1 832 W Sheridan Rd Chicago, IL 3 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or ) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 98 3,8 $,948,82 SITE $38,322 Campus Total,8 $2,8,54 Category: Building Exterior Entrance Entrance Control - Audio and Video EA Entrance Control - Audio and Video EA Exterior Doors - Exterior Steel Door 2 EA $48 Exterior Doors - Exterior Steel Door 4 EA $48 Exterior Doors - Exterior Steel Door EA $48 Exterior Doors - Exterior Steel Door 8 2 EA $9 Exterior Doors - Side lite EA $33 Exterior Doors - Store Front 4 EA Exterior Doors - Store Front 3 2 EA $,92 Exterior Doors - Store Front 5 2 EA $,92 Exterior Doors - Store Front 2 EA $,92 Exterior Doors - Transom Lite 5 2 EA $2 Exterior Doors - Transom Lite 8 2 EA $2 Exterior Stairs - Concrete 4 3 LF $2,453 Exterior Stairs - Concrete 5 LF $4, Exterior Stairs - Concrete 8 8 LF $,42 Power Door Operator and Controls EA Power Door Operator and Controls EA Ramp Handrail - Steel_Ramp Handrail 5 55 LF Ramp Handrail - Steel_Ramp Handrail 8 LF Ramps - Concrete 5 5 LF 4 $,952 cracks at handrail posts GREELE Page of 2 Assessment Date: 4/8/4

2 832 W Sheridan Rd Chicago, IL 3 Category: Building Exterior Entrance Ramps - Concrete 5 2 LF $3,55 Ramps - Concrete 39 LF $5,859 Stair Handrail - Wood_Stair Handrail 8 LF Foundation Lighting Roof System Foundation - Concrete Entire Building 9 LF Superstructure - Steel Entire Building 59,5 SF Exterior Lighting - Parapet or Roof Mounted Entire Building 3 EA Exterior Lighting - Wall Mounted Entire Building 4 EA $4,42 Exterior Lighting - Wall Mounted Entire Building 23 EA $,4 Exterior Lighting - Wall Mounted Entire Building EA 5 $42 Lenses are broken Coping - Stone 59 LF $5, Coping - Stone LF $8,2 Coping - Stone 3 52 LF $2,94 Coping - Stone 4 4 LF $4,529 Downspouts - Interior Downspouts 32 LF $,3 Downspouts - Interior Downspouts 2 8 LF $2,89 Downspouts - Interior Downspouts 3 24 LF $,9 Downspouts - Interior Downspouts 4 58 LF $,928 Parapet - " - 3" Height 4 LF Parapet - " - 3" Height / orth 55 LF $2,32 mortar popping at flashing Parapet - " - 3" Height 2 3 LF Parapet - " - 3" Height 3 52 LF Parapet - " - 3" Height 4 4 LF Parapet - Parapet > 3" 2 9 LF Roof Structure - Steel / Metal Deck/ Concrete Topping 4,9 SF Roof Structure - Steel / Metal Deck/ Concrete Topping 2,5 SF Roof Structure - Steel / Metal Deck/ Concrete Topping 3 5,484 SF Roof Structure - Steel / Metal Deck/ Concrete Topping 4,5 SF Roof - Modified Bitumen 4,9 SF $4, worn areas at ponding Roof - Modified Bitumen 2,5 SF 5 $3,29 ponding, patches, leaks Roof - Modified Bitumen 3 5,484 SF $45,95 worn areas at ponding Roof - Modified Bitumen 4,5 SF $,43 worn areas at ponding GREELE Page 2 of 2 Assessment Date: 4/8/4

3 Category: Building Exterior Walls Windows 832 W Sheridan Rd Chicago, IL 3 Exterior Walls - Brick Entire Building / East Façade 5 SF $454 step cracks Exterior Walls - Brick Entire Building 33,5 SF Guard - Guards perforated Entire Building 85 SF $,854 Lintels - Steel Entire Building 395 LF $,4 minor corrosion at underside, open joints Storefront Windows Entire Building / Main Entrance 9 SF $2,3 Windows - Casement Aluminum Double-pane Entire Building 33 SF Windows - Louver Entire Building 44 SF 5 $2,33 blades bent Windows - Sash Aluminum Double-pane Entire Building,9 SF fixed Building Exterior Subtotal: $49,9 Category: Electrical System Emergency System Main Service Automatic Transfer Switch Electrical Room 2 EA $8 Automatic Transfer Switch Electrical Room EA 4 $8,2 Greater than 2 years of age and shows signs of deterioration Emergency A/C Power - Auditoium and Aisle Lighting Entire Building / st Floor 2,5 SF $,323 Emergency A/C Power - Corridors and Stairs Entire Building 8,88 SF $2,39 Emergency A/C Power - Gym Entire Building / st Floor 4, SF $,48 Emergency A/C Power - Lunchrooms Entire Building / st Floor,84 SF $4 Emergency A/C Power - Students Toilets Entire Building 39 SF $3 Emergency Battery Packs - Corridors and Stairs Entire Building EA $,25 Emergency Generator- Outdoor- Diesel KW Site - East / East Courtyard EA $2,534 Exit Signs - Auditoium Entire Building / st Floor EA Exit Signs - Corridors and Stairs Entire Building 2 EA Exit Signs - Gym Entire Building / st Floor 2 EA Exit Signs - Lunchroom Entire Building / st Floor 2 EA Security System - Intrusion Detection Entire Building 59,5 SF $5,225 Main Electrical Service - A 2/48/3PH Electrical Room EA $4,55 Serves boiler room only Main Electrical Service - 2 A 2/48/3PH Electrical Room EA $8,2 Serves entire school PA System Entire Building 59,5 SF $9,454 GREELE Page 3 of 2 Assessment Date: 4/8/4

4 832 W Sheridan Rd Chicago, IL 3 Category: Electrical System Power Distribution Lighting and Power Panels - Above A Entire Building EA $8,449 Main Distribution Panels amp Entire Building / Electrical Room EA Main Distribution Panels - Greater than amp Entire Building / Electrical Room 2 EA Main Distribution Panels - Less than 4 amp Entire Building / Electrical Room EA Transformers - 2/48-2/28 Entire Building / Electrical Room 2 EA $2,53 Transformers - 2/48-2/28 Entire Building / Electrical Room EA 4 $8,9 Electrical System Subtotal: $,8 Category: Safty System Fire Alarm Fire Alarm Panel Entire Building / Electrical Room EA $,4 Fire Alarm Strobe Lights Entire Building 59,5 SF $2,4 Fire Alarm_System Entire Building 59,5 SF $28,59 Safty System Subtotal: $5,3 Category: Mechanical System Air Conditioning Cooling Tower - Closed Cell Boiler Room EA 4 $,32 Cooling tower works, but is approximately 4 years of age Air Handling Systems Roof Top Unit-Single Zone-Roof Mounted- Electric and DX Cooling with Self Contained Compressor tons Roof Top Unit-Single Zone-Roof Mounted- Electric and DX Cooling with Self Contained Compressor - Less than 5 tons Roof EA $2,3 Roof EA $,93 Boiler Systems Boiler Auxiliary- Electric- Hot Water Boiler MBH Boiler Room EA 5 $2, Chemical Pot Feeder Boiler Room EA $25 Electric- Hot Water Boiler MBH Boiler Room EA 5 $4,99 The single boiler provides hot water for the unit ventilators installed in the classrooms. GREELE Page 4 of 2 Assessment Date: 4/8/4

5 Category: Mechanical System Heating Devices Cabinet Heaters - With Electric Coil Entire Building 4 EA $,42 PTAC - Electric Heating and Self Contained Cooling Entire Building 2 EA $482 Unit Heater - Electric Entire Building 3 EA $ W Sheridan Rd Chicago, IL 3 Wall Heater - Electric st Floor EA 4 $,83 Wall heater is both old and cover is missing Wall Heater - Electric st Floor 5 EA $95 Mechanical Plumbing Hot Water Pump HP Boiler Room 2 EA 4 $,585 Pumps show significant signs of wear Temperature Control Unit Ventilation Ventilation Electric Controls Entire Building 59,5 SF School has stand-alone electric controls Electric Thermostat Entire Building 55 EA Thermostats are electric and serve univents Unit Ventilators- Floor Mounted- Hot Water Heating Coils Only Entire Building 45 EA $5,4 Mod#:UARQ34KHH5A22GIC; MFG: Oct. 999; McQuay Exhaust Fans- Roof Mounted CFM Entire Building / Roof EA $592 Exhaust Fans- Roof Mounted CFM Entire Building / Roof EA $,5 Exhaust Fans- Roof Mounted - Less than 5 CFM Entire Building / Roof 5 EA $,48 Type I Exhaust Hood- Kitchen Entire Building / st Floor EA $,248 Mechanical System Subtotal: $434,82 Category: Plumbing System Hot Water Electric Heater KW Entire Building / Boiler Room EA $82 Piping Domestic Piping-Cold Water from Risers to Fixtures Entire Building 59,5 SF $,842 Domestic Piping-Cold Water Horizontal Lines Entire Building 59,5 SF $4,39 Domestic Piping-Cold Water Risers Entire Building 59,5 SF $,99 Domestic Piping-Hot Water from Risers to Fixtures Entire Building 59,5 SF $9,34 Domestic Piping-Hot Water Horizontal Lines Entire Building 59,5 SF $,99 Domestic Piping-Hot Water Return Lines Entire Building 59,5 SF $8,458 Domestic Piping-Hot Water Return Risers Entire Building 59,5 SF $8,458 GREELE Page 5 of 2 Assessment Date: 4/8/4

6 832 W Sheridan Rd Chicago, IL 3 Category: Plumbing System Piping Sanitary Piping Entire Building 59,5 SF Storm Piping Entire Building 59,5 SF Vent Piping Entire Building 59,5 SF Pumps Pumps - Domestic Booster Pump-Duplex Pump Room / st Floor EA $,9 Pumps - Sump-Simplex Electrical Room EA 2 $,443 Plumbing System Subtotal: $88,53 Category: Classrooms Classroom #4/4 (Pre School) Casework st Floor LF $,55 Only including built in units. Ceiling - Lay-in st Floor 2,9 SF $,5 Doors - Side-lite st Floor 2 SF $334 Typical, side-lite frames need painting. Doors - Wood Doors inclu hw st Floor EA $3 Floor - Tile st Floor 2,9 SF $4,92 Lighting - Lay-in st Floor 38 EA Walls - Concrete Block st Floor,8 SF Typical, classroom walls are terrazzo block Work Sink st Floor 2 EA $58 Classroom #44 (Kindergarten) Casework st Floor 2 LF $53 Ceiling - Lay-in st Floor 852 SF $2,559 Chalk Board st Floor 8 LF 4 $,53 Doors - Side-lite st Floor 2 SF $334 Doors - Wood Doors inclu hw st Floor EA $3 Floor - Tile st Floor 852 SF $,84 Lighting - Lay-in st Floor 8 EA Walls - Concrete Block st Floor 952 SF $2,9 Work Sink st Floor EA $39 Classroom #45 () Casework st Floor 2 LF $53 Ceiling - Lay-in st Floor 852 SF $2,559 Chalk Board st Floor 8 LF 4 $,53 GREELE Page of 2 Assessment Date: 4/8/4

7 Category: Classrooms Classroom #45 () Doors - Side-lite st Floor 2 SF $334 Doors - Wood Doors inclu hw st Floor EA $3 832 W Sheridan Rd Chicago, IL 3 Floor - Tile st Floor 852 SF $,84 Chairs leave dark markings. Lighting - Lay-in st Floor 8 EA Walls - Concrete Block st Floor 952 SF $2,9 Work Sink st Floor EA $39 Classroom #4 () Casework st Floor 2 LF $53 Ceiling - Lay-in st Floor 85 SF $2,28 Chalk Board st Floor 8 LF 4 $,53 Doors - Side-lite st Floor 2 SF $334 Doors - Wood Doors inclu hw st Floor EA $3 Floor - Tile st Floor 85 SF $,94 Chairs leave dark marks on floor. Lighting - Lay-in st Floor 8 EA Walls - Concrete Block st Floor 9 SF $2,844 Work Sink st Floor EA $39 Classroom #4 () Casework st Floor 23 LF $58 Ceiling - Lay-in st Floor 928 SF $2,8 Chalk Board st Floor 8 LF 4 $,53 Doors - Side-lite st Floor 2 SF $334 Doors - Wood Doors inclu hw st Floor EA $3 Floor - Tile st Floor 928 SF $2,3 Lighting - Lay-in st Floor 8 EA Walls - Concrete Block st Floor, SF $2,932 Work Sink st Floor EA $39 Classroom #48 () Casework st Floor 2 LF $5 Ceiling - Lay-in st Floor 85 SF Chalk Board st Floor 8 LF 4 $,53 Doors - Side-lite st Floor 2 SF $334 Doors - Wood Doors inclu hw st Floor EA $3 Floor - Tile st Floor 85 SF $,94 Chairs leave dark marks, which are especially bad in this classroom. Lighting - Lay-in st Floor 9 EA Walls - Concrete Block st Floor 9 SF $2,844 GREELE Page of 2 Assessment Date: 4/8/4

8 832 W Sheridan Rd Chicago, IL 3 Category: Classrooms Classroom #48 () Work Sink st Floor EA $39 Classroom #5 (Kindergarten) Casework st Floor 2 LF $82 Ceiling - Lay-in st Floor 549 SF $,49 Chalk Board st Floor 8 LF 4 $,53 Doors - Side-lite st Floor 2 SF $334 Doors - Wood Doors inclu hw st Floor EA $3 Floor - Tile st Floor 549 SF $,2 Lighting - Lay-in st Floor EA Walls - Concrete Block st Floor 5 SF $2,243 Work Sink st Floor EA $39 Classroom #24 (Other Instructional Use) Casework 2nd Floor LF $28 Ceiling - Lay-in 2nd Floor 35 SF $,9 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Transom Window 2nd Floor SF $9 Doors - Wood Doors inclu hw 2nd Floor 3 EA $93 Floor - Carpet 2nd Floor 35 SF $8 Lighting - Lay-in 2nd Floor EA Marker Board 2nd Floor LF Storage/ Closet 2nd Floor 35 SF $254 Walls - Concrete Block 2nd Floor SF $,94 Work Sink 2nd Floor EA $39 Classroom #25 () Casework 2nd Floor 28 LF 4 $2,99 Face and edge lamination is missing/damaged. Ceiling - Lay-in 2nd Floor 52 SF $,958 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor EA $3 Door closer is missing. Floor - Tile 2nd Floor 52 SF $,42 Lighting - Lay-in 2nd Floor 4 EA Marker Board 2nd Floor 8 LF Walls - Concrete Block 2nd Floor 45 SF $,89 Walls - Plaster/Drywall 2nd Floor 3 SF $828 Wall added between Work Sink 2nd Floor 3 EA $,3 GREELE Page 8 of 2 Assessment Date: 4/8/4

9 Category: Classrooms Classroom #2 () Casework 2nd Floor 24 LF $ Ceiling - Lay-in 2nd Floor 55 SF $,52 Chalk Board 2nd Floor 8 LF 4 $34 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor EA $3 Floor - Tile 2nd Floor 55 SF $,23 Lighting - Lay-in 2nd Floor 2 EA Storage/ Closet 2nd Floor 5 SF $9 Walls - Concrete Block 2nd Floor 53 SF $, W Sheridan Rd Chicago, IL 3 Walls - Plaster/Drywall 2nd Floor 3 SF $828 Wall added between Classroom #2 () Casework 2nd Floor 5 LF $39 Ceiling - Lay-in 2nd Floor 8 SF $2,342 Chalk Board 2nd Floor 8 LF 4 $,53 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor EA $3 Floor - Carpet 2nd Floor 8 SF 4 $,2 Carpet is worn and very stained. If carpet cannot be cleaned, it should be replaced. Lighting - Lay-in 2nd Floor 8 EA Walls - Concrete Block 2nd Floor 9 SF $2,59 Classroom #28 () Casework 2nd Floor 8 LF $455 Ceiling - Lay-in 2nd Floor 8 SF $2,42 Chalk Board 2nd Floor 8 LF 4 $,53 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor EA $3 Floor - Tile 2nd Floor 8 SF $,5 Lighting - Lay-in 2nd Floor 8 EA Walls - Concrete Block 2nd Floor 9 SF $2,38 Walls - Concrete Block 2nd Floor SF 5 $225 Vertical crack in cmu at south east corner. Work Sink 2nd Floor EA $39 Classroom #29 () Casework 2nd Floor 2 LF $33 Ceiling - Lay-in 2nd Floor 8 SF $2,42 Chalk Board 2nd Floor 8 LF 4 $,53 Doors - Side-lite 2nd Floor 2 SF $334 GREELE Page 9 of 2 Assessment Date: 4/8/4

10 Category: Classrooms Classroom #29 () Doors - Wood Doors inclu hw 2nd Floor EA $3 832 W Sheridan Rd Chicago, IL 3 Floor - Carpet 2nd Floor 8 SF 4 $,35 Carpet is worn and very stained. If carpet cannot be cleaned, it should be replaced. Lighting - Lay-in 2nd Floor 8 EA Walls - Concrete Block 2nd Floor 9 SF $2,38 Walls - Concrete Block 2nd Floor SF 5 $225 Vertical crack in cmu at south west corner. Classroom #22 () Casework 2nd Floor 5 LF $39 Ceiling - Lay-in 2nd Floor 8 SF $2,42 Chalk Board 2nd Floor 8 LF 4 $,53 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor EA $3 Floor - Carpet 2nd Floor 8 SF 4 $,35 Carpet is worn and very stained. If carpet cannot be cleaned, it should be replaced. Lighting - Lay-in 2nd Floor 8 EA Walls - Concrete Block 2nd Floor 925 SF $2,2 Classroom #22 (Computer Lab) Ceiling - Lay-in 2nd Floor 8 SF $2,342 Chalk Board 2nd Floor 8 LF 4 $,53 Charging Station 2nd Floor 2 EA Two units were found directly outside classroom door, but not in the classroom. Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor EA $3 Floor - Tile 2nd Floor 8 SF $, Lighting - Lay-in 2nd Floor 8 EA Walls - Concrete Block 2nd Floor 9 SF $2,38 Walls - Plaster/Drywall 2nd Floor 2 SF $34 Wall was added between B Classroom #22B () Casework 2nd Floor 4 LF $354 Ceiling - Lay-in 2nd Floor 528 SF $,58 Chalk Board 2nd Floor LF 4 $98 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor EA $3 Floor - Tile 2nd Floor 528 SF $,55 Lighting - Lay-in 2nd Floor 2 EA Marker Board 2nd Floor 8 LF Walls - Concrete Block 2nd Floor 8 SF $2,345 GREELE Page of 2 Assessment Date: 4/8/4

11 832 W Sheridan Rd Chicago, IL 3 Category: Classrooms Classroom #22B () Classroom #224 (Science Lab Level 3) Casework 2nd Floor 52 LF 5 $,82 Ceiling - Lay-in 2nd Floor 928 SF $2,8 Some tiles have water damage and should be replaced. Chalk Board 2nd Floor 8 LF 4 $,53 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor 2 EA $2 Floor - Tile 2nd Floor 928 SF $2,3 Chairs are leaving dark markings on floor tile. Gas Line 2nd Floor EA Located at teacher station only. Lighting - Lay-in 2nd Floor 8 EA Storage/ Closet 2nd Floor SF $49 Walls - Concrete Block 2nd Floor 98 SF $2,83 Walls - Concrete Block 2nd Floor 2 SF 5 $282 oted several large holes in the terrazzo walls below casework, which should be repaired. Work Sink 2nd Floor EA $39 Work Sink 2nd Floor 3 EA 5 $4,523 Three sinks are non-operational. Classroom #228 (Other Instructional Use) Ceiling - Lay-in 2nd Floor,99 SF $3,3 Room is used as both a teachers lounge and a small group instructional space. Doors - Side-lite 2nd Floor 2 SF $334 Doors - Wood Doors inclu hw 2nd Floor 4 EA $,24 Doors - Wood Doors inclu hw 2nd Floor EA 4 $3,43 Door is cracked vertically down core and should be replaced. Floor - Carpet 2nd Floor 525 SF 5 $2,95 Floor - Tile 2nd Floor 54 SF $,25 Lighting - Lay-in 2nd Floor EA Storage/ Closet 2nd Floor 2 SF $8 Walls - Concrete Block 2nd Floor,2 SF $3,55 Classroom #34 (Other Instructional Use) Ceiling - Lay-in 3rd Floor SF $2,23 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Wood Doors inclu hw 3rd Floor 2 EA $2 Door is missing closer. Floor - Carpet 3rd Floor SF 5 $3,3 Carpet is worn and very stained. If carpet cannot be cleaned, it should be replaced. Lighting - Lay-in 3rd Floor 5 EA Marker Board 3rd Floor LF $29 Portable unit. Walls - Concrete Block 3rd Floor 9 SF $2,38 GREELE Page of 2 Assessment Date: 4/8/4

12 Category: Classrooms Classroom #3 () Casework 3rd Floor 2 LF $53 Ceiling - Lay-in 3rd Floor 85 SF $2,28 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 832 W Sheridan Rd Chicago, IL 3 Floor - Carpet 3rd Floor 9 SF 5 $3,542 Carpet is worn and very stained. If carpet cannot be cleaned, it should be replaced. Floor - Tile 3rd Floor 85 SF $45 Lighting - Lay-in 3rd Floor 8 EA Walls - Concrete Block 3rd Floor 98 SF $2,89 Work Sink 3rd Floor EA $39 Classroom #3 () Casework 3rd Floor 2 LF $53 Ceiling - Lay-in 3rd Floor 852 SF $2,559 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 Floor - Carpet 3rd Floor SF $,428 Floor - Tile 3rd Floor 82 SF $398 Lighting - Lay-in 3rd Floor 8 EA Walls - Concrete Block 3rd Floor 952 SF $2,9 Work Sink 3rd Floor EA $39 Classroom #38 () Casework 3rd Floor 5 LF $39 Ceiling - Lay-in 3rd Floor 529 SF $,589 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA 5 $,4 Floor - Carpet 3rd Floor 529 SF 5 $2, Lighting - Lay-in 3rd Floor 2 EA Storage/ Closet 3rd Floor 48 SF $348 Walls - Concrete Block 3rd Floor 9 SF $2,3 Classroom #32 () Casework 3rd Floor 3 LF $83 Ceiling - Lay-in 3rd Floor 92 SF $2,889 Chalk Board 3rd Floor 8 LF 4 $,53 GREELE Page 2 of 2 Assessment Date: 4/8/4

13 832 W Sheridan Rd Chicago, IL 3 Category: Classrooms Classroom #32 () Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 Floor - Carpet 3rd Floor 2 SF 5 $3,399 Floor - Tile 3rd Floor 3 SF $5 Lighting - Lay-in 3rd Floor 2 EA Walls - Concrete Block 3rd Floor, SF $3,4 Work Sink 3rd Floor EA $39 Classroom #32 () Casework 3rd Floor 2 LF 5 $5,43 Casework at sink is missing pulls and lamination is missing on edges. Ceiling - Lay-in 3rd Floor 852 SF $2,559 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA 4 $3,43 Door is cracked lengthwise down core and needs to be replaced. Door closer is missing. Floor - Tile 3rd Floor 852 SF $,84 Lighting - Lay-in 3rd Floor 8 EA Walls - Concrete Block 3rd Floor 952 SF $2,9 Work Sink 3rd Floor EA $39 Classroom #322 () Casework 3rd Floor 2 LF $53 Ceiling - Lay-in 3rd Floor 852 SF $2,559 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 Floor - Carpet 3rd Floor SF 4 $, Carpet is worn and very stained. If carpet cannot be cleaned, it should be replaced. Floor - Tile 3rd Floor 82 SF $398 Lighting - Lay-in 3rd Floor 8 EA Walls - Concrete Block 3rd Floor 952 SF $2,9 Work Sink 3rd Floor EA $39 Classroom #323 () Casework 3rd Floor 2 LF $53 Ceiling - Lay-in 3rd Floor 852 SF $2,559 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 GREELE Page 3 of 2 Assessment Date: 4/8/4

14 Category: Classrooms Classroom #323 () 832 W Sheridan Rd Chicago, IL 3 Floor - Carpet 3rd Floor SF 4 $, Carpet is worn and very stained. If carpet cannot be cleaned, it should be replaced. Floor - Tile 3rd Floor 82 SF $398 Lighting - Lay-in 3rd Floor 8 EA Walls - Concrete Block 3rd Floor 952 SF $2,9 Work Sink 3rd Floor EA $39 Classroom #324 () Casework 3rd Floor 2 LF $53 Ceiling - Lay-in 3rd Floor 852 SF $2,559 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 Floor - Tile 3rd Floor 852 SF $,84 Lighting - Lay-in 3rd Floor 8 EA Walls - Concrete Block 3rd Floor 952 SF $2,9 Work Sink 3rd Floor EA $39 Classroom #325 () Casework 3rd Floor 2 LF $33 Ceiling - Lay-in 3rd Floor 55 SF $, Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 Floor - Carpet 3rd Floor 44 SF 5 $2,259 Floor - Tile 3rd Floor SF $254 Lighting - Lay-in 3rd Floor 2 EA Walls - Concrete Block 3rd Floor 8 SF $2,28 Work Sink 3rd Floor EA $39 Classroom #32 () Casework 3rd Floor 22 LF $55 Ceiling - Lay-in 3rd Floor 928 SF $2,8 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Side-lite 3rd Floor 2 SF $334 Doors - Wood Doors inclu hw 3rd Floor EA $3 Floor - Tile 3rd Floor 928 SF $2,3 Lighting - Lay-in 3rd Floor 2 EA Walls - Concrete Block 3rd Floor 98 SF $2,83 GREELE Page 4 of 2 Assessment Date: 4/8/4

15 Category: Classrooms Classroom #32 () 832 W Sheridan Rd Chicago, IL 3 Walls - Concrete Block 3rd Floor 2 SF 5 $282 Vertical crack in cmu at north east corner. Work Sink 3rd Floor EA $39 Classroom #328 () Casework 3rd Floor 24 LF $ Ceiling - Lay-in 3rd Floor 85 SF $2,28 Chalk Board 3rd Floor 8 LF 4 $,53 Doors - Wood Doors inclu hw 3rd Floor EA $3 Floor - Carpet 3rd Floor 35 SF 5 $3,3 Floor - Tile 3rd Floor 4 SF $3 Lighting - Lay-in 3rd Floor 9 EA Walls - Concrete Block 3rd Floor 9 SF $2,844 Terrazzo block. Work Sink 3rd Floor EA $39 Classroom #33 (Other Instructional Use) Ceiling - Exposed 3rd Floor 4 SF Metal panel system. Doors - Steel Doors incl hw 3rd Floor EA Floor - Tile 3rd Floor 4 SF $3 Lighting - Pendent/Surface 3rd Floor 4 EA Walls - Metal Panel 3rd Floor 34 SF Classrooms Subtotal: $32,84 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in Assistant Principal 3 8 SF $24 Doors - Wood Doors inclu hw Assistant Principal 3 EA $3 Floor - Carpet Assistant Principal 3 8 SF $ Lighting - Lay-in Assistant Principal 3 2 EA $238 Power Distribution Assistant Principal 3 4 EA Walls - Concrete Block Assistant Principal SF $95 Ceiling - Lay-in Building Engineer 58 SF 5 $345 Doors - Wood Doors inclu hw Building Engineer 2 EA $2 Floor - Tile Building Engineer 58 SF $2 Lighting - Lay-in Building Engineer EA Power Distribution Building Engineer 4 EA $8,5 GREELE Page 5 of 2 Assessment Date: 4/8/4

16 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Storage/ Closet Building Engineer 4 SF $29 Walls - Concrete Block Building Engineer 2 SF $ Ceiling - Lay-in Conference SF Doors - Wood Doors inclu hw Conference 25 EA $3 Floor - Carpet Conference SF $484 Lighting - Lay-in Conference 25 4 EA Power Distribution Conference 25 4 EA Walls - Concrete Block Conference SF $,4 Ceiling - Lay-in Kitchen Manager 52 SF $5 Doors - Wood Doors inclu hw Kitchen Manager EA $3 Floor - Tile Ceramic/ Porcelain Kitchen Manager 52 SF $ Lighting - Lay-in Kitchen Manager 2 EA Power Distribution Kitchen Manager 2 EA Walls - Concrete Block Kitchen Manager 2 SF $58 Ceiling - Lay-in Main Office - open area 882 SF Doors - Wood Doors inclu hw Main Office - open area EA $3 832 W Sheridan Rd Chicago, IL 3 Floor - Carpet Main Office - open area 882 SF 4 $8, worn and deteriorated Lighting - Lay-in Main Office - open area 5 EA $595 Recessed halogens Lighting - Lay-in Main Office - open area 5 EA Power Distribution Main Office - open area 22 EA $4,4 Storage/ Closet Main Office - open area 9 SF $5 Walls - Concrete Block Main Office - open area, SF $4,984 Ceiling - Lay-in Office A SF $98 Doors - Wood Doors inclu hw Office A EA Floor - Carpet Office A SF $4 Lighting - Lay-in Office A 2 EA Power Distribution Office A 2 EA Walls - Concrete Block Office A 295 SF Ceiling - Lay-in Office B 88 SF $24 Doors - Wood Doors inclu hw Office B EA $3 Floor - Tile Office B 88 SF $93 Lighting - Lay-in Office B 2 EA Power Distribution Office B 4 EA Walls - Concrete Block Office B 322 SF Ceiling - Lay-in Office C 88 SF Doors - Wood Doors inclu hw Office C EA $3 Floor - Tile Office C 88 SF $93 GREELE Page of 2 Assessment Date: 4/8/4

17 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Lighting - Lay-in Office C 2 EA Power Distribution Office C 4 EA Walls - Concrete Block Office C 322 SF AC Unit Principal Office 39 EA in wall Ceiling - Lay-in Principal Office SF Doors - Wood Doors inclu hw Principal Office 39 EA $3 Floor - Carpet Principal Office SF $5 Lighting - Lay-in Principal Office 39 EA Power Distribution Principal Office 39 8 EA Walls - Concrete Block Principal Office SF $,548 Auditorium & Theater Gymnasia 832 W Sheridan Rd Chicago, IL 3 Ceiling - Lay-in KIVA - Enter on st + 2nd floor 2,5 SF 5 $4,82 Water damage. Will need a lift to replace damaged panels. Doors - Transom Window KIVA - Enter on st + 2nd floor 28 SF $44 Doors - Wood Doors inclu hw KIVA - Enter on st + 2nd floor 4 EA $,24 Floor - Carpet KIVA - Enter on st + 2nd floor 2, SF 4 $24,82 Carpet florring, seating and stairs are worn and torn in areas, which can become a tripping hazard. Carpet area is included in flooring below.does not include stage carpeting, which is shown below. Lighting - Lay-in KIVA - Enter on st + 2nd floor 44 EA Sound System KIVA - Enter on st + 2nd floor EA Stage KIVA - Enter on st + 2nd floor 4 SF 5 $,9 Carpet. Stage Lift KIVA - Enter on st + 2nd floor EA Stage-Stairs - Tile KIVA - Enter on st + 2nd floor 3 LF 5 $4 Stairs are actually carpet, but that was not an option. Stairs - Tile KIVA - Enter on st + 2nd floor 2 LF $,39 Carpet area shown included in flooring. Storage/ Closet KIVA - Enter on st + 2nd floor 25 SF $,83 Below stage platform (3'-8" stage height) Walls - Concrete Block KIVA - Enter on st + 2nd floor 2,335 SF $,845 Walls - Plaster/Drywall KIVA - Enter on st + 2nd floor 24 SF $,43 Area above wall partition. Ceiling - Exposed st Floor 4, SF $5,949 Doors - Transom Window st Floor 28 SF $44 Doors - Wood Doors inclu hw st Floor EA $,8 Floor - Tile st Floor 4, SF $8,52 Lighting - Pendent/Surface st Floor 24 EA Scoreboards st Floor EA Sound System st Floor EA GREELE Page of 2 Assessment Date: 4/8/4

18 Category: Rooms (Other Than Classrooms) Gymnasia 832 W Sheridan Rd Chicago, IL 3 Storage/ Closet st Floor SF $435 ot included in gym sf. Walls - Concrete Block st Floor 5 SF 5 $,43 Water infiltration/damage noted at upper area of wall. Walls have no padding. Walls - Concrete Block st Floor 4,8 SF $4,2 Kitchen Library Ceiling - Lay-in st Floor 95 SF $2,8 Doors - Wood Doors inclu hw st Floor 5 EA $,55 Floor - Tile Ceramic/ Porcelain st Floor 95 SF $2,23 Lighting - Lay-in st Floor 2 EA Serving Line st Floor 23 LF Storage/ Closet st Floor 25 SF $,48 Walls - Concrete Block st Floor,4 SF $4,4 Casework 2nd Floor 35 LF $3,49 Book fair ongoing. Unable to confirm all casework. Ceiling - Lay-in 2nd Floor 2,4 SF $,2 Doors - Side-lite 2nd Floor 2 SF $334 Doors - Transom Window 2nd Floor 4 SF $23 Doors - Wood Doors inclu hw 2nd Floor 2 EA $2 Floor - Carpet 2nd Floor 2,4 SF $5,4 Lighting - Lay-in 2nd Floor 4 EA Walls - Concrete Block 2nd Floor 2, SF $,332 Lunch & Multipurpose Room Ceiling - Lay-in st Floor,84 SF $5,44 Floor - Tile st Floor,84 SF $3,99 Lighting - Lay-in st Floor 25 EA Walls - Concrete Block st Floor,528 SF $4,49 Mechanical/ Service Rooms Restroom Janitor's Closet Loading Dock/Receiving Area 9 SF $4 Includes a mop sink. Loading Docks Loading Dock/Receiving Area 9 SF $,3 Storage Room Loading Dock/Receiving Area SF $544 ot included in Loading Dock/Receiving Area sf. Accessories 4 Kindergarten 2 SF $ Ceiling - Plaster/Drywall 4 Kindergarten 2 SF Doors - Wood Doors inclu hw 4 Kindergarten EA $3 Floor - Tile Ceramic/ Porcelain 4 Kindergarten 2 SF $25 GREELE Page 8 of 2 Assessment Date: 4/8/4

19 Category: Rooms (Other Than Classrooms) Restroom 832 W Sheridan Rd Chicago, IL 3 Lighting - Wall Mounted 4 Kindergarten EA 4 $393 rusted/damaged Walls - Concrete Block 4 Kindergarten SF $293 Water Closet 4 Kindergarten EA 5 $,344 ot operational. Intense odors. Accessories 4 Kindergarten 2 SF $ Ceiling - Plaster/Drywall 4 Kindergarten 2 SF Doors - Wood Doors inclu hw 4 Kindergarten EA $3 Floor - Tile Ceramic/ Porcelain 4 Kindergarten 2 SF $25 Lighting - Wall Mounted 4 Kindergarten EA Walls - Concrete Block 4 Kindergarten SF $293 Water Closet 4 Kindergarten EA 4 $,9 Toilet dismantled. ot working. Intense odors. Accessories st Floor 54 SF Accessories st Floor 54 SF Ceiling - Plaster/Drywall st Floor 54 SF $533 Ceiling - Plaster/Drywall st Floor 54 SF Floor Drain st Floor EA $,59 Floor Drain st Floor EA $,59 Floor - Tile st Floor 54 SF $33 Floor - Tile st Floor 54 SF $33 Hand Dryer st Floor EA Hand Dryer st Floor EA Lavatory st Floor 2 EA $39 Lavatory st Floor 2 EA $39 Lighting - Lay-in st Floor 4 EA Lighting - Lay-in st Floor 4 EA $4 Partitions st Floor 2 EA $594 Partitions st Floor 4 EA $,88 Urinals st Floor 4 EA $,344 Walls - Concrete Block st Floor 4 SF $,93 Walls - Concrete Block st Floor 45 SF $,8 Water Closet st Floor 4 EA $,344 Water Closet st Floor 2 EA $2 Accessories 2nd Floor Accessible 3 SF Ceiling - Plaster/Drywall 2nd Floor Accessible 3 SF Doors - Wood Doors inclu hw 2nd Floor Accessible EA Floor Drain 2nd Floor Accessible EA Floor - Tile 2nd Floor Accessible 3 SF $8 Lavatory 2nd Floor Accessible EA $32 GREELE Page 9 of 2 Assessment Date: 4/8/4

20 832 W Sheridan Rd Chicago, IL 3 Category: Rooms (Other Than Classrooms) Restroom Lighting - Pendent/Surface 2nd Floor Accessible 2 EA Walls - Concrete Block 2nd Floor Accessible 89 SF Water Closet 2nd Floor Accessible EA Accessories 2nd Floor Unisex 5 SF Ceiling - Plaster/Drywall 2nd Floor Unisex 5 SF Doors - Wood Doors inclu hw 2nd Floor Unisex EA Floor - Tile 2nd Floor Unisex 5 SF $42 Lavatory 2nd Floor Unisex EA Lighting - Pendent/Surface 2nd Floor Unisex EA Partitions 2nd Floor Unisex 2 EA $594 Walls - Concrete Block 2nd Floor Unisex 2 SF Water Closet 2nd Floor Unisex EA Accessories 2nd Floor 54 SF Accessories 2nd Floor 54 SF Ceiling - Plaster/Drywall 2nd Floor 54 SF Ceiling - Plaster/Drywall 2nd Floor 54 SF Floor Drain 2nd Floor EA Floor Drain 2nd Floor EA Floor - Tile 2nd Floor 54 SF $33 Floor - Tile 2nd Floor 54 SF $33 Hand Dryer 2nd Floor EA Hand Dryer 2nd Floor EA Lavatory 2nd Floor 2 EA $39 Lavatory 2nd Floor 2 EA $39 Lighting - Lay-in 2nd Floor 4 EA Lighting - Lay-in 2nd Floor 4 EA Partitions 2nd Floor 2 EA $594 Partitions 2nd Floor 4 EA $,88 Urinals 2nd Floor 4 EA Walls - Concrete Block 2nd Floor 45 SF Walls - Concrete Block 2nd Floor 45 SF $,8 Water Closet 2nd Floor 2 EA Water Closet 2nd Floor 4 EA $,344 Accessories 3rd Floor 54 SF $,42 Accessories 3rd Floor 54 SF $,42 Ceiling - Plaster/Drywall 3rd Floor 54 SF $533 Ceiling - Plaster/Drywall 3rd Floor 54 SF $533 GREELE Page 2 of 2 Assessment Date: 4/8/4

21 Category: Rooms (Other Than Classrooms) Restroom Floor Drain 3rd Floor EA $,59 Floor Drain 3rd Floor EA $,59 Floor - Tile 3rd Floor 54 SF $33 Floor - Tile 3rd Floor 54 SF $33 Hand Dryer 3rd Floor EA $23 Hand Dryer 3rd Floor EA Lavatory 3rd Floor 2 EA $39 Lavatory 3rd Floor 2 EA $39 Lighting - Lay-in 3rd Floor 4 EA $4 Lighting - Lay-in 3rd Floor 4 EA $4 Partitions 3rd Floor 4 EA $,88 Partitions 3rd Floor 2 EA $594 Urinals 3rd Floor 4 EA $,344 Walls - Concrete Block 3rd Floor 45 SF $,8 Walls - Concrete Block 3rd Floor 4 SF $, W Sheridan Rd Chicago, IL 3 Water Closet 3rd Floor EA 4 $,9 out of order Water Closet 3rd Floor 3 EA $,8 Water Closet 3rd Floor 2 EA $2 Accessories Main Office 23 SF $22 Ceiling - Plaster/Drywall Main Office 23 SF $8 Doors - Wood Doors inclu hw Main Office EA $3 Floor - Tile Ceramic/ Porcelain Main Office 23 SF $49 Lavatory Main Office EA Lighting - Wall Mounted Main Office EA Walls - Concrete Block Main Office 5 SF $44 Water Closet Main Office EA Accessories Principal's Toilet 3 SF $2 Ceiling - Plaster/Drywall Principal's Toilet 3 SF $4 Doors - Wood Doors inclu hw Principal's Toilet EA $3 Floor - Tile Principal's Toilet 3 SF $ Lavatory Principal's Toilet EA $32 Lighting - Wall Mounted Principal's Toilet EA $24 Walls - Concrete Block Principal's Toilet 2 SF $328 Walls - Plaster/Drywall Principal's Toilet 32 SF $88 Water Closet Principal's Toilet EA $33 Accessories Receiving Dock - Men's 4 SF $59 Ceiling - Plaster/Drywall Receiving Dock - Men's 4 SF $22 GREELE Page 2 of 2 Assessment Date: 4/8/4

22 Category: Rooms (Other Than Classrooms) Restroom Doors - Wood Doors inclu hw Receiving Dock - Men's EA $3 Floor Drain Receiving Dock - Men's EA $,59 Floor - Tile Ceramic/ Porcelain Receiving Dock - Men's 55 SF $ Lavatory Receiving Dock - Men's EA 832 W Sheridan Rd Chicago, IL 3 Lighting - Pendent/Surface Receiving Dock - Men's EA 4 $54 Missing lens. Partitions Receiving Dock - Men's EA 4 $,98 Support rusted off. Showers Receiving Dock - Men's EA $3 Urinals Receiving Dock - Men's EA Walls - Concrete Block Receiving Dock - Men's 2 SF $58 Walls - Plaster/Drywall Receiving Dock - Men's 8 SF $25 Water Closet Receiving Dock - Men's EA Accessories Receiving Dock - Women's 2 SF $52 Ceiling - Plaster/Drywall Receiving Dock - Women's 2 SF $25 Doors - Wood Doors inclu hw Receiving Dock - Women's EA $3 Floor Drain Receiving Dock - Women's EA $,59 Floor - Tile Ceramic/ Porcelain Receiving Dock - Women's 53 SF $2 Lavatory Receiving Dock - Women's EA Lighting - Pendent/Surface Receiving Dock - Women's EA 4 $54 Missing lens. Partitions Receiving Dock - Women's EA 4 $,98 Rusted at floor. Showers Receiving Dock - Women's EA $3 Being used for storage. Walls - Concrete Block Receiving Dock - Women's 22 SF $3 Walls - Plaster/Drywall Receiving Dock - Women's 8 SF $25 Shower enclosure. Water Closet Receiving Dock - Women's EA Rooms (Other Than Classrooms) Subtotal: $299,994 Category: Building Interior Corridor Ceiling - Lay-in st Floor 3,9 SF $, Doors - Wood Doors include hw st Floor 4 EA $,24 Drinking Fountains - Single Fountain st Floor 2 EA $55 Floor - Tile/Sheet st Floor 3,9 SF $2,28 Lighting - Lay-in st Floor 4 EA Student Lockers - One Tier st Floor 24 EA 5 $3,34 Walls - Concrete Block st Floor 4,599 SF $3,482 GREELE Page 22 of 2 Assessment Date: 4/8/4

23 Category: Building Interior Corridor Ceiling - Lay-in 2nd Floor 2, SF $,35 Doors - Wood Doors include hw 2nd Floor 3 EA $93 Drinking Fountains - Single Fountain 2nd Floor 2 EA $55 Floor - Tile/Sheet 2nd Floor 2, SF $,5 Lighting - Lay-in 2nd Floor 2 EA $2,38 Walls - Concrete Block 2nd Floor 3,8 SF $9,5 Ceiling - Lay-in 3rd Floor,924 SF $5,8 Doors - Side-lite 3rd Floor EA $,3 Doors - Wood Doors include hw 3rd Floor 3 EA $93 Drinking Fountains - Double Fountain 3rd Floor EA Floor - Tile/Sheet 3rd Floor,924 SF $,4 Lighting - Lay-in 3rd Floor EA 832 W Sheridan Rd Chicago, IL 3 Walls - Concrete Block 3rd Floor 2,9 SF $8,5 Requires cleaning where children can reach wall in high traffic areas. Safety Stairs Camera Viewing Station Exterior Parking EA 4 $5,4 Building Engineer stated it was located in the main office, but was not functioning. Security Cameras Exterior Parking 2 EA 4 $2,5 ot functioning. Floor - Tile Ceramic/ Porcelain orth / st Floor 285 SF $,9 Lighting - Lay-in orth / st Floor 2 EA $238 Engineer said they were halogen. Ceiling - Plaster/Drywall orth 3 SF Handrails orth LF $8 Lighting - Lay-in orth EA Lighting - Wall Mounted orth 4 EA Stairs - Tile orth 98 LF $,838 Walls - Concrete Block orth,925 SF $5,43 34'-" ceiling height. Ceiling - Plaster/Drywall South East 448 SF Floor - Tile Ceramic/ Porcelain South East 34 SF $2,32 Handrails South East LF $8 Lighting - Lay-in South East 8 EA Lighting - Wall Mounted South East 4 EA Stairs - Tile South East 98 LF $,838 Walls - Concrete Block South East,925 SF $5,43 34'-" ceiling height. Floor - Tile Ceramic/ Porcelain South West / st Floor 2 SF $,34 Ceiling - Plaster/Drywall South West 335 SF Handrails South West LF $8 GREELE Page 23 of 2 Assessment Date: 4/8/4

24 Category: Building Interior Stairs Lighting - Lay-in South West EA Lighting - Wall Mounted South West 4 EA 832 W Sheridan Rd Chicago, IL 3 Stairs - Tile South West 98 LF $,838 (4 Tread + 4 Landings) x 4'-" wide. Walls - Concrete Block South West,89 SF $5,54 34'-" ceiling height. Vertical Conveyance Elevator - Hydraulic Elevator South EA Building Interior Subtotal: $8,93 Total Building Cost $,948,82 SITE Category: Site Civil/Drainage Civil/ Drainage - Catch Basin Entire Site 5 EA Civil/ Drainage - Site Manhole Entire Site 8 EA Fencing Landscape Parking Lot Fencing - Chain Link Entire Site 8 LF $3,492 west of playlot and east mechanical enclosure Fencing - Guard Rail Entire Site LF W parking lot Fencing - ew Standard Ornamental Entire Site 9 LF $25,395 Benches Entire Site 2 EA west playlot and main entry Landscape - Grass Entire Site 3,3 SF Landscape - Hardscape- Concrete Entire Site,45 SF 5 $,8 SE corner- cracked; used for parking Landscape - Hardscape- Concrete Entire Site 8,4 SF Landscape - Hardscape- Concrete Entire Site / Site - East 95 SF 5 $, uneven settling Parkway trees Entire Site / Site South 2 EA Planting Beds/ Area Entire Site 45 SF main entry and south Play Area - Asphalt/ Hardscape Entire Site 8,3 SF $2,98 west playlot- cracked Trash Receptacles Entire Site 3 EA $93 west playlot Concrete Curbs Entire Site 39 LF $5,8 E parking lot and W corner- cracking Surface - Asphalt Entire Site 2, SF W lot GREELE Page 24 of 2 Assessment Date: 4/8/4

25 SITE Category: Site Parking Lot Playground Sidewalks Signage 832 W Sheridan Rd Chicago, IL 3 Surface - Asphalt Entire Site / Site - East 4,3 SF 5 $9,5 crumbling surface Surface - Concrete Entire Site 4 SF $,3 W corner Equipment - Combo 3-2 West EA $,92 Equipment - Pre K 3-5 Main Entrance EA Surface - Poured Surface Main Entrance 84 SF Surface - Square Rubber Mats West 2,25 SF $,94 west playlot Sidewalks - Perimeter Sidewalks Entire Site,425 SF $4,59 & S Flag Pole - Building Mounted Flag Pole Entire Site EA SW corner Marquee - Building Mounted Back Lighted w/ LED Entire Site EA SW corner Monument - Building Mounted Cut Letter Sign Entire Site / West Façade EA Site Subtotal: $38,322 Total Site Cost $38,322 Campus Total ² ³ $2,8,54 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). GREELE Page 25 of 2 Assessment Date: 4/8/4

26 832 W Sheridan Rd Chicago, IL 3 Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. GREELE Page 2 of 2 Assessment Date: 4/8/4

27 832 W Sheridan Rd Chicago, IL 3 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Computer Lab Kindergarten Kindergarten Other Instructional Use Other Instructional Use Other Instructional Use Other Instructional Use Pre School Science Lab Level 3 Other Instructional Use Kindergarten Kindergarten Other Instructional Use Faculty Lounge Other Instructional Use Pre School Science Lab Level 3 2nd Floor st Floor st Floor 2nd Floor 2nd Floor 3rd Floor 3rd Floor st Floor st Floor st Floor st Floor st Floor 2nd Floor 2nd Floor 2nd Floor 2nd Floor 2nd Floor 2nd Floor 2nd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 2nd Floor / B ,99 4 2, GREELE Page 2 of 2 Assessment Date: 4/8/4

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619 E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 Linder Ave Chicago, IL 030 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Jane Addams Elementary School S Avenue H Chicago, IL 60617

Jane Addams Elementary School S Avenue H Chicago, IL 60617 00 S Avenue H Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

BOWIE LEARNING CENTER

BOWIE LEARNING CENTER BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28- 1 Metz Elementary School Site Summary Address 84 Robert Martinez Jr. Austin, TX 78702 Number of Permanent Campus Facilities 1 Original Year of Construction 1993 Total Campus Building Area (combined) 61,905

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet FLANDERS ELEMENTARY SCHOOL Located at 167 Boston Post Road, East Lyme, Connecticut the school s original structure was built in 1964 and replaced the Central Office Building as the elementary school. Two

More information

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good. EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

CARL E. SCHLUTER ELEMENTARY SCHOOL

CARL E. SCHLUTER ELEMENTARY SCHOOL CARL E. SCHLUTER ELEMENTARY SCHOOL Carl E. Schluter Elementary School Campus Data CARL E. SCHLUTER ELEMENTARY SCHOOL 1220 Mesa Crest Drive, Haslet, Texas 76052 Year Built 2011 Approx. Total Square Footage

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

INSPIRE each student to develop a strong

INSPIRE each student to develop a strong DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

TERMINAL BUILDING EVALUATION

TERMINAL BUILDING EVALUATION TERMINAL BUILDING EVALUATION 1.0 INTRODUCTION This report evaluates the existing Terminal Building at Frederick Municipal Airport (FDK) to determine the suitability of the building for continued use as

More information

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX 423.1 Scope: Public educational facilities 423.2 Public schools and community colleges general requirements 423.2.1 Owner 423.2.2 Exemption from local requirements 423.2 Code enforcement 423.3.1 School

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Facilities Condition Assessment Qualcomm Stadium

Facilities Condition Assessment Qualcomm Stadium Qualcomm Stadium Facilities Condition Assessment Qualcomm Stadium Facilities Condition Assessment AECOM San Diego, California April 2011 Qualcomm Stadium Qualcomm Stadium Facilities Condition Assessment

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS

HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS 1 Page 1 of 28 HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS HISTORIC PLAN NOT TO SCALE NORTH 2 Page 2 of 28 SITE PLAN NOT TO SCALE NORTH 3 Page 3 of 28 BUILDING INSPECTION REPORT The assessment of site and

More information

Cost Estimate Details

Cost Estimate Details C 0131 1 Inadequate Parking Construct or Expand Parking Lots $67,000 F 0132 1 Inadequate Drop Off Zone Widen Sidewalk, Construct Pathway and $77,000 Canopy RR 0132 2 No Landings at Classroom Exits Construct

More information

Morehouse School of Medicine

Morehouse School of Medicine /0/00 Print /0/00 00 Campus General Building ID Built 7098 98 Renovated Gross Square Feet Building Type Current Replace Value 00 - ACADEMIC FALITIES $ FC/QI (%) > 00.00 Electrical Lighting upgrades/retrofits

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

CITY OF NOVI. Police Department

CITY OF NOVI. Police Department CITY OF NOVI Police Department Indoor Gun Range and Training Facility Assessment Analysis with Master Plan for Novi Police Department at Community Build Out Field Services Complex Facility Needs Master

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

DRAFT. Baker Center Special Campus Site Summary 64,153 SF. Introduction

DRAFT. Baker Center Special Campus Site Summary 64,153 SF. Introduction 1 Baker Center Special Campus Site Summary Address 3908 Avenue B Austin, TX 78751 Number of Permanent Campus Facilities 3 Original Year of Construction 1911 Total Campus Building Area (combined) 64,153

More information

TENANT CRITERIA MANUAL INSERT PHOTO HERE

TENANT CRITERIA MANUAL INSERT PHOTO HERE G TENANT CRITERIA MANUAL GREENWOOD MALL INSERT PHOTO HERE General Growth Properties, Inc. 110 N. Wacker Drive Chicago, IL 60606 (312)-960-5000 Tenant shall supply and install an electrical meter

More information

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ). 1. GENERAL GUIDANCE REGARDING DESIGN A. Commissary facilities are Department of Defense (DoD) projects, and as such must be constructed in accordance with the following criteria, codes, and standards.

More information

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ 08014 856-467-3626--- FAX 856-467-9260 Application for Certificate of Occupancy for Change of Occupancy Pursuant to Chapter 119 of the Township

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

3D Home Improvement and Inspection Services, Inc

3D Home Improvement and Inspection Services, Inc Property Inspection Report Cover Page ABC Disney Lane, Winter Garden FL, 34787 Inspection prepared for: John Doe Inspection Date: 7/15/2010 Time: 11:00 am Age: 6 Years Size: 3,378 LSF / 4,427 TSF Weather:

More information

Gerald Desmond Bridge Replacement

Gerald Desmond Bridge Replacement Item # Room # icip. # of Occupants 101 12 Conference / Crew Room 1 400 400 Supervisor Offices Conference and secondary training room for up to 12 people Flooring: VCT Electrical Type: rmal (utility power)

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet 1.0 DESIGN SPECIFICATIONS 1.1 Size of Building and Tract: The facility is approximately 439,350 square feet, located on a 21.86-acre parcel on Wood Dale Road in Wood Dale, Illinois. 1.2 Size of Building

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

NEW YORK STATE MAIN STREET PROGRAM BEFORE & AFTER

NEW YORK STATE MAIN STREET PROGRAM BEFORE & AFTER SUMMARY OGDENSBURG, NY The New York Main Street program (NYMS) is administered by the Office of Community Renewal (OCR) under the direction of the New York State Housing Trust Fund Corporation (HTFC).

More information

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary

More information

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems Facility Condition Assessment Summary Report This report provides a summary of the Facility Condition Index (FCI) value of a school facility and select major building systems. The FCI calculation represents

More information

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken. Building Information - Cincinnati City SD (43752) - Jacobs Center Middle (81778) Program Type: Setting: Assessment Name: Classroom Facilities Assessment Program Urban Jacobs Center Middle School Assessment

More information

2012 IRC Sections R303 R310 Building Planning II

2012 IRC Sections R303 R310 Building Planning II Study Session 3 2012 IRC Sections R303 R310 Building Planning II OBJECTIVE: To develop an understanding of the health and safety criteria of the code, including light and ventilation; minimum room areas

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

Continuing Certificate of Occupancy Pre-Inspection Checklist

Continuing Certificate of Occupancy Pre-Inspection Checklist Pre-Inspection Checklist INTRODUCTION: This pre-inspection checklist has been produced to assist you in preparing for a Continuing Certificate of Occupancy (CCO) inspection. The inspection criteria and

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken. Building Information - Cincinnati City SD (43752) - Whittier Elem (41152) Program Type: Setting: Assessment Name: Classroom Facilities Assessment Program Urban Whittier Elem Assessment Date: 2001-04-11

More information

USER INSTRUCTIONS The FIT is comprised of three parts as follows:

USER INSTRUCTIONS The FIT is comprised of three parts as follows: GENERAL INFORMATION The Facility Inspection Tool (FIT) has been developed by the Office of Public School Construction to determine if a school facility is in good repair as defined by Education Code (EC)

More information

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM Note: This list should be used as a guide and not considered all inclusive. The offeror should use due diligence for any items

More information

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 FORUM for Historic Harvard Property Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 The purpose of this document is to identify in checklist

More information

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax: City of Des Moines Permit and Development Center 602 Robert D Ray Drive Des Moines, IA 50309 Phone: 515-283-4200 Fax: 515-283-4270 This Code Analysis Form must be completed and returned with the Building

More information

New Beautifully Designed Office Condominium Complex. Heading

New Beautifully Designed Office Condominium Complex. Heading FOR SALE DOYLESTOWN EXECUTIVE QUARTERS COMMERCIAL INDUSTRIAL INVESTMENT 2003 Lower State Road Doylestown, Bucks County, PA New Beautifully Designed Office Condominium Complex Heading PRESENTED BY: Kurt

More information

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,

More information

Hotel/Motel. Slip, Trip and Fall Self Inspection Checklist. Completed by: Date: Time:

Hotel/Motel. Slip, Trip and Fall Self Inspection Checklist. Completed by: Date: Time: Hotel/Motel Slip, Trip and Fall Self Inspection Checklist Directions: This checklist will serve to indicate areas where you should focus attention for reducing the potential for slip, trip and fall accidents.

More information

DESIGN DEVELOPMENT PHASE

DESIGN DEVELOPMENT PHASE UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design

More information

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI. Feasibility Report Property Inspection Engineers, Inc. (248) 644-8798 Inspection ate: 10/27/2010 Consultant's Job No: Consultant: Christopher J. aggy Applicant ark Beard Property Address 405 Fairgrove

More information

Building Systems and Design Elements included in SliDeRulE

Building Systems and Design Elements included in SliDeRulE Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

Penns Valley Area School District

Penns Valley Area School District Penns Valley Area School District Table of Contents District Overview... Tab 1/Page 1 Educational Program Overview... Tab 2/Page 3 Existing Conditions Analysis... Tab 3/Page 7 Enrollment Report... Tab

More information

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in

More information

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize

More information

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING PROJECT: 25 E 5 S SALT LAKE CITY, UTAH 84111 CODE ANALYSIS APPLICABLE CODES 675 E. 5 S. Suite 4 DFCM PROJECT NUMBER: 182782 DFCM CONTRACT NUMBER: 18793 STRUCTURAL ENGINEER: REAVELEY ENGINEERS + ASSOCIATES

More information

Madison School District. Strategic Five-Year Facility Maintenance Plan

Madison School District. Strategic Five-Year Facility Maintenance Plan Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since

More information

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification Division 1 Division 2 Division 3 Construction Type Type III B, Not suppressed,

More information

Mount Vernon Elementary School Grades PK 5

Mount Vernon Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Mount Vernon Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Mount

More information

Davis Frame Co., Inc. Construction Budget Considerations

Davis Frame Co., Inc. Construction Budget Considerations Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability

More information

Code Analysis and Conditions Assessment Report. Evanston Arts Center Sheridan Road Evanston, IL Prepared for: City of Evanston

Code Analysis and Conditions Assessment Report. Evanston Arts Center Sheridan Road Evanston, IL Prepared for: City of Evanston Code Analysis and Conditions Assessment Report Evanston Arts Center 2603 Sheridan Road Evanston, IL 60201 Prepared for: City of Evanston Prepared by: McGuire Igleski & Associates, Inc. In Consultation

More information

Fairfax Elementary School 3150 Fairfax Rd, Cleveland Heights, Ohio

Fairfax Elementary School 3150 Fairfax Rd, Cleveland Heights, Ohio District Wide Facilities Evaluation Building Assessment Report Fairfax Elementary School 3150 Fairfax Rd, Cleveland Heights, Ohio prepared for: Cleveland Heights University Heights City School District

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

Proposal Request (attachment to AIA Form G709)

Proposal Request (attachment to AIA Form G709) Proposal Request (attachment to AIA Form G09) PR No: PR-0 Date: January, 06 Project: Great Work Montessori School Owner: Great Work Inc. Architect: Cuningham Group Copy To: File DESCRIPTION OF WORK The

More information

Operational Services Facility Innovation & Readiness Stakeholder Team

Operational Services Facility Innovation & Readiness Stakeholder Team Operational Services Facility Innovation & Readiness Stakeholder Team A great place for kids to learn. A great place for employees to work. A place our community can be proud of. 21 st Century School District!

More information

CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT

CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT DESIGN DEVELOPMENT CQ + MA 100% DD Set 04-28-2015 Canning Warehouse CQ + MA 04-28-2015 Canning Warehouse EXISTING CONDITIONS CQ + MA 04-28-2015 Canning Warehouse

More information

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION 1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the

More information

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles 2017 standard features INTERIOR Cornice w / Full Length Drapes Panels-Main Living Areas only Shaw Moxie Carpet with Pad and Tack Designer Select Congoleum No Wax Vinyl Flooring 8 Flat Ceilings Throughout

More information

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection Slab on Grade & Basements: A capillary break is installed on top of all footings Slab / Pre-Drywall / Thermal Inspection A minimum of 4" of clean or washed gravel (0.5" diameter or greater) is placed over

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken. Building Information - Columbus City SD (43802) - Alum Crest Special School (513) Program Type: Setting: Assessment Name: Classroom Facilities Assessment Program Urban Alum Crest Special School Assessment

More information

Appendix A. Facilities Condition Assessment

Appendix A. Facilities Condition Assessment Appendix A Facilities Assessment Facilities Assessment Facilities Assessment s on the Harford Community College campus have been well-maintained and are in excellent condition. Recent renovations to Havre

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Donnan Elementary / Junior High School B391A Edmonton Report run on: March 8, 211 1:35 AM Building Name: Address: Location: Building Id:

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master

More information

Healthy Homes Provisions of Lansing, Michigan Ordinances Extracted from by National Center for Healthy Housing

Healthy Homes Provisions of Lansing, Michigan Ordinances Extracted from  by National Center for Healthy Housing TITLE 6. HOUSING CHAPTER 1460. HOUSING AND PREMISES CODE Selected Provisions Related to Healthy Homes 1460.02. Applicability. (h) Historic Buildings. The provisions of this Code shall not be mandatory

More information

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment

More information

Homebuyers Survey. Final Report. Mr Client. A Home, A Street, A Town. 3rd July 2014

Homebuyers Survey. Final Report. Mr Client. A Home, A Street, A Town. 3rd July 2014 Homebuyers Survey Final Report Mr Client A Home, A Street, A Town 3rd July 2014 Alpine Water Management Ltd Dorset House Regent Park Kingston Road Leatherhead KT22 7PL Tel: 0845 319 9 319 www.alpinedamp.co.uk

More information