The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

Size: px
Start display at page:

Download "The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin"

Transcription

1 The following documenttion is n electronicllysubmitted vendor response to n dvertised solicittion from the West Virgini Purchsing Bulletin within the Vendor Self Service portl t wvoasisgov As prt of the Stte of West Virgini s procurement process, nd to mintin the trnsprency of the bid opening process, this documenttion submitted online is publicly posted by the West Virgini Purchsing Division t WVPurchsinggov with ny other vendor responses to this solicittion submitted to the Purchsing Division in hrd copy formt

2

3 Purchsing Division 2019 Wshington Street Est Post Office Box Chrleston, WV Stte of West Virgini Solicittion Response Dte issued Proc Folder : Solicittion Description : Addendum; Wstewter Tretment nd Wter System Renovtions Proc Type : Centrl Contrct - Fixed Amt Solicittion Closes Solicittion No Version :30:00 SR 0310 ESR VENDOR ANDERSON & ASSOCIATES OF VIRGINIA INC FOR INFORMATION CONTACT THE BUYER Guy Nisbet (304) guylnisbet@wvgov Signture X FEIN # DATE All offers subject to ll terms nd conditions contined in this solicittion Pge : 1 FORM ID : WV-PRC-SR-001

4 Line Comm Ln Desc Qty Unit Issue Unit Price Ln Totl Or Contrct Amount 1 Architecturl engineering Comm Code Mnufcturer Specifiction Model # Extended Description : AE Services for Moncove Lke Wstewter Tretment Plnt Replcement nd Lost River Wter System Renovtions Pge : 2

5 Expression of Interest Moncove Lke nd Lost River Stte Prks Wstewter Tretment Plnt Replcement & Wter Line Renovtion Due: November 17, :30 pm Deprtment of Administrtion, Purchsing Division Purchsing Deprtment 2019 Wshington Street Est Chrlestion, WV

6 Tble of Contents A COVER LETTER B INTRODUCTION C APPROACH D PERSONNEL E SIMILAR EXPERIENCE F REFERENCES 2

7 A Cover Letter 3

8 A Anderson & Assocites, Inc Professionl Design Services November 18, 2015 Mr Guy Nisbet Buyer Supervisor Deprtment of Administrtion Purchsing Division 2019 Wshington Street, Est Chrleston, WV Re: Moncove Lke/Lost River Stte Prks Wter nd Wstewter Improvements - JN Der Mr Nisbet, Anderson & Assocites with our project prtner, Trid Engineering (Project Tem) is plesed to submit this proposl for professionl services relting to prk improvements t Moncove Lke nd Lost River Stte Prks UNDERSTANDING 1 This project involves design nd construction dministrtion/inspection for wstewter improvements to Moncove Lke Stte Prk nd wter improvements Lost River Stte Prk 2 These services will involve engineering, geotechnicl nd construction services for ech prk individully 3 The selected project tem will review the existing plns nd conditions to mke recommendtions to the Deprtment of Nturl Resources (DNR) 4 After consensus mongst the project tem including DNR, the project tem will design improvements with ccordnce to WV Stte Regultions, West Virgini Bureu of Public Helth, West Virgini Deprtment of Environmentl Protection nd requirements of the DNR 5 The Project Tem will ssist the DNR with soliciting nd pprovl of responsive contrctor 6 Upon execution of the contrct the Project Tem will provide Construction Administrtion/Construction Inspection in conjunction with personnel from the prks nd the DNR APPROACH We will: 1 Following n initil scope kick-off meeting we will work with the DNR s personnel to procure informtion tht will id the project success 2 The project tem will gther vilble informtion to determine project prmeters with the DNR 3 Provide 50%, 90%, nd finl project documents with cost estimtes to the DNR for pprovl nd review Review meetings will be held t ech milestone 4 Submit the pproved contrct documents to DNR for their review nd pprovl PROJECT SCHEDULE Will be provided upon project initition \\AAPROJECTS\Projects\31\31918\31918_PROPOSAL\RFP_Process\Proposl\Moncove_31918_CoverLetter_2015_1117doc An Employee-Owned Compny 195 Dvis Street, Princeton, WV (540) (540) fx wwwndssoccom Blcksburg & Edinburg, Virgini Greensboro, North Crolin Princeton, West Virgini

9 A STRONG EXPERIENCED PROJECT TEAM The project tem will consist of: Bill Keton, PE Officer-in-Chrge nd Project Mnger Jessic Nichols, PE Qulity Assurnce nd Qulity Control Dennis Amos, PE Project Engineer Mtt Gross, PE Project Engineer Chris Kknis, LS Survey Mnger Crmen Dunford Design Technicin Nicole Kmetz- Environmentl Technicin Dniel Lipscomb, PE Project Engineer Jeffrey T Huffmn, MS, PE Geotechnicl Engineerg The Project Tem s ssembled hs over 224 yers of experience with this type of project Detils of ech tem member role re included in the proposl PROJECT RESPONSIVENESS/OFFICE LOCATION The Project Tem hs stff immeditely vilble to undertke this project Our loction in Princeton, West Virgini nd St Albns, WV enbles our project tem to esily perform field work to ensure successful project for the DNR We hve the desire to work closely with you nd your stff on the ground nd in the office to provide projects tht will serve s the bsis for improvements to your system to include better opertions nd cost effective chnges to your system In ddition, the cost estimtes will serve s the bsis for budget figures pproprite for the project We look forwrd to discussing our qulifictions with you in more detil If you hve ny questions, or if we cn help in ny wy, plese let us know Sincerely, Anderson & Assocites, Inc WBK/wbk Willim B Keton PE Vice President

10 B Introduction Anderson & Assocites, Inc is n employee-owned professionl design services firm Founded in 1968, the compny is hedqurtered in Blcksburg, Virgini, nd hs grown to include offices locted in Virgini, West Virgini nd North Crolin A&A invests in humn engineering, fostering not only technicl skills, but the totl development of the individul A determined effort is mde to recruit top-notch people, ssist them in personl nd professionl development, nd llow them to be directly responsive to clients rther thn to internl mngement All full-time employees re lso eligible to become owners through n Employee Stock Ownership Pln (ESOP) Your work will be performed by employee-owners who hve high stke in your stisfction nd re prticulrly concerned bout upholding the firm's well-erned reputtion With our strong stff nd yers of building good reltionships within the communities where we work, clients pprecite the benefits of coopertive, dedicted performnce Core services t A&A include civil, environmentl, nd trnsporttion engineering, surveying, plnning nd lndscpe rchitecture The firm specilizes in the plnning, design, nd construction dministrtion of public nd privte works Institutionl, municipl, stte, industril, nd recretionl projects encompss res such s mster plnning, utilities, wter, wstewter, stormwter, trnsporttion, nd site development A&A's consistent focus on improving responsiveness to clients reflects our dediction Anderson & Assocites, Inc hs been helping our clients chieve their gols for infrstructure nd citizens like for over three decdes Our tem is prcticed in designing solutions not just projects Tking into considertion your project s unique circumstnces nd your specific gols, we develop response tht ddresses funding ssistnce if pplicble, public informtion dissemintion, nd opertionl sustinbility s well s engineering fetures We work s prtner with you to ensure your bility to serve your mny constituents From dily opertions to emergency needs to nticipting regionl growth, the demnds on tody s municipl mngement nd stff re enormous nd often require tem pproch The Project Tem specilizes in systems similr to this project We hve worked for mny Cities, Towns, Counties, Service Authorities, nd Public Service Districts For these clients nd others, we hve modeled, designed, nd dministered construction contrcts for numerous wter nd wstewter systems On the following pges, we hve highlighted few of our clients nd some representtive projects tht we hve worked on We consider our reltionships to our clients to be prtnership We strongly encourge you to contct our clients nd sk ny dditionl questions regrding the services nd performnce tht A&A offers 4

11 WASTEWATER QUALIFICIATIONS Anderson & Assocites hs been offering wstewter engineering services since our founding in 1968 This work hs included studies, design, construction inspection, construction dministrtion, nd opertion ssistnce for collection systems, pump sttions nd wstewter tretment plnts Fcilities hve rnged in size from 1000 gllons per dy to 135 million gllons per dy Most of these fcilities hndled municipl wstewter consisting of domestic, commercil, nd industril wstes Anderson & Assocites is lso experienced with some industril wstewter tretment nd recirculting quculture systems Our tem of professionl engineers, grdute engineers, technicins, nd construction inspectors hs experience with projects from process investigtion, evlution, concept development, design, construction, nd into opertion Our fmilirity with ll of the stges of project contributes to the development of resonble solutions WASTEWATER TREATMENT EXPERIENCE Anderson & Assocites hs experience with the evlution nd design of secondry nd tertiry wstewter tretment fcilities using both conventionl nd lterntive tretment processes While fcilities hve rnged in size from 1000 to 13,500,000 gllons per dy (gpd), mny of these fcilities hve treted domestic nd commercil wstewter from truck stops, shopping centers, cmpgrounds, resorts, reserch sttions, churches, correctionl fcilities, s well s smll communities Conventionl process experience includes tricking filters, pcked biologicl rectors, rotting biologicl contctors, nd vritions of the ctivted sludge process including pckged extended ertion nd sequencing biologicl rectors All of these systems were designed to meet secondry tretment limits nd severl met vrious tertiry tretment requirements including reduced BOD, mmoni, nd suspended solids Severl fcilities hve been designed for future phosphorus removl, but few smll plnts hve constructed or operte phosphorus removl fcilities Phosphorus cn be removed biologiclly or chemiclly, however chemicl tretment using lum precipittion hs typiclly been used for smll tretment fcilities Anderson & Assocites lso hs extensive experience with lterntive tretment systems These hve found prticulr fvor with clients generting low flow nd needing to minimize operting cost nd complexity Experience hs included subsurfce tretment nd dispersl using enhnced flow or low pressure distribution, forest spry irrigtion, constructed wetlnds, pond systems, nd wstewter quculture Other tretment experience of significnce for this project include experience with recirculting quculture systems This work hs included evlution of existing systems, conceptul design nd plnning, nd detiled design of new tretment fcilities to be used for both pilot studies nd production 5

12 WATER & WASTEWATER A&A hs been offering wter nd wstewter engineering services since our founding in 1968 This work hs included studies, design, construction inspection, construction dministrtion, nd opertion ssistnce for collection nd distribution systems, pump sttions, nd tretment plnts Fcilities hve rnged in size from 1,000 gllons-per-dy to 25 million gllons-per-dy A&A hs provided engineering services relted to ll components of wter supply, tretment, nd distribution systems, in ddition to ll spects of wstewter, from collection system design nd I/I nlysis to tretment systems, including innovtive nd on site systems Pertinent to the Town s requirements, these projects hve included the following: Wter Storge Tnks Inflow/Infiltrtion Anlysis Wter Distribution Mins Collection System Design Regultion Complince On site systems Opertionl Assistnce Pumping Sttions Wter & Sewer Modeling Sewer Rehbilittion Mster Plnning Rte Studies ENVIRONMENTAL A&A hs experience in performing environmentl ssessments for wter nd wstewter projects, site development, col mine reclmtion projects, dm removl projects, nd stone qurry opertions We lso hve performed wetlnds impct ssessments nd designed mitigtion mesures We lso re ble to perform environmentl studies, site reviews, subsurfce investigtions (with geotechnicl ssistnce), nd coordinted soil nd groundwter smpling for storge continment res We hve the experience to ssist you with interprettion of stte nd federl environmentl regultions, including the ssessment of potentil impcts of proposed regultions Our stff includes severl engineers with yers of experience in nlyzing, ssessing, nd interpreting the menings, effects, nd impcts of federl nd stte environmentl requirements nd regultions SURVEY AND MAPPING A&A hs been providing field surveying to support engineering nd development for the lst 40 yers We re cpble of providing Boundry, Subdivision, Esement, GPS, Topogrphic, nd Route Loction Surveys, s well s Aeril Photo Control nd Construction Stking We hve lso recently been involved with sset mngement nd dt collection for VDOT long the interstte highwy corridors in the Commonwelth In ddition, we hve dded the cpbilities of new 3D scnner for detiled surveys in congested res, with complex piping systems, bridges, nd buildings FUNDING No pln is successful unless it cn be implemented Funding of projects thus becomes key element of project plnning Anderson & Assocites is fmilir with ll vilble infrstructure nd economic development funding progrms nd hs provided both technicl nd dministrtive ssistnce in prepring successful funding pplictions, including 40 Rurl Development projects over our lst 40 yers in business Experience with other funding progrms oriented towrd utility system projects nd economic development hs included the Environmentl Protection Agency (EPA), Economic Development Administrtion (EDA), Community Development Block Grnt (CDBG), Deprtment of Environmentl Qulity (DEQ), n the Applchin Regionl Commission (ARC) We hve close ties with vrious gency personnel nd keep up to dte on requirements through regulr communiction nd ttendnce t workshops nd informtion sessions We hve lso ssisted gency personnel with dvice on policy nd document revisions, nd workshop presenttions 6

13 C Approch MONCOVE LAKE nd LOST RIVER STATE PARKS PROJECT UNDERSTANDING nd APPROACH Moncove Lke Stte Prk Wstewter Tretment Plnt Moncove Lke Stte Prk Extended Air Wstewter Tretment Plnt Sized nd Permitted for 7,500 gllons per dy (GPD) 7

14 Moncove Lke Aertion Bsin Notice the ge of the bsin nd condition of the grting Moncove Lke Tblet Chlorintion Feed nd Chmber This should be replced due to ge nd condition Moncove Lke Controls nd Timers These need replced nd the electricl service upgrded 8

15 Moncove Lke Pump Submersible Pump Sttion Flygt Submersible pumps need retrofitted with grinder pump impellers Moncove Lke NPDES No Shows evidence of wshout ner the outfll pipe Consider instlling hedwll 9

16 Lost River Stte Prk Wter System Understnding The Lost River Wter system hs wells tht supply the prks users The Prk is sesonl The prk storge tnks re in need of replcement The prk wter system is in need of replcement Project Approch for Both Projects The exct process will be mended upon selection for the project Upon Notice to Proceed, the Project Tem will meet with DNR nd the Prk Superintendent to determine the precise scope of the improvements A letter of understnding of the project will be circulted to the project tem for consensus, nd then design will begin The superintendent nd opertor of the system will be prt of the project tem nd will hve ultimte decision mking in the types of mterils nd units to be used Design will commence with meetings being held t the 50%, 90% nd Finl periods of design The Project Tem will then ssist the DNR to solicit nd evlute bids nd contrctors Construction dministrtion nd inspection will be undertken t the direction of the DNR nd Prk A monthly progress meeting will be prt of the construction process Upon substntil completion punch list inspection will be undertken nd the Project Tem will oversee its completion Upon completion nd cceptnce of the project by DNR nd the Superintendent, the project tem will issue Notice of Completion **This list is intended to show potentil listing of tsks nd milestone dtes Upon selection forml schedule nd tsk list will be provided using Microsoft project nd updted monthly with progress report sent to the DNR for review This schedule cn be mended t ny time by the DNR nd updted 10

17 D Personnel Moncove Lke nd Lost River Stte Prks BILL KEATON, PE OFFICER-IN-CHARGE AND PROJECT MANAGER JESSICA NICHOLS, PE QUALITY ASSURANCE / QUALITY CONTROL GEOTECHNICAL DENNIS AMOS, PE PROJECT ENGINEER CHRIS KAKNIS, LS SURVEY MANAGER NICOLE KMETZ ENVIRONMENTAL TECHNICIAN MATTHEW GROSS, PE PROJECT ENGINEER CARMEN DUNORD DESIGN TECHINICIAN RESUMES Following the orgniztionl chrt, resumes of the key personnel cn be seen highlighting their experience, qulifictions nd ny specilized trining 11

18 Bill Keton, PE Officer-in-Chrge nd Project Mnger Mr Keton is Vice President of Environmentl Engineering t Anderson & Assocites, Inc He mnges vriety of civil engineering projects, He hs over 20 yers of experience in vriety of environmentl nd wstewter projects, nd holds BS in Civil Engineering, nd BA in Business from the West Virgini Institute of Technology, s well s n MBA from Webster University Bill hs worked on projects in severl sttes, including North Crolin, Virgini, West Virgini, Tennessee, nd New York Keton s experience llows him to use his knowledge to crete effective engineering plns nd solutions tht will stisfy our clients gols His experience is listed below: LOW MOOR WASTE WATER TREATMENT PLANT IMPROVEMENTS, ALLEGHANY COUNTY, VA A&A is providing engineering improvements of the existing Low Moor Wstewter Tretment Plnt locted in Low Moor, Virgini Suggested improvements were prepred for the UV disinfection s well s the mechnicl post ertion system Officer-in-Chrge WATER TREATMENT PLANT AND SUPPLY WELLS, TOWN OF SOUTHEAST, NY Provided services for design of 20,000 gpd per dy wter tretment plnt nd supply wells to serve the Town of Southest Springhouse re residents Project Mnger nd Led Designer WASTEWATER TREATMENT PLANT IMPROVEMENTS, PRINCETON SANITARY BOARD, PRINCETON, WV Provided construction phse of wstewter tretment plnt upgrde project tht consisted of the rehbilittion of primry clrifiers, new hedworks building with influent pump sttion, new ultrviolet disinfection, ATAD/SNDR solids digester, new SCADA systems, new genertor nd electricl upgrdes to the fcility Project Mnger nd Led Engineer POTABLE WATER TREATMENT PLANT REPLACEMENT, RADFORD ARMY AM- MUNITION PLANT/ALLIANT TECH SYSTEMS, INC, RADFORD, VA A&A ssisted ATK by providing detiled evlution of the existing Building 419 Potble Wter Tretment Plnt The evlution ssessed the cpcity, condition, risks, nd costs of upgrding individul tretment nd pumping units An evlution of existing potble wter tretment plnt nd relted fcilities ws conducted Life cycle cost ssessment for upgrde versus replcement, nd design of new stte of the rt wter tretment plnt on fst trck bsis Project Engineer CLARKE COUNTY SANITARY AUTHORITY, BERRYVILLE, VA Providing n updted PER nd wter model for the wter tretment plnt nd wter distribution system The PER will ddress the fesibility nd ssocited costs to updte the existing SCADA system or converting to rdio system, updting control equipment, nd evluting the cpbility for the plnt to produce more wter to meet demnds in the re The wter system model will evlute the cpbility of the distribution system to meet current nd existing demnds nd will provide prioritized list of recommended wter system improvements EDUCATION: BS/1993/West Virgini Institute of Technology/ Civil Engineering MBA/1992/Webster University BA/1987/West Virgini Institute of Technology/ Environmentl Engineering REGISTRATION: Virgini West Virgini Tennessee YEARS OF EXPERIENCE: With A&A since 2013 With other firms 25 yers 12

19 Jessic Nichols, PE Qulity Control nd Qulity Assurnce Ms Nichols joined Anderson & Assocites s Vice President of Municipl Engineering, bringing with her vst mount of experience in Wter nd Wstewter Tretment Fcilities nd Trnsmission systems, Stormwter, Lnd Her expertise in engineering nd design combined with her knowledge nd fmilirity with Southwest Virgini, llow Ms Nichols to provide cretive nd effective engineering nd plnning solutions tht ddress client gols in n efficient nd proctive mnner Her professionl experience is highlighted below WASTEWATER SYSTEM IMPROVEMENTS, BLAND COUNTY, VA Anderson & Assocites, Inc is providing engineering design nd surveying services for grvity collection system, pproximtely 25,000 liner feet of force min sewer, nd multiple pump sttions to serve the Blnd Courthouse community in Blnd County This project provided much needed sewer service to community tht hs lcked it It llowed for enhnced environmentl resource protection nd commercil/industril development opportunities within nd round Blnd Officer in Chrge WATER SYSTEM IMPROVEMENTS PER, THOMAS BRIDGE WATER CORPORA- TION, MARION, VA Our services included the updte of wter distribution system mpping to identify the type, size nd loction of the existing piping A&A then performed lek detection study on portions of the existing system to id in locting sections of wterline tht contribute to the Corportion s unccounted for wter losses A hydrulic model ws then generted g nd A&A performed n nlysis on the existing system A&A prepred preliminry engineering report (PER) tht conformed to both Rurl Development nd VDH guidelines with our recommended improvements A&A provided funding ssistnce in order to obtin dditionl funding for the design of the selected improvements Officer in Chrge GALAX WATER TREATMENT PLANT AND PUMP STATION PER CITY OF GALAX, VA A&A ssisted the City of Glx s efforts to improve opertionl relibility nd efficiency in its wter tretment system A&A prepred PER for the City to evlute nd mke recommendtions on upgrding the Wter Tretment Plnt nd the Est Glx nd City View pumping sttions The result of the report ws minor electricl work for the City View pump sttion long with the recommendtion of bckup power supply for two pump sttions Officer in Chrge EDUCATION: BS/1998/Virgini Polytechnic Institute nd Stte University/ Civil Engineering REGISTRATION: PE Licenses: Virgini Wter & Wstewter System Improvements, Town of Perisburg, VA This project begn with the development of Preliminry Engineering Reports s prt on n on-going effort to continue improving the Town s wter nd wstewter system infrstructure nd opertion Following these studies, A&A ssisted the Town with Rurl Development funding ppliction nd funding ws received to move forwrd with design of the recommended improvements Design included the replcement nd extension of portions of the existing wter distribution nd wstewter collection systems Approximtely 18,000 feet of 10, 8, 6, 4 nd 2-inch wter mins nd 1,800 feet of 8-inch sewer mins were replced The wter system ws connected to the existing Riverbend Tnk with mster meter which will llowed the Town to bndon the ging Virgini Heights hydrotnk Officer-in-Chrge 13 No Delwre No Mrylnd No Pennsylvni No YEARS OF EXPERIENCE: With A&A since: 2013 With other firms: 15 Yers PROFESSIONAL MEMBERSHIPS: Americn Council of Engineering Compnies

20 Dennis A Amos, PE Project Engineer Mr Amos begn his creer with the West Virgini Deprtment of Trnsporttion, prior to moving to privte sector engineering His experience includes wter nd sewer systems, trnsporttion systems, nd hydrulic nlysis He brings extensive knowledge of funding requirements nd regultions His experience is highlighted below: Red Sulphur PSD Wstewter Tretment Plnt Upgrde Develop plns, contrct documents nd technicl specifictions for the upgrde of the existing Red Sulphur PSD wstewter tretment plnt to n SBR bsed tretment process Also included in the work were new UV disinfection unit nd new belt filter press fcility Lindside Wstewter System Extension Develop plns, contrct documents nd technicl specifictions for the extension of the existing Red Sulphur PSD wstewter collection system from Peterstown to Lindside Included in the project were vrious grvity collection system components nd the design of three wstewter pumping sttions nd ssocited force mins Red Sulphur Wter System Extension Phse II Develop plns, contrct documents nd technicl specifictions for the extension of Red Sulphur PSD s existing wter distribution system from Peterstown to Bozoo nd from Lindside to Rock Cmp Included in the project were vrious distribution system components nd the design of pump sttion nd wter storge tnk Lshmeet PSD Spnishburg Wter System Extension Develop plns, contrct documents nd technicl specifictions for the extension of West Virgini Americn s existing wter distribution system into Spnishburg EDUCATION: BS/1998/West Virgini University/Civil Engineering Registrtion: Professionl Engineer/ VA/2005 Professionl Engineer/ WV/2003 Yers of Experience: With A&A since: 2005 With other firms: 7 yers Professionl Membership: Americn Wter Works Assocition Americn Society of Civil Engineers Estern Wyoming PSD Mullens Wter System Improvements Develop plns, contrct documents nd technicl specifictions for the replcement of the existing Mullens wter distribution system Included in the project were vrious distribution system components, two wter storge tnks, nd new wter tretment fcility 14

21 Mtthew G Gross, PE Project Engineer Mr Gross hs wide rnge of experience in environmentl, wter, nd wstewter systems He hs both designed nd mnged wter nd wstewter projects on numerous municipl systems He hs worked extensively on tretment nd pump sttion designs for Anderson & Assocites This work hs included the evlution, design, equipment selection, preprtion of construction documents, construction mngement, strt-up, nd opertionl ssistnce As prt of this wter nd wstewter experience, he hs developed specific expertise with pumps nd pumping systems His experience is highlighted below: COMPREHENSIVE WATER TREATMENT PLANT EVALUATION, TOWN OF PO- CAHONTAS, VA Anderson & Assocites, Inc prepred PER to ssess the Pochonts WTP nd compre upgrde nd replcement lterntives A&A lso performed brief rte study to determine if rtes re dequtely set The work ws funded by 2012 West Virgini Bureu for Public Helth (WVBPH) Plnning Grnt Project Engineer WASTEWATER SYSTEM IMPROVEMENTS, ALLISON GAP, SMYTH COUNTY AND TOWN OF SALTVILLE, VA Preliminry engineering report, funding ppliction, environmentl ssessment Preliminry design of wstewter collection system to serve Allison Gp, with connection to Town of Sltville system Included services to investigte existing inflow nd infiltrtion in the Sltville collection system VDHCD plnning grnt funding Project Engineer WASTEWATER CONSENT ORDER ASSISTANCE, CRAIG-NEW CASTLE PUBLIC SERVICE AUTHORITY, VA In 2009, the PSA entered into Consent Specil Order with the DEQ to bring its wstewter fcility into complince A&A prepred Complince Correction Pln to fulfill DEQ requirements This pln ddressed vrious overflows nd how the PSA will chieve consistent complince with the effluent limits A&A lso evluted the need for mking physicl improvements t the tretment plnt nd new technologies for reducing totl suspended solids (TSS) In ddition, we evluted the request to construct cr wsh which would connect into the snitry sewer system Comments were provided regrding the pretretment of wstewter prior to dischrge to the PSA system A&A then designed the recommended improvements bsed on the previous study Design included flow improvements nd the upgrde of n existing pump sttion In 2011, A&A conducted pilot evlution of covered Bio-Dome system to improve TSS (lge) removl from the plnt effluent Project Engineer EDUCATION: BS/1997/Virgini Tech/ Civil Engineering REGISTRATION: 2002/Professionl Engineer/VA YEARS OF EXPERIENCE: With A&A since: 1995 PROFESSIONAL MEMBERSHIPS: Americn Society of Civil Engineers Americn Wter Works Assocition WATER AND WASTEWATER IMPROVEMENTS, FLOYD COUNTY PUBLIC SER- VICE AUTHORITY, FLOYD COUNTY, VA Helped design loction for new sewer line nd estimte cost for wter nd sewer system improvements Provided construction contrct dministrtion services for execution of the construction contrct Project Mnger 15

22 Christopher B Kknis, LS Survey Mnger Mr Kknis begn his survey creer t A&A s rodmn nd is now the Associte Vice President of the survey deprtment He works closely with other Survey Mngers to coordinte the lloction of survey crews nd equipment Mr Kknis lso provides dy-to-dy supervision nd direction to field crews nd in-house CADD opertions, s well s qulity control reviews During his 25 yers of service he hs successfully mnged vriety of lrge projects tht include, GPS, topogrphic, route, utility, boundry, construction stking, control, nd eril surveys TUNNEL WATERLINE REPLACEMENT, BLAND COUNTY, VA Provided plnning, design nd construction dministrtion for the replcement of pproximtely one mile of wterline locted in the VDOT Est River Mountin Tunnel on Interstte 77 in Blnd County, Virgini nd Mercer County, West Virgini This project ws designed on fst-trck bsis due to lek in the existing wterline tht ws incresingly becoming worse The design fetured the cpbility to utomticlly detect leks nd rpidly shut-off flow to the wter min in the event of lek This ws done in order to minimize potentil impcts on trffic opertions in the tunnel nd to solve n on-going mintennce problem due to leks in the existing wterline in the tunnel Survey Mnger ISLE OF PINES WATERLINE EXTENSION, BEDFORD COUNTY PSA, VA Provided survey nd design for the Isle of Pines wterline extension This 13,000 liner foot wterline project connected the independently operted Isle of Pines well system to the Smith Mountin Lke Centrl wter system, nd llowed the BCPSA to consolidte fcilities by closing the Isle of Pines well nd removing the Isle of Pines tnk This project ws the next phse of work to the Smith Mountin Lke Phse I wter system designed in 2002 Survey Mnger BOUNDARY SURVEY, LEWISBURG, WV A&A prepred boundry survey of pproximtely 1,000 cres in Greenbrier County for Lnd Resource Compnies Survey Mnger CONTROL SURVEY, WEST VIRGINIA DEPARTMENT OF TRANSPORTATION, ROUTE 52, WILLIAMSON, WV Control for eril photogrphy Estblishment of 27 monument pirs for future topogrphy nd loction work for pproximtely 26 miles of new rodwy CADD Technicin OAKHURST GOLF COURSE, WHITE SULFUR SPRINGS, WV Provided 750 cre boundry survey consisting of four mountinous trcts for development of gted golf community locted in Greenbrier County, West Virgini The developer/designer Jck Johnson Compny, nd developer/owner Lewis Keller, worked together to crete Okhurst Links Other services provided included n ALTA/ACSM survey, offsite utility esement plts, subdivision plt, stking of proposed rods, nd stking of golf firwys nd greens design by Nicklus A&A lso performed reconnissnce of the site nd delineted ll jurisdictionl wters including wetlnd nd strems Survey Mnger EDUCATION: Course Work/Virgini Tech/Forestry REGISTRATION: Certified Lnd Surveyor/VA/2001 Certified Professionl Surveyor/WV/2003 Certified Professionl Surveyor/NC2011 Confined Spces Certifiction CSX Generl Trining Certifiction YEARS OF EXPERIENCE: With A&A since 1985 With other firms 1 yers PROFESSIONAL MEMBERSHIPS: Virgini Assocition of Surveyors 16

23 Crmen B Dunford Design Technicin Before joining A&A, Mr Dunford worked with the Deprtment of Conservtion nd Recretion on the instlltion of new wter nd electric lines throughout Clytor Lke Stte Prk Since joining A&A, Mr Dunford hs ssisted in the preprtion of design plns nd detils for numerous projects He lso hs extensive onsite construction inspection experience His experience is highlighted below: WATER SYSTEM IMPROVEMENTS, PRICES FORK, BLACKSBURG, VA Prepred preliminry engineering studies nd funding pplictions, provided design, construction contrct dministrtion, nd inspection for this mjor wter system improvement project which connected the Prices Fork community of Montgomery County with the Rdford Arsenl tretment system nd the Town of Blcksburg This project included 58,000 ft of 12" nd 8" pipe, 500,000 gllon wter tnk, 400 gpm booster sttion, nd connections for pproximtely 350 new nd existing customers These improvements lso eliminted dependence on filing well system nd included coordintion with utility compnies to void possible conflicts Technicin/Inspector NUCKOLLS CURVE WATERLINE EXTENSION, GRAYSON COUNTY, VA Anderson & Assocites, Inc provided engineering services for the Nuckolls Curve Wterline Extension Project This vluble project hs the provided potble wter service to over forty new county customers The project included performing detiled topogrphic survey for 3,800 liner feet of wterline The detiled topogrphic survey consisted of performing 10 wide strip topogrphic survey long the proposed lignment of the wterline Bse mpping of the proposed improvements were lso generted This bse mpping ws used to develop wterline pln nd profile sheets The project lso included the ddition of fire hydrnts to the distribution system so which were up to Virgini Deprtment of Helth (VDH) stndrds Design Technicin WATER DISTRIBUTION, BEDFORD COUNTY PSA, VA Smith Mountin Lke, Phse 1 Wter System New wterline to extend wter service from the Highpoint Wter Tretment Plnt to the North side of Hles Ford Bridge on Route 122 Also proposed is the design of one million -gllon wter storge tnk Drfting Technicin WATER TREATMENT PLANT EVALUATION AND IMPROVEMENTS DESIGN & SURVEY, TOWN OF HILLSVILLE, VA The Town s wter tretment plnt nd Howlett Street wter tnk were in need of improvements in order to continue to provide qulity drinking wter to its existing nd future customers Our ssistnce begn by locting funding options nd s result, SERCAP nd Mount Rogers PDC provided the funding needed for this study As next step, we worked closely with the Town to prepre Preliminry Engineering Report (PER) to ddress needed improvements After completion of the PER, we ssisted the Town with VDH Construction Funding ppliction to help fund the improvements Design Technicin EDUCATION: AAS/1995/New River Community College/ Architecturl Technology REGISTRATION: Erosion nd Sediment Control Certifiction VDOT Asphlt Field Certificte YEARS OF EXPERIENCE: With A&A since:

24 Nicole Kmetz Environmentl Technicin In her position t Anderson & Assocites, Ms Kmetz serves s n environmentl scientist on environmentl engineering projects Her work hs included the permitting of bot rmps, Environmentl Impct Reviews of mjor universities, nd Phse 1 Environmentl Site Assessments of properties Her experience is highlighted below: SEVEN MILE FORD SEWER PER, SMYTH COUNTY, VA A&A provided preliminry engineering report to be used s bsis for funding pplictions nd subsequent implementtion of recommended utility improvements This study hs ddressed such issues s cpcities, fire flows, mximizing existing resources, centrliztion, relibility, djcent systems, opertion nd mintennce, cost projections, solving existing problems, nd plnning for the future A&A is working with County stff to rnk the vrious lterntives nd options to recommend the best solution to improve residentil nd commercil/industril service nd blnce overll costs in the project re Environmentl Scientist SOUTH FORK REED CREEK SEWER REPLACEMENT, RURAL RE- TREAT, VA Coordinted with stte nd federl gencies to obtin pplicble permits, South Fork Reed Creek Environmentl Scientist ENVISOUTH FORK REED CREEK SEWER REPLACEMENT, RURAL RETREAT, VA Coordinted with stte nd federl gencies to obtin pplicble permits, South Fork Reed Creek Environmentl Scientist RONMENTAL IMPACT REVIEW, BLACKSBURG, VA Performed n environmentl impct review for the Virgini Tech Footbll Indoor Prctice Fcility Environmentl Scientist ENVIRONMENTAL SITE ASSESSMENT, HARRISONBURG, VA Anlysis of the Est Tower Project nd immedite surrounding grounds t Jmes Mdison University Environmentl Scientist ENVIRONMENTAL SITE ASSESSMENT, BLACKSBURG, VA Preprtion of Phse I ESA in ccordnce with ASTM stndrd 1527 A 5 building multi-fmily residentil complex Environmentl Scientist ENVIRONMENTAL SITE ASSESSMENT NRV COMMERCE PARK, DUBLIN, VA Preprtion of Phse I ESA on 420 cre site, the lrgest site A&A hs ever conducted n ESA on Environmentl Scientist ENVIRONMENTAL SITE ASSESSMENT, BLACKSBURG, VA Conducted Phse I ESA nd Phse II ESA groundwter nd vpor testing on 5 cre building lot Environmentl Scientist ENVIRONMENTAL REPORT, SMYTH COUNTY, VA Coordinted with stte nd federl gencies, conducted site visit nd hbitt loction survey, nd prepred n Environmentl Report dhering to USDA Rurl Development s strict environmentl review process Environmentl Scientist EDUCATION: BS/2013/Bridgewter College Environmentl Science YEARS OF EXPERIENCE: With A&A since 2013 With other firms: 0 yers 18

25 Jeffrey T Huffmn, MS, PE Senior Geotechnicl Engineer PROFESSIONAL EXPERIENCE 27 Yers Highlights of Experience Mr Huffmn brings over 27 yers of full-time design nd project mngement experience s well s 5 yers of teching experience to Trid Engineering Mr Huffmn joined Trid in 2013 to provide geotechnicl expertise to the southwest region Prior to coming to Trid he served in number of technicl nd ledership positions for vrious consultnts in the mid-atlntic re His expertise is in geotechnicl engineering, receiving his undergrdute degrees in civil engineering with specilty in geotechnicl engineering He hs completed the course work for his Ph D lso in this field Eduction Ph,D Course Work Completed, Civil Engineering (Geotechnicl), Virgini Polytechnic Institute nd Stte University, Blcksburg, Virgini, Disserttion in progress Anticipted completion December 2016 MS, Civil Engineering (Geotechnicl), 1990, Virgini Polytechnic Institute nd Stte University, Blcksburg, Virgini BS, Civil Engineering, 1988, Virgini Polytechnic Institute nd Stte University, Blcksburg, Virgini, Grduted Cum Lude Registrtions, Licenses & Trining Registered Professionl Engineer West Virgini Pennsylvni Kentucky Ohio North Crolin HIS PROJECT EXPERIENCE INCLUDES: Trid Engineering, Scott Depot, West Virgini Senior Geotechnicl Engineer, 9/13 Present (Prt-time) Mr Huffmn hs plyed n importnt role in mintining the technicl qulity nd mngement of the geotechnicl work in the region Mr Huffmn hs been involved in the forensic investigtion, monitoring, nd short term remedition of the reinforced soil slope filure t Yeger irport Work on this project lso includes developing permnent repir He hs provided geotechnicl expertise for numerous lndslide investigtion nd remedition projects in West Virgini nd Kentucky He hs been project mnger for 17 foot high, foot long dm modifiction project involving trining wlls nd crest lowering Mr Huffmn provides technicl expertise on retining wll design, deep foundtion design, nd well pd design 19

26 Dniel H Lipscomb, PE Project Mnger PROFESSIONAL EXPERIENCE 11 Yers EDUCATION BS, Civil Engineering Technology, Firmont Stte College, WV Highlights of Experience Mr Lipscomb is currently Project Engineer t the St Albns brnch of TRIAD In this cpcity, he hs been involved in development nd mngement of subsurfce explortion projects nd development of geotechnicl engineering reports providing recommendtions bsed on field observtions nd lbortory results for bering cpcity, erthwork opertions, erthen dm embnkments, slope stbility, flexible nd rigid pvement design, lterl erth pressures, sinkhole remedition, geophysics (electricl resistivity nd ground penetrting rdr), nd rock excvtion These projects hve included freshwter dms, shopping centers, rodwy/bridges, buildings, retining wlls, residentil communities, wter storge tnks, wste wter tretment fcilities, nd structures for col mining fcilities Duties included ssignment of lbortory testing, visul inspection of soil/rock specimens, geophysics, nd erthen embnkment evlution Mr Lipscomb hs dditionl experience in res relting to civil site design, hydrologic nd hydrulic design, grding plns, wter line plns, sewer line plns, hydrulic clcultions, storge tnk sizing, booster sttion design, rodwy lyout nd design, storm wter mngement plns, technicl specifictions, environmentl nd regultory permitting, blst monitoring, nd construction qulity control Registrtions, Licenses & Trining Registered Professionl Engineer, West Virgini HIS PROJECT EXPERIENCE INCLUDES: Subsurfce nd Foundtion Investigtions (West Virgini, Virgini, Mrylnd, Kentucky, nd Ohio) Mr Lipscomb hs performed subsurfce nd foundtion investigtions for vrious privte business nd industril firms The projects consisted of performing subsurfce investigtions nd nlysis nd recommending pproprite foundtion types bsed on the results of the subsurfce investigtion The projects lso involved estimting potentil settlement, delineting potentil subsurfce problems, nd providing relted recommendtions regrding the geotechnicl spects of the projects A geotechnicl report ws prepred nd provided to the client for ech project Mr Lipscomb hs lso designed foundtion systems for buildings nd other structures Dominion Trnsmission, Inc (Chelyn, West Virgini) As project engineer, Mr Lipscomb processed informtion gthered during drilling ctivities nd developed report of subsurfce explortion to id in the design of horizontl directionl drilling project under the Knwh River in Knwh County, West Virgini This included providing rock core unconfined compression test results, nd performing review of rock core smples to observe their Mohs Scle of Minerl Hrdness vlues Regionl geologic informtion ws lso given to id in the project s design Wter Distribution System Upgrdes (Boone, Wyne, Berkley, Lincoln, nd Logn Counties, West Virgini) Mr Lipscomb hs served s the project engineer for the detiled design of over 30 miles of wter line extensions nd ssocited ppurtennces, including the preprtion of construction drwings, wter storge tnk sizing nd design, booster sttion design, hydrulic clcultions, technicl specifictions, cost estimtes, contrctor s bid documents, review nd recommendtion of contrctor s bids, nd review of shop drwings 20

27 E Experience 21

28 Amigo Devils Fork Wstewter Amigo, West Virgini FIRM S RESPONSIBILITY: Fesibility Study & Tretment Plnt Design OWNER: Upper Guyndotte Wtershed Assocition 300 Front St Mullens, WV Vl Pge This project involved the compiltion of fesibility study nd preliminry engineering report to consider options to provide wstewter collection nd tretment service to pproximtely 60 customers in the Amigo re who hd no wstewter tretment in the re These options included investigtions of trditionl nd innovtive collection nd tretment options Once the preliminry engineering hd been completed, we worked with the Upper Guyndotte Wtershed Assocition nd the Crb Orchrd-McArthur Public Service District to pply for construction funding through the West Virgini Infrstructure nd Jobs Development Council Finl design included plns for collection nd tretment, including pump sttion to serve the Amigo nd JA Woods communities Collection minly consisted of 8 grvity wstewter collection nd ppurtennces flowing to single pump sttion tht delivered the wstewter to wstewter tretment fcility where the wter ws treted nd dischrged to the Devils Fork River The selected lterntive for the tretment system ws 10,000 gpd conventionl extended ertion ctivted sludge plnt The bsis of design ws precst concrete tnks in pckged tretment plnt system 22

29 Coldle Mountin Wterline Extension WV DEP Abndoned Mine Lnds FIRM S RESPONSIBILITY: Design, Hydrulic Modeling, Surveying, Mpping OWNER: WV DEP-Abndoned Mine Lnds (AML) th Street SE Chrleston, WV Mr Jonthn Holbert, PE COMPLETION DATE: Design TOTAL PROJECT COST: $13 Million The Coldle Mountin Wterline Extension Project involves extending wter service to residents long Brmwell Hill Rod nd Coldle Mountin Rod who currently collect rinwter or hul wter for use t their residences A&A is responsible for surveying, nd performing hydrulic modeling, design, preliminry design, nd finl design of 33,000 liner feet of wter line, booster sttion, 75,000 gllon wter storge tnk nd ppurtennces This project is extending wter to residents by utilizing connection with the Bluewell Public Service District long Brmwell Hill Rod nd constructing booster sttion to fill 75,000 gllon wter storge fcility on Coldle Mountin A&A hs contrcted with the Bluewell PSD for the construction phse of the project, scheduled to begin in 2013 Our work with the WVDEP nd PSD throughout the bidding nd construction processes will include resident project representtion services 23

30 Moorefield/Hrdy County, WV Regionl Wstewter,Collection, Tretment, nd Sludge Mngement Town of Moorefield, WV Project Description The Town of Moorefield, long with regionl prtners Hrdy County nd the Pilgrim s Pride poultry fcilities, embrked on project tht will gretly reduce pollution entering the Potomc River nd will be the single most significnt contribution in WV towrds chieving the Potomc Tributry Strtegy to protect Chespeke By Ech regionl prtner opertes wstewter tretment fcilities tht dischrge long the South Brnch of the Potomc River Combined, the prtners re responsible for totl of nine dischrge points; including five wstewter tretment plnts nd four combined sewer overflow (CSO) dischrges This project will intercept flow from ll nine dischrge points nd convey it to new stte-of-the-rt regionl wstewter tretment fcility tht will tret up to 41 million gllons per dy of wstewter The new plnt will meet WV NPDES dischrge limits nd will be consistent with Chespeke By protection gols In My of 2006, the Town of Moorefield retined AECOM (formerly Metclf & Eddy) s the project engineer In 2007, AECOM hired Trid to design the wstewter collection system The collection network consists of nerly four miles of sewer lines, including 24-inch grvity sewer, n 18 inch force min, nd single pumping sttion The pumping sttion includes three pumps Also, Trid surveyed collection line lignments nd pumping sttion sites, nd provided geotechnicl engineering for the pump sttion To provide the client the most efficient nd cost effective service s possible, work ws performed by multiple Trid loctions In September 2010, Trid ws hired by the Town of Moorefield to replce AECOM for the durtion of the project Trid s duties for this phse of the project included vlue engineering of the existing design nd complete construction dministrtion services This required full time construction oversight, shop drwing nd submittl review, nd review nd pprovl of contrctor py requests This single project will remove bout 85 percent of West Virgini s 2002 point source phosphorus lod to the Chespeke By nd will remove bout 26 percent of the point source nitrogen lod The plnt will crete sound environmentl bsis for continued economic development in the South Fork of the Potomc River Vlley The new plnt will eliminte five existing wstewter plnts including the Town of Moorefield, two poultry industry plnts nd two Hrdy County wstewter plnts The project will lso reduce Town of Moorefield CSO dischrge volume by eliminting one permitted stormwter dischrge nd one wstewter pumping sttion Services provided by TRIAD included surveying nd mpping to generte n existing conditions site mp of the pipe routes nd pumping sttion sites, geotechnicl engineering for the pump sttion sites, nd genertion of design drwings nd construction bid pckges for the collection system nd pump sttion Services for the WWTP include vlue engineering for the WWTP design, nd construction dministrtion services during the construction process Project Contct Moorefield / Hrdy County Wstewter Authority Phone: (304)

31 Wstewter Tretment Plnt Improvements Town of Belle, WV PROJECT DESCRIPTION The project consists of constructing new 035 MGD WWTP nd converting the existing ertion tnks to EQ bsins The project lso includes instlling new hedworks structure with n utomtic br screen nd grit removl system, second externl secondry clrifier, ll ssocited piping nd vlves, electricl upgrde nd new emergency genertor nd complete rehbilittion of the min pump sttion Services provided by TRIAD included surveying nd mpping to generte n existing conditions site mp, Geotechnicl Engineering to determine foundtion design prmeters, ssistnce obtining project funding, obtining permits from the West Virgini Deprtment of Environmentl Protection (WVDEP), genertion of design drwings nd construction bid pckges nd provide construction dministrtion services during the construction process PROJECT CONTACT Town of Belle Phone: (304)

32 Est Hungry Mother Wter Project Smyth County, Virgini FIRM S RESPONSIBILITY: Plnning, Design, Contrct Administrtion, Inspection OWNER: Smyth County 121 Bgley Circle, Suite 100 Mrion, VA Mr Scott Simpson, PE COMPLETION DATE: The Est Hungry Mother Wter Project ws n extension of the Smyth County Wter systems ffecting four residentil res within the County including Arden Lne, Est Hungry Mother Drive, Red Stone Rod, nd Vnce Drive The project consisted of instlling pproximtely 25,000 feet of wter lines nd relted ppurtennces to provide public wter service to res tht did not hve dequte service, nd improve service to res tht hve experienced deteriortion from old wter lines 26

33 Allison Gp Sewer Project Town of Sltville/Smyth County, Virgini FIRM S RESPONSIBILITY: Design, Construction Contrct Administrtion OWNER: Smyth County 121 Bgley Circle, Ste 100 Mrion, VA Mr Scott Simpson COMPLETION: 2005 Anderson & Assocites, Inc provided wrd winning services for this project A&A ws presented the ACEC 2006 Virgini Engineering Excellence Merit Awrd for this project We were retined by Smyth County nd the Town of Sltville to design nd complete the Allison Gp Sewer Project to sewer congested rurl community This project included the following: The design nd instlltion of over 58,000 feet of grvity flow sewer collector lines to serve pproximtely 385 residentil nd non-residentil users The expnsion of the Sltville Wstewter Tretment Plnt from 05 million gllons per dy (MGD) to 099 MGD, nd including the instlltion of new ertion bsin, clrifiers, two new sludge digesters, nd sludge drying beds The replcement of pproximtely 8,000 feet of the min sewer interceptor long McHenry Creek nd mnhole rehbilittion to correct inflow nd infiltrtion problems Design of the min pump sttion nd force min for the expnded tretment fcility Anderson & Assocites, Inc provided bsic design services s well s construction dministrtion services This included the preprtion of detiled design plns nd specifictions for the construction of the proposed sewer system, nd the preprtion of ll bid documents, dministrtion of the construction bid process, nd monitoring of construction progress A&A lso secured lons nd 27

34 Wstewter System Improvements Town of Elkton, Virgini FIRM S RESPONSIBILITY: Preliminry Engineering Report, Rte Study, Design of Upgrdes, Opertionl Assistnce OWNER: Town of Elkton 173 W Spotswood Avenue Elkton, VA Mr Reid Wodick Town Mnger Anderson & Assocites, Inc worked with the Town of Elkton to ssess nd improve the Town s wstewter tretment system Work initilly begn s n ssessment of the tretment fcility to ccommodte nticipted growth nd nutrient limits for nitrogen nd phosphorous The Preliminry Engineering Report (PER) evluted the Town s options for meeting the proposed nutrient limits nd incresed cpcity needs of the Town, nd proposed phsed pproch for improvements The initil two phses of work were undertken s prt of Revolving Lon Fund project to ddress the existing deficiencies in the tretment fcility nd to provide new electricl bckbone for the fcility Improvements t the tretment fcility included new influent screening, clrifier repirs, ultrviolet disinfection system replcement, new effluent metering fcility, new sludge press nd rehbilittion to existing sludge fcilities, nd new primry electricl system with bck-up power The work hs lso included significnt snitry sewer rehbilittion component tht hs included internl inspection of sewer mins, joint testing nd seling, sewer min lining, mnhole replcement nd rehbilittion, nd point repirs to vrious sewer mins 28

35 Tunnel Wterline Replcement Blnd County, Virgini FIRM S RESPONSIBILITY: Design, Construction Administrtion, Inspection OWNER: Blnd County PO Box 510 Blnd, VA Mr Rodney Rtliff Director Provided plnning, design nd construction dministrtion for the replcement of pproximtely one mile of wterline locted in the VDOT Est River Mountin Tunnel on Interstte 77 in Blnd County, Virgini nd Mercer County, West Virgini The initil work included n evlution of the existing tunnel wterline to identify shortcomings tht were contributing to opertions nd mintennce difficulties A design ws formulted to meet constrints of Virgini Deprtment of Trnsporttion nd meet the needs of the County s opertion stff The design fetured the cpbility to utomticlly detect leks nd rpidly shut-off flow to the wter min in the event of lek This ws done in order to minimize potentil impcts on trffic opertions in the tunnel nd to solve n on-going mintennce problem due to leks in the existing wterline in the tunnel Construction logistics were n importnt considertion in the design Following design, Anderson & Assocites provided construction contrct dministrtion nd inspection services for the project 29

36 Wstewter Tretment Plnt Vlue Engineering Town of Strsburg, Virgini FIRM S RESPONSIBILITY: Vlue Engineering Study OWNER: Town of Strsburg 174 Est King Street Strsburg, VA Mr Judson Rex Town Mnger In 2011, Anderson & Assocites nd RH & Assocites, Inc temed up to provide n independent Vlue Engineering (VE) nlysis of proposed wstewter tretment plnt upgrdes designed by nother engineering firm The Town ws proposing to expnd its tretment plnt to ccommodte n verge flow of 20 million gllons per dy nd upgrde the tretment process to comply with more stringent nitrogen nd phosphorous dischrge limits In ddition, the Town wished to upgrde systems nd controls to ddress existing problems creted by the ge nd design of the existing plnt The study ws performed for prticiption in the Wter Qulity Improvements Fund (WQIF) for projects greter thn $10 million in construction costs Becuse the design hd lredy progressed to the 90% completion stge, the site of the tretment plnt, the bsic tretment process nd the sludge tretment process were ll excluded from the VE nlysis These items hd previously undergone evlution by the Town nd their design engineer The VE nlysis identified severl res of potentil cost svings for considertion by the Town nd their design engineer The VE process included finl meeting to present the findings nd VE process trining session for the Town stff conducted by RH & Assocites 30

37 Wstewter System Improvements Floyd, Virgini FIRM S RESPONSIBILITY: Preliminry Engineering Report, Design, Administrtive & Opertionl Assistnce OWNER: Floyd-Floyd County Public Service Authority 169 PSA Rod PO Box 407 Floyd, VA Mr Elwood Holden The Floyd-Floyd County PSA operted 15 MGD wstewter tretment plnt which ws lst upgrded in bout 1980 The PSA needed to increse cpcity to ccommodte locl economic development nd ws fced with new requirements for mmoni nitrogen removl Superintendent Anderson & Assocites evluted the existing fcilities nd determined tht significnt expnsion in cpcity could be provided by just upgrding some criticl elements in the tretment process Two dditionl rotting biologicl contctors (RBC s) were instlled nd the flow routed to provide both prllel nd series flow through to units to crete multi-stge tretment nd chieve dequte nitrifiction of mmoni New blowers were provided to drive the ir driven RBC s nd for improved erobic digestion The project lso included new chlorine contct tnk, effluent flow meter, sludge belt press, nd sludge storge building The tretment plnt cpcity ws incresed to 25 MGD while still dischrging to reltively smll strem tht is prt of the hedwters for the New River The project ws finnced through USDA Rurl Development Work by A&A included detiled 31

38 Wstewter System Development Fluvnn County, Virgini FIRM S RESPONSIBILITY: Preliminry Engineering Report, Funding Assistnce, Design, Construction Contrct Administrtion, Opertionl Strt-Up Assistnce OWNER: Fluvnn County PO Box 540 Plmyr, VA Mr John Robins Director of Public Works Our involvement on this project begn with short term nd long term wstewter plnning nd preliminry engineering for the Fluvnn Courthouse, Plmyr, nd Plesnt Grove res of Fluvnn County, VA A&A evluted numerous lterntives nd mde recommendtions regrding the County s needs for both wstewter distribution nd tretment, then prepred plns nd specifictions for the new system An environmentl review ws prepred nd environmentl permits nd clernces obtined Following this study, A&A proceeded with the design of pproximtely 5,700 feet of 8-inch sewer min, 1,400 feet of force min, 100 gpm pump sttion, nd 40,000 gpd wstewter tretment plnt using the extended ertion process nd ultrviolet light disinfection A&A worked with the County beginning with the PER study phse, progressing through securing of funding for the project, continuing with design nd construction phse services, nd rounding out our services with opertionl strt-up ssistnce Funding ws provided by the VDEQ s Re- 32

39 Wstewter System Improvements Hrper s Ferry Job Corps Center & Jefferson County High School FIRM S RESPONSIBILITY: Environmentl Assessment, Design OWNER: Jefferson County Public Service District 340 Edmond Rod, Suite A Kerneysville, WV Ms Susnne Lwton Generl Mnger COMPLETION DATE: 2000 The Hrper s Ferry Job Corps Center operted dted wstewter stbiliztion pond in remote prt of Jefferson County The Jefferson County School Bord operted smll wstewter tretment plnt which served Jefferson County High School The tretment systems dischrged to smll stems, were limited in their cpcity to expnd, nd required opertion by personnel who were lredy busy with other duties t ech site The Jefferson County PSD undertook project to connect these fcilities to public sewer Anderson & Assocites provided plnning, environmentl, nd engineering design services to Mrk Jeffries Engineering, the PSD s project mnger for the work A&A prepred construction contrct documents, plns nd technicl specifictions for two wstewter pump sttions nd pproximtely 15,000 feet of force min Work lso included the preprtion of environmentl documents, permit pplictions, wstewter fcilities closure plns, nd O&M mnuls for the new fcilities The unique force min design included n intermedite pump sttion which llowed flexibility for the expnsion of Jefferson County High School, nd the force min lso l- 33

40 Wter System Improvements Town of Perisburg, Virgini FIRM S RESPONSIBILITY: Preliminry Engineering Report, Design, Construction Administrtion OWNER: Town of Perisburg 112 Tzewell Street Perisburg, VA Mr Kenneth Vittum Town Mnger Anderson & Assocites, Inc prepred wter system PER to evlute the existing wter distribution system nd recommend improvements This report is prt of n on-going effort by the Town to continue improving the infrstructure nd opertion of the Town wter distribution system The Town hd numerous 1, 2 nd 4 inch wterlines tht need to be replced with 6, 8, nd 10 inch wterline to improve vilble flow nd pressure issues In ddition, this report outlined the mesures tht hd been tken to reduce wter loss nd improve ccountbility in n effort to meet the EPA driven 30% wter loss regultion The report lso evluted the effect of future development within the County nd the dditionl flows tht will hve to be trnsmitted through the Town system to meet the needs of these developments nd wterline extensions A&A responsibilities in completing the PER included preprtion of mpping, hydrulic nlysis, system pressure evlution, system effective storge evlution, nd lek detection study of the existing Town wter system Following the PER, A&A designed nd performed construction dministrtion for 18,000 liner feet of wterline nd 1,800 feet of sewer line 34

41 Wter System Improvements Cmp on Crig, Crig County, Virgini FIRM S RESPONSIBILITY: Design OWNER: HopeTree Fmily Services PO Box 307 New Cstle, VA Mr Dle Hmnn Director The Virgini Deprtment of Helth (VDH) requested the immedite disinfection of the potble well for 24-hour residentil fcility for troubled teens (Cmp on Crig) using injection of hypochlorite solution into the wter system A&A designed nd coordinted the instlltion of chlorintion system to provide disinfection nd dequte contct time to meet VDH requirements This work ws completed in 2 weeks Subsequently, VDH determined the existing well source ws considered ground wter influenced nd A&A ws then hired for Phse 2 improvements This included siting nd drilling new well nd the ddition of new tretment building nd equipment to provide disinfection nd storge volume to stisfy VDH requirements The tretment building lso included wter softening equipment nd new booster pumps to provide dequte wter qulity nd pressure for the wter system Finlly, A&A provided strtup 35

42 Well #4 Development Crig-New Cstle PSA, Virgini FIRM S RESPONSIBILITY: Well Development OWNER: Crig-New Cstle PSA PO Box 128 New Cstle, VA Mr Donld Jones Public Works Director A&A provided plnning nd design for the development of 130 gpm well (Well #4) to connect to the Authority s wter distribution system The well ws given to the Authority by the public school system, since their fcilities re served by the Authority Work consisted of documenting well construction, conducting yield nd drwdown test, identifying well protection during new school construction, nd design of the well hed nd disinfection fcilities Design ws funded by VDH Plnning Grnt with construction performed by the Authority s force ccount 36

43 F References [Include list of three (3) references, from locl governments nd/or similr projects only, who cn confirm to the firm s knowledge, qulity of work, timeliness, diligence, flexibility nd overll expertise Include nmes, contct persons nd phone numbers or emil ddresses of ll references ] Mike Wtson, Town Mnger Town of Bluefield PO Box 1026 Bluefield, VA Chris Clrk, Public Works Director/Engineer County of Allegheny 9212 Winterberry Avenue, Suite A Covington, VA Mike Kennedy, Public Works Director City of Lexington 890 Shop Rod Lexington, VA

44

45

46

47 Purchsing Divison Stte of West Virgini 2019 Wshington Street Est Centrlized Expression of Interest Post Office Box Chrleston, WV Architect/Engr Proc Folder: Doc Description: Addendum; Wstewter Tretment nd Wter System Renovtions Proc Type: Centrl Contrct - Fixed Amt Dte Issued Solicittion Closes Solicittion No Version :30:00 CEOI 0310 DNR BID RECEIVING LOCATION BID CLERK DEPARTMENT OF ADMINISTRATION PURCHASING DIVISION 2019 WASHINGTON ST E CHARLESTON WV US VENDOR Vendor Nme, Address nd Telephone Number: FOR INFORMATION CONTACT THE BUYER Guy Nisbet (304) guylnisbet@wvgov Signture X FEIN # All offers subject to ll terms nd conditions contined in this solicittion Pge : 1 DATE FORM ID : WV-PRC-CEOI-001

Our Missio n. Silver/ Petrucelli+ Associates, Inc. is dedicated. to providing the highest quality services to

Our Missio n. Silver/ Petrucelli+ Associates, Inc. is dedicated. to providing the highest quality services to Silver/ Petrucelli+ Assocites, Inc. is dedicted to providing highest qulity services to our clients, producing cretive nd effective design solutions tht re fisclly responsible nd environmentlly sensitive.

More information

DESIGN DEVELOPMENT GUIDELINES FOR SIX-YEAR TRANSPORTATION PLAN PROJECTS Policy & Procedure 416

DESIGN DEVELOPMENT GUIDELINES FOR SIX-YEAR TRANSPORTATION PLAN PROJECTS Policy & Procedure 416 DESIGN DEVELOPMENT GUIDELINES FOR SIX-YEAR TRANSPORTATION PLAN PROJECTS Policy & Procedure 416 Clllm County Tble of Contents.1 Purpose... 1.2... 1 2.1 Refinement of Gols... 1 2.2 Design Development...

More information

Planning & Performance Reporting Officer. Job Description

Planning & Performance Reporting Officer. Job Description 1. Min purpose of the job Plnning & Performnce Reporting Mnger Job Description To work collbortively with theme tems nd other senior collegues to develop nd operte performnce reporting systems (including

More information

HUMAN RESOURCES MANAGEMENT REFORM TIME FRAME

HUMAN RESOURCES MANAGEMENT REFORM TIME FRAME Distribution: Restricted REPL.VII/4/R.10 1 October 2005 Originl: English Agend Item 10 English IFAD Consulttion on the Seventh Replenishment of IFAD s Resources Fourth Session Doh (Qtr), 1-2 October 2005

More information

Table 1: Basic Data. 1. Process Thresholds, Review and 18-Month Procurement Plan

Table 1: Basic Data. 1. Process Thresholds, Review and 18-Month Procurement Plan A. Pln Tble 1: Bsic Dt Project Nme: Hubei Hungshi Urbn Pollution Control nd Environmentl Mngement Project Country: People s Republic of Chin Executing Agency: Hungshi Municipl Government Lon Amount: $100

More information

p Coaches j i n C Dimensions Report Name Ali Example Date of Report: 29/06/2016 Team Profile 3

p Coaches j i n C Dimensions Report Name Ali Example Date of Report: 29/06/2016 Team Profile 3 Report Nme Ali Exmple Dte of Report: 29/06/2016 Tem Profile 3 Also Recommended: Behviourl Type t Work Profile, Composite Tem Report Who could use components of this report: p Coches j i HR professionls

More information

... SAN RAFAEL CITY COUNCIL AGENDA REPORT INFORMATIONAL REPORT ABOUT EMPLOYEE COMMUTE PILOT PROGRAM

... SAN RAFAEL CITY COUNCIL AGENDA REPORT INFORMATIONAL REPORT ABOUT EMPLOYEE COMMUTE PILOT PROGRAM ... Agend Item No: 3.,-f Meeting Dte: December 17,212 Deprtment: CITY MANAGER SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepred by: Rebecc Woodbury, Mngement Anlyst City Mnger Approvll2~ SUBJECT: INFORMATIONAL

More information

Table 8. Vacuum filter performance for processing municipal sludges conditioned by ferric chloride and lime. a

Table 8. Vacuum filter performance for processing municipal sludges conditioned by ferric chloride and lime. a Tble 8. Vcuum filter performnce for processing municipl sludges conditioned by ferric chloride nd lime. Type of Sludge Solids Loding (lb/hr-ft 2 ) Percent Solids Cke Fresh primry 6-8 25-38 Fresh primry

More information

CITY OF BELL GARDENS THE SUCCESSOR AGENCY TO THE COMMUNITY DEVELOPMENT COMMISSION REGULAR MEETING MONDAY, SEPTEMBER 11, 2017, 6:00 PM AGENDA

CITY OF BELL GARDENS THE SUCCESSOR AGENCY TO THE COMMUNITY DEVELOPMENT COMMISSION REGULAR MEETING MONDAY, SEPTEMBER 11, 2017, 6:00 PM AGENDA CITY OF BELL GARDENS THE SUCCESSOR AGENCY TO THE COMMUNITY DEVELOPMENT COMMISSION REGULAR MEETING MONDAY, SEPTEMBER 11, 2017, 6:00 PM AGENDA LOCATION: CITY COUNCIL CHAMBER, 7100 GARFIELD AVENUE, BELL GARDENS,

More information

Business Continuity Software Buyer s Guide

Business Continuity Software Buyer s Guide Business Continuity Softwre Buyer s Guide Opertionlly strtegic nd deployble, business continuity plns re criticl to ensuring your orgniztion cn survive nd succeed following n unplnned incident. Mny orgniztions

More information

ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE

ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE This series of fct sheets ws prepred s prt of UN Environment s environmentl udit of the sites

More information

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Country Case Studies

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Country Case Studies Setting Stndrds for Sustinble Development Updte nd Review of the World Bnk s Sfegurd Policies Country Cse Studies Phse 3 Consulttion Rbt Jnury 25, 2016 Content Rod Testing the new ESSF for opertionl implictions

More information

Drug, Alcohol, and Medical Testing Guidelines for Commercial Driver's License Holders and Other Identified Positions

Drug, Alcohol, and Medical Testing Guidelines for Commercial Driver's License Holders and Other Identified Positions Virgini Polytechnic Institute nd Stte University Drug, Alcohol, nd Medicl Testing Guidelines for Commercil Driver's License Holders nd Other Identified Positions NO. 4061 Policy Effective Dte: 7/13/1995

More information

Service Architecture. T.C. Lea-Cox, A Lesson for the CMDB from Containerised Cargo Services. Introduction. Overview of Container Movement

Service Architecture. T.C. Lea-Cox, A Lesson for the CMDB from Containerised Cargo Services. Introduction. Overview of Container Movement A Lesson for the CMDB from Continerised Crgo Services Trevor LeCox Introduction The Problem Are: Continerised Crgo Importtion Service Time to deliver crgo to the Consignee ws tking longer thn tht benchmrked

More information

CLOUD-EXTENSIBLE TRANSCODING AVOID THE TRAP OF SINGLE CLOUD OVER-DEPENDENCY

CLOUD-EXTENSIBLE TRANSCODING AVOID THE TRAP OF SINGLE CLOUD OVER-DEPENDENCY CLOUD-EXTENSIBLE TRANSCODING AVOID THE TRAP OF SINGLE CLOUD OVER-DEPENDENCY compny Cloud-Extensible Trnscoding TABLE OF CONTENTS Trnscode Worklod Chllenges... 3 Cloud Dependency... 4 Cloud-Extensibility...

More information

p Coaches j i m Recruitment Dimensions Report Name Ali Example Date of Report: 29/06/2016 Elements report 3

p Coaches j i m Recruitment Dimensions Report Name Ali Example Date of Report: 29/06/2016 Elements report 3 Report Nme Ali Exmple Dte of Report: 29/06/2016 Elements report 3 Also Recommended: Trit Profile, Competency Report Who could use components of this report: p Coches j i HR professionls Trined prctitioners

More information

STAFF RECOMMEN- DATIONS:1. APPROVE THE EMPLOYEE MENTOR PROGRAM PROGRESS REPORT.

STAFF RECOMMEN- DATIONS:1. APPROVE THE EMPLOYEE MENTOR PROGRAM PROGRESS REPORT. THE BOARD OF SUPERVISORS OF THE COUNTY OF STANISLAUS ACTION AGENDA SUMMARY DEPT: CHIEF EXECUTIVE OFFICE BOARD AGENDA#r_--,B~-...L7 _ Urgent Routine X AGENDA DATE Jnury 14;:2003 CEO Concurs with Recommendtion

More information

Chapter 02 - Putting the Customer First

Chapter 02 - Putting the Customer First 1. About hlf of every dollr tht consumers spend on products pys for mrketing costs. LEARNING OBJECTIVES: SEM.KO.4.LO: 2.1-1 - LO: 2.1-1 2. The mrketing concept requires mintennce of importnt reltionships

More information

Proposed Initiatives for Key Transport Linkages

Proposed Initiatives for Key Transport Linkages Chpter 10 Proposed Inititives for Key Trnsport Linkges ERIA 2009 This chpter should be cited s ERIA (2009), Proposed Projects for Key Trnsport Linkges, ERIA (ed.), Mekong-Indi Economic Corridor Development-.

More information

The basic model for inventory analysis

The basic model for inventory analysis The bsic model for inventory nlysis Lecture Notes for ME515 Prepred by Joyce Smith Cooper Professor of Mechnicl Engineering University of Wshington cooperjs@uw.edu See Chpter 2 of Heijungs nd Suh (22)

More information

ATEGI International purchasing

ATEGI International purchasing ATEGI Interntionl purchsing We specilise in the purchsing process nd look for the progress of our customers Our gol is to help our customers become more cost-efficient nd competitive, wherever they re

More information

harvest in the packhouse

harvest in the packhouse hrvest in the pckhouse About us Viscon Hydroponics The demnd for food sfe products re worldwide incresing. In Chin Food Sfety is in the governments top priority list in the renowned 5-yer pln. In the United

More information

described in further detail in Volumes II and III

described in further detail in Volumes II and III .4.6 1 8 A common prctice in both mbient ir monitoring nd i. source emission monitoring includes pretest preprsttionry high.nd representtive monitoring dt. These viding qulity described in further detil

More information

EXTRA 14/11/2006. Executive Training for Research Application Formation en utilisation de la recherche pour cadres qui exercent dans la santé

EXTRA 14/11/2006. Executive Training for Research Application Formation en utilisation de la recherche pour cadres qui exercent dans la santé Executive Trining for Reserch Appliction Formtion en utilistion de l recherche p cdres qui exercent dns l snté Implementing Blnced Scorecrd in Continuing C Orgniztion: One Orgniztion s Jney in Evidence

More information

High strength fine grained structural steel, thermo-mechanically rolled, for high temperature application

High strength fine grained structural steel, thermo-mechanically rolled, for high temperature application P420M HT High strength fine grined structurl steel, thermo-mechniclly rolled, for high temperture ppliction Specifiction DH-E52-D, edition April 2016 1 P420M HT is high strength thermomechniclly rolled

More information

Small Business Cloud Services

Small Business Cloud Services Smll Business Cloud Services Summry. We re thick in the midst of historic se-chnge in computing. Like the emergence of personl computers, grphicl user interfces, nd mobile devices, the cloud is lredy profoundly

More information

h 4 t i Table of Contents Advantages of Fundraising Events Steps to Planning a Fundraising Event

h 4 t i Table of Contents Advantages of Fundraising Events Steps to Planning a Fundraising Event tiv e i t i d In n ts e l h You t ou gh Eve 4 g is in $ $ $ th r r d Fu n is in g R s: A Toolkit for Grssroots Y outh-led Inititives For Yo uth Inititiv CORE e, Orgniz(Centre for ti o n Resilie nce) l

More information

We engineer your success. All over the world. Semi Automatic

We engineer your success. All over the world. Semi Automatic We engineer your success. All over the world. Semi Automtic Viscon Hydroponics Mnul System The demnd for food sfe products re worldwide incresing. In Chin Food Sfety is in the governments top priority

More information

HUMAN RESOURCES MANAGEMENT

HUMAN RESOURCES MANAGEMENT Distribution: Restricted REPL.VII/3/INF.2 15 June 2005 Originl: English English IFAD Consulttion on the Seventh Replenishment of IFAD s Resources Third Session Rome, 5-7 July 2005 HUMAN RESOURCES MANAGEMENT

More information

IBM Rational Software

IBM Rational Software IBM Rtionl Softwre Development Conference 2008 Build better softwre nd systems nd improve business processes with Enterprise Lifecycle Mngement Udy Rvi Business Development Director - Telelogic Enterprise

More information

LAKES LAND AND RESOURCE MANAGEMENT PLAN IMPLEMENTATION MONITORING REPORT

LAKES LAND AND RESOURCE MANAGEMENT PLAN IMPLEMENTATION MONITORING REPORT LAKES LAND AND RESOURCE MANAGEMENT PLAN IMPLEMENTATION MONITORING REPORT Jnury 2002 Introduction The Lkes LRMP Implementtion Pln (Jnury 2001) nd this Implementtion Monitoring Report follow the direction

More information

EMPLOYER HUB APPRENTICESHIPS THE. 2019/20 Apprenticeships. Information for applicants. The college of choice

EMPLOYER HUB APPRENTICESHIPS THE. 2019/20 Apprenticeships. Information for applicants. The college of choice EMPLOYER HUB APPRENTICESHIPS THE 2019/20 Apprenticeships Informtion for pplicnts The college of choice Contents Why Nescot? 04 Wht is n pprenticeship? 04 Wht re the benefits of doing n pprenticeship?

More information

No Action Alternative, provides a future without the project scenario as a baseline to compare the impacts of the proposed Action Alternatives.

No Action Alternative, provides a future without the project scenario as a baseline to compare the impacts of the proposed Action Alternatives. EXECUTIVE SUMMARY ES.1 Introduction The North By Wter Reuse Authority s (NBWRA) Memer Agencies nd the U.S. Deprtment of Interior, Bureu of Reclmtion (Reclmtion) hve prepred this Drft Environmentl Impct

More information

CITY OF BERKLEY, MICHIGAN BUILDING PERMIT APPLICATION

CITY OF BERKLEY, MICHIGAN BUILDING PERMIT APPLICATION Building & Plnning 3338 Coolidge Hwy Berkley, MI 4872 248-658-332 Fx: 248-658-331 www.berkleymich.org CITY OF BERKLEY, MICHIGAN BUILDING PERMIT APPLICATION Appliction for permit to (Describe wht you re

More information

home water audit kit take a look Clackamas River Water Providers (CRWP) Saving Water Makes Cents! CRWP Public Education and Outreach Cooordinator

home water audit kit take a look Clackamas River Water Providers (CRWP) Saving Water Makes Cents! CRWP Public Education and Outreach Cooordinator tke look Clckms River Wter Providers (CRWP) Encourges you to tke look t your home wter system to identify wys you cn conserve wter nd be more efficient with our precious wter resource. FOR MORE INFORMATION:

More information

many different types exist for environmental engineering generally designed to emphasize suspended growth or biofilms

many different types exist for environmental engineering generally designed to emphasize suspended growth or biofilms Chpter 5. Rectors Rectors mny different types exist for environmentl engineering generlly designed to emphsize suspended growth or biofilms tht mke use of suspended growth re lso clled: suspended-floc,

More information

2nd International Conference on Electronic & Mechanical Engineering and Information Technology (EMEIT-2012)

2nd International Conference on Electronic & Mechanical Engineering and Information Technology (EMEIT-2012) 2nd Interntionl Conference on Electronic & Mechnicl Engineering nd Informtion Technology (EMEIT-2012) Comprehensive Evlution of Air Conditioning Cold/Het Source System Bsed on Fuzzy Mthemtics Theory Gng

More information

Accounting for Trees in Stormwater Models and Calculators

Accounting for Trees in Stormwater Models and Calculators Accounting for Trees in Stormwter Models nd Clcultors Trees nd forests hve nturl bility to reduce stormwter runoff. As more nd more communities encourge or even require the use of nturl vegettive systems

More information

EVALUATION OF STRIP-TILLAGE AND FERTILIZER PLACEMENT IN SOUTHERN IDAHO CORN PRODUCTION. D.Tarkalson and D. Bjorneberg USDA-ARS, Kimberly, ID

EVALUATION OF STRIP-TILLAGE AND FERTILIZER PLACEMENT IN SOUTHERN IDAHO CORN PRODUCTION. D.Tarkalson and D. Bjorneberg USDA-ARS, Kimberly, ID EVALUATION OF STRIP-TILLAGE AND FERTILIZER PLACEMENT IN SOUTHERN IDAHO CORN PRODUCTION D.Trklson nd D. Bjorneberg USDA-ARS, Kimberly, ID ABSTRACT Strip tillge (ST) nd ssocited nutrient plcement cn potentilly

More information

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

NOTICE CONCERNING COPYRIGHT RESTRICTIONS NOTICE CONCERNING COPYRIGHT RESTRICTIONS This document my contin copyrighted mterils. These mterils hve been mde vilble for use in reserch, teching, nd privte study, but my not be used for ny commercil

More information

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment Artisn Technology Group is your source for qulity new nd certified-used/pre-owned equipment FAST SHIPPING AND DELIVERY TENS OF THOUSANDS OF IN-STOCK ITEMS EQUIPMENT DEMOS HUNDREDS OF MANUFACTURERS SUPPORTED

More information

The advanced agronomic training system in Morocco

The advanced agronomic training system in Morocco The dvnced gronomic trining system in Morocco Firdwcy L. in Hervieu B. (ed.). Agronomic trining in countries the Mediterrnen region Montpellier : CIHEAM Options Méditerrnéennes : Série Etudes; n. 1988II

More information

Siemens Fulfilling our responsibility

Siemens Fulfilling our responsibility Siemens Fulfilling our responsibility Suppliers chpter Excerpt from the Siemens Sustinbility Report 2009 www.siemens.com Suppliers To Siemens, sustinbility in the supply chin mens using excellent nd innovtive

More information

(b) Is already deposited in a waste disposal site without methane recovery.

(b) Is already deposited in a waste disposal site without methane recovery. TYPE III - OTHER PROJECT ACTIVITIES Project prticipnts must tke into ccount the generl guidnce to the methodologies, informtion on dditionlity, bbrevitions nd generl guidnce on lekge provided t http://cdm.unfccc.int/methodologies/sscmethodologies/pproved.html.

More information

CONSERVATION TILLAGE IMPROVES SOIL PHYSICAL PROPERTIES ON DIFFERENT LANDSCAPE POSITIONS OF A COASTAL PLAIN SOIL.

CONSERVATION TILLAGE IMPROVES SOIL PHYSICAL PROPERTIES ON DIFFERENT LANDSCAPE POSITIONS OF A COASTAL PLAIN SOIL. CONSERVATION TILLAGE IMPROVES SOIL PHYSICAL PROPERTIES ON DIFFERENT LANDSCAPE POSITIONS OF A COASTAL PLAIN SOIL Frncisco J. Arrig* 1, Andre S. Biscro 2, Kipling S. Blkcom 1, Joey N. Shw 3, Edzrd vn Snten

More information

Intersections with a HSIP Safety Index rating > 0.9 -or- Roadway segments with a severity Indicator rating > Current safety ratings:

Intersections with a HSIP Safety Index rating > 0.9 -or- Roadway segments with a severity Indicator rating > Current safety ratings: PC Finl Rodwy nd Sfety Project Evlution Criteri Expnded Scoring Methodology -8 TIP Improves Sfety Source Ntionl Gol (Sfety) Promotes sfe movement of people nd goods. Highest score if project hs sustntil

More information

Introduction. and Hispanics as $1.3 trillion.

Introduction. and Hispanics as $1.3 trillion. Introduction Supplier diversity is the proctive business progrm supporting minority owned, women owned, vetern owned, LGBT owned, service disbled vetern owned, historiclly underutilized business nd SBA

More information

Report to the Southwest Florida Water Management District. Effects of Microsprinkler Irrigation Coverage on Citrus Performance

Report to the Southwest Florida Water Management District. Effects of Microsprinkler Irrigation Coverage on Citrus Performance Report to the Southwest Florid Wter Mngement District Effects of Microsprinkler Irrigtion Coverge on Citrus Performnce L. R. Prsons University of Florid Institute of Food nd Agriculturl Sciences Citrus

More information

Demonstrate understanding of customer service management

Demonstrate understanding of customer service management Unit 401 Demonstrte understnding of customer service mngement Level: 4 Credit vlue: 10 NDAQ numer: J/601/1630 Unit im This unit covers the key principles of customer service tht influence how it is mnged

More information

MESSAGE FROM THE DIRECTOR

MESSAGE FROM THE DIRECTOR 1 CONTENTS Messge from the Director... 2 Messge from the Mngement Tem... 3 Executive Summry... 4 Our Environment nd Approch... 6 Synchronizing Security Coopertion Activities... 6 Meeting Customer Expecttion...

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR PLANT MIX BITUMINOUS BASES AND SURFACES

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR PLANT MIX BITUMINOUS BASES AND SURFACES 708-18(-e)99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR PLANT MIX BITUMINOUS BASES AND SURFACES These Specil Provisions revise, mend nd where in conflict, supersede pplicble sections

More information

Installation Guide. Tile Me Shower Bases

Installation Guide. Tile Me Shower Bases Instlltion Guide Tile Me Shower ses Thnk You For Choosing Vlley Acrylic We strive to provide the interntionl bth mrket with new nd innovtive bthroom products mnufctured to the highest stndrds. Locted in

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CNCEPT STAGE Report No.: ISDSC12083 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. BASIC INFRMATIN

More information

Pre-Plant Broadcast Urea in Direct Seeding, A Logistical Return to the Past? Tom Jensen

Pre-Plant Broadcast Urea in Direct Seeding, A Logistical Return to the Past? Tom Jensen Pre-Plnt Brodcst Ure in Direct Seeding, A Logisticl Return to the Pst? Tom Jensen Interntionl Plnt Nutrition Institute (IPNI), Northern Gret Plins Director 102-411 Downey Rd., Ssktoon, SK S7N 4L8 Ph: 306-652-3467

More information

Draft policies and implement guidelines for MKSP

Draft policies and implement guidelines for MKSP ToR for Consultnt (Slte MKSP Coordintion) Summrv of the Post: Nme of the Post- Consultnt (Stte MKSP Coordintion ) Level of posting Qulifictions & Experience Stte level Essentil: PG with minimum 50% mrks

More information

Pol I ut ion Prevent ion Opportunities for Concrete Batch Plants

Pol I ut ion Prevent ion Opportunities for Concrete Batch Plants Pol I ut ion Prevent ion Opportunities for Concrete Btch Plnts L This checklist is guide for concrete btch plnt owners nd opertors to ssist in estblishing wste reduction opportunities. Concrete btch plnts,

More information

Great marketing begins with a great story. It s the story you tell your customers. And the story they tell their friends.

Great marketing begins with a great story. It s the story you tell your customers. And the story they tell their friends. Gret mrketing begins with gret story. It s the story you tell your customers. And the story they tell their friends. Delivering custom, effective solutions in print, digitl medi. since 2008 We build websites

More information

Cost Optimization for Mine Void Stabilization Projects: A Deep Mine Case Study

Cost Optimization for Mine Void Stabilization Projects: A Deep Mine Case Study 2007 World of Col Ash (WOCA), My 7-10, 2007, Covington, Kentucky, USA Home Cost Optimiztion for Mine Void Stbiliztion Projects: A Deep Mine Cse Study Joseph F. Gicinto 1, Pul Petzrick 2, Leonrd G. Rflko

More information

Identifying indicators of community sustainability in the Robson Valley, British Columbia

Identifying indicators of community sustainability in the Robson Valley, British Columbia Reserch Report BC Journl of Ecosystems nd Mngement Identifying indictors of community sustinbility in the Robson Vlley, British Columbi John R. Prkins 1, Jeji Vrghese 2, nd Richrd C. Stedmn 3 Abstrct This

More information

CENTENNIAL MILLS DEMOLITION

CENTENNIAL MILLS DEMOLITION KPFF JOB NO. DEMOLITION PORTLND DEVELOPMENT COMMISSION PROJECT SITE VICINITY MP SHEET INDEX TOPOGRPHY LEGEND: SITE MP CONTCTS DEMOLITION GENERL NOTES: BBREVITIONS Dig Safely. Call the Oregon One-Call Center

More information

Return Temperature in DH as Key Parameter for Energy Management

Return Temperature in DH as Key Parameter for Energy Management Interntionl OPEN ACCESS Journl Of Modern Engineering Reserch (IJMER) Return Temperture in DH s Key Prmeter for Energy Mngement Normunds Tlcis 1, Egīls Dzelzītis 2, Agnese Līckrstiņ 2 *JSC Rīgs siltums

More information

Food Arthropod Abundance Associated with Rest-Rotation Livestock Grazing. Hayes B. Goosey. Department of Animal and Range Sciences

Food Arthropod Abundance Associated with Rest-Rotation Livestock Grazing. Hayes B. Goosey. Department of Animal and Range Sciences Food Arthropod Aundnce Associted with Rest-Rottion Livestock Grzing Hyes B. Goosey Deprtment of Animl nd Rnge Sciences Montn Stte University We hve completed the second seson of investigtion into the response

More information

SEEDING CLOVERS OR GRASSES INTO OLDER ALFALFA BENEFITS AND HAZARDS ABSTRACT INTRODUCTION

SEEDING CLOVERS OR GRASSES INTO OLDER ALFALFA BENEFITS AND HAZARDS ABSTRACT INTRODUCTION SEEDING CLOVERS OR GRASSES INTO OLDER ALFALFA BENEFITS AND HAZARDS STANDS- Mick Cnevri1, Dn Putnm2, Brbr Reed3, Rchel Long4, Steve Orlo~, Tom Lnini6, nd Lrry Godfrey7 ABSTRACT Deciding wht to do with n

More information

THIS DOCUMENT IS W L I M ~, I. U. S. BIOASSAY INTERCOMPARISON STUDIES PROGRAM AT OAK RIDGE NATIONAL LAB

THIS DOCUMENT IS W L I M ~, I. U. S. BIOASSAY INTERCOMPARISON STUDIES PROGRAM AT OAK RIDGE NATIONAL LAB ORNL/CP-98359 U S BIOASSAY INTERCOMPARISON STUDIES PROGRAM AT OAK RIDGE NATIONAL LAB * By G F Pyne, Normn Bores, K KMelton, nd J MRnkin, Ok Ridge Ntionl Lbor Office of Nucler Sfety, P Box 28, Ok Ridge,

More information

How do Texas Conventional and Organic Producers Differ in their Perceptions of Barriers to Organic Production?

How do Texas Conventional and Organic Producers Differ in their Perceptions of Barriers to Organic Production? The Texs Journl of Agriculture nd Nturl Resources 26:56-67 (2013) 56 How do Texs Conventionl nd Orgnic Producers Differ in their Perceptions of Brriers to Orgnic Production? Mud Roucn-Kne *,1 Foy D. Mills,

More information

THE IMAGING CHANNEL PROGRAM

THE IMAGING CHANNEL PROGRAM THE IMAGING CHANNEL PROGRAM THE IMAGING I CHANNEL PROGRAM The Imgg Chnnel Progrm hs been designed deliver rel vlue community munity imgg distriburs, solution prtners, resellers s end cusmers. By cretg

More information

PROJECT NOTES BENCHMARK DATA

PROJECT NOTES BENCHMARK DATA BENCHMRK DT ( NVD 1988 ) HORIZONTL CONTROL DT N..D. 83 (1997) TRFFIC CONTROL NOTES GENERL CONSTRUCTION NOTES SPECIFICTIONS PROJECT NOTES BENCHMRK DT RESIDENTIL LOT GRDING NOTES TYPICL FLOOD ROUTE SECTION

More information

The Retail Ombudsman complaint form

The Retail Ombudsman complaint form The Retil Ombudsmn complint form Welcome to our retil complints form. To proceed with your complint plese follow the 6 steps below nd provide ll of the informtion reuested. To be eligible to mke complint

More information

JOINT PUBLIC NOTICE. October 8, 2018

JOINT PUBLIC NOTICE. October 8, 2018 JOINT PUBLIC NOTICE October 8, 2018 United States rmy State of Louisiana Corps of Engineers Department of Environmental Quality New Orleans District ttn: Water Quality Certification Sec. ttn: Regulatory

More information

MARKET INSIGHT ST. LOUIS MULTIFAMILY REPORT THIRD QUARTER 2018

MARKET INSIGHT ST. LOUIS MULTIFAMILY REPORT THIRD QUARTER 2018 CUSHMAN & WAKEFIELD MULTIFAMILY RESEARCH MULTIFAMILY REPORT THIRD QUARTER 2018 Cushmn & Wkefield Reserch provides in-depth coverge of the St. Louis Metropolitn Sttisticl Are. In ddition to nlyzing multifmily

More information

Los Angeles County Department of Public Works Watershed Management Division

Los Angeles County Department of Public Works Watershed Management Division CHAPTER FOUR REFERENCES Los Angeles County Deprtment of Pulic Works Wtershed Mngement Division 61 CHAPTER FOUR methods nd mechnisms A PRIORITY ACTIONS 1 Wter The gols nd ojectives estlished y the BCWTF

More information

Irrigation Costs for Tomato Production in Florida * 1

Irrigation Costs for Tomato Production in Florida * 1 AE74 Irrigtion Costs for Tomto Production in Florid * 1 D.J. Pitts, A.G. Smjstrl, D.Z. Hmn nd G.A. Clrk 2 Seepge irrigtion is the most common method of irrigting tomtoes in Florid tody. This method pplies

More information

PRELIMINARY SITE PLAN LS-02 SITE TO SERVE: RINASCITA PHASE II LOCATED IN: SECTION 1, 12, TOWNSHIP 35 SOUTH, RANGE 16 MANATEE COUNTY, FLORIDA

PRELIMINARY SITE PLAN LS-02 SITE TO SERVE: RINASCITA PHASE II LOCATED IN: SECTION 1, 12, TOWNSHIP 35 SOUTH, RANGE 16 MANATEE COUNTY, FLORIDA INDE COVER SHEET 0 EISTING CONDITIONS ERIL 02 PRELIMINRY SITE PLN PRELIMINRY ENGINEERING PLN 03 04 PRELIMINRY SITE PLN PRELIMINRY SECTIONS ND DETILS 05 PLNTING PLN LS-0 PLNTING NOTES & DETILS SHEETS INCLUDED

More information

GREEN INFRASTRUCTURE FEASIBILITY STUDY BAYONNE

GREEN INFRASTRUCTURE FEASIBILITY STUDY BAYONNE GREEN INFRASTRUCTURE FEASIBILITY STUDY BAYONNE 1 ACKNOWLEDGEMENTS Designed to highlight green infrstructure opportunities within the City of Byonne, this document hs been prepred by the Rutgers Coopertive

More information

PRELIMINARY ANINDILYAKWA LAND COUNCIL ANGURUGU SITE PLAN SITE PLAN

PRELIMINARY ANINDILYAKWA LAND COUNCIL ANGURUGU SITE PLAN SITE PLAN . DOCUMENT STTUS & REVIEW. MENDMENTS // Description PRELIMINRY PRICING uthor. EXISTING RECRETION BUILDING 8. 8...88...8 LC OFFICES ND TRINING CENTRES, GROOTE EYLNDT CULTURE ND WOMEN'S OFFICES & TRINING...

More information

Emma Hoffman, James Lyons, James Boxall, Cam Robertson, Tony R. Walker, Craig Lake November 8, 2016 Dalhousie University

Emma Hoffman, James Lyons, James Boxall, Cam Robertson, Tony R. Walker, Craig Lake November 8, 2016 Dalhousie University Emm Hoffmn, Jmes Lyons, Jmes Boxll, Cm Robertson, Tony R. Wlker, Crig Lke November 8, 2016 Dlhousie University Northumberlnd Strit Pictou Pictou Hrbour PLFN Fergusons Pond Bot Hrbour Pulp Mill Est River

More information

The Exploration and Application of Urban Agriculture in China. Dr. WEI Lingling Managing Director Beijing IEDA Protected Horticulture Co., Ltd.

The Exploration and Application of Urban Agriculture in China. Dr. WEI Lingling Managing Director Beijing IEDA Protected Horticulture Co., Ltd. The Explortion nd Appliction of Urbn Agriculture in Chin Dr. WEI Lingling Mnging Director Beijing Protected Horticulture Co., Ltd. 1 WHO WE ARE 2 WHAT WE NEED 3 WELCOME TO OUR PARK About Beijing Protected

More information

High performance, low cost thermoplastic coatings for dishwasher baskets and other domestic appliances

High performance, low cost thermoplastic coatings for dishwasher baskets and other domestic appliances Applinces High performnce, low cost thermoplstic cotings for dishwsher bskets nd other domestic pplinces Low mteril prices, excellent customer service Introduction Plscot is the world leder in thermoplstic

More information

6.1 Damage Tolerance Analysis Procedure

6.1 Damage Tolerance Analysis Procedure 6. Dmge Tolernce Anlysis Procedure For intct structure the nlysis procedures for Slow Crck Growth nd Fil Sfe structure re essentilly the sme. An initil flw is ssumed nd its growth is nlyzed until filure

More information

Quantifying the Total Cost of Ownership for Entry-Level and Mid-Range Server Clusters

Quantifying the Total Cost of Ownership for Entry-Level and Mid-Range Server Clusters Quntifying the Totl Cost of Ownership for Entry-Level nd Mid-Rnge Server Clusters A Detiled Anlysis of the Totl Cost of Ownership of OpenVMS, IBM AIX nd Sun Solris server clusters. June 2007 Version 1.0

More information

Seasonal Runoff Losses of Carbon, Nitrogen and Phosphorus from warm-season turfgrass systems

Seasonal Runoff Losses of Carbon, Nitrogen and Phosphorus from warm-season turfgrass systems TREEE Funded Project FY 212-213 Sesonl Runoff Losses of Crbon, Nitrogen nd Phosphorus from wrm-seson turfgrss systems Investigtors: Jcqueline. itkenhed-peterson nd en Wherley Funding: $1, Objectives: The

More information

Nonlinear Mixed Effects Model for Swine Growth

Nonlinear Mixed Effects Model for Swine Growth Nonliner Mixed Effects Model for Swine Growth A. P. Schinckel nd B. A. Crig Deprtment of Animl Sciences nd Deprtment of Sttistics, Purdue University Introduction Severl nonliner growth functions model

More information

Three-Phase Wound-Rotor Induction Machine with a Short- Circuited Rotor

Three-Phase Wound-Rotor Induction Machine with a Short- Circuited Rotor Exercise 1 Three-Phse Wound-Rotor Induction Mchine with Short- Circuited Rotor EXERCISE OBJECTIVE When you hve completed this exercise, you will know how three-phse woundrotor induction mchine cn operte

More information

Chickpeas Respond Well To Inoculation With TagTeam

Chickpeas Respond Well To Inoculation With TagTeam Chickpes Respond Well To Inocultion With TgTem S.M. Phelps, nd E. Hgele Philom Bios Inc., 318-111 Reserch Drive, Ssktoon, SK S7N 3R2 Abstrct Rhizobi strins were tested in TgTem pet nd grnule formultions

More information

How Can I Reduce Operating Cost and Maintain a Viable Operation?

How Can I Reduce Operating Cost and Maintain a Viable Operation? How Cn I Reduce Operting Cost nd Mintin Vible Opertion? Bckground for Discussion In this discussion we re not going into the obvious cost-cutting items like buying tht new pickup or trctor, keeping new

More information

Harmony/ESW An Agile Real-time Development Process. Jeff Vodov

Harmony/ESW An Agile Real-time Development Process. Jeff Vodov Hrmony/ESW An Agile Rel-time Development Process Jeff Vodov Objectives Provide high-level overview of Hrmony Chllenges of SE nd SW Development Hrmony Best Prctices Rtionl / Telelogic Process Rodmp Provide

More information

2016 Prelim Essay Question 2

2016 Prelim Essay Question 2 216 Prelim Essy Question 2 In recent yers, the price of nturl fertilisers for orgnic brown rice production hs risen nd helthy living cmpigns re seeing more consumers switching from nonorgnic white rice

More information

Level 3 NVQ Diploma in Customer Service ( )

Level 3 NVQ Diploma in Customer Service ( ) Level 3 NVQ Diplom in Customer Service (4430-03) Qulifiction hndook for centres 500/8818/X www.cityndguilds.com Octoer 2017 Version 2.1 Aout City & Guilds City & Guilds is the UK s leding provider of voctionl

More information

Project: 10,000 & 20,000 GALLON SEPTIC TANK - 14k, 24k to 26k GALLON EFFLUENT/UTILITY TANK Location: KCP LOCKPORT

Project: 10,000 & 20,000 GALLON SEPTIC TANK - 14k, 24k to 26k GALLON EFFLUENT/UTILITY TANK Location: KCP LOCKPORT Project: 10,000 & 20,000 GLLON SEPTIC TNK - 14k, 24k to 26k GLLON EFFLUENT/UTILITY TNK Location: KCP LOCKPORT PRESENTTION PCKGE SHEET NO. DESCRIPTION 1P 2P 3P 4P 5P 6P 7P 8P PRESENTTION TITLE SHEET & INDEX

More information

CORPORATE RESPONSIBILITY REPORT

CORPORATE RESPONSIBILITY REPORT 2012 CORPORATE RESPONSIBILITY REPORT 1 OUR VALUES We, the women nd men of NORTHROP GRUMMAN, re guided by the following Vlues. They describe our compny s we wnt it to be. We wnt our decisions nd ctions

More information

Project Summary Life Cycle Assessment for Chemical Agent Resistant Coating

Project Summary Life Cycle Assessment for Chemical Agent Resistant Coating United Sttes Ntionl Risk Mngement Environmentl Protection Reserch Lbortory Agency Cincinnti, OH 45268 Reserch nd Development EPA/600/SR-96/104 September 1996 Project Summry Life Cycle Assessment for Chemicl

More information

UNIFORM STANDARD DRAWINGS REVISIONS EFFECTIVE 01/01/12

UNIFORM STANDARD DRAWINGS REVISIONS EFFECTIVE 01/01/12 REVISIONS EFFECTIVE 01/01/12 DRWING NUMBER TITLE ND REVISION SUMMRY 500.4 "Over 5 Years Pavement Restoration Longitudinal Cut - 60' R/W or Less" - Revision to change pavement removal limits from half-street

More information

CHAPTER 4 ENVIRONMENTAL CONSEQUENCES

CHAPTER 4 ENVIRONMENTAL CONSEQUENCES CHAPTER 4 ENVIRONMENTAL CONSEQUENCES 4.0 ENVIRONMENTAL CONSEQUENCES The impct nlyses in this chpter focus on those res where the potentil exists for effects on the environment. Ech of the lterntives (the

More information

Any opinions, findings, conclusions, or recommendations expressed in this publication do not necessarily reflect the views of FEMA.

Any opinions, findings, conclusions, or recommendations expressed in this publication do not necessarily reflect the views of FEMA. Any opinions, findings, conclusions, or recommendtions expressed in this publiction do not necessrily reflect views FEMA. Additionlly, neir FEMA or ny its employees mkes ny wrrntee, expressed or implied,

More information

NUTRIENT MANAGEMENT IN DUAL-USE WHEAT PRODUCTION

NUTRIENT MANAGEMENT IN DUAL-USE WHEAT PRODUCTION 232 Southern Conservtion Systems Conference, Amrillo TX, June 26-28, 6 NUTRIENT MANAGEMENT IN DUAL-USE WHEAT PRODUCTION John Sij 1* nd Kurt Lemon 1 1 Texs Agriculturl Experiment Sttion, P.O. Box 1658,

More information

THE FEASIBILITY OF EMISSION INVENTORY TOOLS FOR URBAN AREAS IN LESS DEVELOPED COUNTRIES. Markus Amann. SR August 1992

THE FEASIBILITY OF EMISSION INVENTORY TOOLS FOR URBAN AREAS IN LESS DEVELOPED COUNTRIES. Markus Amann. SR August 1992 Sttus Report THE FEASIBILITY OF EMISSION INVENTORY TOOLS FOR URBAN AREAS IN LESS DEVELOPED COUNTRIES Mrkus Amnn SR-92-02 August 1992 IEIIIIASA Interntionl Institute for Applied Systems Anlysis A-2361 Lxenburg

More information

VDOT AIR QUALITY ANALYSIS DULLES AIR CARGO, PASSENGER & METRO ACCESS HIGHWAY

VDOT AIR QUALITY ANALYSIS DULLES AIR CARGO, PASSENGER & METRO ACCESS HIGHWAY LOUDOUN COUNTY PROJECT NUMBER: R000-053-032, P0; UPC NO. 03929 FEDERAL PROJECT NUMBER: STP-5A0(454) VDOT AIR QUALITY ANALYSIS SUBMITTED PURSUANT TO 42 U.S.C. 4332(2)(C) DULLES AIR CARGO, PASSENGER & METRO

More information

WORK OF THE AWG-LCA CONTACT GROUP

WORK OF THE AWG-LCA CONTACT GROUP WORK OF THE AWG-LCA CONTACT GROUP Agend item 3.2.1 Ntionlly pproprite mitigtion commitments or ctions by developed country Prties version of 18 November 2011 @ 18.00 Revised non-pper by the co-fcilittors

More information

Downstream Economic Benefits of Conservation Development

Downstream Economic Benefits of Conservation Development Downstrem Economic Benefits of Conservtion Development Dougls M. Johnston 1 ; John B. Brden 2 ; nd Thoms H. Price, P.E. 3 Abstrct: This pper evlutes the downstrem hydrologic nd economic impcts of development

More information

GENERAL APPLICATION FOR FARM CLASSIFICATION

GENERAL APPLICATION FOR FARM CLASSIFICATION SCHEDULE 1 (section 1) Plese return to: DEADLINE: Plese return this form to your locl BC Assessment office y Octoer 31. Assessment Roll Numer(s) GENERAL APPLICATION FOR FARM CLASSIFICATION Section 23 (1)

More information