barker, Assistant City Manager Stephen A. Cook, AICP, Senior Planner Contact Person Phone ; Contact Person City Annual Financial Summary Check here if you have included Comprehensive Plan Summary Check here if you have included or have ed planner pdf Web link to City s Comprehensive Plan City Leverage Amount $ 0 Part 2: Public Participation Date of Public Hearing Supporting records of hearing Check here if you have attached a copy of the public notice, public hearing and minutes from the hearing. Citizen Input Comments attached No comments received. Part 3: Engineering Information Engineering Firm Name Firm Address Firm Contact Person 1 Contact Person Phone Engineering and Public Works 201 N Ector Dr. Euless, T Jeff Pearson, P.E. Contact Person 1 jpearson@eulesstx.gov Firm Contact Person 2 Contact Person Phone 2 Contact Person 2 Project Cost/ Engineering Estimate $ 223,125 CDBG 43 rd Year PY 2017 Project Proposal Form 1 of 5
2 Part 4: Project Information (Follow Instructions) Type of Project Project Address (incl. block #) Zip Code Census Tract/BG Wastewater line pipe burst and replacement. 104 W Huitt Lane Acquisition of real property Project entails purchasing ROW or other property: Yes No Project Description (Complete & Detailed) Service Area Description (Street boundaries and description of non-residential area) 1040 Linear Feet of wastewater main line replacement. The wastewater mainline proposed for replacement in the target area is an older line that is considered sub-standard based on the size and the construction material. The age and type of the line has caused it to be more susceptible to frequent line breakage, pulled joints, root infiltration, restricted flows and deterioration form hydrogen sulfide gas, which have in turn increased maintenance needs. The service area of this line is directly tied to at least 23 single family residential structures. The line is located at rear property line of W. Huitt Dr from South Main Street and along the cul-desac of Gaye Ct. Land Use Information State Land Use Codes Land Use in Acres MAPS (Check each which you have included) A1 (Single Family Residential) A2 (Mobile Homes) B1 (Multi family Residential) C1 (Residential Vacant) C2 (Commercial Vacant) C6 (Exempt ROW) D3 (Farm land) D4 (Undeveloped) F1 (Commercial) F2 (Industrial) J1-8 (Utilities) Total Acres in Service Area % of Total Service Area % OTHER Transportation ) % TOTAL RESIDENTIAL: % Map(s) indicating Service Area and Project location Map of FEMA Flood Map (FIRM) of project area Other maps (ie, indicating water or sewer flow) CDBG 43 rd Year PY 2017 Project Proposal Form 2 of 5
3 Part 5: Detailed Cost Estimate 43 rd Year PY 2017 City Name Date 01/11/2017 Project Address 104 W Huitt Lane Please fill in the below information Item No. Description Quantity Unit Price Amount Mobilization Approx 5% of project cost. This cost includes fees, temporary structures, equipment rental and various misc. items. 8-inch PVC Waterline 1 $8,750 $8,750 1 Pipe Burst 6 VCT w/8 HDPE 1040 LF $55.00/LF $57,200 2 F&I 8 PVC 150 LF $65.00/LF $9,750 3 F&I 8 HDPE 50 LF $65.00/LF $3,250 4 Remove and Dispose of 4 Dia Brick Manhole EA $500/EA $1,000 5 F&I 4 Dia R/C Manhole EA $3,750/EA $7,500 6 F&I Extra vertical Feet 4 Dia R/C Manhole over 6 6 EVF $180/EVF $1,080 7 Remove and Dispose of 6 Cleanout 3 EA $300/EA $900 8 F&I 8 Cleanout and Shallow Manhole 3 EA $2,750/EA $8,250 9 F&I Standard Lateral Service 0-6 Reinstatement 21 EA $900.00/EA $18, F&I Extra 4 PVC Lateral in Excess of LF $35.00/LF $3, Pre-Construction CCTV Inspection/Cleaning 1040 LF $8.00/LF $8, Remove & Replace 4 or 5 Chain Link Fence 100 LF $20.00/LF $2, Remove & Replace 6 Wood Fence 100 LF $27.00/LF $2, F&I and Processing Top Soil 100 CY $16.00/CY $1, F&I Bermuda or St. Augustine Grass Sod 1000 SY $10.00/SY $10, F&I Hydromulch w/ Green Dye 800 SY $8.00/SY $6, Remove/Replant Crepe Myrtle Tree 3 EA $600.00/EA $1, F&I Extra Sand Embedment 10 CY $30.00/CY $ F&I Extra Gravel Embedment 10 CY $40.00/CY $ F&I Extra Concrete Encasement 2 CY $150.00/CY $ Allowance for Point Repair 200 LF $75.00/LF $15, Allowance for Utility Relocation/Repair 1 LS $5,000/LS $5, F&I Trench/Excavation Safety System 1 LS $1,500.00/LS $1, F&I and Maintain Barricades 1 LS $1,500.00/LS $1, F&I and Maintain Project Signs 2 EA $800.00/EA $1, % Contingency 1 EA $17,850/EA $17,850 Estimated Construction Subtotal: $196,350 Design/Engineering Subtotal: $26,775 TOTAL ESTIMATED PROJECT COSTS: $223,125 City Leverage Amount (if applicable) $0 City Paid Design/Engineering (if applicable) $ Other Sources (if applicable) $ Assumed CDBG award $265,000 Total Estimated Funds Available $223,125 Note: Project Costs must balance with Funds Available. Prepared By: _Jeff Pearson, P.E. CDBG 43 rd Year PY 2017 Project Proposal Form 3 of 5
4 Part 6: Description of Need and Problem to be Addressed. Will this project complement another project within the city or surrounding cities? The repairs that have been accomplished have only served as temporary fixes, and do not address the larger problem at hand. Replacement of this wastewater main line will reduce breaks, maintenance costs and customer problems that effect being able to provide wastewater service without interruption to the residents of the target block group area. Past projects have eliminated reoccurring problems, and now provide safe and reliable service. Part 7: Financial Need Explanation (Include statement and/or audit results) The values the annual CDBG program as a significant financial resource that helps to enable critical development in our community. Please see the attached Community Information document for a detailed explanation of current city revenue and financial resources. In addition, a full copy of the FY Preliminary Capital Improvement Program and Operating Budget can be found at: Part 8: Project Performance Objectives and Outcome OBJECTIVE (Select one) Suitable Living Environment (most public works) Decent Housing Economic Opportunity OUTCOME (Select One) Availability or Accessibility Affordability Sustainability (most public works) Part 9: Environmental and Neighborhood Conditions This project will be located in existing, developed neighborhoods. The project areas are not located near sensitive natural habitats, nor will the project be constructed in the floodplain. It is not anticipated that the construction of the project will result in any surface water and/or traffic issues. CDBG 43 rd Year PY 2017 Project Proposal Form 4 of 5
5 Part 10: CDBG Environmental Review Statutory Checklist City Project Location 104 W Huitt Lane Place an in the appropriate response. If compliance response is other than Not Applicable please indicate needed requirement and any additional information. Area of Statutory or Regulatory Compliance Historic Properties Not Applicable to this project Consultation Required Review Required Permits Required Determination of Consistency Approvals, Permits Obtained Conditions and/or Mitigation Actions Required Provide Compliance Documentation. Additional material may be attached. Flood Plain Wetlands Coastal Zone Management Tarrant County, Texas is not located along a coastal area. Map on File. Sole-Source Aquifers Edwards Aquifer is the only sole source aquifer exchange zone in Texas. This Aquifer is not located in Tarrant County, Texas. Map on file. Endangered Species Wild and Scenic River No wild and scenic rivers are located in Tarrant County, Texas. Map on file. Air Quality Farmlands Protection Manmade Hazards: Thermal/Explosive Noise Airport Clear Zones Toxic Sites Solid Waste Environmental Justice CDBG 43 rd Year PY 2017 Project Proposal Form 5 of 5
6 VINE ST CANNON DR HENSLEE DR GAYE CT S MAIN ST Capital Project Request W HUITT LN MARTHA ST JEFFLYN CT JEAN LN REAVES CT CANNON DR q 43RD CDBG LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II Feet LENGTH: 1040 FT AVG AGE: 56 YEARS COST: $223,125 PRIORITY: B Legend Wastewater System Other CIP SS Lines CIP SS Lines 40+ YRS SS Lines
7
Tarrant County Community Development Community Development Block Grant 42 nd Year PY 2016 PROJECT PROPOSAL FORM
Tarrant County Community Development Community Development Block Grant 42 nd Year PY 2016 PROJECT PROPOSAL FORM Part 1: City Information City Name City of Euless City Contact Name(s) Chris Barker, Assistant
More informationAPPENDIX A. NEPA Assessment Checklist
APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,
More informationENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL ASSESSMENT Project Identification Project: Cleveland E. 185 th Street & Marcella Road Relief Sewer (Phase 1) Applicant: Robert L Davis, Director of Public Utilities City of Cleveland 12302
More informationBID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 194 Muir Woods Ln Project ID Number: 216-2 Problem: At 194 Muir Woods Lane, nearly two acres of watershed flow through the
More informationCollege Station, TX. Legislation Details (With Text)
City Hall 1101 Texas Ave 77840 Legislation Details (With Text) File #: 18-0233 Version: 1 Name: Veterans Park and Athletic Complex Build Out Phase 1 Construction Contract Type: Contract Status: Consent
More informationFeasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017
Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Prepared By: Introduction The purpose of this report is to determine the feasibility
More informationEXHIBIT E SCHEDULE OF UNIT PRICES
SCHEDULE OF UNIT PRICES TO ACCOMPANY THE BID OF (Bidder/Contractor) ON CALL UTILITY SERVICES AND MISCELLANEOUS CONSTRUCTION FOR SEWER AND WATER LINES SOLICITATION NO.: IFB SA1703 Any bidder who enters
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: Essex Point Subdivision/Sellenriek Retention Project ID Number: 2-A Problem: The watershed above the Essex Point Subdivision
More informationEastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018
Eastern Sewershed Package IV Project Solicitation Number: CO-00149 Job No.: 17-4527 ADDENDUM 1 April 20, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to
More informationOAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No
PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City
More informationProject Information. *Project Name: *Responsible Entity: Grant Recipient (if different than Responsible Entity): State/Local Identifier: *Preparer:
U.S. Department of Housing and Urban Development 451 Seventh Street, SW Washington, DC 20410 www.hud.gov espanol.hud.gov Environmental Review for Continuum of Care Leasing or Rental Assistance Project
More informationBID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS
BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS (Easement 6 & 11, 4200 block of Versailles Avenue and Belclaire Avenue and the 4300 block of Westway
More informationPROGRAM NAME: Northfield Owner-Occupied Home Rehabilitation 2015
NEW YORK STATE HOUSING TRUST FUND HOME PROGRAM PROGRAMMATIC ENVIRONMENTAL REVIEW RECORD FOR LOCAL PROGRAM ADMINISTRATOR (LPA) PROGRAMS PROGRAM NAME: Northfield Owner-Occupied Home Rehabilitation 2015 SHARS
More informationToday s Date: April 15, 2015 Bid Opening Date: April 22, 2015
ADDENDUM NO. 1 FOR CONSTRUCTION OF COMMUNITY SEWAGE LIFT STATIONS & WASTEWATER TREATMENT LAGOONS FOR THE WHITE SHIELD COMMUNITY FORT BERTHOLD RESERVATION McLEAN COUNTY, NORTH DAKOTA Project AB-14-S59,
More informationENVIRONMENTAL ASSESSMENT For Choctaw Utilities, Inc. Water Plant Replacement Loan Number FS
ENVIRONMENTAL ASSESSMENT For Choctaw Utilities, Inc. Water Plant Replacement Loan Number FS391083-0002 Applicant: David Lohrer, President, Board of Directors Choctaw Utilities, Inc. 2005 Itawamba Trail
More informationSAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6
SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced
More informationDRAFT Foothills District Framework Plan PRELIMINARY District-Wide Cost Summary July 11, 2011
DRAFT Foothills District Framework Plan PRELIMINARY DistrictWide Cost Summary July 11, 2011 USES FOOTHILLS DISTRICT 10 POTENTIAL SOURCES North District B Avenue East of Foothills $ 4,052,453 TIF, LID,
More informationENVIRONMENTAL CHECKLIST (WAC )
Fee: $400.00 Date Fee Paid: Received by: 186 Iron Horse Court, Suite 101, Yakima WA 98901 Phone: (509) 834-2050 Fax: (509) 834-2060 Website: http://www.yakimacleanair.org ENVIRONMENTAL CHECKLIST (WAC 197-11-960)
More informationITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P
BID FORM (continued) DAYTON INTERNATIONAL AIRPORT TERMINAL APRON RECONSTRUCTION PHASE 2 21% DBE PARTICIPATION) FEDERAL CONSTRUCTION FUNDS) ITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P-101-5.1.1 FULL
More informationMichael Baker International, Inc West Linebaugh Avenue Suite 240 Tampa, Florida Fax
Michael Baker International, Inc. 5020 West Linebaugh Avenue Suite 240 Tampa, Florida 33624 813-889-3892 Fax 813-889-3893 Brooksville-Tampa Bay Regional Airport Existing Airport Administration Building
More informationFor Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned
More informationCity of Crosby, ND Municipal Infrastructure Needs Assessment September 2012
City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and
More informationPROGRAM NAME: Washington County HOME Program 2015
NEW YORK STATE HOUSING TRUST FUND HOME PROGRAM PROGRAMMATIC ENVIRONMENTAL REVIEW RECORD FOR LOCAL PROGRAM ADMINISTRATOR (LPA) PROGRAMS PROGRAM NAME: Washington County HOME Program 2015 SHARS NUMBER: 20153083
More informationNovember 29, CITY OF PLANT CITY Purchasing Division (813)
November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required
More informationLIMITED ENVIRONMENTAL REVIEW. Bowling Green Wooster and Main Street Water Main Replacement
LIMITED ENVIRONMENTAL REVIEW Project Identification Project: Applicant: Bowling Green Brian O Connell, Director of Utilities City of Bowling Green 304 North Church Street Bowling Green, Ohio 43402 Loan
More informationImprovement Plan Cost Estimate
Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or
More informationCity of Town & Country Wirth Tract Development
ENGINEER'S OPINION SUMMARY OF PROBABLE COSTS // BASED ON PRELIMINARY PLAN DATED // City of Town & Country Wirth Tract Development SUMMARY TOTAL GRADING AMOUNT,0. TOTAL SANITARY SEWER AMOUNT,0.0 TOTAL STORM
More informationCOST ESTIMATE STREET IMPROVEMENTS (Off Site)
STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter
More informationPreliminary Determination of Environmental Nonsignificance
Preliminary Determination of Environmental Nonsignificance City of Tacoma Temporary Homeless Camp Permitting Process Proposed Amendments to the Tacoma Municipal Code SEPA File Number: SEP2013-40000215160
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 1 Ridge Creek Rd Bank Stabilization Project ID Number: 21-11 Problem: The resident of 1 Ridge Creek Road has indicated continued
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2- Problem: Storm runoff from the park flows overland through a gap in a berm and then into the neighboring subdivision
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 HIGHWAY: COUNTY: 05/03/2012 ESTIMATE PAID: AWARD DATE: 05/31/2012 ESTIMATE PERIOD:
5,285.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 139 75.00 CONTRACT ID: 091200469 : NH 2012(513) CONTRACT: 05123222 AWARD : $778,293.17 ED : $778,293.17 ADJ. ED : $783,578.25 CONTRACT: CONTRACTOR:
More informationSample. Bid Proposal. Not Valid for Use
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions Invitations to Bidders, the undersigned proposes
More informationINVITATION TO BIDDERS. Solicitation No. CO-00157
INVITATION TO BIDDERS Solicitation No. CO-00157 Sealed bids are requested by the San Antonio Water System for the construction of approximately 5,900 LF of 6 to 8-inch of water main and approximately 3,000LF
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More informationKANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION
KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION Michael J. Van Mill, AICP Planning Director 189 East Court Street Kankakee, IL 60901
More informationSANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA
SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING
More informationCAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - STORM DRAINAGE SYSTEM. M - Page 25 of 37. Proposed CIP
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STORM DRAINAGE SYSTEM Project: Gulf Terrace Sec 1, Acre Homes Area M410007 Drainage and Paving Project Description Provides ROW acquisition,
More informationInformation for File # MVP MHK
Information for File # MVP-017-04353-K Applicant: Corps Contact: Town of Brookfield Marie Kopka Address: 50 N. Sunnyslope Road, Suite 96, Brookfield, WI 53005 E-Mail: Phone: (651) 90-5733 Primary County:
More information3.1 Wastewater Treatment Plants The City of Victoria has two (2) wastewater treatment plants: Victoria Regional WWTP and Odem Street WWTP.
1. INTRODUCTION AND SCOPE This study is an update to the City of Victoria's Master Wastewater Plan prepared in 2009 by Urban Engineering and Water and Wastewater Treatment Plant Capacity Assessment prepared
More informationPROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES
PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES Burlingame Hills Sewer Maintenance District Burlingame Public Library Lane Community Room 480 Primrose Road Burlingame, CA May 23, 2007 6:30 P.M. County
More informationCity of Lawrence, Kansas
Table of Contents 1 EXECUTIVE SUMMARY... 1-1 1.1 General Overview... 1-1 1.2 Phase 1 Field Investigation Findings... 1-3 1.2.1 Public Sector Inflow/Infiltration Sources... 1-3 1.2.2 Private Sector Inflow/Infiltration
More informationPreliminary Engineering Report Wastewater System Improvements Project for the Bosque Loop Area Sandoval County, New Mexico.
Wastewater System Improvements Project for the Bosque Loop Area Sandoval County, New Mexico July 2014 Souder, Miller & Associates 2904 Rodeo Park Drive East, Suite 100 Santa Fe, New Mexico 87505 (505)
More informationENVIRONMENTAL ASSESSMENT For City of Saint Clairsville. New Reservoir Improvement Project Loan Number FS
ENVIRONMENTAL ASSESSMENT For City of Saint Clairsville New Reservoir Improvement Project Loan Number FS390821-0001 Applicant: Jim Zucal, Service Director City of St. Clairsville 100 North Market Street
More informationProject Type: Drainage and Storm Systems
580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install
More informationINFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN
FINAL REPORT INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN Prepared for: City of Modesto Prepared by: Willdan Financial Services Approved by Modesto City Council on July 9, 2013 Resolution
More informationLJA Engineering, Inc.
BID OPENING DATE: TABULATION DATE: LJA JOB NO. 2085-0114D (9.2) BIDDER'S NAME TOTAL BID AMOUNT 1) CROSTEX CONSTRUCTION, INC. $535,000.00 2) BLAZEY CONSTRUCTION SERVICES, LLC $552,212.70 3) R CONSTRUCTION
More informationCity of Parshall, ND Municipal Infrastructure Needs Assessment August 2012
City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact
More informationPROPOSAL OF, a corporation. an individual doing business as
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to instructions and invitations to bidders, the undersigned proposes
More informationENGINEER S REPORT MAIN TILE IMPROVEMENTS DRAINAGE DISTRICT NO. 131 WRIGHT COUNTY
ENGINEER S REPORT MAIN TILE IMPROVEMENTS DRAINAGE DISTRICT NO. 131 WRIGHT COUNTY 2013 TABLE OF CONTENTS Page I. Introduction 1 II. Background 1 III. Existing Conditions 1-4 IV. Improvement Options 4-6
More informationSH 34 Corridor Study & Environmental Assessment:
SH & Environmental Page 1 SH & Environmental : from Kaufman (SH 243) to Terrell (north of IH 20) Third Series TxDOT 80 557 80 The SH Corridor 20 20 175 SH Study Area Boundary 243 175 SH & Environmental
More informationVILLAGE OF LIBERTYVILLE SPECIAL WORKSHOP MEETING. Wednesday, September 13, W. Church Street Libertyville, IL :00 p.m.
VILLAGE OF LIBERTYVILLE SPECIAL WORKSHOP MEETING Wednesday, September 13, 2017 135 W. Church Street Libertyville, IL 60048 7:00 p.m. 1) Roll Call 2) Town Hall Meeting: July 2017 Flood and Storm Water Management
More informationOld Mill School Stream Restoration
Project Overview This conceptual plan restores and stabilizes two consecutive reaches of a highly incised and unstable stream and reconnects them with the floodplain. The restoration reaches are part of
More information5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description
Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon TEXAS FLOODPLAIN MANAGEMENT ASSOCIATION April 27, 2017 PROJECT LOCATION PROJECT VICINITY MAP Lumpkin Road Overall Description
More informationADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF
ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project
More informationADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF
ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds
More informationPublic Hearing December 12, 2013
Public Hearing December 12, 2013 Commission s Water Transmission System Finished Water Transmission System South Transmission Main South Transmission Main Route South Main Replacement Route from Provin
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationRequest Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara
Applicant & Property Owner Public Hearing April 13, 2016 City Council Election District Rose Hall Agenda Item 5 Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara Location
More informationApplication fee: $ payable to Stevens County Land Services A completed environmental checklist Any other supplemental information.
SEPA CHECKLIST FOR ENVIRONMENTAL REVIEW STEVENS COUNTY LAND SERVICES PLANNING DIVISION Street Address: 260 S. Oak Courthouse Annex, Colville, WA Mailing Address: 215 S. Oak Courthouse Annex, Colville,
More informationBidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the
More informationDEVELOPMENT PERMIT APPLICATION COMMERCIAL
DEVELOPMENT PERMIT APPLICATION COMMERCIAL DEVELOPMENT DIVISION Department of Unincorporated Area Services 600 Commerce Street 7 th Floor, Suite 750, Dallas Texas 75202 Main: 214.653.6565 Fax: 214.653.6464
More informationGeneral Water Bid Items Item No.
BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationHolly Swartz and Jason Shirey
Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes
More informationSPECIAL SPECIFICATION. Water and Sewer System and Appurtenances
2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to
More informationChapter 5 Existing Wastewater Facilities
Chapter 5 Existing Wastewater Facilities \\7348101\TOC.doc CHAPTER 5 Existing Wastewater Facilities 5.1 INTRODUCTION Lacey s wastewater utility serves over 21,000 acres (33 square miles) of residential
More informationProcedure for NEPA for County or City Projects
Procedure for NEPA for County or City Projects I. County or City Projects with any Federal Highway funding or action shall be submitted to Environmental Program Division (EPD) with a request to start studies
More informationTabulation of Bids 8 September 2017 MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF PROJECT
SCHEDULE 1 BASE BID: PROJECT-WIDE ITEMS All work exclusive of Items listed separately, including tunnel between Station 8+00 and 1 1 LS Station 271+85 $191,675,695.00 $191,675,695.00 $190,592,000.00 $190,592,000.00
More informationPERMIT APPLICATION FEES Fees must be paid at time of application
Permits SEPA Checklist Permit # Staff use Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful
More informationAddendum No: 3 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO.3. Closing Time: 2:00 P.M., December 18, 2018 Opening Time: 2:01 P.M., December 18, 2018
CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-8405 Fax: 254 / 750-8063 www.waco-texas.com Date: 12/18/2018 RFB No: 2018-078 Commodity: South 26 th Street Improvements
More information2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationCITY OF ELKO BID TABULATION FOR Sports Complex
CITY OF ELKO BID TABULATION FOR Sports Complex 2017-2018 NAME Granite Construction Great Basin Engineering Contractors Road & Highway Builders CLEARING EARTHWORK 1 33701200 Mobilization @ Per Lump Sum
More informationPublic Notice. CENAB-OPR-P P24 (Lime Spring Run)
U.S. Army Corps of Engineers Baltimore District Public Notice In Reply to Application Number CENAB-OPR-P-2016-00168-P24 (Lime Spring Run) PN-17-16 Comment Period: April 3, 2017 to May 3, 2017 THE PURPOSE
More informationENVIRONMENTAL ASSESSMENT
DIVISION OF ENVIRONMENTAL AND FINANCIAL ASSISTANCE OFFICE OF FINANCIAL ASSISTANCE WATER POLLUTION CONTROL LOAN FUND ENVIRONMENTAL ASSESSMENT A. PROJECT IDENTIFICATION Project Name: WPCLF #: Project Contact:
More informationRio Arriba County Planning & Zoning Department
Rio Arriba County Planning & Zoning Department Conditional Use Permit or Special Use Permit GENERAL INFORMATION (please print or type) NAME OF DEVELOPMENT and/or APPLICANT ADDRESS OF APPLICANT TELEPHONE
More information3/27/2018. Today s Presentation. Baltimore Department of Public Works. Background and Overview. Key Programs / Initiatives. Data Management / GIS
American Council of Engineering Companies (ACEC) Maryland Chapter Asset Management in City DPW Asset Management March in 28, Baltimore 2018 City DPW Today s Presentation Background and Overview Key Programs
More information2. SECTION MEASUREMENT AND PAYMENT:
IN THE SPECIFICATIONS: 1. SECTION 00301 BID FORM: REPLACE Pages BF-1 through BF-6 (BF-1 follows page 00301-3) with the attached BF-1 through BF-6. This change adds a bid item for payment of CIPP testing.
More informationLegal Description Part of the Southwest Quarter of the Southeast Quarter of Section 17, Decoria Township
PC 32-16 Eric & Rande Baker Cut/Fill in Bluff Impact Zone CUP 12/07/2016 Applicants Eric & Rande Baker 17898 578 th Avenue Mankato, MN 56001 Request Request for review and approval of a Conditional Use
More informationSan Antonio Water System ADDENDUM NO. 1
San Antonio Water System ADDENDUM NO. 1 Historic Mission Reach, Phase IV ADDENDUM NO. 1 To Bidder of Record: February 26, 2010 This addendum, applicable to work referenced above, is an amendment to the
More informationGeneral Permit Registration Form for Contaminated Soil and/or Sediment Management (Staging and Transfer)
General Permit Registration Form for Contaminated Soil and/or Sediment Management (Staging and Transfer) Please complete this form in accordance with the instructions (DEP-SW-INST-001) to ensure the proper
More informationC. Applicant (If Applicant is not owner, attach document confirming interest in property): Name: Address: City: State: Zip: Phone:
The undersigned applicant hereby applies to the Rye City Planning Commission for approval of a Wetlands and Watercourses Permit in accordance with Chapter 195, Wetlands and Watercourses, of the Rye City
More informationCOMBINED PUBLIC WORKSHOP/ PUBLIC HEARING
COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING Draft Environmental Assessment Five-Year Capital Improvement Program Punta Gorda Airport, Charlotte County, Florida March 2019 Project Overview The Charlotte County
More informationWest Bountiful City. Water System Capital Facilities Plan
Water System Capital Facilities Plan August 2008 TABLE OF CONTENTS 1.0 Executive Summary... 1 2.0 Definition of Terms and Abbreviations... 2 3.0 Introduction... 3 3.1 Background...3 3.2 Scope of Investigation...3
More informationJacobi, Toombs, and Lanz, Inc.
Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations
More informationIMPACT ASSESSMENT. Bartow, FL (863) FORM
Growth Management Department Land Development Division 330 W. Church St. IMPACT ASSESSMENT P.O. Box 9005, Drawer GM03 STATEMENT Bartow, FL 33831-9005 (863)534-6792 www.polk-county.net FORM FAX (863) 534-6407
More informationHistory of the City of Keller Sanitary Sewer System
History of the City of Keller Sanitary Sewer System Dec. 8, 2015 Keith Fisher, P.E. Director of Public Works Sanitary Sewer History The City of Keller s introduction into the sanitary sewer service business
More informationHIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda
More informationstudy for 2018 include:
MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION
More informationAirport Master Plan Update June 14, 2017
Airport Master Plan Update June 14, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationENVIRONMENTAL ASSESSMENT. Steubenville Isolation Valve Replacement and Rehabilitation
ENVIRONMENTAL ASSESSMENT Project Identification Project: Applicant: Steubenville Isolation Valve Replacement and Rehabilitation Honorable James S. Mavromatis, Mayor City of Steubenville 115 South Third
More informationMasterson 24-Inch Water Main Extension Solicitation Number: CO Job No.: ADDENDUM 2 July 3, 2018
Masterson 24-Inch Water Main Extension Solicitation Number: CO-00177 Job No.: 18-1018 ADDENDUM 2 July 3, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to
More informationJob Order Sewer Repair Services
Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified
More informationStorm Water and Sanitary Sewer
Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements
More informationPublic Meeting for SH-85A Horse Creek Bernice, OK. SH-85A bridge located 3.5 miles east of SH-85, including west and east approaches
WELCOME Public Meeting for SH-85A Horse Creek Bernice, OK SH-85A bridge located 3.5 miles east of SH-85, including west and east approaches Randle White, PE ODOT Division VIII Engineer PURPOSE OF THIS
More informationFOCUS ENGINEERING, inc. OLD VILLAGE PHASE 3 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 30TH STREET N 10TH STREET N
OLD VILLAGE PHASE 3 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 30TH STREET N 20TH STREET 10TH STREET N NOVEMBER, 2016 CITY OF LAKE ELMO, MN. Project No. 2016.133 www.focusengineeringinc.com FOCUS ENGINEERING,
More informationEnvironmental Resource Inventories. What are ERIs? Significance of information How to use them
Environmental Resource Inventories What are ERIs? Significance of information How to use them Environmental Resource Inventory - ERI Compiled by the environmental commission Information about the natural
More informationMunicipal Service Review
Willow Creek Community Services District Municipal Service Review May 2008 Prepared by: For the District Sphere of Influence Report TABLE OF CONTENTS Page Local Agency Formation Commission Authority...
More informationAPPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES
MASTER PLAN UPDATE APPENDICES APPENDIX H Capital Improvement Program Detail Project Costs Montgomery Consulting Group August 11, 2009 Appendix H CAPITAL IMPROVEMENT PROGRAM Short Term (0-5 years) SUB-
More informationGlossary. September 11,
Adequate public facilities: Facilities which have the capacity to serve development without decreasing levels of service below locally established minimums. (WAC 365- Adopt a comprehensive land use plan:
More information