1 SDHM 3.1 User Workshop Morning Session Instructor: Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc.

2 SDHM 3.1 San Diego Hydrology Model Developed for: San Diego County and cities Replaces SDHM 3.0

3 SDHM 3.1 Changes from SDHM 3.0 New SDHM 3.1 HSPF parameter values. New vertical orifice outlet control option. New drawdown criteria.

4 SDHM 3.1 Changes from SDHM 3.0 Note: Because of the above listed changes, projects that have been created in SDHM 3.0 (and earlier SDHM2015) will not work in SDHM 3.1. To convert these older projects to SDHM 3.1 the user needs to manually re-input the project information into a new SDHM 3.1 project file. The project results will change and the hydromod mitigation facility may need to be re-sized.

5 Presentation Introduction SDHM Background and Theory SDHM and HSPF SDHM Application SDHM Demo Questions & Answers

6 Introduction SDHM 3.1 software platform is part of WWHM, which was originally developed for the State of Washington Department of Ecology. Now used in California, Oregon, Washington, and Texas.

7 Introduction SDHM 3.1 is available free from the Clear Creek Solutions, Inc., web site. Go to Free Software Downloads.

8 SDHM Background and Theory Flow duration threshold requirements: based on erosive flows. Erosive flow range: varies by location (percent of 2-yr flow to 10-yr flow)

9 SDHM Background and Theory Flow duration threshold requirements: Default range: 10% of 2-yr flow to 10-yr flow

10 SDHM Background Flow Duration Analysis: Percent of time the flow exceeds a specific value. Requires continuous simulation hydrology to compute flow duration.

11 SDHM Background Single event modeling doesn t work because: Single-event flow frequency standards are based on inappropriate assumptions. Single-event modeling cannot compute flow durations (percent of time flows exceed a specific value).

12 SDHM Background Continuous simulation hydrology models the entire hydrologic cycle for multiple years. Stormwater runoff = surface runoff + interflow.

13 SDHM Background Distribution of San Diego annual rainfall and runoff: Blue: Evapotranspiration Green: Groundwater Yellow: Interflow Red: Surface Runoff A Soil C Soil Impervious

14 SDHM Capabilities SDHM 3.1 uses HSPF continuous simulation hydrology to compute stormwater runoff for both predevelopment and post-development conditions. Predeveloped Developed

15 SDHM Capabilities SDHM 3.1 continuous simulation computations from HSPF (included in software). HSPF runs in the background with local parameter values and local meteorological data. HSPF sponsored and funded by EPA and USGS.

16 How HSPF works Drainage areas are divided into pervious land segments based on soil, vegetation, and land slope and impervious land segments. Pervious and impervious segments are linked to conveyance pathways (pipes, ditches, ponds, streams, rivers, lakes, etc.) Historic rainfall and evaporation are used as input.

17 How HSPF works The entire water cycle is modeled on a hourly time step for multiple years. The model computes changes in soil moisture, evapotranspiration, and runoff every time step. Three types of runoff: surface runoff interflow groundwater/base flow

18 SDHM 3.1 The user selects the rainfall station from the available list (same as SDHM 3.0).

19 How SDHM works User locates project on county map, inputs pre- and post-development land use, and proposed mitigation measure(s). Predevelopment and mitigated flows are compared at Point of Compliance (POC). Mitigated flows are not allowed to exceed flow duration standards.

20 SDHM Basic Elements 13 elements: 1. Landuse Basin 2. Trapezoidal Pond 3. Storage Vault 4. Storage Tank 5. Irregular-Shaped Pond 6. Gravel Trench Bed 7. Sand Filter 8. Open Channel 9. Flow Splitter 10. Time Series 11. SSD Table 12. Lateral Flow Soil Basin 13. Lateral Flow Impervious Area

21 SDHM Pro Elements 3 elements: 1. Biofiltration 2. Porous Pavement 3. Green Roof

22 How SDHM works User outputs report file and project file. Output files can be submitted to the permitting agency for approval. Permitting agency can load project file and rerun analysis, if needed. Report file summarizes input data and output results.

23 How SDHM works Guidance/help is provided by SDHM 3.1 User Manual Program Help File Training Workshops Phone and Support

24 SDHM Application Example: Convert undeveloped land to suburban residential housing.

25 SDHM Application Stormwater Vault Sizing Example Predevelopment land use: Project: 10 ac D soil, Natural vegetation (NatVeg), Moderate land slope (5-15%) 1 ac C soil, Rock, Flat land slope (0-5%) Developed mitigated land use: Project: 6.5 ac D soil, Urban landscape with no irrigation (UrbNoIrr), Moderate slope 1.0 ac D soil, Urban landscape with irrigation (Urban), Moderate slope 1.0 ac Impervious, Flat slope 2.5 ac Impervious, Moderate slope

26 SDHM Application Stormwater Vault Sizing Example 12 steps from start to finish: 1. Select project location. 2. Set up Predevelopment land use scenario. 3. Set up Mitigated (developed) land use scenario. 4. Calculate lower and upper HMP thresholds based on Predevelopment runoff. 5. Calculate lower and upper HMP thresholds based on USGS regional equations (optional).

27 SDHM Application Stormwater Vault Sizing Example 12 steps from start to finish: 6. Compare sets of threshold values (optional). 7. Change thresholds (optional). 8. Size Mitigated scenario HMP facility. 9. Review analysis. 10. Produce report. 11.Save project. 12.Exit SDHM.

28 SDHM Application: Step 1 User selects land development location and places red dot on map. Then selects rainfall station record.

29 SDHM Application: Step 2 User sets up Predevelopment land use scenario. Selects Landuse Basin element.

30 User inputs Predevelopment land use. SDHM Application: Step 2 Pre: C, Rock, Flat: 1 ac D, NatVeg, Mod: 10 ac

31 SDHM Application: Step 2 User connects Landuse Basin element to Point of Compliance (POC 1).

32 SDHM Application: Step 2 POC 1 shows up in the lower right corner of the Landuse Basin element.

33 SDHM Application: Step 2 User computes Predevelopment scenario runoff by clicking on the Run Scenario button.

34 SDHM Application: Step 3 User sets up Mitigated land use scenario using the same procedures as used in Step 2.

35 SDHM Application: Step 3 User inputs Mitigated (developed) land use. Mit: D, Urban, Mod 1.0 ac D, UrbNoIrr, Mod 6.5 ac Impervious, Flat 1.0 ac Impervious, Mod 2.5 ac

36 SDHM Application: Step 3 User connects Landuse Basin element to Point of Compliance (POC 1).

37 SDHM Application: Step 3 ONLY FOR THE PURPOSE OF CALCULATING THE Q2 AND Q10 FLOW FREQUENCY VALUES FOR COMPARISON WITH THE USGS REGIONAL VALUES we will select the exit from this Landuse Basin element as the Point of Compliance for the Mitigated scenario. We will change the location of the Mitigated POC when we size our HMP facility in Step 8.

38 SDHM Application: Step 3 User computes Mitigated scenario runoff by clicking on the Run Scenario button.

39 SDHM Application: Step 4 User calculates the lower and upper HMP thresholds based on the Predevelopment runoff.

40 SDHM Application: Step 4 The Predeveloped Q2 value is cfs; the Q10 value is cfs.

41 SDHM Application: Step 5 User calculates the lower and upper HMP thresholds based on USGS regional equations (this step is done outside of SDHM and is optional). USGS Q2 and Q10 calculation method: Q2 = 3.60*(A^0.672)*(P^0.753) Q10 = 6.56*(A^0.783)*(P^1.07) Where A = drainage area (sq. miles) P = mean annual precipitation (inches)

42 SDHM Application: Step 5 P = mean annual precipitation (inches) Mean annual precipitation values for the standard 18 San Diego County rain gages are shown in the table below. Rain Gage Mean Annual Rainfall (in) Bonita 8.9 Borrego 3.2 CCDA Lindbergh 9.9 Encinitas 10.3 Escondido 13.9 Fallbrook 15.3 Fashion Valley 10.4 Flinn Springs 13.2 Kearny Mesa 11.1 Lake Cuyamaca 30.9 Lake Henshaw 22.4 Lake Wohlford 17.0 Lower Otay 10.5 Oceanside 11.8 Poway 12.2 Ramona 14.4 San Onofre 11.6 San Vicente 12.7 Santee 13.1

43 SDHM Application: Step 5 For 11 acre site in Fashion Valley: A = 11 ac = square miles P = 10.4 inches USGS Q2 = cfs USGS Q10 = cfs

44 SDHM Application: Step 6 User compares the two sets of threshold values (optional). The Predeveloped Q2 and Q10 values from Step 4 are: Pre Q2 = cfs Pre Q10 = cfs The USGS Q2 and Q10 values from Step 5 are: USGS Q2 = cfs USGS Q10 = cfs

45 SDHM Application: Step 6 User selects the set with the largest Q2 value. The Predeveloped Q2 and Q10 values from Step 4 are: Pre Q2 = cfs (use this set) Pre Q10 = cfs (use this set) The USGS Q2 and Q10 values from Step 5 are: USGS Q2 = cfs USGS Q10 = cfs

46 SDHM Application: Step 6 Lower and upper HMP thresholds: Lower: 10% Q2 = cfs Upper: Q10 = cfs Note: No need to change SDHM default lower and upper HMP thresholds in Step 7.

47 SDHM Application: Step 7 Change thresholds (optional): View, Options, Duration Criteria. (1) Default: SDHM (2) User input: USGS

48 SDHM Application: Step 8 User selects and sizes the Mitigated scenario HMP facility based on the lower and upper threshold values selected in Step 6. For this example project we will size a stormwater storage vault.

49 SDHM Application: Step 8 User disconnects the Mitigated scenario Landuse Basin from POC 1.

50 SDHM Application: Step 8 User adds a Storage Vault element for the HMP facility.

51 SDHM Application: Step 8 User connects the Landuse Basin element to the Storage Vault element.

52 SDHM Application: Step 8 User connects the Landuse Basin element to the Storage Vault element.

53 SDHM Application: Step 8 User connects the outflow (Outlet 1) from the Storage Vault element to POC 1.

54 SDHM Application: Step 8 POC 1 shows up in the lower right corner of the Storage Vault element.

55 SDHM Application: Step 8 User inputs initial vault specifications or uses Auto Vault to size vault storage volume and outlet control configuration.

56 SDHM Application: Step 8 User inputs Auto Vault sizing info: (1) Amount of sizing (little to everything possible). (2) Vault Depth (including freeboard). (3) Outlet structure (1 orifice + notch or 3 orifices no notch).

57 SDHM Application: Step 8 User options: Create Vault: Creates a vault from scratch, ignoring userinput dimensions and outlet control values. Optimize Vault: Starts with user-input dimensions and outlet control values and tries to improve on them.

58 SDHM Application: Step 8 Sizing is done by iterating to find the smallest vault dimensions (length and width) that produce outflow that meets the HMP flow duration criteria.

59 SDHM Application: Step 8 Iterations continue until no smaller vault dimensions (length and width) meet the HMP flow duration criteria..

60 SDHM Application: Step 9 User reviews the flow duration analysis. Flow duration (10% of 2-year to 100% of 10-year)

61 SDHM Application: Step 9 SDHM 3.1 computes the vault drawdown/drain time for the maximum (riser height) stage:

62 SDHM Application: Step 9 SDHM 3.1 computes the vault drawdown/drain time for the maximum (riser height) stage: 1 day, 6 hours, 43 minutes.

63 SDHM Application: Step 10 User produces Project Report:

64 SDHM Application: Step 10 Project Report summarizes statistics and whether or not the facility meets the jurisdiction s standards.

65 User saves project file. SDHM Application: Step 11

66 User exits SDHM. SDHM Application: Step 12

67 After Sizing Facility User outputs report file and project file. Output files can be submitted to the permitting agency for approval. Permitting agency can load project file and rerun analysis, if needed. Report file summarizes input data and output results.

68 SDHM 3.1 File Types Project file:.whm Backup project file:.wh2 Database file:.wdm Report file:.rtf or Report file:.pdf

69 SDHM: LID Options SDHM 3.1 includes the following LID options: Dispersion of impervious surface runoff on adjacent pervious surface (example: roof runoff to lawn). Biofiltration to filter and infiltrate stormwater. Infiltration to retain and infiltrate stormwater. Porous pavement to retain and infiltrate stormwater.

70 SDHM 3.1 Questions? Contact: Doug Beyerlein Joe Brascher

San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington

San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek Solutions,

More information

Bay Area Hydrology Model

Bay Area Hydrology Model Bay Area Hydrology Model Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc. www.clearcreeksolutions.com Bay Area Hydrology Model This introductory presentation was given at BAHM

More information

Western Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington

Western Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Western Washington Hydrology Model (WWHM) Software Introduction Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek

More information

INFILTRATION FACILITY MODELING

INFILTRATION FACILITY MODELING INFILTRATION FACILITY MODELING Clear Creek Solutions, Inc., 2010 Infiltration is good. Infiltration returns the runoff to the ground, allowing it to slowly recharge the aquifer and the nearest stream.

More information

Hydromodification Computer Modeling

Hydromodification Computer Modeling Hydromodification Computer Modeling Douglas Beyerlein, P.E. Clear Creek Solutions, Inc. 15800 Village Green Drive #3 Mill Creek, WA 98012 beyerlein@clearcreeksolutions.com Phone: 425.892.6454 Introduction

More information

Tualatin River Urban Stormwater Tool (TRUST) User Manual

Tualatin River Urban Stormwater Tool (TRUST) User Manual Tualatin River Urban Stormwater Tool (TRUST) User Manual Prepared by Clear Creek Solutions, Inc. www.clearcreeksolutions.com Prepared for Clean Water Services April 2015 To download the Tualatin River

More information

Porous Pavement Flow Paths

Porous Pavement Flow Paths POROUS PAVEMENT MODELING Clear Creek Solutions, Inc., 2010 Porous pavement includes porous asphalt or concrete and grid/lattice systems (nonconcrete) and paving blocks. The use of any of these types of

More information

LID PLANTER BOX MODELING

LID PLANTER BOX MODELING LID PLANTER BOX MODELING Clear Creek Solutions, Inc., 2010 Low Impact Development (LID) planter boxes are small, urban stormwater mitigation facilities. They are rain gardens in a box. WWHM4 provides the

More information

GROUNDWATER RECHARGE. Clear Creek Solutions, Inc., 2010

GROUNDWATER RECHARGE. Clear Creek Solutions, Inc., 2010 GROUNDWATER RECHARGE Clear Creek Solutions, Inc., 2010 Groundwater provides the base flow to streams and wetlands during dry periods. Groundwater also recharges aquifers and provides water for residential,

More information

Western Washington Hydrology Model Version 3.0. User Manual

Western Washington Hydrology Model Version 3.0. User Manual Western Washington Hydrology Model Version 3.0 User Manual August 2006 Western Washington Hydrology Model Version 3.0 User Manual Prepared by Clear Creek Solutions, Inc. August 2006 To download the Western

More information

THE SAN DIEGO AND IMPERIAL COUNTIES CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA) ANNOUNCE A SEMINAR DEMONSTRATING The BMP Sizing

THE SAN DIEGO AND IMPERIAL COUNTIES CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA) ANNOUNCE A SEMINAR DEMONSTRATING The BMP Sizing THE SAN DIEGO AND IMPERIAL COUNTIES CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA) ANNOUNCE A SEMINAR DEMONSTRATING The BMP Sizing Spreadsheeet A Tool to Comply with Hydromodification Management

More information

WWHM4 MODELING USING NATIONAL MAP

WWHM4 MODELING USING NATIONAL MAP WWHM4 MODELING USING NATIONAL MAP Clear Creek Solutions, Inc., 2010 How to create a project that uses national data. WWHM4 is one of the most powerful continuous simulation hydrologic models available.

More information

Bay Area Hydrology Model User Manual

Bay Area Hydrology Model User Manual Bay Area Hydrology Model 2013 User Manual Prepared by Clear Creek Solutions, Inc. www.clearcreeksolutions.com Prepared for Alameda Countywide Clean Water Program San Mateo Countywide Water Pollution Prevention

More information

Bay Area Hydrology Model. User Manual

Bay Area Hydrology Model. User Manual Bay Area Hydrology Model User Manual Prepared by Clear Creek Solutions, Inc. www.clearcreeksolutions.com Prepared for Alameda Countywide Clean Water Program San Mateo Countywide Water Pollution Prevention

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Permeable Pavement Hydrologic Modeling

Permeable Pavement Hydrologic Modeling Permeable Pavement Hydrologic Modeling Robin Kirschbaum, PE, LEED AP Alice Lancaster, PE April 24, 2013 Presentation Overview Overview of Hydrologic Modeling Performance Standards Modeling Guidelines,

More information

HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation

HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation Jill C. Bicknell, P.E., EOA, Inc. Assistant Program Manager EOA, Inc. GeoSyntec Consultants Presentation

More information

The Bay Area Hydrology Model A Tool for Analyzing Hydromodification Effects of Development Projects and Sizing Solutions

The Bay Area Hydrology Model A Tool for Analyzing Hydromodification Effects of Development Projects and Sizing Solutions The Bay Area Hydrology Model A Tool for Analyzing Hydromodification Effects of Development Projects and Sizing Solutions Jill Bicknell, P.E., EOA, Inc., Santa Clara Valley Urban Runoff Pollution Prevention

More information

Hydrologic Modeling for Green Roofs, Rainwater Harvesting and LID Foundations

Hydrologic Modeling for Green Roofs, Rainwater Harvesting and LID Foundations Hydrologic Modeling for Green Roofs, Rainwater Harvesting and LID Foundations Robin Kirschbaum, PE, LEED AP Alice Lancaster, PE May 8, 2013 Presentation Outline Overview of Hydrologic Modeling Performance

More information

Krista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities

Krista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities Krista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities Agenda 1. Evolution of Water Quality Facilities 2. Regulatory Response/MS4 Permit Requirements 3. Change

More information

Sizing Calculations and Design Considerations for LID Treatment Measures

Sizing Calculations and Design Considerations for LID Treatment Measures SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Jill Bicknell, P.E., EOA, Inc. Presentation Overview Sizing/Design of Self Treating and Self Retaining Areas

More information

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc.

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. STORMWATER CONTROL PLAN 23 LOT SUBDIVISION ON PROCTOR ROAD CASTRO VALLEY, CALIFORNIA Owner/Developer: Hue Tran 4584 Ewing

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts

Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts Maine Stormwater Conference (Portland, ME, 2015) Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts Park Jongpyo, Lee Kyoungdo: HECOREA. INC Shin Hyunsuk: Busan National University

More information

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock A Case for the Design and Modeling of BMP Infiltration and LID Techniques 2009 IAFSM Annual Conference 2009 IAFSM Annual Conference By: Bob Murdock Presentation Outline 1. Runoff Reduction (RR) and Low

More information

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Lester McKee San Francisco Estuary Institute 5/24/2017 1 The importance of the natural water cycle of infiltration

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

Design Handbook. Low Impact Development Best Management Practices

Design Handbook. Low Impact Development Best Management Practices Design Handbook for Low Impact Development Best Management Practices Prepared by: 9/2011 Riverside County Flood Control and Water Conservation District 1995 Market Street Riverside, CA 92501 TABLE OF CONTENTS

More information

Modeling the Veolia Water Technologies TTT (Thistle Tube Throttle) in Washington

Modeling the Veolia Water Technologies TTT (Thistle Tube Throttle) in Washington Engineering and Water Technologies CA# 31653 12821 Spur Rd Hudson, FL 34669 (727) 457-4059 Modeling the Veolia Water Technologies TTT (Thistle Tube Throttle) in Washington Introduction The Thistle Tube

More information

10/16/2013. The Big Picture of LID and Green Infrastructure. Learning Objectives

10/16/2013. The Big Picture of LID and Green Infrastructure. Learning Objectives Low impact development (LID) the basic idea behind LID is to manage stormwater in a way that imitates the natural hydrology of a site. Details Matter Selection, Design, and Implementation of Low Impact

More information

LID & Detention Pond Sizing Tool to Address Hydromodification and Water Quality in Clackamas County

LID & Detention Pond Sizing Tool to Address Hydromodification and Water Quality in Clackamas County LID & Detention Pond Sizing Tool to Address Hydromodification and Water Quality in Clackamas County Leah Johanson, Water Environment Services February 12 th, 2015 Agenda» WES History/Stormwater Standards»

More information

Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY

Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY PRE POST (ACTUAL) WHICH IS THE APPROPRIATE PERFORMANCE STANDARD? Post = 90% of Pre vs. 55% N and 80% P reduction

More information

Capturing Storm Water in Semi-arid Climate

Capturing Storm Water in Semi-arid Climate Capturing Storm Water in Semi-arid Climate REBEKA SULTANA, PHD CALIFORNIA STATE UNIVERSITY, LONG BEACH NATHANIEL SUMMERVILLE, PE CALIFORNIA STATE UNIVERSITY LONG BEACH (STUDENT PROJECT MANAGER) AND CH2M

More information

Low Impact Development in Western WA Municipal Stormwater Permits

Low Impact Development in Western WA Municipal Stormwater Permits Low Impact Development in Western WA Municipal Stormwater Permits USGS Tacoma Office September 19, 2012 E-mail: eobr461@ecy.wa.gov ttp://www.ecy.wa.gov/programs/wq/stormwater/municipal/index.html Municipal

More information

TECHNICAL GUIDANCE DOCUMENT FOR THE SOUTH ORANGE COUNTY HYDROMODIFICATION CONTROL BMP SIZING TOOL

TECHNICAL GUIDANCE DOCUMENT FOR THE SOUTH ORANGE COUNTY HYDROMODIFICATION CONTROL BMP SIZING TOOL TECHNICAL GUIDANCE DOCUMENT FOR THE SOUTH ORANGE COUNTY HYDROMODIFICATION CONTROL BMP SIZING TOOL December 13, 2010 Table of Contents SECTION 1. INTRODUCTION... 1-1 1.1. Applicability... 1-1 1.1.1. Priority

More information

CHAPTER 4. Hydrologic Analysis

CHAPTER 4. Hydrologic Analysis CHAPTER 4 Hydrologic Analysis Chapter 4 Table of Contents List of Tables... 4-iii List of Figures... 4-iv Chapter 4 Hydrologic Analysis... 4-1 4-1 Introduction... 4-1 4-2 Project Considerations... 4-1

More information

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT All Best Management Practices (BMPs) are considered feasible until demonstrated otherwise.

More information

Effectiveness of Non-Structural Measures in Watershed Restoration

Effectiveness of Non-Structural Measures in Watershed Restoration Effectiveness of Non-Structural Measures in Watershed Restoration Bill Frost, PE, D.WRE Sr. Water Resources Engineer KCI Technologies, Inc. Sparks, MD 2011 Low Impact Development Symposium Philadelphia,

More information

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

California Construction General Permit Web Conference. Session III: Hydromodification Management

California Construction General Permit Web Conference. Session III: Hydromodification Management California Construction General Permit Web Conference Session III: Hydromodification Management Wednesday, November 18, 2009 12:00 p.m. 1:30 p.m. For audio participation Dial: 1.866.206.7204; Passcode

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Tom Dalziel, Contra Costa Clean Water Program Dan Cloak, Dan Cloak Environmental Consultants

Tom Dalziel, Contra Costa Clean Water Program Dan Cloak, Dan Cloak Environmental Consultants Memorandum Date: May 12, 2005 To: Cc: From: Subject: Tom Dalziel, Contra Costa Clean Water Program Dan Cloak, Dan Cloak Environmental Consultants Christie Beeman, Philip Williams Associates Jeff Haltiner,

More information

Design of Stormwater Wetlands

Design of Stormwater Wetlands Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak

More information

Stormwater Treatment Practice (STP) Calculator Instructions

Stormwater Treatment Practice (STP) Calculator Instructions Stormwater Treatment Practice (STP) Calculator Instructions The STP Calculator is a tool developed by the Department of Environmental Conservation (DEC) to estimate total phosphorus load reductions achieved

More information

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion

More information

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011

More information

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Should vs. Must In Chapter 4, should means should, and must means must. Poorly Drained Soils Well-Drained Soils Flat Terrain

More information

CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1

CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1 CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1 SERIES ISSUE #2: DECENTRALIZED STORMWATER MANAGEMENT TO COMPLY WITH RUNOFF RETENTION POST-CONSTRUCTION STORMWATER CONTROL REQUIREMENTS

More information

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) 525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

SWMM5 LID Control for Green Infrastructure Modeling

SWMM5 LID Control for Green Infrastructure Modeling SWMM5 LID Control for Green Infrastructure Modeling Ohio Water Environment Association Collection Systems Workshop Matt McCutcheon, E.I. Water Resources Engineer CDM Smith May 9, 2013 11:15 AM 11:45 AM

More information

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS Page 4-1 INTRODUCTION 4-3 4-1.01 Applicability of VMCs 14.24, 14.25, 14.26 4-4 4-1.02 Minimum Requirements - Projects Below Threshold

More information

Appendix F: Sample Design Calculations & Worksheets Intentionally Left Blank

Appendix F: Sample Design Calculations & Worksheets Intentionally Left Blank Appendix F: Sample Calculations & Worksheets Intentionally Le Blank DEELOPMENT BEST MANAGEMENT PRACTICES HANDBOO Part B: PLANNING ACTIITIES, 5 TH ED. Appendix F: Sample Calculations & Worksheets FLOW RATE

More information

GreenPlan Modeling Tool User Guidance

GreenPlan Modeling Tool User Guidance GreenPlan Modeling Tool User Guidance Prepared by SAN FRANCISCO ESTUARY INSTITUTE 4911 Central Avenue, Richmond, CA 94804 Phone: 510-746-7334 (SFEI) Fax: 510-746-7300 www.sfei.org Table of Contents 1.

More information

Water Balance Methodology

Water Balance Methodology Water Balance Methodology Integrating the Site with the Watershed and the Stream March 2012 An initiative under the umbrella of the Water Sustainability Action Plan for British Columbia Water Balance Methodology

More information

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012 Shirley E. Clark, Ph.D., P.E. October 5, 2012 Prior development decisions have led to directly connected impervious areas and pervious areas with heavily-compacted soils. Prince Georges Cty, MD photo 1

More information

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES

More information

DRAINAGE PLAN AND REPORT OLD DENVER ROAD

DRAINAGE PLAN AND REPORT OLD DENVER ROAD DRAINAGE PLAN AND REPORT 16140 OLD DENVER ROAD PART OF THE NW1/4 SEC. 28, T.11S., R.67W., 6 th P.M. EL PASO COUNTY February 3, 2017 Revised January 5, 2018 Prepared for All About Outdoor Storage Oliver

More information

Analyzing the Changes to the Hydrologic Cycle. with the Implementation of LID Techniques in Korea

Analyzing the Changes to the Hydrologic Cycle. with the Implementation of LID Techniques in Korea Analyzing the Changes to the Hydrologic Cycle with the Implementation of LID Techniques in Korea Jung Min Lee Contents 1 Introduction 2 Change of New City Paradigm on Korea 3 Case Study 4 The Effects of

More information

Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented

Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented by: Kenneth Kozlik, Fuscoe Engineering San San Diego Diego

More information

Application of the SWAT Hydrologic Model for Urban Stormwater Management

Application of the SWAT Hydrologic Model for Urban Stormwater Management UT Arlington, June 5 th, 2015 Application of the SWAT Hydrologic Model for Urban Stormwater Management Jaehak Jeong, PhD, PE Assistant Professor Texas A&M AgriLife Research Texas A&M University Roger Glick,

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

Santa Margarita Region of Riverside County

Santa Margarita Region of Riverside County Santa Margarita Region of Riverside County Water Quality Management Plan (WQMP), Hydromodification Management Plan (HMP) Program Training Presented by: Daniel Apt, CPSWQ, CPESC Vice President Kevin Villarama

More information

Appendix B. Storm Drain System Data

Appendix B. Storm Drain System Data MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO

More information

4c Using WinSLAMM to Evaluate LID Practices Hands-on Workshop. Using WinSLAMM to Evaluate LID Practices

4c Using WinSLAMM to Evaluate LID Practices Hands-on Workshop. Using WinSLAMM to Evaluate LID Practices Using WinSLAMM to Evaluate LID Practices This workshop will start with a prepared WinSLAMM model file and add Low Impact Development (LID) Practices to it. The two LID Practices that will be modeled are

More information

Chapter 2 - Hydrologic Analysis

Chapter 2 - Hydrologic Analysis Chapter - Hydrologic Analysis The broad definition of hydrology is the science which studies the source, properties, distribution, and laws of water as it moves through its closed cycle on the earth (the

More information

3.2 INFILTRATION TRENCH

3.2 INFILTRATION TRENCH 3.2 INFILTRATION TRENCH Type of BMP Priority Level Treatment Mechanisms Infiltration Rate Range Maximum Drainage Area LID Infiltration Priority 1 Full Retention Infiltration, Evapotranspiration (when vegetated),

More information

Introduction. Welcome to the Belgium Study Abroad Program. Courses:

Introduction. Welcome to the Belgium Study Abroad Program. Courses: Introduction Welcome to the Belgium Study Abroad Program Courses: AGSM 335: Soil and Water Management BAEN 460: Principals of Environmental Hydrology BAEN 460 / AGSM 335 Combined lecture and HW sessions

More information

Watershed Modeling of Copper Loads to San Francisco Bay

Watershed Modeling of Copper Loads to San Francisco Bay Watershed Modeling of Copper Loads to San Francisco Bay Tony Donigian AQUA TERRA Consultants Brake Pad Partnership Stakeholder Conference July 31, 2007 Watershed Model Objectives - Provide daily loadings

More information

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development

More information

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS v. 11.0 WMS 11.0 Tutorial Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS Objectives Learn how to use several Hydraulic Toolbox calculators

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Environment, Energy, Security & Sustainability (E2S2)

Environment, Energy, Security & Sustainability (E2S2) Environment, Energy, Security & Sustainability (E2S2) Modeling Your Way Through EISA Patrick N. Deliman, PhD Environmental Laboratory US Army Engineer Research and Development Center US Army Corps of Engineers

More information

Stream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM

Stream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM Stream Buffers Sharpest Tool in the SWM Toolbox 1 Tom Hegemier, PE, D.WRE, CFM www.apaienv.com Stream Buffers - Overview 2 Why stream buffers? Floodplain management and other benefits Existing regulatory

More information

Hydrologic Analysis of a Watershed-Scale Rainwater Harvesting Program. Thomas Walsh, MS, PhD Candidate University of Utah

Hydrologic Analysis of a Watershed-Scale Rainwater Harvesting Program. Thomas Walsh, MS, PhD Candidate University of Utah Hydrologic Analysis of a -Scale Rainwater Harvesting Program Thomas Walsh, MS, PhD Candidate University of Utah 1. Hydrologic analysis of watershed-scale RWH networks targeting stormwater runoff volumes,

More information

How Climate Change Impacts Urban Runoff and Water Quality Design

How Climate Change Impacts Urban Runoff and Water Quality Design How Climate Change Impacts Urban Runoff and Water Quality Design by J. C. Hayes, C. Privette, III and S. J. Klaine AWRA Conference Anchorage, AK May 4-7, 2009 Presentation Outline Introduction: Why manage

More information

June 27, 2012 Holly Galavotti U.S. EPA

June 27, 2012 Holly Galavotti U.S. EPA June 27, 2012 Holly Galavotti U.S. EPA Urban stormwater is a leading source of water quality impairment Urban stormwater identified as source of impairment (2004 WQ Report) 22,559 miles of impaired rivers

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

STORMWATER RETROFIT AND LID COMPETITIVE GRANT PROGRAM G

STORMWATER RETROFIT AND LID COMPETITIVE GRANT PROGRAM G STORMWATER RETROFIT AND LID COMPETITIVE GRANT PROGRAM G1100286 THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND PIERCE COUNTY SURFACE WATER MANAGEMENT CLARKS CREEK BASIN STORMWATER RETROFITS DESIGN REPORT,

More information

Water Resources Management Plan

Water Resources Management Plan B u r n s v i l l e M i n n e s o t a Water Resources Management Plan - Volume Control / Infiltration Worksheet This Appendix contains a worksheet and related information that can be used for evaluating

More information

Names: ESS 315. Lab #6, Floods and Runoff Part I Flood frequency

Names: ESS 315. Lab #6, Floods and Runoff Part I Flood frequency Names: ESS 315 Lab #6, Floods and Runoff Part I Flood frequency A flood is any relatively high flow of water over land that is not normally under water. Floods occur at streams and rivers but can also

More information

City of Gig Harbor Stormwater Management and Site Development Manual

City of Gig Harbor Stormwater Management and Site Development Manual City of Gig Harbor Stormwater Management and Site Development Manual Volume III Hydrologic Analysis and Flow Control BMPs Prepared by: Pierce County Surface Water Management Modified by: City of Gig Harbor

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

New Draft Model BMP Design Manual for San Diego Region

New Draft Model BMP Design Manual for San Diego Region New Draft Model BMP Design Manual for San Diego Region Public Input 2013 Storm Water Permit June 10, 2014 & June 11, 2014 1 Welcome Sign-In Refreshments Sponsor Break Q&A and Input 2 Outline of Presentation

More information

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002

More information

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page

More information

Opti-Tool: A BMP Optimization Tool for Stormwater Management in EPA Region 1

Opti-Tool: A BMP Optimization Tool for Stormwater Management in EPA Region 1 Opti-Tool: A BMP Optimization Tool for Stormwater Management in EPA Region 1 Mark Voorhees, EPA Region 1 Khalid Alvi, Tetra Tech April 20, 2016 Project Background Massachusetts (MA) MS4 General Permit

More information

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Stormwater Volume and Treatment Methods Simplifying the Numbers IAFSM March 10, 2011 Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Introduction GOALS: Improve understanding of Rate and Volume (Quantity)

More information

Module 6 Temporary Pond and Silt Fence. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Module 6 Temporary Pond and Silt Fence. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Module 6 Temporary Pond and Silt Fence by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University of Alabama Tuscaloosa,

More information

L-THIA Online and LID in a watershed investigation

L-THIA Online and LID in a watershed investigation L-THIA Online and LID in a watershed investigation Larry Theller Agricultural and Biological Engineering, Purdue University Great Lakes Sedimentation Workshop Ann Arbor Mi. L-THIA On-line watershed delineation

More information

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM June 2017 C.3 Workshop Sizing Example Section II. Sizing for Volume-Based Treatment Measures Section II.B Sizing Volume-Based Treatment Measures