SUMMARY OF PRICES FOR 30MVA 161/24/36 kv MOBILE SUBSTATION ACCORDING to SR-152
|
|
- Annabella Knight
- 6 years ago
- Views:
Transcription
1 Israel Electric Corporation Ltd. Tender no. Name of Contractor: SUMMARY OF PRICES FOR 30MVA 161/24/36 kv MOBILE SUBSTATION ACCORDING to SR GENERAL INSTRUCTIONS 2.1. Prices for the above captioned tender must be inserted in this Annexure only 2.2..Prices may not be contingent upon quantities or otherwise All Items hereunder determined in SR-152 technical specification 2. PRICES FOR EQUIPMENT: 2.1. Unit price for ITEM 1: 170kV Outdoor SF6 Gas Insulated Switchgear for Mobile substation mounted on a high way semitrailers connecting between 161kV Over-Head line and primary side of power transformer according to the one line diagram SP in the following alternatives Alternative 1: 170kV Outdoor SF6 Gas Insulated Switchgear three phases encapsulated in two (2) options of connection to Power transformer (Z1): Option A: Three (3) single-phase cable Option B: Three (3) single-phase direct Alternative 2: 170kV Outdoor SF6 Gas Insulated Switchgear single phase encapsulated in two (2) option connection to Power transformer (Z1): Option A: Three (3) single-phase cable. C - 1
2 Option B: Three (3) single-phase direct 2.2. Unit price for ITEM 2: Main power transformer 30MVA 161/36-24kV Dyn ITEM 3 M.V. Surge Arrester: Unit price for ITEM 3.1 Three (3) Metal oxide gapless surge arrester at 33 kv voltage level Unit price for ITEM 3.2 One (1) Metal oxide gapless surge arrester at kv voltage level 2.4. ITEM 4 Cubicles installed in air conditioned outdoor L.V. Container on mobile substation trailer including: Unit price for ITEM 4.1 Control and metering equipment necessary for operation of 170kV SF6 switchgear, visual alarm signals Unit price for ITEM 4.2 Protective relaying equipment of power transformer Unit price for ITEM 4.3 Control and metering for AC and DC auxiliaries supply Unit price for ITEM 4.4 RTU unit for National Control Center (NCC) Unit price for ITEM 4.5 Communication equipment Unit price for ITEM 4.6 Junction box Regional dispatch center (RDC) 2.5. ITEM 5 DC supply for services installed in air conditioned outdoor L.V. Container, including: Unit price for ITEM DC Battery Unit price for ITEM Battery Charger 45A 60Vdc/400Vac 2.6. ITEM 6 Seven (7) bays 36kV metal enclosed SF6 gas insulated installed in air-conditioned outdoor mobile M.V. Container on mobile substation trailer, including: Unit price for ITEM One (1) bay 36kV A for 36kV incoming feeder connecting to secondary side of main power transformer Unit price for ITEM 6.2 One (1) bay 36kV A busbar coupler Unit price for ITEM 6.3 One (1) bay 36kV - 630A capacitors bank Unit price for ITEM 6.4 One (1) bay 36kV - 630A C - 2
3 Unit price for ITEM 6.5 One (1) bay 36kV - 630A Unit price for ITEM 6.6 One (1) bay 36kV - 630A Unit price for ITEM 6.7 One (1) bay 36kV - 630A 2.7. ITEM 7 The Neutral Switchgear SF6 gas insulated in M.V. Container on the mobile substation, including: Unit price for ITEM 7.1 One (1) 36/ 3kV bay, 400A, for connection to Petersen Coil and to Neutral Point of power transformer Unit price for ITEM 7.2 One (1) 36/ 3kV bay, 400A, for connection to earthing system 2.8. ITEM 8 Neutral Earthing system for outdoor application, including: Unit price for ITEM kV Arc Suppression Reactor with continuously adjustable rated current 15Amp to 150Amp, with restricted dimensions and weight Unit price for ITEM 8.2 Resistor Switching System (RSS) included in outdoor metal clad cabinet Unit price for ITEM 8.3 Automatic Resonance Controller (ARC) for automatic tuning of the coil inductive current (OPTIONAL) Unit price for ITEM 8.4 Current Injection Unit (CIU) into secondary winding of Arc Suppression Reactor (OPTIONAL) 2.9. Unit price for ITEM 9 2 x 4 [MVAR] 36kV Capacitor Bank Unit price for ITEM 10 Electrical Power Protections Unit price for ITEM 11 Fire Protection Measures Unit price for ITEM 12 Security Alarm System Unit price for ITEM 13 Earthing System Unit price for ITEM 14 Cables Unit price for ITEM 15 Semitrailers "A" and B Unit price for SPARE PARTS AND TOOLS according manufacturer list: C - 3
4 3. PRICES FOR SERVICES : 3.1. TRAINING COURSE (OPTIONAL): Price for training course services per day for IECo staff Recommended quantity of days for complete training course services [days] Total price for complete Training Course services (training price per day multiplied by days of course) 3.2. ERECTION and COMMISSIONING SURPERVISION - (OPTIONAL): Price for erection and commissioning supervision services per person, for one day Estimated quantity of men*days required for erection and commissioning supervision services per one Mobile Substation [men*days] Total price for complete erection and commissioning supervision services (sub-clause multiplied by subclause ) Indicate how many MS is required supervision if it's more than one MS. 4. TOTAL PRICES IN BASIC ORDER 4.1. For complete 5 sets Mobile Substations (ITEM 1 to 15): 5. TOTAL PRICES IN EXTENSION ORDER (EXTEND SOLELY BY THE PURCHASER) 5.1. For complete 3 sets Mobile Substations (ITEM 1 to 15): 6. DELIVERY 7.1. Port of origin for delivery 7.2. Manufacturer s part number 7.3. Total (gross) weight per shipped complete 1 set according to sub-clause 4.1 [kg] 7.4. Total (gross) volume per shipped complete 1 set according to sub-clause 4.1 [m 3 ] 7.5. Shipping dimensions (Width*Length*Height) per shipped complete set according to sub-clause 4.1 [mm*mm*mm] C - 4
5 Signature of Contractor Print name and title of signing officer Date of Proposal C - 5
A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS
A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS Willy LORD SwedPower AB Sweden willy.lord@swedpower.com Lennart AHNLUND Vattenfall Eldistribution AB Sweden B. WALLBING-LÖVGREN Vattenfall Eldistribution
More informationMOBILE SUBSTATIONS TRAILER AND SKID. tgood.com. Energy, Fast!
MOBILE SUBSTATIONS TRAILER AND SKID tgood.com Energy, Fast! Global leader in E-House and prefabricated substation solutions PRODUCT OVERVIEW Custom configurable skid-mounted and trailer-mounted designs.
More informationPLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationNEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate
NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) SAMUNDRATAR TRISHULI 3B HUB 132 KV TRANSMISSION LINE PROJECT BIDDING DOCUMENT FOR DESIGN, SUPPLY AND CONSTRUCTION OF 132/33 KV SUBSTATION
More informationmv & hv switchgears Installation Servicing Testing Commissioning
mv & hv switchgears Installation Servicing Testing Commissioning mission With exceptional professionalism we always exceed our customers' expectations by increasing their productivity and competitiveness
More informationCompany Introduction and Information EPTCON LTD. 560 SHELDON DRIVE, CAMBRIDGE ONTARIO. PHONE:
Company Introduction and Information EPTCON LTD. 560 SHELDON DRIVE, CAMBRIDGE ONTARIO. PHONE: 519 620 4414 WWW.EPTCON.COM Company Background ABOUT US EPTCON Ltd. (Electrical Power & Transmission Construction),
More informationImportant Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008
Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:
More informationClarification Lot C Technical List No.03. Ref Clause / Page Description Bidders Query KETRACO response
Clarification Lot List 03 1 Lot C Nairobi East LVAC and DC - for the purpose of the tender the bidders shall offer a new system covering the 400kV and 220kV. Control System - the price schedule is clear,
More informationPre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network
Electricity Specification 220 Issue 3 December 2016 Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Contents 1 Introduction
More informationSECTION 1 - INTENT, SYSTEM REQUIREMENT, DESIGN CRITERIA AND SCOPE
Customer : Tamil Nadu Transmission Corporation Limited. Section 1 SECTION 1 - INTENT, SYSTEM REQUIREMENT, DESIGN CRITERIA AND SCOPE 1.0.0 INTENT OF SPECIFICATION 1.1.0 This specification covers the design,
More informationDESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT
DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT Mining & Industrial Switchgear Kiosk Substations Water Infrastructure Projects Project Management Slurry Management Systems Pumping Solutions Fire Protection
More informationEXHIBIT X. Specification for Substation Equipment Installation, Testing and Commissioning
Specification for Substation Equipment Installation, Testing and Commissioning Substation General: Testing and Commissioning 1 of 23 TABLE OF CONTENTS Substation Testing and Commissioning 1 Substation
More informationELECTRICAL INSPECTION BULLETIN (Effective )
ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which
More informationDistribution Information Exchange Code
Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission
More informationThis tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows:
This tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows: I. CLARIFICATIONS S.No. Clause/Paragraph/Item No. Clarification/Query
More informationCONSTRUCTION OF NEW 132/33 KV GIS SUBSTATION AT KULI, DISTRICT - MURSHIDABAD. (Package-12)
Section I - NOTICE INVITING TENDER ABRIDGED NOTICE INVITING TENDER WBSETCL (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION OF NEW
More informationFacility Interconnection Requirements
Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents
More informationEngineering Standard- Design Electrical Networks MEST TRACTION SUBSTATIONS AND TIE STATIONS
Engineering Standard- Design Electrical Networks MEST 000002-01 Version: 1 Issued: May 2013 Owner: Chief Engineer Approved By: Norm Grady Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET
More informationCompact Substation Design. Kobus Coetzer TGOOD Africa
Compact Substation Design Kobus Coetzer TGOOD Africa 1. 2. 3. 4. TGOOD Electric Compact Substation Design Considerations Project Reference Agenda 1. TGOOD Electric Key Facts Sino German Joint Venture Leading
More informationB. Provide liquid-filled secondary substation transformers as indicated on drawings.
SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED
More informationSpecification for Prefabricated Glass Reinforced Plastic Enclosures
1. SCOPE This document outlines a technical specification for prefabricated Glass Reinforced Plastic (GRP) enclosures designed to house outdoor rated equipment in secondary substations installed on the
More informationACS OTHER PRIMARY EQUIPMENT
ACS OTHER PRIMARY EQUIPMENT Fleet Strategy Document 31/10/2013 Transpower New Zealand Limited 2013. All rights reserved. Page 1 of 70 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I
More informationInternational ejournals
ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER
More informationTHE ISRAEL ELECTRIC CORPORATION LTD. PLANNING DEVELOPMENT & TECHNOLOGY DIVISION RELIABILITY & H.V. EQUIPMENT DEPARTMENT SPECIFICATION FOR
SR-138 SR-138 THE ISRAEL ELECTRIC CORPORATION LTD. PLANNING DEVELOPMENT & TECHNOLOGY DIVISION RELIABILITY & H.V. EQUIPMENT DEPARTMENT SPECIFICATION SR-138 FOR 24 kv, 250 and 450 A for 1 hour EARTHING TRANSFORMER
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More informationTotally Integrated Power Answers for infrastructure.
Innovative Power Distribution in the Automotive Industry Cost-effective and reliable power distribution Totally Integrated Power Answers for infrastructure. Requirements and trends Requirements and Trends
More informationSECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number
MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and
More information5.2 MW Solar Mobile Power Unit
5.2 MW Solar Mobile Power Unit Ventilation air intake Ventilation air exhaust Air inlet & silencer Exhaust Silencer Power Control Room & Trailer -13.8 KV switchgear -CO2 fire system -480 VAC MCCC for turbine
More informationDistribution Code Review Panel. Product Approval Procedure
Distribution Code Review Panel Product Approval Procedure Version 1.3 October-2013 INDEX Item page 1) List of Abbreviations 2 2) Introduction 3 3) Clause-1 Requirements and Submission methods 4 4) Clause-2
More informationPratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.
Power Systems Pratt & Whitney Power Systems MOBILEPAC Gas Turbine Package TM It s in our power. Pratt & Whitney FT8 MOBILEPAC Gas Turbine Package The MOBILEPAC gas turbine package requires the smallest
More informationCLARIFICATIONS TENDER KEMP ITEM QUESTION RESPONSE
1 CLARIFICATIONS TENDER KEMP ITEM QUESTION RESPONSE 1 2 3 4 5 With regards to the Mt. Kenya Lot 1 tender, we are in the process of preparing the offer for 315KVA, 2500KVA & 7.5MVA.Kindly provide us the
More informationSystems Commissioning Table of Contents
Systems Commissioning Table of Contents C NC NA I. General II. Commissioning III. Mechanical Systems A. Testing, Adjusting, and Balancing B. Piping IV. Electrical Systems A. Load Balancing B. Electrical
More informationNEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate
(An Undertaking of Government of Nepal) Project Management Directorate GRID SUBSTATION CAPACITY EXPANSION PROJECT A component of SASEC: Power System Expansion Project BIDDING DOCUMENT FOR Procurement of
More informationBusiness Practice. Contents
Business Practice Department: External Affairs Document No: BP-1001 v1.0 Title: TRANSMISSION RELATED STATION POWER USE AT SUBSTATIONS Issue Date: 11-01-2010 Previous Date: 09-05-2017 Contents 1 PURPOSE...
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used
More informationThe complete guide to transformers and packaged substations
LAND LOGICAL POWER The complete guide to transformers and packaged substations Contents Land Logical Power transformers An introduction to the complete range of Land Logical Power transformers and package
More informationMedium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany
Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Frank.Herbener@Piller.com, Germany 1 Contents 1 Scope 3 2 Power Demand and Distribution in today s Mission Critical Applications
More informationRoute to Authorisation
Route to orisation 1. SCOPE This document was previously included in OPSAF-13-001 orisation Procedures as Attachment 1 Route to orisation Manual. This document has now been issued as an individual document
More informationCONSTRUCTION OF 132/33 KV GIS SUBSTATION AT BAJKUL, DISTRICT-PURBA MEDINIPUR. (Package- 26)
DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION
More informationBILL OF MATERIALS Name of the work: F.T.S Modernisation Work
1 BILL OF MATERIALS Name of the work: F.T.S Modernisation Work Erection,Testing and commissioning of Converter transformer 3 PH,11 KV/2 X 1800 V,4000 KVA outdoor Transformer size of 3150 L X 2800 D X 3200
More informationProposed Facility Study Report. Project: A380_A383_A415_A414_A413 MISO # F088. Prepared for Midwest ISO
Proposed Facility Study Report Project: A380_A383_A415_A414_A413 MISO # F088 Prepared for Midwest ISO January 15 th, 2010 Great River Energy Contact: Greg Schutte, Project Manager Great River Energy 1
More informationCONSTRUCTION OF 132/33 KV GIS SUB-STATION AT SONAKHALI, DISTRICT 24 PARGANAS (SOUTH) (Packge-29)
DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION
More informationTHE ISRAEL ELECTRIC CORPORATION LTD. ENGINEERING PLANNING DIVISION SUBSTATION PLANNING SECTOR STR-1419 SPECIFICATION FOR TRANSFORMER PROTECTION
THE ISRAEL ELECTRIC CORPORATION LTD. ENGINEERING PLANNING DIVISION SUBSTATION PLANNING SECTOR SPECIFICATION FOR TRANSFORMER PROTECTION APPENDIX NO. 1 Reliability THE ISRAEL ELECTRIC CORPORATION LTD. PLANNING
More information6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.
6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection
More informationTurnkey High Voltage Electrical Infrastructure and Secondary Systems
Turnkey High Voltage Electrical Infrastructure and Secondary Systems 01-02 Company Overview 03-04 Turnkey Project Delivery 05-06 Design Services 07-08 Manufacturing Capabilities 09 Quality Assurance, Safety
More informationB Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E.
21, rue d'artois, F-75008 Paris http://www.cigre.org B3-214 Session 2004 CIGRÉ Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation G. M. Bastos (*) R. C. Valente E.
More informationInformation Document Protection System Information ID# R
Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)
More informationCentralized Procurement Agent Practices in Large Chinese Enterprise Groups. Mr. Zhang Zhifeng Vice President State Grid Materials Co.
Centralized Procurement Agent Practices in Large Chinese Enterprise Groups Mr. Zhang Zhifeng Vice President State Grid Materials Co., Ltd Contents General introduction Centralized tendering procurement
More informationABB AG - EPDS. FC-Protector Innovative fault current limiter for indoor and outdoor applications
ABB AG - EPDS FC-Protector Innovative fault current limiter for indoor and outdoor applications Agenda Short-circuit challenge New member of fault current limiter family New power part New control unit
More informationYour partner for the right solution
Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning
More informationEngineering Design & Power Training Institute
Engineering Design & Power Training Institute Recognition & Approvals Association of Power & Design Engineers (APDE) An ISO 9001: 2008 Certified Institute Courses P G Diploma in Piping Design & Details
More informationTECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.
More informationREGULATIONS FOR ELECTRICAL INSTALLATIONS 2017 EDITION
REGULATIONS FOR ELECTRICAL INSTALLATIONS INTRODUCTION: This edition supersedes the REGULATIONS FOR ELECTRICAL INSTALLATIONS - 1997 EDITION. The Revised Edition incorporates the amendments and guidelines
More informationSTACK ELEVATORS SECTION - C SUB SECTION A6 SPECIFIC TECHNICAL REQUIREMENT STACK ELEVATORS TITLE:
TITLE: SPECIFIC TECHNICAL REQUIREMENT STACK ELEVATORS SPECIFICATION NO. PE-TS-Q11-503-A-001 VOLUME - IIB SECTION C SUB-SECTION A6 REV. 00 DATE: SHEET 1 OF 5 SECTION - C SUB SECTION A6 STACK ELEVATORS SPECIFIC
More informationDOC // SINGLE LINE DIAGRAM OF HYDRO POWER STATION DOWNLOAD
25 March, 2018 DOC // SINGLE LINE DIAGRAM OF HYDRO POWER STATION DOWNLOAD Document Filetype: PDF 410.7 KB 0 DOC // SINGLE LINE DIAGRAM OF HYDRO POWER STATION DOWNLOAD Hydro power plant Diagrams Parts of
More informationTECHNICAL SPECIFICATION FOR 22 kv, 1.2/2.4/3.0 MVAR CAPACITOR BANK WITH DOUBLE STAR ARRANGEMENT & ASSOCIATED EQUIPMENTS
Maharashtra State Electricity Distribution Co. Ltd. SPECIFICATION NO. MSEDCL/ DIST: MSC-III/06/2009 TECHNICAL SPECIFICATION FOR 22 KV 1.2/2.4/3.0 MVAR CAPACITOR BANK WITH DOUBLE STAR ARRANGEMENT AND ASSOCIATED
More informationA little bit about us...
Industrial, Commercial & Domestic Electrical Engineering Railway ElectrifIcation Engineers & Maintainers A little bit about us... A & M Electricals Limited have many years experience and expertise undertaking
More informationB. Accept materials on site in original factory packaging, labeled with manufacturer s identification.
SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,
More informationQ1-Sketch the winding connection diagram for thre phase 4 poles 36 slots induction motor
1 G158 HV Machine Testing 1.1+1.2 OHS See G006 Exercises 1.5 Winding data (G158 Page 67 to 74) Q1-Sketch the winding connection diagram for thre phase 4 poles 36 slots induction motor 1.7 Materials Q2-List
More informationLA Engineering Academy
Laxmi Associates Consultancy Third party Inspection RLA Testing& Commissioning AMC Project Management Training 323-324, Sunplaza1, GIDC Road, Makarpura, Vadodara-390010. lxassociates@gmail.com, www.laxmiassociates.in,
More informationSpecification for 11 KV outdoor GOD Air Break Isolator along with earth switch,post insulators, CT, PT and the Double pole Structure.
Page 1 of Specification for 11 KV outdoor GOD Air Break Isolator along with earth switch,post insulators, CT, PT and the Double pole Structure. Hindustan Petroleum Corporation Ltd 8 S.V. Marg, Ballard
More informationImperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP
Service Manual Imperial Series Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP Contents of Service Manual 1. Safety Precautions ------------------------------------------------------------------
More informationFriday, May 29, Update on Testing Medium Voltage Cable and Switchgear Systems
Update on Testing Medium Voltage Cable and Switchgear Systems Friday, May 29, 2015 Presented by: Ashley Harkness Ashley.Harkness@Emerson.com Electrical Reliability Services Value--- When we find the one
More informationGUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 66 kv LIGHTNING ARRESTORS
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 66 kv LIGHTNING ARRESTORS GETCO/ENGG/TECH SPECI.- 66 KV LA/R4/Jan11 Sign
More informationFacilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station
Facilities Study For XXXXXXXXXXXX Wind Park Interconnection Switching Station Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents CERTIFICATION...
More informationPower IT Compact Secondary Substations, CSS. Technical Brochure
Power IT Compact Secondary Substations, CSS Technical Brochure Substations from ABB Content Definitions In accordance with the EN 61330 standard, Prefabricated Secondary Substations are defined as substations
More informationTechnical Specification for LV ABC Fuse Switch Disconnectors
Ergon Energy Corporation Limited Technical Specification for LV ABC Fuse ETS-06-02-02 Check this is the latest Process Zone version before use. Specification ETS 06-02-02 Ver 3 Contents 1. Purpose and
More informationSECTION LOW-VOLTAGE SWITCHGEAR
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 00 LOW-VOLTAGE SWITCHGEAR SPEC WRITER NOTE: This specification is not for general use. Use Section 26 24 13, DISTRIBUTION SWITCHBOARDS for most applications.
More informationNEC 2014 Code Changes
NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge
More information9KV/18KV METAL OXIDE LIGHTNING ARRESTORS WITHOUT GAPS WITH STANDARD NOMINAL DISCHARGE CURRENT 5KA
9KV/18KV METAL OXIDE LIGHTNING ARRESTORS WITHOUT GAPS WITH STANDARD NOMINAL DISCHARGE CURRENT 5KA Technical specification for 9KV/18KV 5KA Metal oxide Lightning Arrestors without Gap. ----------------------------------------------------------------------------------------------------------------
More informationAlvin.Xu, ABB Xiamen Switchgear Co,Ltd, Green & Energy saving concept of ABB MV apparatus For a better tomorrow.
Alvin.Xu, ABB Xiamen Switchgear Co,Ltd, 2014-11 Green & Energy saving concept of ABB MV apparatus For a better tomorrow Slide 1 VD4 vacuum circuit-breaker in China Inheritance and innovation Y1992 Y2003
More informationElectrica.l Insta.lla.tions in Multi-storey Buildings
Electrica.l Insta.lla.tions in Multi-storey Buildings By Giinter G. Seip The number of multi-storey buildings is constantly increasing - particularly in cities - due to the shortage of space and the high
More informationNOTICE INVITING EXPRESSION OF INTEREST FOR INTEGRATED INTELLIGENT SWITCHYARD 3D MODELLING AND ENGINEERING SOLUTION
NOTICE INVITING EXPRESSION OF INTEREST FOR INTEGRATED INTELLIGENT SWITCHYARD 3D MODELLING AND ENGINEERING SOLUTION EOI REFERENCE NUMBER: TBEM/EOI/3D/201-19 BHARAT HEAVY ELECTRICALS LIMITED Transmission
More informationGUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA - 390 007 TENDER FOR Supply, Erection, Testing and Commissioning of 220/132/66KV C & R Panels and SCADA
More informationGEK B Instructions. Test Cabinet. for Power/Vac Vacuum Circuit Breakers
g GEK 105263B Instructions Test Cabinet for Power/Vac Vacuum Circuit Breakers Power/Vac Test Cabinet Table of Contents Section 1. Introduction 1-1 Safety... 3 1-2 Maintenance... 3 Section 2. Receiving,
More informationDistribution Value Added
Distribution Value Added Eng.. Carlos A. Pérez P MéndezM 1 CONTENTS 1. Introduction 2. How to calculate DVA 3. Costs by Voltage Levels 4. Required Revenue 5. NRV Optimization 6. Grid Operation Costs 2
More informationWIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY
WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS J O G Tande and K Uhlen SINTEF Energy Research, Norway SUMMARY Cost efficient utilisation of the wind energy resource requires wind farms to be located
More informationDistribution Network Planning for Mumbai
Newsletter Issue 98 January 2006 Distribution Network Planning for Mumbai Carsten Böse Project Manager Siemens AG, PTD SE PT carsten.boese@siemens.com Introduction The Indian utility Reliance Energy Ltd.
More informationSECTION 07 TECHNICAL SPECIFICATIONS 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA)
SECTION 07 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA) 7.0 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO)
More informationNPS/002/023 Technical Specification for 132kV Power Cables.
Version:- 2.2 of Issue:- June 09 Page 1 of 11 NPS/002/023 Technical Specification for 132kV Power Cables. 1. Purpose The purpose of this document is to detail the technical requirements of Northern Powergrid
More informationNPS/002/020 Technical Specification for 11 & 20kV Power Cables
Version:- 3.1 of Issue:- Nov - 09 Page 1 of 11 NPS/002/020 Technical Specification for 11 & 20kV Power Cables 1. Purpose The purpose of this document is to detail Northern Powergrid (the Company) requirements
More informationSEAL & SIGNATURE OF THE TENDERER
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. SCHEDULE - `A' TECHNICAL SPECIFICATION FOR 11 kv & 22 kv A.B. SWITCH. SPECIFICATION NO:RE/II/A.B.SWITCH/2005 INDEX -----------------------------------------------------------------------------------------------------------------------
More informationStudy Committee A3. High Voltage Equipment. Action Plan
Study Committee A3 High Voltage Equipment Action Plan October 2011 CIGRE Study Committee A3 - High Voltage Equipment Action Plan 1 Content 1 Content...2 2 Purpose of the Action Plan...3 3 Activities of
More informationDescription/ Reference. Shall be as per manufacturer's standard design.
Reply of Pre-bid Queries submitted by ABB for & 11kV Distribution Substation Enquiry for Supply, Erection, Testing and Commissioning of & 11kV Distribution Substation Sl. 1 Cl:3.3 It is indicated that
More information7700 TEST KIT OPERATIONS MANUAL
7700 TEST KIT OPERATIONS MANUAL 1 The following specifications apply to the CosaTron Model 7700 Digital Test Kit. SPECIFICATIONS: HV DISPLAY ------------------------------------------- 3 Digit (XX.X KV),
More informationHigh voltage gas-insulated switchgear and hybrid switchgear, PASS
Factory portrait Savli, India High voltage gas-insulated switchgear and hybrid switchgear, PASS ABB is a leader in power and automation technologies that enable utility and industry customers to improve
More informationInspection and Testing Plan
Inspection and Testing Plan {Insert Project Name} {Insert Plan Title (If more than one plan is required)} I&T Plan No. {Insert.} File No. {Insert} Prepared by: Commissioning Manager {Insert Name} {Insert
More informationPoint Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear
Table of Content 1.0 General... 2 2.0 Scope... 2 3.0 Applicable Codes, Standards and Qualifications... 2 4.0 Service and Environmental Conditions... 3 5.0 Construction... 3 6.0 Front Breaker Compartment
More informationFAST POWER FACTOR REGULATOR. Computer-14df - xx - 144a INSTRUCTION MANUAL ( M / 00A ) (c) CIRCUTOR S.A.
FAST POWER FACTOR REGULATOR Computer-14df - xx - 144a INSTRUCTION MANUAL ( M 981 611 / 00A ) (c) CIRCUTOR S.A. -------- POWER FACTOR REGULATOR COMPUTER- 14f --------- Page 2 POWER FACTOR REGULATOR COMPUTER-
More informationWORKS PROCUREMENT NOTICE
Document for completion and publication by the Contracting Authority. 1. Publication reference EuropeAid/131550/C/WKS/RS 2. Procedure Open 3. Programme IPA 4. Financing IPA 2010 5. Contracting authority
More informationKASHAGAN / KAZAKHSTAN >>>
KASHAGAN / KAZAKHSTAN >>> Kashagan / Kazakhstan Kashagan Field Development Experimental Programme frame agreement mv/lv packaged substations Local equipment rooms process and utilities buildings >>> The
More informationCERN electricity consumption forecast & validation
CERN electricity consumption forecast & validation Bruno Mouche, CERN Electrical Engineering Group EN-EL 23 November 2017 Presentation outline Part 1: Introduction to electricity at CERN Part 2: Electricity
More informationGas-insulated medium-voltage switchgear. for wind parks. Answers for energy.
Gas-insulated medium-voltage switchgear for wind parks Answers for energy. Switchgear for wind turbines: 8DH10 up to 24 kv, up to 20 ka, up to 1,250 A up to 17.5 kv, up to 25 ka, up to 1,250 A Best performance
More informationELECTRIC ARC FURNACE WITH STATIC VAR COMPENSATOR PLANNING AND OPERATIONAL EXPERIENCE
GERHARD HACKL 1 HERWIG RENNER 2 MANFRED KRASNITZER 3 CHRISTIAN HOFBAUER 1 ELECTRIC ARC FURNACE WITH STATIC VAR COMPENSATOR PLANNING AND OPERATIONAL EXPERIENCE Abstract The paper describes the process of
More informationDetailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content
Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Purpose The purpose of this Detailed Requirements Document (DRD) is to provide
More informationNPS/003/015 Technical Specification for 33kV, 66kV and 132kV Post Insulators
Version:- 3.1 Date of Issue:- June 2014 Page 1 of 13 NPS/003/015 Technical Specification for 33kV, 66kV and 132kV Post Insulators 1. Purpose This document is the technical specification for 33kV, 66kV
More informationNORTH CASPIAN OPERATING COMPANY (NCOC)
KASHAGAN / KAZAKHSTAN ONSHORE / OFFSHORE Caspian Sea KAZAKHSTAN Uzbekistan Kyrgyzstan THE GIANT KASHAGAN - KASHAGAN, 80 KM SOUTH-EAST OF ATYRAU, IN THE NORTH CASPIAN SEA, IS THE LARGEST OIL FIELD DISCOVERED
More informationEXELON UTILITIES TRANSMISSION FACILITY INTERCONNECTION REQUIREMENTS
EXELON UTILITIES TRANSMISSION FACILITY INTERCONNECTION REQUIREMENTS In compliance with NERC standard FAC-001-2 01-01-2016 TABLE OF CONTENTS INTRODUCTION...4 RESPONSIBILITIES OF THE INTERCONNECTION REQUESTOR...6
More informationGUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 220, 132 & 66 COMPOSITE SOLIDCORE STATION POST INSULATORS GETCO/E/2,1,6
More informationA. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).
16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the
More information