TRICON TM RETAINED SOIL WALL SYSTEM
|
|
- Lauren Atkins
- 6 years ago
- Views:
Transcription
1 T R I C O N P R E C A S T L T D. TRICON TM RETAINED SOIL WALL SYSTEM CONSTRUCTION MANUAL
2 TRICON TM RETAINED SOIL WALL SYSTEM The Tricon TM Retained Soil Wall System is a mechanically stabilized earth retaining wall structure comprised of a cast-in-place leveling course (by others), precast concrete fascia panels, panel alignment shims, HDPE bearing pads, filter fabric and adhesive joint materials, connection anchors, locking rods, hot-dipped galvanized welded wire soil reinforcement mats combined with a select backfill mass (by others). Included with the system are engineered design and erection drawings, precast concrete copings, as well as limited on-site technical assistance as required. Figure 1 below illustrates the installed system. Facing Panels Soil Reinforcement Mat Bearing Pads Connection Anchor Locking Rods Horizontal Panel Joint Select Backfill Mass Leveling Course Vertical Panel Joint FIGURE 1 1
3 Extents of Wall Coping Back of Wall Face of Wall Select Backfill Mass Finished Grade Soil Reinforcement Mats Leveling Course Cross Section of Typical Retained Soil Wall FIGURE 2 Outside Dims to C of Joint 3 7'-6 " [2.296M][NOM] 8 C to C of Panel Joints 3 3 1'-1116 " [.589M] 1'-1116 " [.589M] 3'-8" [1.117M] 1'-6" [.457M] 1/2" HDPE Bearing Pad Double Panel Anchors 1'-6" [.457M] 1 6'-0 2 " [1.842M][NOM.] C to C Finish as Specified in Contract Documents Third Mat Row When Req'd Trowel Finish 1'-6" [.457M] 1'-6" [.457M] Front Face Elevation 1 Nominal Erected Dimension = 6'-0 2 " (1.841M) H 3 7'-6 8 " (2.296M) WC to C of Wall Joint Back Face Elevation Mat Width Will Vary - See Elevation Drawings For Mat Designations Type K - 1''-6" (.457M) Wide Type J - 2'-3" (.686M) Wide FIGURE 3 2
4 Panel Face (As Specified) Panel Face (As Specified) Soil Reinforcement (Length as Required) Soil Reinforcement (Length As Required) 1'-3" [.381M] 1'-6" [.457M] 2'-0" [0.610M] 1'-6" [.457M] 1'-3" 1'-3" [.381M] [.381M] 1'-6" [.457M] 1'-6" 2'-0" [.457M] [0.610M] 1'-3" [.381M] " [.267M] 2'-3" [.686M] 2'-3" [.686M] 1'-9" [0.533M] 2'-3" [.686M] 2'-3" [.686M] " [.267M] Panel With Type K (1'-6" Wide) Soil Reinf. Panel With Type J (2-'3" Wide) Soil Reinf. FIGURE 4 CONNECTION ANCHOR DETAIL Locking Rod Panel Reinf. 8" x 3", W7.5 x W4.5 Soil Reinforcement Mat Connection Anchor 3" Front Face of Panel FIGURE 5 3
5 Delivery, Storage and Handling Soil Reinforcement Mats- Mats are supplied in bundles, by size and tagged with description. Mats should be stored on wooden dunnage. Mats should be color coded by size to help identify easily. Wall Panels- Unloading- Panels can be unloaded individually by using a four point lift with slings. Panels should be stacked four high on level ground. The panels are shipped stacked four high and can be unloaded by stack using nylon slings. Storage- Panels should be stored on adequate dunnage as near to the final setting position as possible on firm, level ground. Dunnage should maintain vertical alignment to eliminate the chance of the panel being damaged. When lifting panels off storage stack, always place a wooden block between panels to prevent damage when rotating to vertical position. (See Figure 6) FIGURE 6 4
6 ERECTION PROCEDURE I. Leveling Course Construction Layout the leveling course on the centerline and grade of the wall panels as provided by the project drawings. Course dimensions are detailed in the supplied erection drawings. Typical course is 6 inches thick and 12 inches wide. Finish leveling course to a smooth trowel finish. LINE AND GRADE MUST BE HELD TO 1/4 TOLERANCE. 5
7 II. Setting B Panels Snap chalk line on leveling course along the face of the panels. Place first B panel. Closely check for horizontal alignment and vertical plumb. A 1/4 back batter is recommended. Use wooden wedges and/or shims as required. Brace panel with 2 X 4 lumber for vertical alignment. Set second half B panel at a typical 3/8 spacing. Align, shim, and brace panel. 1D 1C 1B 1A Use clamps to secure First and Second panels together. Set remaining B panels in wall as described in C & D above. Install supplied filter fabric with adhesive over the vertical and horizontal joints. Make sure to cover the joint between the panel and leveling course. 1A. Cast or place leveling course on prepared foundation. Compact void on back face side. 1B. Layout proper panel face alignment on leveling course. 1C. Place and plumb bottom row of panels. Use plastic shims as required. If excessive shimming is necessary, please notify engineer. 1D. Cover all vert. and horiz. joints with filter fabric. 6
8 III. Backfill Place and compact the first lift of specified backfill up to the first row of soil reinforcement mats. Use hand operated compactors within 3 feet of the panel. Place soil reinforcement mats into the wall connectors and install the locking rod. Ensure both transverse bars on mats are placed between the panels and connectors. Wooden Wedge Remove slack in mat by using a wooden wedge between the panel and transverse wire. Continue installing and compacting backfill in specified lifts to the next level of connectors. (Do not operate tracked equipment on reinforcing mats. Equipment with rubber tires can be used, but with extreme caution.) 2D 2A 2E 2C 2B 3 2A. Place 1/2" Bearing pads (before beginning backfill) 2B. Place and compact backfill to level of first panel anchor. 2C. Place soil reinforcing mat and secure with locking rod. Remove slack in mat and connection. 2D. Place and compact backfill to top of panel. Start from end of mat and work toward panel. 2E. Backfill and compact toe at face of wall. 7
9 IV. Installation of Second and Following Panel Courses Always backfill to the top of the prior course before setting the next course. Remove clamps one panel at a time. Remove wooden wedges from panel face. Place supplied bearing pads on top of the panels in the preformed bearing pad pockets. Set A panel in place. Check spacing, and the horizontal and vertical alignment of the panel. Set joint clamps. Install supplied filter fabric with adhesive over the vertical and horizontal joints. Install backfill and soil reinforcement mats as described in Step III Backfill. Check the vertical alignment. No bracing should be required for the remainder of the wall. Backfill front of the wall above the leveling pad according to the plans. 3C 3C 3B 3A 3A. Place bearing pads at top of panel. 3B. Place and plumb next lift of panels. 3C. Place bearing pads. 3D. Repeat sequence 2B thru 3C until wall elevation is reached. 8
10 V. Final Completion of the Wall Install T panels as described in Step IV Installation of Second and Following Panel Courses. Complete backfill and compaction. Remove all bracing, clamps, and wedges. Form and pour the level-up course to accept precast coping, or form and pour coping in place as specified. 9
11 Materials Supplied with the TM Tricon Retained Soil Wall System Precast Concrete Fascia Panes Panel Alignment Shims Panel Bearing Pads Filter Fabric and Adhesive Soil Reinforcement Mats Connection Locking Rods Panel Lifting Devises (1 set) Material, Tools and Equipment Required by Contractor Excavation Equipment Leveling Course Formwork and Concrete Crane, Picker or Boom Truck Cable and Sling Rigging Survey Instrument Chalk Line, Level, Plumb Bob Wooden Wedges, Pry Bars Select Backfill Material and Placement Equipment Small Vibratory Roller Joint Clamps and Bracing Hammer Drill and Concrete Bits Miscellaneous Small Tools 10
12 T R I C O N P R E C A S T L T D. Founded in 1987, Tricon Precast Ltd. provides innovative engineered MSE wall and bridge systems throughout North America. With headquarters in Houston, Tricon operates two state-of-the-art plants strategically located in Texas; Houston in the Gulf Coast Region and San Antonio in the Central Texas Region making it the largest precast concrete manufacturer in the state. Networks of licensed producer partners expand the reach of the Tricon systems by providing manufacturing and support across the US and Canada. Tricon de Mexico headquartered in Mexico City, provides the Tricon products and systems into many parts of that country. Tricon Engineering Group (TEG) headquartered in Grand Rapids, MI, with offices in Texas, provides a full range of structural engineering services not only for all Tricon system applications but for other civil construction projects across the continent. TEG continues to expand its network with the most talented and innovative professional engineering staff in the country. Tricon s unique patented systems are produced and offered by a growing number of licensed precast affiliate partners. Licensing agreements are currently available in certain geographic locations. Interested precast concrete producers should please contact us for more information. Products and Systems include: Retained Soil Wall System Con-Struct Prefabricated Bridge System Drill Shaft Fascia Panel Wall System Sound Wall System Soil Nail Fascia Panel Wall System Privacy Wall System Temporary Wire Wall System Precast Concrete Traffic Barriers Permanent Wire Wall System Custom Civil, Industrial and Commercial Redi-Span Arch Bridge System Precast Concrete Services 11
13 NOTES
14 6 249 Jersey Village North Houston 290 Beltway 8 45 Aldine Hardy Toll Rd. 59 Sheldon Lake State Park Beaumont Place 90 Grey Forest Helotes Leon Springs Cross Mountain 87 Shavano Park 281 Hollywood Park Hill Country Village Live Oak Garden Ridge Selma 35 Schertz Spring Valley Hunters Creek Village Bellaire 10 Houston West University Place South Houston Cloverleaf Galena Park 225 Pasadena 10 Leon Valley Lackland AFB 16 Castle Hills Balcones Heights San Antonio 10 Alamo Heights Kirby 410 Converse China Grove Sayers 90 Adkins Missouri City 288 Brookside Village Pearland 45 Macdona 35 Von Ormy Palo Alto Heights 281 Buena Vista Southton Hilltop Calaveras Lake Elmendorf (Henry Road between Aldine Bender & Aldine Mail Rt.) TRICON PRECAST, LTD HENRY RD. HOUSTON, TX FAX (TOLL FREE) (FM Old Nacogdoches Road) SERVTEX PLANT OLD NACOGDOCHES RD. NEW BRAUNFELS, TX PHONE FAX Please feel free to contact our office with any additional questions we can help you with in the future.
T R I C O N P R E C A S T L T D. TRICON RETAINED SOIL WALL SYSTEM CrimpLock Connection System CONSTRUCTION MANUAL
T R I C O N P R E C A S T L T D. TRICON RETAINED SOIL WALL SYSTEM CrimpLock Connection System CONSTRUCTION MANUAL TRICON TM RETAINED SOIL WALL SYSTEM The Tricon TM Retained Soil Wall System is a mechanically
More informationUwall UNIVERSAL CONSTRUCTION MANUAL
Uwall UNIVERSAL Retaining Wall System CONSTRUCTION MANUAL TM President s Letter CSI is a leader in its industry supplying precast infrastructure products throughout New England and beyond since 1972, developing
More informationREINFORCED EARTH. Construction and Quality Control Procedures Manual. Construction Manual: Rectangular Panels. Rectangular Panels
REINFORCED EARTH Construction Manual: Rectangular Panels Construction and Quality Control Procedures Manual Rectangular Panels CONSTRUCTION AND QUALITY CONTROL PROCEDURES MANUAL CONTENTS I. Preface...4
More informationARES RETAINING WALL SYSTEMS. installation guide and construction manual
ARES RETAINING WALL SYSTEMS installation guide and construction manual When long-term performance and speed of construction are important, ARES Retaining Wall Systems offer unmatched advantages. Tensar
More informationSANDERS PRE-CAST CONCRETE SYSTEMS, INC. MSE WALL SYSTEM SUBMITTAL
SANDERS PRE-CAST CONCRETE SYSTEMS, INC. MSE WALL SYSTEM SUBMITTAL FLORIDA DEPARTMENT OF TRANSPORTATION THE SANDERS COMPANIES 605 SOUTH INDIANAPOLIS ROAD WHITESTOWN, IN 46075 09-8-5 ISSUED FOR REVIEW REVISIONS/ISSUE
More informationOpen-Web Truss Long Span Installation Guidelines
TECHNICAL BULLETIN #301 Open-Web Truss Long Span Installation Guidelines RedBuilt has maintained a policy of manufacturing and marketing products of the highest quality to our customers. We guarantee the
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationLANDSCAPE RETAINING WALLS
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls
More informationBureau of Materials Materials Approval Procedures
Bureau of Materials Materials Approval Procedures MAP Number: 116-15 Effective Date: April 1, 2015 Approved By: Eileen Sheehy PROCEDURE FOR APPROVAL OF MECHANICALLY STABILIZED EARTH (MSE) RETAINING WALL
More informationODOT Design & Construction Requirements for MSE Walls
ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation
More informationDESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM
Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM T. C. NEEL and K.BOZKURT ABSTRACT This work shall consist of the design, manufacture
More informationRedi Rock Specification and Installation Manual
Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as
More informationWall Modular Block Mechanically Stabilized Earth, Item S.
Wall Modular Block Mechanically Stabilized Earth, Item 532.0300.S. A Description (1) This special provision describes designing, furnishing materials and erecting a permanent earth retention system in
More informationDIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK
DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,
More informationACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.
ACCELERATED BRIDGE CONSTRUCTION IN TEXAS Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. Holt, PE 5 ABSTRACT The Texas Department of Transportation (TxDOT)
More informationENGINEERING DIRECTIVE
Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel
More informationMSE WALLS CASE STUDIES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch
MSE WALLS CASE STUDIES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch COMMON RETAINING WALL TYPES CONCRETE BLOCK MSE TEMPORARY EARTH SPREAD FOOTING Gabions Drilled Shaft Soil Nail Tiedback
More informationRETAINING WALL SYSTEM. ViaWall. ViaWall A. ViaWall B. ViaBlock
RETAINING WALL SYSTEM ViaWall ViaWall A ViaWall B ViaBlock Table of contents Introduction page 1 ViaWall type A Elements of the system 1. Reinforced concrete panel 2. Reinforcing meshes 3. U-bolts Additional
More informationSteps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along
Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along Wall Face Option 5 - Steps In Wall; 10 (25cm) Tread Option
More informationSECTION PLATE CONNECTED WOOD TRUSSES
SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:
More informationThe Aizhai Suspension Bridge is
INTERNATIONAL DESIGN & CONSTRUCTION: BRIDGES Mountain grown Hilly terrain contributes mightily to China bridge By Yinbo Liu, Ph.D., P.E., Guoping Chen, Shulong He and Yongjian Zhang, Ph.D. Contributing
More informationSteps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to
Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to Wall - Option 4 Steps and Stairs Q & A E CONSTRUCTION
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More informationSTANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL
STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,
More informationYOUR LITE-DECK SECTIONS
General Information Warning - Serious injury or death may result from safety hazards caused by improper use or installation. When in doubt about proper use or installation of Lite-Deck, immediately contact
More informationA. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)
SECTION 05 44 00 - PRE-ENGINEERED PRE-FABRICATED COLD-FORMED STEEL TRUSSES (Section 05425 in MasterFormat 1995) PART 1 GENERAL 1.1 SECTION INCLUDES A. Pre-engineered cold-formed steel trusses. B. Cold-formed
More informationZurn Z886. 6" Perma-Trench. Installation Instructions
Zurn Z886 6" Perma-Trench Installation Instructions Z886 Accessories 6" [152mm] Wide Trench Drain System Below are the components of the Z886 trench drain typical to an installation. Check your order to
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationBonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationElevated Slab Sequence
Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)
More information1 Exam Prep Placing Reinforcing Bars Tabs and Highlights
1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationSECTION CHAIN-LINK FENCES AND GATES 02821/1
SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where
More informationCONCRETE FORMWORK CHECKLIST AT SITE
CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets
More informationConcrete weighs about 150 pounds per cubic foot
At Bassora, where they have no timber, they make arches without any frame. The mason, with a nail and a bit of string, marks a semicircle on the ground, lays his bricks, fastened together with a gypsum
More informationENGINEERED SOLUTIONS. Precast Bridge Installation Guide
ENGINEERED SOLUTIONS Precast Bridge Installation Guide Foundation Preparation A successful precast bridge or vault installation starts with the foundation. In addition to following standard construction
More informationT-WALL & STONE STRONG
shawprecastsolutions.com & STONE STRONG Retaining Walls PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. The Retaining Wall System is a gravity structure constructed of individual
More informationSTRUCTURAL MASONRY SPECIAL INSPECTOR. Study Guide
STRUCTURAL MASONRY SPECIAL INSPECTOR Study Guide May 2017 Examination: The Structural Masonry Inspector Examination is based on the references cited in this document. It is 3 hours in length, is an open-book
More informationAttachment A-Flagpole(s) Specifications
Attachment A-Flagpole(s) Specifications PART 1-GENERAL 1.1 SCOPE A. The scope of work includes the removal of existing flagpole(s) and associated concrete bases, and installation of a new flagpole(s) and
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing
More informationInstalling DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site
Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan
More informationInstallation Manual. Orion. TL-3 Steel Barrier. VHD (v2)
Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations
More informationInstallation Guide. PrivacyShield Outdoor Enclosure
Installation Guide PrivacyShield Outdoor Enclosure Table of Contents 1.0 Introduction... 2 2.0 Materials, Delivery & Tools... 2 3.0 Layout and Post Locations. 3 4.0 Foundations... 5 5.0 PVC Installation....
More informationConstructing Fixed Span Bridges From Floating Equipment
Chapter 10. Constructing Fixed Span Bridges From Floating Equipment CONSTRUCTING FIXED SPANS FROM M4T6 EQUIPMENT Characteristics of M4T6 Fixed Spans Short freed spans erected with M4T6 components can provide
More informationSpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )
SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:
More informationSECTION STRUCTURAL PRECAST HOLLOW CORE SLABS
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationENGINEERED SOLUTIONS. ArmorFlex Installation Guide
ENGINEERED SOLUTIONS ArmorFlex Installation Guide ArmorFlex Installation Guide The purpose of the ArmorFlex Installation Guide is to provide recommendations for the proper installation of Articulating
More informationStandards for Testing and Rating Shoring Equipment
ANSI/SSFI SH300-2007 American National Standard Standards for Testing and Rating Shoring Equipment Scaffolding, Shoring & Forming Institute, Inc. Sponsor: Scaffolding, Shoring & Forming Institute, Inc.
More informationStormTech Construction Guide
A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED
More informationSECTION UNIT MASONRY SYSTEM
SECTION 04320 UNIT MASONRY SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete masonry and face brick units. B. Reinforcement, anchorage, and accessories. 1.03 SUBMITTALS A. Submit product data under
More informationHILLSBOROUGH TOWNSHIP CODE ENFORCEMENT
HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationSECTION 1043 FENCE MATERIAL
SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance
More informationSECTION ROLLER GATES
GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as
More informationMODULAR CONCRETE RETAINING WALL
MODULAR CONCRETE RETAINING WALL PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing and construction of a KEYSTONE Retaining Wall System or equal in accordance with these specifications
More informationADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1
ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions
More informationSECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationBIO-AQUIFER STORM SYSTEM
BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationNORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA
NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationSECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM
ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary
More informationStandard Duty Cantilever Rack Installation and Assembly Guide
Standard Duty Cantilever Rack Installation and Assembly Guide Steel King Industries, Inc. 2700 Chamber St Stevens Pont, WI 54481 (800) 826 0203 www.steelking.com info@steelking.com ASSEMBLY INSTRUCTIONS:
More informationThe better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................
More informationChapter 7. Roof Framing
Chapter 7. Roof Framing 7.1 ROOFING PREP WORK 7.2 INSTALLING ROOF TRUSSES 7.3 INSTALLING PORCH TRUSSES 7.4 SHEATHING ROOF 7.5 INSTALLING SUB-FASCIA 7.6 BUILDING AND INSTALLING SCUTTLE BOX 7.7 INSTALLING
More informationCITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures
CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person
More informationSPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS
SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, and erection of precast prestressed concrete girders;.2 Supply
More informationSingle Post Anchor Part Number Spectrum Lane ~ Missoula MT ~
Single Post Anchor Part Number 21700 7100 Spectrum Lane ~ Missoula MT 59808 800.791.8056 ~ www.spectrumproducts.com 21700 Man Rev B You have purchased a Spectrum Aquatics Single Post Anchor. Providing
More informationGrade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway
Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers
More informationA. Product Data shall be provided for each type of product indicated.
32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical
More informationSECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?
SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum
More informationFabrication and Installation Table of Contents
Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection
More informationDesign and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone:
Design and Installation Guidelines for Retaining Walls 1 P age Geo Products, LLC 8615 Golden Spike Lane Houston, TX 77086 Phone: 281.820.5493 2011 Geo Products, Fax: 281.820.5499 LLC www.geoproducts.org
More informationSECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)
SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationTYPE "A" CATCH BASIN
27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationROOF PAVER SYSTEM National Distribution SPEC - SECTION 07760
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
More informationMACHINE-LAY Installation Manual
MACHINE-LAY Installation Manual PaveDrain Installation Manual Table of Contents Section 1: Base Preparation (pages 3 6) Section 2: Machine-Lay PaveDrain Blocks (pages 8 11) Section 3: Edge Restraints (pages
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationSECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.
SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.
More information_spav prefabbricati s.p.a. historical notes
_spav prefabbricati s.p.a. historical notes The activity Spav Prefabbricati started its activity in 1960 in the outskirts of Udine (north east of Italy) Until this time it has realized more than 2000 buildings
More informationCITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS
CONCRETE SIDEWALKS AND DRIVEWAYS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary
More informationAUGUST 2017 HASTINGS. retaining walls installation guide
AUGUST 2017 HASTINGS retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry retaining wall blocks are an ideal choice for retaining walls in gardens,
More information2011 INSTALLATION MANUAL
Redi-Rock International 2 PRE-CONSTRUCTION CHECKLIST... Before you start construction of a Redi-Rock wall, take the time to complete necessary planning and preparation. This process will help ensure a
More informationYOUR SPLASH PAD RESOURCE
1 Index Permits & Inspections Material List Warnings Splash Pad Types Pre-Site Grading Plumbing Schematic Pressure Testing Concrete Preparation and Pour Housing/Nozzle Installation Above Ground Water Feature
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationCANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is
More informationDesign Manual: Gravity Wall. Section 1
Design Manual: Gravity Wall Section 1 A Design Manual: Gravity Wall General Information Company Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide
More informationTION GUIDE ALLA T INS
INSTALLATION GUIDE TENSAR GEOGRIDS Easier installation makes the Sierra Slope Retention System a more affordable alternative to conventional retaining walls. The Sierra System owes its strength and durability
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (6-03) MANUAL: Standard
More informationPATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge
Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth
More informationIBC Compliant Seismic Rated Isolators
ISOLATORS IBC Compliant Seismic Rated Isolators Features & Benefits Rugged steel housing is designed to handle high wind and seismic forces. Housing serves as blocking during equipment erection. Top plate
More informationYCW 250 I-Beam Curtain Wall System Installation Manual
Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS INSTALLATION NOTES..................................... Page ii PARTS DESCRIPTION Framing
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationNorthpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017
SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information