1 SDHM 3.1 User Workshop Morning Session Instructor: Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc.
2 SDHM 3.1 San Diego Hydrology Model Developed for: San Diego County and cities Replaces SDHM 3.0
3 SDHM 3.1 Changes from SDHM 3.0 New SDHM 3.1 HSPF parameter values. New vertical orifice outlet control option. New drawdown criteria.
4 SDHM 3.1 Changes from SDHM 3.0 Note: Because of the above listed changes, projects that have been created in SDHM 3.0 (and earlier SDHM2015) will not work in SDHM 3.1. To convert these older projects to SDHM 3.1 the user needs to manually re-input the project information into a new SDHM 3.1 project file. The project results will change and the hydromod mitigation facility may need to be re-sized.
5 Presentation Introduction SDHM Background and Theory SDHM and HSPF SDHM Application SDHM Demo Questions & Answers
6 Introduction SDHM 3.1 software platform is part of WWHM, which was originally developed for the State of Washington Department of Ecology. Now used in California, Oregon, Washington, and Texas.
7 Introduction SDHM 3.1 is available free from the Clear Creek Solutions, Inc., web site. Go to Free Software Downloads.
8 SDHM Background and Theory Flow duration threshold requirements: based on erosive flows. Erosive flow range: varies by location (percent of 2-yr flow to 10-yr flow)
9 SDHM Background and Theory Flow duration threshold requirements: Default range: 10% of 2-yr flow to 10-yr flow
10 SDHM Background Flow Duration Analysis: Percent of time the flow exceeds a specific value. Requires continuous simulation hydrology to compute flow duration.
11 SDHM Background Single event modeling doesn t work because: Single-event flow frequency standards are based on inappropriate assumptions. Single-event modeling cannot compute flow durations (percent of time flows exceed a specific value).
12 SDHM Background Continuous simulation hydrology models the entire hydrologic cycle for multiple years. Stormwater runoff = surface runoff + interflow.
13 SDHM Background Distribution of San Diego annual rainfall and runoff: Blue: Evapotranspiration Green: Groundwater Yellow: Interflow Red: Surface Runoff A Soil C Soil Impervious
14 SDHM Capabilities SDHM 3.1 uses HSPF continuous simulation hydrology to compute stormwater runoff for both predevelopment and post-development conditions. Predeveloped Developed
15 SDHM Capabilities SDHM 3.1 continuous simulation computations from HSPF (included in software). HSPF runs in the background with local parameter values and local meteorological data. HSPF sponsored and funded by EPA and USGS.
16 How HSPF works Drainage areas are divided into pervious land segments based on soil, vegetation, and land slope and impervious land segments. Pervious and impervious segments are linked to conveyance pathways (pipes, ditches, ponds, streams, rivers, lakes, etc.) Historic rainfall and evaporation are used as input.
17 How HSPF works The entire water cycle is modeled on a hourly time step for multiple years. The model computes changes in soil moisture, evapotranspiration, and runoff every time step. Three types of runoff: surface runoff interflow groundwater/base flow
18 SDHM 3.1 The user selects the rainfall station from the available list (same as SDHM 3.0).
19 How SDHM works User locates project on county map, inputs pre- and post-development land use, and proposed mitigation measure(s). Predevelopment and mitigated flows are compared at Point of Compliance (POC). Mitigated flows are not allowed to exceed flow duration standards.
20 SDHM Basic Elements 13 elements: 1. Landuse Basin 2. Trapezoidal Pond 3. Storage Vault 4. Storage Tank 5. Irregular-Shaped Pond 6. Gravel Trench Bed 7. Sand Filter 8. Open Channel 9. Flow Splitter 10. Time Series 11. SSD Table 12. Lateral Flow Soil Basin 13. Lateral Flow Impervious Area
21 SDHM Pro Elements 3 elements: 1. Biofiltration 2. Porous Pavement 3. Green Roof
22 How SDHM works User outputs report file and project file. Output files can be submitted to the permitting agency for approval. Permitting agency can load project file and rerun analysis, if needed. Report file summarizes input data and output results.
23 How SDHM works Guidance/help is provided by SDHM 3.1 User Manual Program Help File Training Workshops Phone and Support
24 SDHM Application Example: Convert undeveloped land to suburban residential housing.
25 SDHM Application Stormwater Vault Sizing Example Predevelopment land use: Project: 10 ac D soil, Natural vegetation (NatVeg), Moderate land slope (5-15%) 1 ac C soil, Rock, Flat land slope (0-5%) Developed mitigated land use: Project: 6.5 ac D soil, Urban landscape with no irrigation (UrbNoIrr), Moderate slope 1.0 ac D soil, Urban landscape with irrigation (Urban), Moderate slope 1.0 ac Impervious, Flat slope 2.5 ac Impervious, Moderate slope
26 SDHM Application Stormwater Vault Sizing Example 12 steps from start to finish: 1. Select project location. 2. Set up Predevelopment land use scenario. 3. Set up Mitigated (developed) land use scenario. 4. Calculate lower and upper HMP thresholds based on Predevelopment runoff. 5. Calculate lower and upper HMP thresholds based on USGS regional equations (optional).
27 SDHM Application Stormwater Vault Sizing Example 12 steps from start to finish: 6. Compare sets of threshold values (optional). 7. Change thresholds (optional). 8. Size Mitigated scenario HMP facility. 9. Review analysis. 10. Produce report. 11.Save project. 12.Exit SDHM.
28 SDHM Application: Step 1 User selects land development location and places red dot on map. Then selects rainfall station record.
29 SDHM Application: Step 2 User sets up Predevelopment land use scenario. Selects Landuse Basin element.
30 User inputs Predevelopment land use. SDHM Application: Step 2 Pre: C, Rock, Flat: 1 ac D, NatVeg, Mod: 10 ac
31 SDHM Application: Step 2 User connects Landuse Basin element to Point of Compliance (POC 1).
32 SDHM Application: Step 2 POC 1 shows up in the lower right corner of the Landuse Basin element.
33 SDHM Application: Step 2 User computes Predevelopment scenario runoff by clicking on the Run Scenario button.
34 SDHM Application: Step 3 User sets up Mitigated land use scenario using the same procedures as used in Step 2.
35 SDHM Application: Step 3 User inputs Mitigated (developed) land use. Mit: D, Urban, Mod 1.0 ac D, UrbNoIrr, Mod 6.5 ac Impervious, Flat 1.0 ac Impervious, Mod 2.5 ac
36 SDHM Application: Step 3 User connects Landuse Basin element to Point of Compliance (POC 1).
37 SDHM Application: Step 3 ONLY FOR THE PURPOSE OF CALCULATING THE Q2 AND Q10 FLOW FREQUENCY VALUES FOR COMPARISON WITH THE USGS REGIONAL VALUES we will select the exit from this Landuse Basin element as the Point of Compliance for the Mitigated scenario. We will change the location of the Mitigated POC when we size our HMP facility in Step 8.
38 SDHM Application: Step 3 User computes Mitigated scenario runoff by clicking on the Run Scenario button.
39 SDHM Application: Step 4 User calculates the lower and upper HMP thresholds based on the Predevelopment runoff.
40 SDHM Application: Step 4 The Predeveloped Q2 value is cfs; the Q10 value is cfs.
41 SDHM Application: Step 5 User calculates the lower and upper HMP thresholds based on USGS regional equations (this step is done outside of SDHM and is optional). USGS Q2 and Q10 calculation method: Q2 = 3.60*(A^0.672)*(P^0.753) Q10 = 6.56*(A^0.783)*(P^1.07) Where A = drainage area (sq. miles) P = mean annual precipitation (inches)
42 SDHM Application: Step 5 P = mean annual precipitation (inches) Mean annual precipitation values for the standard 18 San Diego County rain gages are shown in the table below. Rain Gage Mean Annual Rainfall (in) Bonita 8.9 Borrego 3.2 CCDA Lindbergh 9.9 Encinitas 10.3 Escondido 13.9 Fallbrook 15.3 Fashion Valley 10.4 Flinn Springs 13.2 Kearny Mesa 11.1 Lake Cuyamaca 30.9 Lake Henshaw 22.4 Lake Wohlford 17.0 Lower Otay 10.5 Oceanside 11.8 Poway 12.2 Ramona 14.4 San Onofre 11.6 San Vicente 12.7 Santee 13.1
43 SDHM Application: Step 5 For 11 acre site in Fashion Valley: A = 11 ac = square miles P = 10.4 inches USGS Q2 = cfs USGS Q10 = cfs
44 SDHM Application: Step 6 User compares the two sets of threshold values (optional). The Predeveloped Q2 and Q10 values from Step 4 are: Pre Q2 = cfs Pre Q10 = cfs The USGS Q2 and Q10 values from Step 5 are: USGS Q2 = cfs USGS Q10 = cfs
45 SDHM Application: Step 6 User selects the set with the largest Q2 value. The Predeveloped Q2 and Q10 values from Step 4 are: Pre Q2 = cfs (use this set) Pre Q10 = cfs (use this set) The USGS Q2 and Q10 values from Step 5 are: USGS Q2 = cfs USGS Q10 = cfs
46 SDHM Application: Step 6 Lower and upper HMP thresholds: Lower: 10% Q2 = cfs Upper: Q10 = cfs Note: No need to change SDHM default lower and upper HMP thresholds in Step 7.
47 SDHM Application: Step 7 Change thresholds (optional): View, Options, Duration Criteria. (1) Default: SDHM (2) User input: USGS
48 SDHM Application: Step 8 User selects and sizes the Mitigated scenario HMP facility based on the lower and upper threshold values selected in Step 6. For this example project we will size a stormwater storage vault.
49 SDHM Application: Step 8 User disconnects the Mitigated scenario Landuse Basin from POC 1.
50 SDHM Application: Step 8 User adds a Storage Vault element for the HMP facility.
51 SDHM Application: Step 8 User connects the Landuse Basin element to the Storage Vault element.
52 SDHM Application: Step 8 User connects the Landuse Basin element to the Storage Vault element.
53 SDHM Application: Step 8 User connects the outflow (Outlet 1) from the Storage Vault element to POC 1.
54 SDHM Application: Step 8 POC 1 shows up in the lower right corner of the Storage Vault element.
55 SDHM Application: Step 8 User inputs initial vault specifications or uses Auto Vault to size vault storage volume and outlet control configuration.
56 SDHM Application: Step 8 User inputs Auto Vault sizing info: (1) Amount of sizing (little to everything possible). (2) Vault Depth (including freeboard). (3) Outlet structure (1 orifice + notch or 3 orifices no notch).
57 SDHM Application: Step 8 User options: Create Vault: Creates a vault from scratch, ignoring userinput dimensions and outlet control values. Optimize Vault: Starts with user-input dimensions and outlet control values and tries to improve on them.
58 SDHM Application: Step 8 Sizing is done by iterating to find the smallest vault dimensions (length and width) that produce outflow that meets the HMP flow duration criteria.
59 SDHM Application: Step 8 Iterations continue until no smaller vault dimensions (length and width) meet the HMP flow duration criteria..
60 SDHM Application: Step 9 User reviews the flow duration analysis. Flow duration (10% of 2-year to 100% of 10-year)
61 SDHM Application: Step 9 SDHM 3.1 computes the vault drawdown/drain time for the maximum (riser height) stage:
62 SDHM Application: Step 9 SDHM 3.1 computes the vault drawdown/drain time for the maximum (riser height) stage: 1 day, 6 hours, 43 minutes.
63 SDHM Application: Step 10 User produces Project Report:
64 SDHM Application: Step 10 Project Report summarizes statistics and whether or not the facility meets the jurisdiction s standards.
65 User saves project file. SDHM Application: Step 11
66 User exits SDHM. SDHM Application: Step 12
67 After Sizing Facility User outputs report file and project file. Output files can be submitted to the permitting agency for approval. Permitting agency can load project file and rerun analysis, if needed. Report file summarizes input data and output results.
68 SDHM 3.1 File Types Project file:.whm Backup project file:.wh2 Database file:.wdm Report file:.rtf or Report file:.pdf
69 SDHM: LID Options SDHM 3.1 includes the following LID options: Dispersion of impervious surface runoff on adjacent pervious surface (example: roof runoff to lawn). Biofiltration to filter and infiltrate stormwater. Infiltration to retain and infiltrate stormwater. Porous pavement to retain and infiltrate stormwater.
70 SDHM 3.1 Questions? Contact: Doug Beyerlein Joe Brascher
San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington
San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek Solutions,
More informationBay Area Hydrology Model
Bay Area Hydrology Model Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc. www.clearcreeksolutions.com Bay Area Hydrology Model This introductory presentation was given at BAHM
More informationWestern Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington
Western Washington Hydrology Model (WWHM) Software Introduction Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek
More informationINFILTRATION FACILITY MODELING
INFILTRATION FACILITY MODELING Clear Creek Solutions, Inc., 2010 Infiltration is good. Infiltration returns the runoff to the ground, allowing it to slowly recharge the aquifer and the nearest stream.
More informationHydromodification Computer Modeling
Hydromodification Computer Modeling Douglas Beyerlein, P.E. Clear Creek Solutions, Inc. 15800 Village Green Drive #3 Mill Creek, WA 98012 beyerlein@clearcreeksolutions.com Phone: 425.892.6454 Introduction
More informationTualatin River Urban Stormwater Tool (TRUST) User Manual
Tualatin River Urban Stormwater Tool (TRUST) User Manual Prepared by Clear Creek Solutions, Inc. www.clearcreeksolutions.com Prepared for Clean Water Services April 2015 To download the Tualatin River
More informationPorous Pavement Flow Paths
POROUS PAVEMENT MODELING Clear Creek Solutions, Inc., 2010 Porous pavement includes porous asphalt or concrete and grid/lattice systems (nonconcrete) and paving blocks. The use of any of these types of
More informationLID PLANTER BOX MODELING
LID PLANTER BOX MODELING Clear Creek Solutions, Inc., 2010 Low Impact Development (LID) planter boxes are small, urban stormwater mitigation facilities. They are rain gardens in a box. WWHM4 provides the
More informationGROUNDWATER RECHARGE. Clear Creek Solutions, Inc., 2010
GROUNDWATER RECHARGE Clear Creek Solutions, Inc., 2010 Groundwater provides the base flow to streams and wetlands during dry periods. Groundwater also recharges aquifers and provides water for residential,
More informationWestern Washington Hydrology Model Version 3.0. User Manual
Western Washington Hydrology Model Version 3.0 User Manual August 2006 Western Washington Hydrology Model Version 3.0 User Manual Prepared by Clear Creek Solutions, Inc. August 2006 To download the Western
More informationTHE SAN DIEGO AND IMPERIAL COUNTIES CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA) ANNOUNCE A SEMINAR DEMONSTRATING The BMP Sizing
THE SAN DIEGO AND IMPERIAL COUNTIES CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA) ANNOUNCE A SEMINAR DEMONSTRATING The BMP Sizing Spreadsheeet A Tool to Comply with Hydromodification Management
More informationWWHM4 MODELING USING NATIONAL MAP
WWHM4 MODELING USING NATIONAL MAP Clear Creek Solutions, Inc., 2010 How to create a project that uses national data. WWHM4 is one of the most powerful continuous simulation hydrologic models available.
More informationBay Area Hydrology Model User Manual
Bay Area Hydrology Model 2013 User Manual Prepared by Clear Creek Solutions, Inc. www.clearcreeksolutions.com Prepared for Alameda Countywide Clean Water Program San Mateo Countywide Water Pollution Prevention
More informationBay Area Hydrology Model. User Manual
Bay Area Hydrology Model User Manual Prepared by Clear Creek Solutions, Inc. www.clearcreeksolutions.com Prepared for Alameda Countywide Clean Water Program San Mateo Countywide Water Pollution Prevention
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationPermeable Pavement Hydrologic Modeling
Permeable Pavement Hydrologic Modeling Robin Kirschbaum, PE, LEED AP Alice Lancaster, PE April 24, 2013 Presentation Overview Overview of Hydrologic Modeling Performance Standards Modeling Guidelines,
More informationHMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation
HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation Jill C. Bicknell, P.E., EOA, Inc. Assistant Program Manager EOA, Inc. GeoSyntec Consultants Presentation
More informationThe Bay Area Hydrology Model A Tool for Analyzing Hydromodification Effects of Development Projects and Sizing Solutions
The Bay Area Hydrology Model A Tool for Analyzing Hydromodification Effects of Development Projects and Sizing Solutions Jill Bicknell, P.E., EOA, Inc., Santa Clara Valley Urban Runoff Pollution Prevention
More informationHydrologic Modeling for Green Roofs, Rainwater Harvesting and LID Foundations
Hydrologic Modeling for Green Roofs, Rainwater Harvesting and LID Foundations Robin Kirschbaum, PE, LEED AP Alice Lancaster, PE May 8, 2013 Presentation Outline Overview of Hydrologic Modeling Performance
More informationKrista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities
Krista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities Agenda 1. Evolution of Water Quality Facilities 2. Regulatory Response/MS4 Permit Requirements 3. Change
More informationSizing Calculations and Design Considerations for LID Treatment Measures
SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program
More informationDesign Example Residential Subdivision
Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site
More informationStormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017
Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Jill Bicknell, P.E., EOA, Inc. Presentation Overview Sizing/Design of Self Treating and Self Retaining Areas
More informationAppendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc.
Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. STORMWATER CONTROL PLAN 23 LOT SUBDIVISION ON PROCTOR ROAD CASTRO VALLEY, CALIFORNIA Owner/Developer: Hue Tran 4584 Ewing
More informationAppendix F. Flow Duration Basin Design Guidance
Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by
More informationPRELIMINARY DRAINAGE STUDY
PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,
More informationAnalysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts
Maine Stormwater Conference (Portland, ME, 2015) Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts Park Jongpyo, Lee Kyoungdo: HECOREA. INC Shin Hyunsuk: Busan National University
More informationA Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock
A Case for the Design and Modeling of BMP Infiltration and LID Techniques 2009 IAFSM Annual Conference 2009 IAFSM Annual Conference By: Bob Murdock Presentation Outline 1. Runoff Reduction (RR) and Low
More informationRainfall, runoff and sediment transport in the Napa River watershed: now and a possible future
Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Lester McKee San Francisco Estuary Institute 5/24/2017 1 The importance of the natural water cycle of infiltration
More informationChapter 3 Dispersion BMPs
Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates
More informationDesign Handbook. Low Impact Development Best Management Practices
Design Handbook for Low Impact Development Best Management Practices Prepared by: 9/2011 Riverside County Flood Control and Water Conservation District 1995 Market Street Riverside, CA 92501 TABLE OF CONTENTS
More informationModeling the Veolia Water Technologies TTT (Thistle Tube Throttle) in Washington
Engineering and Water Technologies CA# 31653 12821 Spur Rd Hudson, FL 34669 (727) 457-4059 Modeling the Veolia Water Technologies TTT (Thistle Tube Throttle) in Washington Introduction The Thistle Tube
More information10/16/2013. The Big Picture of LID and Green Infrastructure. Learning Objectives
Low impact development (LID) the basic idea behind LID is to manage stormwater in a way that imitates the natural hydrology of a site. Details Matter Selection, Design, and Implementation of Low Impact
More informationLID & Detention Pond Sizing Tool to Address Hydromodification and Water Quality in Clackamas County
LID & Detention Pond Sizing Tool to Address Hydromodification and Water Quality in Clackamas County Leah Johanson, Water Environment Services February 12 th, 2015 Agenda» WES History/Stormwater Standards»
More informationPinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY
Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY PRE POST (ACTUAL) WHICH IS THE APPROPRIATE PERFORMANCE STANDARD? Post = 90% of Pre vs. 55% N and 80% P reduction
More informationCapturing Storm Water in Semi-arid Climate
Capturing Storm Water in Semi-arid Climate REBEKA SULTANA, PHD CALIFORNIA STATE UNIVERSITY, LONG BEACH NATHANIEL SUMMERVILLE, PE CALIFORNIA STATE UNIVERSITY LONG BEACH (STUDENT PROJECT MANAGER) AND CH2M
More informationLow Impact Development in Western WA Municipal Stormwater Permits
Low Impact Development in Western WA Municipal Stormwater Permits USGS Tacoma Office September 19, 2012 E-mail: eobr461@ecy.wa.gov ttp://www.ecy.wa.gov/programs/wq/stormwater/municipal/index.html Municipal
More informationTECHNICAL GUIDANCE DOCUMENT FOR THE SOUTH ORANGE COUNTY HYDROMODIFICATION CONTROL BMP SIZING TOOL
TECHNICAL GUIDANCE DOCUMENT FOR THE SOUTH ORANGE COUNTY HYDROMODIFICATION CONTROL BMP SIZING TOOL December 13, 2010 Table of Contents SECTION 1. INTRODUCTION... 1-1 1.1. Applicability... 1-1 1.1.1. Priority
More informationCHAPTER 4. Hydrologic Analysis
CHAPTER 4 Hydrologic Analysis Chapter 4 Table of Contents List of Tables... 4-iii List of Figures... 4-iv Chapter 4 Hydrologic Analysis... 4-1 4-1 Introduction... 4-1 4-2 Project Considerations... 4-1
More informationSUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT
SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT All Best Management Practices (BMPs) are considered feasible until demonstrated otherwise.
More informationEffectiveness of Non-Structural Measures in Watershed Restoration
Effectiveness of Non-Structural Measures in Watershed Restoration Bill Frost, PE, D.WRE Sr. Water Resources Engineer KCI Technologies, Inc. Sparks, MD 2011 Low Impact Development Symposium Philadelphia,
More informationHYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY
LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic
More informationAppendix B Stormwater Site Plan Submittal Requirements Checklist
Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following
More informationCalifornia Construction General Permit Web Conference. Session III: Hydromodification Management
California Construction General Permit Web Conference Session III: Hydromodification Management Wednesday, November 18, 2009 12:00 p.m. 1:30 p.m. For audio participation Dial: 1.866.206.7204; Passcode
More informationClean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts
Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)
More informationClean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts
Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)
More informationTom Dalziel, Contra Costa Clean Water Program Dan Cloak, Dan Cloak Environmental Consultants
Memorandum Date: May 12, 2005 To: Cc: From: Subject: Tom Dalziel, Contra Costa Clean Water Program Dan Cloak, Dan Cloak Environmental Consultants Christie Beeman, Philip Williams Associates Jeff Haltiner,
More informationDesign of Stormwater Wetlands
Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak
More informationStormwater Treatment Practice (STP) Calculator Instructions
Stormwater Treatment Practice (STP) Calculator Instructions The STP Calculator is a tool developed by the Department of Environmental Conservation (DEC) to estimate total phosphorus load reductions achieved
More information15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES
1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion
More informationIncorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan
Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011
More informationConcurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)
Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Should vs. Must In Chapter 4, should means should, and must means must. Poorly Drained Soils Well-Drained Soils Flat Terrain
More informationCENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1
CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1 SERIES ISSUE #2: DECENTRALIZED STORMWATER MANAGEMENT TO COMPLY WITH RUNOFF RETENTION POST-CONSTRUCTION STORMWATER CONTROL REQUIREMENTS
More informationEXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)
525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided
More informationPlanning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.
Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions
More informationFORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview
Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...
More informationSWMM5 LID Control for Green Infrastructure Modeling
SWMM5 LID Control for Green Infrastructure Modeling Ohio Water Environment Association Collection Systems Workshop Matt McCutcheon, E.I. Water Resources Engineer CDM Smith May 9, 2013 11:15 AM 11:45 AM
More informationSECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS
SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS Page 4-1 INTRODUCTION 4-3 4-1.01 Applicability of VMCs 14.24, 14.25, 14.26 4-4 4-1.02 Minimum Requirements - Projects Below Threshold
More informationAppendix F: Sample Design Calculations & Worksheets Intentionally Left Blank
Appendix F: Sample Calculations & Worksheets Intentionally Le Blank DEELOPMENT BEST MANAGEMENT PRACTICES HANDBOO Part B: PLANNING ACTIITIES, 5 TH ED. Appendix F: Sample Calculations & Worksheets FLOW RATE
More informationGreenPlan Modeling Tool User Guidance
GreenPlan Modeling Tool User Guidance Prepared by SAN FRANCISCO ESTUARY INSTITUTE 4911 Central Avenue, Richmond, CA 94804 Phone: 510-746-7334 (SFEI) Fax: 510-746-7300 www.sfei.org Table of Contents 1.
More informationWater Balance Methodology
Water Balance Methodology Integrating the Site with the Watershed and the Stream March 2012 An initiative under the umbrella of the Water Sustainability Action Plan for British Columbia Water Balance Methodology
More informationShirley E. Clark, Ph.D., P.E. October 5, /30/2012
Shirley E. Clark, Ph.D., P.E. October 5, 2012 Prior development decisions have led to directly connected impervious areas and pervious areas with heavily-compacted soils. Prince Georges Cty, MD photo 1
More informationCENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND
BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES
More informationDRAINAGE PLAN AND REPORT OLD DENVER ROAD
DRAINAGE PLAN AND REPORT 16140 OLD DENVER ROAD PART OF THE NW1/4 SEC. 28, T.11S., R.67W., 6 th P.M. EL PASO COUNTY February 3, 2017 Revised January 5, 2018 Prepared for All About Outdoor Storage Oliver
More informationAnalyzing the Changes to the Hydrologic Cycle. with the Implementation of LID Techniques in Korea
Analyzing the Changes to the Hydrologic Cycle with the Implementation of LID Techniques in Korea Jung Min Lee Contents 1 Introduction 2 Change of New City Paradigm on Korea 3 Case Study 4 The Effects of
More informationLatest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented
Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented by: Kenneth Kozlik, Fuscoe Engineering San San Diego Diego
More informationApplication of the SWAT Hydrologic Model for Urban Stormwater Management
UT Arlington, June 5 th, 2015 Application of the SWAT Hydrologic Model for Urban Stormwater Management Jaehak Jeong, PhD, PE Assistant Professor Texas A&M AgriLife Research Texas A&M University Roger Glick,
More informationAppendix A Stormwater Site Plan Report Short Form
Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within
More informationSanta Margarita Region of Riverside County
Santa Margarita Region of Riverside County Water Quality Management Plan (WQMP), Hydromodification Management Plan (HMP) Program Training Presented by: Daniel Apt, CPSWQ, CPESC Vice President Kevin Villarama
More informationAppendix B. Storm Drain System Data
MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO
More information4c Using WinSLAMM to Evaluate LID Practices Hands-on Workshop. Using WinSLAMM to Evaluate LID Practices
Using WinSLAMM to Evaluate LID Practices This workshop will start with a prepared WinSLAMM model file and add Low Impact Development (LID) Practices to it. The two LID Practices that will be modeled are
More informationChapter 2 - Hydrologic Analysis
Chapter - Hydrologic Analysis The broad definition of hydrology is the science which studies the source, properties, distribution, and laws of water as it moves through its closed cycle on the earth (the
More information3.2 INFILTRATION TRENCH
3.2 INFILTRATION TRENCH Type of BMP Priority Level Treatment Mechanisms Infiltration Rate Range Maximum Drainage Area LID Infiltration Priority 1 Full Retention Infiltration, Evapotranspiration (when vegetated),
More informationIntroduction. Welcome to the Belgium Study Abroad Program. Courses:
Introduction Welcome to the Belgium Study Abroad Program Courses: AGSM 335: Soil and Water Management BAEN 460: Principals of Environmental Hydrology BAEN 460 / AGSM 335 Combined lecture and HW sessions
More informationWatershed Modeling of Copper Loads to San Francisco Bay
Watershed Modeling of Copper Loads to San Francisco Bay Tony Donigian AQUA TERRA Consultants Brake Pad Partnership Stakeholder Conference July 31, 2007 Watershed Model Objectives - Provide daily loadings
More informationExample 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)
Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development
More informationLearn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS
v. 11.0 WMS 11.0 Tutorial Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS Objectives Learn how to use several Hydraulic Toolbox calculators
More informationSoutheast Policy Area Drainage Study
Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0
More informationSan Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and
San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green
More informationChapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall
6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures
More informationEnvironment, Energy, Security & Sustainability (E2S2)
Environment, Energy, Security & Sustainability (E2S2) Modeling Your Way Through EISA Patrick N. Deliman, PhD Environmental Laboratory US Army Engineer Research and Development Center US Army Corps of Engineers
More informationStream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM
Stream Buffers Sharpest Tool in the SWM Toolbox 1 Tom Hegemier, PE, D.WRE, CFM www.apaienv.com Stream Buffers - Overview 2 Why stream buffers? Floodplain management and other benefits Existing regulatory
More informationHydrologic Analysis of a Watershed-Scale Rainwater Harvesting Program. Thomas Walsh, MS, PhD Candidate University of Utah
Hydrologic Analysis of a -Scale Rainwater Harvesting Program Thomas Walsh, MS, PhD Candidate University of Utah 1. Hydrologic analysis of watershed-scale RWH networks targeting stormwater runoff volumes,
More informationHow Climate Change Impacts Urban Runoff and Water Quality Design
How Climate Change Impacts Urban Runoff and Water Quality Design by J. C. Hayes, C. Privette, III and S. J. Klaine AWRA Conference Anchorage, AK May 4-7, 2009 Presentation Outline Introduction: Why manage
More informationJune 27, 2012 Holly Galavotti U.S. EPA
June 27, 2012 Holly Galavotti U.S. EPA Urban stormwater is a leading source of water quality impairment Urban stormwater identified as source of impairment (2004 WQ Report) 22,559 miles of impaired rivers
More informationLAKE COUNTY HYDROLOGY DESIGN STANDARDS
LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide
More informationSTORMWATER RETROFIT AND LID COMPETITIVE GRANT PROGRAM G
STORMWATER RETROFIT AND LID COMPETITIVE GRANT PROGRAM G1100286 THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND PIERCE COUNTY SURFACE WATER MANAGEMENT CLARKS CREEK BASIN STORMWATER RETROFITS DESIGN REPORT,
More informationWater Resources Management Plan
B u r n s v i l l e M i n n e s o t a Water Resources Management Plan - Volume Control / Infiltration Worksheet This Appendix contains a worksheet and related information that can be used for evaluating
More informationNames: ESS 315. Lab #6, Floods and Runoff Part I Flood frequency
Names: ESS 315 Lab #6, Floods and Runoff Part I Flood frequency A flood is any relatively high flow of water over land that is not normally under water. Floods occur at streams and rivers but can also
More informationCity of Gig Harbor Stormwater Management and Site Development Manual
City of Gig Harbor Stormwater Management and Site Development Manual Volume III Hydrologic Analysis and Flow Control BMPs Prepared by: Pierce County Surface Water Management Modified by: City of Gig Harbor
More information6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff
October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design
More informationNew Draft Model BMP Design Manual for San Diego Region
New Draft Model BMP Design Manual for San Diego Region Public Input 2013 Storm Water Permit June 10, 2014 & June 11, 2014 1 Welcome Sign-In Refreshments Sponsor Break Q&A and Input 2 Outline of Presentation
More informationThe Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire
The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002
More informationEFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA
EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page
More informationOpti-Tool: A BMP Optimization Tool for Stormwater Management in EPA Region 1
Opti-Tool: A BMP Optimization Tool for Stormwater Management in EPA Region 1 Mark Voorhees, EPA Region 1 Khalid Alvi, Tetra Tech April 20, 2016 Project Background Massachusetts (MA) MS4 General Permit
More informationStormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC
Stormwater Volume and Treatment Methods Simplifying the Numbers IAFSM March 10, 2011 Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Introduction GOALS: Improve understanding of Rate and Volume (Quantity)
More informationModule 6 Temporary Pond and Silt Fence. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control
Module 6 Temporary Pond and Silt Fence by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University of Alabama Tuscaloosa,
More informationL-THIA Online and LID in a watershed investigation
L-THIA Online and LID in a watershed investigation Larry Theller Agricultural and Biological Engineering, Purdue University Great Lakes Sedimentation Workshop Ann Arbor Mi. L-THIA On-line watershed delineation
More informationJune 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach
SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM June 2017 C.3 Workshop Sizing Example Section II. Sizing for Volume-Based Treatment Measures Section II.B Sizing Volume-Based Treatment Measures
More information