1 OPN ARCHITECTS Home Office Building of The Bankers Life Building, 1940 HISTORICAL OVERVIEW Designed as the home office of The Bankers Life Insurance Company by architects Tinsley, McBroom & Higgins in 1938, the building was declared the Building of the Decade in the June 1940 issue of Architectural Record. From the ground to the highest point, the building rises 145 feet, with six floors, the penthouse, and cooling towers above grade. Exterior surfacing materials include a 23 foot base of rainbow granite with limestone above. The bronze-framed glass-block panels, with clearglass inserts are separated vertically by spandrels of extruded bronze. For the conduct of insurance business, the front portion of the building was organized according to desirable relationships between several departments and their need for accessibility. The basement and ground floors largely contain utility, storage, supply rooms, and office space. Also located in this area is a gymnasium for employees use. From the first through fifth floors are the public lobbies, and large open work spaces. Most of the executive offices are located on the sixth floor, along with conference rooms, and a law library. In the seventh-floor penthouse is a private executive suite, including coat room, foyer and director s room. Additions to the northeast and northwest of the building in 1959 and 1976, respectfully, and the addition of the north pavilion in 1984 positioned the building as a central circulation and meeting point within Principal Financial Group s corporate downtown * Excerpts taken from the reprinted issue of the June 1940 issue of Architectural Record, Home Office Building, The Bankers Life Company. 6

2 CORPORATE 1 DISCOVERY PHASE BUILDING OVERVIEW CODE ANALYSIS CHARACTER DEFINING ELEMENTS CHARACTER DEFINING SPACES MATERIAL SOURCING BUILDING PROGRESS IMAGES BUILDING DIAGRAMS MATERIAL DESCRIPTIONS 1939 CONDITION ANALYSIS 1981 AREAS OF PROTECTION Expansions to The Bankers Life Building, Present Des Moines campus. The three additions created additional office and service space needed for the growing financial company and its connection to neighboring office buildings. With each subsequent addition and remodel, the building still maintained and displayed many of the original Art Deco features often characterized by rich colors, bold geometric shapes, and ornamentation. ENERGY ANALYSIS Long before the sustainability trend in contemporary architecture, the Bankers Life building employed many strategies in the SALVAGED MATERIALS MECHANICAL SYSTEMS ELECTRICAL SYSTEMS planning, design, and material selection process that lends itself greatly to its continued use and longevity in its 75th anniversary. These strategies included; Clear Span Open Office Space Copper Pipes Used as Radiators Behind Metal Wall Panels Perforated Metal Ceiling Panels with Acoustical Panels Above Cork Insulation on the Interior Rubber Flooring and Wainscot Double Bronze Windows Allowed to Naturally Oxidize Glass Block to Diffuse Natural Light Metal Reflective Lighting Coffers Under Floor Utility Metal Ducts Flat Tile Floor System with Varied Thicknesses 7 APPENDIX

3 OPN ARCHITECTS Principal Financial Group Corporate 1, 2014 CONTEMPORARY OVERVIEW Corporate 1 continues to serve as a central hub within Principal Financial Groups corporate campus, as well as the front door and home to the executive leadership. The building currently houses many of the corporate campus Shared Services, as well as Corporate Real Estate, Corporate Marketing, Corporate Human Resources, Conference Center, and Executive offices. Building program, in addition to that originally built in 1938, now includes food service facilities, employee pharmacy, banking services, information technology and critical communication space, recreational zones, gallery space, and employee retreat areas. Skywalk connections to the north, east, and south of the building to Corporate 4, Corporate 2, annex, and city parking garages further emphasize the building s central location and overall connection campus wide. The original building core still functions as the main vertical circulation space and consists of an elevator bank, central stair, and restrooms. Additional vertical circulation cores were added with each addition and include elevator, stair, and restroom services. Building code and ADA deficiencies exist at circulation systems due to incorrect door swings and inaccessible knob hardware that dates from the original building. Such instances are prevalent throughout which include restrooms with inaccessible entry configurations and missing or inaccessible wheelchair stalls, as well as inaccessible drinking fountains. 8

4 CORPORATE 1 DISCOVERY PHASE CODE ANALYSIS BUILDING OVERVIEW AREAS OF PROTECTION CONDITION ANALYSIS CHARACTER DEFINING ELEMENTS ELECTRICAL SYSTEMS MECHANICAL SYSTEMS SALVAGED MATERIALS ENERGY ANALYSIS CHARACTER DEFINING SPACES MATERIAL SOURCING MATERIAL DESCRIPTIONS BUILDING DIAGRAMS BUILDING PROGRESS IMAGES CORP 1 Comparison of Interior Open Office Space 1940 / 2014 With various interior remodels and reconfigurations, many of the original and forward thinking sustainable practices have been altered and no longer function as they originally intended. Alterations to the mechanical systems have resulted in lowered ceiling heights, decreased ambient lighting levels and the reliance on fluorescents. Natural lighting is further decreased by the use of tall office partitions. In addition, skywalk access on multiple levels has resulted in inefficient circulation patterns and a decrease in the prominence in the southern entry. Because the building is not centrally metered, it remains difficult to determine the actual energy use. With air handling units past the 20-year median life expectancy set by ASHRAE standards there remains great potential to significantly decrease the building s energy consumption. Windows surveyed and thermally evaluated indicate they exceed contemporary code standards, a testament to the longevity of the building. Strategies moving forward include developing space and amenities within the existing building confines that accompany the evolving work structure and client base of Principal Financial Groups business operations and to the Des Moines community. Methods aim to address circulation, code and ADA compliance, and mechanical systems with emphasis on preserving the Art Deco features as originally built and its centrally located role within the corporate campus. 9 APPENDIX

5 OPN ARCHITECTS 1939 BUILDING PROGRESS Foundation Wall Forms Being Erected, September 29, 1938 Site Under Construction as Viewed From 7th Street, October 24,

6 CORPORATE 1 DISCOVERY PHASE CHARACTER DEFINING ELEMENTS CHARACTER DEFINING SPACES MATERIAL SOURCING MATERIAL DESCRIPTIONS BUILDING DIAGRAMS BUILDING PROGRESS IMAGES BUILDING OVERVIEW Erection of Structural Steel Members, January 19, 1939 MECHANICAL SYSTEMS SALVAGED MATERIALS CONDITION ANALYSIS ENERGY ANALYSIS ELECTRICAL SYSTEMS CODE ANALYSIS AREAS OF PROTECTION Structural Steel Members with HVAC Penetrations, April 1, APPENDIX

7 OPN ARCHITECTS Flat Clay Tile Arch Flooring System Installation, February 13, 1939 Masons Constructing Exterior Wall, May 3,

8 CORPORATE 1 DISCOVERY PHASE CHARACTER DEFINING ELEMENTS CHARACTER DEFINING SPACES MATERIAL SOURCING MATERIAL DESCRIPTIONS BUILDING DIAGRAMS BUILDING PROGRESS IMAGES BUILDING OVERVIEW Octagonal Molded Glass Positive, January 16, 1939 MECHANICAL SYSTEMS SALVAGED MATERIALS CONDITION ANALYSIS ENERGY ANALYSIS ELECTRICAL SYSTEMS CODE ANALYSIS AREAS OF PROTECTION Installation of Exterior Rainbow Granite at Base, April 1, APPENDIX

9 OPN ARCHITECTS Installation of Cream Vein Bedford Limestone, May 3, 1939 Structural Steel of Open Office Area, January 19,

10 CORPORATE 1 DISCOVERY PHASE CHARACTER DEFINING ELEMENTS CHARACTER DEFINING SPACES MATERIAL SOURCING MATERIAL DESCRIPTIONS BUILDING DIAGRAMS BUILDING PROGRESS IMAGES BUILDING OVERVIEW East Stair Tower at Third Floor, June 20, 1939 MECHANICAL SYSTEMS SALVAGED MATERIALS CONDITION ANALYSIS ENERGY ANALYSIS ELECTRICAL SYSTEMS CODE ANALYSIS AREAS OF PROTECTION Progression of Exterior Facade, May 17, APPENDIX

11 OPN ARCHITECTS 1959 BUILDING PROGRESS Deconstruction Along North Portion of Original Building, March 18, 1958 Foundation Work at New North Addition, June 25,

12 CORPORATE 1 DISCOVERY PHASE CHARACTER DEFINING ELEMENTS CHARACTER DEFINING SPACES MATERIAL SOURCING MATERIAL DESCRIPTIONS BUILDING DIAGRAMS BUILDING PROGRESS IMAGES BUILDING OVERVIEW Existing Foundation Wall and Connection to Original Building, June 25, 1958 MECHANICAL SYSTEMS SALVAGED MATERIALS CONDITION ANALYSIS ENERGY ANALYSIS ELECTRICAL SYSTEMS CODE ANALYSIS AREAS OF PROTECTION Erection of Structural Steel for North Addition, Date Unknown 17 APPENDIX

13 OPN ARCHITECTS 1976 BUILDING PROGRESS Erection of Structural Steel on North Side, September 27, 1976 Erection of Structural Steel on West Elevation, February 15,

14 Principal Financial Group. Corporate 1 Site Plan Description for UDRB. January 27, 2015 In response to interior building changes that further enhance Corporate One as Principal Financial Group s Corporate Headquarters, the site scope for this phase of work encompasses the area between the building face and the street curb on the south, west and east sides of the building. South side enhancements focus on improving accessibility to Corporate 1 with the addition of symmetrical walks to the east and west of the front doors, as well as a dedicated drop-off zone for vehicles. To accommodate the drop-off zone on High Street, a +/- 3.5 shift of the north curb is proposed along with a reduction in width of existing travel lanes. No reduction of travel lanes or elimination of parking lane is proposed. City of Des Moines Traffic and Transportation has reviewed the schematic design for this proposal and has voiced their support and agreed to work with the design team on further development of the design. Site paving, plantings, lighting, curb ramps and traffic signals will be upgraded as part of this phase. West side enhancements improve pedestrian connectivity by eliminating three vehicular curb cuts and reconstructing to provide a continuous sidewalk. A dedicated ADA on-street parking space is proposed just north of the Pleasant and 8 th intersection. Paving, plantings, lighting and traffic signals will be upgraded as part of this phase. East side enhancements focus on replacing existing walks, street curbs and the addition of trees within new planting areas.

Alterations, disproportionality, and the 20% rule

Alterations, disproportionality, and the 20% rule Alterations, disproportionality, and the 20% rule By M. Bradley Gaskins, AIA, CASp and Ellis L. McIntosh Jr., AIA, LEED AP The MCintosh group 1850 South Boulder Avenue Tulsa, OK 74119 918.585.8555 tmgada.com

More information

AGILITAS Property Development

AGILITAS Property Development Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development

More information

Project Narrative: Nationwide Allied Insurance Parcel C Project

Project Narrative: Nationwide Allied Insurance Parcel C Project THREESIXTY ARCHITECTURE Project Narrative: Nationwide Allied Insurance Parcel C Project City of Des Moines, Urban Design Review Board Meeting February 20, 2007 Project Description The Nationwide Allied

More information

Corridor Residential Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Residential Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.070 - Corridor Residential Suburban Districts ( CRS ) Sections: Typical Buildings in the CRS District 16.20.070.1 Composition of Suburban Residential Corridors 16.20.070.2 Purpose and Intent

More information

Neighborhood Traditional Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Neighborhood Traditional Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.010 - Neighborhood Traditional Single-Family Districts ( NT ) Typical Houses in a Neighborhood Traditional District Typical Block in a Neighborhood Traditional District Common Features of

More information

PRESENTATION JANUARY 24, 2017

PRESENTATION JANUARY 24, 2017 4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction

More information

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW HISTORIC PRESERVATION REVIEW submitted to: DC Historic Preservation Office Office of Planning ARCHITECTS ARCHITECTURAL NARRATIVE Bruce Monroe Elementary School at Park View is among the schools included

More information

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting:

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting: a contract within the Total Project Cost budget of $123.2 million, and to proceed with project construction not to exceed a Total Project Cost of $62.6 million. This motion is effective September 27, 2012.

More information

Residential Uses in the Historic Village Core

Residential Uses in the Historic Village Core BLACK DIAMOND DESIGN GUIDLINES for Residential Uses in the Historic Village Core Adopted June 18, 2009 Introduction and Purpose These guidelines are intended to guide infill development within the Historic

More information

Corridor Residential Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Residential Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.070 - Corridor Residential Suburban District ( CRS ) Figure REFERENCE Typical Buildings in the CRS District Sections: 16.20.070.1 Composition of Suburban Residential Corridors 16.20.070.2 Purpose

More information

General Design Guidelines

General Design Guidelines General Design Guidelines The following will apply to all districts: Building Massing: Varied building heights define a hierarchy of forms and introduce variety in the urban fabric. 1. Building massing

More information

McNichols Civic Center Building City & County of Denver Proposed New Terrace and South Facade Rehabilitation Denver, Colorado

McNichols Civic Center Building City & County of Denver Proposed New Terrace and South Facade Rehabilitation Denver, Colorado McNichols Civic Center Building City & County of Denver Proposed New Terrace and South Facade Rehabilitation Denver, Colorado Denver Landmark Preservation Commission Infill Mass & Scale Submittal 04 September

More information

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.020 - Neighborhood Suburban Single-Family Districts ( NS ) Sections: Typical Block in a Neighborhood Suburban District 16.20.020.1 History and Composition of Suburban Neighborhoods 16.20.020.2

More information

CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS

CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS STAFF RECOMMENDATION PETITIONER: FILE NUMBER: ADDRESS: Brenda K. Pearson Neil Dawson Architects, PC 1020 Bryan

More information

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new

More information

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.060 - Corridor Residential Traditional Districts ( CRT ) Typical Buildings in the CRT District Sections: 16.20.060.1 Composition of Traditional Residential Corridors 16.20.060.2 Purpose and

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Accepted Architectural Styles 1. Classical Revival 2. French 3. Texas Regional Vernacular 4. Tudor 5. Mediterranean 6. Modern Classical Revival Classical Revival design seeks to emulate elements of Ancient

More information

National Property Inspections

National Property Inspections National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

A PPEARANCE REVIEW BOARD

A PPEARANCE REVIEW BOARD ARB Staff Report A PPEARANCE REVIEW BOARD July 21, 2016 Case Number AGENDA ITEM 4 619, 621, 623 E. PINE ST. THE OLIVE TOWNHOMES ARB2016-00037 Applicant Michael Wenrich Michael Wenrich Architects Owner

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 234 ANNEX - MANHATTAN, 200 CHAMBERS STREET, New York, 10007 Inspection Id Inspection Type Time In Last

More information

CITY OF NOVI. Police Department

CITY OF NOVI. Police Department CITY OF NOVI Police Department Indoor Gun Range and Training Facility Assessment Analysis with Master Plan for Novi Police Department at Community Build Out Field Services Complex Facility Needs Master

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

Civic Center Renovation News

Civic Center Renovation News Civic Center Renovation News February 15, 2015 Virginia Avery of Wells, ME was the first guest to enter the newly renovated Civic Center at the Maine Home, Remodeling and Garden Show! She was presented

More information

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING Multi family housing is an increasingly popular form of infill development in Shaker Heights because of the city s built out

More information

Chapter Institutional District

Chapter Institutional District hapter 1007. Institutional District 1007.01 Statement of urpose The Institutional District is designed to: A. ermit and regulate a variety of governmental, educational, religious, and cultural uses that

More information

Site Plan from Design Guidelines WALTER REED - BUILDING VU HINES / URBAN ATLANTIC / TRIDEN. March 20, 2017

Site Plan from Design Guidelines WALTER REED - BUILDING VU HINES / URBAN ATLANTIC / TRIDEN. March 20, 2017 Site Plan from Design Guidelines 1 Walter Reed Zoning 2 Landscape Character Zones, Heritage Landscapes, Inc. May 2016. Campus Character Areas 3 Aerial - Existing Conditions 4 Buildings 8 + 9 5 Building

More information

DESIGN STANDARDS & GUIDELINES for THE EMILY GRIFFITH OPPORTUNITY SCHOOL WELTON STREET and 1261 GLENARM PLACE

DESIGN STANDARDS & GUIDELINES for THE EMILY GRIFFITH OPPORTUNITY SCHOOL WELTON STREET and 1261 GLENARM PLACE DESIGN STANDARDS & GUIDELINES for THE EMILY GRIFFITH OPPORTUNITY SCHOOL 1250 WELTON STREET and 1261 GLENARM PLACE Adopted by Denver City Council May 2016 INTRODUCTION 1. View of the Emily Griffith Opportunity

More information

TOWN OF BRUNSWICK, MAINE

TOWN OF BRUNSWICK, MAINE TOWN OF BRUNSWICK, MAINE INCORPORATED 1739 DEPARTMENT OF PLANNING AND DEVELOPMENT 85 UNION STREET, SUITE 216 BRUNSWICK, ME 04011 ANNA M. BREINICH, FAICP PHONE: 207-725-6660 DIRECTOR OF PLANNING & DEVELOPMENT

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

Lemm Elementary. Restoring the Heart of the Community. Klein Independent School District

Lemm Elementary. Restoring the Heart of the Community. Klein Independent School District Lemm Elementary Restoring the Heart of the Community Target Date: August 2018 June Work Update - Project is on schedule Exterior brick is ongoing in Area A addition Area A walls have been covered Main

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Corridor Commercial Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Commercial Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.080 - Corridor Commercial Traditional District ( CCT ) CCT-1 Figure REFERENCE Typical Buildings in the CCT District CCT-2 Sections: 16.20.080.1 Composition of Corridor Commercial Traditional 16.20.080.2

More information

RZ-1 LEGEND FUTURE ACCESS TO ALIGN W/ EXISTING HARRIS COVE DRIVE FUTURE ACCESS TO ALIGN WITH PROPOSED ACCESS OPPOSITE COX ROAD

RZ-1 LEGEND FUTURE ACCESS TO ALIGN W/ EXISTING HARRIS COVE DRIVE FUTURE ACCESS TO ALIGN WITH PROPOSED ACCESS OPPOSITE COX ROAD ZONED RU(CD) ZONED RU(CD) LEGEND FUTURE ACCESS TO ALIGN W/ EXISTING HARRIS COVE DRIVE ZONED R-9PUD ZONED R-9PUD ZONED RU(CD) ZONED R-9PUD FUTURE ACCESS TO ALIGN WITH PROPOSED ACCESS OPPOSITE COX ROAD RZ-1

More information

Country Club Historic District Architecture Review Committee

Country Club Historic District Architecture Review Committee Country Club Historic District Architecture Review Committee Project: 378 Lafayette St November 8, 018 Dear Landmark Preservation, Our committee would recommend the project @ 378 Lafayette, Rear Addition,

More information

City of Richmond Zoning Ordinance Page 12-1

City of Richmond Zoning Ordinance Page 12-1 ARTICLE 12 BUILDING DESIGN AND COMPOSITION Section 12.01 Purpose. High quality architectural design and building composition are important elements in reinforcing a comfortable, human-scale environment,

More information

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.020 Neighborhood Suburban Single-Family District ( NS ) Figure REFRENCE Typical Houses in Neighborhood Suburban 1 Figure REFRENCE Typical Block in a Neighborhood Suburban District Sections: 16.20.020.1

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Corridor Commercial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Commercial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.090 - Corridor Commercial Suburban District ( CCS ) CCS-1 CCS-2 Figure REFERENCE Typical Buildings in the CCS District INSERT DRAWING: SITE PLAN OF A TYPICAL SUBURBAN COMMERCIAL CORRIDOR DEVELOPMENT

More information

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.060 - Corridor Residential Traditional District ( CRT ) Figure REFERENCE Typical Buildings in the CRT District Sections: 16.20.060.1 Composition of Traditional Residential Corridors 16.20.060.2 Purpose

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

OREGON STATE UNIVERSITY Memorial Union Access Improvement Study. October 21, 2013

OREGON STATE UNIVERSITY Memorial Union Access Improvement Study. October 21, 2013 OREGON STATE UNIVERSITY Memorial Union Access Improvement Study October 21, 2013 OREGON STATE UNIVERSITY Memorial Union Access Improvement Study October 11, 2013 CONTENTS DESIGN OPTIONS EXECUTIVE SUMMARY

More information

Sec Development Standards in P-N-T Districts.

Sec Development Standards in P-N-T Districts. Sec. 4-9. Development Standards in P-N-T Districts. a. Intent: The purpose of this district is to recognize predominately residential areas which: (1) Front along major or secondary arterial streets, (2)

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

Americans with Disabilities Act Accessibility Survey

Americans with Disabilities Act Accessibility Survey Americans with Disabilities Act Accessibility Survey Self-Evaluation and Transition Plan Sarpy County Impound Facility 14242 S. 156th St. Springfield, Nebraska 68159 Prepared by Sarpy County Facilities

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

Design Review Committee Anne Burns, Secretary Land Use Planning 1947 Center Street, 2nd Floor Berkeley, CA Bancroft Way.

Design Review Committee Anne Burns, Secretary Land Use Planning 1947 Center Street, 2nd Floor Berkeley, CA Bancroft Way. Page 1 of 5 Design Review Committee Anne Burns, Secretary Land Use Planning 1947 Center Street, 2nd Floor Berkeley, CA 94704 2580 Bancroft Way Enclosed are revised plans for The Standard project located

More information

OAK BROOK AMC This unique structure within a shopping mall in the western suburbs, contains a twenty four theater complex above the parking structure.

OAK BROOK AMC This unique structure within a shopping mall in the western suburbs, contains a twenty four theater complex above the parking structure. OAK BROOK AMC This unique structure within a shopping mall in the western suburbs, contains a twenty four theater complex above the parking structure. This structure was constructed as two elevated levels

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

MIAMI 21 ARTICLE 5. SPECIFIC TO ZONES PUBLIC HEARING-FIRST READING TABLE OF CONTENTS

MIAMI 21 ARTICLE 5. SPECIFIC TO ZONES PUBLIC HEARING-FIRST READING TABLE OF CONTENTS TABLE OF CONTENTS 5.1 Generally 5.2 Natural Transect Zone (T1) and Rural Transect Zones (T2) (Reserved) 5.3 Sub-Urban Transect Zones (T3) 5.4 General Urban Transect Zones (T4) 5.5 Urban Center Transect

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

How to Prepare Your LSE Report

How to Prepare Your LSE Report LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

Administrative Office Building

Administrative Office Building EMP Museum Administrative Office Building SEATTLE, WA 52,520 GSF EMP is a leading-edge non-profit museum dedicated to contemporary popular culture. The client had special and unique requirements for the

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Certificate of Appropriateness Case Report

Certificate of Appropriateness Case Report City of Shreveport Caddo Parish MetropolitanPlanningCommission 505 Travis Street, Suite 440 Shreveport, LA 71101 318-673-6480 fax 318-673-6461 www.shreveportcaddmpc.com Case Report Filing Date: March 13,

More information

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such

More information

THE RIVER DISTRICT Nominations of Landmarks and the North 16 th Street Historic District

THE RIVER DISTRICT Nominations of Landmarks and the North 16 th Street Historic District THE RIVER DISTRICT Nominations of Landmarks and the North 16 th Street Historic District Preservation Commission November 3, 2010 Pipeworks Complex, 116 North 16 th Street Character Defining Features:

More information

DESIGN REVIEW COMMITTEE AGENDA

DESIGN REVIEW COMMITTEE AGENDA CITY OF SAN MARINO DESIGN REVIEW COMMITTEE AGENDA Kevin Cheng, Chair www.cityofsanmarino.org Corinna Wong, Vice-Chair (626) 300-0711 Phone John Dustin City Hall Judy Johnson-Brody Council Chambers Chris

More information

STAFF BRIEF. Arrow B Architecture. Project Scope Under Review: Façade rehabilitation and restoration

STAFF BRIEF. Arrow B Architecture. Project Scope Under Review: Façade rehabilitation and restoration Community Planning and Development Denver Landmark Preservation 201 West Colfax, Dept. 205 Denver, CO 80202 p: 720.865.2709 f: 720.865.3050 www.denvergov.org/preservation STAFF BRIEF This document is the

More information

AN OFFERING OF 1661 EAST OGLETHORPE HIGHWAY FLEMINGTON, LIBERTY COUNTY, GEORGIA PRESENTED BY WHITLEY AND ASSOCIATES, INC.

AN OFFERING OF 1661 EAST OGLETHORPE HIGHWAY FLEMINGTON, LIBERTY COUNTY, GEORGIA PRESENTED BY WHITLEY AND ASSOCIATES, INC. AN OFFERING OF 1661 EAST OGLETHORPE HIGHWAY FLEMINGTON, LIBERTY COUNTY, GEORGIA 31313 PRESENTED BY WHITLEY AND ASSOCIATES, INC. OFFERING DISCLAIMER This offering summary has been prepared solely for informational

More information

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord. ARTICLE 987. PD 987. SEC. 51P-987.101. LEGISLATIVE HISTORY. PD 987 was established by Ordinance No. 30512, passed by the Dallas City Council on June 14, 2017. SEC. 51P-987.102. PROPERTY LOCATION AND SIZE.

More information

5. Project Construction Cost (Provide cost for new construction, the addition or the alteration): $ Estimated Project Budget is $125,000.

5. Project Construction Cost (Provide cost for new construction, the addition or the alteration): $ Estimated Project Budget is $125,000. 3. Please check one of the following: [ ] New construction. [ ] Addition to a building or facility. [X] Alteration to an existing building or facility. [ ] Historical preservation (addition). [ ] Historical

More information

*Universal Design Audit Checklist

*Universal Design Audit Checklist *Universal Design Audit Checklist Design should adapt to people, not the other way around. AD AS furniture purveyors This Checklist is designed to complete an audit of a design in process or a facility

More information

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action Project Number: Prepared By: Action General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and

More information

SCHEMATIC DESIGN CANNING WAREHOUSE BOZEMAN, MT. The Cannery District CQ + MA SD Set Canning Warehouse / 100% SD

SCHEMATIC DESIGN CANNING WAREHOUSE BOZEMAN, MT. The Cannery District CQ + MA SD Set Canning Warehouse / 100% SD SCHEMATIC DESIGN CANNING WAREHOUSE BOZEMAN, MT The Cannery District CQ + MA SD Set 04-8-2015 Canning Warehouse / 100% SD SITE Ski 20 Minutes CANNING WAREHOUSE Airport 15 Minutes RAIL SPUR TRAIL COMPLETED

More information

LUFacilities Policy Service Level Agreement v1.1

LUFacilities Policy Service Level Agreement v1.1 PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University

More information

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) -  Owned By: Select one Code Enforcement Jurisdiction: Select one 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) -  Owned By: Select one Code Enforcement Jurisdiction: Select one 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

TWO CORPORATE CIRCLE PROFESSIONAL OFFICE SUITES GREENSBURG, PA TABLE OF CONTENTS

TWO CORPORATE CIRCLE PROFESSIONAL OFFICE SUITES GREENSBURG, PA TABLE OF CONTENTS CUSTOM BUILT HOMES IN C O R P OR T A E D 131 MATHEWS STREET - SUITE 1000 GREENSBURG, PA 15601 PHONE: (724)832-3506 FAX: (724)832-6433 TWO CORPORATE CIRCLE PROFESSIONAL OFFICE SUITES GREENSBURG, PA 15601

More information

CITY OF DANA POINT SITE ACCESSIBILITY AND PARKING B103 SITE INTRODUCTION

CITY OF DANA POINT SITE ACCESSIBILITY AND PARKING B103 SITE INTRODUCTION INTRODUCTION CITY OF DANA POINT COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248-3594 www.danapoint.org SITE ACCESSIBILITY AND PARKING B103 SITE 2013

More information

ARCH 5901 A02 Office Building Program FALL 2015

ARCH 5901 A02 Office Building Program FALL 2015 Assignment A02: Office Building Program ARCH 5901 Instructor: Glenn Hill TASK: Develop a program for your Office Building. Include diagrams and images on the Tectonic, Cultural, Social and Aesthetic of

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

Citizens National Bank Building

Citizens National Bank Building Citizens National Bank Building 212 W. Main Street Gastonia NC 28052 Offer to Purchase Exhibit B Redevelopment Proposal!1 Citizens National Bank Building 212 W. Main Street Gastonia NC 28052 Built in 1920,

More information

BOARD OF TRUSTEES OCTOBER 13, 2014

BOARD OF TRUSTEES OCTOBER 13, 2014 Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property

More information

Sgt. Alvin C. York Historic School

Sgt. Alvin C. York Historic School Sgt. Alvin C. York Historic School TABLE OF CONTENTS I. Introduction II. III. IV. Historical Evaluation Architectural Evaluation Preservation Plan V. Design Parameters VI. VII. Master Plan/ Site Design

More information

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS OVERLAY REGULATIONS Effective September 1, 2017 On May 29, City Council approved the following changes to the Mature Neighbourhood Overlay (Section 814 of Edmonton Zoning Bylaw 12800). These new regulations

More information

1800 ARGYLE ST. REDEVELOPMENT DESIGN RATIONALE Argyle St. Redevelopment: Design Rationale

1800 ARGYLE ST. REDEVELOPMENT DESIGN RATIONALE Argyle St. Redevelopment: Design Rationale 1800 ARGYLE ST. REDEVELOPMENT DESIGN RATIONALE Submitted by Harvey Architecture On behalf of ARMCO Capital TABLE OF CONTENTS 3 PROJECT BRIEF 5 LAND USE REQUIREMENTS 7 S-1 DESIGN MANUAL OBJECTIVES 17 VARIANCE

More information

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement. NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications

Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications During the review of the application materials submitted with the Bishop Place Economic Hardship

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

CITY OF CEDARBURG. August 3, 2015

CITY OF CEDARBURG. August 3, 2015 CITY OF CEDARBURG PLAN COMMISSION PLN20150803-1 A regular meeting of the Plan Commission of the City of Cedarburg was held on Monday, at Cedarburg City Hall, W63 N645 Washington Avenue, second floor, Council

More information

Hodgson Road. Randolph Road Variable Public Right of Way VICINITY MAP NOT TO SCALE. 50' Public Right of Way

Hodgson Road. Randolph Road Variable Public Right of Way VICINITY MAP NOT TO SCALE. 50' Public Right of Way Site Development Data: MPV Properties Development Standards 07/18/18 Rezoning Petition No. 2018-061 --Acreage: ± 2.192 acres --Tax Parcel #: portion of 185-033-01 --Existing Zoning: R-3 --Proposed Zoning:

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Overall Existing Conditions Summary

Overall Existing Conditions Summary September 12, 2002 Overall Executive Summary: The multi-use project on 250 West Street is a 7-story building with space for offices, retail, storage and parking. The project is a small part of the development

More information

BUILDING DESIGN STANDARDS

BUILDING DESIGN STANDARDS BUILDING DESIGN STANDARDS TOPEKA NON-RESIDENTIAL BUILDINGS APPROVED BY TOPEKA PLANNING COMMISSION 12/17/2018 APPROVED BY GOVERNING BODY 1/8/2019 Topeka Non-Residential Design Standards Section 1 (18.275.010)

More information

Parnassus Construction Projects Community Meeting. August 22, 2018

Parnassus Construction Projects Community Meeting. August 22, 2018 Parnassus Construction Projects Community Meeting August 22, 2018 Agenda 1. Welcome 2. Project Communications 3. 5 th and Kirkham Traffic-Calming Schedule 4. UCSF Parnassus Heights Campus Projects Questions

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: LAFAYETTE ACADEMIES - BRONX, 1231 LAFAYETTE AVENUE, New York, 10474 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-01-02

More information

W. EDWARD BALMER SCHOOL

W. EDWARD BALMER SCHOOL W. EDWARD BALMER SCHOOL NORTHBRIDGE, MA SCHEMATIC DESIGN SCHOOL BUILDING COMMITTEE MEETING FEBRUARY 28, 2018 N O R T H B R I D G E PUBLIC SCHOOLS 1. SITE PLANNING UPDATE 2. BUILDING DESIGN UPDATE 3. MECHANICAL

More information