Central Valley Rail Working Group 1. INTRODUCTIONS

Size: px
Start display at page:

Download "Central Valley Rail Working Group 1. INTRODUCTIONS"

Transcription

1 CVRWG Meeting: February 24, 2017

2 Central Valley Rail Working Group 1. INTRODUCTIONS

3 Central Valley Rail Working Group 2. SJJPA Update Dan Leavitt, SJJPA

4 CVRWG Meeting: February 24, 2017

5 Morning Express Service (Fresno Sacramento) Key Investments (for Service Initiation in January 2018) Temporary Layover Facility - $1.5 Million Parking Expansions (Fresno, Merced, Turlock/Denair, Modesto, Stockton ACE Stations) - $1.8 Million Station Enhancements (various safety and security, signage, and beautification projects) - $425,000

6 Surveys for Morning Express Service Initial Results Sacramento Employee Survey 256 Respondents San Joaquin Valley Resident/Worker 1,676 respondents

7 Surveys for Morning Express Service Initial Results Initial Takeaways Both surveys indicate a high preference for Single Occupancy Vehicle (SOV) for current trips to Sacramento 73% of San Joaquin Valley Survey respondents have previously ridden the service 91% would be interested in riding if the train were an option Survey period is still open

8 2017 SJJPA Business Plan SJJPA must develop and approve a Business Plan for submittal to the Secretary of CalSTA by April 1 of each year. The 2017 SJJPA Business Plan is an update of the 2016 SJJPA Business Plan. The 2017 SJJPA Business Plan is for fiscal years 17/18 and 18/19. Includes updated numbers for the Amtrak budget and the SJJPA administrative costs and staffing. Updates portions of the 2016 Business Plan Update which were out-of-date, while adding relevant new text to reflect new initiatives and priorities.

9 Summary of Updates Financial Numbers and Ridership Figures Up-to-date figures through FY 16, including some future projections. Integration of the Morning Express Service Reflect the high priority of SJJPA s efforts to provide early-morning arrivals to Sacramento and the Bay Area. Focus on Additional Service to Sacramento Efforts to initiate 8 th Daily Round-Trip (as the 3 rd Daily Round Trip to Sacramento) utilizing Fresno as a midcorridor start/ends terminal.

10 Summary of Updates Operational Initiatives Reducing the end-to-end run time between the Bay Area and Bakersfield below 6 hours. Thruway Bus Initiative Exploring ways to increase the utilization of Thruway Buses. Madera Station Relocation Working with Madera County/Madera CTC and CHSRA to develop a new multi-modal hub station for Madera County.

11 Madera Station Relocation

12 2017 SJJPA Business Plan The Draft 2017 SJJPA Business Plan will be released to the Board and public by the end of February. The 2017 SJJPA Business Plan will be an action item for approval at the March, SJJPA Business Plan. Requires a 2/3 majority vote.

13 Central Valley Rail Working Group 3. CHSRA Update Melissa Dumond, CHSRA

14 Central Valley Rail Working Group 4. Connected Corridors Study - North Yoav Hagler

15 Connected Corridors Study - North Central Valley Rail Working Group CCS Project Update February 24, 2017

16 Connected Corridors Study - North Agenda 1. Framework 2. Network Corridor Inventory 3. Key Network Decision Points 4. Next Steps

17 Connected Corridors Study - North Framework

18 Connected Corridors Study - North Framework Three Elements in Framework 1. Building Blocks Introduced at Dec 16 CVRWG Meeting: End States and Incremental Approaches 2. Five Network Defining Decisions Introduced at Feb 24 CVRWG meeting 3. Road Map Identifies interaction between three scales of decision making and provides framework for how decisions can be made in region Final CCS-N Update Next CVRWG Meeting

19 Connected Corridors Study - North Network Corridor Inventory

20 Connected Corridors Study - North Corridor Inventory Mapped Number of Tracks Land Use Grade X-ings ROW Width Demo

21 Connected Corridors Study - North Corridor Inventory Composite Difficulty Index

22 Connected Corridors Study - North Relative Cost Comparison by Full Route Pathway (Merced-Downtown Sacramento) Relative Cost per Route Mile (Low Cost = 1) Low-Cost: BN-Stockton (Merced- Stockton) + UP-Sacramento (Stockton-Sacramento)* 1 High-Cost: UP-Fresno 1.75 Hybrid Route: BN Stockton + Modesto Connection + UP-Fresno (Modesto Stockton) + UP - Sacramento 1.3

23 Connected Corridors Study - North Locations of Key Decision Points

24 Connected Corridors Study - North Five Major Network Defining Decisions Alignment Immediately North of Merced Location of Modesto Station Location of Stockton Area Hub Location of Elk Grove & Lodi Station Access to Sacramento Final HST/ICE Alignment North of Merced UP Fresno BN Stkn HST Station in Downtown Modesto Hub In Lathrop Hub In Stockton Downtown (UP or Close Prox) Sac Valley Station from East Sac Valley Station from West HST Station Outside Modesto Sac Sub Sac Midtown / Northside

25 Connected Corridors Study - North Merced Decision Point Key Questions Options What is the path for high-speed trains north of Merced and when is that decision made? How are connections made between existing passenger service and the Merced HS station post of Phase I HSR. Are these connections for runthrough operations from south or as a transfer point for diesel service from the north? What are the range of options for those connections, what types of operations do they facilitate, and what are the cost differences?

26 Connected Corridors Study - North 2. Modesto Decision Point Key Questions Options Is the long term station in Downtown Modesto? Is there Regional service along the UP serving the Modesto Altamont/Stockton market? If the requirement is for a downtown station and alignment is along the BN north of Merced, what are the range of options to transition from BN to UP (downtown)? What are the costs and challenges with these options?

27 Connected Corridors Study - North 3. Stockton Decision Point Trip Time from Merced to meet timed connections Statewide trip time goals Which connections should be / can be prioritized in each location When in the program is there a commitment to timed connections How the existing rail network can handle competing interests (multitude of the desired connections) Local interests Key Questions

28 Connected Corridors Study - North 3. Scenario Assessment Implement hub station without construction of new intercity route Scenario 1: Downtown Stockton Scenario 2: Lathrop Only one ICE/HSR station in Stockton area Martinez service serves downtown Stockton Link Martinez Regional service with Altamont and/or Modesto Regional service Support revitalization efforts in downtown Stockton Achieve 45-minute trip time between Merced and Hub in the short-medium term Achieve 45-minute trip time between Merced and Hub in the long term Modesto - Altamont service participate in hub Facilitate Martinez to southbound Intercity / HSR transfers Facilitate Altamont to southbound Intercity / HSR transfers Requires high-speed bypass through region

29 Connected Corridors Study - North 4. Stockton to South of Sacramento Key Questions Options Where are the preferred intermediate station locations between Stockton Sacramento? Is there Regional service along the Sac Sub serving regional markets? What are the range of costs and challenges with Sacramento vs Fresno Sub?

30 Connected Corridors Study - North 4. Stockton - Sacramento Relative Potential Cost of Route Options North of Stockton (Low cost option Sac Sub 110 Diesel = 1) SAC SUB ROW Construction FRE SUB ROW Construction

31 Connected Corridors Study - North 5. Approach to Sacramento Key Questions Options What corridor is rail service on approaching Sacramento from the south? Do HSR trains need to serve Sacramento Valley Station or can they serve Sacramento with one or more alternate station locations? What are the range of options for serving the Sacramento region and what are the benefits, challenges and costs of each of the options?

32 Connected Corridors Study - North Next Steps

33 Connected Corridors Study - North Next Steps 1. Complete the Decision Making Framework Addresses the interaction between three scales of decision making and what analysis needs to be done at each scale 2. Identify items for follow up analysis and coordination 4 Next Steps

34 Central Valley Rail Working Group 5. ACEforward: Stockton to Sacramento Bryan Pennino, ACEforward

35 ACEforward ACEforward - Sacramento Bryan Pennino, P.E. President, Pennino Management Group San Joaquin Regional Rail Commission Status February 2017

36 Sacramento Service Study Goals Merced Stockton Sacramento Improve Service Task Completion Outreach November Ongoing Conceptual Strip Maps December Ongoing Speed and Travel Time Tables January Ongoing Phased Implementation Evaluation February 2017 Service Schedules March 2017 Operating Plan April 2017 Matrix of Funding Sources April 2017 Conceptual Design, Cost Estimates and Operating Cost May 2017 Ridership and Revenue Analysis March - May 2017 Funding Strategy Technical Memo June

37 Overview of Sacramento Service Alignment Options UP Fresno UP Sacramento Merced Stockton Sacramento BNSF Stockton UP Fresno Service Goals Existing Near-Term Mid-Term Long-Term Number Outreach: Sacramento Rail Working Group Numerous other meetings with Sacramento Agencies and Elected Officials Lodi 3 Modesto

38 System Map Northern Segment Southern Segment 4

39 5 Northern Segment Potential Alignments and Stations

40 6 Northern Segment Downtown Sacramento

41 Northern Segment Connection to Sacramento Valley Station 25 MPH 40 MPH 7

42 Northern Segment ROW / Environmental Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Sacramento Subdivision Inside ROW Right of Way Residential Property 1 44 Acres / 300+ Homes 3 None 3 None Commercial Property 1 77 Acres / 102 Commercial Units 2 17 Acres / 2 Commercial Units Acres / 2 Commercial Units Agricultural Property Acres 3 None 2 9 Acres Park and Preserve Property 1 14 Acres 3 None 2 11 Acres Railroad Property 1 26 Acres 3 None 3 None Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Sacramento Subdivision Inside ROW Environmental Impacts Environmental Clearance (Preliminary Observation) 1 Full Environmental Impact Report 2 Mitigated Negative Declaration 2 Mitigated Negative Declaration Wildlife Refuge and Wetland Impacts 1 Extensive through the Consumnes River Preserve 2 Less impacts through the Consumnes River Preserve 2 Potential Station at Elk Grove may impact Conservation Easement, alternative Station is provided 8

43 Northern Segment Track Construction Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Sacramento Subdivision Inside ROW Track Construction Track Construction (Minimum) Miles Miles Miles (Initial) 8.7 Miles (Hourly) Track Structure (Minimum) 1 4 Miles miles of track structure 2.5 miles of retaining wall 3 None Grade Separation Modification (Minimum) At-Grade Crossing Modifications (Minimum) 1 8 Grade Separations 2 4 Grade Separations 3 None 1 35 At-Grade Crossings 1 35 At-Grade Crossings 3 3 At-Grade Crossings (Initial) 2 Add. At-Grade Crossings (Hourly) 9

44 Northern Segment Operations Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Sacramento Subdivision Inside ROW Operations Adds Freight Capacity Not Applicable 3 Additional capacity would benefit freight and passenger 3 Additional capacity would benefit freight and passenger Allows for faster speeds 3 Allows for speeds up to 110 MPH 1 Will be limited to 79 MPH 3 Allows for speeds up to 110 MPH Controlled Dispatching 3 No freight traffic Dedicated Dispatching 1 Subject to UPRR Dispatching 1 Subject to UPRR Dispatching Trackage Rights Required 3 No agreement required 1 Would be difficult to obtain additional slots 2 Likely to obtain trackage rights agreement Phased Implementation 1 Service can not be phased 2 Service could be phased with approval of UP 3 Service definitely can be phased based on conversations with UP Service Expansion Potential to the North (Sacramento Airport, etc.) Unconstrained Travel 79 MPH Unconstrained Travel 110 MPH 2 2 Stop at Sacramento Valley Station would require crossing UP Not Applicable 2 Faster 46 Min. Stockton to Sacramento Valley Station 2 Stop at Sacramento Valley Station would require crossing UP Slowest (existing speeds) 56 Min. Stockton to Sacramento Valley Station 1 UP will not allow 3 3 Service could easily extend north 3 Fastest 48 Min. Stockton to Midtown Fastest 41 Min. Stockton to Midtown 10

45 Fresno Outside ROW (110 MPH) Fresno Inside ROW Sacramento Inside ROW (79 MPH) Sacramento Inside ROW (110 MPH) Average Auto During Commute Downtown Stockton to Capitol Travel Time (minutes) Travel Times Stockton to Sacramento Stockton to Sacramento 11

46 Fresno Outside ROW (110 MPH) Fresno Inside ROW Sacramento Inside ROW (79 MPH) Sacramento Inside ROW (110 MPH) Average Auto During Commute City Hall to Downtown Travel Time (minutes) Travel Times Elk Grove to Sacramento Elk Grove to Sacramento 12

47 Northern Segment Station Locations Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Sacramento Subdivision Inside ROW Station Locations Stockton 3 Existing Robert J. Cabral Station, additional parking will be required 3 Existing Robert J. Cabral Station, additional parking will be required 3 Existing Robert J. Cabral Station, additional parking will be required Lodi 3 Existing station located in downtown Lodi, ample parking 3 Existing station located in downtown Lodi, ample parking 2 Located West of Lodi, greenfield area Elk Grove 1 Location is south of the ridership area, not good for Northbound service. Ingress and egress to station is not efficient 1 Location is south of the ridership area, not good for Northbound service. Ingress and egress to station is not efficient 2 Location is good for ridership area and has good ingress and egress South Sacramento 3 65th Street Station will have limited parking, close connection to light rail. Good connection with SR th Street Station will have limited parking, close connection to light rail. Good connection with SR Platform to Platform Transfer to Light Rail at Sacramento City College, parking available (need to coordinate with College) Sacramento 3 Platform to Platform transfers with Capitol Corridor and other Amtrak Services, connection to Light Rail. Walking distance to Capitol. 3 Platform to Platform transfers with Capitol Corridor and other Amtrak Services, connection to Light Rail. Walking distance to Capitol. 3 Connection to Light Rail, no parking needed. Walking distance to Capitol. 13

48 Northern Segment Project Construction Cost Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Sacramento Subdivision Inside ROW Construction Cost ROW Acquisition (Minimum) 1 $400 M 2 $17.0 M 3 $27.6 M Track, Structures and Crossings (Minimum) 1 $768 M (Initial) +$30.0 M (Hourly) 2 $486 M (Initial) +$30.0 M (Hourly) 3 $29.5 M (Initial) +$63.5 M (Hourly) Stations (Minimum) 3 $22.0 M (Initial) +$5.0 M (Hourly) 3 $22.0 M (Initial) +$5.0 M (Hourly) 1 $49.5 M (Initial) +$7.2 M (Hourly) Total (Initial) 1 $1,190 M 2 $525 M 3 $107 M Total (Hourly) 1 $1,225 M 2 $560 M 3 $178 M 14

49 15 Southern Segment Potential Alignments and Stations

50 Southern Segment ROW / Environmental Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Stockton Subdivision Outside ROW Stockton Subdivision Inside ROW Right of Way UPRR BNSF Residential Property 1 22 Acres / 198 Homes 2 1 Acres / 6 Homes 1 25 Acres / 106 Homes 3 None Commercial Property Acres / 242 Commercial Units 2 15 Acres / 12 Commercial Units 2 65 Acres / 65 Commercial Units 3 5 Acres / 4 Commercial Units Agricultural Property 2 48 Acres 2 7 Acres Acres 3 None Park and Preserve Property 1 14 Acres Acres 2 7 Acres 3 None Railroad Property 2 12 Acres 3 None 1 27 Acres 3 None Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Stockton Subdivision Outside ROW Stockton Subdivision Inside ROW Environmental Impacts UPRR BNSF Environmental Clearance (Preliminary Observation) 1 Full Environmental Impact Report 1 Full Environmental Impact Report (Part of the Corridor In Progress) 1 Full Environmental Impact Report 2 Mitigated Negative Declaration Waterway Crossings

51 Southern Segment Track Construction Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Stockton Subdivision Outside ROW Stockton Subdivision Inside ROW Track Construction UPRR BNSF Track Construction (Minimum) Track Structure (Minimum) State Highway Modifications (Minimum) Grade Crossing Modifications (Minimum) At-Grade Crossing Modifications Miles Miles Miles 3 TBD miles of track structure miles of track structure miles of track structure miles of track structure Miles 3 None 3 None 3 None 1 33 Grade Separations Reconstruction 2 25 Grade Separations Modifications 3 1 Grade Separation Reconstruction 3 None 2 53 At-Grade Crossings 2 53 At-Grade Crossings 1 63 At-Grade Crossings 3 TBD 17

52 Southern Segment Operations Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Stockton Subdivision Outside ROW Stockton Subdivision Inside ROW Operations UPRR BNSF Adds Freight Capacity Not Applicable 3 Additional capacity would benefit freight and passenger Not Applicable 3 Additional capacity would benefit freight and passenger Allows for faster speeds 3 Allows for speeds up to 110 MPH 1 Will be limited to 79 MPH 3 Allows for speeds up to 110 MPH 2 Allows for speeds up to 90 MPH Controlled Dispatching 3 No freight traffic Dedicated Dispatching 1 Subject to UPRR Dispatching 3 No freight traffic Dedicated Dispatching 1 Subject to BNSF Dispatching Trackage Rights Required 3 No agreement required 1 Would be difficult to obtain additional slots 3 No agreement required 2 Likely to obtain trackage rights agreement Phased Implementation 1 Service can not be phased 2 Service could be phased with approval of UP 1 Service can not be phased 3 Service potentially can be phased based on conversations with BNSF Unconstrained Travel 79 MPH 2 Faster (Limited Stops) 70 Min. Merced to Stockton 1 Slowest 87 Min. Merced to Stockton 3 Fastest 64 Min. Merced to Stockton 3 Fastest 64 Min. Merced to Stockton Unconstrained Travel 110/90 MPH 3 Fastest (Limited Stops) 52 Min. Merced to Stockton (110 MPH) 1 UP will not allow 3 Fastest 53 Min. Merced to Stockton (110 MPH) 2 Faster 58 Min. Merced to Stockton (90 MPH) 18

53 Fresno Outside ROW (110 MPH) Fresno Inside ROW Stockton Outside ROW (110 MPH) Stockton Inside ROW (90 MPH) Stockton Inside ROW (79 MPH) Average Auto During Commute Downtown Merced to Stockton Travel Time (minutes) Travel Times Merced to Stockton Merced to Stockton 19

54 Southern Segment Stations Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Stockton Subdivision Outside ROW Stockton Subdivision Inside ROW Station Locations UPRR BNSF Merced 3 Proposed location is located in the heart of Downtown Merced, best opportunity for Transit Oriented Development 3 Proposed location is located in the heart of Downtown Merced, best opportunity for Transit Oriented Development 2 Existing station, additional parking would be required. Does not directly connect with proposed HSR Station. 2 Existing station, additional parking would be required. Does not directly connect with proposed HSR Station. Livingston or Atwater 2 Station Locations are adjacent to the downtown locations for each option 2 Station Locations are adjacent to the downtown locations for each option Not Applicable Not Applicable Turlock/Denair 3 Station is located adjacent to Turlock Regional Transit Center, additional parking would be required 3 Station is located adjacent to Turlock Regional Transit Center, additional parking would be required 1 Existing Station, additional parking would be required. Station is located away from city center. 1 Existing Station, additional parking would be required. Station is located away from city center. Ceres 3 Station is located downtown with parking on both sides of the freeway 3 Station is located downtown with parking on both sides of the freeway Not Applicable Not Applicable Modesto 2 Reconstruction of the existing Modesto Transit Center in downtown Modesto 3 Located at existing Modesto Transit Center in downtown Modesto, ample parking appears to be available 2 Existing Station located on the eastern limits of Modesto, additional parking would be required 2 Existing Station located on the eastern limits of Modesto, additional parking would be required Ripon 2 Station is adjacent to the downtown but requires a pedestrian bridge for access 2 Station is adjacent to the downtown but requires a pedestrian bridge for access Not Applicable Not Applicable Manteca 2 Reconstruction of the existing Modesto Transit Center in downtown along with replacing the parking 3 Located at existing Manteca Transit Center in downtown Manteca additional parking would be required Not Applicable Not Applicable 20 Stockton 3 Existing Robert J. Cabral Station, additional parking will be required. This station is the current terminus for the ACE Service. 3 Existing Robert J. Cabral Station, additional parking will be required. This station is the current terminus for the ACE Service. 3 Existing Robert J. Cabral Station, additional parking will be required. This station is the current terminus for the ACE Service. 3 Existing Robert J. Cabral Station, additional parking will be required. This station is the current terminus for the ACE Service.

55 Southern Segment Project Construction Costs Project Element Fresno Subdivision Outside ROW Fresno Subdivision Inside ROW Stockton Subdivision Outside ROW Stockton Subdivision Inside ROW Construction Cost UPRR BNSF ROW Acquisition (Minimum) State Highway Modifications (Minimum) Track, Structures and Crossings (Minimum) Stations (Minimum) 1 $517 M 2 $34.2 M 1 $336 M 3 $9.2 M 1 $1,397 M 3 None 3 None 3 None 1 1 $791 M (Initial) +$90 M (Hourly) $99 M (Initial) +$32 M (Hourly) 2 1 $593 M (Initial) +$90 M (Hourly) $99 M (Initial) +$32 M (Hourly) 2 3 $685 M (Initial) +90 M (Hourly) $10.5 M (Initial) +$16 M (Hourly) 3 TBD 3 $10.5 M (Initial) +$16 M (Hourly) Total (Initial) 1 $2,804 M 2 $726 M 2 $1,032 M 3 TBD Total (Hourly) 1 $2,926 M 2 $848 M 2 $1,138 M 3 TBD 21

56 Next Steps Evaluate Phased Implementation Refine Cost Estimates Develop Operating Plans and Cost Produce Ridership and Revenue Analysis Evaluate Funding Opportunities Draft Recommendation on Phased Implementation Prepare for Cap and Trade Application 22

57 Questions? Everything in life depends on a good connection.

58 Central Valley Rail Working Group 6. ACEforward Update Dan Leavitt, SJJPA

59 ACEforward Program-Level Analysis Stockton - Merced Extension to Merced Altamont Corridor Increase Service to 10 Daily Round Trips

60 ACEforward Project Schedule Activity Schedule Alternatives Description June 2016 In Progress Design August 2015 May 2016 In Progress Environmental Affected Environment In Progress Environmental Consequences Analysis Administrative Draft EIR March 2017 Full Package Design September 2016 Draft EIR + Public Review April 2017 October 2015 September 2016 Final EIR September 2017 December 2015 December 2016

61 Centerville/Niles/Sunol Alternative 2B Upgrade Former SPRR Line for Freight from Niles Junction to West of Sunol

62 5 Tri Valley and BART Connectivity

63 5 San Joaquin Valley

64 TIRCP Grant for ACEforward $16.5 million award (8/16/16) New Locomotive Platform Extensions: Lathrop, Tracy, Vasco, Livermore, Pleasanton

65 Central Valley Rail Working Group 7. CIPR Leadership Coalition Dan Leavitt, SJJPA

66 CA INTERCITY PASSENGER RAIL LEADERSHIP COALITION

67 CALL FOR ACTION: Support Dedicated Annual Funding for Capital Improvements SB1 Passed Senate Transportation Committee 2/14 Includes approximately $40 million annually for intercity & commuter rail + increase TIRCP to 20% of funds (currently at 10%) CIPR Leadership Coalition seeking $200 million annually in dedicated funding for intercity rail $400 million annually with commuter ($200 million annually for intercity & $200 million for commuter)

68 Central Valley Rail Working Group 8. OTHER ITEMS Dan Leavitt

69 San Joaquin Joint Powers Authority Next Board Meeting, March 24, 2017 at th Street (Basement Board Room), Modesto: Business Plan Approval Additional Service to Sacramento Thruway Bus Pilot Program Madera Station

70 Central Valley Rail Working Group NEXT MEETING: April 28, 2017 at SJ COG (555 E. Weber Ave.) at 9:30 am

SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections

SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT DATE: May 9, 2016 FROM: TO: SUBJECT: San Joaquin Regional Rail Commission Agencies, Organizations, and Interested Parties ACEforward

More information

Executive Summary. ES.1 Project Background

Executive Summary. ES.1 Project Background This executive summary presents the key findings of this environmental impact report (EIR) for the San Joaquin Regional Rail Commission s (SJRRC) ACEforward plan. SJRRC proposes to expand service and connections

More information

SAN JOAQUIN JOINT POWERS AUTHORITY 2018 BUSINESS PLAN UPDATE

SAN JOAQUIN JOINT POWERS AUTHORITY 2018 BUSINESS PLAN UPDATE SAN JOAQUIN JOINT POWERS AUTHORITY 2018 BUSINESS PLAN UPDATE PREPARED FOR CALIFORNIA STATE TRANSPORTATION AGENCY UPDATED FOR FY 2018/2019 & FY 2019/2020 TABLE OF CONTENTS Executive Summary...3 1. Introduction...10

More information

Stockton Freight & Passenger Rail Mobility Enhancement

Stockton Freight & Passenger Rail Mobility Enhancement Stockton Freight & Passenger Rail Mobility Enhancement 2017 $10.34 million in 2017 FASTLANE Grant funding to complete engineering design, permitting, and construction of the Stockton Track Extension and

More information

Capitol Corridor Vision Implementation Plan Vision for the Megaregion. CCJPA November 2017

Capitol Corridor Vision Implementation Plan Vision for the Megaregion. CCJPA November 2017 Capitol Corridor Vision Implementation Plan Vision for the Megaregion CCJPA November 2017 1990 s: Prop 116/108 SR3T Ph 1 2006 Electrified, very frequent passenger rail service plateau Europe Asia 3 CCJPA

More information

This section summarizes federal, state, regional, and local regulations related to energy resources and energy use and applicable to ACEforward.

This section summarizes federal, state, regional, and local regulations related to energy resources and energy use and applicable to ACEforward. 4.6 4.6.1 Introduction This section describes the regulatory and environmental setting for energy resources and energy use in the vicinity of ACEforward s near-term and longer-term improvements. It also

More information

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP Presented By Ken Galt, Caltrans Division of Rail John Fleming, Burlington Northern Santa Fe Railway William Brewster, Hanson-Wilson

More information

3 Documentation of Alternatives

3 Documentation of Alternatives Sacramento Intermodal Transportation Facility TR #9 SITF Alternatives 3 Documentation of Alternatives This section documents the four alternative concept plans for the Sacramento Intermodal Transportation

More information

California State Rail Plan. Santa Cruz County Regional Transportation Commission November 2, 2017

California State Rail Plan. Santa Cruz County Regional Transportation Commission November 2, 2017 California State Rail Plan Santa Cruz County Regional Transportation Commission November 2, 2017 Page 2 Overview: Division of Rail & Mass Transportation Mass Transit Funding Programs Federal Transit Grants

More information

Rail Strategy Study. ACTAC October 9, 2017

Rail Strategy Study. ACTAC October 9, 2017 5.1 Rail Strategy Study ACTAC October 9, 2017 Agenda Overview 1. Overview of rail system issues and growth scenarios 2. Capacity and operations analysis and improvement options 3. Grade crossing improvements

More information

1.1 Overview. 1.2 Project History. Chapter 1 Introduction

1.1 Overview. 1.2 Project History. Chapter 1 Introduction Chapter 1 1.1 Overview The an Joaquin Regional Rail Commission (JRRC) is the designated owner, operator, and policymaking body for the Altamont Corridor Express (ACE) service which presently focuses on

More information

Caltrain Business Plan

Caltrain Business Plan Caltrain Business Plan O CTO BER 2018 November 15, 2018 Bicycle Advisory Committee How Should Caltrain Grow? Business Plan Overview Business Plan Overview A Vision for Growth Crafting the Vision Next Steps

More information

Caltrain Business Plan

Caltrain Business Plan Caltrain Business Plan OCTOBER 2018 Quarterly Update PCJPB How Should Caltrain Grow? Business Plan Overview Business Plan Overview A Vision for Growth Crafting the Vision Next Steps What is the Caltrain

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 Final EIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need

More information

CHAPTER 2.0: INTRODUCTION

CHAPTER 2.0: INTRODUCTION CHAPTER 2.0: INTRODUCTION 2.1 INTRODUCTION The Federal Transit Administration (FTA) and the Santa Clara Valley Transportation Authority (VTA) have prepared this Environmental Impact Statement/Environmental

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Concept Level Operational Feasibility Study TM 4.1 Prepared by: Signed document on file Paul Mosier _21 July 08 _ Date Checked by: Signed document on file 21 July 08 Ken Jong, PE Date

More information

Integrating High Speed Rail, Regional Rail, and Transit Services in California

Integrating High Speed Rail, Regional Rail, and Transit Services in California Integrating High Speed Rail, Regional Rail, and Transit Services in California SPUR Oakland, CA September 27, 2017 Chad Edison Deputy Secretary for Transportation California State Transportation Agency

More information

2004 FEASIBILITY STUDY UPDATE

2004 FEASIBILITY STUDY UPDATE Austin-San Antonio Intermunicipal Commuter Rail District 2004 FEASIBILITY STUDY UPDATE December 2004 EXECUTIVE SUMMARY INTRODUCTION Almost 3 million people in Central Texas, living and working between

More information

11. MARKETING AND OUTREACH

11. MARKETING AND OUTREACH 11. MARKETING AND OUTREACH The San Joaquins serve markets from Bakersfield to Sacramento via the San Joaquin Valley and branch off from Stockton through the East Bay Area to Oakland. The San Joaquins are

More information

Goods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015

Goods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015 ALAMEDA COUNTY TRANSPORTATION COMMISSION Goods Movement COLLABORATIVE AND PLAN A presentation to the California Marine Affairs and Navigation Conference Arthur L. Dao, Alameda CTC Executive Director 1

More information

South Sounder Capital Improvements Program

South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Date Last Modified July 1, 2016 PROJECT AREA AND REP RESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

CHAPTER 1 INTRODUCTION REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

CHAPTER 1 INTRODUCTION REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY CHAPTER 1 INTRODUCTION REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY CHAPTER 1 INTRODUCTION CREATING A SUSTAINABLE COMMUNITIES STRATEGY FOR THE SAN JOAQUIN REGION This chapter describes

More information

AGENDA January 23, :30 PM Merced County Supervisors Board Room 2222 M Street Merced, CA

AGENDA January 23, :30 PM Merced County Supervisors Board Room 2222 M Street Merced, CA AGENDA January 23, 2015 1:30 PM Merced County Supervisors Board Room 2222 M Street Merced, CA This Agenda shall be made available upon request in alternative formats to persons with a disability, as required

More information

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan. Minnesota Department of Transportation

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan. Minnesota Department of Transportation 2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Minnesota Department of Transportation ! First Statewide Comprehensive Rail Plan for MN! Commissioned by 2008 Legislature! Compliant

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 DEIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need of the

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

1.1 Overview. 1.2 Project History. Chapter 1 Introduction

1.1 Overview. 1.2 Project History. Chapter 1 Introduction . Overview Chapter The an Joaquin Regional Rail Commission (JRRC) is the designated owner, operator, and policymaking body for the Altamont Corridor Express (ACE) service that presently focuses on connecting

More information

South Sounder Capital Improvements Program

South Sounder Capital Improvements Program South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Version Draft ST3 Plan Date Last Modified March 28, 2016

More information

CHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

CHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY CHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY CHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES INTRODUCTION

More information

AB 758, as amended, Eggman. Transportation: Tri-Valley San Joaquin Valley Regional Rail Authority.

AB 758, as amended, Eggman. Transportation: Tri-Valley San Joaquin Valley Regional Rail Authority. AB 758, as amended, Eggman. Transportation: Tri-Valley San Joaquin Valley Regional Rail Authority. Existing law provides for the creation of statewide and local transportation agencies, which may be established

More information

MEETING DATE: July 28, 2017 ITEM 20. Update on Coordination with the California High Speed Rail, Link US Projects, and Freight Railroads

MEETING DATE: July 28, 2017 ITEM 20. Update on Coordination with the California High Speed Rail, Link US Projects, and Freight Railroads REVISED July 25, 2017 Page 4 TRANSMITTAL DATE: July 21, 2017 MEETING DATE: July 28, 2017 ITEM 20 TO: FROM: SUBJECT: Board of Directors Arthur T. Leahy Update on Coordination with the California High Speed

More information

Chapter 4. Recommendations

Chapter 4. Recommendations Chapter 4 Recommendations Project Rating Methodology 1.0 Introduction This chapter outlines the prioritization of potential investments that were identified during this MIS process. During this study there

More information

California Partnership for the San Joaquin Valley. Delivering Transportation Projects

California Partnership for the San Joaquin Valley. Delivering Transportation Projects California Partnership for the San Joaquin Valley Delivering Transportation Projects (very) Quick History In 2006 The voters approved Proposition 1B: $19.9 billion transportation bond program - The bond

More information

California High-Speed Train Program FEIR/EIS

California High-Speed Train Program FEIR/EIS Page 2-30 Page 2-31 Page 2-32 Page 2-33 Page 2-34 Page 2-35 Page 2-36 of Enrique Manzanilla, Director U.S. Environmental Protection Agency, August 31, 2004 (Letter AF008) AF008-1 Acknowledged. AF008-2

More information

Rail Freight and Passenger

Rail Freight and Passenger Take Care of the System Critical Investments in the areas of: Rail Freight rehabilitate rail bridges o Rail Bridge Inventory Database... $0.5 - $1.0 million (one time) Rail Freight rail replacement and

More information

advertising opportunities

advertising opportunities advertising opportunities With over 1.3 million passengers annually and growing, the Altamont Corridor Express (ACE) provides a unique audience and affordable opportunities to advertise your business,

More information

Michael Gillam Deputy Program Director - Southern California

Michael Gillam Deputy Program Director - Southern California International Right of Way Association Los Angeles Chapter: C A L I F O R N I A H I G H - S P E E D R A I L Michael Gillam Deputy Program Director - Southern California January 25, 2011 A Statewide System

More information

1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan.

1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan. Rail Rail plays a significant role in transportation planning, especially when considering economic development, safety, freight, and intermodal connectivity. Jackson has two rail lines serving the area,

More information

2018 advertising opportunities

2018 advertising opportunities 2018 advertising opportunities With over 1.3 million passengers annually and growing, the Altamont Corridor Express (ACE) train provides a unique audience with affordable opportunities to advertise your

More information

Assessment of Current Status, Plans, and Preliminary Alternatives for High Capacity Transportation in the I-5 Corridor

Assessment of Current Status, Plans, and Preliminary Alternatives for High Capacity Transportation in the I-5 Corridor CONNECTING THURSTON COUNTY AND THE CENTRAL PUGET SOUND Alternatives to Meet Transportation Needs in the I-5 Corridor Working Paper #1 June 2011 Assessment of Current Status, Plans, and Preliminary Alternatives

More information

Minnesota Comprehensive Statewide Freight and Passenger Rail Plan

Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Open House Round 2 October 2009 presented by Cambridge Systematics,, Inc. Kimley-Horn and Associates, Inc. TKDA, Inc. Agenda Outreach Erika

More information

1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project

1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project 1.0 INTRODUCTION 1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project Connecticut is centrally located in a part of

More information

Ann Arbor Station Environmental Review. Public Information Meetings April 2, 2014

Ann Arbor Station Environmental Review. Public Information Meetings April 2, 2014 Ann Arbor Station Environmental Review Public Information Meetings April 2, 2014 Welcome Eli Cooper, AICP Transportation Program Manager City of Ann Arbor ecooper@a2gov.org 734-794-6430 x.43710 Robert

More information

Sandpoint Junction Connector

Sandpoint Junction Connector Sandpoint Junction Connector BNSF Railway MAY 23, 2018 BNSF is a Leading Railroad A Berkshire Hathaway, Inc. company 32,500 route miles in 28 states and 3 Canadian provinces 42,000 employees Approximately

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

Rail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014

Rail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014 NH Capitol Corridor Rail & Transit Alternatives Analysis Public Scoping Meeting March 5, 2014 Agenda Study overview National Environmental Policy Act Preliminary alternatives: rail, bus, stations, layover

More information

CALIFORNIA HIGH- SPEED RAIL PROGRAM UPDATE. October 9, 2018 SPUR, San Jose, CA

CALIFORNIA HIGH- SPEED RAIL PROGRAM UPDATE. October 9, 2018 SPUR, San Jose, CA CALIFORNIA HIGH- SPEED RAIL PROGRAM UPDATE October 9, 2018 SPUR, San Jose, CA 2 MEETING AGENDA Introductions & Agenda Review Statewide Update San Francisco to San Jose Project Overview San Jose to Merced

More information

TSM/TDM (Transit and Roadway Efficiency) Concept - Analysis and Results

TSM/TDM (Transit and Roadway Efficiency) Concept - Analysis and Results M E M O R A N D U M TSM/TDM (Transit and Roadway Efficiency) Concept - Analysis and Results TO: FROM: Task Force and Oversight Team Steve Perone/PTV America Tim Burkhardt/CH2M HILL DATE: Revised: August

More information

Airports in the Region Case Study

Airports in the Region Case Study DESTINATION LINDBERGH: COLLABORATION AND VISION TO MEET SAN DIEGO S MOBILITY NEEDS By Bob Leiter, FAICP, Keith Wilschetz, and Tait Galloway INTRODuCTION Destination Lindbergh was a year-long, comprehensive

More information

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11 Contents i Contents 1 A New Transportation Plan... 1 Why develop a new plan?... 1 What area does the LRTP focus on?... 2 Why is this LRTP important?... 3 Meeting Requirements for Transportation Planning...

More information

Railyard Alternatives & I-280 Boulevard Feasibility Study: Meeting #3 1

Railyard Alternatives & I-280 Boulevard Feasibility Study: Meeting #3 1 Railyard Alternatives & I-280 Boulevard Feasibility Study: Meeting #3 1 Railyard Alternatives & I-280 Boulevard Feasibility Study: Meeting #3 2 Railyard Alternatives & I-280 Boulevard Feasibility Study:

More information

Revised Scoping Report

Revised Scoping Report Revised Scoping Report For the ACEforward Program/Project EIR/EIS February 2014 Prepared for the: San Joaquin Regional Rail Commission and Prepared by: ICF International, Inc. 620 Folsom Street, Suite

More information

Sounder Extension to DuPont

Sounder Extension to DuPont Subarea Pierce Primary Mode Commuter Rail Facility Type Station Length 7.8 miles Version Draft ST3 Plan Date Last Modified March 28, 2016 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

The Wake County Transit Plan commits resources to

The Wake County Transit Plan commits resources to september 2012 139 APPENDIX D Capital Investment to Support Commuter Rail The Wake County Transit Plan commits resources to construct the capital items needed to safely and efficiently operate commuter

More information

Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study

Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study Rail Modeling Update May 4, 2017 www.dot.state.mn.us/passengerrail/tc-mil-chi/

More information

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis Contra Costa Transportation Authority STAFF REPORT Meeting Date: February 15, 2017 Subject Summary of Issues Regional Measure 3 (RM3) Candidate Projects for Submittal to the Metropolitan Transportation

More information

Frequently Asked Questions (FAQs) For Communications Based Overlay Signal System (CBOSS) Positive Train Control (PTC)

Frequently Asked Questions (FAQs) For Communications Based Overlay Signal System (CBOSS) Positive Train Control (PTC) (FAQs) For Communications Based Overlay Signal System (CBOSS) Positive Train Control (PTC) 1. What is CBOSS PTC? CBOSS PTC stands for Communications Based Overlay Signal System (CBOSS) Positive Train Control

More information

S-16: Sounder Rail Extension from Puyallup to Orting

S-16: Sounder Rail Extension from Puyallup to Orting Project Number S-16 Subarea Pierce Primary Mode Commuter Rail Facility Type Corridor Length 5.7 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT

More information

ARIZONA STATE RAIL PLAN

ARIZONA STATE RAIL PLAN ARIZONA STATE RAIL PLAN AzTA / ADOT Transit Conference April 11 th, 2011 Statewide Planning Process ADOT Planning Process Evolution Accepted by State Transportation Board on March 18 th Final Document

More information

Chapter 3 - Goals, Objectives, & Strategies

Chapter 3 - Goals, Objectives, & Strategies Chapter 3 - This chapter presents goals, objectives, and strategies that have been developed as part of the Richmond Area MPO 2026 Long-Range Transportation Plan (LRTP) update. Strategies have been developed

More information

Green Line Extension EOT. Project Location. Project Purpose. Environmental Impact Report Public Scoping Session

Green Line Extension EOT. Project Location. Project Purpose. Environmental Impact Report Public Scoping Session Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 16, 2006 Project Location Green Line Extension Project Purpose Implement enhancements to transit services

More information

4 Evaluation of Alternatives

4 Evaluation of Alternatives 4 Evaluation of Alternatives The alternatives have undergone an evaluation on numerous topics related to transportation function, implementation, cost, and financing/revenue. For each topic, the performance

More information

Environmental Impact Statement for the California High-Speed Rail System Burbank to Los Angeles Section, CA

Environmental Impact Statement for the California High-Speed Rail System Burbank to Los Angeles Section, CA This document is scheduled to be published in the Federal Register on 07/24/2014 and available online at http://federalregister.gov/a/2014-17384, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Tier 1 Draft Environmental Impact Statement. Prepared by

Tier 1 Draft Environmental Impact Statement. Prepared by Tier 1 Draft Environmental Impact Statement Prepared by October 2018 This page intentionally left blank. This page intentionally left blank. Executive Summary The U.S. Department of Transportation s (USDOT)

More information

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL OCTOBER 2014 Cover photographs courtesy of Top left - Mike Bates TABLE OF CONTENTS MISSION... 1 INTRODUCTION... 1 VISION STATEMENT... 1 BACKGROUND... 2

More information

Caltrain Rapid Rail Plan

Caltrain Rapid Rail Plan TRANSPORTATION RESEARCH RECORD 1677 Paper No. 99-1328 31 Caltrain Rapid Rail Plan ANDREW BUTLER NASH The results of Caltrain s Rapid Rail Study are described. The purpose of the study was to develop a

More information

PLANNING FOR TRANSIT ORIENTED DEVELOPMENT IN CARROLLTON

PLANNING FOR TRANSIT ORIENTED DEVELOPMENT IN CARROLLTON PLANNING FOR TRANSIT ORIENTED DEVELOPMENT IN CARROLLTON Townscape Inc Angelou Economic Advisors Newman Jackson Bieberstein Parsons Transportation Group Bridgefarmer & Associates Carrollton Renaissance

More information

Northern Illinois Commuter Transportation Initiative (NICTI) Locally Preferred Alternative Briefing Paper

Northern Illinois Commuter Transportation Initiative (NICTI) Locally Preferred Alternative Briefing Paper Northern Illinois Commuter Transportation Initiative () Locally Preferred Alternative Briefing Paper 1. Background Winnebago and Boone Counties established a coalition in 2003 to explore commuter connections

More information

Strategic Transportation Plan FOCUS ON TRANSIT

Strategic Transportation Plan FOCUS ON TRANSIT Strategic Transportation Plan FOCUS ON TRANSIT Presented to: Gateway Cities Service Council Presented by: Jerry Wood, GCCOG Director of Transportation and Engineering COG2013\2013 - POWER POINTS for JRW

More information

Rail Division 2012 Annual Summary

Rail Division 2012 Annual Summary Rail Division 2012 Annual Summary Overview The Rail Division oversees rail planning and inspection, highway rail crossings, management of stateowned lines (such as the South Orient Rail line (SORR) and

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

CHAPTER 6 TRANSPORTATION PLAN AND POLICIES

CHAPTER 6 TRANSPORTATION PLAN AND POLICIES CHAPTER 6 TRANSPORTATION PLAN AND POLICIES TRANSPORTATION PLAN AND POLICIES The extent to which the 2014 RTP/SCS improves the performance of the region s transportation system, improves mobility and access,

More information

Nashville Southeast Corridor High-Performance Transit Alternatives Study. Final Report

Nashville Southeast Corridor High-Performance Transit Alternatives Study. Final Report Nashville Southeast Corridor High-Performance Transit Alternatives Study Final Report August 2007 - Nashville Southeast Corridor Executive Summary I. Introduction The southeast corridor is a 30 mile long

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Sustainable Streets BRIEF DESCRIPTION: This item is a request for the San Francisco Municipal Transportation

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL)

DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL) DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL) Background On June 25, 2014, the Federal Railroad Administration (FRA) issued a Notice of Intent to Prepare an Environmental

More information

CHAPTER 2 INTRODUCTION

CHAPTER 2 INTRODUCTION CHAPTER 2 INTRODUCTION 2.1 INTRODUCTION The Santa Clara Valley Transportation Authority (VTA) has prepared this Second Supplemental Environmental Impact Report (SEIR-2) in accordance with the California

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM California High-Speed Train Project TECHNICAL MEMORANDUM 15% Design Scope Guidelines TM 0.1 Signed document on file Prepared by: 12 May 08_ Ken Jong, PE Checked by: Signed document on file 12 May 08_ John

More information

METROPOLITAN BAKERSFIELD TRANSIT CENTER STUDY. Final Report

METROPOLITAN BAKERSFIELD TRANSIT CENTER STUDY. Final Report METROPOLITAN BAKERSFIELD TRANSIT CENTER STUDY Final Report August 2015 Achnowledgements TBD i Table of Contents 1. Executive Summary... 1 Background and Purpose...1 Public Outreach...1 Suitable Transit

More information

Moving the first state forward! Delaware s Statewide Long- Range Transportation Plan November 17, 2010 WILMAPCO Our Town

Moving the first state forward! Delaware s Statewide Long- Range Transportation Plan November 17, 2010 WILMAPCO Our Town Moving the first state forward! Delaware s Statewide Long- Range Transportation Plan November 17, 2010 WILMAPCO Our Town Moving the First State t Forward Today s problems yesterday s decisions. Implementation

More information

7.1 Cumulative Impacts under NEPA and CEQA

7.1 Cumulative Impacts under NEPA and CEQA Chapter 7 This chapter includes the following discussions required by the National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA). Cumulative Impacts under NEPA and CEQA

More information

Regional Transit Framework Study

Regional Transit Framework Study MARICOPA ASSOCIATION OF GOVERNMENTS Regional Transit Framework Study Regional Stakeholders Group Meeting #1 February 29, 2008 Copyright 2008 AGENDA Welcome and Introductions Project Process Regional Transit

More information

TEXAS-OKLAHOMA PASSENGER RAIL STUDY

TEXAS-OKLAHOMA PASSENGER RAIL STUDY TEXAS-OKLAHOMA PASSENGER RAIL STUDY Jennifer Moczygemba, P.E. Rail Division Texas-Oklahoma Passenger Rail Study (TOPRS) Study of the feasibility of various passenger rail options that will result in a

More information

ODOT Intercity Passenger Rail Study

ODOT Intercity Passenger Rail Study Oregon Department of Transportation Rail Division 13th Street NE, Suite 3 Salem, Oregon 97301-4179 Parsons Brinckerhoff 400 SW Sixth Ave, Suite 802 Portland, Oregon 97204 TABLE OF CONTENTS EXECUTIVE SUMMARY...

More information

Administration and Projects Committee STAFF REPORT

Administration and Projects Committee STAFF REPORT Meeting Date: Subject Summary of Issues Recommendation Financial Implications Options Attachments Changes from Committee Innovate 680 (Project 8009) Authorization to Issue Request for Proposals (RFP) No.

More information

Peninsula Corridor Electrification Project. Draft Environmental Impact Report

Peninsula Corridor Electrification Project. Draft Environmental Impact Report Peninsula Corridor Electrification Project Draft Environmental Impact Report Public Meeting Purpose of Tonight s Meeting Provide an overview of Draft Environmental Impact Report (Draft EIR) Receive comments,

More information

Hampton Roads Transportation Planning Organization. Hampton Roads Passenger Rail Study Data Collection. Phase 2A. Presentation To.

Hampton Roads Transportation Planning Organization. Hampton Roads Passenger Rail Study Data Collection. Phase 2A. Presentation To. Presentation To Hampton Roads Transportation Planning Organization Hampton Roads Passenger Rail Study Data Collection Phase 2A Presentation By February 29, 2012 Transportation Economics & Management Systems,

More information

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY April 2013 Alignments Alignments Magnolia Ave Northeast corridor Knoxville Transit Center Hall of Fame Dr Magnolia Ave Prosser Rd. Corridor contains commercial,

More information

The Metropolitan Transportation Plan. Public Meetings February 2016

The Metropolitan Transportation Plan. Public Meetings February 2016 The Metropolitan Transportation Plan for North Central Texas Public Meetings February 2016 Presentation Agenda Mobility 2040 Draft Recommendations RTC Policy Bundle Concept Transportation Improvement Program

More information

VRE Gainesville-Haymarket Extension (GHX) Study. December 16, 2016

VRE Gainesville-Haymarket Extension (GHX) Study. December 16, 2016 VRE Gainesville-Haymarket Extension (GHX) Study December 16, 2016 1 Project Origins System Plan 2040 and Financial Plan Follow Natural Growth profile to run longer trains Continue to pursue funding for

More information

Database and Travel Demand Model

Database and Travel Demand Model Database and Travel Demand Model 7 The CMP legislation requires every CMA, in consultation with the regional transportation planning agency (the Metropolitan Transportation Commission (MTC) in the Bay

More information

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. FINAL March 2005 Foreword

More information

Transit Investment Direction and Plan Introduction. Transportation Advisory Board October 18, 2017

Transit Investment Direction and Plan Introduction. Transportation Advisory Board October 18, 2017 Transit Investment Direction and Plan Introduction Transportation Advisory Board October 18, 2017 Today s Topics - Transit Where are we now, what are the current issues? Where do we want to go? How will

More information

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015 ACTIVE TRANSPORTATION ADVISORY COMMITTEE Memphis MPO March 30, 2015 Agenda Welcome & Introductions Announcements and Briefings Livability 2040: Regional Transportation Plan Congestion Management Process

More information

CHAPTER 5: TRANSPORTATION

CHAPTER 5: TRANSPORTATION CHAPTER 5: TRANSPORTATION GOAL 12: TRANSPORTATION BACKGROUND SUMMARY INTRODUCTION Albany s location and transportation facilities provide excellent advantages for commerce and economic development. Albany

More information

Appendix F 2008 Travel Demand Modeling

Appendix F 2008 Travel Demand Modeling Appendix F 2008 Travel Demand Modeling TRAVEL DEMAND MODELING Purpose: The Jackson/Teton County Comprehensive Plan Update is revisiting land use and transportation planning policies to ensure they can

More information

11. PHASED IMPLEMENTATION STRATEGY

11. PHASED IMPLEMENTATION STRATEGY 11. PHASED IMPLEMENTATION STRATEGY 11.1. ALTERNATIVES ANALYSIS SUMMARY The Harbor Subdivision AA Study analyzed both existing and forecast transportation conditions within the Study Area and identified

More information

S-09: Auburn Station Access Improvements

S-09: Auburn Station Access Improvements Project Number S-09 Subarea South King Primary Mode Commuter Rail Facility Type Infrastructure Improvements Length Version Number ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org

More information

ARIZONA STATE RAIL PLAN. ITE / IMSA 2011 Spring Conference March 9 th 2011

ARIZONA STATE RAIL PLAN. ITE / IMSA 2011 Spring Conference March 9 th 2011 ARIZONA STATE RAIL PLAN ITE / IMSA 2011 Spring Conference March 9 th 2011 Statewide Planning g Process ADOT Planning Process Evolution Southwest Transportation Network Sun Corridor Sun Corridor will include

More information