Engineering Services Report for. Proposed Student Housing Development. Westwood Hotel Site. Dangan, Upper Newcastle. Galway City
|
|
- Sybil Caldwell
- 5 years ago
- Views:
Transcription
1 Engineering Services Report for Proposed Student Housing Development Westwood Hotel Site Dangan, Upper Newcastle Galway City Client: NTM ROI Seed Capital LP Job No. A079 May 2018
2 Engineering Services Report For Proposed Student Housing Development Westwood Hotel Site, Dangan, Upper Newcastle, Galway City CONTENTS: 1.0 INTRODUCTION SCOPE OF WORKS SITE CONTEXT FOUL DRAINAGE STORM DRAINAGE FLOOD RISK ASSESSMENT POTABLE WATER SUPPLY 13 Appendix A Existing Drainage Records from Galway City Council Appendix B Pre-Development Enquiry to Irish Water Appendix C Irish Water Response to Pre-Development Enquiry Appendix D Attenuation Calculation Appendix E OPW Floodmaps Report This Report was prepared by CS Consulting Engineers for the benefit of its Client only. The contents of this Report are shared with interested parties for information only and without any warranty or guarantee, express or implied, as to the accuracy, reliability or completeness of its content. This Report cannot be relied on by any party other than the party who commissioned it. File Location: J:\A_JOBS\Job-A079\B_Documents\Reports\ESR Job Ref: Author Reviewed By Authorised Issue Date Rev No. A079 GL NB OS A Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report
3 Engineering Services Report For Proposed Student Housing Development Westwood Hotel Site, Dangan, Upper Newcastle, Galway City 1.0 INTRODUCTION Cronin & Sutton Consulting were commissioned by NTM ROI Seed Capital LP, in conjunction with a multi-disciplinary design team, to develop an Engineering Services Report (ESR) to accompany a planning application for the development will comprising of 63 apartments with 394 number student bedrooms to be constructed on the site of the existing Westwood House Hotel. It is proposed to demolish the existing hotel and construct the student accommodation together with a reception area, social spaces, storage areas, all ancillary facilities associated with student accommodation and a commercial retail/café space with 24 number car spaces, (10 permanent and 14 temporary for summer use), an access road, hard and soft landscaping areas etc. The purpose of this Engineering Services Report is to review the potential services available to develop the proposed subject lands. This report addresses drainage (both foul & storm), potable water and flood risk assessment items for the site. The development site is located within the curtilage of Galway City Council (GCC) and is located to the west of the junction of the Upper Newcastle Road and the Thomas Hynes Road (N59), see Figure 1 for site location map. The remainder of the site is bounded to the Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 1
4 south and east by the Tudor Lawn and Dun Daingean residential estates respectively. The total site area of the development is approximately 8,797 sqm (0.88 Ha) and is predominately hardstanding in the form of the existing hotel structure and 97 car parking spaces and access roads. Approximately 2,000m 2 of a greenfield area exists on the site and is predominately situated to the southern quarter of the site. Figure 1 Location of the Proposed Development Site (map data & imagery: Google) A full description of the scheme is outlined in the Planning Report prepared by McCarthy Keville O'Sullivan Ltd. and this report should be read in conjunction with all other documents and drawings submitted with this planning application. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 2
5 2.0 SCOPE OF WORKS Cronin & Sutton Consulting were commissioned by NTM ROI Seed Capital LP to prepare the following Engineering Services Report to accompany a planning application for the site at the Westwood House Hotel, Galway City. In compiling this report CS Consulting liaised with a number of third parties, namely: Galway City Council, Irish Water, Clients representatives & Design Team. In preparing this report the site was visited and assessed. No intrusive on site testing was carried out and all conclusions indicated in this report were based solely on desk top information. 3.0 SITE CONTEXT 3.1 Site Description The total site area of the development is approximately 8,797 sqm (0.88 Ha) The status of the is existing site is predominately hardstanding in the form of the existing hotel structure and car parking spaces and access roads, however approximately 2,000m 2 is greenfield situated to the southern quarter of the site. The topography of the existing site is relatively flat with a small fall southward with ground levels along the northern boundary at 15.9m OD, falling to 15.25m OD on the southern boundary (Note all levels to Malin Head Datum). Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 3
6 4.0 FOUL DRAINAGE 4.1 Existing Foul Drainage Infrastructure Records obtained from Galway City Council (Appendix A) indicate an existing 225mm public foul sewer running eastwards along the northern boundary of the development site, on the Upper Newcastle Road. From a topographical survey taken of the site the existing foul effluent of the hotel outfalls to this sewer. 4.2 Proposed Foul Drainage Infrastructure The proposed development is to consist of 394 number student accommodation rooms, an office, launderette (for the student use only) and a retail unit. Due to the proposed layout of the new buildings, the existing foul outfall is deemed unfeasible to re-use and therefore a new foul network and outfall will be constructed to cater for the foul effluent generated. All foul effluent generated from the proposed development will be collected in pipes of 100mm, 150mm and 225mm in diameter and flow under gravity to the existing 225mm foul sewers on the Upper Newcastle Road a new manhole. The drainage network for the development will be in accordance with Part H of the Building Regulations and the connection manhole to the requirements and specifications of Irish Water. The proposed foul effluent generated by the subject lands will be completely separated from all surface water flows, including post-attenuation storm flows so here will be a minimal impact on the receiving drainage infrastructure. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 4
7 A pre-development enquiry was issued to Irish Water Ltd (Ref: ) in respect to the proposed development and the response received from Irish Water confirmed that there was adequate capacity in the public network to cater for the peak foul discharge of 6.21 l/s from proposed development. A copy of the pre-development enquiry is included in Appendix B, with the respective response letter in Appendix C and the proposed foul water drainage infrastructure and routing plan is shown on drawings A included with this submission. CS confirm, following the grant of permission, the development will be constructed in one phase, with occupation of the development due in September Therefore, a connection to the Irish Water sewer network on the Upper Newcastle will be required before this date. There are no existing Irish Water assets traversing the development site, so there is no requirement for diversions or protection measures to be introduced. The existing 225mm foul sewer on the Upper Newcastle Road is also deep enough to withstand construction traffic loadings and we confirm no protection measures will be required. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 5
8 5.0 STORMWATER DRAINAGE 5.1 Existing Stormwater Drainage Infrastructure Records obtained from Galway City Council (Appendix A) indicate a 375mm diameter public storm drain running eastwards along the northern boundary of the development site, on the Upper Newcastle Road. From a topographical survey taken of the site the existing surface water runoff of the hotel grounds outfall to this drain unattenuated. 5.2 Proposed Storm Water Infrastructure and SuDs CS consulting had preliminary discussions with Mr. Joe McGuire of the drainage department of Galway City Council and stated the existing development site discharged to the public network unattenuated. Mr McGuire confirmed he would no objections to the development if the existing discharge rate from the site could be reduced by 50%. Analysis carried out based on the topographical survey of the site, indicates a flow of 30 l/s currently discharging from the site for a 2-year return rainfall event. Based on the above, it is proposed to limit the surface water flow from the proposed development to 15 l/s (reducing the current flow by 50%). The total site area of the development site subject to re-development is approximately 8,797 sqm (0.88 Ha) with an internal hardstanding area of 5,100 m2 for the external roads, footpaths and roof areas. Based on these parameters the attenuation required for this development is 120 m 3 of storage for the 1 in 100 year storm event plus climate change (see Appendix D for calculations). Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 6
9 It is proposed to retain the storm water volumes in underground tanks (Aquacell Ltd or similar approved), 14.0 x 6.0 x 1.45m deep (120m 3 ) and to release the restricted storm water into the public 375mm diameter surface water drainage system on the Upper Newcastle Road. The last public manhole is to be constructed in accordance with Local Authority s requirements and the storm water flow will be restricted to 15.0 l/s by the use of a flow control i.e. a hydrobrake or similar approved. Additional SuDS features such as a swale to roadway, permeable paving to parking bays, gravel drains to footpaths and waterbutts will be provided to reduce the volume of surface water runoff entering the drainage network. The drainage network for the development will be in accordance with Part H of the Building Regulations and to best practices. The proposed surface water network will be completely separated from all foul water flows, including post-attenuation so there will be a minimal impact on the receiving drainage infrastructure. The proposed surface water drainage infrastructure and routing plan is shown on drawing A included with this submission. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 7
10 6.0 FLOOD RISK ASSESSMENT 6.1 Level of Service There is an existing inherent risk of any flood event occurring during any given year. Typically, this likelihood of occurrence was traditionally expressed as a 1-in-100 chance of a 100-year storm event happening in any given year. A less ambiguous expression of probability is the Annual Exceedance Probability (AEP), which may be defined as the probability of a flood event being exceeded in any given year. Therefore, a 1 in 100 year storm event has a return period of 1% AEP flood event, similarly a 100% AEP can be expressed as a 1-in-1-year event. 6.2 The Planning System and Flood Risk Management, Guidelines for Planning Authorities set out the best practice standards for flood risk assessment in Ireland. These standards are summarised in Table 1.0 (extract from Guidelines document). Under these guidelines a proposed development site has first to be assessed to determine the flood zone category it falls under. Flooding Source Drainage River Tidal/Coastal Residential 1% AEP 0.1% AEP 0.1% AEP Commercial 1% AEP 1% AEP 0.5% AEP Water-compatible - >1% AEP >0.5% AEP (docks, marinas) Table 1.0 Summary of Level of Service Flooding Source. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 8
11 6.3 Climate Change It is a requirement of Galway City Council and the Department of the Environment, Community & Local Government (DoECLG) flooding guidelines (The Planning System and Flood Risk Management, Guidelines for Planning Authorities) that the predicted effects of climate change are incorporated into any proposed design, see Table 2.0. Design Category Drainage Fluvial (River flows) Mean Sea Level Rise Predicted Impact of Climate Change 20% Increase in extreme rainfall depths 20% Increase in flood flows +500mm Table 2.0 The predicted climate change variations based on MRFS 1 (OPW) 6.4 Flood Zones The flooding guidelines categorise the risks associated with flooding into three areas, Zone A, B & C. This categorisation is indicated as follows; Zone A High Probability of Flooding. Where the average probability of flooding from rivers and sea is highest (greater than 1% annually or 1 in 100 for river flooding or 0.5% annually or 1 in 200 for coastal flooding). Zone B Moderate Probability of Flooding. Where the average probability of flooding from rivers and sea is moderate (risk between 0.1% annually or 1 in 1000 years and 1% annually or 1 in 100 years for river flooding, and between 0.1% or 1 in 1000 years and 0.5% annually or 1 in 200 for coastal flooding). 1 Mid-Range Future Scenario, OPW Assessment of Potential Future Scenarios, Flood Risk Management Draft Guidance, Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 9
12 Zone C Low Probability of Flooding. Where the probability of flooding from rivers and sea is moderate (risk is less than 0.1% annually or 1 in 1000 years for both rivers and coastal flooding). In accordance with DoECLG flooding guidelines (the Planning Systems and Flood Risk Management Guidelines for Planning Authorities), residential dwellings are classified as highly vulnerable developments. 6.5 Flood Zone of Proposed Development From a review of the OPW floodmaps website the proposed development is located within the Zone C designation. Figure.1.0 Source-pathway-receptor model from Flood Risk Management Guidelines. 6.6 Fluvial Flooding The site is located approximately 550m from the Corrib River to the north east of the development site and is deemed to be located in Zone C due to the local topography of the development site to the river. A review of the Office of Public Works flood maps database, the area does not indicate any historical fluvial flooding within close vicinity of the site. See Appendix E for the OPW Floodmaps Report. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 10
13 6.7 Tidal Flooding The sites location and elevation is such that it is not effected by tidal water bodies and as such tidal flooding is negligible. 6.8 Pluvial Flooding Pluvial flooding is flooding which has originated from overland flow resulting from high intensity rain fall. There are no records of flood events due to high rainfall events in the area but due the local topography we understand the risk of fluvial flooding to the site is negligible. See Appendix E for OPW Floodmaps Report, following a review of these maps the potential flooding the development site is deemed not to be at risk from pluvial flooding. The development itself will be designed to cater for a 100 year storm event in accordance with requirements of Galway City Council to minimise the risk of pluvial flooding. 6.9 Potential for Site to Contribute to Off-Site Flooding The existing site currently discharges surface water runoff to the public network unrestricted. The proposed development will reduce the runoff entering the public system by 50% provide attenuation sized for a 1 in 100 year storm event (120m 3 ) including climate change By restricting the flow to a reduced rate, the likelihood of the proposed development adversely affecting the public drainage system or contributing to downstream flooding is mitigated. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 11
14 6.10 Existing Off-Site Drainage There is no evidence of hydraulic issues with the local drainage infrastructure. Notwithstanding, the proposed entrances to the development will be slightly raised above the adjoining highway to ensure the egress of flood water from the Upper Newcastle Road, Thomas Hynes Road and Tudor Lawn does not occur Groundwater Flooding No records of groundwater flooding have been found in proximity to the development site and no basement construction is proposed, therefore groundwater flooding of the development site is deemed negligible. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 12
15 7.0 POTABLE WATER SUPPLY 7.1 Existing Potable Water Supply Records obtained from Galway City Council indicate a 100mm PVC public watermain entering the development site from Tudor Lawn that currently supplies the existing hotel. 7.2 Proposed Potable Water Supply It is proposed to re-use the existing water connection from the Tudor Lawn, to serve the new development. The connection will be 110mm diameter PE pipework to Irish Water Ltd standards and will be looped around the proposed development to supply each block as well as for firefighting purposes. 24-hour water storage will be provided at roof level to each block via a pump system which will in turn feed the student units below under gravity. Dual flush toilets and aeration taps to sinks will also be provided to each unit to help reduce the demand of potable water. A pre-development enquiry was issued to Irish Water Ltd (Ref: ) in respect to the proposed development and the response received from Irish Water confirmed that there was adequate capacity in the public network to cater for the peak water demand of 3.1 l/s from proposed development. Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 13
16 However, it was confirmed in the pre-development enquiry response that there is insufficient pressure to serve the higher floors of the development with potable water for fire-fighting purposes. To cater for fire-fighting it is proposed to provide additional breaker tanks and booster pump sets adjacent to each hydrant to ensure sufficient flow to the higher floors. A copy of the pre-development enquiry is included in Appendix B, with the respective response letter in Appendix C and the proposed watermain infrastructure and routing plan is shown on drawing A included with this submission. CS confirm, following the grant of permission, the development will be constructed in one phase, with occupation of the development due in September Therefore, a connection to the Irish Water sewer network on the Upper Newcastle will be required before this date. There are no existing Irish Water assets traversing the development site, so there is no requirement for diversions or protection measures to be introduced. On behalf of Cronin & Sutton Consulting: Gary Lindsay Associate BE, CEng, MIEI Student Housing, Westwood Hotel Site, Galway City - Engineering Services Report 14
17 Appendix A Existing Drainage Records from Galway City Council Student Accommodation, Westwood, Galway City - Engineering Services Report 15
18 Galway City Council Water Department September 5, :1,000 Flow Control Valves Part Closed Reservoir Potable Water mi Non-return Hydro Air Control Valves Water Stop Valves Potable Raw Water Water Mains(Non Irish Water Owned) Untreated km Orifice Plate Non Boundary Meter Pump Stations Potable Water PRV PSV Other Boundary Valves Meter Group Scheme Source Boundary Meter Water Network Structures Abstraction Point Kisok Water Fittings Water Lateral Lines Irish Water Non IW Water Abandoned Lines Open District (Boundary Meter) Cap Water Casings Closed Water Hydrants Other Fitting Part Closed Fire Hydrant Water Distribution Chambers Non Boundary Valves Open Fire Hydrant/Washout Washout Pressure Monitoring Point Water Mains(Irish Water Owned) osi Closed Treatment Plant Untreated For Non-SLA Local Authority staff use only. "Copyright Ordnance Survey Ireland. All rights reserved.2017/14/ccma/galwaycitycouncil."
19 Galway City Council Water Department September 5, 2017 Gravity Main (Irish Water Owned) Surface Gravity Main (Non-Irish Water Owned) Surface Storm Manholes Cascade Catchpit Hatchbox Lamphole Standard Other; Unknown Storm Inlets Gully Standard Other; Unknown Storm Fittings Vent/Col Other; Unknown Storm Discharge Points Outfall Overflow Soakaway Other; Unknown Storm Culverts Storm Clean Outs Stormwater Pressure Mains Surface osi 1:1, mi km For Non-SLA Local Authority staff use only. "Copyright Ordnance Survey Ireland. All rights reserved.2017/14/ccma/galwaycitycouncil."
20 Galway City Council Water Department September 5, :1,000 Sewer Discharge Points Gully Foul mi Outfall Overflow Standard Other; Unknown Overflow Unknown km Soakaway Sewer Manholes Sewer Gravity Mains (Non-Irish Water owned) Standard Outlet Cascade Combined Other; Unknown Catchpit Foul Sewer Clean Outs Hatchbox Overflow Rodding Eye Flushing Structure Other; Unknown Lamphole Standard Other; Unknown Unknown Sewer Pressurized Mains Combined Sewer Flow Control Valves Treatment plant Sewer Fittings Vent/Col Foul Overflow osi Pump station Other; Unknown Unknown Sewer Inlets Sewer Gravity Mains (Irish Water owned) Catchpit Combined For Non-SLA Local Authority staff use only. "Copyright Ordnance Survey Ireland. All rights reserved.2017/14/ccma/galwaycitycouncil."
21 Appendix B Pre-Development Enquiry to Irish Water Student Accommodation, Westwood, Galway City - Engineering Services Report 16
22
23
24
25
26
27
28
29
30
31 Appendix C Irish Water Response to Pre-Development Enquiry Student Accommodation, Westwood, Galway City - Engineering Services Report 17
32 Biggurat Westwood Ireland Lt c/o Gary Lindsay CS Group, Dame Street Dublin 2 Letter Ref: CDSCOF1 3rd November 2017 Dear Sir/Madam, Re: pre-connection enquiry - Subject to contract Contract denied Connections for 427 Room Student Accomodation Development at Westwood House Hotel, Dangan, Upper Newcastle Road, Galway Irish Water has reviewed your pre-connection enquiry in relation to water and wastewater connections at Dangan, Upper Newcastle Road, Galway Based upon the details you have provided with your pre-connection enquiry and on the capacity currently available as assessed by Irish Water, we wish to advise you that, subject to a valid connection agreement being put in place, your proposed connection to the Irish Water network can be facilitated. The existing Westwood House Hotel has an existing connection to the Irish Water network and it is proposed to utilise the existing connection point for the proposed development. The existing Irish Water water supply network can facilitate the proposed additional demand asscociated with the proposed student accomodation development. The confirmation of feasibility to connect to the Irish Water infrastructure does not extend to your fire flow requirements. To guarantee a flow to meet the Fire Authority requirements you should provide adequate fire storage capacity within your development. The existing Westwood House Hotel has an existing connection to the Irish Water 225mm diameter wastewater network which runs along the N59 Moycullen Road. The existing Irish Water wastewater network can facilitate the proposed additional loading asscociated with the proposed student accomodation development. It is noted that should a trade type effluent be proposed as part of the proposed development then a Trade Effluent to Sewer Discharge Licence may require to be in place prior to a connection being made. The applicant is advised to visit in this regard. The water and wastewater infrastructure should be designed and constructed in accordance with the IW Codes of Practice and Standard Details. You are advised that this correspondence does not constitute an offer in whole or in part to provide a connection to any Irish Water infrastructure and is provided subject to a connection agreement being signed at a later date.
33 A connection agreement can be applied for by completing the connection application form available at Irish Water s current charges for water and wastewater connections are set out in the Water Charges Plan as approved by the Commission for Energy Regulation. If you have any further questions, please contact James O Malley from the design team at jomalley@water.ie. For further information, visit Yours sincerely, Maria O Dwyer Connections and Developer Services
34 Appendix D Attenuation Calculation Student Accommodation, Westwood, Galway City - Engineering Services Report 18
35 JOB NAME:Westwood Galway JOB NO: A079 Oct-17 TITLE: Preliminary Attenuation Calculations CALCS BY: CHECK'D: GL RFM RCD. 48 ISSUE. 1 REV. 1 Design Storm Return Period: Nearest Rainfall Gauge: 100 years Sligo Total Site Area: 0.80 ha Roof Area: 0.00 ha.@ 100% Impervious Hard Surface: 0.51 ha.@ 95% Impervious Open Area: 0.29 ha.@ 5% Impervious Effective Impermeable Area: 0.50 ha Allowable Outflow Calculate IH124: QBAR = x AREA 0.89 x SAAR 1.17 x SOIL 2.17 SAAR: 919 mm Soil Type: 3 SOIL: 0.37 QBAR/ha 3.95 l/s/ha Specified Allowable Outflow Allowable Outflow l/s/ha l/s Duration Rainfall Intensity Discharge Proposed Contiguous Total Allowable Storage 100 Q Runoff Land Runoff Outflow Req'd Year (= 2.71Ai) Runoff (min) (mm) (mm/hr) (l/s) (m 3 ) (m 3 ) (m 3 ) (m 3 ) (m 3 ) Storage required = 120 m 3
36 Appendix E OPW Floodmaps Report Student Accommodation, Westwood, Galway City - Engineering Services Report 19
37 Summary Local Area Report This Flood Report summarises all flood events within 2.5 kilometres of the map centre. The map centre is in: County: Galway NGR: M This Flood Report has been downloaded from the Web site The users should take account of the restrictions and limitations relating to the content and use of this Web site that are explained in the Disclaimer box when entering the site. It is a condition of use of the Web site that you accept the User Declaration and the Disclaimer. Map Legend Flood Points Multiple / Recurring Flood Points Areas Flooded Hydrometric Stations Rivers Lakes River Catchment Areas Land Commission * Drainage Districts * Benefiting Lands * 1 Result Map Scale 1:5,229 * Important: These maps do not indicate flood hazard or flood extent. Thier purpose and scope is explained in the Glossary. 1. Quay Street Galway Jan 1995 Start Date: 17/Jan/1995 County: Galway Flood Quality Code: 3 Additional Information: Reports (1) More Mapped Information Report Produced: 12-Jan :29
Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.
7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological
More informationKildare County Council. Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare.
Job No. : 16027 SHB2-CLA-CS-MOR Date: Feb 2018 Kildare County Council Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare. Engineering Report 2B
More informationSITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN / F5.1 3 RD JANUARY 2018
SITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN 7 26 098 / F5.1 3 RD JANUARY 2018 Issued For Distribution Revision Final Architect B 1 INTRODUCTION 1.1 It
More informationRespond! Housing Association. Residential Development at Flinters Field, Athy, Co. Kildare. Engineering Report. Job No. : Date: April 2017
Job No. : 16036 Date: April 2017 Respond! Housing Association Residential Development at Flinters Field, Athy, Co. Kildare Engineering Report 2B Richview Office Park Clonskeagh Dublin 14 Contents Amendment
More informationKildare County Council. Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare.
Job No. : 16027 SHB1-CRA-CS-MOR Date: April 2017 Kildare County Council Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare. 2B Richview Office
More information5.9 Water (Drainage, Supply, Flood Risk and Groundwater)
5.9 Water (Drainage, Supply, Flood Risk and Groundwater) 5.9.1 Introduction This Chapter of the EIAR presents the water assessment for the Demolition, Construction and Operational Phase of the proposed
More informationGuide to completing the Pre Connection Enquiry Application Form
Guide to completing the Pre Connection Enquiry Application Form This form is to be filled out by applicants enquiring about the feasibility of a water and/or wastewater connection to Irish Water infrastructure.
More informationSurface Water Guidance for Developers
Surface Water Guidance for Developers Contents Overview of Sustainable Drainage Systems (SuDS)... 2 Information Required in a Flood Risk Assessment or Drainage Strategy... 3 Outline Planning Applications...
More informationFlood Risk and Drainage Assessment.
Flood Risk and Drainage Assessment. Change of Use off land to Leisure Complex At, Caersws, Powys, SY17 5SB October 2018 Statement prepared for: Mr T Bebb By Woodsyde Developments Ltd Woodsyde Developments
More informationRising Sun. Scaffold Hill. Flood Risk Assessment
Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11
More informationpoga Engineering Planning Report Residential Scheme Earls Court Kill Co Kildare CONSULTING ENGINEERS STRUCTURAL & CIVIL
poga Pat O Gorman & Associates CONSULTING ENGINEERS STRUCTURAL & CIVIL Engineering Planning Report Residential Scheme Earls Court Kill Co Kildare Ref: 1715-EPS(P)-R1 Date of Original Issue: July 2017 Date
More informationDrainage Strategy Report
CONSULTING ENGINEERS Report No: Date: C1014 Aug 2017 Project: Drainage Strategy Report Danygraig Works, Risca Client: P.D. Edenhall This report is provided for the benefit only of the party to whom it
More informationProposed Alterations and Extension to 17 St. John's Road, Sandymount, Dublin 4
Proposed Alterations and Extension to 17 St. John's Road, Sandymount, Dublin 4 Engineering Report April, 2014 1422 Issue 1 Casey O Rourke Associates Structural & Civil Consulting Engineers 77 Merrion Square
More informationNational Paediatric Hospital Project. Planning Application Satellite Centre, Tallaght Hospital - Engineering Report
National Paediatric Hospital Project Planning Application Satellite Centre, Tallaght Hospital - Engineering Report Roughan & O'Donovan Consulting Engineers Tallaght satellite centre, Dublin 24 Tallaght
More informationAttachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)
IE0311133-22-RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE0311133-30-RP-0001) IE0311133-22-RP-0001_A_02.DOC Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals
More informationFlood Risk Assessment. for. Proposed Residential Development at Bentletts Scrap Yard Claygate Road Collier Street Kent
Flood Risk Assessment for Proposed Residential Development at Bentletts Scrap Yard Claygate Road Collier Street Kent 1129-1008 February 2016 RCD Consultants Ltd Proposed Residential Development Bentletts
More informationStormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications
Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage
More informationBarton Farm Winchester. Outline Planning Application A New Suburb for Winchester. Flood Risk Assessment prepared by Parsons Brinckerhoff
Barton Farm Winchester Outline Planning Application A New Suburb for Winchester Flood Risk Assessment prepared by Parsons Brinckerhoff November 2009 BARTON FARM WINCHESTER FLOOD RISK ASSESSMENT May 2009
More informationCOLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment
COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment APRIL 2017 CONTACTS JOSHUA MOORE Graduate Hydrologist dd ++44 (0) 117 372 1238 joshua.moore@arcadis.com
More informationFoul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY
Foul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY RMB Consultants (Civil Engineering) Ltd March 2015 RMB Consultants (Civil Engineering) Ltd 39 Cossington Road
More informationPreliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers
Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers 1. Objective of this guidance and Procedure W5-074/A is to assist
More informationDevelopers Guide for Surface Water Management.
Developers Guide for Surface Water Management www.southwark.gov.uk Contents 1. Introduction... 2 2. Requirements for Flood Risk Assessments and Drainage Strategies... 3 2.1 Planning Applications... 3 2.2
More informationStormwater Management Practice Note NSC 07: Detention Tanks
Stormwater Management Practice Note NSC 07: Detention Tanks This practice note has been developed to give general information on the minimum design requirements and maintenance of detention tanks for both
More informationAPPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary
APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report
More informationAppendix 8.4. Site-wide Drainage Strategy
Appendix 8.4 Site-wide Drainage Strategy Noble House, Capital Drive, Linford Wood, Milton Keynes MK14 6QP T +44 (0)1908 669898 F +44 (0)1908 669899 E harrisjt@rpsgroup.com W www.rpsgroup.com/design THE
More informationATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)
ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-
More informationFunctional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1
Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...
More informationSTORMWATER MANAGEMENT REPORT. Dundas Square Gardens Inc. High Rise Residential/Commercial Development
STORMWATER MANAGEMENT REPORT Dundas Square Gardens Inc. Revised: April 6, 2016 Revised: January 12, 2016 Revised: July 10, 2015 OUR FILE: 14-RE-352 June 16, 2014 TABLE OF CONTENTS PAGE 1.0 Scope of work
More informationFoul Water Drainage Strategy Monkton Road Minster CT12 4EE
66-68 Monkton Road Minster CT12 4EE RMB Consultants (Civil Engineering) Ltd May 2016 RMB Consultants (Civil Engineering) Ltd 39 Cossington Road Canterbury Kent CT1 3HU Tel 01227 472128 www.rmbconsultants.co.uk
More informationSewer Capacity Assessment
Sewer Capacity Assessment Wainlode Lane, Norton, Gloucestershire DE-1607-722 Version 2 Date: 10 th February 2017 Black & Veatch Ltd. 60 High Street Redhill Surrey RH1 1SH Sewer Capacity Assessment Summary
More informationIsle of Wight Strategic Flood Risk Assessment MK2. Appendix E West Wight
Isle of Wight Strategic Flood Risk Assessment MK2 Appendix E June 2010 Isle of Wight Strategic Flood Risk Assessment Overview The RDA is comprised of the towns of Totland and Freshwater and is classified
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers
More informationPre-Development Enquiry Form
Pre-Development This application form is to be used to assess if we are able to provide your development with water and/or drainage services for a planned development. It is expected that this is submitted
More informationProposed Strategic Housing Development at the Former Doyles Nursery, Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18
Proposed Strategic Housing Development at the Former Doyles Nursery, Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18 Flood Risk Assessment Report Vimovo Doyles Limited Project Number:
More informationPRE-APPLICATION MEETING Meeting Minutes
PRE-APPLICATION MEETING Meeting Minutes Date/Time : Location : Attendees: Site Location: LPA District reference: KCC reference: 2 nd May 2017, 09:30am The Street, Great Chart, Ashford Alex Brauninger,
More informationYorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report
Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345
More informationAdoption of sewers. Application for the adoption of a sewer under Section 104 of the Water Industry Act Section 1A: Applicant s details
Adoption of sewers Application for the adoption of a sewer under Section 104 of the Water Industry Act 1991 NOTE: Please ensure all relevant sections of the application are completed and refer to the attached
More informationMasters Geelong Stormwater Management Plan
` Masters Geelong Job Number: CG111748 ABN 47 106 610 913 150 Oxford Street, Collingwood Victoria 3066 Australia Telephone: 03 8415 7777 Facsimile: 03 8415 7788 International: +61 3 8415 7777 victoria@cardno.com.au
More informationWSUD On-site Detention in xprafts 2013
WSUD On-site Detention in xprafts 2013 Content 1. Introduction of ODS 2. General a. Impervious Area b. Pervious Area Capture c. Average Allotment Density d. Developed Area/Total Area 3. On-site Detention
More informationFlood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully
Flood Consequence Assessment Proposed Commercial Development, Tank Farm Way, Sully Client O Reilly Concrete Group Larchfield Kingscourt County Cavan Ireland By RVW Consulting 6 Neptune Court Vanguard Way
More informationModelling a Combined Sewage and Stormwater Flood Detention Basin
Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip
More informationSECTION 6 STORMWATER AND LAND DRAINAGE
SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS... 2 6.1.1 General... 2 6.2 MEANS OF COMPLIANCE... 3 6.2.1 General...
More informationFLOOD RISK ASSESSMENT
Firth Buildings, 99-101 Leeds Road, Dewsbury, WF12 7BU t 01924 464342 f 01924 450662 e trevor.haigh@haighhuddleston.co.uk FLOOD RISK ASSESSMENT ON LAND AT BUTT LANE SNAITH WEST YORKSHIRE FOR HARRON HOMES
More informationMuse Developments Ltd Mile End Road Development Flood Risk and Surface Water Drainage Strategy
Muse Developments Ltd Mile End Road Development Flood Risk and Surface Water Drainage Strategy FRSWDS/MER Issue 1 20 October 2016 This report takes into account the particular instructions and requirements
More informationSustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century
Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century R. Kellagher 1 and H. Udale-Clarke 1 * 1 HR Wallingford Ltd., Howbery Park, Wallingford. Oxfordshire, OX10 8BA,
More informationIsle of Wight Strategic Flood Risk Assessment MK2. Appendix P Newport
Isle of Wight Strategic Flood Risk Assessment MK2 Appendix P June 2010 Isle of Wight Strategic Flood Risk Assessment Overview Please review this discussion in conjunction with the mapping provided in this
More informationSurface Water Drainage Pro-forma for major developments
Surface Water Drainage Pro-forma for major developments We advise that developers complete this form and submit it to the Local Planning Authority with their planning application, referencing from where
More informationThe Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives
More informationAttachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS
Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Lagan Cement Ltd. IPPC Licence Application Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Air Contents F.2.0 Air Emissions.3 Water
More informationAppendix 15.3 Hydraulic Assessment of Sewers
Appendix 15.3 Hydraulic Assessment of Sewers Irish Water Arklow Wastewater Treatment Plant Project EIA Report Issue September 2018 Arup \\GLOBAL\EUROPE\DUBLIN\JOBS\247000\247825-00\4. INTERNAL\4-03 DESIGN\4-03-02
More informationAppendix 9 - Engineering Performance Standards
Appendix 9 - Engineering Performance Standards A9.1 Introduction A9.1.1 This Appendix contains standards that apply to the subdivision of land. It is referred to in the Subdivision Rules for the Living,
More informationNuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment
Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices Appendix C - Herriot Consulting Engineering Assessment 4th May 2018 C1803-002 Rocland Estate Lot 147 Sturt Highway, Nuriootpa
More informationLidl, Chippenham. Flood Risk Assessment & Drainage Strategy. September 2017
September 2017 DOCUMENT VERIFICATION RECORD CLIENT: SCHEME: INSTRUCTION: Lidl UK GmbH Proposed Lidl Food store at the former Middlefield Adult Training Centre, Chippenham SN14 0JP The instruction to carry
More informationABERDEEN HARBOUR EXPANSION PROJECT November Volume 2: Environmental Statement. Chapter 8: FLOOD RISK AND SURFACE WATER
ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 2: Environmental Statement Chapter 8: FLOOD RISK AND SURFACE WATER 8. FLOOD RISK AND SURFACE WATER 8.1 Introduction This chapter presents an assessment
More informationAPPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS
APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method
More informationFollowing the November 2009 flood event Galway County Council and the OPW have been working together on the Ballinasloe flooding situation.
Derrymullan, Ballinasloe Flood Defence Wall, Report October 2011 Following the November 2009 flood event Galway County Council and the OPW have been working together on the Ballinasloe flooding situation.
More informationStorm Water Management
Storm Water Management Policy September 2014 2 Sustainable drainage feature designed to control and manage flows through a series of check dams 3 Document Name: Storm Water Management Controlled Copy No:
More informationEPA Export :23:27:55. For inspection purposes only. Consent of copyright owner required for any other use.
Finnea Agglomeration Wastewater Treatment Plant Waste Water Certificate of Authorisation Application (Register Number A0068-01) Regulation 24 Compliance Requirements County Buildings Mullingar Co. Westmeath
More informationThinking about developing or building on land with ponding or drainage issues?
Thinking about developing or building on land with ponding or drainage issues? Much of the Kāpiti Coast is low-lying and subject to flooding, ponding or drainage issues. We need to pay careful attention
More informationAppendix H Water Resources, Drainage and Flood Risk Assessment
Blossom Street Appendix H Water Resources, Drainage and Flood Risk Assessment Replacement Environmental Statement Volume III 3461 Blossom Street Flood Risk Assessment December 2014 100 St John Street
More informationRE: FLOOD MITIGATION STRATEGY FOR THE PROPOSED DEVELOPMENT REFERRED TO AS LAND AT BRACKENWAY, FORMBY
Your Reference: DC/2018/00093 Our Ref: 881079 FRA L05 18 th December 2018 Sefton Council Planning Services Magdalen House 30 Trinity Road Bootle L20 3NJ 14,Beecham Court, Pemberton Business Park, Wigan,
More informationAdoption of Sewers Application for the adoption of a sewer under Section 104 of the Water Industry Act 1991
Adoption of Sewers Application for the adoption of a sewer under Section 104 of the Water Industry Act 1991 NOTE: Please ensure all relevant sections of the application are completed and refer to the attached
More informationAction plans for hotspot locations
Action plans for hotspot locations Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side of the railway. Guildford
More informationAPPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS
ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011
More informationD12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY
D12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY OBJECTIVES D12/a To ensure that the development would not be at risk of flooding either from itself
More informationOutline Corrective Action Summary
Outline Corrective Action Summary Technical Note 20 October 2017 Quality information Prepared by Checked by Approved by Matteo Viganotti Senior Environmental Consultant David Mullan Associate Environmental
More informationStormwater Management Plan - Phase 1
Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Stormwater Management Plan - Phase 1 1a Ammonia Plant 103H Building Construction 1b Ammonia Plant General Construction March 2010 Revision 0 Document
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design
More informationFlood Risk Assessment
15T788 Proposed Lidl Store, Stanley Street, South Shields 07 December 2015 Prepared By Billinghurst George & Partners www.bgp-consulting.co.uk Waterloo House, Teesdale South, Thornaby, Stockton on Tees
More informationENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013
ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the owner. Neither
More informationSustainable Drainage Design Guidance
Sustainable Drainage Design Guidance Contents Introduction 3 1. Legislative and Policy Background 4 2. What are Sustainable Drainage Systems? 5 3. Designing SuDS 7 4. Maintaining SuDS 9 5. Construction
More informationPRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.
PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION
More informationCity Development Plan Variation No. 7 Marina Park - Pairc Ui Chaoimh
City Development Plan Variation No. 7 Marina Park - Pairc Ui Chaoimh Strategic Environmental Assessment (SEA) Screening Report 25 th November 2011 Cork City Council Comhairle Cathrach Chorcaí Proposed
More informationFUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE
FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...
More informationInfrastructure and Servicing Assessment Report Ballantyne Road Oxidation Ponds Site, Wanaka Prepared for Queenstown Lakes District Council
Infrastructure and Servicing Assessment Report Ballantyne Road Oxidation Ponds Site, Wanaka Prepared for Queenstown Lakes District Council Infrastructure and Servicing Assessment Report Ballantyne Road
More informationDrainage Philosophy 15T788 Proposed Retail and Business Development, Stanley Road, South Shields 08 December 2015 Prepared By Billinghurst George & Partners www.bgp-consulting.co.uk Waterloo House, Teesdale
More informationInitial Construction Costs For Various Pavement and Drainage Options
Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types
More informationHydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)
Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.
More informationHorton Landfill, Small Dole, West Sussex. Infill of geological SSSI. Surface Water Management Assessment. Current Approved Design
Horton Landfill, Small Dole, West Sussex Infill of geological SSSI Surface Water Management Assessment Current Approved Design Planning Permission DC/814/07 (UB) Condition 21 (Surface Water Management)
More informationLand at Cowdray Avenue, Colchester Flood Risk Assessment. Appendices
Land at Cowdray Avenue, Colchester Flood Risk Assessment Appendices Land at Cowdray Avenue, Colchester Flood Risk Assessment A Existing Site Topographical Survey Adopted Sewer Plans Anglian Water Pre Planning
More informationCOOPER STREET, EPPING STORMWATER MANAGEMENT STRATEGY. May Cooper Street Pty Ltd
415-425 COOPER STREET, EPPING STORMWATER MANAGEMENT STRATEGY May 2017 Cooper Street Pty Ltd Disclaimer Dalton Consulting Engineers Pty Ltd This report has been prepared solely for the benefit of Cooper
More informationWormald Burrows Partnership Limited Civil Engineering Consultants
Wormald Burrows Partnership Limited Civil Engineering Consultants HARE STREET ROAD, BUNTINGFORD FLOOD RISK ASSESSMENT JUNE 201 REGISTRATION OF AMENDMENTS Revision Date Amendment Details Prepared by Checked
More informationNumerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area
Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Kenji KAWAIKE* and Hajime NAKAGAWA* *Disaster Prevention Research Institute, Kyoto University (Received:
More informationStormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)
Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater
More informationDOUGHTY ROAD, GRIMSBY Flood Risk Assessment and Surface Water Drainage Strategy DECEMBER 2017
Flood Risk Assessment and Surface Water Drainage Strategy DECEMBER 2017 CONTACTS SARAH DEMETRIOU Graduate Flood Modeller dd 0117 313 6152 e sarah.demetriou@arcadis.com Arcadis. 2 Glass Wharf Temple Quay
More informationSITE SERVICING PRELIMINARY DESIGN BRIEF
855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855
More informationEPA Waste Water Discharge Licence Application
Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update
More informationDevelopment enquiry request
Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached
More informationOur ref: NE/2011/112644/02-L01 Your ref: 2011/0898. Mr Stanley Lau Waltham Forest Borough Council Planning & Transportation Service
Mr Stanley Lau Waltham Forest Borough Council Planning & Transportation Service Stanley.Lau@walthamforest.gov.uk Our ref: NE/2011/112644/02-L01 Your ref: 2011/0898 Date: 25 April 2012 Dear Mr Lau Re-consultation
More informationDrainage design tools
Drainage design tools Richard Kellagher This presentation Designing drainage systems > Conveyance >Storage > Infiltration > Interception > Exceedence Assessing outline designs (planning) Checking detailed
More informationDrainage Servicing Report - Terms of Reference
Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage
More informationAnnual Environmental Report
Annual Environmental Report For Waste Water Discharge Licence D0208-01 Dungloe Agglomeration Licensee Donegal County Council Contents; 1.0 Introduction and Summary 2.0 Monitoring Report 3.0 Operational
More informationFlood Risk Assessment
Temporary Shale Gas Exploration Roseacre Wood, Lancashire PNR_PL_ June 2014 Contents 1 Introduction 1 2 Development Description and Location 2 Page 2.1 Location 2 2.2 Existing Site Characteristics 3 2.3
More informationOHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:
Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph
More informationLand North East of Blandford
Land North East of Blandford On behalf of Savills Plc Project Ref: 36965/4001 Rev: B Date: February 2016 Office Address: Lakeside House, Blackbrook Business Park, Blackbrook Park Avenue, Taunton TA1 2PX
More informationGalway County Council Portumna Draft Local Area Plan Strategic Flood Risk Assessment of Material Alterations
Galway County Council Portumna Draft Local Area Plan 2016-2022 Strategic Flood Risk Assessment of Material Alterations 4-04-03 Issue 1 23 February 2016 This report takes into account the particular instructions
More informationNew Connections Services Charging Arrangements
New Connections Services Charging Arrangements 2018-19 January 2018 Contents Charging arrangements for new connection services... 3 Introduction to our charges... 3 Who pays for what?... 4 Who can deliver
More informationPortsmouth Flood Alleviation Scheme part of Southern Water s 50m programme of improvements to the sewer network in Portsmouth
www.projectsonline.com water & Sewerage Portsmouth Flood Alleviation Scheme part of Southern s 50m programme of improvements to the sewer network in Portsmouth by Robert McTaggart BEng CEng CIWEM P ortsmouth
More informationENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT
ENGINEERING INFRASTRUCTURE ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT Job No 37240R#C Date May 17 Level 1, 12 14 Como Street, PO Box 33 426, Takapuna,
More informationAyrburn Farm Development Infrastructure Assessment Report
Ayrburn Farm Development Infrastructure Assessment Report 1 EXECUTIVE SUMMARY Further to Clark Fortune McDonald & Associates correspondence dated 12 February 2015 please find below the assessment of foul
More information