Engineering District 5-0

Size: px
Start display at page:

Download "Engineering District 5-0"

Transcription

1

2 Engineering District 5-0 Executive Staff Michael W. Rebert, PE District Executive Christopher Kufro, PE Assistant District Executive (Design) Alfred A. Picca, PE Assistant District Executive (Construction) Jill Krause Assistant District Executive (Maintenance)

3 Engineering District 5-0 Design Staff Christopher Kufro, PE ADE - Design Kamlesh Ashar, PE Bridge Engineer Scott Vottero, PE Project Delivery Engineer Dave Rostron, PE Design Services Engineer Jeff Peterson, PE Portfolio Manager

4 District 5-0 Statistics 3,727 miles of highway (2,445 miles on high level network) -65% of network is high level 2,157 bridges (9,355,113 SF of deck area) 323 state bridges that are SD (14.9%) 94 state bridges that are posted (4.3%) 12 state bridges that are closed (0.5%) Local Bridges 780 locally-owned bridges 252 local bridges that are SD (32.3%) 180 local bridges that are posted (23.0%) 19 local bridges that are closed (2.4%)

5 District 5-0 Statistics Annual Maintenance Budget-----$115M Flat for last 10 years FY Funds---+26M Base TIP--FFY $199M Base TIP--FFY $207M Base TIP--FFY $199M Base TIP--FFY $196M Act $80M FAST ACT $48M

6 Transportation Investment Plan (TIP) Decade of Investment (DOI) in District 5: Significant progress has been made through the first three years 748 projects on DOI list from November bridge projects are being advanced through the P3 Bridge Program Of the remaining 706 projects, 180 have been let as of 10/1/ projects are currently programmed on the TIP and/or TYP 343 projects are to be addressed with Maintenance DOI Funds (A-409) 10 projects, not yet programmed, will be programmed on the 2019 TIP update

7 Project Delivery District 5 Total Lettings $257 $260 $227 $ $195 $180 Total Letting $ Total Amount ($ Million) *2017 *Projection

8 Transportation Investment Plan (TIP) TIP Area LVTS NEPA RATS Bridge $151,529,485 $85,213,431 $127,590,051 Highway Construction $39,786,556 $3,370,000 $15,551,210 Betterment $89,345,953 $83,607,647 $88,415,248 Safety $30,610,979 $32,870,493 $46,370,564

9 Number of SD Bridges SD Percent Transportation Investment Plan (TIP) Structural Deficient (SD) trends Year SD # of Bridges SD Percent

10 Transportation Investment Plan (TIP) District 5 has a goal of eliminating 115 SD Bridges by Contract or Department Forces through 2018, and we plan to exceed that goal by delivering 128 Bridges Governors Bridge Goals District 5 Progress TOTAL MPMS DF

11 Retaining Walls SR 248 Wall, Carbon Co. SR 4010 Wall, Carbon Co.

12 Construction Program Currently $475M worth of Projects ongoing in District 5

13 Major Construction Projects LVTS US 22 Fullerton Ave & Lehigh River Fahy Bridge Coplay/ Northampton Bridge NEPA SR 611 Scotrun RATS Penn Street Bridge Buttonwood Street Bridge Fleetwood Roadway Restoration I-78 Underclearance Bridges SR 78 Krumsville Interchange

14 Recently Completed Projects

15 Recently Completed Projects

16 Major Projects in Design LVTS US 22 Widening (15 th Airport Rd) PA 309/Tilghman St Interchange Tilghman Street Bridge Hill to Hill Bridge NEPA I-80 Exit 308 Interchange I-80 Reconstruction ( ) SR 61 Restoration (St Clair Frackville) SR 191 Tunnel Bridge RATS I-78-12M Main Line I-78/PA 61 Interchange & River Bridge US /73 Intersections US 222 Corridor North & South of Kutztown US 422 West Shore Bypass Reconstruction I-78 Lenhartsville Bridge

17 Betterment Projects TIP Betterment Projects Currently in Design 78-Auxiliary Lane miles of additional lane. Let date 4/20/ M Lehigh Co miles of resurfacing on I-78. Let 11/21/ M Schuylkill Co miles of restoration on I-81. Let 3/23/ M Berks Co miles of resurfacing on SR 61. Let 11/2/ M Schuylkill Co miles of resurfacing on SR 309. Let 12/13/ M Schuylkill Co miles resurfacing on SR 924. Let 12/13/ M Berks Co miles resurfacing on SR 100. Let 12/7/ M Berks Co miles resurfacing on SR 29. Let 12/7/ M Lehigh Co miles reconstruction on SR 100. Let 3/22/2018.

18 Safety Projects District 5 has the most roundabout projects in design across the state with 16. Currently 1 is open to traffic. The SR 222 corridor will have a total of 8 with the first one just under construction. SR 1024 SR S, Berks SR 222

19 HOP Projects Highway Occupancy Permit West Hills Business Park, SR 863 over I-78 Lehigh County

20 District 5 Storm Water Management Committee Formed in early 2016 Provides additional oversight for storm water management Ensures permit compliance through future maintenance and documentation requirements. Serves as an open forum to establish Best Management Practices Identifies opportunities for training and organizational resources. SR 422 Stormwater Basin Berks Co.

21 P3 Rapid Bridge Replacement District 5-0 Update 40 bridges being replaced 19 bridges completed: 7 in Schuylkill, 12 in Monroe 3 bridges currently in construction: SR B, SR B, & SR B all in Monroe County 13 bridges expected to start construction in bridges have been moved to 2018 for complex ROW, Utility or Environmental Reasons

22 PennDOT Connects District 5 has 57 new projects that will begin the PE phase in FFY 2017 Outreach to municipal and MPO partners will occur to ensure all needs are properly considered Executive staff, Project Managers, Municipal representatives and MPO staff will field view projects and work together on a Meeting of the Minds and identify opportunities

23 Project Delivery Assistance Six year agreement RATS/NEPA/LVTS TAP, Multimodal

24 Upcoming Projects SR 33 Over Bushkill

25 2036 Upcoming Projects SR 309 Center Valley

26 26

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

US 70 Corridor James City Project Update. Craig Young, Three Oaks Engineering US 70 Corridor Commission May 21, 2015

US 70 Corridor James City Project Update. Craig Young, Three Oaks Engineering US 70 Corridor Commission May 21, 2015 US 70 Corridor James City Project Update Craig Young, Three Oaks Engineering US 70 Corridor Commission May 21, 2015 Presentation Overview Improving the US 70 Corridor The Project Team Where Are We Today?

More information

Mega Projects at WSDOT

Mega Projects at WSDOT Mega Projects at WSDOT Managing multiple projects in major urban corridors LINEA LAIRD, WSDOT ASSISTANT SECRETARY ENGINEERING & OPERATIONS Presentation to Oregon State Legislature Congestion Work Group

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 23, Alexander Road to Maple Lake Road DBNUM: 11424 / UPC: 114240 Initiated from the Pavement Management System, this project will resurface within the project limits. ADA upgrades and guiderail repair

More information

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe: November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014 PLAN 2040 Regional Transportation Plan Update Final Recommendations Transportation and Air Quality Committee March 13, 2014 TIP/RTP Update Milestones Official public comment period closed February 21 Final

More information

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm Goal Development Workshop TCATS October 12- Works 5:30-7pm NATS October 19-Niles District Library 6-7:30pm SAFETEA-LU Goals 2035 TwinCATS Goals 2030 TwinCATS Goals 1. Support the economic vitality of the

More information

Incorporating TMS into Planning. Jianming Ma, Ph.D., P.E.

Incorporating TMS into Planning. Jianming Ma, Ph.D., P.E. Incorporating TMS into Planning Jianming Ma, Ph.D., P.E. Table of Contents 1 What is TMS 3-4 2 Transportation Environment is Changing 5-6 3 Benefits from TMS 7-8 4 Traditional Approach to Managing Transportation

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

Des Moines Area MPO. MPO Planning Subcommittee Meeting March 3, Des M oines Area M etropolitan Planning Organization

Des Moines Area MPO. MPO Planning Subcommittee Meeting March 3, Des M oines Area M etropolitan Planning Organization Des Moines Area MPO MPO Planning Subcommittee Meeting March 3, 2014 2014 Des M oines Area M etropolitan Planning Organization Agenda 1. Call To Order 2. VOTE: Approval of Agenda 3. VOTE: Approval of Meeting

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County Public Meeting US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County Cary Cleland Road Design Engineering Supervisor January 17, 2017 Project Limits US18/US281 US281

More information

Chapter 10 Goals, Objectives + Policies

Chapter 10 Goals, Objectives + Policies Chapter 10 Goals, + Policies Warehouse on Nestle Way near I-78 114 115 10.1 ESTABLISHMENT OF CONSISTENT GOALS 10.2 NATIONAL FREIGHT GOALS The Lehigh Valley s freight transportation investment decisions

More information

Highway 15 Project Hutchinson, MN

Highway 15 Project Hutchinson, MN Highway 15 Project Hutchinson, MN Adjacent Properties and Businesses Meeting Hutchinson Area Chamber of Commerce 1 Agenda Topic 1) Introduce the project scope 2) Project goals and benefits 3) Project timeline

More information

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program New Jersey Department of Transportation Local Freight Impact Fund Handbook Procedures and Criteria for Local Freight Impact Fund Grant Program Page 1 of 10 Overview The New Jersey Department of Transportation

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

Blueprint for One of the Nation s Largest SCM Maintenance Programs

Blueprint for One of the Nation s Largest SCM Maintenance Programs Blueprint for One of the Nation s Largest SCM Maintenance Programs PA Department of Transportation Hydrologic & Hydraulic Studies Waterway Permitting Stormwater Design & Permitting Technical Course Development

More information

VUSP PA Stormwater Symposium Villanova University, PA

VUSP PA Stormwater Symposium Villanova University, PA VUSP PA Stormwater Symposium Villanova University, PA 1 Delaware River Watershed 2 Source: ESRI 3 Population 8.5M Source: Kauffman U. Delaware 4 Source: OSI Water supply for 17M Source: DRBC 5 Source:

More information

VOLUME I - EXECUTIVE SUMMARY. Prepared by: Lehigh Valley Planning Commission. PUBLIC REVIEW: August 19, 2010 September 20, 2010

VOLUME I - EXECUTIVE SUMMARY. Prepared by: Lehigh Valley Planning Commission. PUBLIC REVIEW: August 19, 2010 September 20, 2010 AIR QUALITY CONFORMITY ANALYSIS REPORT FOR THE LEHIGH VALLEY MPO OZONE MAINTENANCE AREA (Under the 8-hour Ozone NAAQS) And 24-HOUR PM 2.5 NONATTAINMENT AREA VOLUME I - EXECUTIVE SUMMARY Prepared by: Lehigh

More information

Greenhouse Gas Emission Reduction Strategies

Greenhouse Gas Emission Reduction Strategies Greenhouse Gas Emission Reduction Strategies 2011 ITE Quad Conference April 18 19, 2011, Embassy Suites; Lynnwood, WA Victor L. Sl Salemann, PE Senior Associate David Evans and Associates Bellevue, WA

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013 Maintenance, Construction & Secondary Roads Terry Gibson, PE Chief Engineer February 20, 2013 State versus local responsibility Division structure Allocations Flexibility in funding Implications of not

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

Business Plan for FY14 FY15

Business Plan for FY14 FY15 Business Plan for FY14 FY15 Commissioner s Message May 2013 The Executive Team and I are pleased to present the new Business Plan for FY 2014-15. This plan builds on the key priorities to deliver our mission:

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

Arizona Association of County Engineers New Rules for Categorical Exclusions for FHWA Projects

Arizona Association of County Engineers New Rules for Categorical Exclusions for FHWA Projects Arizona Association of County Engineers New Rules for Categorical Exclusions for FHWA Projects Paul O Brien Manager, ADOT Environmental Planning Group June 19, 201 4 MAP-21 What are the new rules for Categorical

More information

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing Project Reston Avenue to Jarrett Valley Drive Public Hearing Nicholas J. Roper, P.E. District Project Development Engineer Email: nicholas.roper@vdot.virginia.gov Phone: (703)259-1953 Agenda 7:00-7:15

More information

Straight Line Diagram. Cameron 12. January 2018

Straight Line Diagram. Cameron 12. January 2018 Straight Line Diagram Cameron 12 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE Tuesday, April 30, 2013 4:00 p.m. County Board Room Bldg. A A. CALL TO ORDER B. ROLL CALL C. PLEDGE OF ALLEGIANCE & PRAYER D. APPROVAL OF MINUTES: March 26,

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. AMENDMENT #3 + Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. Adopted October 16, 2014 by the Board of Directors Palm Beach

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

Updating Virginia s Statewide Functional Classification System. Briefing to MPOs, PDCs, and Local Governments

Updating Virginia s Statewide Functional Classification System. Briefing to MPOs, PDCs, and Local Governments Updating Virginia s Statewide Functional Classification System Briefing to MPOs, PDCs, and Local Governments October 15 & 19, 2012 Functional Class 101 Shelton s FC Game Research Phase Today s Review New

More information

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

Members of the Board of Directors. Laurena Weinert, Clerk of the Board COMMITTEE TRANSMITTAL July, 06 To: From: Subject: Members of the Board of Directors Laurena Weinert, Clerk of the Board Update on the State Route Improvement Project Between Interstate 0 and Interstate

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission,

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission, , and ODOT s Updated, and Since the Vision 2000 effort under taken in 1995, ODOT has operated under a, Vision, and. These were updated in 2000 and are updated again here by Senior Leadership to reflect

More information

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study CENTRAL FLORIDA EXPRESSWAY AUTHORITY SR 408 Eastern Extension PD&E Study WHAT IS A PD&E? Process used to evaluate - o Engineering Alternatives o Environmental Impacts and Social, Cultural and Economic

More information

Tier 1 Recommendations October 30, 2017

Tier 1 Recommendations October 30, 2017 Tier 1 Recommendations October 30, 2017 Page Left Intentionally Blank Bristol District B.2 B.9 Need Tier 1 District Needs Need Description Within the Bristol MPO, the I-81 interchanges in Abingdon have

More information

TRANSPORTATION PLAN Donald Vary

TRANSPORTATION PLAN Donald Vary LOUISIANA STATEWIDE TRANSPORTATION PLAN Donald Vary March 2, 2016 AGENDA Plan Development Decision-Making Process Outreach Activities Vision and Goals Transportation Needs Financial Analysis (revenue scenarios

More information

Corridors of Statewide Significance: Introduction

Corridors of Statewide Significance: Introduction Virginia s Long-Range Multimodal Transportation Plan Corridors of Statewide Significance: Introduction Prepared for: Commonwealth Transportation Board Prepared by: Office of Intermodal Planning and Investment

More information

U.S. Army Corps of Engineers Permit Application Tips

U.S. Army Corps of Engineers Permit Application Tips U.S. Army Corps of Engineers Permit Application Tips MnDOT Environmental Conference Ben Orne and Sarah Wingert, USACE 4-29-2015 US Army Corps of Engineers BUILDING STRONG Outline Introduction to Corps

More information

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013 IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange Public Meeting Thursday April 4, 2013 1 Project Contacts: TxDOT-Fort Worth District John R. Tillinghast, P.E. IH 820 Project

More information

Regional Mobility Authorities in Texas

Regional Mobility Authorities in Texas Regional Mobility Authorities in Texas Testimony of Ginger Goodin, P.E., Senior Research Engineer and Director, TTI Transportation Policy Research Center John Overman, Research Scientist for Transit Mobility

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

Engineers Perspective on the State of Transportation Infrastructure in NC

Engineers Perspective on the State of Transportation Infrastructure in NC Engineers Perspective on the State of Transportation Infrastructure in NC Pamela B. Townsend, PE MS Civil Engineering, BSCE, NC State University Vice President, Earth Tech, Inc. David Peterson, PE Past

More information

Delaware Valley Freight Planning

Delaware Valley Freight Planning Delaware Valley Freight Planning 2015 Mid-Atlantic Regional Planning Roundtable DVRPC Office of Freight and Aviation Planning OCTOBER 29, 2015 WILMINGTON, DE Delaware Valley Regional Planning Commission

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012 I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation

More information

Regional Transportation Studies Regional Council

Regional Transportation Studies Regional Council Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement

More information

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS

Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS GENERAL CONCEPTS...2 General...2 Design Vehicle...2 Driver Expectancy...2 Design Speed...2 Sight Distances...3 Exhibit

More information

Congestion Management Process 2013 Update

Congestion Management Process 2013 Update OVERVIEW OF THE DALLAS-FORT WORTH CONGESTION MANAGEMENT PROCESS Traffic Congestion In The Dallas-Fort Worth Region With the Dallas-Fort Worth (DFW) urban area as its center, the North Central Texas region

More information

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft 2 0 4 0 Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN Draft 2040 Long Range Transportation Plan Amendment 1 DRAFT January 2018 Background The JUMPO 2040 LRTP

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

PPTA Project Pipeline

PPTA Project Pipeline PPTA Project Pipeline Commonwealth of Virginia May 2012 Opening Remarks The Commonwealth of Virginia was developed in the 17 th century as a risky, but ultimately highly successful business venture between

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-44b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED RANDY S SANITATION TRANSFER FACILITY PROPOSED

More information

Performance Based Practical Design (PBPD)

Performance Based Practical Design (PBPD) Performance Based Practical Design (PBPD) 2016 ODOT D08 LPA Day John R. Kasich, Ohio Governor Jerry Wray, ODOT Director PBPD PBPD Presenter Katherine DeStefano, P. E. District 08 Design Engineer ODOT D08

More information

Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory

Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory Public Information Meeting Thursday, February 21, 2008 6:30 p.m., Eastbank Council Chambers, Yenni Building Project Sponsors

More information

Re: PW Appendix 3 - Part 8

Re: PW Appendix 3 - Part 8 Demolish S/W DVP ramp, FGE WBL (including Logan Ramp), Don River bridge WB, and existing LSB WBL Construct new S/W DVP ramp, FGE WBL ramp, Don River bridge WB, and remaining portion of LSB WB roadwork.

More information

Sunrise Project South I-205 Corridor Improvement Project

Sunrise Project South I-205 Corridor Improvement Project Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Interstate, NHS Non-Interstate and Non-NHS (IJR / IMR Guidance) SPECIFIC SUBJECT:

More information

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House HIGHLIGHTS OF HWY 14 PROGRESS 1960s & 70s Four-lane expansion in Rochester and Mankato areas 1993 Owatonna to Kasson EIS Completed (redone to

More information

Infrastructure Financing Programs (DIF)

Infrastructure Financing Programs (DIF) Infrastructure Financing Programs (DIF) Massachusetts Municipal Association January 24, 2015 Infrastructure Needs in Massachusetts* Approximately 10% of bridges are classified as Structurally Deficient

More information

FINAL INSPECTION OF CONSTRUCTION PROJECTS

FINAL INSPECTION OF CONSTRUCTION PROJECTS Approved: Standard Procedure No.: 510-007(SP) Effective Date: January 19, 2010 Responsible Division: Construction Management Supersedes procedure dated June 1, 2009 William H. Lindenbaum, P.E., P.S., Deputy

More information

Executive Summary October 2017

Executive Summary October 2017 Executive Summary The King of Prussia Rail Draft Environmental Impact Statement/Draft Section 4(f) Evaluation (DEIS) describes and summarizes the transportation and environmental benefits and impacts of

More information

I-11 Project Nevada Transportation Conference. Ryan Wheeler, P.E. NDOT, Senior Project Manager. Nevada Department of Transportation

I-11 Project Nevada Transportation Conference. Ryan Wheeler, P.E. NDOT, Senior Project Manager. Nevada Department of Transportation I-11 Project 2017 Nevada Transportation Conference Ryan Wheeler, P.E. NDOT, Senior Project Manager Nevada Department of Transportation nevadadot.com About NDOT NDOT Core Values: Respect treating others

More information

*027 P E R S H I N G LOVELOCK LOVELOCK AREA HUMBOLDT WASHOE LANDER CHURCHILL. Lovelock. Lovelock. Cosgrave Rest Area. Imlay. Rye Patch Reservoir

*027 P E R S H I N G LOVELOCK LOVELOCK AREA HUMBOLDT WASHOE LANDER CHURCHILL. Lovelock. Lovelock. Cosgrave Rest Area. Imlay. Rye Patch Reservoir *027 WASHOE HUMBOLDT Rye Patch Reservoir Imlay 58 Mill City Cosgrave Rest Area P E R S H I N G Vernon Seven Troughs Unionville Oreana 0 78 Eagle Picher Mine 9 164 Rochester LANDER SEE ENLARGEMENT THIS

More information

CUY-90-Innerbelt ODOT PID No 77510

CUY-90-Innerbelt ODOT PID No 77510 CUY-90-Innerbelt ODOT PID No 77510 Chapter 1: Project History and Background Figure 1-1: Innerbelt Study Area Points of Interest 1.0 Introduction Planned in the 1940s and built during the 1950s and early

More information

Trans-Texas Corridor-35 Update

Trans-Texas Corridor-35 Update Trans-Texas Corridor-35 Update TTC-35 Regional Briefing July 13, 2006 North Central Texas Council of Governments Transportation Department Trans-Texas Corridor-35 Is there a need? 6 Lanes 12 Lanes 20 Lanes

More information

WINDFARM DEVELOPMENT. FM 1847, Pharr District, Cameron County. Date. Footer Text

WINDFARM DEVELOPMENT. FM 1847, Pharr District, Cameron County. Date. Footer Text WINDFARM DEVELOPMENT FM 1847, Pharr District, Cameron County Table of Contents 1 2 3 4 Location Map Windfarm Planning Activities Windfarm Construction Closeout/Negotiations 5 Lessons Learned 2 Location

More information

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1 Miami-Dade Transit Alice N. Bravo, P.E. Director Miami-Dade Transit 1 Miami-Dade Transit MDT is the largest transit agency in the State of Florida, and one of the largest departments within Miami-Dade

More information

PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B

PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B April 2008 Prepared by: Curtis Lueck & Associates 5460 West Four Barrel Court Tucson, AZ

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

Statewide Acceleration Transformation (SWAT)

Statewide Acceleration Transformation (SWAT) Presented to: AASHTO SCOE/SCOD Presented by: Marjorie Kirby Paul Hiers, P.E. Statewide Acceleration Transformation (SWAT) July 2017 PD&E Study Comply with the National Environmental Policy Act (NEPA) and

More information

What s Good for the Tap is Good for the Creek! Reading Area Water Authority marks five years of Source Water Protection

What s Good for the Tap is Good for the Creek! Reading Area Water Authority marks five years of Source Water Protection What s Good for the Tap is Good for the! Reading Area Water Authority marks five years of Source Water Protection Reading Area Water Authority Provides water to 125,000 residents in and around the City

More information

*027 P E R S H I N G N 398 LOVELOCK LOVELOCK AREA HUMBOLDT WASHOE LANDER CHURCHILL. Lovelock. Lovelock. Cosgrave Rest Area. Imlay. Rye Patch Reservoir

*027 P E R S H I N G N 398 LOVELOCK LOVELOCK AREA HUMBOLDT WASHOE LANDER CHURCHILL. Lovelock. Lovelock. Cosgrave Rest Area. Imlay. Rye Patch Reservoir *027 WASHOE HUMBOLDT Rye Patch Reservoir Imlay 58 Mill City Cosgrave Rest Area P E R S H I N G Vernon Seven Troughs Unionville Oreana 0 78 Eagle Picher Mine 9 164 Rochester LANDER SEE ENLARGEMENT THIS

More information

Appendix B. Benefit-Cost Technical Memorandum

Appendix B. Benefit-Cost Technical Memorandum Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH

More information

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration Scope of Work Route 116/Hinesburg Growth Center Corridor Study Town of Hinesburg and CCRPC Project Approach and Understanding Route 116 through Hinesburg had seen substantial changes in the past 15 years,

More information

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015 NCDOT Overview Nick Tennyson, Chief Deputy Secretary March 4, 2015 Overview Major Functions of DOT Board of Transportation Highway System Overview Construction- Road Building Process Operations and Maintenance

More information

Status of Highway Safety Manual Implementation. October 2015

Status of Highway Safety Manual Implementation. October 2015 Status of Highway Safety Manual Implementation October 2015 Agenda NCHRP Project 17-50 Overview Project Objective Panel members and support states Project Deliverables to Date Status of HSM Implementation

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

US-101 CORRIDOR ADVISOR S UPDATE

US-101 CORRIDOR ADVISOR S UPDATE US-101 CORRIDOR ADVISOR S UPDATE MONTECITO ASSOCIATION BOARD OF DIRECTORS 12 MAY 2015 1 SCOPE OF SERVICES Identify & evaluate innovative project delivery strategies: Avoid & minimize delays / expedite

More information

Documenting Climate Change Considerations in the National Environmental Policy Act Process. Jeff Houk FHWA Resource Center June 7, 2010

Documenting Climate Change Considerations in the National Environmental Policy Act Process. Jeff Houk FHWA Resource Center June 7, 2010 1 Documenting Climate Change Considerations in the National Environmental Policy Act Process Jeff Houk FHWA Resource Center June 7, 2010 2 Current Practice for Climate Change in NEPA Nothing Boilerplate

More information

State Route 8 Bridge Replacement Project

State Route 8 Bridge Replacement Project OPEN HOUSE PUBLIC INVOLVEMENT MEETING Celebration Church 688 Dan Street, Akron, Ohio Tuesday, July 14, 2015 5:00 PM to 7:00 PM State Route 8 Bridge Replacement Project Existing Bridge Future Bridges: Steel

More information

The transportation needs described demonstrate that improvements are needed to meet the anticipated demands of travelers in the corridor and region.

The transportation needs described demonstrate that improvements are needed to meet the anticipated demands of travelers in the corridor and region. traveling to jobs in the corridor and in downtown Dallas, and residents from elsewhere in the region traveling to jobs in the corridor (reverse commute). Improve Accessibility and Increase Economic Development

More information

Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life. March Washington, DC

Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life. March Washington, DC Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life March 2015 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

ITEM 9 Action October 18, 2017

ITEM 9 Action October 18, 2017 ITEM 9 Action October 18, 2017 Approval of the Air Quality Conformity Analysis of the VDOT and MDOT Off-Cycle Amendment to the 2016 CLRP and Approval of the 2016 Off-Cycle Amendment Staff Recommendation:

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

GreenDOT Advisory Group

GreenDOT Advisory Group GreenDOT Advisory Group Massachusetts Department of Transportation Kick-Off Meeting 1 Leading the Nation in Transportation Excellence www.mass.gov/massdot GreenDOT Policy Development and Implementation

More information

Alternative Project Delivery Division Consultant Procurement

Alternative Project Delivery Division Consultant Procurement Alternative Project Delivery Division Consultant Procurement VTCA/VDOT Consultant Forum 2016 September 8, 2016 Jeff Rodgers Director of Consultant Procurement Alternative Project Delivery Division Merged

More information

PUBLIC HEARING LOOP 9

PUBLIC HEARING LOOP 9 PUBLIC HEARING LOOP 9 From Interstate (I)-35E to I-45 Dallas and Ellis Counties, Texas CSJ: Loop 2964-10-005 9: I-35E to I-45 Tuesday, June 20, 20, 2017 2017 Public Hearing Introductions ELECTED & PUBLIC

More information