1 Citizens National Bank Building 212 W. Main Street Gastonia NC Offer to Purchase Exhibit B Redevelopment Proposal!1
2 Citizens National Bank Building 212 W. Main Street Gastonia NC Built in 1920, the subject property is located at 212 W. Main Street in downtown Gastonia, North Carolina. The building is presently owned by the City of Gastonia. Attached is the outline format of the intent for design and improvement to the building with a timetable of these events and related expenditures. Overview. It is the intent of CNB 1920 to purchase the property, retain the existing Arts on Main operations for at least three years and commence Architectural studies to improve the facilities based on the attached documents and schematic plans. The overall intent is as follows:!2
3 I. Year One. 1. Main Floor. Retain Arts on Main operations as presently established for the first year as the Architectural study and planning commence. The front main facade of Sections A, B, C will be cleaned and restored where necessary. Section D to the West side of the building will be evaluated and planned as a stand alone structure with a New Entrance from W. Main. 2. Basement. The Lower Level of the building (Basement) will be left as is for year one and used for storage. Mechanical systems (HVAC) will be evaluated and work started within year one for any necessary refurbishment and/or replacement. A complete cleaning and removal of materials will occur as well as new lighting where necessary for use as storage and the HVAC systems center. 3. Second Floor. Existing Arts on Main ( AOM ) Studio Spaces are to remain intact on the second floor for the first year. Areas outside the AOM Studios will be cleared of debris and unused systems. Temporary lighting for the inner parts of Sections C, D will be installed. Partitions and ceilings not to be retained will be removed to allow for new electric and HVAC system rework. 4. Third Floor. Demolition will begin on the Third Floor within year one. All interior partitions, dropped ceilings, HVAC and electric systems components not being refurbished will be removed and hauled off site in preparation for Development of Section A of this floor and the entry corridor. II. Years Two to Five 1. New HVAC Systems for all floors including Basement. Existing service duct and equipment partially for main floor and basement (if feasible). New Equipment for Floors two and three. 2. New Electric system distribution and service. Some equipment re-use if feasible. 3. New plumbing lines for water and waste. Bathrooms renovated with new fixtures. 4. Exterior facade cleaning and restoration for W. Main elevation. 5. Entry canopy at Main Bank Building. 6. New street entry with recessed alcove at Building D. 7. New Architectural lighting at full W. Main Elevation and Rear of Building 8. Patio area at rear of building with deck extension at metal Stair system. 9. New Street level entry at Building D 10. Refurbish elevators as needed and as feasible.!3
4 11. New Main elevator and stairway at the Main Bank Building entry based on structural feasibility and code. Elevator and main segments of the bank building and interior to be construction from engineered wood (timber) with architectural metal fittings, glass panels and stone. 12. Complete Renovation of Floor One Sections A, B, C, D. New Ceilings, Partitions, floor and lighting. Front and Rear entry vestibules to accommodate Master Plan for Retail use. 13. Complete Renovation of Floor Two for Artist Studios and Open Gallery as shown on schematic plan. New Gallery displays and partitions. New Architectural lighting for Gallery and Studios. Create Private Design Studio/Classroom. 14. Build two new Live-Work Artist Studios on third floor. Complete renovation and up-fit. Full kitchens in each unit with Master Bath suites. Build two large (12x16) vaulted skylight banks with timber and insulated glass frameworks at the location of the original main skylights. Build a new entry corridor from the existing main elevator to the Artist Units with a third timber/glass skylight bank. 15. Building D to receive a complete tenant up-fit with new flooring, ceiling, lighting, interior partitions, doors, hardware et. al. as well as the new street level vestibule entry. 16. Rear Patio with hardscape improvements and landscaping with new trees and planting.!4
5 17. Thermador Cooking School on Level Two of Buildings C&D or possibly all of Building D. The Cooking School is aligned/sponsored by/with Thermador and Bosch USA with Approximately 4800 SF with fully equipped kitchens and teaching facilities, interactive classrooms and a kitchen design center. The classrooms and showroom contain the full Thermador, Bosch and Gaggenau product lines on display as well as a boutique cooking accessories product store. The Cooking School will also contain a Wine Education Center with a certified Sommelier and staff who provide a full learning experience for wines of the world. A complete wine cellar and tasting room is integral to the design.!5
Update on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationNARI National 2018 CotY Program Categories Please read category descriptions carefully as some criteria have changed.
Please read category descriptions carefully as some criteria have changed. New for 2018! Green and Universal Design Categories *Cost is defined as contract price, all extras, change orders and the fair
More informationLUFacilities Policy Service Level Agreement v1.1
PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University
More information9'-2 1/2" 72" Whirlpool Tub Unit 6'-0" 9'-2" x 11'-6" Bathroom. 66" Vanity. 60" Shower 5'-0" 5'-8" Laundry Room 9'-2" x 5'-7" 5'-7 1/2"
37'-0" 1 '-" 18'-" 18'-" 2030 11'-1" 8'-1" 11'-7" 7'-2 1/2" 0" Tub/Shower '-0" Bedroom #2 11'-0" x 11'-0" 7'-1" x 1'-11" Linen 48" Vanity 28 Bedroom #3 11'-0" x 11'-" 3'-7" 42" Archway 011 3535 Dining
More informationCapital 21 Realty, LLC
Capital 21 Realty, LLC 742 US Highway One, North Palm Beach, FL 33408 For More Information and Showings Contact Brian Mylett, 561-707-2710 742 US Highway One Building Details 1. 10,570 Under AC 2. Complete
More informationPRESENTATION JANUARY 24, 2017
4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction
More informationRR Building Area: (sf) 13,000 SF. Cost per Square Foot: $ /SF. Construction Cost $2.7 million. Date of Completion: March 2014
Program Summary: Renovation and historic restoration of a pre-turn-of-the-century warehouse into an architectural firm located in New Orleans. Program Statement: This pre-turn-of-the-century building located
More informationAGILITAS Property Development
Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development
More informationPRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016
PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More informationSubject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3
MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape
More informationBedrooms. Baths. 2 Bdr. 2 Bdr. 2 Bdr. 2 + Den. 2 + Den. $298,800 Prairie. 2 + Den. 3 + Loft Loft 2.5. $318,800 Prairie 2.5.
Floor Plan / Elevation Sq Ft Bedrooms Baths Garage Price w/ Country Estate Model 1369 Bdr $56,900 $85,800 Craftsman 1369 Bdr $57,400 $86,300 Prairie 1369 Bdr $58,00 $87,100 Country Estate 1687 + Den $70,900
More informationEquine Barn LLC 213 Crescent Moon Way Canton, Ga Proposal
Equine Barn LLC 213 Crescent Moon Way Canton, Ga 30114 Proposal 2014 We hereby propose to provide all the materials and labor necessary to build a custom barn located in, Ga for. What is included in the
More informationSgt. Alvin C. York Historic School
Sgt. Alvin C. York Historic School TABLE OF CONTENTS I. Introduction II. III. IV. Historical Evaluation Architectural Evaluation Preservation Plan V. Design Parameters VI. VII. Master Plan/ Site Design
More informationSCHEMATIC DESIGN CANNING WAREHOUSE BOZEMAN, MT. The Cannery District CQ + MA SD Set Canning Warehouse / 100% SD
SCHEMATIC DESIGN CANNING WAREHOUSE BOZEMAN, MT The Cannery District CQ + MA SD Set 04-8-2015 Canning Warehouse / 100% SD SITE Ski 20 Minutes CANNING WAREHOUSE Airport 15 Minutes RAIL SPUR TRAIL COMPLETED
More informationPhillips Family Offices: Preservation & LEED-NC
Phillips Family Offices: Preservation & LEED-NC Deborah Everson, AIA LEED AP Michael Everson, J.D. LEED AP, BD + C Jason Briles, Associate AIA Daniel Katzenberger, P.E., LEED AP, CEM, CSDP, DSMP, GBE The
More informationReliance House Investors Report. IR11 September 2018
Reliance House Investors Report IR11 September 2018 Extension & Conversion of Reliance House to Create 139 Luxury Apartments The 3 storey extension, refurbishment, adaptation and the sub-division works
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls
More informationAlder Circle Alder Circle Price range: $795K - $1M. For More Information. Bill Conrad Sales Consultant
Alder Circle 5409 Alder Circle Price range: $795K - $1M Bellaire High School Centrally located- just minutes from the Galleria and Medical Center A total of 15 Classical Designed homes with all the new
More informationRR Building Area: (sf) 13,000 sf. Cost per Square Foot: $208/sf. Construction Cost $2.7 million. Date of Completion: March 2014
Program Summary: Façade renovation and new infill of a pre-turn-of-the-century warehouse into offices for an architectural firm located in New Orleans. Program Statement: The existing pre-turn-of-the-century
More informationAPPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS
APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.
More informationDisclaimer for Review of Plans
Disclaimer for Review of Plans The San Francisco Planning Code requires that the plans of certain proposed projects be provided to members of the public prior to the Cityʹs approval action on the project.
More informationDESIGN STANDARDS & GUIDELINES for THE EMILY GRIFFITH OPPORTUNITY SCHOOL WELTON STREET and 1261 GLENARM PLACE
DESIGN STANDARDS & GUIDELINES for THE EMILY GRIFFITH OPPORTUNITY SCHOOL 1250 WELTON STREET and 1261 GLENARM PLACE Adopted by Denver City Council May 2016 INTRODUCTION 1. View of the Emily Griffith Opportunity
More informationBUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER
THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca
More informationMain Floor Plan Scale: 1/8"=1'-0"
16'-0" 1 6'-6" 1 36'-0" Future Deck 10'-6" 4'-11" 4'-11" 10'-6" 36'-0" Future Deck 1 6'-6" 1 16'-0" 6068 3030 3030 6068 1 20'-9 1/2" 20'-9 1/2" 1 D/W D/W 26'-4" 24'-8" 2'-0" '-4" '-4" '- 1/2" 20'-10 1/2"
More informationINTERNATIONAL BUILDING CODE
INTERNATIONAL BUILDING CODE MODEL BUILDING CONDITIONS ASSESSMENT The Reid and Hughes building is a four-story, four-bay, brick building, constructed in 1869 with a later addition known as the Williams
More informationBUILDING DESIGN STANDARDS
BUILDING DESIGN STANDARDS TOPEKA NON-RESIDENTIAL BUILDINGS APPROVED BY TOPEKA PLANNING COMMISSION 12/17/2018 APPROVED BY GOVERNING BODY 1/8/2019 Topeka Non-Residential Design Standards Section 1 (18.275.010)
More informationAWARD CATEGORIES RESIDENTIAL
AWARD CATEGORIES NOTE: Cost is defined as contract price, all extras, change orders and the fair market value of materials and products that were purchased, sweat-equity and in-kind services provided,
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationThe Foundation House. Commercial Exterior. Project cost: $442,620.18
The Foundation House Commercial Exterior Project cost: $442,620.18 Farm Foundation House The Foundation is dedicated to the conservation of the valley and furthering education and preservation. The Foundation
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 309 EWING STREET PRINCETON, NEW JERSEY EXTERIOR Garage Doors: * One 16 x7 steel insulated, tan door. * Two garage openers, 1 keypad * Steel insulated with embossed panels with
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 505 EWING STREET PRINCETON, NEW JERSEY EXTERIOR Garage Doors: * One 16 x7 steel insulated, tan door. * Two garage openers, 1 keypad * Steel insulated with embossed panels with
More informationNEW YORK STATE MAIN STREET PROGRAM BEFORE & AFTER
SUMMARY OGDENSBURG, NY The New York Main Street program (NYMS) is administered by the Office of Community Renewal (OCR) under the direction of the New York State Housing Trust Fund Corporation (HTFC).
More informationFeasibility Site Report
Required Document for HomeStyle: Total rehabilitiation cost exceeds 15,000 OR At the recommendation of the HomeBridge Renovation Concierge Feasibility Site Report (AKA Feasibility Study) SUBJECT PROPERTY
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationPROJECT: 733 Jackson Albany, CA Addition & Renovation
PROJECT: 733 Jackson Albany, CA Addition & Renovation APPLICAT/ARCHITECT DEVI DUTTA-CHOUDHURY, AIA DEVI DUTTA ARCHITECTURE IC. 1958 A UIVERSITY AVEUE BERKELEY, CA 94704 510-705-1937 hello@devidutta.com
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 28 HILLSIDE ROAD PRINCETON, NJ 08540 EXTERIOR Garage Doors: * Two 8 X7 steel insulated, tan door * Two garage openers, 1 keypad * Steel insulated with embossed panels with windows
More informationArchitectural Design Standards - Character
RESIDENTIAL DESIGN STANDARDS - ALL BUILDINGS The design of individual residential buildings and groups of buildings shall employ a variety of design features. In addition to the design features used on
More informationSite Comparison. Cornelius Arts Center. Town of Cornelius, North Carolina Prepared by Craig Gaulden Davis Greenville, South Carolina May 18, 2012
Cornelius Arts Center Town of Cornelius, North Carolina Prepared by Craig Gaulden Davis Greenville, South Carolina May 18, 2012 Summary The Town of Cornelius, North Carolina asked Craig Gaulden Davis to
More informationCWA C W A S S O C I A T E S, P L L C. O c cwa copyright
Construction After BOGGS BUILDING RESTORATION Steamboat Springs, CO Exterior Storefront and Interior Renovation of a Historic Old Town Steamboat Commercial Building, Divided into Commercial Condos with
More informationProject Information. Nominations of Artists. University of Houston
UNIVERSITY OF HOUSTON SYSTEM SYSTEM WIDE ART ACQUISTION COMMITTEE AGENDA ITEM ITEM: UH University Center Transformation Project Artwork-Artists Nominations DATE PREVIOUSLY SUBMITTED: NA SUMMARY: Nominations
More informationREQUIRED RESIDENTIAL PERMITS
100 Parklane Drive Eagleville, PA 19403 www.lowerprovidence.org Administration: 610 539-8020 Fax: 610 539-6347 Police: 610-539-5901 Fax: 610-630-2219 REQUIRED RESIDENTIAL PERMITS The majority of construction
More informationUpdate on FCPS Construction/Renovation Projects. December 2015
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationProject Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope
Project Scope & Budget Breakdown Mandatory Scope Recommended Additional Scope Wish List Scope Site Plan EXISTING Site Plan PROPOSED First Floor Plan PROPOSED Basement Floor Plan PROPOSED Mandatory Scope
More informationPHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C
PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No. 20140101C CONSTRUCTION ESTIMATE AND PROJECT BUDGET Dated June 7. 2014 Estimated Cost HARD COSTS $ 1,560,284 Core Renovations (Toilet Rooms, Ceilings
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationLANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent
RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural
More informationUpdate on FCPS Construction/Renovation Projects. August 2015
Update on FCPS Construction/Renovation Projects Jessie Clark Middle -- Renovation Architect: General Contractor: Tate Hill Jacobs Architects Alliance Corporation GC Contract Sum: $18,041,500 Total Project
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior
More informationPROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station
RETAIL FOR SALE 5990 Asheville Highway, Hendersonville, NC 28791 OFFERING SUMMARY SALE PRICE: $1,350,000 LOT SIZE: 0.75 Acres YEAR BUILT: 1980 BUILDING SIZE: 5,848 SF RENOVATED: 2018 C-2 Commercial ZONING:
More informationBuilding Architecture
The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L
More informationFACILITY COMPONENTS - MIDDLE SCHOOL
SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls
More informationHighland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features
unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview Raised
More informationPROPOSED PLAN DEVELOPMENT 2501 WEST HOMER STREET. Guardian Properties, LLC. September 9, 2015
PROPOSED PLAN DEVELOPMENT 2501 WEST HOMER STREET Guardian Properties, LLC September 9, 2015 2501 W Homer Zoning Map Scale: 1:080 Project Site 2501 W Homer Aerial Scale: 1:048 Project Site 2501 W Homer
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More informationDate: Lot #: Address: Phone # Name: Phase # Address: Cell Fax . Address Phone No. Cell Fax . Address Phone No.
1 of 6 To: MUIRFIELD DESIGN CONTROL COMMITTEE Application for: New Home Construction Date: Lot #: Email Address: Phone # Name: Phase # Address: This application is presented to the Muirfield Design Control
More informationUpland Lakes Largest Geothermal Community in the U.S.
Upland Lakes Largest Geothermal Community in the U.S. 1843 Upland Lakes Price range: $400s-725s GeoThermal HVAC systems Stratford HS in prestigious Spring Branch ISD Future 24 Hr Manned Gate 3 Beautifully
More information(d) Metal buildings used for industrial uses are not exempt from additional landscape standards as required in Section (e).
5.22. Non-Residential and Multifamily Design Standards. 5.22-1 Applicability of Non-Residential Design Standards. All non-residential and multifamily buildings, with the exception of those described in
More informationSpringdale Creek Springdale Road Austin Tx Price range: $480s-660s. For More Information. Juan Pablo Hisse Sales Consultant
Springdale Creek 4926 Springdale Road Austin Tx 78702 Price range: $480s-660s Urban Farmhouse Designs 1 Mile from Mueller HEB 3 Miles from Downtown 15 min from Bergstrom International Airport Easy access
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: SAINT FRANCIS COLLEGE - BROOKLYN, 180 REMSEN STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-05
More informationRT-10 and RT-10N Districts Schedule
Districts Schedule 1 Intent The intent of this Schedule is to encourage development of multiple small houses and duplexes on large lots and assembled sites, while continuing to permit lower intensity development
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit
More informationSchool Without Walls
INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationCertificate of Appropriateness Case Report
City of Shreveport Caddo Parish MetropolitanPlanningCommission 505 Travis Street, Suite 440 Shreveport, LA 71101 318-673-6480 fax 318-673-6461 www.shreveportcaddmpc.com Case Report Filing Date: March 13,
More informationThe Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016
The Butler Gallery at the Evans Home CONSERVATION REPORT McCullough Mulvin Architects September 2016 To be read in conjunction with impact statement and condition survey / recommendations in Carrig reports
More informationProject #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50
Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 73 LEAVITT LANE PRINCETON, NEW JERSEY EXTERIOR Garage Doors: * One 16 x7 steel insulated, tan door. * Two garage openers, 1 keypad. * Steel insulated with embossed panels with
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationCODE ANALYSIS REPORT SECOND FLOOR
CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary
More informationCivil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility
Civil District Court Parish of New Orleans Image Courtesy of EDR MA Renovation & Utilization Feasibility Challenges with Courthouse Design Courthouse Space Standards and Requirements Charity Hospital Building
More informationNAAHB Workgroup Index General Ledger Account
NAAHB Workgroup Index General Ledger Account 1000 Series Preparation/Preliminaries 1000 Permits/Fees 1010 Building Permits 1020 HBA Assessments 1030 Warranty Fees 1100 Architectural/Engineering 1110 Blue
More informationSingle Family, Orange, CT
Single Family, Orange, CT Project Introduction and Overview Description A single family home, 2916 sq/ft with 6 bedrooms and 3 baths. House built in 1967 on 1.04 ac lot in a quite, rural, upscale neighborhood.
More informationStaff Review June 12, 2013
Charlotte Historic District Commission Application for a Certificate of Appropriateness Staff Review June 12, 2013 ADDRESS OF PROPERTY:, Dilworth Local Historic District HDC 2013-068 SUMMARY OF REQUEST:
More informationDENNIS TOWNSHIP FEASIBILITY STUDY
DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT
More informationCountry Club Historic District Architecture Review Committee
Country Club Historic District Architecture Review Committee Project: 378 Lafayette St November 8, 018 Dear Landmark Preservation, Our committee would recommend the project @ 378 Lafayette, Rear Addition,
More information(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE
More informationRS-1 District Schedule
District Schedule 1 Intent The intent of this Schedule is generally to maintain the single-family residential character of the District, but also to permit conditionally one-family dwellings with secondary
More informationBLRB architects. TACOMA // SPOKANE // PORTLAND // BEND
CommercialServices The range of our commercial planning and design services encompasses the needs. both large scale and small, of developers, owners, realtors and tenants, each of whom we recognize has
More informationRB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)
STANDARD SPECIFICATIONS FOR 63-65 PATTON AVENUEW PRINCETON, NEW JERSEY EXTERIOR Garage Doors: * One 8 X7 steel insulated, tan door * Two garage openers, 1 keypad * Steel insulated with embossed panels
More information3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607
FOR LEASE 3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607 PROPERTY OVERVIEW Centrally located at 180 South Clinton Avenue in Downtown Rochester, 3 City Center is a modern 200,000 square foot,
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20
More informationARCHITECTURE DARK HORSE GOLF CLUB CLUBHOUSE A4 EXTERIOR ELEVATIONS FRONT PERSPECTIVE / EAST ELEVATION REAR DECK PERSPECTIVE / WEST ELEVATION
WALL SCONCE, TYP. CEMENT PLASTER FINISH, PAINTED WOOD SOFFIT CLADDING WOOD V COLUMN, TYP. STONE VENEER CLADDING WOOD SIDING, TYP. SOFFIT MOUNTED CAN LIGHT, TYP FRONT PERSPECTIVE / EAST ELEVATION CEMENT
More informationTenant Fit-Out for PLCB / Waynesboro Mall
Tenant Fit-Out for PLCB / CODE REVIEW: PROJECT DESCRIPTION TENANT BUILD OUT PROPOSED USE SALE OF BEVERAGE ALCOHOL / PLCB SPRINKLERED: YES ALLOWABLE BUILDING HEIGHT & AREA: GROUP M / TYPE VB ALLOWED 1 STORY
More informationDesign Review Committee Anne Burns, Secretary Land Use Planning 1947 Center Street, 2nd Floor Berkeley, CA Bancroft Way.
Page 1 of 5 Design Review Committee Anne Burns, Secretary Land Use Planning 1947 Center Street, 2nd Floor Berkeley, CA 94704 2580 Bancroft Way Enclosed are revised plans for The Standard project located
More informationWillowbend. Model Coming Soon Price range: $268k-$354k. For More Information. Will Conrad Sales Consultant
Willowbend Model Coming Soon Price range: $268k-$354k Centrally located with easy access to the Downton and Highway 90 Community will feature a brick wall around the community with gorgeous landscaping
More informationBonadio Residence. Renovations to Existing Dwelling: new kitchen. 23 Albert Street Waltham, MA. Addition to existing structure.
December 1, 6 Renovations to Existing Dwelling: new kitchen 3 Albert Street Waltham MA Addition to existing structure. Renovations for 3 Albert Street Waltham, MA Cover sheet First Floor Demolition D1
More informationCulver City Building Safety Division Mandatory Green Building Program
Effective June 2009 Culver City Building Safety Division Mandatory Green Building Program Category 1 Qualifying Projects All new construction, new additions, and major renovations in Culver City up to
More informationDisclaimer for Review of Plans
Disclaimer for Review of Plans The San Francisco Planning Code requires that the plans of certain proposed projects be provided to members of the public prior to the Cityʹs approval action on the project.
More informationARTSPACE LOFTS - DMC DESIGN REVIEW OCTOBER 21, 2015
OCTOBER 21, 2015 1 S. MAIN ST ST. PAUL AVE GE PATTERSON AVE PROPOSED SITE Vicinity Plan Not To Scale NORTH 2ND ST Existing Site - 138 St. Paul Avenue 2 southwest corner west facade west dock west dock
More informationSTRATTON CENTENNIAL ARTS ACADEMY PROGRESS REPORT SEPTEMBER 7, 2016 CARROLL DANIEL CONSTRUCTION 509 CROWE DRIVE HIGHLANDS, NC
CARROLL DANIEL CONSTRUCTION CENTENNIAL ARTS ACADEMY PROGRESS REPORT SEPTEMBER 7, 2016 STRATTON CONSTRUCTION SCHEDULING & SEQUENCING 509 CROWE DRIVE HIGHLANDS, NC 28741 404.944.5298 (f CARROLL DANIEL CONSTRUCTION
More informationCheri Coffey, Assistant Planning Director;
Work Session Memo PLANNING DIVISION DEPARTMENT of COMMUNITY and NEIGHBORHOODS To: From: Salt Lake City Historic Landmark Commission Cheri Coffey, Assistant Planning Director; cheri.coffey@slcgov.com Date:
More informationEASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923
INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationdate: 10 july 2012 the pennsylvania state university: burrowes building
the pennsylvania state university: burrowes building. faculty/staff committee project overview introductions goals of the renovation critical considerations exterior envelope mechanical systems interior
More informationPLATEAU REACHING A NEW. Plateau Mont-Royal Montreal, Quebec Victorian Row House, Renovation of Second and Third Floors
Plateau Mont-Royal Montreal, Quebec Victorian Row House, Renovation of Second and Third Floors Architect: L. McComber Ltée. General Contractor: PA Construction By John Bleasby Residential real estate prices
More informationS CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS
S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS This Attachment lists the items to be provided by the Architect in accordance with Owner/Architect Agreement. This list is not all-inclusive, nor is it
More informationCONSTRUCTION COST BREAKDOWN THIS IS FORM CCB
CONSTRUCTION COST BREAKDOWN Property Owner s Name or Borrowers Name Brief Description of Project John Homeowner Build single family residence Property Address Property City Property Zip Code 4625 Jillbarr
More informationAPPENDIX 3C DOMINION HOTEL SPECIFICATIONS
APPENDIX 3C DOMINION HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.
More information