Category Minimum Standards Recommended Standards

Size: px
Start display at page:

Download "Category Minimum Standards Recommended Standards"

Transcription

1 SITE AREAS Parking and Access - Service / Delivery Parking and Access - Staff Parking and Access - Visitors Street Frontage Sidewalks Quantity: 1 delivery vehicle stall, 12' wide. Type: Asphalt, 20-year life. Location: Delivery stall adjacent to building. Quantity: 12 stalls, 9' wide. Type: Asphalt, 20-year life. Location: Adjacent to or across street from building. Quantity: 4 stalls, 9' wide, ADA compliant. Type: Asphalt, 20-year life. Location: Adjacent to building. Type: 5' wide with ADA compliant curb cuts, asphalt. Quantity: 1 delivery stall 12' wide. 1 maintenance vehicle stall, 10' wide. Type: 30-year life. Location: Delivery and maintenance stalls adjacent to building. Quantity: 24 stalls, 9' wide. Type: Asphalt, 30-year life. Location: Adjacent to building. Quantity: 6 stalls, 9' wide, ADA compliant. Type: 30-year life. Location: Adjacent to building. Type: 6' wide with ADA compliant curb cuts, concrete. On-Site Walkways Type: 5' wide with ADA compliant curb cuts, asphalt. Type: 6' wide with ADA compliant curb cuts, concrete. Stairs and Ramps Type: 4' wide, ADA compliant, concrete. Type: 5' wide, ADA compliant, concrete with abrasive stair nosings at stairs and detectible warning pattern at ramps. Lawns Dumpster Area SITE IMPROVEMENTS Fences and Gates Pipe Rail Gates and Railings Type: Irrigated grass turf. Location: At front of building, street frontage, and adjacent to landscape areas where suitable. Type: Designated area to accommodate one 4 YD garbage dumpster and one 4 YD recycle dumpster. Location: Close to exterior door with direct access for refuse trucks. Type: Chainlink fencing at perimeter of property where adjacent to other property. 12' wide chainlink gates at all fence areas for direct vehicle access. Height: 6' high. Gates: 12' wide made from galvanized steel pipe with padlock hardware and reflective warning tape. Located at driveway access to staff parking lots that are not available for public use after work hours. Railings: Made from galvanized steel pipe. Type: Irrigated grass turf with concrete mow strip around posts and hydrants and where grass is adjacent to building. Location: At front of building, street frontage, and adjacent to landscape areas where suitable. Type: Designated area to accommodate one 4 YD garbage dumpster and one 4 YD recycle dumpster with screen walls on three sides. Location: Close to exterior door with direct access for refuse trucks. Type: Chainlink fencing at perimeter of property where adjacent to other property. 16' wide chainlink gates at all fence areas for direct vehicle access. Height: 6' high. Gates: 16' wide made from galvanized steel pipe with padlock hardware and reflective warning tape. Located at driveway to staff parking lots that are not available for public use after work hours. Railings: Made from galvanized steel pipe, ADA compliant. Retaining Walls Type: Concrete, segmental block or rockery. Type: Concrete, segmental block or rockery. Bicycle Racks None. Quantity: One rack with capacity for 6 bicycles. Type: Galvanized "ribbon" metal. Location: Adjacent to building. Dumpsters Quantity: One 4 YD garbage dumpster and one residential recycle container. Location: At dumpster area close to building. Quantity: One 4 YD garbage dumpster and one 2 YD recycle dumpster. Location: At dumpster area close to building. Exterior Benches None. Quantity: 1 at front of building. Type: Durable non-wood bench. 11/19/2008 AA - Standards - Facility Components Page 1 of 12

2 None. Exterior Waste Receptacles Quantity: One at main entry. Type: Painted metal container with push door dome top. Flag Pole Traffic Control Signs Type: 20' painted metal. Location: Front of building and accessible from hard surface. Type: As needed for traffic and parking control. Location: At HC parking stalls, maintenance parking stalls, delivery vehicle stalls and parking lots. Type: 20' spun aluminum. Location: Front of building and accessible from hard surface. Type: As needed for traffic and parking control. Location: At HC parking stalls, maintenance parking stalls, delivery vehicle stalls and parking lots. Pavement Markings Type: Painted lines for cross walks, stop bars, traffic arrows, parking stalls, HC parking symbols, and fire lanes. Location: At parking lots and entry driveways. Type: Painted lines for parking stalls, HC parking symbols, and fire lanes. Thermoplastic markings for cross walks, stop bars and traffic arrows. Location: At parking lots and entry driveways. LANDSCAPING Shrubs / Groundcover Trees Irrigation System Type: As required by landscape ordinance, as needed for attractive appearance, and as approved by school district grounds department with automated irrigation system. Location: At building perimeter, parking lot islands, and perimeter landscape buffers. Type: As required by landscape ordinance, as needed for attractive appearance, and as approved by school district grounds department. Location: At lawn areas, street frontage, parking lot islands, and perimeter landscape buffers. Type: Automated system with separate water meter. Location: At lawns and landscape areas. Type: As required by landscape ordinance, as needed for attractive appearance, and as approved by school district grounds department with automated irrigation system. Location: At building perimeter, parking lot islands, and perimeter landscape buffers. Type: As required by landscape ordinance, as needed for attractive appearance, and as approved by school district grounds department. Location: At lawn areas, street frontage, parking lot islands, and perimeter landscape buffers. Type: Automated system controlled by EMS with separate water meter. Location: At lawns and landscape areas. UTILITIES Water System Sanitary Sewer System Type: Ductile iron pipe with separate domestic and fire service systems, deduct meter for irrigation system, backflow preventer and FDC on fire system. Size: As required for flow requirements. Location: As required by local water purveyor. Type: PVC or concrete pipe with positive slope in compliance with Dept. of Ecology "Orange Book". Size: 6" diameter side and main sewer. Location: As required by local sewer purveyor with manhole structures easily accessible for maintenance. Type: Ductile iron pipe with separate domestic and fire service systems, separate (non-deduct) meter for irrigation system, backflow preventer and FDC on fire system. Supplemental electronic meters for domestic and irrigation systems located in Main Mechanical Room and connected to EMS. Size: As required for flow requirements. Location: As required by local water purveyor with domestic and irrigation meters located close to building. Type: PVC pipe with ductile iron pipe where cover is less than 24". Positive slope in compliance with Dept. of Ecology "Orange Book" and locking manhole covers.. Size: 6" diameter side and 8" diameter main sewer. Location: As required by local sewer purveyor with manhole structures easily accessible for maintenance. 11/19/2008 AA - Standards - Facility Components Page 2 of 12

3 Storm Drainage System Type: Concrete pipe, ductile iron, PVC or corrugated Type: PVC or corrugated polyethylene pipe with polyethylene pipe. ductile iron pipe where cover is less than 24". Locking Size: 4" diameter footing and roof drains. 8" diameter grates and Type 2 manhole structures where invert is site storm drains. deeper that 60". Clean outs at the base of all Location: As required by local jurisdiction with downspouts and at ends of roof and footing drain lines. drainage structures easily accessible for maintenance. Size: 6" diameter footing and roof drains. 8" diameter site storm drains. Location: As required by local jurisdiction with drainage structures easily accessible for maintenance. Natural Gas Service Fuel Storage Tanks Electrical Service Telephone Service Internet Connection Energy Usage - MBTUs per SF Building Area Water Usage - Domestic Water per SF Building Area Water Usage - Irrigation Water per SF Landscape Area Type: Capacity as required for building gas load provided in inches or pounds. Location: Underground with gas meter adjacent to exterior wall of building. Underground storage tanks: Steel with corrosionresistant coating. Locate close to equipment receiving fuel and below an area that is accessible for future excavation. Above ground storage tanks: Steel with corrosion protection and secondary containment area. Locate close to equipment receiving fuel. Type: As required for calculated electrical load. Location: Underground. Type: 6 voice grade Centrex lines. Size: 2" conduit. Location: Underground. Type: One T1 line with 1.54 MB bandwidth. Location: Underground. Annual usage:.0230 MBTUs per SF. Annual usage: Average of last three years. Annual usage: Average of last three years. Type: Capacity in pounds as required for building gas load with a minimum of 2 pounds and supplemental electronic meter located in Main Mechanical Room and connected to EMS. Location: Underground with gas meter adjacent to exterior wall of building. Underground storage tanks: Not acceptable. Above ground storage tanks: Steel with corrosion protection and secondary containment area. Locate close to equipment receiving fuel. Type: As required for calculated electrical load plus 15% spares with fully coordinated over current protection. Location: Underground. Type: 6 voice grade Centrex lines. Size: Two 4" conduit. Location: Underground. Type: Optical fiber with a 100 MB bandwidth. Location: Underground with spare 4" conduit for future expansion. Annual usage:.0184 MBTUs per SF. Annual usage: 80% of the average of the last three years. Annual usage: 80% of the average of the last three years. STRUCTURE Foundation Floor Structure Wall Structure - Bearing Walls Wall Structure - Non Bearing Walls Roof Structure Design Criteria: Built in compliance with ASCE or Benchmark Buildings standards. Design Criteria: Built in compliance with ASCE or Benchmark Buildings standards. Design Criteria: Built in compliance with ASCE or Benchmark Buildings standards. Design Criteria: Built in compliance with ASCE or Benchmark Buildings standards. Design Criteria: Built in compliance with ASCE or Benchmark Buildings standards. Design Criteria: Built in compliance with building structural code currently in effect. Design Criteria: Built in compliance with building structural code currently in effect. Design Criteria: Built in compliance with building structural code currently in effect. Design Criteria: Built in compliance with building structural code currently in effect. Design Criteria: Built in compliance with building structural code currently in effect. 11/19/2008 AA - Standards - Facility Components Page 3 of 12

4 BUILDING ENVELOPE Floors Ground level: Reinforced concrete slab-on-grade with vapor retarder and capillary break. Upper levels: Wood framing with plywood subfloor. Ground level: Reinforced concrete slab-on-grade with vapor retarder and capillary break. Upper level: Reinforced concrete over wood or metal decking. Exterior Wall Surface Type: Cement board siding, metal siding, concrete or window wall. Type: Masonry. Exterior Wall Insulation Type: R-11. Type: R-19 or greater if required by code. Exterior Windows Exterior Doors Quantity: 20 SF of glazing at each office, 20 SF of glazing at small conference rooms, and 40 SF of glazing at large conference rooms. Type: Fixed or operable sash metal frames with dual glazing. Location: At all offices and conference rooms. Type: Solid core wood or 16-gauge painted hollow metal doors. Location: As required for ease of circulation and fire exiting. Size: 3' x 6'-8" except 3'-6" x 6'-8" door at loading dock and a pair of 3' x 6'-8" doors with removable mullion at exterior door of mechanical equipment spaces. Quantity: 24 SF of glazing at each office, 24 SF of glazing at small conference rooms, and 48 SF of glazing at large conference rooms. Type: Operable sash prefinished aluminum frames with 1/4" dual glazing, low E coating, and U-value less than 40. Location: At all offices and conference rooms. Type: 14-gauge hollow painted hollow metal door with hollow metal frame and U-value less than 40. Location: As required for ease of circulation and fire exiting. Size: 3' x 7' except oversized door at loading dock and a pair of 3' x 7' doors with removable mullion at exterior door of mechanical equipment spaces. Soffits Type: Painted wood. Type: Painted MDO plywood or prefinished metal. Flashing Type: Painted metal. Type: Pre-finished 24-gauge sheet metal. Trim Type: Painted wood. Type: Pre-finished 24-gauge sheet metal. Gutters and Downspouts Roof Membrane Gutters: Painted metal located at edge of roof. Downspouts: Painted PVC or metal. Low-sloped roof: Built-up roofing with mineral cap sheet. Pitched roof: 30-year fiberglass composition shingles. Gutters: Pre-finished 22-gauge sheet metal field formed in continuous lengths located at edge of roof. Downspouts: Pre-finished 11-gauge sheet metal with rain diverters at roof valleys and connected to storm drainage system or rain garden. Low-sloped roof: Single-ply Hypolon membrane. Pitched roof: Pre-finished 24-gauge metal. Roof Insulation Type: R-19. Type: R-38 or greater if required by code, installed at roof level. Roof Accessories Skylights Fall Arrest System Type: Painted metal. Location: Minimum 5' separation from roof drains, edges and valleys. Type: Translucent glazing and 300-pound point load capacity. Type: Fall protection roof anchors in compliance with UMC, WISHA and OSHA standards. Location: In compliance with WISHA and OSHA standards. Type: Pre-finished metal with protected electrical receptacle at all mechanical equipment. Location: Minimum 10' separation from roof drains, edges and valleys. Type: Translucent, dual-surface, reinforced plastic glazing with pre-finished aluminum frame and 300- pound point load capacity. Type: Fall protection roof anchors and railings in compliance with UMC, WISHA and OSHA standards. Location: In compliance with UMC, WISHA and OSHA standards. 11/19/2008 AA - Standards - Facility Components Page 4 of 12

5 INTERIORS Floors - Corridors and Stairs Type: VCT or synthetic pile carpet with synthetic backing. Loose laid walk off mats with synthetic pile. Location: VCT or carpet at corridors and stairs. Walk off mats at exterior doors. Type: Synthetic pile carpet with polypropylene / vinyl backing. Glue-down walk off mats with synthetic pile and polypropylene / vinyl backing. Location: Carpet at corridors and stairs. Walk off mats at exterior doors. Floors - Offices Carpet: Synthetic pile with synthetic backing. Carpet: Synthetic pile with polypropylene / vinyl backing. Floors - Restrooms Type: Sheet vinyl or seamless resin flooring. Type: Sheet vinyl or unglazed ceramic tile. Floors - Support Spaces Walls - Corridors and Stairs Carpet: Synthetic pile with synthetic backing at reception areas, conference rooms, and staff lounge. VCT: 12" x 12" tile at storage and work rooms. Concrete: Sealed concrete at custodial, telecommunications, mechanical and electrical rooms. Plywood: Plywood floor deck at catwalks and mechanical attics in wood frame buildings. Gypsum wallboard: Painted wallboard at corridors, stairs and entry areas. Carpet: Synthetic pile with polypropylene / vinyl backing at reception areas, conference rooms, staff lounge and work rooms. VCT: 12" x 12" tile at storage and telecommunications rooms. Sheet vinyl: Vinyl sheet flooring at custodial rooms. Concrete: Sealed concrete at mechanical and electrical rooms, and at catwalks and mechanical attics in metal frame buildings. Plywood: Plywood floor deck at catwalks and mechanical attics in wood frame buildings. Gypsum wallboard: Painted wallboard above wainscot in corridors, stairs, and entry areas. Wainscot: Painted veneer plaster, plastic laminate or MDF plywood at corridors, stairs and entry areas. Walls - Offices Type: Painted gypsum wallboard. Type: Painted gypsum wallboard. Walls - Restrooms Gypsum wallboard: Painted wallboard above wainscot. Wainscot: Plastic laminate or ceramic tile behind lavatories and toilet fixtures. Gypsum wallboard: Painted wallboard above wainscot. Wainscot: Plastic laminate or ceramic tile at all walls. Walls - Support Spaces Gypsum wallboard: Painted wallboard. Gypsum wallboard: Painted wallboard. Wainscot: MDO or MDF wainscot in storage rooms 4' high. Asbestos-Containing Materials Criteria: Asbestos-containing building materials present in a facility shall be intact, undisturbed and included in an asbestos management plan in compliance with AHERA regulations. Criteria: Asbestos-containing building materials shall not be present. Interior Doors Type: Solid core wood doors. Type: Solid core wood doors. Door Hardware Automatic Door Opener Locksets: Schlage or Corbin with keying that matches the school district's Schlage or Corbin Master Key system. Type: ADA compliant with keyed power shut off at door. Location: At main entry door. Closers and handles: ADA compliant. Door mullions: Removable and secured with key. Locksets: Schlage with Primus at exterior doors and keying that matches the school district's Schlage Great Grand Master Key system. Type: ADA compliant with keyed power shut off at door. Location: At main entry door. 11/19/2008 AA - Standards - Facility Components Page 5 of 12

6 Interior overhead doors and grilles: Manually operated up to 6' wide. Motorized operation when over 6' wide. Fire-rated overhead doors and grilles shall be activated by local smoke or heat detectors. Exterior overhead doors and grilles: Manually operated. Overhead Doors and Grilles Interior overhead doors and grilles: Manually operated up to 6' wide. Motorized operation when over 6' wide. Fire-rated overhead doors and grilles shall be activated by local smoke or heat detectors. Exterior overhead doors and grilles: Manually operated up to 10' wide. Motorized operation when over 10' wide. Interior Windows Type: Wood or metal frame with glazing in compliance with applicable building codes. Type: Wood or metal frame with glazing in compliance with applicable building codes. Operable Walls None. Type: Folding panel partition with minimum STC 52. Location: At large conference rooms. Ceilings - Corridors and Stairs Ceilings - Offices Ceilings - Restrooms Type: Surface applied acoustical ceiling tile or suspended acoustical ceiling panels. Height: Minimum 9'. Type: Surface applied acoustical ceiling tile or suspended acoustical ceiling panels. Height: Minimum 8'. Type: Surface applied or suspended acoustical ceiling tile. Height: Minimum 8'. Type: Surface applied acoustical ceiling tile or 2' x 2' suspended acoustical ceiling panels. Height: Minimum 10'. Type: Surface applied acoustical ceiling tile or suspended acoustical ceiling panels. Height: Minimum 9'. Type: Painted gypsum board. Height: Minimum 9'. Ceilings - Support Spaces Gypsum board: Custodial and mechanical rooms, minimum 8'-6" high. Acoustical ceiling: Surface applied or suspended acoustical ceiling tile in conference rooms, staff lounge, storage and workrooms, minimum 8' high. Gypsum board: Custodial and mechanical rooms, minimum 9' high. Acoustical ceiling: Surface applied or suspended acoustical ceiling tile in conference rooms, public meeting, staff lounge, storage and workrooms, minimum 9' high. EQUIPMENT AND SPECIALTIES Marker Boards Quantity: One 4' board at small conference rooms. One 8' board at large conference rooms. Type: Ceramic coated steel. Quantity: One 4' board at small conference rooms. One 8' board at large conference rooms. Type: Ceramic coated steel. Tackboards Exterior Signage Interior Signage Toilet Partitions Toilet Accessories Quantity: 4' at offices and workrooms, 8' at staff lounge, 4' at small conference rooms, and 8' at large conference rooms. Type: Cedar, cork or vinyl-covered cork. Type: Pre-finished lettering at front of building identifying building name and street number. Type: High impact acrylic room signs with room name and number. Location: Room sign at main entry door to all rooms. Type: Plastic laminate covered fiber board. Location: Partitions at toilet stalls. Type: Mirrors, paper towel dispensers, soap dispensers, grab bars, tampon dispensers and sanitary napkin receptacles. Location: Mirrors at restroom hand wash areas. Paper towel and soap dispensers at all sinks. Grab bars at ADA accessible toilet stalls. Tampon dispenser and sanitary napkin receptacle at women's restrooms. Quantity: 8' at offices and workrooms, 8' at staff lounge, 4' at small conference rooms, and 8' at large conference rooms. Type: Cork or vinyl-covered cork. Type: Pre-finished metal lettering at front of building identifying building name and address. Type: ADA compliant high impact acrylic room signs with room name and number. Cast metal dedication plaque. Location: Room sign at main entry door to all rooms. Dedication plaque at entry lobby. Type: Plastic laminate covered phenolic panels. Location: Partitions at toilet stalls and screens at urinals. Type: ADA compliant mirrors, paper towel dispensers, soap dispensers, grab bars, tampon dispensers and sanitary napkin receptacles. Location: Mirrors at restroom hand wash areas. Paper towel and soap dispensers at all sinks. Grab bars at ADA accessible toilet stalls. Tampon dispenser and sanitary napkin receptacle at women's restrooms. 11/19/2008 AA - Standards - Facility Components Page 6 of 12

7 Residential Appliances Type: Residential grade. Type: Residential grade, ADA compliant and Microwave oven: Portable microwave in staff lounge. ENERGY STAR qualified. Refrigerator: One large capacity refrigerator with Ranges: Electric range with oven at staff lounge. freezer compartments in staff lounge. Exhaust hoods: Electric exhaust fan with removable and cleanable filters above range in staff lounge. Microwave ovens: Portable microwave in staff lounge. Refrigerator: One large capacity refrigerator with freezer compartment in staff lounge. Projection Screens Window Covering Cabinets - Offices Cabinets - Support Spaces Equipment - Large Conference Rooms Equipment - Offices Equipment - Workrooms Furniture - Conference Rooms Furniture - Offices Furniture - Reception Areas Large conference rooms: 60" W x 60" H with manual operation. Type: Horizontal louver blinds or roller shades at exterior windows. Horizontal louver mini-blinds at interior relite windows at offices. Type: 3/4" thick panels with plastic laminate surfaces, PVC edge band, locks keyed to a master system. Quantity: As needed to accommodate office use. Type: 3/4" thick panels with plastic laminate surfaces, PVC edge band, locks keyed to a master system. Quantity: As needed to accommodate support space use. Audio Visual Cart: Cart with computer and LCD Projector for each large conference room. Computers: One computer, not exceeding 5 years in age, for each staff member. Printers: One laser printer, not exceeding 8 years in age, for each staff member. Copy Machines: One 72 copies per minute machine, not exceeding 7 years in age. FAX Machine: One machine, not exceeding 10 years in age. Chairs: Hard plastic stacking chairs not exceeding 30 years in age at conference tables. Conference tables: Plastic laminate surfaced tables not exceeding 30 years in age. Staff Chairs: Upholstered not exceeding 20 years in age. Staff Desks: Plastic laminate surfaced not exceeding 30 years in age. Tables: Plastic laminate surfaced not exceeding 30 years in age. File Cabinets: Metal not exceeding 40 years in age. Chairs: Five upholstered chairs and two moveable upholstered chairs at work counter. Large conference rooms: 72" W x 72" H with manual operation. Type: Horizontal louver blinds at exterior windows. Horizontal louver mini-blinds at interior relite windows at offices. Type: 3/4" thick panels with plastic laminate surfaces, PVC edge band, and locks keyed to the building master key system. Quantity: As needed to accommodate office use. Type: 3/4" thick panels with plastic laminate surfaces, PVC edge band, locks keyed to the building master key system. Quantity: As needed to accommodate support space use. Audio Visual Cart: Cart with computer, LCD Projector and document camera for each large conference room. Computers: One computer, not exceeding 4 years in age, for each staff member. Printers: One laser printer, not exceeding 6 years in age, for each staff member. Copy Machines: One networked, 72 copies per minute machine, not exceeding 7 years in age. FAX Machine: One machine, not exceeding 10 years in age. Chairs: Hard plastic stacking chairs not exceeding 25 years in age at conference tables. Conference tables: Plastic laminate surfaced tables not exceeding 25 years in age. Staff Chairs: Upholstered not exceeding 15 years in age. Staff Desks: Plastic laminate surfaced not exceeding 20 years in age. Tables: Plastic laminate surfaced not exceeding 25 years in age. File Cabinets: Metal not exceeding 30 years in age. Chairs: Six upholstered chairs and two moveable upholstered chairs at work counter. Work counter: 4' work counter. Furniture - Staff Lounge Chairs: 6 hard plastic stacking chairs not exceeding 25 years in age. Two upholstered lounge chairs not exceeding 25 years in age. Tables: One plastic laminate surfaced 36" x 72" table not exceeding 30 years in age. Chairs: 12 upholstered hard plastic stacking chairs not exceeding 20 years in age. Two upholstered lounge chairs not exceeding 20 years in age. Tables: Two plastic laminate surfaced 36" x 72" tables not exceeding 25 years in age. 11/19/2008 AA - Standards - Facility Components Page 7 of 12

8 Furniture - Workrooms Tables: Plastic laminate surfaced not exceeding 30 Tables: Plastic laminate surfaced not exceeding 25 years in age. years in age. File Cabinets: Metal not exceeding 40 years in age. File Cabinets: Metal not exceeding 30 years in age. Artwork and Photographs Elevator Vending Machines Corridors and entry foyer: Permanent artwork and photographs subject to approval of building administrator. Type: Hydraulic with acoustically isolated equipment room. Size: 68" W x 50" D interior cab size. Type: Refrigerated or non-refrigerated machines with motion sensitive illumination control. Quantity: 1 machines. Location: At corridor area near or within staff lounge. Corridors and entry foyer: Permanent artwork and photographs subject to approval of building administrator. Type: Hydraulic with acoustically isolated equipment room. Size: 80" W x 50" D interior cab size. Type: Refrigerated and non-refrigerated machines with motion sensitive illumination control. Quantity: 2 machines. Location: At corridor area near or within staff lounge. MECHANICAL Fire Suppression System Plumbing Insulation Domestic Water System Domestic Water Quality Fire sprinkler system: Wet or dry system in compliance with NFPA 13, and local building codes. Fire suppression: Chemical fire suppression system at computer equipment room. Type: Insulation in compliance with building code at time of construction on domestic hot water lines. Piping: Type L copper. Pumps: Bronze fitted pumps. Heating: Gas or electric heaters. Criteria: A maximum level of.015 mg/l (15ppb) of lead and 1.3 mg/l (1300 ppb) of copper in tap water. Fire sprinkler system: Wet system in compliance with NFPA 13, local building codes and FM Global Data Sheets 2-8 and 3-6. Fire suppression: Chemical fire suppression system at computer equipment room. Type: Insulation in compliance with current building code on domestic hot water lines and 1/2" insulation on domestic cold water lines. Piping: Type L copper. Pumps: All bronze pumps with isolation valves at both sides of pumps. Heating: Gas heaters. Criteria: A maximum level of.015 mg/l (15ppb) of lead and 1.3 mg/l (1300 ppb) of copper in tap water. Soil and Waste Type: Cast iron pipe and fittings. Type: Cast iron pipe and fittings. Plumbing Fixtures Natural Gas Piping HVAC Duct Insulation HVAC Pipe Insulation Water closets: Vitreous china. Urinals: Vitreous china. Lavatories: Vitreous china wall-hung sinks and stainless steel counter-mounted sinks. Drinking fountains: Vitreous china or stainless steel. Trap primers: None. Type: Black steel, Schedule 40 pipe with butt-weld fittings. Type: In compliance with building code at time of construction. Type: In compliance with building code at time of construction. Water closets: ADA compliant, wall-hung vitreous china with water saving valves. Urinals: ADA compliant, wall-hung vitreous china with water saving valves. Lavatories: ADA compliant, vitreous china wall-hung sinks and stainless steel counter-mounted sinks with self-closing faucets. Drinking fountains: ADA compliant, stainless steel. Trap primers: Electronic trap primers with manual override. Type: Black steel, Schedule 40 pipe with butt-weld fittings. Type: In compliance with current building code. Type: In compliance with current building code. Hydronic Piping Type: Type L copper or Schedule 40 black steel. Type: Type L copper at piping below 2" diameter. Schedule 40 black steel at 2" diameter piping and above with welded or rolled grooved Victaulic fittings. Hydronic Pumps Type: Vertical in-line or base mounted end-suction pumps. Type: Vertical in-line or base mounted end-suction pumps with redundant pumps for back-up. 11/19/2008 AA - Standards - Facility Components Page 8 of 12

9 Refrigerant Piping Type: Type L hard drawn copper tube, refrigeration Type: Type L hard drawn copper tube, refrigeration grade. grade. HVAC Ductwork HVAC Fans Metal ducts: Galvanized sheet metal. Non-metal ducts: Insulated, reinforced flexible duct with vapor barrier jacket. Type: Forward curved or backward inclined units with 1" filters, non-asbestos flexible connections, standard motors, and belt guards. Metal ducts: Galvanized sheet metal per SMACNA Standards with welded stainless steel at Kitchen exhaust hoods. Non-metal ducts: Insulated, reinforced flexible duct with vapor barrier jacket allowed at locations approved by school district. Type: Forward curved or backward inclined units with neoprene flexible connections, high efficiency motors, belt guards, minimum two rows of coils, drain valves, and 2" filters contained in factory-built filter rack. HVAC - Conference Rooms HVAC - Offices HVAC - Workroom HVAC - Support Spaces Type: Temperature control shared by common areas, minimum 15% outside air supply, and mechanical cooling. Type: Temperature control shared by common areas, minimum 15% outside air supply, and mechanical cooling. Type: Individual temperature control and high capacity ventilation system where high volume photocopy machines are used. Type: Heating and ventilation systems capable of maintaining comfortable temperature range and ventilation. Type: Temperature control shared by common offices, minimum 20% outside air supply, and mechanical cooling. Type: Temperature control shared by common offices, minimum 20% outside air supply, and mechanical cooling. Type: Individual temperature control and independent high capacity ventilation system where high volume photocopy machines are used. Type: Heating and ventilation systems capable of maintaining comfortable temperature range and providing ventilation supply in compliance with current codes. Air Terminal Units Type: Steel or aluminum units. Type: Steel or aluminum units with bird screens at intakes. Boilers Type: Single gas fired hot water or steam boiler. Type: Dual hot water, gas-fired, fire-tube, minimum 82% efficient, steel boilers each sized for 66% of load. Furnaces Type: Gas fired with 80% efficiency. Type: Gas fired with minimum 80% efficiency. Heat Exchangers Type: Plate-type with 50% efficiency. Type: Plate-type with 66% efficiency. Water Chillers Type: Air cooled with dual compressors. Type: Dual air cooled units with minimum of 2 compressors each and sound attenuation treatment. Exhaust Fans Heat Pumps Fan Coil Units Unit Ventilators Type: Steel utility or aluminum dome type. Location: Easily accessible for maintenance. Type: Air cooled units. Location: One unit per zone. Type: Units with steel housing, minimal filters, and no outside air. Type: Units with heavy-duty steel housing and capacity based on code required CFM. Type: Steel utility or aluminum dome type. Location: Non-kitchen exhaust fans located in catwalk or mechanical attic area, not on roof. Type: Air cooled units with automatic compressor lock out. Location: One unit per zone. Type: Units with steel housing, 1" filters, and damper controlled outside air. Type: Units with heavy-duty steel housing, capacity based upon code required CFM, factory installed access panels and filter racks, and NC-35 sound rating. 11/19/2008 AA - Standards - Facility Components Page 9 of 12

10 Unit Heaters Type: Propeller type gas or hot water units. Type: Propeller type gas or hot water units. Automatic Controls ELECTRICAL Type: Direct digital control system with individual zone control and thermostat for each instructional space and office area, Local Operator's Station at building's Maintenance Office, and connected to Central Operator's Station at Support Services Center. Type: Direct digital control system with BACnet automation system, individual zone control and thermostat for each instructional space and office area, Dynamic Data exchange, Local Operator's Station at building Maintenance Office, and connected to Central Operator's Station at Support Services Center. Transformers Type: Dry type with capacity for calculated load. Type: Low noise, dry type with capacity for calculated load plus 20%. Switchgear Type: Fuse or circuit breaker type with capacity for calculated load. Type: Fuse or circuit breaker type with capacity for calculated load plus 15% and includes 15% spares. Panel boards Type: Circuit breaker type. Type: Circuit breaker type with 15% spares. Power Distribution Type: Copper for #1 wire or less. Copper or aluminum for wire greater that #1. Type: Copper wire. Power Conditioning None. Type: Transient voltage surge suppressors. Location: At panel boards for protection of lighting, receptacles and computers. Wiring Devices Type: 15 or 20 amp. Type: 20 amp. Electrical Outlets - Offices Electrical Outlets - Support Spaces Quantity: One duplex electrical receptacle for each staff workstation, one for each copy and fax machine, plus one at each wall. Quantity: One duplex electrical receptacle for each electrical equipment item, one at every 80' on center in corridors, plus one at 15' on center at each wall. Quantity: Two duplex electrical receptacles for each staff workstation, one for each copy and fax machine, plus one at each wall. Quantity: One duplex electrical receptacles for each electrical equipment item, one at every 50' on center in corridors, plus one at 12' on center at each wall. Electrical Outlets - Workrooms Electrical Outlets - Emergency Power Circuit Protection Devices Quantity: One duplex electrical receptacle for each copy machine, fax machine, and postage meter, plus one at 8' on center at work counters and one at each wall. None. Type: Circuit breakers with fuses at selected equipment. Quantity: One duplex electrical receptacle for each copy machine, fax machine, and postage meter, plus one at 6' on center at work counters and one at each wall. Quantity: Duplex electrical receptacles connected to emergency generator at MC and HC Rooms, Main Mechanical Room, and main office area, and building administrator's office. Type: Circuit breakers with fuses at selected equipment. Packaged Generator None. Type: Diesel-fired with belly tank and minimum 48- hour operation capability with capacity to operate emergency lighting, stand-by lighting, fire alarm system, telecommunications equipment, and selected electrical outlets plus 10% additional capacity. Battery Equipment Type: Uninterrupted power supply for telephone, and energy management systems. Back-up battery for fire alarm system. Type: Uninterrupted power supply for telephone, and energy management systems. Back-up battery for fire alarm system. 11/19/2008 AA - Standards - Facility Components Page 10 of 12

11 Type: Pole or building mounted fixtures with 5.0 footcandle level controlled by photocell and EMS. Location: At front entrance between building and entry drive. Lighting - Exterior - Main Entry Type: Pole or building mounted fixtures with 8.0 footcandle level controlled by photocell and EMS. Location: At front entrance between building and entry drive. Lighting - Exterior - Parking Lighting - Exterior - Pathways Lighting - Exterior - Service / Delivery Lighting - Corridors Lighting - Emergency Lighting - Offices Lighting - Restrooms Lighting - Support Spaces Type: Pole mounted fixtures with 0.8 foot-candle level controlled by photocell and EMS. Location: At parking lots. Type: Pole or building mounted fixtures with 1.0 footcandle level controlled by photocell and EMS. Location: At pathways around building and between building and parking areas. Type: Pole or building mounted fixtures with 3.0 footcandle level controlled by photocell and EMS with manual bypass timer. Location: At area between building and dumpsters. Type: Fluorescent fixtures with a minimum 15 footcandle level and a maximum of 0.8 watts per SF. Interior Pathways: An average of 1 foot-candle level at floor level at all paths of egress with a minimum of 0.3 foot-candle level at the center of paths of egress. Standby Lighting: One standby light fixture connected to emergency generator in each office, restroom and mechanical equipment space. Type: Fluorescent fixtures with a minimum 50 footcandle level and a maximum of 1.3 watts per SF. Type: Fluorescent fixtures with a minimum 20 footcandle level and a maximum of 1.1 watts per SF. Type: Fluorescent fixtures with a minimum 50 footcandle level and a maximum of 1.3 watts per SF. Type: Pole mounted fixtures with 1.0 foot-candle level controlled by photocell and EMS. Location: At parking lots. Type: Pole or building mounted fixtures with 1.5 footcandle level controlled by photocell and EMS. Location: At pathways around building and between building and parking areas. Type: Pole or building mounted fixtures with 5.0 footcandle level controlled by photocell and EMS with manual bypass timer. Location: At area between building and dumpsters. Type: T-8, T-5 and compact fluorescent fixtures with a minimum 15 foot-candle level and a maximum of 0.6 watts per SF. Interior Pathways: An average of 1 foot-candle level at floor level at all paths of egress with a minimum of 0.3 foot-candle level at the center of paths of egress. Standby Lighting: One standby light fixture connected to emergency generator in each office, restroom and mechanical equipment space. Type: T-8 or T-5 fluorescent fixtures with parabolic louvers to control screen glare with a minimum 50 footcandle level and a maximum of 1.1 watts per SF. Type: T-8, T-5 and compact fluorescent fixtures with a minimum 20 foot-candle level and a maximum of 0.8 watts per SF. Type: T-8 or T-5 fluorescent fixtures with parabolic louvers to control screen glare with a minimum 50 footcandle level and a maximum of 1.1 watts per SF. Automatic Lighting Control Exit Signs Data Communications Cabling Data Communications Equipment Exterior lighting: Time clock and photocell control. Type: In compliance with building code at time of construction. Backbone: Optical fiber between MC and HC locations. Wiring: Category 3 cable between computer equipment and MC or HC. Filter: Granular site-based web content filtering. Router: 10 Mb WAN connectivity. Routing: Layer 3 capability in core switch at MC. Switch: 10 /100 / 1000 host capability. Traffic shaping: Site-based capability. WAN connectivity speed: 10 Mb. UPS: For routers, switches, and servers providing a minimum of 5 minutes of uninterrupted power. Exterior lighting: EMS and photocell control with separate zones. Interior lighting: Occupancy sensors corridors. Type: In compliance with current building code and connected to emergency generator. Backbone: 6 pair multimode optical fiber between MC and HC locations. Wiring: Category 5e below grade and Category 6 above grade between computer equipment and MC or HC. Filter: Granular site-based web content filtering. Router: 100 Mb WAN connectivity. Routing: Layer 3 capability in core switch at MC. Switch: 10 /100 / 1000 host capability. Traffic shaping: Site-based capability. WAN connectivity speed: 1,000 Mb. UPS: For routers, switches, and servers providing a minimum of 10 minutes of uninterrupted power. 11/19/2008 AA - Standards - Facility Components Page 11 of 12

12 Quantity: Two data outlets in each small conference room. Four data outlets in each large conference room. Data Communications Outlets - Conference Rooms Quantity: Two data outlets in each small conference room. Four data outlets in each large conference room. Data Communications Outlets - Offices Data Communications Outlets - Support Spaces Data Communications Outlets - Workrooms Wireless Data Communications Telephone System Quantity: One data outlet for each staff workstation and one for each printer. Quantity: One data receptacle for each computer station and one for each printer located within the space. Quantity: One data outlet for networked copy machine. None. Telephones: Digital PBX central exchange, voice mail system. Quantity: Two data outlets for each staff workstation and one for each printer. Quantity: One data receptacle for each computer station and one for each printer located within the space. Quantity: Two data outlets for networked copy machines plus two additional outlets at a perimeter wall. Type: Power and data outlets for secure wireless access and free-roaming capability at each floor of building. Telephones: Digital PBX central exchange, voice mail system. Television System None. Large conference rooms: One cable TV outlet in each room. Intrusion Detection None. Type: Multi-zone system with NAPCO control panel, keypad activation device, and passive infrared motion detectors. Location: Control panel in Maintenance office, keypad at main entry door. Detection devices in large office areas and corridors. Fire Detection and Alarm Type: Automatic detection system in compliance with building code at time of construction. Plastic guards with local alarm at pull stations. Location: Detection and alarm devices located in compliance with building code at time of construction and annunciator at front entry. Type: Automatic addressable alarm and detection system in compliance with current building code. Plastic guards with local alarm at pull stations. Location: Detection and alarm devices located in compliance with current building code, control panel and printer in Maintenance Office, and graphic annunciator at front entry. 11/19/2008 AA - Standards - Facility Components Page 12 of 12

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

Category Minimum Standards Recommended Standards

Category Minimum Standards Recommended Standards SITE AREAS Parking and Access - Buses Parking and Access - Service / Delivery Quantity: 2 stalls, 12' wide. Type: Asphalt, 20-year life. Location: Bus loading zone close to a building entrance. Quantity:

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

NC State University Design and Construction Guidelines Division 00 Planning & Design Space Planning

NC State University Design and Construction Guidelines Division 00 Planning & Design Space Planning 1.0 Purpose A. These guidelines provide requirements for the Designer and Contractor to follow related to space planning. 2.0 General Requirements A. Single Occupant Toilet Room Each new or renovated building

More information

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7 TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure

More information

Whitley Shower Locker Toilet Facilities

Whitley Shower Locker Toilet Facilities Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.com Building Type Building Code Whitley Shower Locker Toilet Facilities

More information

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8 TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance

More information

TABLE OF CONTENTS. (Δ = Rev 06/08)

TABLE OF CONTENTS. (Δ = Rev 06/08) TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)

More information

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 01 Project Title Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 00 21

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Northwestern Facilities

Northwestern Facilities Northwestern Facilities NU Master Specification - Issuances Record & Summary of Changes Only the most current version of an NU Master Specification is included as a PDF for download on this website. The

More information

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free / / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary

More information

SPACE TYPE: ENHANCED OFFICE

SPACE TYPE: ENHANCED OFFICE SPACE TYPE: ENHANCED OFFICE Construction Criteria The unit costs for Enhanced Office space types are based on the construction quality and design features in the following table. This information has been

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

Exhibit A Library Shell Construction

Exhibit A Library Shell Construction Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation

More information

Administrative Offices

Administrative Offices CUYAHOGA COUNTY PUBLIC LIBRARY EXISTING FACILITY ASSESSMENT December 2009 Administrative Offices 2111 Snow Road, Parma, Ohio 44134 Location Entry Site View of Staff Entrance ADM Administrative Offices

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

VOLUME 4 DIVISION SPECIFICATIONS

VOLUME 4 DIVISION SPECIFICATIONS Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

KU West Campus LEEP II High Bay Facility Project # , A (c)

KU West Campus LEEP II High Bay Facility Project # , A (c) Number Revision Title Rev Date Discipline Bulletin Drawings B-West Structural Category S051 0 General Notes - Sheet 1 7/31/13 Structural Bid Package B- West Campus S052 0 General Notes - Sheet 2 7/31/13

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

CAMPUS STANDARDS HANDBOOK

CAMPUS STANDARDS HANDBOOK CAMPUS STANDARDS HANDBOOK OFFICE OF PHYSICAL PLANNING AND CONSTRUCTION UNIVERSITY OF CALIFORNIA, SANTA CRUZ Italics indicate recent revisions. THESE STANDARDS ARE PROVIDED TO UCSC CONSULTANTS FOR GUIDANCE

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

REHABILITATION STANDARDS CHECKLIST

REHABILITATION STANDARDS CHECKLIST Project Name Date Built Date Last Rehabilitated (If applicable) EXTERIORS REHABILITATION STANDARDS CHECKLIST ROOF Age (Yrs) Poor Fair Good Excellent Roof /Pitch/Flat # of Layers Substrate Material Insulation

More information

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications Carter's Oshkosh (SIS) #1185 - The Center at Pearland Parkway - Pearland, TX 77581 - Scope Of Work / Bid Qualifications Please fill out the blanks associated with your trade scope or work with the words

More information

pershing+ desperes uichomes.com 6005 and 6007 Pershing Avenue pershing+desperes call or

pershing+ desperes uichomes.com 6005 and 6007 Pershing Avenue pershing+desperes call or pershing+ desperes modern homes in the skinker-debaliviere neighborhood 6005 and 6007 Pershing Avenue - new construction - 3 bedrooms - 2.5 baths - 2,237sf TRANSPARENT site plan 6007 6005 floor plans upper

More information

AGILITAS Property Development

AGILITAS Property Development Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development

More information

260,000 SF Building Profile

260,000 SF Building Profile Expanding Your Development & Investment Perspectives 260,000 SF Building Profile Precast & Brick Exterior Finish 245,000 SF Production/Warehouse 7,500 SF Office & 7,500 SF Mezzanine 50 x 50 Bays, 24 Clear

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

OPERATI LATRINES. Standard Range Types

OPERATI LATRINES. Standard Range Types OPERATI LATRINES Standard Range Types Purpose This building provides lavatory facilities for the troops and trainers who are using the range. The document covers all standard types used on SRP Range Facilities.

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Foothills School Div #38 Sheep River School B3839A Okotoks Report run on: February 27, 29 2:28 PM Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement

More information

K.B. Polk Recreation Center Summary

K.B. Polk Recreation Center Summary K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016

More information

Building Systems and Design Elements included in SliDeRulE

Building Systems and Design Elements included in SliDeRulE Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation

More information

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Metal & EIFS Exterior Finish 150,000 SF Production/Warehouse 4,500 SF Office & 4,500 SF Mezzanine 50 x 50 Bays, 24 Clear

More information

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA Atlanta, GA LOCATED AT CAMP CREEK PARKWAY AND CAMPBELLTON ROAD For Sale or Lease Single units start at 1,176sf and can be combined to exact specification Custom Designed Medical and Professional finishes

More information

Columbia County Health Care Center Added Amenities

Columbia County Health Care Center Added Amenities Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center

More information

Gerald Desmond Bridge Replacement

Gerald Desmond Bridge Replacement Item # Room # icip. # of Occupants 101 12 Conference / Crew Room 1 400 400 Supervisor Offices Conference and secondary training room for up to 12 people Flooring: VCT Electrical Type: rmal (utility power)

More information

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following: New buildings or renovations to existing buildings for which an application for a permit was made to the Department or a municipality before April 9, 2004. New buildings or renovations to existing buildings

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

GROUNDS Grading General Grading, slope and drainage: Satisfactory N/A See Notes. Grading and slope at house wall

GROUNDS Grading General Grading, slope and drainage: Satisfactory N/A See Notes. Grading and slope at house wall GROUNDS Grading General Grading, slope and drainage: Satisfactory Grading and slope at house wall Satisfactory (within 5 feet from building) Sidewalk Concrete Brick Flagstone Other Patio stones Driveway

More information

OFFICE Space STANDARD SPECS Page 1

OFFICE Space STANDARD SPECS Page 1 OFFICE Space STANDARD SPECS Page 1 Standard features listed are based on manufacturer availability- Substitutions may occur and interchanged with items of similar standard likeness at the discretion of

More information

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645 030 Sacramento Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

PAULDING COLLEGE & CAREER ACADEMY

PAULDING COLLEGE & CAREER ACADEMY PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

FRV AE SOLAR PROJECT, WEBBERVILLE, TX SPECIFICATION FOR THE TURNKEY, DESIGN AND BUILD OF THE OPERATIONS & MAINTENANCE (O&M) BUILDINGS

FRV AE SOLAR PROJECT, WEBBERVILLE, TX SPECIFICATION FOR THE TURNKEY, DESIGN AND BUILD OF THE OPERATIONS & MAINTENANCE (O&M) BUILDINGS FRV AE SOLAR PROJECT, WEBBERVILLE, TX SPECIFICATION FOR THE TURNKEY, DESIGN AND BUILD OF THE OPERATIONS & MAINTENANCE (O&M) BUILDINGS Author: Leasa Lennox Date: 2 May 2011 Ref: 22067 Prepared: Leasa Lennox

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

Smokey Ridge, Christiansburg, Virginia

Smokey Ridge, Christiansburg, Virginia Smokey Ridge, Christiansburg, Virginia Outline Specifications Prepared by Community Design Studio, LLC Project # 1305, March 15, 2013 The following describes the Sections to be included in each Division

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

Residential Outline Specifications

Residential Outline Specifications Residential Outline Specifications September 2014 1. General a. Site i. Direct elevator access from parkade to residential floors ii. Separate commercial elevator access from parkade to 10th Street NW

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

Facilities Management Service and Support Function Needs

Facilities Management Service and Support Function Needs Facilities Management Service and Support Function Needs In addition to mechanical and electrical equipment rooms, Facilities Management requires the following minimum amount of space in each building

More information

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621 2 S Morgan St Chicago, IL 21 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

MODULAR BUILDING SPECIFICATIONS

MODULAR BUILDING SPECIFICATIONS Use Group A - Assembly B Business E Education I - Institutional Construction Type Type II Non Combustible Type V - Wood Floor 12 Outrigger Frame with Cross members Frame: 12 Perimeter Steel Main Beams

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

1 data PIC location (with 2 ports) typically asf for multiple staff members

1 data PIC location (with 2 ports) typically asf for multiple staff members 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING

More information

Thurgood Marshall Recreation Center Summary

Thurgood Marshall Recreation Center Summary Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August

More information

University of New Mexico Environmental Services Design & Development Standard Requirements

University of New Mexico Environmental Services Design & Development Standard Requirements University of New Mexico Environmental Services Design & Development Standard Requirements Please review the following standards to be considered on all construction specifications. Your consideration

More information

2800 TRANS-CANADA MONTREAL POINTE-CLAIRE

2800 TRANS-CANADA MONTREAL POINTE-CLAIRE Exceptional Head Office Leasing Opportunity! 2800 TRANS-CANADA COMMISSION BONUS! 65,000 SF and up $25,000 125,000 SF $50,000 Contact Leasing Director for details. Limited time offer. MONTREAL POINTE-CLAIRE

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

Inspection Report. Property Address:

Inspection Report. Property Address: Inspection Report provided by: Safe Side Home Inspection Inspector: Corey Stuart TN License # 778 434 Margaret Circle McMinnville, TN 37110 safesideinspection@blomand.net Property Address: 1234 Anywhere

More information

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street CITY OF ANDERSON BUILDING AND CODES 601 South Main Street Plan Review Notes (STREET ADDRESS) ANDERSON, SC Plan Review Number: Building Plans prepared by: Plans Signed by: Project Name: Plans Received:

More information

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits 3. Development and Septic Fees 4. Tarion New Home Warranty

More information

3D Home Improvement and Inspection Services, Inc

3D Home Improvement and Inspection Services, Inc Property Inspection Report Cover Page ABC Disney Lane, Winter Garden FL, 34787 Inspection prepared for: John Doe Inspection Date: 7/15/2010 Time: 11:00 am Age: 6 Years Size: 3,378 LSF / 4,427 TSF Weather:

More information

Rental Inspection Checklist

Rental Inspection Checklist Rental Inspection Checklist Address: Date: NOTE: The water, gas and/or electrical services were off at the time of inspection. A re-inspection at a later date SHALL BE required to inspect these items.

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY PART 1 - GENERAL SECTION 01 01 11 MULTIPLE CONTRACT SUMMARY 1.01 SCOPE OF WORK A. This Section includes a summary of each Contract, including responsibilities for coordination and temporary facilities

More information

1234 Main St. Buyer Name. Table of Contents

1234 Main St. Buyer Name. Table of Contents AMERICAN PROFESSIONAL HOME INSPECTION 719.648.4098 drew@americanprofessionalhomeinspection.com http://www.amproinspection.com RESIDENTIAL REPORT 1234 Main St. Colorado Springs CO 80903 Buyer Name 10/02/2017

More information

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi 1 Site Summary Address 7105 Berkman Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1995 Total Campus Building Area (combined) 14,890 SF Introduction is located

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting

More information

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619 E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS STANDARD FEATURES LIST Foundation Concrete walls 4 concrete floor slab Interior basement unfinished Standard nine foot foundation walls

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

Frederic Chopin Elementary School

Frederic Chopin Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information