1 COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT Corrigendum No:III No. INFRA/CIV/70/ Sept 2017 Name of Work: Ground Improvement Works for the New Dry Dock Project A layer of nonwoven geotextile is to be provided as a separation medium between the granular blanket layer and surcharge material.the item of supplying and laying of nonwoven geotextile has been incorporated as item no. 9 in the amended tender schedule given below. The bidders have to submit the price bids in the amended tender schedule. This amended tender schedule supersedes earlier tender schedule. All other terms and conditions shall remain unaltered. Sd/- General Manager (Infra Projects), Infra Projects Department Signature of Contractor
2 80 No.INFRA/CIV/70/2017 INFRA PROJECTS DEPARTMENT GROUND IMPROVEMENT WORKS FOR THE NEW DRY DOCK PROJECT AMENDED TENDER SCHEDULE 1 Mobilizing and demobilizing of PVD installation equipment w ith mandrel, necessary machinery and personnel, all other enabling w orks including site establishment etc, complete (50% of the total amount under this item shall be released upon mobilization of tw o rigs (one rig capable of driving PVD upto 27m depth) and balance 50% shall be released after demobilization.) 1 LS LS 2 Granular blanket 0.5m thick using M- sand/ 20 mm to 40mm broken stone to be laid prior to installation of PVDs, including cost of materials, labour, equipments, material handling & transportation charges etc. all complete as directed by Engineer-in-charge. 13,610 m 2 m 2
3 81 3 Ground Strengthening Using Prefabricated Vertical Drains (PVDs): Design and installation of Prefabricated Vertical Drains (PVDs) at a specified grid pattern up to the design depth from the Existing Ground level (R.L. +3.0m CD varies). This includes design, supply of PVDs, installation of PVDs, real time monitoring of depth for PVDs and w ater level, preparation and submission of records etc complete as directed by the Engineer-in-charge. (Rate should be inclusive of providing excavators for removing scrap materials if encountered) a Zone 1/Area A as detailed in draw ing no. RA1158/GI/005 Rev 02 27,070 m m b Section AA /Area B & C as detailed in draw ing no. RA1158/GI/005 Rev 02 94,700 m m c Section BB /Area D & E as detailed in draw ing no. RA1158/GI/005 Rev ,830 m m
4 82 4 Surcharge Transporting, hauling, stacking, dumping approved M-Sand material in position at the designated/demarcated locations in the project site to act as surcharge material over the PVD system including forming trapezoidal section w ith required slope as show n in the draw ings, transporting the M-Sand material to the locations w ithin the project site after completion of PVD w orks in a required profile as show n in the draw ings or as directed by the Engineer-in-Charge, providing side drain etc. complete 100,000 m 3 m 3
5 83 5 Carrying out the electric cone penetration test (ECPT) w ith piezocone as specified and as per instructions of Engineer including supply of all tools, plant, materials, labour, complete etc. and submission of field data w ith a report to the ow ner, for all types of onshore as required and as per specifications and as directed by the Engineer-in-charge a Mobilisation of ECPT and Hydrualic rotary rig for boring (50% of the total amount under this item shall be released upon mobilization and balance 50% after demobilization.) 1 LS LS b Field tests including set up and transfer of ECPT rig and interpretation of results (Depth of ECPT tests w ill be based on item no.s 3.a to 3.c) 35 Nos E 6 Confirmatory boreholes and field vane s hear tests
6 84 a Boring 100/150mm diameter land boreholes ( 1 borehole of 13m deep and 10 boreholes of 28m deep ) in the designated area for soil improvement for Zone 1 (Ref. draw ing no. RA 1158/GI/003 Rev 01) and Zone 2, 3, & 4 ( Ref. draw ing no. RA 1158/GI/005 Rev 01) through gravel,sand,silt clay,hard clay and all types of soils other than boulders or rock to a depth below ground level(n<100) including setting up and transfering of hydraulic rotary drilling equipment w ith other accessories, backfilling of all boreholes, all labour and incidental expenses etc. complete, as directed by the Engineer-incharge 295 m m b Conducting field vane shear 3m depth intervals in boreholes as specified in the above item (6.a) 85 Nos E
7 85 7 Supplying and providing facilities like installation of full height dust control shrouds or curtains, adequate w ater sprinklers for dust control, cleaning the tyres of trucks w ith w ater before leaving the site, covering of construction material w ith sheets w hile transportation and storage as directed by Engineer-in-Charge. The dust control shrouds or curtains viz. fence of 10m height for a length of 80m along the northern boundary w all near residential buildings w ith new pre-painted galvalume sheet and structural steel/ MS pipes in order to protect the surrounding area from dust w hich may cause inconvenience to and endanger the public. The barricade especially those exposed to public shall be aesthetically maintained by regular cleaning and painting as directed by the Engineer-in- Charge. These shall be maintained in one line and level. Water sprinklers to be provided for dust control is to be placed over surcharge mounds
8 86 and w ork sites. Construction materials should be covered w ith sheets w hile transportation and storage etc. complete, trucks carrying sand, earth and any pulverized materials etc. in order to avoid dust or odour impact shall be covered w hile moving as directed by the Engineerin-Charge. All surplus earth and debris should be removed/disposed off from the w orking areas to officially designated dumpsites. The tyres of the trucks leaving the site shall be cleaned w ith w ater, w herever the possibility of spillage on carriagew ays meant for regular road traffic exists. No parking of trucks/trolleys, cranes and trailers etc. shall be allow ed on roads, w hich may obstruct the traffic movement. All the above facilities except fence can be taken back by the contractor after total completion of w ork. (75% of the payment for this item w ould be released after the completion of installation w ork of fence) 1 LS LS
9 87 8 Clearing jungle including uprooting of rank vegetation, grass, brush w ood, trees and saplings of girth up to 30 cm, removal of rubbish and disposal w ithin CSL premises, general levelling of the ground etc as per direction of Engineerin-Charge including cost and conveyance of all labour, hire for tools and plants, other incidentals etc. complete. 7,000 m 2 m 2 9 Supplying and laying of nonw oven geotextile having density 200 grams per square meter as a separation medium betw een granular blanket layer and surcharge as directed by the Engineer-in- Charge. 13,610 m 2 m 2 Sub total (A) Rs Deduction Item :- Cutting and Sale of trees
10 88 10 Sale,Cutting, and Taking aw ay the follow ing trees of various species w ithout causing any damage to the existing structures/installations and as per the direction of Engineer-in-charge Note: Total am ount quoted in this item w ill be deducted for arriving at the overall total amount a) Sale of Rain Tree of girth upto 180 cm b) Sale of Acasia Tree of girth upto 50 cm Sub total (B) Total amount of all individual items (C) (A-B) % of the total amount of all individual items (C) 1 Nos E 2 Nos E Rs Rs Rs Overall Total Amount Rs Signature, Name & Address of the Tenderer : Date : sd/- GENERAL MANAGER (Infra Projects)
COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT. Corrigendum No:I. No. INFRA/CIV/70/ Sep 2017
COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT Corrigendum No:I No. INFRA/CIV/70/2017 05 Sep 2017 Name of Work: Ground Improvement Works for the New Dry Dock Project 1. The time of completion of work
More informationPILING WORKS FOR PROPOSED NEW BUILDING OF IIT MADRAS RESEARCH PARK AT KANAGAM ROAD, TARAMANI, CHENNAI
PILING WORKS FOR PROPOSED NEW BUILDING OF IIT MADRAS RESEARCH PARK AT KANAGAM ROAD, TARAMANI, CHENNAI- 600 113 PRE MID MEETING DATE OF MEETING:- 07-5-2013 DECISIONS MADE IN THE MEETING Note : These decisions
More informationScanned by CamScanner
JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY
More informationSchedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer
Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationCONSTRUCTION SPECIFICATION FOR CLEARING, CLOSE CUT CLEARING, GRUBBING, AND REMOVAL OF SURFACE AND PILED BOULDERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 201 NOVEMBER 2003 CONSTRUCTION SPECIFICATION FOR CLEARING, CLOSE CUT CLEARING, GRUBBING, AND REMOVAL OF SURFACE AND PILED BOULDERS TABLE OF CONTENTS
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationNATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT
NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING
January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2007 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationSTANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS
TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...
More informationEstimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing
1 2 Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30
More informationSub Total for Demolishing
A Cleaning of Jungle Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish
More informationSCOPE OF WORK FOR PILING JOB
SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More informationInvitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $
Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation
More informationSpecial Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS
... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE
More informationAN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR
AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID
More informationB701 WATERMAINS- OPSS 701
B701 - OPSS 701 701.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.
More informationContract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C
Notice of Amendment No.1 Addendum No.1 to the following Contract Packages has been made in the Bids, for which the first date notice was published in the Gorkhapatra daily on December 14, 2010 by Sanjen
More informationSpecial Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS
... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE
More informationBill of Quantity. Unit Price in words (Nu) Unit Price (Nu) Code Description Unit Quantity. Amount (Nu) CP-AR-
in 02 03 RS-AR- 04 RS-AR- 05 06 07 Access track rehabilitation, to Vegetation clearing as necessary for both the track section to undergo rehabilitation, and track section to be extended/created Earthworks
More informationBharat Heavy Electricals Limited High Pressure Boiler Plant Tiruchirappalli India Civil Engineering Department (Factory)
Bharat Heavy Electricals Limited High Pressure Boiler Plant Tiruchirappalli 620 014. India Civil Engineering Department (Factory) TENDER DOCUMENT (PRICE BID) Name of work : Supplying & fixing of Aluminium
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationB441 - WATERMAINS - OPSS GENERAL
B441 - - OPSS 441 441.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.
More informationSubsurface Investigation Report
AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland
More informationThe Regional Municipality of Peel Basis of Payment
Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.
More informationTechnical Guidelines for Construction near Pipeline Facilities
Plains Midstream Canada Damage Prevention Department Technical Guidelines for Construction near Pipeline Facilities Table of Contents 1.0 PURPOSE...3 2.0 REGULATORY GOVERNANCE...3 3.0 ACTIVITIES REQUIRING
More informationBill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.
Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations
More informationSOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE
SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationTENDER FOR " Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including
VADODARA SMART CITY DEVELOPMENT LIMITED VADODARA SMART CITY DEVELOPMENT LIMITED TENDER FOR " Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including Refurbishment of existing
More informationTHE ADVANTAGES OF THE USE OF GPS BASED LOGGING SYSTEMS FOR VERTICAL DRAIN INSTALLATION PROJECTS
International Conference on Soft Ground Engineering (ICSGE2015) 3-4 December 2015, Singapore THE ADVANTAGES OF THE USE OF GPS BASED LOGGING SYSTEMS FOR VERTICAL DRAIN INSTALLATION PROJECTS JEROEN DIJKSTRA
More informationName of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL TENDER SCHEDULE
Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL Sl.no. Qty Description TENDER SCHEDULE 1 10000 m2 Clearing the grass and other
More informationAmendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 416 September 2017 Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility
More informationTender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.
Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 416 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING TABLE OF CONTENTS 416.01 SCOPE 416.02 REFERENCES
More information406 - PIPE SEWERS - MTC FORM 406
406 - - MTC FORM 406 INDEX 406.1 GENERAL Types of Pipe Pipe Strength, Rigid Pipes Polyethylene Pipe Strength - Rigid or Flexible Pipe Strength and Treatment, Flexible Pipes Selection of Type, Strength
More informationINDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1
March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural
More informationBharat Heavy Electricals Limited High Pressure Boiler Plant Tiruchirappalli India Civil Engineering Department (Factory)
Bharat Heavy Electricals Limited High Pressure Boiler Plant Tiruchirappalli 620 014. India Civil Engineering Department (Factory) TENDER DOCUMENT (PRICE BID) Name of work : Supplying & fixing of Aluminium
More informationJune i TABLE OF CONTENTS
June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description
More informationTECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GETCO/E/TS LUC058/R1
More informationAmendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:
Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of
More informationAnchorplex retaining wall construction guide
Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems Table of Contents and Introduction table of contents ow to Use This Guide......................... 2 About the Anchorplex
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationCONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 760 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS TABLE OF CONTENTS 760.01 SCOPE 760.02 REFERENCES 760.03 DEFINITIONS 760.04 DESIGN
More informationINVITATION TO TENDER ITT / PS VANCOUVER LANDFILL FRONT ENTRANCE REDESIGN - PRELOAD QUESTIONS AND ANSWERS NO.1
FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / PS20161054 ISSUED ON OCTOBER 13, 2016 Schedule A - Item 3.01 references MMCD Section 03 40 01 Measurement and Payment Clause 1.4.3.
More informationCONSTRUCTION SPECIFICATION FOR TUNNELLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationAnchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems
Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems Table of Contents and ow to Use This Guide table of contents ow to Use This Guide. 2 About the Anchorplex System.
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 416 NOVEMBER 2018 (Formerly OPSS 416, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 416 COMMON, November 2013 with no technical
More informationITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES
AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,
More informationStage 4 Geotechnical Investigations Information Sheet
Stage 4 Geotechnical Investigations Information Sheet Geotechnical specialists will use a range of equipment to examine ground conditions by either excavating small shallow test pits of soil, using a mechanical
More informationCONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF
More informationSECTION 14 EMBANKMENT
SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of
More informationBuilding. Anchorplex. Retaining Wall Systems
Building Anchorplex Retaining Wall Systems Table of Contents and Introduction table of contents ow to Use This Guide 2 About the Anchorplex System 2 Anchorplex System Material Specifications 3 Anchorplex
More informationBILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI
Item No. Civil Works:- BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Description Qty. Unit Rate Amount 1 Granite Cladding near entrance. Providing and fixing to the 110 wall after preparing
More informationENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1
ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Tender No. NERO/MMD/57/ Date: 27..208 Tender for Construction of Border Road works from BP NO FROM 822/2S to 825/M at Panisagar sector along
More informationSECTION 303 CULVERTS
303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the
More informationConstruction Specification for Concrete Unit Pavers
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS
More informationJericho Agro Industrial Park
Bill. 1 Excavation Earth Works and Embankment Work 1 Description Unit QTY Price/ Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for
More informationVolume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali
Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at
More informationSECTION EXCAVATION AND FILL
SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING TABLE OF CONTENTS 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS
More informationCW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS
CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4
More informationOweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B
Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS
CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSchedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.
Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. QUOTED SL NO D E S C R I P T I O N OF ITEM UNIT Quantity IN Figures
More informationTable 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre
CASE STUDY CONSTRUCTION OF HIGH ROAD EMBANKMENT OVER THICK SOFT SILTY CLAY- A CASE STUDY Radhakrishnan R, Geo-Enviro Engineers P Ltd, Chennai, Tamil Nadu, India, 044-24483522, geoenviro2012@gmail.com.
More informationGUJARAT TECHNOLOGICAL UNIVERSITY Office Address: GTU Campus, Sabarmati Koba Highway, Nr. Visat Three Roads, Chandkheda, Ahmedabad
GUJARAT TECHNOLOGICAL UNIVERSITY Office Address: GTU Campus, Sabarmati Koba Highway, Nr. Visat Three Roads, Chandkheda, Ahmedabad 382 424 DETAILED TENDER NOTICE No. 13/2018-19 The Gujarat Technological
More informationSpecial Provision No. 405F03 March 2005
PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and
More informationSCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road
Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 2008 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS
More informationSpecial Provision Item P-152 Excavation and Embankment
Special Provision Item P-152 Excavation and Embankment DESCRIPTION This item shall be constructed in conformity with FAA Standard Specification "Item P-152 Excavation and Embankment, except as herein modified
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationSECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS
SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which
More informationVNIT campus, Nagpur-10
Invitation to Offer Name: Procurement of FRP security cabins for IIM Nagpur at MIHAN Campus. Name of bidder & Address: Inquiry Ref. No. IIMN/Estate./01/2017-18 dated 19/02/18 Submission of quotation: on
More informationCONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 771 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE TABLE OF CONTENTS 771.01 SCOPE 771.02 REFERENCES 771.03 DEFINITIONS 771.04
More informationAmendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 493 September 2017 Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water
More informationSection 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS
TABLE OF CONTENTS 5.22 SUPPLY AND INSTALL SMOOTH WALL STEEL PIPES... 1 5.22.1 GENERAL... 1 5.22.2 MATERIALS... 1 5.22.2.1 Culvert Material... 1 5.22.2.2 Material for Bedding, Backfill and Sealing... 1
More informationCity of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion
City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01
More informationConstruction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis.
ESTIMATE OF QUANTITIES Bid Item Number Item Quantity Unit 009E0010 Mobilization Lump Sum LS 120E0100 Unclassified Excavation, Digouts 100 CuYd 260E1030 Base Course Salvaged 2,351.0 Ton 270E0040 Salvage
More informationCITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL
CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor
More information- Earthwork Operations & Equipments
- Earthwork Operations & Equipments Earthwork Operations Those construction processes that involve the soil or earth in its natural form and that precede the building of the pavement structure itself Basic
More informationHUITEX GEOCELL INSTALLATION MANUAL
Table of Contents 1 Site Preparation 2 Installation for the Retaining Wall 2.1 Base Preparation 2.2 Footing Installation 2.3 Placement of the Drainage System 2.4 Placement of the HUITEX Geocell panels
More informationL.S. 1. m 600. No No. 400
, S.No Field Work : Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 3 4 5 6 7 Setting up site organization including complete mobilization of personnel, equipment & accessories as per specification,
More informationTOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT
TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74
More informationNATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ NORTH EASTERN REGIONAL CENTRE, Jawaharnagar, Khanapara, Guwahati
NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ NORTH EASTERN REGIONAL CENTRE, Jawaharnagar, Khanapara, Guwahati-781022 Notice Inviting Tender Sealed tenders are invited from the competent firms
More informationG&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW.
Page 1 of 4 WORK INSTRUCTIONS FOR ENGINEERS Compiled by Checked by Approved by KYW : : TYC : LSS OP-3-57. (ROCK EXCAVATION) Page 2 of 4 NO. CHECKLIST ITEMS PROJECT Project Name : Project No.: Checked By
More informationTITAN SERIES BOLLARDS. Installation Guidelines
TITAN SERIES BOLLARDS Installation Guidelines Titan 2 General installation guidelines 1.0 Bollard barrier foundation Determine vehicle barrier location and prepare excavation/foundation for insertion of
More informationFeatures Include: Near Vertical Walls Do it Yourself No Concrete Footings Required
Features Include: Near Vertical Walls Do it Yourself No Concrete Footings Required Tel: Office: +27 (0)11 964 2995 Fax number: +27 (0)86 601 6692 info@dsmmasonry.co.za www.dsmmasonry.co.za Range three
More informationThe developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.
SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and
More informationCENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chithranjali Hills, Thiruvallom, Thiruvananthapuram-27
CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chithranjali Hills, Thiruvallom, Thiruvananthapuram-27 RE-TENDER FOR DEMOLISHING THE EXISTING BRICK WALL OF THE WATER TANK AND FOR RECONSTRUCTING THE
More information1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment
1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related
More information