FORM 1, FORM 1A AND CONCEPTUAL PLAN

Size: px
Start display at page:

Download "FORM 1, FORM 1A AND CONCEPTUAL PLAN"

Transcription

1 EXPANSION OF GROUP HOUSING PROJECT "SIGNATURE HEIGHTS" AT KHASRA NO: 977,976,981, VILLAGE NOOR NAGAR, PARGANA - LONI, TAH & DIST GHAZIABAD, UTTAR PRADESH FORM 1, FORM 1A AND CONCEPTUAL PLAN Project Proponent: M/S ANNIKA PROMOTERS EIA Consultant: Ind Tech House Consult (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini Delhi Tel: , Fax: ithconsult@hotmail.com Feb 2017

2 ENVIRONMENTAL CLEARANCE FOR EXPANSION OF GROUP HOUSING PROJECT "SIGNATURE HEIGHTS" AT KHASRA NO: 977,976,981, VILLAGE NOOR NAGAR, PARGANA - LONI, TAH & DIST GHAZIABAD, UTTAR PRADESH Project Proponent: M/S ANNIKA PROMOTERS For and on behalf of: Ind Tech House Consult Approved by: Mr. A.N. Devikar Signed: Position: EIA Coordinator Date: February, 2017 This report has been prepared by Ind Tech House Consult with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our general terms and conditions of business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. The document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Ind Tech House Consult being obtained. Ind Tech House Consult accepts no responsibility or liability for the consequences of this document being used for a purpose other than the purpose for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Ind Tech House Consult for all loss or damage resulting there from. Ind Tech House Consult accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.

3 Team of Experts associated for the Project Declaration By Experts Contributing to the EIA Of Environment Clearance For EXPANSION OF GROUP HOUSING PROJECT "SIGNATURE HEIGHTS" AT KHASRA NO: 977,976,981, VILLAGE NOOR NAGAR, PARGANA - LONI, TAH & DIST GHAZIABAD, UTTAR PRADESH I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above EIA. EIA coordinator: Mr. Arvind Narayan Devikar Associate Coordinator: Mr. Soumya Dwivedi Name: Mr. Arvind Narayan Devikar Signature and Date: S. NO. Functional areas Name of the expert/s 1 WP Mrs. Supriti Guha (FAE) Mr. Soumya Dwivedi (Team Member) Signature and date 2 MSW Mrs. Supriti Guha (FAE) Mr. Soumya Dwivedi (Team Member) 3 LU Mr. Rajveer Singh (FAE) Mr. Manish Shukla (AFAE) 4 AP Mr. Suman Banerjee (FAE) Mr. Soumya Dwivedi (Team Member) 5 NV Dr. Manoj Kr. Mishra (FAE) Mr. Suman Banerjee (AFAE) 6 EB Dr. Sameer DeshPande(FAE) Dr. Bideh Shukla (Team Member) 7 SE Dr. Debashish Bhttacharya (FAE) 8 HG Mr. Manish Shukla (AFAE) 9 SC Mr. Shrikant Mishra (FAE) Dr. Bideh Shukla (Team Member)

4 Associate Staff 1. Mr. Anand Kumar Dubey 2. Mr. Indra Sharma 3. Ms Monika Singh 4. Mr. Saurabh Bhardwaj Monitoring Laboratory Involved Ind Research and Development House ( NABL Approved Lab) Signature For Ind Tech House Consult

5 TABLE OF CONTENTS S.. Contents Page. I Form II Form 1 A III Conceptual Plan IV Annexure A DESCRIPTIVE Site Location Map (on Google) Annexure-A1 500 Mt Radius Map Annexure-A2 10 km Radius Map Annexure-A3 Water balance Diagram Annexure-A4 Rain Water Harvesting Calculation Annexure-A5 B LAND DOCUMENTS Building Plan Approval Letter Annexure-B1 AAI Approval Annexure-B2 Fire C Annexure-B3 C from pollution Control Board Annexure-B4 C D CONSULTANT DISCLOUSURE Consultant Disclosure NABET Accreditation letter DRAWINGS Site Layout Plan Landscape Plan Parking Plan Basement Plan Annexure-C1 Annexure-C2 Annexure-D1 Annexure-D2 Annexure-D3 Annexure-D4

6 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar Application for Prior Environmental Clearance (EC) FORM 1 FORM 1 (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt Basic Information SN Item Details 1. Name of the project/s Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar 2. S.. in the schedule 8(a) Building and Construction Projects 3. Proposed capacity / area / length /tonnage to be handled / command area/lease area / number of wells to be drilled 4. New/Expansion/Modernization Expansion Plot area : sq m Net Plot Area: sq m Proposed Built up area: sq m. of Building tower : 7 of Dwelling Units: Existing capacity/area etc. Building under construction 6. Category of the project i.e. A or B B 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. 9. Location Khasra : 977,976,981 Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar Plot/Survey/Khasra. 977,976,981 Village Tehsil District State 10. Nearest railway station/airport along with distance in kms. Village or Nagar, Pargana - Loni Ghaziabad Ghaziabad Uttar Hindon Air Base, 4.3 km, West IGI Airport is at 34 km South 11. Nearest town, city, district Ghaziabad Headquarters along with distance in Km 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body Ghaziabad (complete postal address with telephone nos. to be given) 13. Name of the applicant Annika Promoters Private Limited , Akashdeep Building, 26A, Barakhamba Registered Address, Road, New Delhi

7 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM Address for correspondence: Name 901, Akashdeep Building, 26A, Barakhamba Road, New Delhi Mr. Nirmal Jain Designation (Owner/Partner/CEO) Managing Director Address 901, Akashdeep Building, 26A, Barakhamba Road, New Delhi Pin Code info@mccdevelopers.in Telephone Fax. NA 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. t applicable, project land is in residential area as per master plan of Ghaziabad 17. Interlinked Projects t Applicable 18. Whether separate application of t Applicable interlinked project has been submitted? 19. If yes, date of submission t Applicable 20. If no, reason. t Applicable 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a)the forest (Conservation) Act, 1980? (b)the wildlife (Protection) Act, 1972? (c) The C.R.Z. tification, 1991? 22. Whether there is any Government order/policy relevant/ relating to the site? 23. Forest land involved (hectares) 24. Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case. (c) Orders/directions of the Court, if any and its relevance with the proposed project., Project proposal does not involve approval/clearance under subhead a, b & c 2

8 (I) Activity Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) SN Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data Proposed development is as per local plan developed by Ghaziabad Development Authority. Development will be done according to sanctioned building plan. clearance of existing land and vegetation & buildings is required as the land was free from any vegetation. 1.3 Creation of new land uses?. There will be no creation of new land use. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical Soil investigation has been carried out. 1.5 Construction works? Yes The major construction works are given below: Site Development Road Development Internal roads Utilities/Services Water Supply Sewerage Drainage Rain Water Harvesting Structures and Pits Power supply and back up facility, Buildings Residential commercial facility Community Hall Guard room 1.6 Demolition works? demolition activity was involved in this project. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations Yes All the construction activities including storage of raw materials will be confined to the project site only. Above ground building structures will include building of 7 towers. The earthwork was involved for foundation and basement. Excavated soil will be used for site leveling, back 3

9 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation 1.9 Underground works including mining or tunneling? Yes/ Yes Details thereof (with approximate quantities / rates, wherever possible) with source of information data filling/filling in raft and road construction. Top layer of soil is stored and will be used for landscaping/horticulture development work. Underground works includes excavation of earth and construction of foundation & basement for parking 1.10 Reclamation works? t involved Dredging? t involved Offshore structures? t involved Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid or liquid effluents? Yes Yes This is a group housing project. Hence no production or manufacturing activities will be involved. Temporary facilities will be developed during construction phase for storage of construction materials. During operation phase facility for storage of HSD will be constructed at a specified place within the premises. Solid Waste Construction Stage : The construction stage solid waste will comprise mainly of construction waste. The construction debris generated will be reused within the site for various construction works. In addition to that there will be generation of small quantity of municipal waste from 45 floating construction labors. It will be ensured that the generated waste will be sent to nearest designated waste storage bins. Operation Stage: Solid waste generation from the facility will be approximately 1.70 TPD including 1.02 TPD biodegradable wastes. Solid waste generated from different apartments and other areas will be collected daily on door to door basis by the dedicated and trained housekeeping staff. Twin bin systems will also be provided for collection of waste segregated at sources. Recyclable wastes will be sold to authorized vendors and non- recyclable wastes will 4

10 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data be disposed through authorized agency to municipal waste disposal site. Biodegradable (including horticulture) shall be treated in OWC installed at site. Sewage sludge 193 Kg/day of sewage sludge will be generated which will be use as manure for plants and surplus manure will be sold to the farmers. Hazardous waste: 2.82 liters/day of waste oil from DG sets will be generated this will be sold to authorized recyclers. E Waste : Approx kg/day e-waste will be generated from the project this will be stored at a designated place within site and will be handed over to authorized recyclers. Liquid Effluent Construction Stage: During the construction stage 3.05 KLD domestic liquid effluent generations will be limited to small quantity from labor camp proposed at site. Wastewater generated from construction site contains suspended materials, and washings from various areas. Construction wastewater shall be collected in a separate basin and shall be reused after primary treatment for sprinkling on roads. Mobile toilets and potable water facilities will be provided at site during construction phase for labour and staff. Operation Stage: Approximately 246 KLD of waste water will be generated from the proposed facility. This effluent will be treated in Sewage Treatment Plant of 295 KLD capacities within the site. The treated water from STP will be reused for flushing, and maintenance activities. Surplus treated water will be discharged in municipal drain with prior permission. 5

11 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation 1.16 Facilities for long term housing of operational workers? Yes/ Yes Details thereof (with approximate quantities / rates, wherever possible) with source of information data Cabin for watchman provided New road, rail or sea traffic t applicable during construction or operation? 1.18 New road, rail, air waterborne t applicable or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing t applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? t applicable 1.21 Impoundment, damming, culverting, realignment or t applicable. other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? t applicable 1.23 Abstraction or transfers of water form ground or surface waters? There is no extraction or transfers of ground water for the project For construction: Water is being sourced through Tanker supplies/ Taken from the nearest STP. After treatment water quality is checked for fitness for the construction purpose before use Changes in water bodies or the land surface affecting drainage or run-off. Yes By considering run off prior to development & run off after development there is some increment in storm water runoff. However runoff generated from the project site during monsoon season will be recharged to ground water aquifer. Network of drainage system developed in the site will be used to collect roof as well as surface runoff Transport of personnel or materials for construction, operation or decommissioning. Yes During construction phase transport of personnel as well as construction materials would be required. The personnel would preferably be engaged from nearby areas. Precaution will be taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak 6

12 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data hours. During the operation phase sufficient parking spaces will be provided in basements Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? t applicable t applicable 1.28 Influx of people to an area in either temporarily or permanently? Yes Construction phase Temporary influx of about 30 labors (floating) from the nearby areas is expected. Introduction of alien species? t applicable 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? ne Operation phase 3120 persons residential in complex floating. t applicable 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): SN Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: Yes/ Yes Yes Details thereof (with approximate quantities / rates, wherever possible) with source of information data The proposed project site and its surrounding areas have been designated for residential development. Water requirement during construction phase is being met by tanker supply by authorized supplier or treated waste water supply from nearest STP. During operation phase fresh water demand will be met from Ghaziabad Nagar Nigam. Treated water demand for flushing and gardening shall be met from treated water from STP installed at Site. 95 KLD treated water will be reused within site premises. 7

13 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data 2.3 Minerals (MT) t applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Yes Yes Construction materials such as Cement, Steel, Bricks, Stone aggregates, and Sand would be required for the project. These will be procured from reputed licensed local vendors. Limited use of timber will be done and it will be restricted to selected locations. Power for the proposed project will be supplied by Uttar Power Corporation Ltd. Maximum power Demand for the proposed project is 2300 KW. DG sets of 2000 KVA (2X X 1000) will be used as power backup during grid failure. HSD (low sulphur variety as per availability) fuel will be used for DG sets. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. SN Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data This is a Group Housing Project and no storage of hazardous chemicals (as per MSIHC rules) will be made, apart from limited quantity of HSD storage (for DG sets). Suitable drainage and waste management measures will be adopted to restrict stagnation of water & accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. t Applicable. 3.4 Vulnerable groups of people t applicable. 8

14 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes t applicable 4. Production of solid wastes during construction or operation or decommissioning (MT/month) SN Information/Checklist confirmation 4.1 Spoil, overburden or mine wastes 4.2 Municipal wastes (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) 4.4 Other industrial process wastes Yes/ Yes Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Excavated top soil was properly stacked it will be reused as top layer for horticulture development. Remaining soil will be used for site leveling, back filling/filling in raft and road construction. Construction Phase: Municipal solid waste 4.5 kg/day (from floating labour) Operation Phase: Municipal solid wastes 1.70 TPD The solid waste includes paper, card board, plastic cans etc. and kitchen wastes from houses. Recyclable wastes like card boards and plastic cans will be sold to authorized vendors. Biodegradable waste will be treated in onsite OWC. Waste oil 2.82 Lts on daily basis from DG sets will be the only hazardous waste generated from the project. This waste oil will be carefully stored in HDPE drums in isolated covered space and sold to recycler authorized by CPCB/SPCB. Suitable care will be taken to prevent spills/ leaks of used oil from storage. t applicable 4.5 Surplus product t applicable 4.6 Sewage sludge or other sludge from effluent treatment 4.7 Construction or demolition wastes Yes Yes Dried sludge from the STP will be used as manure for horticulture development. Surplus manure will be sold to farmers. Demolition work was not involved. Construction Waste: Excavated soil will be used for back filling. Other construction waste 9

15 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data like bricks, concrete etc will be used in sundry/roadwork/manholes etc. Gunny bags, cardboards will be sent to authorize recycler. The unused waste will be sent to land fill site through authorized vender. t applicable t applicable 4.10 Agricultural wastes t applicable 4.11 Other solid wastes t applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) SN Information/Checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Emission will be from Stationary Sources: DG sets 2000 (2X X1000) KVA Mobile Sources: Vehicular emissions CPCB approved DG sets with acoustic canopy will be used only during power failure. 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport t applicable Fugitive dust emission due to transportation & handling -loading - unloading activities was envisaged during construction. Frequent water sprinkling will be done to minimize the fugitive emissions. 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Yes 10 During the construction phase, major emission will be in the form of fugitive dust, use of DG sets and transportation of construction material. The project may cause rise in dust levels during construction phase. Precautions would be taken to reduce dust generation during construction phase: Use of RMC to reduce material handling & dust generation. Tarpaulins will be used to cover trucks carrying debris.

16 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data Water sprinkling will be practiced at regular intervals to reduce dust emissions. Dust generated during operation stage shall be minimal due to vegetated & hard surface. Sewage generated from proposed project will be treated in onsite STP. 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources t applicable Burning of any substances including biomass, slash materials and/ or construction debris will be prohibited Nil 6. Generation of ise and Vibration, and Emissions of Light and Heat: SN Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data ise is expected to be generated during construction phase mainly from operation of heavy machinery, DG sets, and traffic. The indicated noise levels from certain construction plants/equipment are indicated below: Concrete Mixer - 85 dba Generator - 75 dba Pumps dba Trucks dba For control of noise following measures shall be adopted: Properly maintained equipment with mufflers will be used. High noise generating construction activities would be carried out only during day time. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. 11

17 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data During operation noise from operation of DG sets is envisaged. However, the generator sets installed will operate at noise level less than 75 db (A) as the generators will be placed either in acoustic chambers or a canopy as per CPCB norms. 6.2 From industrial or similar processes 6.3 From construction or demolition Yes t applicable ise Pollution Control: ise pollution will be due to operation of machinery DG set & transportation vehicles during construction stage & operation of DG set & vehicular movements during operation phase. As there is negligible habitation in nearby area impact will be insignificant. However following precautions shall be taken to control noise pollution : High noise generating construction activities would be carried out only during day time. Installation, use and maintenance of mufflers on equipment. Workers working near high noise construction Machinery would be supplied with ear muffs/ear plugs. 6.4 From blasting or piling t involved in the project. 6.5 From construction or operational traffic 6.6 From lighting or cooling systems Yes Yes Construction Phase: Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase: The vehicular parking will be restricted only in the planned parking area, which would help in reducing noise pollution generally created due to traffic congestion. Adequate peripheral tree plantation & soft vegetation will also help in surface reduction of the noise level and improve air quality. Residents may use unit ACs which reject heat. 12

18 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data 6.7 From any other sources Nil 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: SN Information/Checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data The waste oil generated during operation phase from the DG sets will be collected and separately stored in HDPE drums over concrete floor within the premises before final disposal. All precautionary steps will be taken to avoid spillage It will be directly transferred to authorized recyclers. Generated Sewage from the campus will be treated in the STP proposed onsite, and recycled within the proposed project facility for gardening and D.G. cooling Surplus treated water will be discharged in public sewer with permission of competent authority. Dust generation during construction phase from earthworks and movement of vehicles was a temporary phenomenon and will have short term impact during construction phase. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG exhaust will be discharged at height stipulated by CPCB. Height of stack will be 6 mt above the terrace of tallest tower. 7.4 From any other sources Nil 7.5 Is there a risk of long term build up of pollutants in the environment from these sources?. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment 13

19 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes/ 8.2 From any other causes Nil Details thereof (with approximate quantities/rates, wherever possible) with source of information data During construction phase, no such risk was anticipated. However, the contractors shall comply with the safety procedures, norms and guidelines as applicable) mentioned in the National Building Code of India and Bureau of Indian Standards. During Operation Phase, all precautionary and safety measures will be taken to minimize any accident hazard. 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)? Yes The site lies in Seismic Zone IV. The construction will be carried out as per the guidelines prescribed for Seismic Zone IV in NBC All the civil structures will be seismically resistant and designed as per following IS codes: IS 4326: 1993 IS 1893 (Part I),2002 Site & surrounding is flat hence Flooding & landslide respectively are not involved in project. Event of cloudburst not recorded. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality SN Information/Checklist confirmation 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project, which could have impact on the environment e.g. Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Yes/ Yes Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data The Group housing project will be equipped with dedicated internal road, parking, internal water distribution system, fire fighting system, internal sewage collection & treatment facility, lighting facilities, solar lighting, and power backup facility & solid waste collection & treatment facility. This is a planned development hence social as well as physical infrastructure like roads, power, waste has already been considered by planning department of GDA and waste water will be treated onsite will have negligible discharge and impacts on environment. extractive industries Yes Increase demand for minerals, metals & transport fuel. 14

20 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1 SN Information/Checklist confirmation Yes/ supply industries Yes Construction materials other 9.2 Lead to after-use of the site, which could have an impact on the environment Details thereof (with approximate quantities/rates, wherever possible) with source of information data 9.3 Set a precedent for later developments Yes This is residential project there will be generation of employment during construction & operation phase. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Impacts on water availability, availability of electricity, traffic congestion etc. (II) Environmental Sensitivity SN Areas Name/ Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value Aerial distance (within 15 km) of proposed project location boundary Okhla Bird Sanctuary, 19 KM/SW 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Yes Hindon River: 2.2 km, West Does not fall within 15 Km radius. 4 Inland, coastal, marine or underground waters 15 t located within 15 km of the proposed project location. 5 State, National boundaries Yes UP- Delhi border is at 9.0 Km, West from the project site. 6 Routes or facilities used by the public for access to The site does not fall under any route to any pilgrim, tourist or recreational area.

21 Expansion 0fGroup Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana. Loni, Tah & Dist chaziabad, Uthr SN Areas Name/ recreation or other tourist, ldentity pilgrim areas Aerial distance (within 15 km) of proposed proiecl location boundary 7 Defense installations l." I Densely populated or bullf up area Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, torestty, agriculture, fisheries, tourism, minerals). 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards areexceeded) Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, f looding or exlreme or adverse climatic conditions) Yes Yes Yes Hindon Air base 4.3 km, West Density ot surrounding development is as per master olan. Manmade community facilities such as, schools, places of worship are planned but are not close to the site. These installations will not have any impact due to construction of proposed project. The project site falls in the notified areas for control and regulation of ground water. The ground water will be extracted by prior permission from competent authority. thing specific The project is located at seismic zone lv according to Indian Standard Seismic Zoning Map. Structural design will be done for this seismic zone as oer code. There are no possibilities of the proposed project site getting flooded as per available records. Landslides not applicable as the proiect site & ryilounding land is flat. "l hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stige, the proiect will be rejected and clearance give, if any to the project will be revoked at our risk and cost." Date: Place: Signature of thlproponent withrf{arfr e and Full Address ffhatpajnt-18teta/71 16

22 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM-1 A FORM 1A 1. LAND ENVIRONMENT 1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use, if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. The proposed project site is located at Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad. Uttar. The Land use of Project site is residential which is in conformity with plan of Ghaziabad Development Authority. The following maps are attached. (i) (ii) (iii) 500 M Radius Map with location of site. 10 M Radius Map Layout (Conceptual) plan. 1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc. S.. The proposed project is expansion of group housing. The, Brief description of the proposed project is given below in Table-1: SUMMARY Description Table-1: Brief description of the Project Post Revision Quantity GENERAL 1 Plot Area SQM 2 Area Still to be Acquired SQM 3 Net Plot Area SQM 4 Proposed Built Up Area SQM 5 Number of Building Blocks 7 NOS 6 Total no of Saleable DU's 624 NOS 7 Max Height of Building M 8 Max of Floors (Residential Tower) G+19 NOS 9 Cost of Project CR 10 Expected Population (3120 Residential +824 Floating) 3944 PERSONS 11 Permissible Ground Coverage Area (40%) 5436 SQM 12 Proposed Ground Coverage Area ( 25.08%) 3409 SQM 13 Permissible FAR Area ( ) + 5% on SQM 14 Proposed FAR Area SQM 15 Total Basement Area SQM 16 Other n FAR, & Service areas SQM 17 Proposed Built Up Area SQM Unit 17

23 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A WATER 18 Total Water Requirement KLD 19 Fresh water requirement (68.86% of total water req) KLD 20 Waste water Generation KLD 21 Proposed STP Capacity 295 KLD 22 Treated Water Available for Reuse KLD 23 Recycled Water (31.14% of total water requirement) KLD 24 Surplus treated water KLD RAIN WATER HARVESTING 25 Rain Water Harvesting Potential CUM 26 of RWH of Pits Proposed 4 NOS PARKING 27 Total Parking Required as / Building Bye Laws 772 ECS 28 Proposed Total Parking 775 ECS 29 Proposed Parking on Surface 96 ECS 30 Proposed Parking in Stilt Nil ECS 31 Basement Parking 679 ECS GREEN AREAS 32 Required Green Area (10% of Net Plot Area) SQM 33 Proposed Green Area (10.17% of Net Plot Area) SQM WASTE GENERATION 34 Municipal Solid Waste Generation 1.70 TPD 35 Quantity of E-Waste Generation- Kg/Day 11 KG/DAY 36 Quantity of Hazardous waste Generation 2.8 LTS/DAY 37 Quantity of Sludge Generated from STP KG/DAY POWER 38 Total Power Requirement 2300 KW 39 DG set backup 2000 KVA FACILITIES i Commercial 1. ii Community Hall 1. iii Nursery School What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). The project is being developed in accordance with GDA building bye laws, approved building plans and NBC norms. The development will not cause any disturbance to local ecology and surrounding establishments. Peripheral green belt will be developed. Proposed project will provide all the basic utilities such as proper drainage, sewerage treatment & water supply system, Structures to recharge ground water aquifer, green area development and sufficient parking so that it will not have negative impact on the surroundings. The proposed development will have a positive impact as the project site was vacant and is being developed for residential purposes. The project will provide organized open spaces and green areas adding to aesthetics and improvement of surrounding 18

24 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A environment. Terraces will be used for installation of solar panels to generate energy/hot water. The land use of area in the immediate surrounding is also residential. A number of residential construction project are located around the project site. 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). The proposed site was almost flat and was not prone to erosion. The proposed construction involved cutting and filling operations, construction of paved areas and development of green areas, which would reduce the chances of erosion. Excavation carried out for foundation & basement would be protected with strutting and shoring where ever required. Structural design of building will be vetted by the Govt agency nominated by local body & structural stability certificate will be submitted to local body as per rules. Soil investigation has been done. Slope Analysis: From the topographical map and survey map it was observed that the site was a flat land. Seismo-Tectonic Appraisal of the Area: Bureau of Indian Standards (BIS) has prepared a seismic zoning map of India based on tectonic features and records of past earthquakes. The project site falls under Zone-IV as per the Seismic Zoning map of India (IS 1893, Part I, 2002.) Necessary seismic factors as per codes shall be incorporated suitably while designing the structures to safeguard against earthquake risks. 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site), proposal will not involve alteration of natural drainage system. Due to this construction project there will be increase in hard area & storm water runoff rates. But with the implementation of proposed RWH scheme, the runoff rate will be less than the preconstruction runoff rate. 1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) During construction phase, excavation was envisaged in order to provide foundations and basement construction. The excavated top soil will be stored & preserved separately for reusing the same for landscaping, and remaining soil will be properly stored at site under cover and will be reused for backfilling purpose, road construction etc. There will be no requirement to bring materials for filling from outside. 1.7 Give details regarding water supply, waste handling etc. during the construction period. Water Supply: During construction stage, Tanker water supply or Treated waste water from the nearest STP will be taken for construction works. This water will be treated at site in 19

25 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A STP and brought to the standards that the quality of water is fit for construction work as per standards specified in relevant IS Code. Waste Generation and Handling: Excavated soil is stored and covered at site and it will be reused for site leveling, back filling/filling in raft and road construction. The fertile top soil will be reused for landscaping purpose. Construction waste generated at site will be reused in road construction, recyclable waste shall be disposed off through authorized vendor and unused waste shall be sent to approved dumping/land fill site through authorized agency. Spillage of oil from the machinery will be properly collected in drums and disposed off. For construction laborers, proper sanitary facilities, wash areas, Potable water will be provided and good hygienic conditions will be maintained. 1.8 Will the low lying areas and wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity), there is no low lying area observed within and in the vicinity of the project site. 1.9 Whether construction debris and waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal) The waste generated during construction phase can broadly be classified as construction waste and domestic waste MT of construction waste (Calculated using TIFAC (Technology Information, Forecasting, and Assessment Council 40 Kg / sq m) and domestic waste would be generated from construction labours. Construction waste generated will be used on the site as filler material for as internal roads and pavements. Remaining construction waste if any will be sent to an approved dumping site/landfill site. The waste generated will be collected and disposed of through an authorized agency. Approx. 30 labors (floating) per day will be employed during the construction period. Required sanitary facilities will be provided to Construction laborers through mobile toilets. Wash areas will be constructed and good hygienic conditions will be maintained for labour camp. 2. WATER ENVIRONMENT 2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement. Total water requirement for this project is 305 KLD out of which approx.95 KLD treated waste water from STP will be reused. The fresh water demand of 210 KLD will be obtained from Ghaziabad Nagar Nigam. Breakup of water requirements for various uses is given below. Efficient dual plumbing system will be provided to achieve conservation of fresh water. Details of water requirement are given in Table 2 below: 20

26 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A Table 2: Total Water Requirement Details of the Project SN Particulars Water Demand (KLD) 1 Total Water Demand Fresh Water Requirement Total Waste water Generation Total treated waste water Treated water Recycled 95 Flushing 79 DG Cooling 11 6 STP Proposed 295 Water requirement for street wash, D.G. cooling and flushing purpose will be fulfilled by recycling the treated waste water from onsite STP; it will help in conservation of fresh. Water Balance Diagram is given below. Residential Fresh: 203KLD Waste Water : 162 KLD Total Water Demand of project : 305 KLD Residential Flushing: 65 KLD n Residential (Working) Fresh : 4 KLD n Residential (Working) Flushing: 8 KLD Waste Water : 65 KLD Waste Water : 3 KLD Waste Water : 8 KLD Total Waste water : 246 KLD Total Fresh Water Demand: 210 KLD Treated water reuse: 95 KLD Visitors Fresh: 3 KLD Visitors Flushing: 6 KLD Waste Water : 2 KLD Waste Water : 6 KLD Proposed STP : 295 KLD D.G Cooling : 11 KLD Treated Water : 197 KLD Gardening: 5 KLD Recycled Treated Waste water : 95 KLD Surplus treated water : 102 KLD to be used for nearby construction site/discharge to sewer with prior permission 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? The source of fresh water supply shall be Ghaziabad Nagar Nigam. 210 KLD will be sourced at the starting operation of project. After treatment of waste water and recycling of waste water, 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 21

27 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A During operation phase, fresh water will be sourced from water supply department of Ghaziabad Nagar Nigam. The quality of water would confirm to the desirable drinking water standards as per IS: How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) Approx 95 KLD of treated waste water from onsite STP will be used to meet 100% water required for flushing and D.G. cooling. 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) Fresh water confirming to the drinking water standard will be supplied by water supply department of Ghaziabad Nagar Nigam. Therefore, no diversion of water from other user is expected and no impact on the existing users is anticipated. 2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity) As estimated, 246 KLD of waste water will be generated from the project which will be treated onsite STP. Approx. 95 KLD of treated wastewater will be used for flushing and D.G. cooling. 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. It is proposed to provide Rain Water Harvesting structures as per details given to recharge rain water to ground water aquifer. The rain water collected from the roof top, green area and other paved area will be collected through the network of storm water drainage lines & conveyed to RWH system. RWH system shall consist of de-silting cum filter chamber, oil and grease separator and pits are designed to store 15 minutes peak hour rainfall, for recharge into ground aquifer& to prevent flooding in the complex. 2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? Due to construction of the project on vacant land there would be change in the runoff characteristics quantitative and qualitative as well The quantitative change: Runoff coefficient from the project site prior to development of project = 0.2 Runoff coefficient from the project site after development of project = 0.57 (Considering different coefficients for paved area, soft area, terrace etc) Hence incremental runoff = = 0.37 Qualitative change: 22

28 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A Runoff form parking areas may contain spilled oil- Provision of oil & grease separator made to separate it before recharge. Storm water drainage & Rain water harvesting system as described in item no: 2.7 above meet quantitative, qualitative & over flooding/water logging requirements. 2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) There will be no tapping of ground water. This will be strictly prohibited during construction and operation phase of the project. It is proposed to provide 4 nos RWH pits to recharge ground water aquifers What precautions/measures are taken to prevent the run-off from construction activities polluting land and aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts) The major underground construction activity will not be taken during monsoon period. During the construction stage construction water will be channelized to sedimentation basin with silt trap. The water will be reused after testing for construction. Requirement of water for construction purposes will be 24 KLD and the runoff is not likely to be more than 2 KLD. This will be filtered and reused for sprinkling How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) There will be a network of storm water drainage lines to collect runoffs, which will be channelized to rain water harvesting system. Water so collected will pass through desilting-cum-filter chamber, oil and grease separators.rwh pits are designed to store 15 minutes peak hour rainfall, for recharge into ground aquifer & to prevent flooding in the complex Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) Provision for 30 labors (floating) with provision of mobile toilets is planned at the site. Proper maintenance of the area and facility would be done regularly to maintain hygienic condition. Estimated generation of waste water from labour is 3.05 KLD. Spent/ used oil generation from DG set is estimated to be 2.8 lts/day, this will be stored in HDPE drums and sold to authorized vendors What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology and facilities for recycling and disposal) During operation phase, the estimated quantity of sewage generation from project is 246 KLD, Generated Sewage would be collected and treated upto tertiary level in STP of 295 KLD capacity installed at the site. MBBR technology is proposed for the treatment of sewage.the treated water will be recycled and used for toilet flushing, DG cooling etc. 23

29 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A Surplus treated water will be discharged in to municipal sewer with permission of competent authority/ used for nearby construction area Give details of dual plumbing system if treated waste water is used for flushing of toilets or any other use. Estimated generation of treated water from onsite STP is 197 KLD out of which 79 KLD water will be used for Flushing, and 11 KLD for DG cooling surplus 102 KLD of treated water shall be discharged into public sewer after permission of competent authority/used for nearby construction area. 3. VEGETATION 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any), there is no threat to biodiversity. 3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) The project site was without any vegetation & trees. Hence tree cutting was not involved. Project construction activities will be restricted to the project site only. 3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) Proposed project has dedicated (10.17%) sq m green area. Landscape development plan prepared for the project includes peripheral & avenue plantation with local species, ornamental as well as large and dense foliage plants especially on the periphery. Green area also includes ground cover, lawns at selected locations and shrubs for shade and reduction of Air and ise pollution. Trees and plant species for plantation in the project will be selected from the list given below. Table 3: List of Plant Species that are likely to be plant SN Botanical Name Common Name 1 Alstonia Scholaris Scholar tree 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Ficus Infectoria Pakur 8 Thespesia populnea Paras Pipal 9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 24

30 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 19 Pilkhan Ficus 4. FAUNA 4.1 Is there likely to be any displacement of fauna-both terrestrial and aquatic or creation of barriers for their movement? Provide the details. threatened, rare, endangered or endemic faunal species were observed during the survey. displacement of fauna is envisaged due to this project. This site is not a natural host to any sensitive creature. Therefore, no animal habitat is likely to be effected due to construction of the proposed building. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details. direct or indirect impact on the fauna of the area is envisaged. However after commissioning of the project better environmental condition may provide better habitat to the avifauna of the area. 4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna. t applicable for this project. 5. AIR ENVIRONMENT 5.1 Will the project increase atmospheric concentration of gases and result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) Proposed development will increase hard areas (Terrace, Roads, Paths and parking area). The traffic volume due to proposed project will increase marginally. Heat island effect will be negligible due to shading of hard surfaces by proposed plantation along periphery of the plot, roads and paths. Construction Phase The important activities during the construction phase that produce particulate matter and affect the air quality are material storage, transportation and handling of excavated earth and construction materials like cement, sand and aggregates. Gaseous pollutants like SO 2, NO x, CO emitted from the various machineries and vehicles used in construction activities. Appropriate mitigation measure will be employed during this stage of the project to reduce the pollution level to the acceptable limit. 25

31 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A Operational Phase During this stage, there will be no major impact on air environment. Low sulphur diesel for DG Set will be used as a fuel which will causes air pollution. But APMC will minimize the pollution load into environment. 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. During construction phase, Dust, Particulate Matter is the main pollutant, which may be generated during construction activities. Other emission sources are intermittent and include emissions of SO 2, NO x and CO from materials transport of heavy vehicles on site etc. Proper upkeep and maintenance of vehicles, sprinkling of water on roads and construction site are some of the measures that would reduce the impact during construction phase. Sources of Air pollution during operational phase The gaseous emission from vehicles. Emissions from DG set while in operation only during power failure. Mitigation measures: The traffic congestion will be avoided by proper parking arrangement and maintaining smooth traffic flow. Regular PUC check up for vehicles. CPCB approved DG sets only will be used. Regular maintenance of DG sets shall be done & low sulphur diesel shall be used. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site., well organized parking arrangement has been designed for the project. Separate Entry & exit is planned to avoid cognation congestion at these point. 5.4 Provide details of the movement patterns with internal roads, bicycle tracks, Pedestrian pathways, footpaths etc with area under each category. The site is approached through existing 33 m wide road. There is a provision of road network for internal traffic movement on the project site. The detail of the road system had been clearly demarcated in the layout plan. 5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. The source of noise is mainly vehicular noise. Well organized parking arrangement is designed to maintain smooth traffic flow which would help in reducing traffic congestion and noise levels. Maximum parking has been planned in the basement to minimize noise level and traffic on surface. Trees planned along road & periphery would act as noise barrier and will reduce the noise level. 26

32 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details. D.G. Sets will be operated only in case of power failures during construction and operational phase. The Pollutants like SPM, SO 2 that may arise from emissions from D.G. sets will be discharged through vent of proper height. D.G. sets will be installed with inbuilt acoustic enclosures to reduce the noise of D.G. sets while in construction or operation. Plantation of trees would act as noise barrier and will reduce noise level. DG sets with a capacity of 2000 (2X500+1X1000) KVA have been proposed during operation phase as power backup during power failure. 6. AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?, the use of proposed site is in conformity with the planned land use. There is no scenic amenity or landscape in its surrounding. Site photographs are attached. 6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? There are no existing structures in the immediate vicinity of the site. However the design development of the project was done on the basis of development control norms and as per approved master plan of the local body the construction of the proposed project will not have any adverse impact on the structures to be developed in future. 6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. There are no mandatory guidelines issued by local body for development of urban form; however architect and landscape have designed the project keeping in mind principles of urban design & urban form and setting in over all contexts. 6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered., anthropological or archeological sites of significance do not exist in the vicinity of the project site. However measures will be taken to reduce the impact on air and noise pollution during construction and operation phase. 7. SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. Total population of district Ghaziabad is 46,81,645 as per census data The male and female population of the district is 24,88,834 and 21,92,811 respectively. The sex ratio of 27

33 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A the district is 1000:880. The overall literacy rate of district Gautam Buddha Nagar is 67%, in which, male literacy rate is 72.7% and female literacy rate is 60%. Since, this is a group housing project, major impact on present demography of the district, is not anticipated. 7.2 Give details of the existing social infrastructure around the proposed project. The proposed project site is located at Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar, Site is easily accessible through public transport such as buses, Auto, Taxis etc, Apart from this number of Hospitals/Clinics, and facilities like post office, schools, shopping are also located at convenient distance from the site. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? There is no habitation, sacred sites in the vicinity of the project site. Hence no disturbance is envisaged. 8. BUILDING MATERIALS 8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) ISI marked building materials of reputed brands to be procured from 400 km range as far as possible. Preference will be given to locally available building materials which conserve low energy in entire processes of manufacture. Use of alternative technologies for each component of the buildings of envelope, superstructure, finishes and the road and surrounding areas will be as per guidelines provided in NBC 2005 Some of them are given below: Building material with low embodied energy will be given preference. Ready mix concrete with fly ash 15 to 20%. Some of the alternate materials for openings in construction are:- Use of rapidly renewable timber for doors where ever wooden doors are proposed. Use of steel manufactured from recycled content of smaller diameter. Saw dust based particle board for panels. Use Ceramic tile in flooring. The use of the above alternative building materials will help reduce the use of non renewable resources. 8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? Detail construction management plan shall be prepared by the construction management Team showing location of storage of different building materials in the go down Covered places and in open yards, Location of various machineries required for Construction, location of DG sets to be used for construction in case of power failure Construction waste collection and disposal point. These locations shall be decided with consideration to reduce air, noise and soil pollution and nuisance to the public. 28

34 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? Locally available recycled materials would be given preference. However, bricks made from the fly-ash will be used for construction of pavements, side walls, boundaries for parks etc. Readymade concrete (RMC) will be used in construction. This will result in significant saving. 8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. As estimated, approx TPD solid wastes will be generated from the project. Out of which, approx TPD waste will be of bio-degradable in nature. Waste will be collected door to door. Dry & wet garbage will be managed separately. Waste Management during operation phase: Municipal Solid Waste Sweepers will be engaged for door to door collection and handling municipal waste. Location for bin/container at common places would be identified for collection of waste. Adequate number of collection bins separately for biodegradable and non-biodegradable waste shall be provided as per the Municipal Solid Waste (Management and Handling) Rule, Wastes from such bins shall be collected on daily basis and biodegradable waste shall be handed over to authorized agency for treatment and disposal as per MSW n biodegradable waste shall be segregated into recyclable & inert waste. Recyclable waste like glass, Card Board, Paper Waste shall be sold to authorized recycler. Remaining inert waste shall be sent to landfill site through authorized vendor. All waste collection bins shall be properly maintained on regular basis. Arrangement will be made with local civic authority, for providing garbage station or transfer point (preferably near the entry/ exit point of the site), for collection and disposal of inert waste. It will be assured that there is no spillage of waste along the internal roads during collection of wastes. The garbage storage/transfer point will be covered and cleaned every day to as to avoid any nuisance, vectors and unhygienic conditions. Biodegradable waste comprises of fallen leaves and other vegetative material which shall be collected and treated shall be handed over to authorized agency for treatment and disposal as per MSW ENERGY CONSERVATION 9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption? Power will be sourced from Uttar Power Corporation Ltd.: The Maximum Power demand for the project is estimated to be as around 2300 KW. The power shall be supplied by Uttar Power Corporation Ltd. DG sets of 29

35 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A Capacity: 2X X1000 KVA are proposed to meet requirement of power back up during power failure. Energy Conservation Measures & Management Plan: During operation phase, appropriate energy conservation measures & management plan will be adopted in order to minimize the consumptions of conventional energy. The following measures are suggested to be adopted. Details of energy saving measure: o Incorporate solar passive techniques in a building design to minimize load on conventional systems. o Day light provision to all habitable room. o Use of high frequency, high power factor, electronic ballasts in place of conventional copper-iron ballasts in light fixture. o Use energy efficient light fixtures with good photometric properties. o Use LED in external lighting bollards, and in areas such as staircases, corridors & lift lobbies, where lights burn on 24 hrs. basis. o Putting external lighting control on time switch/time control. o Using time switch control/time control for common area & basements lighting. o Using high efficiency motors EF1 for pumps & ventilation fans. o Use of local building material (400 Km range) to reduce pollution & transportation energy. o Use of Fly Ash in RMC What type of, and capacity of, power back-up do you plan to provide? I) Type: Diesel Generator Set II) Capacity: 2X X1000 KVA 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? Suitable single glass of appropriate thickness depending on glass panel size and keeping in mind U values and SHGC recommended in ECBC norms will be selected. 9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. Passive solar technique:- Passive solar architectural feature- Optimizing building envelope & window design to reduce cooling demand (selection of energy efficient low U value materials for envelop is application of high reflecting white china mosaic tiles to terraces). Day light integrated to reduce artificial lighting demand. Shading devices provide shade to windows & external façade. Planned buffer spaces, like balconies, cupboards on external façade of building - to reduce heat gain & there by cooling load. Adopting low energy passive cooling strategies: Landscaping to alter micro climate for better condition Large green areas, peripheral plantation and avenue plantation provided to shed the hard areas & reduce heat island effect, reduction of noise & air pollution & provide buffer to sun heat. 30

36 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. Yes, the layout of streets & buildings have been designed to maximize the potential for solar energy devices. Further, solar energy will also be used for common area lighting, 9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? It is proposed to reduce cooling/ heating load through careful selection of plantationplanting deciduous trees on south side and evergreen trees on east and west side. Passive solar architectural measures have been adopted to provide shades to windows and roof which would effectively reduce heating of building envelope. Sunshades, balconies & buffer space designed on external façade will protect external façade from heat gain & reduce heat gain/energy consumption. 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. Building is not centrally air conditioned. However energy efficient (low U Value) materials shall be used. Conventional GSL/ florescent lamps have been replaced with energy efficient LED lamps. This reduces lighting power density or higher power factor shall be maintained This will reduce electrical power distribution losses in the installation. Pumps & Motors: shall be of BEE 4 star rating. Elevators shall be operated with intelligent group control. Chillers are not used as building is not centrally air-conditioned. All cables shall be de-rated to avoid heating during use. This also indirectly reduces losses and improves reliability. 9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? The proposed project will increase hard surfaces like building, terraces, roads, pavement. This increase ambient air temperature and heat island effect. If not properly taken care off. To reduce heat island effect the ground coverage is deliberately kept minimum to increase green area. Peripheral and avenue plantation, grass pavers lawns and water bodies planned in the proposed project will shade hard surfaces reduce heat gain and formation of Heat island effect. Hence alteration in microclimate with this measure will be negligible. 9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components. This is multi storied group housing project with RCC framed structure. Energy efficient materials for building envelope & heat reflecting terrace surfaces shall be provided to 31

37 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A reduce heat gain and cooling load What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. The project is approved by fire department. Adequate measures have been taken as per local fire norms and National Building Code 2005 to provide fire protection. Proposed measures include building structure designed for appropriate fire rating, provision of Fire detection & alarm and rescue system,provision of infrastructure required by Fire Service Department to suppress the fire, Provision of fire suppression system All these provisions shall be appropriate to the classification and use of the building as per National Building Code If you are using glass as wall material provides details and specifications including emissive and thermal characteristics. t applicable, as this is group housing project without any glass wall What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration. This is not centrally air conditioned building project, this is residential project which rely more on natural ventilation. However during extreme weather (Summer/Winter) it is essential to have control on air filtration. With use of modern building Materials & technology it is possible to make air tight construction and control air infiltration rate. Application of sealants/weather-strips proposed shall take care of this aspect. Air infiltration rate is controlled within the limit prescribed in ECBC norms, for main Entrance door it is less than 5 l/s-m2 and for other fenestration it is less than 2l/s-m To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. n conventional (Solar) energy will be used to reduce burden on conventional energy. In addition to this following technologies would be used to conserve energy Electric meter with timer Replacement of high energy consuming incandescent lights with LED lamps. Shading devices and other passive solar technique. 10. Environment Management Plan The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. 32

38 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A Table4: Environment Management Plan SN Potential Impact Action I. Construction Phase 1. Air Emission 2. ise All equipments will be operated within specified design parameters. Vehicle trips to be minimized to the extent possible Any dry, dusty materials stored in sealed containers or prevented from blowing. Compaction of soil during various construction activities Ambient air quality within the premises of the proposed unit to be monitored. List of all onsite noise generating machinery with age to be prepared. Equipment to be maintained in good working order. Working during night to be minimized. Generation of vehicular noise Implement good working practices (equipment selection and sitting) to minimize noise and also reduce its impacts on human health (ear muffs, safe distances, and enclosures). machinery running when not required. Acoustic mufflers/enclosures to be provided in large engines ise to be monitored in ambient air within the plant premises. The ise level will not exceed the permissible limit both during day and night. All equipment operated within specified design parameters. Parameters for Monitoring Random checks of equipment logs/ manuals Timing Construction activities Vehicle logs Site clearance and construction activities Absence of stockpiles or open containers of dusty materials. Construction logs PM10, PM2.5, SO2, NO 2 and CO Equipment logs, noise reading Working hour records Maintenance records of vehicles Site working practices records, noise reading Mufflers/enclosures place. ise reading in Random checks of Equipment logs/ manuals Construction activities Construction activities As per SPCB requirement. During construction phase. Construction activities During construction phase. During construction Phase. Prior to use of equipment. As per SPCB requirement or quarterly whichever is lesser. During construction phase. 33

39 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 3. Wastewater Discharge 4. Soil Erosion Drainage and effluent Management Waste Management n-routine events accidental releases Environmental Management Cell/Unit II. Operational Phase 9. Air Emission and Vehicle trips to be minimized to the extent possible untreated discharge to be made to surface water, groundwater or soil. Waste water will be discharged to outside drainage. Take care in disposal of wastewater generated such that soil and groundwater resources are protected. Minimize area extent of site clearance, by staying within the defined boundaries Protect topsoil stockpile where possible at edge of site. Ensure drainage system and specific design measures are working effectively. The design to incorporate existing drainage pattern and avoid disturbing the same. Implement waste management plan that identifies and characterizes every waste arising associated with proposed activities and which identifies the procedures for collection, handling & disposal of each waste arising. Plan to be drawn up, considering likely emergencies and steps required to prevent/limit consequences. The Environmental Management Cell/Unit is to be set up to ensure implementation and monitoring of environmental safeguards. Stack emissions from DG set to be monitored Ambient air quality within the premises of the proposed unit to be monitored. Exhaust from vehicles Vehicle logs discharge hoses in vicinity of watercourses. Discharge norms for effluents as given by SPCB. Discharge norms for effluents as given by PCB. Site boundaries not extended / breached as per plan document. Effective cover in place. Visual inspection of drainage and records thereof Comprehensive Waste Management Plan in place and available for inspection on-site. Compliance with MSW Rules, and Hazardous Wastes (Management, Handling and Trans Boundary Movement Rules), 2008 Mock drills and records of the same A formal letter from the management indicating formation of Environment Management Cell PM, SO 2, NO 2, CO PM 10, PM 2.5, SO 2, NO 2, and CO as given by SPCB. Vehicle logs to be maintained During construction Phase. During construction phase. During construction Phase. During construction Phase. During construction Phase. During construction phase Prior to site Clearance. During construction phase During construction phase During operation phase 34

40 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 10. ise Wastewater Discharge Drainage and Effluent Management 13. Energy Usage Emergency preparedness, as fire fighting Environment Management Cell/Unit such to be minimized by use of fuel efficient vehicles and well maintained vehicles having PUC certificate. Vehicle trips to be minimized to the extent possible ise generated from operation of DG set to be optimized and monitored. DG sets are to be provided with acoustic enclosures with appropriate height of chimney above roof level or as specified by PCB Generation of vehicular noise untreated discharge to be made to surface water, groundwater or soil. Take care in disposal of wastewater generated such that soil and groundwater resources are protected Ensure drainage system and specific design measures are working effectively. Design to incorporate existing drainage pattern and avoid disturbing the same. Replacement of conventional luminaries to energy efficient luminary fittings Fire protection and safety measures to take care of fire and explosion hazards, to be assessed and steps taken for prevention. The Environment Management Cell/Unit to be set up to ensure implementation and monitoring of environmental safeguards. Vehicle logs Maintain records of vehicles Maintain records of vehicles discharge hoses in vicinity of watercourses. Discharge norms for effluents as given by SPCB Visual inspection of drainage and records thereof Luminary parameters Mock drill records, on site emergency plan, evacuation plan A formal letter from the management indicating formation of Environment Management Cell During operation Phase During operation phase. During operation phase During operation phase During operation phase During operation phase Table 5: Environment Monitoring Plan (Construction Phase) S.. Particulars Parameters Frequency 1. Ambient Air Monitoring PM 10, PM 2.5, SO 2, NO x, CO Half Yearly 35

41 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 2. Water Quality Monitoring Drinking Water Standard Half yearly 3. ise Level Monitoring 24 Hrs. ise Level Once in a month Table 6: Environment Monitoring Plan (Operation Phase) S.. Particulars Parameters Frequency 1. Ambient Air Monitoring PM 2.5, PM 10, SO2, NOx, CO Half yearly 2. Stack Emission Monitoring PM, SO 2, NO x Half yearly 3. Treated Effluent Monitoring ph, BOD, COD, O& G, Total Suspended Solids Monthly 4. ise Level Monitoring 24 Hrs. ise Level Quarterly 36

42 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 1. INTRODUCTION M/S Annika Promoters Private Limited is one of the leading real estate developers executing various projects under various stages of development and execution. They have rich experience of in the field of real estate and with their creative, innovative ideas and world class technologies; they have completed many residential complex. In continuation of the same and considering the emerging demand of residential facilities in Ghaziabad district M/s Annika Promoters Private Limited has proposed expansion of group housing, located " at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar. 2.0 PROJECT DETAILS Fig 1: Master Plan Ghaziabad The proposed project is at Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar on a total Plot area of sq m. The total built-up area is approximately sq m. The project comprises of Apartments in 7 towers G+18 Floors, and Community Facility Block. Apart from this Group Housing, project will provide following facilities for comfortable living. Parks equipped with children s play equipments, jogging & walking tracks. Adequate cross ventilation and ideal natural light in every apartment. 37

43 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A S.. Provision for lifts and comfortable staircase. Adequate Parking facility, Community facilities DG set Power back up. The Design approach shall be sensitive to environmental issues. The main thrust shall be laid on Energy conservation, safety and ease of maintenance and current technological development. The Design Philosophy is to ensure fulfillment of all functional requirements in accordance with Design Guidelines, Relevant Standards and Codes as well as local Bye laws. The salient features of the project are given in table: 1 below. Table1. Salient features of Proposed Group Housing Project SUMMARY Description Post Revision Quantity GENERAL 1 Plot Area SQM 2 Area Still to be Acquired SQM 3 Net Plot Area SQM 4 Proposed Built Up Area SQM 5 Number of Building Blocks 7 NOS 6 Total no of Saleable DU's 624 NOS 7 Max Height of Building M 8 Max of Floors (Residential Tower) G+19 NOS 9 Cost of Project CR 10 Expected Population (3120 Residential +824 Floating) 3944 PERSONS 11 Permissible Ground Coverage Area (40%) 5436 SQM 12 Proposed Ground Coverage Area ( 25.08%) 3409 SQM 13 Permissible FAR Area ( ) + 5% on SQM 14 Proposed FAR Area SQM 15 Total Basement Area SQM 16 Other n FAR, & Service areas SQM 17 Proposed Built Up Area SQM WATER 18 Total Water Requirement KLD 19 Fresh water requirement (68.86% of total water req) KLD 20 Waste water Generation KLD 21 Proposed STP Capacity 295 KLD 22 Treated Water Available for Reuse KLD 23 Recycled Water (31.14% of total water requirement) KLD 24 Surplus treated water KLD RAIN WATER HARVESTING 25 Rain Water Harvesting Potential CUM 26 of RWH of Pits Proposed 4 NOS PARKING 27 Total Parking Required as / Building Bye Laws 772 ECS Unit 38

44 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 28 Proposed Total Parking 775 ECS 29 Proposed Parking on Surface 96 ECS 30 Proposed Parking in Stilt Nil ECS 31 Basement Parking 679 ECS GREEN AREAS 32 Required Green Area (10% of Net Plot Area) SQM 33 Proposed Green Area (10.17% of Net Plot Area) SQM WASTE GENERATION 34 Municipal Solid Waste Generation 1.70 TPD 35 Quantity of E-Waste Generation- Kg/Day 11 KG/DAY 36 Quantity of Hazardous waste Generation 2.8 LTS/DAY 37 Quantity of Sludge Generated from STP KG/DAY POWER 38 Total Power Requirement 2300 KW 39 DG set backup 2000 KVA FACILITIES i Commercial 1. ii Community Hall 1. iii Nursery School CONNECTIVITY The sector roads are well connected to the major roads which are NH58, NH91 &NH 24. Almost all the surrounding areas and nearby villages are connected through network of roads. Google image showing location and connectivity of project site is as given below (Ref, fig.2) Fig 2: Project site Location on Google Image PROJECT SITE LOCATION 58 PROJECT SITE

45 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 4.0 PROJECT SURROUNDINGS The proposed expansion of Group Housing is located at at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad district in the state of Uttar. Project site is at N to E. (Source: Survey of India). The details of site surroundings are given below in Table- 2. Table-2: Site and Surrounding of the project Site S.. Particulars Details 1. Nearest National Highway NH KM East NH KM South NH KM South 2. Nearest Railway Station Ghaziabad Railway station-5.6 KM West 3. Nearest Airport IGI Airport is at 34 km South west Hindon Air Base; 4.3 km, West 4. Nearest Town/ City Ghaziabad City, 5 KM, East 5. River Body Hindon: 2.2 KM West 6. Hills/ Valleys Nil 7. Site Topography Plain 8. Archaeologically Important Site Nil 9. National Parks/ Wildlife Okhla Bird Sanctury: 19 KM/SW Sanctuaries 10 Delhi State Boundary Delhi UP border is at 9 Km, West from the project site. 11. Reserved/ Protected Forests Nil 12. Seismicity The study area falls under Seismic Zone-IV 40

46 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A PROJECT SITE Fig 3:500 M surroundings of Project site on Google Imagery 10 KM RADIUS MAP AROUND THE PROJECT SITE HINDON RIVER HINDON AIRBASE NH 58 RAILWAY TRACK PROJECT SITE DELHI UP BORDER GHAZIABAD RAILWAY STATION NOIDA DRAIN NH 24 NH 91 Fig 4 10 Km Radius Map 41

47 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 5.0 OCCUPANCY DETAILS The total population of the project will be approx persons including 3120 residents, 824 non residential. Details of population are given below in Table -3. Table -3 Population Detail POPULATION TOTAL RESIDENTIAL DU'S POP/DU POPULATION TOTAL NO. OF DU'S TOTAL 3120 NON RESIDENTIAL COMMUNITY HALL/COMMERCIAL (Employees etc. ) AREA in sqm COMMERCIAL (SHOPPING) COMMUNITY HALL NURSERY SCHOOL FACILITY MANAGEMENT STAFF LS 27 TOTAL 268 VISITORS RESIDENTIAL 312 COMMERCIAL & COMMUNITY HALL 234 SCHOOL 10 TOTAL VISITORS 556 TOTAL POPULATION WATER DEMAND 6.1 Water supply & source The water supply for the residential project during operation phase will be sourced from water supply department of Ghaziabad Nagar Nigam. The total water demand works out to approximately 305 KLD. After recycling and reuse of 95 KLD treated water, the net fresh water requirement will be 210 KLD, which works out to 68.8% of estimated total water demand. Details of daily water requirement, waste water generation & reuse of treated water are given below in Table 4 & 4.1 and water balance diagram is given in Figure-5. Below. Table 4: Calculations for Daily Water Demand for the Project WATER REQUIREMENT POPULATION/ AREA/UNIT RATE IN LTS TOTAL QTY IN KL RESIDENTIAL DOMESTIC

48 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A FLUSHING NON RESIDENTIAL (Working) DOMESTIC FLUSHING VISITORS DOMESTIC FLUSHING TOTAL POPULATION 3944 GARDENING D G COOLING TOTAL WATER REQUIREMENT TOTAL TREATED WATER REQUIREMENT TOTAL FRESH WATER CAPACITY OF STP WATER FLOW TO STP (DOMESTIC) 80% WATER FLOW TO STP (FLUSHING) 100% TOTAL WASTE WATER GENERATION REQUIRED CAPACITY OF STP - 120% SAY 295 AVAILABLE TREATED WATER (80%) REUSE OF TREATED WATER SURPLUS WATER TO BE USED FOR NEAR BY CONSTRUCTION ACTIVITIES S N. Table: 4.1 WASTE WATER GENERATION AND WASTE WATER REUSE DETAILS ITEM 43 TOTAL 1 WATER FLOW TO STP (DOMESTIC) 80% WATER FLOW TO STP (FLUSHING) 100% 79 3 TOTAL WASTE WATER GENERATION TOTAL TREATED WATER AVAILABLE 197

49 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 5 REUSE OF TREATED WATER 95 6 SURPLUS WATER REQUIRED CAPACITY STP - 120% 295 Fig 5: Water Balance Diagram for the Project Residential Fresh: 203KLD Waste Water : 162 KLD Total Water Demand of project : 305 KLD Residential Flushing: 65 KLD n Residential (Working) Fresh : 4 KLD n Residential (Working) Flushing: 8 KLD Waste Water : 65 KLD Waste Water : 3 KLD Waste Water : 8 KLD Total Waste water : 246 KLD Total Fresh Water Demand: 210 KLD Treated water reuse: 95 KLD Visitors Fresh: 3 KLD Visitors Flushing: 6 KLD Waste Water : 2 KLD Waste Water : 6 KLD Proposed STP : 295 KLD D.G Cooling : 11 KLD Treated Water : 197 KLD Gardening: 5 KLD Recycled Treated Waste water : 95 KLD Surplus treated water : 102 KLD to be used for nearby construction site/discharge to sewer with prior permission 7.0 SEWAGE GENERATION Construction phase: Quantity of sewage generated during the construction phase will be negligible and proper management will be done by providing mobile toilets. Septic tank & soak pit will be provided on site for treatment. Operational Phase: Sewage generated during operation phase would be approx. 246 KLD. Capacity of onsite STP is 295 KLD. 8.0 WASTE GENERATION, COLLECTION, TRANSPORT AND DISPOSAL Solid waste would be generated both during the construction as well as during the operation phase. The solid waste expected to be generated during the construction phase will comprise of excavated materials, used bags, bricks, concrete, MS roads, 44

50 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A tiles, wood etc. The following steps are to be followed for the management solid waste: Construction yards are used for storage of construction materials. The excavated material such as topsoil and stones will be stacked for reuse during later stages of construction. Excavated top soil will be stored in temporary constructed soil bank and will be reused for landscaping of the Project. Remaining soil will be utilized for back filling / road work /raising of site level at locations. Waste generation during Operation Phase During operation phase municipal solid waste would be generated from the project. The quantification of different type of waste likely to be generated are given below in table:5 below Table 5: Quantity of Waste Generation during operation phase WASTE GENERATION Total Waste Generation 1.70 TPD Organic Waste Generation 1.02 TPD E- Waste Generation 11.1 KG/Day Sludge Generation 193 KG/Day Hazardous Waste Generation (DG Waste Oil) 2.82 Lts/ Day (Source: The solid waste generation has been 0.45 kg per capita per day basis ad per guideline of (CPHEEO) manual.) Following arrangements will be made at the site in accordance to Municipal Solid Wastes (Management and Handling) Rules, 2016 and amended Rules, Collection and Segregation of waste 1. A door to door collection system will be adopted for collection of domestic waste in colored bins from household units. 2. Biodegradable & non biodegradable waste shall be separately collected to ensure segregation at source. 3. For community hall & commercial occupancy, adequate number of colored bins separate for Bio-degradable and n Bio-degradable will be placed at planned location. 4. Litter bin will also be provided in open areas like parks etc. Treatment of Bio-Degradable wastes Biodegradable /Organic and Horticultural Waste shall be collected and will be handed over to authorized agency for treatment and disposal as per MSW Generated compost would be used as manure for horticulture development. 45

51 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A n Biodegradable waste Recyclables, such as plastic, rubber, wood pieces, glass etc will be segregated from non biodegradable waste & sold to authorize vendors for recycling & remaining inert waste shall be sent to land fill site through authorized vendor as per the guidelines of Municipal Solid Wastes (Management and Handling) Rules, STP sludge will also be used for horticultural purposes as manure. 9.0 POWER REQUIREMENT DETAILS The power supply shall be supplied by Uttar Power Corporation Ltd (UPPCL) the estimated electrical demand load & proposed power back to be used during power failure shall be as per details given in Table:6 below. Table: 6 Power & DG detail `ELECTRICAL LOAD & DG BACK UP ELECTRICAL - DEMAND LOAD 2300 KW POWER BACK UP - DG SETS 2000 KVA NO OF DG SETS (2X500+1X1000) s DG STACK HEIGHT (6M above Tallest Tower) M 9.1 BACKUP POWER DETAILS There is provision of DG sets for power back up in the Project. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion. Energy Conservation Measures: The energy conservation measures shall be adopted to minimize the demand on non- renewable resources and maximize the utilization efficiency of these resources. The benefits of Energy Conservation measures are as follows: Reduced Energy Consumption without sacrificing comfort levels. Reduced destruction of natural resources. Reduced air pollution. Reduced Pollution Loads. Increased user productivity STORM WATER DRAINAGE & RAIN WATER HARVESTING SYSTEM A network of covered/underground storm water drain will be developed to collect rain water runoff from roof tops, hard & soft areas roads, paths, parking & open areas, vegetated surfaces planned on the ground. Strom water would be channelized to rain water harvesting structure designed to charge the rain water to ground water aquifer. The storm water will pass through the desilting chamber/oil& grease separator before finally discharging to percolation tank. Design details of Rain Water Harvesting structure are given in the table 7 & Figure 8 below 46

52 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A For basement parking, the rainwater from ramps will be collected in the basement storm water storage tank. This water will be pumped out to the nearest external storm water drain PARTICULARS Table 7: Calculations for storm water Harvesting Potential OTHER OPEN AREAS RAIN WATER HARVESTING ROAD/PAVEMENT/PARKING AREAS GREEN AREA ROOF TOP AREA Area (Sq.m.) Runoff coefficient Rainfall (m) Harvesting potential (cu.m.) Net water availability and potential for recharge (cu.m.) per year (considering 20% losses) Rain Water Harvesting Pit Design (Roof Top Only) Particulars Values Unit Peak hourly rate 45 mm/hr for one hour duration CUM Peak hourly rate 45 mm/hr for 15 min duration CUM Volume of recharge pit 28 CUM. of recharge pit required 4. Proposed 4. Total of 4 Rain Water Harvesting pits are planed rain water recharge within the project premises. 47

53 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A Figure-6: A typical Recharge pit 11.0 LANDSCAPE & SHELTERBELT DEVELOPMENT Total green area measures (10.17%) m 2 of the total plot area. Approx 50% of area would be used for peripherial tree plantation, road side plantation & remaining area would be used for plantation of shrubs, lawn, and ground cover. There are several trees which will be planted along the sides of the Project boundary. For tree plantation preference will be given to local tree with large leafs & dense foliage for shading & reduction of air & noise pollution. The plant species would be selected from the list given below: 48

54 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A THE LIST OF PLANT SPECIES LIKELY TO BE PLANTED SN Botanical Name Common Name 1 Ficus Infectoria Pakur 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Alstonia Scholaris Scholar tree 8 Thespesia populnea Paras Pipal 9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 19 Pilkhan Ficus 12.0 PARKING FACILITIES For smooth circulation & reduction of pollution separate entry & exits with gates of adequate sizes are planned for the vehicles & also for the movement of fire engine. Provision for car/vehicle parking is planned in the basements. Apart from peripheral roads for vehicular movement internal roads/pavements are planned for traffic free movement of pedestrians. Details of parking provision are given in table:8 Table-8: Parking Details ECS Total Parking Required as/building Bye Laws 2 Proposed Total Parking Proposed Surface Parking 96 4 Proposed Stilt Parking Nill 5 Proposed Basement Parking ( ) Risk and Hazards 13.1 Seismicity Based on the tectonic features and records of earthquake, a Seismic Zoning map has been developed for the country by Bureau of Indian Standard (BIS). The area under study falls in Seismic Zone-IV. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. The 49

55 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A structural design shall be vetted by the agency nominated by local body. Earthquake resistant construction techniques will also be used Emergency Lighting The emergency lights operated on battery power would be provided at appropriate locations such as corridors, common area, staircase, exit and entrance doors, parking, etc Fire Safety Fire Fighting Designed: As per National Building Code 2005 Provision fire detection, alarm & rescue system. Provision of infrastructure required for suppression of fire as per norms. Provision of fire escape staircase Provision of Fire Extinguishers, Fire Hose Cabinet, Internal & External hydrant, Fire sprinkler system in basements & residential towers are planned as per applicable codes & norms of local fire department ENVIRONMENTAL POLLUTION MITIGATION MEASURES 14.1 Air Pollution Increased traffic generation due to project (no. of parking space proposed for the project is 775 is not going to cause significant increase in atmospheric concentration of gases and will not result in heat island formation as adequate landscaping has been provided. Mitigation Measures for Air Pollution during Construction Stage Air quality around the project site will be impacted during construction stage. Various construction activities especially related to handling of loose material are likely to generate fugitive dust that will affect the air quality of the surrounding area of the project site. To minimize such impacts following measures has been proposed: All the loose material either stacked or transported will be provided with suitable covering such as tarpaulin, etc. Water sprinkling shall be done at the locations where dust generation is anticipated. To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity. Mitigation Measures for Air Pollution during Operational Stage Operation of DG Sets is the only source of air pollution during operational phase. Sufficient stack height m will be provided for proper dispersion of pollutants. Also, it is proposed to minimize air pollution by providing plantation as buffer on the periphery of the project site and on the open spaces. An area of m 2 i.e % of the total area has been kept for green development & plantation purposes. 50

56 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 14.2 Water Pollution The source of water pollution during construction and operation phase is due to waste water generated from toilets and washing ise Environment It is envisaged that within the Group Housing complex there shall be maximum movement of light motor vehicles like cars and 2-wheelers which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the sides of internal roads, on the open spaces inside and around the periphery of whole complex. Proper maintenance of the internal roads will also be carried out and Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits. Mitigation Measures for ise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of db (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact. Mitigation Measures for ise Pollution during Operation Stage It is envisaged that there shall be maximum movement of light motor vehicles like cars and 2-wheelers which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the open spaces and around the periphery of whole complex. Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits CONSTRUCTION MATERIALS The following construction materials are required for residential construction; 1. Coarse sand 2. Fine sand 3. Stone aggregate 4. Cement 5. Fly Ash 6. Reinforcement steel 7. Plywood & steel shuttering 8. Pipe scaffolding (cup lock system) 9. Bricks 10. Marble/vitrified/ceramic floor & wall tiles 11. P.V.C. conduit 12. MCBs/DBs 13. Overhead water tanks 14. Pavors 15. Conc, CI, GI, CPVC, UPVC pipes 16. Sanitary fittings & fixtures 17. Stainless steel sink 18. Glass 19. Joinery hardware 20. Aluminium Frames 21. Electrical equipments, fittings & fixtures. 51

57 Expansion Of Group Housing Project "Signature Heights" at Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar FORM 1A 16.0 LIST OF MACHINERY USED DURING CONSTRUCTION (i) Dumper (ii) Concrete mixer with hopper (iii) Excavator (iv)concrete Batching Plant (v) Cranes (vi)road roller (vii Bulldozer (viii) Tower Cranes (ix) Hoist (x) Labor Lifts (xi) Concrete pressure pumps (xii) Mobile transit mixer 17.0 PROJECTCOST The total construction cost of the Group Housing project is approximately Rs Crore. 52

58

59

60

61

62 RAIN WATER HARVESTING CALCULATION PARTICULARS OTHER OPEN AREAS RAIN WATER HARVESTING ROAD/PAVEMENT/PARKING AREAS GREEN AREA ROOF TOP AREA Area (Sq.m.) Runoff coefficient Rainfall (m) Harvesting potential (cu.m.) Net water availability and potential for recharge (cu.m.) per year (considering 20% losses) Rain Water Harvesting Pit Design Particulars Values Unit Peak hourly rate 45 mm/hr for one hour duration CUM Peak hourly rate 45 mm/hr for 15 min duration CUM Volume of recharge pit 28 CUM. of recharge pit required 4. Proposed 4.

63

64

65

66 t.'"i''l. :.ll ',i'i tf'- ' j:i., i j.*) lli :I :,"'_t\' 't *1,..,.ir orqlsl ' qaro:effi{\ ns:3rr:lq /d0dl0.z.fifrqn-r:(rnoar<fl $ tfr1 {itii.i1.. i4q t+iir;ro, ftqq:. {6f{q. olnil ir,nihn ftqqo qci qa {i@r: 2ellrlqo$o7t fttia;: 15{ q[ fi-{,i ' qd-qfr, itqm.gnl s{'{i vr*il q-a R{io: 2G-1G-20i3 d quqq d srrrf, 3lr4-trq mq qt-{fr'-, qq g{ri uqrqft;r' s54r6j rli:fl d wra aa ffistr Vs qhfuit m,ter{in 3IF4ITT{ qffi r 91fu6rft Rq6' ffi: p*1s-2sfi,tn z qnrm qh6t d irsn ufirror5tn ut*mr $fufi0 qffuuiqie elll 613I' flsn fiftn nqr,rffifl inffii ko qfteh if qrsqq t,iltilr{iltt$ ol s.r.rer o-ir$ 'rft ftr*n gutn tt*f d o-9.* qfier ft'mrr$r. IFrarr $r-- q-fi * silii qldsf.{r! 1-Ed -ed ftttiqr{{*i4.1$s.00 ftf s,l ffo i, qs fu qe qftgt-tt,ssz.tiot s, fi0 fu'sfir erqq qit qftfl fi nql 2--rffi{ral q,fxn-roso.czirr,f -rmfan tto Wq.'frFrd it,sq'i'ffsi+ -itlll qftsr,'i'c.szs.sst; sd fio t 3'<Iq,l [=-.ve $*Dfrqlmr qgan I _ fttmo sloqo ii.t\. i$r: ' 61qq, TIIfuutEIi:i flopt rifiimot. rd.irmqll r +--,irat*ii - -..rlatrlfhtt oed ril'tqi- ro,s2s.3s5 sri ff 0 I o'ffiifrt=;ftffii' {f{4n wd os3 qriul q,i,{ro t m* dliqngdl.ci{ $o fto Em wfli'{o-slo,gn, esl fiii Tr+ir fr-cl Tflfif{sr t d Frwuf tg frdqrd qfrffqq sffirtft{ cttrol fr,fn ftt -*t16 sq-q tt qqftl'rqq q, ffir fil-q qri or srgtlu gw 3dlffrfi ardm{ifr ilfuwlr-q ri Rrui 'm i! t I _-T'---?. qa 6-{g \Rql oi {o I I I I I I I l. 'qqrf,q ^l rrilro: effdel u drdr I I I I qrqrsq cril 4rl OE 6q u o-ud gd t d ;n-urm rrm 9 n ftqis: za-to-- fuqr trui w,tfr _s.lqfl F:- -** '} lilct rt gl(9'lvr I i?t FI{eTt) io u.lqh"i ;p16 31[i'-1q;r I srd 3n{ 'unil-tl-.r ozisi-.e, {d-f, \o 17 flfl I (-1.50/ Ag. 1..?5 -:. --- iffitpt-*- oz ffiqne qs ib nir 3g7.Ri { (-r.50 y' 1.50 w8:t*-- ozitfe, gf gs rz ml 500.m0 8568:004 02${ <-1.50 i 1.25 ill l c.mr-d-r oz-lshe, rtcc qs lz ita 500.rw t. 1.'502'i.25 lf_ jt{nl-.fi-.s *: "' "l ozim{t, Tdf, \rq i-t ffi iegi 1.50 / 1.25 l!! r , tmft,e'-- - oeinrt, Trir \g or ffit r,476, { -1.5A/Q5 ':rnffiiiiri$qqq?0( t... fim-*-r oziffie,.pd qd rz niir V 02cl 1,50.'1,20 I l.s4ll-t{.e {F I ziqq dl'-z 1"": l qsq fiiffi-fifdil;fluoolt'* * t :il0rrhr anilslq srqdi,t (wottorfi*zoos 3ilqdls dq \tr-4 ) Ei artc"titl o'flqn a-ff[d 'q'q-{e.[:- ;-,,f0 *,1 riuuo i*; Tilq.{ qnfrrjf i fu d ffi ll fto fr"gqrq rqti as ftir qnfrn) i e Rft.fi+,Tr.roi,i sr$m,tl z-rhr im*rr+rd xnq ii c'tn vi ftorfl fli dt d-snl'-o.oo rilo q.d-6 i t s-srts.- waifild rtct or trqa {iqsn '3:-,;o-ltrl Tt,l-ts.oo ffo t ilo-gr,.rlt-il.3b :dto I silrt--qt{d,tttr qqq-ts,oo fio I $lo--qrrd rnrr Hftq-ts.oo fio c-fiilftn ttnqi il d qni tz {l-st s.eliin it r_i -- _ i qt ctrffii {,,,,,,,,,,,,,,, lrc tsq hc{ he{rq, qiri il i.i-,l [i-,lt,,l t{ rll() 'l iun t, al 3fl*.r11 l;i-'l;i

67 r'\.. r:;!i,, :i: {, i;-.','' -, r./. (, 'r' 'ri(., 'la:i ilqirdnr$cn FEiro qer d $.ei* *d"'fl,$ q gjf$ mflm,3rurlu scn"rl "tr rtlft tnn rynln SzgB iry"19 ;r#r*ft. *,'#i;d; a ** *trt iuft" R"n ord-oiiq org{e fr ri; si-m.ln Rfrn fun ffi.lhtrr,'- nop ritir'-',rtn t ftnf q tq Ti.t.rde i lnsmfi'lqi *LY9g1l3T :;'d;h'dil'*,"u,- **l *t 3 Gtat+ng2oo5 ii' "i-.- ftqry flry jtr:i ;-S#'-'ur.'*iorl;oft.;t I q** ord tg:,uroont,gqt ryfljn:': ;-f".;. t*"ol*i tr {h,n do a'; qrn frqn atoo tr y um zpq1$1y[r':j * ;il.ra,'q,o$r.3 *rq,'iift dd q'q Gofioho qs {'{o$ito\s rrio q $$ wrfro tnsfd u-tt6-tui irtafdir ;ursdls..rcc d uq1 ffo+; s dc''? of tr+r qt tfts tb mtrct lzs'ooo 10,0$, qs,6ill1',ilo, ifcs tq; qcoff0fto qt-{6?ii o-gwr'l ffiu t t o-aiim$r,rtdh oirqdlq,rq-c d erql Eo-tis &'r ol tfutqq trs qq tilm e00 A, FI *a*m. sffifdn ;iledls qsq d r&6 al-q{ t e-cllo na qr r}s{ff, dfrn qla' tq dq qloirlodto lfltrol d +;1wn oa-ftu t t i-ilii#'oqogrcq'.rrw, iffii* i ftmqw qro'ft0$o qr'rn 1TI-t *rull i-urui';lr$ifri-'nit* u" on* ir ftq ah qs qr..iqff"l qooilo$o tyjylt e-q'diilfusr ftjinm Rrert:-- *t*o rrqq d tsi- i;ii eroi ifto-r 'it Eo*s d q's tmq t 3fis EFcr[- zourr d;ql-{eil;fr sqfl'rffi * t r:qg"i-i*{ilt-qiifrr" o* {*,+ mwo-*i* air* i tlgo srrutbg stir*n FI'rc qdl{ s, Et, \ ^ ( \ rolig1iff irltrnq;i'qqqqlq OHi {ffie"wiry- uriirftc wry1 mr t frqtq l$ rflrslfr $faflc fru wn fi q\ qlfin d lrf$q tt ;iili;f*ffi: t#"*tt-i" i t'ir.o qeril*yis q'0s0+il0 qi{6 jsry"m t"'qfl**'tt;t:- lnrrlil'rql d $qk elet'\ qft-w.i'*tt" yt{tt wo d ulwn i"^iwlt*tr- qqot ffs\o Rnzu rnno wgfio$g il; rry olo'fr'r t t *ffi i[,#nn*:ffiq ort d sqit irp+,r'm ar'nerrcif rml ia;frqq; F{a riarffi tq ut#tn letu'stn^w1eqe.u dm nerrr+a-i w:lblifli-tf i mq 6\diffi:,niU*. irtt rft fu,tfr c-q,.rl st ft'frq. ord o$ql srdr t nil rmd frtl srf{erd ir'ft. r ik, s{tilnr{ff{ qqd slfiqn g,trcr{ sm fto mql ss{ q0-97ti,e77, e81 rrq'r r.."'cr' cri!'\''!' rror ttil,im,r itg.,il al+',"f tgjil*t* g{i* :nrk ry:y :[j H H *"-frt'" w m,* gqfilil-eoo*trq1 ;i1q-q-6 fttftgrr 6\; sq; *,ffi-[ffi# Yi{mfu q-sq ffi sdhffiq.r ft'ilt Ti,r*,,*{ -F** qs),r,:fip,rcd rm { srfir d araeniil srer rr wnqfu qqq q-t ws friq qn rcn: fi tillntmw 'alfn t Hfrr{6:,gtpilltn qffi1 ' /u< t qltql-3fqzn Fdn f$qt i -i rr?z ed rr*ilr lftkl Q,l Qr vll \l\ry r'" ''' ' J ' 06 ff1i ibl ri-ctgo itc qr-$tl g,ro,trjorfio W r{i frftqqrqdl q; g{.,.&r Ei qq't asi d {;q t) r ir aihr ir qrrn ab i t fl r,rar or (o 3{s-( drq'c urftso 6l J* cllc\ qa vt eini d ef$ ${ r+-o d, srgnr sl-dlfnr qrec, si dla q-{q or ffiil"l firjinac Rrcc iyrl-d Rft.gtr d'18 gtoiilotfto qrao d sr{{n a"rar'fir" 3il1i0vfl o rr'j{ji ; +tn d sxftftn ftq Gfrl qe-i"{i qfu efir qilen fsl rftel t-'t( 'at' ft,rm srdi g ffi qlq $l.il' 1 fffi tffiuro< tffiuran ii urniftn woii t fu $rfqsiari irt-drzfrlg ti iyl' ros t sdfisn qrlol d 3{$1n d'{ Frq,{qf@q. o"pr iftwt u{h qrrn{ ulr,rft,i u,r qitftl!:r-irqfri{if $ill-{ qftq ho o1 q-unrll " ' ' ',-',i i,oft*t,,tft"t ** *no* air qq+l qq. sllny qrffit t!' t s*r'rfinrn 3TFrorfi otn-qrd, o) q+rnl qs 3rqrw old-4t] Bg ^ -r-,+ thnu,int *i.u qro fto ETII trffil io-szo,srr, eb1 qrq 1+ry ffian nlhwut-< ' l l), 3r;iqil{tl I 't I I i

68 - -ffismq rept q-$ut fr{ilrr q}d, Eo qfro i2 fr, futfr su, riltft qrt{, dcffs qftoa ri+f sql FdYs6ZS-r /woeilo$ /fr-rczq/zots. ftdo, ls ftt q. M orfrml qded qro ft0, 9s2, 3rtF'RT q Rkr.T, 26-\, qsl ErrctT, t-s, =q t6ff-tooor ftqq : M Gi-ftf,r lrh qro fro arqr u-wrfud str-qrftq qm-qrt Rrr+q'y 6r{s-s, e {NI qo s76, s77 dett eb1, T[q TF'R, q$fit, drft, fu-en-qtfuqqe qqffiq r$!t o1 gfr t l$ {firii -.nl {aml=rl E-g 3r-flcfu qqm-q{ FrfT{ q+qq. qrw w-tw frs-{rfi ciqi sil-a-fi qe ffi6-zo/oa/zou or r{<rf 6; Gilqd Grnqq w fuon frrqr rrql detr Eqqr 3icrr6r ET fu vqiq 6i qqferot q-{qq d EMq t ffi'fud ftrte nd qq qtirar uat (e-a-ro1 d rrgfud seqrd-{ d qrq wd 3ffiqfu d-qd qfi cnfr t r 1. crrtqfu yqup-tr-fl ffifut ft'rt ffii d ftrq fr Frfd fu-qr qr w t,- (o) I IFT:- M 3rfiET qder{ qlo fto arit wilfua stm-$-q qmqqt frt+{t Etg..q, qgq io s76, 977 deit 981, qrq TFTTR, qrqqt,.ilfr. fuar-rnfuqrqrq t (u) B'dtrFT : lt -u-s e)t.b-d 9891q, s.f ft-e{, R- q grfl qt,qre.oc, qri figs w ercqrq qffi-qqr ftq1d fu-q qrit ry

69 -2- (T) $s 6-d qrdr :. frrv-t +arq-f,, Gilft (q) smftfr vf,rtrrt 61 qt"t- v5< v\ s-c-eru qfi q-rt:- zz+ qcftfr/ifi (e) qgffi {qq,- 9o fro 8-c tg S-da orrq{qon'rgqtq wgffi ft-wo aq t A-e ff e-mtq t qrildt ovt w gr: enivfu eqm-qe ffq o-fti 3TtrI{{rF' Erfi 2- g- frq fi vrfr enq5t1m' T{, {f,, ERd qfr--.6.r, sdtrr6 gko-{"t u-c iten qrg s-$ut fuilt qrnqjrt o1 *eilqqr q qfi T-fr qqfr Rqtc q{t orqidq tf rd-o. qr6 qfi ffi-4f drt-q ao ftras nfrf, o.f I 3- vst'.r {mt-$ ti trfte+ur sgrefr dq fff qft*t TS oi we ao fu' cc qh t qa G og ufuffir d crf,-fd qeqfr stw q o-q d I atct T{q aq veuft elw 6{i & rfit-{ i vflreq sl{tr{ tn-d qfi ftf} t tnq t enq 2 qr6 os6 guffto qgqfr 3ili{q q"t o\ sflf<l Td qqq srleft or vdq ovn gv gw orulco t ei-q{q S qqr oq RqT qr$ r qr B-dq sqstffi ol 3rjqffiq rfr?f-{dr t d sw udrft'fr; d turfo' srfrqtii d 3ffi.fd s-stt d ft-s- fr-.r.r frffi $ q+;n d fr'do offfi of qr sm-ft e I J 4- B-qiT d qfrerq sdttq;t d Td Eqrt &t*q otqfdq aqr gftt$ or qfrepr Eftdfud frrqr qri I

70 M qqldd yro fuo errqrfrq Erqqq. *m qo gzo, szz cerl gst. T[q T{T.rt. qq.l-{r. d):fi. ftrar-qrfuqgre 5- utq seore, fusr+l qrrt 22a qqfts{/fu{ t crd-6 Ts E).n I s\rtfler{n rso dofto d qrtqq t qyg am fuiffuo q6mi d eqw ft-ftrd fuqr qri r 6- r{yut fu"lt & q-{i-rfud geo-wt vr{f, oer MlT otd srttffi d ft\ frq ]rs ert.' o1 qfr {*' otqfdq s so.o.zors GF s**q ntgo o1 vr$ r $- t{{d srftfri qqh wo fuo il{r rg;fud silqpftq qffiqqt ffii Er{s-s, g-{o, q0 s76, s77 dajtr 981, T[q TC+rn, TErlqr, Fitff, fu-dt_qrfu-qrqrq Fm r+rge q.f fi-es, G- w grqt qqq?e.oq qrffisq w ereerrq qmqrt dr pq1q fuqt qrd t M. o.rd q Wr{ q-a a;r q-drq rs fuqt qr}.n I q- dtstr EtqT qkrqttstq?ls fu'o efto,/rq elrrf,r o-r Vso Oo qo TelilBf, fu-qt qdr q- T]-ten Arsr UUryr fu era.r r) Sotfto tfe qenfto of nen s-qn ig erarr e e-qd *cq *enf-o of r 9o- Tflfu-s a- fiun \r{o {so vq ser looo g q Bqri} d ergvn fuzn qri r ee- griflqd 3TefftA anr qre)fr.)r-g-d il d ft-nili.r tg gfrs; wnfuo q frri qri of fratfr fr rrcen FRr sm or ft-ctrot qfu.{ 6 o="-uq6rdfut/erqfmrqiffit d sm fo-q1 qq, 9?- TfifkI trrflifrd $ofrote q{ utfr tpro t++*ercit d srer qtat rkilqrgq11 ffi fi qerfuo efi qdf r gtr- wen uwagwx i-q qrcq EdR*T qtf{elr velfuo.*1, e8- ddq 5e-a urko-wr, qa r{rwrc qrd-q qref, s{rnn t wd q-a q).6q tg etttl-t{m' erflqfu qerm q.t fiw fuqt qr$ et- qe elilqfu qqm q=r o1 aerdr riis q{ zn i'o n-oa of &TdT friq t \rn q{ oq qitdelqqffil 9t- trd i-fi rnir-& q-dr6- gs'-880,9/qft-q/\toeitotfto_s_9oq8/qoattr fu{i6 e8/ors/?oqg. st otr{r{r: seqrd-{ or-qr gfr-rqo ot, ergqrd{ q ori of qen ii riiert srqr ira +-o rii-s ry d o.n ii _*g* of qr-sm-fi t, ** wi ffi wrf q** m 64* qqteffir o1 d-nl

71 Ecqr *qrq t fu' Bqgw fttfu-d frrr vd w1 rsfnq vrat or eltrfi g+{ sfliwrro. ergqtil{ q EF-d w *d Am ffio fi{tqfu qrnq q-t frffi oq fur qr}.n f frd or slfus-r gqfud t fu stqtqfu qfr crd q dyitft fuqt qrn eterfi fu{sil oq frqr qrq r sq{ffi frrte \rq qrqr;q vrd d iiqq q v*q am qu orul+o if eo.rz.zols cf6. qq-q \_, crgqkt-{ 3ilsr ciqrrr irf, o1 urq I ergq-6q qrcqr ffid ifud of utg crarafi fi{qfu F {RI ot EI qi\rti I tr{aq, Esioq qo,/wodoqfro aeffio: shfttfr ' 1. q6t rftltr',.nfuqrete ft-o-rs -ry"r rnfrrqrqrq r 2. eifiq 3Tffi, soqoy{ru1 futut qts, rnfuqrflq f gcq q-qfqrut otffi (g.-o-r) -8- qtqra/-

72 Ind Tech House Consult Annexure-C1 EIA Consultancy Organization: Ind Tech House Consult, G-8/6, Ground Floor, Rohini, Delhi , has been appointed as EIA Consultant to carry out Environmental Impact Assessment Study and Obtaining Expansion Of Group Housing Project "Signature Heights" At Khasra : 977,976,981, Village or Nagar, Pargana - Loni, Tah & Dist Ghaziabad, Uttar. Accreditation to NABET Status: Ind Tech House Consult was assessed by the NABET on 30 th and 31 st January 2012 and has provisionally accredited the Consultancy organization in Building and Construction Projects. Similar Assignment: Following are some of projects of similar kind successfully carried out/ ongoing by the Consultancy organization. a. Environmental Impact Assessment for Extension of Parliament House Annexe Project, Parliament House Complex, New Delhi; b. Environmental Impact Assessment for Construction of Group Housing for LokSabha Secretariat, New Delhi; c. Environmental Impact Assessment for Park at Sector 92, ida (under direction of Hon ble Supreme Court); d. Environmental Impact Assessment for Expansion of LNJP Hospital, New Delhi; e. Environmental Impact Assessment for Construction of Institutional Campus at Rohtak; f. Environmental Impact Assessment for Construction of Police Line by Delhi Armed Police, Dwarka, New Delhi.

73 Intellectual Strength of Ind Tech House Consult I Name : Mr. Arvind Narayan Devikar 1 Status in the : EIA Coordinator Organization 2 Educational Qualification : Bachelor of Architecture (Visvesvaraya Regional College of Engineering Nagpur (1973) 3 Work Experience : 40 Years 4 Work Experience related to EIA : 7 years More than 25 successful EIA projects in Building Construction Sector 5 Previous Organizations Served : Senior Architect, CPWD, Directorate General, CPWD Nirman Bhawan ( ) 6 Specialization : Planning and Designing, Energy Efficient Buildings, Climate Responsive Architectural Design, Passive Energy in Buildings, Energy Conservation, Landscape and Environmental Impact Assessment 7 Additional Qualification : Evaluator and Trainer for GRIHA - Green Rating for Integrated Habitat Assessment; Panel member for National Building Code 2005 in Landscaping, CED 46:p18; Architecture, Energy and Environment Lund University Sweden Planning and Design of Energy Efficient Building CPWD Ghaziabad; Public Administration II Name : Dr. Ravinder Mohan Mehta 1 Status in the : EIA Coordinator Organization 2 Educational : Ph.D. Chemistry Patiala University, Patiala Qualification 3 Work Experience : 38 years in Pharmaceutical Industry, Academics, Laboratory and Environmental Consultancy 4 Work Experience : 10 years

74 related to EIA More than 50 successful EIA projects 5 Previous Organization Served : Ranbaxy Labs, Punjabi University, Nuchem Limited, Senes Consultants India Pvt. Ltd., Voyants Solutions Pvt. Ltd. 6 Additional Qualification : ISO Lead Auditor, Planning Implementing and Auditing of Laboratory Quality System as per NABL/ISO 17025, Environmental Training on Industry and Environment Protection for India, Unit operation and processes for CETP, CIQA as per 17025:1999 III Name : Mrs. Supriti Guha 1 Status in the : EIA Coordinator Organization 2 Educational : B. Tech Chemical Engineering Qualification 3 Work Experience : 15 Years 4 Work Experience related to EIA : 3.5 years More than 10 EIA Studies 5 Previous Organizations Served : West Bengal Pollution Control Board for 12 years as Regional Officer 6 Specialization : Air Quality, Water Pollution, Solid and Hazardous Waste, Environmental Assessment for Industries and Thermal power Plant and Environmental Impact Assessment IV Name : Mr. Suman Banerjee 1 Status in the : EIA Coordinator Organization 2 Educational : B.E. Environmental Engineering Qualification 3 Work Experience : 12 Years 4 Work Experience related to EIA : 8 Years More than 50 successful EIA projects 5 Previous Organizations Served : Common - Hazardous Waste Management Facility at Taloja, Mumbai; Common - Biomedical Waste Management Facility at Taloja, Mumbai; Consultant for JBIC for Environment and Social Guideline

75 Frame Work for Steel and Thermal Power Projects in India; Consultant for JICA for Dedicated Freight Corridor for DFCCL - Ministry of Railways, projects; EIA Consultant and Environmental Trainer for JBIC funded Kerala water supply project for Thiruvananthapuram, Meenad, Cherthala, Kozhikode&Pattuvam. 6 Specialization : Air Pollution, Water Pollution, ise and Vibration, Green Building, Municipal Solid Waste, Hazardous Waste and Biomedical Waste; Environmental Impact Assessment for Building and Construction Projects, Highway Projects, Area Development Projects, Industrial Estate/ Park/ Leather Park Projects, SEZ, Oil and Natural Gas Exploration Projects, Mineral Beneficiation Projects, Highway and Solid and Hazardous Waste Management Projects; ise and Vibration assessment and analysis expert 7 Additional Qualification : GRIHA Green Rating for Integrated Habitat Assessment ECBC Energy Conservation Building Code EIA Trainer for CPWD Officials at CPWD Training Institute, Ghaziabad V Name : Mr. Anand Kumar Dubey 1 Status in the Organization : Air Quality, Water Quality, Solid Waste and Ecology and Biodiversity Expert 2 Educational : M. Sc. Environment and Ecology Qualification 3 Work Experience : 7 years 4 Work Experience : 7 years related to EIA 5 Previous Organizations Served : Asian Consulting Engineers Pvt. Ltd. 6 Specialization : Environmental Impact Assessment for Building Construction, Industrial Estates/ Parks, Solid Waste Management, Area Development Projects, Oil and Natural Gas Exploration and Highway Projects

76 VI Name : Dr. Debasish Bhattacharya 1 Status in the : Social Expert Organization 2 Educational Qualification : Ph.D. Tribal Development/ Social Science IIT Kharagpur MRP Regional Planning IIT Kharagpur 3 Work Experience : 25 years 4 Work Experience : 25 years related to EIA 5 Previous Organizations Served : IIT Kharagpur Senior Project Manager LEA Associates SMEC India Pvt. Ltd. Feedback Ventures Pvt. Ltd. Nippon Koei External Funding Agency Projects for World Bank, ADB, JICA 6 Specialization : Tribal Development, Socio economic Development, Social Study in Forest Management, Preparation of RAP, SIA, SE Framework Development, Rehabilitation and Resettlement (R&R) VII Name : Mr. Sameer Vilasrao Deshpande 1 Status in the : Ecology and Biodiversity Expert Organization 2 Educational : M.Sc. Botany Qualification 3 Work Experience : 6.5 years 4 Work Experience : 6.5 years related to EIA 5 Previous Organizations Served : National Environmental Engineering Research Institute - NEERI Nagpur 6 Specialization : Biological Monitoring, preparation of Biodiversity report, conservation plan for scheduled plant and animals, green belt development plan VIII Name : Mr. Rahul RamaraoDeshmukh 1 Status in the : Social Expert

77 Organization 2 Educational Qualification : Master of Social Work Ph.D. Submitted 3 Work Experience : 6 years 4 Work Experience : 6 years related to EIA 5 Previous Organizations Served : National Environmental Engineering Research Institute - NEERI Nagpur 6 Specialization : Socio Economic Monitoring, Rehabilitation and Resettlement, Corporate Social Responsibility IX Name : Mr. Sunil Chandra Gupta 1 Status in the : Risk Assessment and Hazard Management Organization 2 Educational Qualification : M.E. Chemical Engineering, B.E. Chemical Engineering (University of Roorkee) 3 Work Experience : 20 years 4 Work Experience : 20 years related to EIA 5 Previous Organizations Served : Shriram Institute of Industrial Research ERM India Pvt. Ltd. SGS India Pvt. Ltd. 6 Specialization : Risk Assessment and Disaster Management Plan; HAZOP study; Execution of Safety Audit, Hazard Analysis and preparation of Disaster Management Plan; Waste Water Treatment and Disposal; Solid and Hazardous Waste Treatment and Disposal. X Name : Mr. UmeshPratap Singh Chauhan 1 Status in the : Geology Expert Organization 2 Educational : M.Sc. Geology Qualification 3 Work Experience : 30 years 4 Work Experience : 6 years

78 related to EIA 5 Previous Organizations Served : Uttar State Mineral Development Corporation Ltd.; Directorate of Geology and Mining 6 Specialization : Mining Plan; R&D project for Mining and Quality Control; Exploration, Surveying and Mapping. XI Name : Dr. Manoj Kumar Mishra 1 Status in the Organization : Air Pollution, Meterology, Modeling and ise and Vibration Expert 2 Educational Qualification : M.Tech. Atmospheric Sciences University of Pune Ph.D. Atmospheric Sciences (Air Quality Modelling and Micrometeorology IIT Delhi) 3 Work Experience : 14 years 4 Work Experience : 14 years related to EIA 5 Previous Organizations Served : IIT Delhi Research Associate SENES Consultants India Pvt. Ltd. 6 Specialization : Air and ise Impact Assessment Studies; Air Quality and ise Modeling by ISCST3, AERMOD, CALPUFF, OCD, CALINE, INM, DHAWANI, TNM, etc.; Air and ise Modeling for Coal and Gas fired industries, landfill, helipad, wind farms, highways SEZ Projects; 7 Specialized Study : Coastal Atmospheric Boundary Layer (CABL) field experiment at kalpakkam in collaboration with Indira Gandhi Centre for Atomic Research (IGCAR), Bhabha Atomic Research Centre (BARC) Mumbai and Institute of Meteorology and Physics, University of Agriculture, Forestry and Renewable Resources Vienna, Austria XII Name : Dr. Suraj Kumar Sharma 1 Status in the Organization : Hydrology, Ground Water, Water Conservation, Geology and Land Use Expert 2 Educational Qualification : M.Sc. Geology Jammu University Diploma in Remote Sensing Indian Institute of Remote

79 Sensing (IIRS Dehradun) Diploma in Advance Course in Remote Sensing ITC, The Netherlands 3 Work Experience : 46 years 4 Work Experience : 3.5 years related to EIA 5 Previous Organizations Served : Assistant Geologist Geological Survey of India Director Hydrogeologist Central Ground Water Authority Member Hydrogeology Central Ground Water Authority 6 Specialization : Water Harvesting Water Shed Management Ground Water Study under NNRMS Program along with ISRO Appraisal and Examination of Environmental Projects of MoEF Interpretation and Analysis of Aerial photographs and satellite imageries and providing S&T inputs to ground water projects in the states, investigation and exploration of ground water resources, Geological and hydro-geological data processing

80 Ind Tech House Consult (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini, Delhi Tel: , ; Fax:

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

Proposed Office Building at Plot no: 11 & 12 Sector 127, Noida, U.P.

Proposed Office Building at Plot no: 11 & 12 Sector 127, Noida, U.P. FORM 1, FORM 1A AND CONCEPTUAL PLAN FOR ENVIRONMENTAL CLEARANCE OF Proposed Office Building at Plot no: 11 & 12 Sector 127, ida, U.P. Project Proponent: M/S SQUARE EIA Consultant: Ind Tech House Consult

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity

More information

Centrade At Plot No. 1, Sector 140, NOIDA Noida, U.P FORM- I

Centrade At Plot No. 1, Sector 140, NOIDA Noida, U.P FORM- I At Plot. 1, Sector 140, NOIDA ida, U.P FORM- I (I) Basic Information S.. Item Details 1. Name of the project/s Centrade 2. S.. in the schedule 8 (a) 3. Proposed capacity/ area/ length/ tonnage to be handled/

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

A 'N 'E B 'N 'E C 'N 'E D 'N 'E Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled

More information

FORM I GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES AND INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT

FORM I GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES AND INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT GROUP HOUSING PROJECT AT GH-03C, SECTOR-144 NOIDA, UP For M/s GULSHAN HOMES AND INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT en-vision Enviro Technologies Pvt. Ltd. (NABET/EIA/364/IA-018(Rev. 1) dated

More information

Revised FORM - I & PRE-FEASIBILITY REPORT

Revised FORM - I & PRE-FEASIBILITY REPORT Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,

More information

Project Proponent: M/S FAITH BUILDTECH PVT. LTD. EIA Consultant:

Project Proponent: M/S FAITH BUILDTECH PVT. LTD. EIA Consultant: Project Proponent: M/S FAITH BUILDTECH PVT. LTD. EIA Consultant: (An ISO 9001:008 Certified Organization, NABET Accredited consultancy organization) G-8/6, Ground Floor, Sector 11, Rohini Delhi 110 085

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Prepared By: Vardan Environet, Gurgaon 1

Prepared By: Vardan Environet, Gurgaon 1 (I) BASIC INFORMATION S.. Items Details 1 Name of the Project Expansion & Modification of IT Park M/s Larsen & Toubro Limited 2 Serial. in schedule 8(a) Building & Construction Projects as per MoEF 3 Proposed

More information

Sector D 1,Kanpur Road Yojna

Sector D 1,Kanpur Road Yojna Proposed Mall/Multiplex Emerald Mall Plot CP-138, Sector-D1, i. Basic Information FORM - 1 Sl. Item Details 1 Name of the project/s Proposed Mall/Multiplex Emerald Mall Plot CP-138, Sector-D1, 2 S.. In

More information

(See paragraph 6) FORM - 1

(See paragraph 6) FORM - 1 (See paragraph 6) (I) Basic Information FORM - 1 Sr. Item Details. 1 Name of the Project Mohan Willows proposed housing complex on property bearing S.. 64, S.. 65, H.. 1, S.. 66 and S.. 67, H.. 1A & 1B

More information

Proposed Group Housing Project ATS Rhapsody At Plot No. GH 12/1, Sector -01, Greater Noida (U.P.) APPENDX (See paragr FORM 1

Proposed Group Housing Project ATS Rhapsody At Plot No. GH 12/1, Sector -01, Greater Noida (U.P.) APPENDX (See paragr FORM 1 At Plot. GH 12/1, Sector -01, Greater ida (U.P.) I. Basic Inform rmation APPENDX (See paragr agraph ph-6) FORM 1 S.. Item Details 1. Name of the project Proposed Group Housing Project ATS Rhapsody, At

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

FORM- I. Behrampur Gurgaon. Gurgaon, Haryana

FORM- I. Behrampur Gurgaon. Gurgaon, Haryana (I) Basic Information: FORM- I SI. Item Details. 1. Name of the project/s IT/ITES SEZ Project 2. S.. in the schedule 8 (b) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number

More information

Prepared by. Regd. Office: January, 2013

Prepared by. Regd. Office: January, 2013 [Vide CRZ tification dated 6 th January, 2011] FORM I For PROPOSED 5 STAR RESORT PROJECT VIVANTA BY TAJ AT HAVELOCK At (Plot : 149/1, 149/3, 150/3/2, 150/3/3, 150/3/4) Village - Radha Nagar, Gram Panchyat

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

"RAMA WORLD desh. PHASE # 2" ZODIAC DEALER PRIVATE LIMITED

RAMA WORLD desh. PHASE # 2 ZODIAC DEALER PRIVATE LIMITED FORM 1 (Submitted to SEIAA) By "RAMA WORLD desh. PHASE # 2" ZODIAC DEALER PRIVATE LIMITED (Multi-storied Residential complex) Khasra. Nos. 25/1, 26 (P), 27 (P), 32 (P), 33/1, 33/2, 34/1, 35/1, 36/1, 37/1,

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

Sandipbhai Shankarbhai Patel

Sandipbhai Shankarbhai Patel Minor Mineral Ordinary Sand Mine (Existing Project) Village : Oze, Ta : Karjan, Dist : Vadodara (Gujarat) Production Capacity : 9000 TPM Area : 04-33-52 Ha. Proposal For Environmental Clearance (Category

More information

Jayendrasinh Bharatsinh Jadeja

Jayendrasinh Bharatsinh Jadeja Minor Mineral Ordinary Sand Mine (Proposed Project) Village : Jodiya, Taluka : Jodiya, Dist. Jamnagar (Gujarat) Production Capacity : 30,600 TPM Area : 04-90-00 Ha. Proposal For Environmental Clearance

More information

STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17.

STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17. STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. SURVEY NO.81/2, NEAR VILLAGE - KODIDRA, TALUKA- VERVAL, DISTRICT GIRSOMANATH, (GUJARAT) PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

FORM -1 CAPITAL CITY COMMERCIAL PROJECT. Plot No. 2B, Sector 94, Noida, District: Gautam Budh Nagar, Uttar Pradesh

FORM -1 CAPITAL CITY COMMERCIAL PROJECT. Plot No. 2B, Sector 94, Noida, District: Gautam Budh Nagar, Uttar Pradesh Sector - 94, ida, FORM-1 FORM -1 CAPITAL CITY COMMERCIAL PROJECT at Plot. 2B, Sector 94, ida, District: Gautam Budh Nagar, Uttar Pradesh M/s. BPTP INTERNATIONAL TRADE CENTRE LIMITED M-11, Middle Circle,

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

M/s Aura Buildwell Pvt. Ltd. 1

M/s Aura Buildwell Pvt. Ltd. 1 FORM-I APPENDIX I (See paragraph-6) FORM 1 S.. Item Details 1. Name of the project/s Sports City - Group Housing & Villas Project by M/s Aura Buildwell Pvt. Ltd. 2. S.. in the schedule 8 (b): Township

More information

APPLICATION FOR ENVIRONMENTAL CLEARANCE

APPLICATION FOR ENVIRONMENTAL CLEARANCE APPLICATION FOR ENVIRONMENTAL CLEARANCE Residential Building Project at Proposed Residential high-rise building on plot bearing CTS.. 837 to 840 of Village Poisar, Samta Nagar, Kandivali (East), Mumbai.

More information

APPENDIX I (See Paragraph 6) FORM 1

APPENDIX I (See Paragraph 6) FORM 1 VI(a) (I) Basic Information APPENDIX I (See Paragraph 6) FORM 1 Serial Item Number 1. Name of the Project/s Details CONFIDENT SUNSHINE 2. S.No. in Schedule B Category item 8 Activity B2 3. Proposed capacity/area/length/tonnage

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH FORM I (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri K. Ravi Shankar Door No. 39/49/39, Krishnadevaraya

More information

FORM 1 & 1 A. Proposed Residential Project. Sr. No. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune. M/s. ANISHKA DEVELOPERS PVT. LTD.

FORM 1 & 1 A. Proposed Residential Project. Sr. No. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune. M/s. ANISHKA DEVELOPERS PVT. LTD. FORM 1 & 1 A Proposed Residential Project At Sr. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune By M/s. ANISHKA DEVELOPERS PVT. LTD. FORM 1 M/s. Anishka Developers Pvt. Ltd. 1 FORM 1 Proposed Residential Project

More information

REVISED APPENDIX I. (See paragraph - 6) FORM - 1

REVISED APPENDIX I. (See paragraph - 6) FORM - 1 REVISED APPENDIX I (See paragraph - 6) FORM - 1 S. (r) BASIC INFORMATION 1. Name of the project Khemlal Verma 2.. in the schedule 3. Proposed capacity/ area/ leng+h/ Lease Area = Capacity = 4.!96 Hect.

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

FORM-I CORPORATE OFFICE FILM CITY PROJECT FC 24C, SECTOR-16A, FILM CITY, NOIDA, UTTAR PRADESH FOR. M/s WINDSOR CORPORATE TOWERS PVT LTD PREPARED BY

FORM-I CORPORATE OFFICE FILM CITY PROJECT FC 24C, SECTOR-16A, FILM CITY, NOIDA, UTTAR PRADESH FOR. M/s WINDSOR CORPORATE TOWERS PVT LTD PREPARED BY FORM-I CORPORATE OFFICE FILM CITY PROJECT AT FC 24C, SECTOR-16A, FILM CITY, NOIDA, UTTAR PRADESH FOR M/s WINDSOR CORPORATE TOWERS PVT LTD PREPARED BY GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (AN

More information

Submitted to. Expert Appraisal Committee (EAC), Mumbai Maharashtra. May 2017

Submitted to. Expert Appraisal Committee (EAC), Mumbai Maharashtra. May 2017 Proposed Panvel Township at Village Vardoli Panvel Raigad Maharashtra by M/s Wadhwa Construction & Infrastructures Pvt. Ltd. May 2017 FORM 1 Proposed Panvel Township at Panvel, Raigadh, Maharashtra Sector

More information

Prepared by: Vardan Environet, Gurgaon

Prepared by: Vardan Environet, Gurgaon Form -1 (I) BASIC INFORMATION S. No. Items Details 1 Name of the Project: Proposed Expansion of AIIMS Residential Colony Developed By All India Institute of Medical Sciences (AIIMS), New Delhi 2 Serial

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Details of Project. Underground source

Details of Project. Underground source Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

APPENDIX I. (See paragraph - 6) FORM Existi ng capacity/area etc. 1,1O,OOO Tonnes/ Area 4.8O8 Hects. I. Bhatbhera Tehsil.

APPENDIX I. (See paragraph - 6) FORM Existi ng capacity/area etc. 1,1O,OOO Tonnes/ Area 4.8O8 Hects. I. Bhatbhera Tehsil. Revised APPENDIX I (See paragraph - 6) S. (r) FORM - 1 BASIC INFORMATION 1. Name of the project Ripusudan Verma 2.. in the schedule 3. Proposed capacity/ area/ l ngth/ area/ lease a rea/-r+tmber'-etr-wehs

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

M/s. SREE BALAJI NIRMAN & ESTATES

M/s. SREE BALAJI NIRMAN & ESTATES SUBMISSION OF FORM I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. SREE BALAJI NIRMAN & ESTATES (Residential Apartment Construction) SY..42/4, KAPAARADA (V), Visakhapatnam Submitted

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT (Attach panoramic view of the project

More information

3 SCOPING 3.1 DEVELOPMENT OF SCOPING PROCESS Need for Scoping

3 SCOPING 3.1 DEVELOPMENT OF SCOPING PROCESS Need for Scoping 3 SCOPING 3.1 DEVELOPMENT OF SCOPING PROCESS 3.1.1 Need for Scoping Environmental clearance procedure in India currently has no formal procedure for scoping of EIA studies except for certain guidelines

More information

Bangalore Development Authority T. Chowdaiah Road Kumara Park West Bangalore

Bangalore Development Authority T. Chowdaiah Road Kumara Park West Bangalore Bangalore Development Authority T. Chowdaiah Road Kumara Park West Bangalore 560020 Submission of Documents Form -1, Form 1A & Environmental Management Plan for grant of Environmental Clearance for the

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity

More information

1. ENVIRONMENT MANAGEMENT PLAN

1. ENVIRONMENT MANAGEMENT PLAN Project : Environmental Management Plan for District E Allahabad 1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Action Plan (EMP) is required to ensure sustainable development of the proposed

More information

Affordable Group Housing At Village Devlawas, Sector 27, Rewari, Haryana FORM 1

Affordable Group Housing At Village Devlawas, Sector 27, Rewari, Haryana FORM 1 Affordable Group Housing Colony FORM I FORM 1 (I) Basic Information Serial Item Number 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/area/length/tonnage to be handled/command

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc. Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in

More information

Expansion in. Environment Clearance Application. Shopping Mall. Mall of India

Expansion in. Environment Clearance Application. Shopping Mall. Mall of India Expansion in Environment Clearance Application Of Shopping Mall Mall of India At Sector-18, ida, Uttar Pradesh BEING DEVELOPED BY: M/s DLF Limited DLF Centre, Sansad Marg, New Delhi PREPARED BY: Environmental

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

FORM I A GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD. En-vision Enviro Technologies Pvt.

FORM I A GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD. En-vision Enviro Technologies Pvt. GROUP HOUSING PROJECT AT GH-03C, SECTOR-144 NOIDA, UP For M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT En-vision Enviro Technologies Pvt. Ltd (NABET/EIA/364/IA-018(Rev. 1) dated

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

FORM-I of. M/s O P CHAINS HOUSINGS LLP & M/s BHARAT NAGAR HOUSING

FORM-I of. M/s O P CHAINS HOUSINGS LLP & M/s BHARAT NAGAR HOUSING FORM-I of Affordable Housing Project (Under Samajwadi Awas Yojna) At Pocket B, Sector 12-D Awas Vikas by M/s O P CHAINS HOUSINGS LLP & M/s BHARAT NAGAR HOUSING Prepared By GRASS ROOTS RESEARCH & CREATION

More information

Wetland Permit Application

Wetland Permit Application DAVID J. KLOTZLE WETLAND INSPECTOR, PHILIPSTOWN, NY 238 Main Street Cold Spring, NY 10516 (914) 736-7132 Wetland Permit Application MEMO TO APPLICANT 1. Use this form to apply for a Wetlands Permit as

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Environmental Assessment Matrix

Environmental Assessment Matrix For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

EIA Notification of LESSEE TANT

EIA Notification of LESSEE TANT (other than fully mechanized) APPLICATION FOR EVIRONMENT CLEARANCE EIA tification 2006 and tification Dt.15.01.2016 (B2 Category) of Pranmati Soap Stonee Deposit (Khasra no. 60, 61, 63 and others) For

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg. No. 10-42/2009-IA.III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003. I i I I I Dated: 22 nd September, 2009. To MIs.

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information