SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
|
|
- Allen Conley
- 6 years ago
- Views:
Transcription
1 Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217
2 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to Congress Avenue MUNICIPALITIES: City of West Palm Beach Town of Mangonia Park City of Riviera Beach 7
3 Purpose and Need Project Purpose: o Identify short-term and long-term needs within the study area, o Develop design concepts to address traffic spillback onto I-95, o Improve interchange operations, reduce congestion, and increase safety at the study interchange. Project Need: o Alleviate existing and future traffic congestion thereby improving safety of I-95 and the interchange 8
4 Alternatives Analysis No-Build Transportation System Management & Operations (TSM&O) Alternatives Evaluation Process No Build NB TSM&O A Build Alternatives ALTERNATIVES SCREENING o Add additional right and left turn lane at the ramp intersections o Add directional signage on NB off-ramp to Port of Palm Beach o Add one EB and one NB left turn lane at Congress Avenue Traffic Operations Safety Freight Access Management Utilities Canal Impacts Constructability MOT Historic & Archeological Wetlands Noise Impacts Permitting R/W Impacts Aesthetic Features Community Services EVALUATION MATRIX Build Alternatives o Alternative 1: Widening of 45th Street o Alternative 2: Diverging Diamond Interchange o Alternative 3: SR 71 Ramps Alternatives Public Workshop Recommended Alternative 9
5 Alternatives Analysis Alternative 1 Widening of 45th Street 1
6 Alternatives Analysis Alternative 2 Diverging Diamond Interchange 11
7 Alternatives Analysis Alternative 3 SR 71 Ramps NOTE: Alternative 3 was developed but eliminated from further consideration as part of this study N AUSTRALIA AVE N MILITARY TR CONGRESS AVE STREET 12
8 Environmental Analysis Wetlands/Benthic Resources No jurisdictional wetlands Sparse tape grass in C-17 Canal south of 45th Street Special Designations No special designation or Outstanding Florida Waters Wildlife and Habitat Project area does not generally provide wildlife habitat Contractor should verify absence of nests prior to construction along canal banks In-water construction should include special protection measures Contamination 2 High Risk Sites 13
9 Preliminary Right-of-Way Impacts COMPONENT TSM&O ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 Residential Properties Business Properties Vacant Land TOTAL PROPERTIES IMPACTED Preliminary Cost Estimate COMPONENT Roadway Construction TSM&O ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 $3,88, $13,67, $11,57, $54,27, Engineering/Design (15% Construction) $582, $1,96, $1,726, $8,131, CEI (15% Construction) $582, $1,96, $1,726, $8,131, $ $1,583, $467, $4,581, $5,44, $18,57, $15,426, $75,5, Right-of-Way Acquisition TOTAL COST 14
10 Public Involvement Public Kick-Off Meeting o September 13, 217 Elected Officials/Agencies Briefings o Palm Beach County o Town of Mangonia o City of Riviera Beach Alternatives Public Workshop o March 28, 217 Public Hearing o Fall
11 Summary Schedule ACTIVITY J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J Notice to Proceed Fact Sheet/Newsletter Elected Officials/Agency Kick-Off Meeting Public Kick-Off Meeting Engineering Data Collection Engineering Analysis Environmental Data Collection Environmental Analysis Develop and Evaluate Alternatives Alternatives Public Workshop Engineering Reports Environmental Reports Public Hearing Federal Highway Administration (FHWA) Review Location and Design Concept Acceptance (LDCA) Continuous Public Involvement TODAY 16
12 Long Range Transportation Plan (LRTP) Amendment I-95 at 45th Street Interchange Project FM # FDOT District Four requested and received approval for statewide SIS funds for all phases Draft Tentative Work Program FY 218 FY 222 and SIS 2nd Five Requesting an amendment to Palm Beach MPO s adopted 24 LRTP to incorporate the I-95 at 45th Street Interchange project as a fully funded project in the Cost Feasible Plan (CFP) 17
13 THANK YOU For more information, please call, or write to: Robert Lopes, PE Project Manager Florida Department of Transportation District Four 34 West Commercial Boulevard Fort Lauderdale, FL 3339 Phone: (954) Toll free: (866) , ext
Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study
Florida Department of Transportation District Four KICK-OFF MEETING I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Palm Beach County, Florida Financial Project ID No.: 435516-1-22-02
More informationSR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014
SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014 Purpose and Need Enhancing Economic Competitiveness Improving Emergency Evacuation Capabilities
More informationI-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)
I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY) TO WEST OF SR 435 (KIRKMAN ROAD) ORANGE COUNTY, FLORIDA Financial Project
More informationPublished by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.
AMENDMENT #3 + Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. Adopted October 16, 2014 by the Board of Directors Palm Beach
More informationMDX Contract #: RFP MDX Work Program #: ETDM #: 11501
SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4G From: Date: Subject: Staff May 16, 2008 Council Meeting Intergovernmental Coordination and Review Log The
More information2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM
2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project Outstanding
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four
DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127
More informationState Road (S.R.) 12 (Florida Arts Trail PD&E)
State Road (S.R.) 12 (Florida Arts Trail PD&E) from North Corry Street to S.R. 63 (U.S. 27) Gadsden County, Florida FPID Number: 433380-1-32-01 CRTPA Briefing September 2015 Today s Presentation Evolution
More informationSIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects. Project Review with Metropolitan/ Transportation Planning Organizations
SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects Project Review with Metropolitan/ Transportation Planning Organizations March/April 2017 Outline Purpose of and Planning for Florida
More informationMEETING SUMMARY FOR APRIL 13, 2017
SARASOTA/MANATEE METROPOLITAN PLANNING ORGANIZATION Performance Measures/Project Prioritization Process Ad Hoc Committee 7632 15 th Street East Sarasota, Florida 34243 3:00-5:00 PM MEETING SUMMARY FOR
More informationAIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision
More informationStatewide Acceleration Transformation (SWAT)
Presented to: AASHTO SCOE/SCOD Presented by: Marjorie Kirby Paul Hiers, P.E. Statewide Acceleration Transformation (SWAT) July 2017 PD&E Study Comply with the National Environmental Policy Act (NEPA) and
More informationINTERCHANGE MODIFICATION REPORT
INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange
More information1.4 Analysis of Alignment Alternatives
Parkway is 20.94 miles, with 8.16 miles in Orange County, 7.37 miles in Lake County and 5.41 miles in Seminole County. SR 46 Reconstruction and Realignment, which would begin at the SR 46/US 441 interchange
More informationCENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study
CENTRAL FLORIDA EXPRESSWAY AUTHORITY SR 408 Eastern Extension PD&E Study WHAT IS A PD&E? Process used to evaluate - o Engineering Alternatives o Environmental Impacts and Social, Cultural and Economic
More information2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM
2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project
More informationSR 50 PD&E Study
SR50 Project Development & Environment Study Public Hearing November 1, 2011 SR 50 PD&E Study 427056-1-22-01 1 Purpose of the Public Hearing Afford persons the opportunity to express their views about
More informationFDOT PROJECT INFORMATION APPLICATION FORM
THIS FORM SHALL BE SUBMITTED FOR ALL PROJECTS NOT CURRENTLY IN THE FDOT WORK PROGRAM. FDOT PROJECT INFORMATION APPLICATION FORM DATE: APPLICANT: FDOT LIAISON: 1. MPO/TPO Project Priority Number: 2. Contact
More informationSR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES
Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road
More informationWednesday May 22, 2013 Managed Lanes Modeling Workshop
FDOT POLICY REQUIREMENTS Wednesday May 22, 2013 Managed Lanes Modeling Workshop Agenda Florida s Transportation Vision for the 21 st Century Brief summary of what has been accomplished to date Draft Statewide
More informationIII. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)
Regional Transportation Technical Advisory Committee (RTTAC) Transportation System Management & Operations (TSM&O) Subcommittee Meeting Agenda June 23, 2015 1:30 PM FDOT District Four Headquarters Auditorium
More informationUS 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL
US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL JOINT MEETING OCTOBER 12, 2018 Future Corridors Auburndale Winter Haven ILC (CSX Rwy) Tampa Airport
More informationAPPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence
APPENDIX 21 1 Methodology Letter of Understanding (MLOU) and Agency Correspondence Question 21 Transportation This document reflects the transportation study methodology to be utilized in preparing responses
More informationWorking with Transportation Concurrency Exception Areas
Working with Transportation Concurrency Exception Areas September 2006 Presented by the Florida Department of Transportation Working with Transportation Concurrency Exception Areas Volume 1, September
More informationOn behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.
On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. Located in the heart of South Carolina, the I-20/26/126 Corridor is the crossroads of the state
More informationFlorida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract
Florida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Contract Evaluation June 2013 06/18/13 FDOT DBPB Evaluation 1 Jobs Creation
More information2040 Long Range Transportation Plan
2040 Long Range Transportation Plan Presented by Iowa Northland Regional Council of Governments October 22, 23, and 24, 2013 Liaison for federal transportation funding that goes to local cities and counties
More informationAlternatives Evaluation Methodology
Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph
More informationPOLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009
POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report ADOPTED June 18, 2009 TABLE OF CONTENTS CHAPTER 1 Introduction and Prior Planning Effort...Page 1-1 CHAPTER 2 Population and Employment
More informationSCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD
SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD (ROADWAY ID 87004000 - MP 0.000 TO MP 4.910) (ROADWAY ID 87003000 MP 3.962 TO MP 4.132) BACKGROUND
More informationADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle
More informationArterial Traffic Control: Advancing Mobility. 1980s, Now, and Beyond
Arterial Traffic Control: Advancing Mobility 1980s, Now, and Beyond Broward MPO: Championing a Vision for Quality of Growth and Life Mobility Affects Quality Collaborative Planned Investment in Mobility
More informationPalm Beach MPO Board Meeting December 7, 2015
Palm Beach MPO Board Meeting December 7, 2015 Overview 1 Background and History 3 Public and Agency Engagement Strategy 2 Overview of Scope and Schedule for the Study 4 Next Steps 2 1 Background and History
More informationProject Study Area. Presentation. July 8, 2008
Florida Department of Transportation Presentation for for the the South Side Community Plan #4 at at the the South South Shore Shore Regional Regional Library, Library, 15816 15816 Beth Beth Shields Shields
More informationNC General Statutes - Chapter 136 Article 3A 1
Article 3A. Transportation Systems in and around Municipalities. 136-66.1. Responsibility for streets inside municipalities. Responsibility for streets and highways inside the corporate limits of municipalities
More informationInterchange Justification Report (IJR) I-75 at Bethlehem Road Henry County
Interchange Justification Report (IJR) I-75 at Bethlehem Road Henry County IJR Study/Analysis Area Exit 216: SR 155 Bethlehem Road Exit 212: Bill Gardner Pkwy Planning Background ARC 2040 Regional Transportation
More informationFDOT District 5 TSM&O. Program Development
FDOT District 5 TSM&O Program Development Overview I. FDOT D5 Program Goals and Projects II.SHRP-2 Support III.TSM&O Planning Guidebook & Methodology FDOT District 5 Program FDOT D5 Program Goals Increase
More informationBroward County Urban Freight/Intermodal Mobility Study Executive Summary
Broward County Urban Freight/Intermodal Mobility Study Executive Summary 2007/08 executive summary Urban Freight/Intermodal Mobility Study prepared for Broward MPO prepared by 110 East Broward Boulevard,
More informationHighway Construction Program
Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,
More informationAir Quality Analysis Technical Memorandum
Air Quality Analysis Technical Memorandum Segment 2: State Road 400 (SR 400) / Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road) Orange County (75280), Florida
More informationFinal Recommendations Identification of Improvements, Strategies, and Solutions
Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...
More informationTHE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.
THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive
More informationLand Use Vision and Transportation Strategy
Phase 1: Land Use and Transportation Strategy ing Workshop March 12, 2015 Phase 1: Land Use and Transportation Strategy Welcome Purpose & Background Consensus Building / Strategies to Implement the Next
More informationSouth Florida East Coast Corridor (SFECC) Study
South Florida East Coast Corridor (SFECC) Study P r o j e c t U p d a t e J u l y 2 7, 2 0 11 FM Number: 417031-3-22-01 Re-introduce Passenger Rail Service on FEC Corridor (85 miles) Improve Freight Capacity
More informationConstruction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL
Construction Engineering and Inspection Services to Silver Shores Boulevard Broward County, FL R L I N O. R 2 11 4 0 8 0 P 1 I. Experience and Qualifications with Roadway Construction a. Eisman & Russo
More informationCORE MPO Freight Transportation Plan. Project Advisory Committee December 3, 2014
CORE MPO Freight Transportation Plan Project Advisory Committee December 3, 2014 Agenda 9:30-9:40 Welcome-Introductions 9:40-10:10 Recap of Previous FAC Meetings 10:10 10:50 Land Use Analysis Update Review
More informationa. Reevaluation Phase: Design Change (FM & ) b. Document Type and Date of Approval: Type 2 Categorical Exclusion approved 7/21/2010
Florida Department of Transportation PROJECT REEVALUATION FORM I. GENERAL INFORMATION (originally approved document) a. Reevaluation Phase: Design Change (FM 412420.2 & 409355.3) b. Document Type and Date
More informationChapter 2 Transportation Element Goals, Objectives and Policies
Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective
More informationTampa Bay has a traffic problem. We re working on a comprehensive set of solutions.
Tampa Bay has a traffic problem. We re working on a comprehensive set of solutions. Modernize infrastructure Prepare for the future Embrace collaboration and innovation The Program Includes: Interstate
More informationNorthwest State Route 138 Corridor Improvement Project
Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816
More informationNorth I-75 Master Plan Summary
North I-75 Master Plan Summary Florida Section ITE Annual Meeting November 3, 2017 The I-75 Relief Task Force Established by Secretary Boxold in October 2015 with broad membership Overarching goals Provide
More informationSummary. Preliminary Alternative Development and Screening. DEIS July 23, 2018
What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key
More informationTYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM
1. GENERAL INFORMATION County: Project Name: Project Limits STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM Collier I-75 at SR 951 Interchange Improvement
More informationHouse Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016
House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions March 28, 2016 US Highway 70 Main highway route from I-40 & I-95 to the Global TransPark and the Port of Morehead
More information2018 FTBA CONSTRUCTION CONFERENCE February 8-9, 2018 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW
Florida Department of TRANSPORTATION 2018 FTBA CONSTRUCTION CONFERENCE February 8-9, 2018 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW Presenter: Brian Blanchard, Assistant Secretary Engineering and
More informationFASTLANE Grant Project US-69 through Calera. Oklahoma Traffic Engineering Association 2017 Fall Meeting
FASTLANE Grant Project US-69 through Calera Oklahoma Traffic Engineering Association 2017 Fall Meeting October 17, 2017 US-69 through Calera Project Location Town of Calera City of Durant Project Location
More informationFTP/SIS Steering Committee Work Plan and PPI Update
FTP/SIS Steering Committee Work Plan and PPI Update Work Plan and PPI Update Presented by: Dana Reiding September 30, 2015 FTP and SIS Update Process and Schedule Issues Identification Jan Feb Potential
More informationAPPENDIX H NEPA TRANSITION REPORT
APPENDIX H NEPA TRANSITION REPORT BORDER HIGHWAY EAST STUDY CSJ: 0-0-00 EL PASO COUNTY, TEXAS TEXAS DEPARTMENT OF TRANSPORTATION The environmental review, consultation, and other actions required by applicable
More informationPalm Coast-Daytona Beach-Port Orange Transportation Management Area (TMA) River to Sea TPO. TMA Federal Certification Review Closeout Presentation
Palm Coast-Daytona Beach-Port Orange Transportation Management Area (TMA) River to Sea TPO TMA Federal Certification Review Closeout Presentation MPO Board Meeting January 27, 2016 Federal Highway Administration
More informationDraft Preliminary Engineering Report
Draft Preliminary Engineering Report May, 2016 Draft Preliminary Engineering Report I 95 from north of Northlake Boulevard (MP 36.575) to south of Donald Ross Road (MP 38.775), PGA Boulevard from west
More informationEXHIBIT "A" SCOPE OF SERVICES (STAGE 1) SYSTEMS PLANNING TRAVEL FORECASTING MODELING F.P.I.D. NO
EXHIBIT "A" SCOPE OF SERVICES (STAGE 1) SYSTEMS PLANNING TRAVEL FORECASTING MODELING F.P.I.D. NO. 202075-1-12-07 Table of Contents TABLE OF CONTENTS... 2 PURPOSE... 3 SERVICES... 4 A. FLORIDA STANDARD
More informationENVIRONMENTAL ADVISORY GROUP MEETING NO. 2
ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2 Lake / Orange County Connector (US 27 to SR 429) Feasibility/Project Development & Environment Study February 12, 2019 Title VI Compliance This meeting, project,
More informationEXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES
EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID 432430-1-32-13 TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES DISTRICT TWO November 27, 2017 Page 1 EXHIBIT A SCOPE
More informationSpace Coast TPO. ITS Master Plan and Project Overview in Brevard County. FSITE/District 10 & ITS FL 2017 Joint Annual Meeting
Space Coast TPO ITS Master Plan and Project Overview in Brevard County FSITE/District 10 & ITS FL 2017 Joint Annual Meeting 2 Presentation Outline Space Coast Overview The SCTPO s Role in TSM&O Success
More informationRE Request for FY 2018 UPWP Budget Adjustments
November 30, 2017 William Eastin Southeast Georgia Branch Chief GDOT Office of Planning 600 W. Peachtree St. NW, 5th Floor Atlanta, GA 30308 RE Request for FY 2018 UPWP Budget Adjustments Dear Mr. Easton:
More informationBROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure
BROWARD COUNTY Solicitation Bid #V2114585P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure YOUR CEI SOLUTION YOUR PARTNERS Cory Nichols, P.E Quality Assurance Quality Control
More informationAttachment E. Logistics. Ridge Road Extension Alternatives Analysis
Attachment E Logistics for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA 33617 April
More informationDesign-Build and Design-Bid-Build
Design-Build and Design-Bid-Build Comparison of Overall Cost and Time Question: How does the total cost and time to deliver a $55,000,000 and 814 day design-build project compare to using design-bid-build
More information2035 LRTP Transportation Options Introduction
2035 LRTP Transportation Options Introduction What is the 2035 LRTP? The 2035 Long-Range Transportation Plan (LRTP) is the guide for major transportation investments in the Durham-Chapel Hill-Carrboro
More informationFOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310
INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006
More informationI-95 Corridor Study Phase II Highway Element
I-95 Corridor Study Phase II Highway Element FAMPO Policy Committee July 16, 2018 1 I-95 Phase 2 Study Final Report A final report is being created to document the findings of the I-95 Phase 2 Study and
More informationHow Should MPO s Engage in Setting Freight Priorities?
How Should MPO s Engage in Setting Freight Priorities? Presented to MPOAC Freight Subcommittee Presented by Michael Williamson, Cambridge Systematics, Inc. October 29, 2015 Key Questions 2 How do MPOs
More informationI-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM
I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation
More informationAll Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL
All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL APRIL 2014 Southeast Florida Rail Network & Proposed All Aboard Florida Route To Jacksonville Tampa Orlando Everglades
More informationWELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015
WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges
More informationDECEMBER P R O G R E S S R E P O R T
DECEMBER 201 2 P R O G R E S S R E P O R T The My 35 Plan is a dynamic document and will continue to be re-evaluated and updated by the Committee as needed. The My 35 Plan contains the ideas and recommendations
More informationAugust 30, Public Meeting #1
August 30, 2012 Public Meeting #1 1 Study Purpose Seek a Transportation Solution Current and Future Needs Develop and Evaluate Alternatives Extensive Stakeholder Involvement 2 Purpose of Today s Meeting
More informationDRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0
SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive
More informationAir Quality Analysis Technical Memorandum
Air Quality Analysis Technical Memorandum Segment 4: State Road 400 (SR 400)/Interstate 4 (I-4) from East of SR 15-600/US 17-92 (Seminole/Volusia County Line) to ½ Mile East of SR 472 Volusia County (79110),
More informationUniversity Corridor Draft Environmental Impact Statement (DEIS)
University Corridor Draft Environmental Impact Statement (DEIS) Public Meetings/Open Houses August 13, 27 August 14, 27 5: pm to 7: pm 5: pm to 7: pm Holiday Inn Select- Greenway* Wheeler Avenue Baptist
More informationASSIGNMENT OF ACCESS MANAGEMENT CLASSIFICATIONS TO THE STATE HIGHWAY SYSTEM
Approved: Effective: December 10, 2001 Office: Systems Planning Topic No.: 525-030-155-e Thomas F. Barry, Jr., P.E. Secretary ASSIGNMENT OF ACCESS MANAGEMENT CLASSIFICATIONS TO THE STATE HIGHWAY SYSTEM
More informationPUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas
PUBLIC HEARING US 69 WIDENING Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas CSJs: 0065-07-062 and 0200-11-095 Footer Text Thursday, April 26, 2018 Date ELECTED
More informationDRAFT PRELIMINARY ENGINEERING REPORT
DRAFT PRELIMINARY ENGINEERING REPORT US 27/ SR 25 / OKEECHOBEE PD&E STUDY Financial Management Number: 423251-1-22-01 Federal Aid Project Number: 0301056P ETDM Number: 9891 County: Miami-Dade Florida Department
More informationInformational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island
Informational Brochure Proposed Interchange OF Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island October 5, 2016 Department of Transportation Two Capitol
More informationRoute 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing
Project Reston Avenue to Jarrett Valley Drive Public Hearing Nicholas J. Roper, P.E. District Project Development Engineer Email: nicholas.roper@vdot.virginia.gov Phone: (703)259-1953 Agenda 7:00-7:15
More informationDRAFT AIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida
More informationConcept, Feasibility & Mobility Studies. Southport Connector Expressway
Concept, Feasibility & Mobility Studies Southport Connector Expressway Project Background FDOT Alternative Corridor Evaluation (ACE) Study Advanced Notification Package distributed September 2012 ETDM
More informationNeal Campbell (WSDOT) Mike Dahlem (City of Sumner) Kirk Wilcox (Parametrix)
Practical Solutions In the Real World APWA 2017 SPRING CONFERENCE April 27, 2017 PANEL Neal Campbell (WSDOT) Mike Dahlem (City of Sumner) Kirk Wilcox (Parametrix) Facilitator Dan McReynolds (Parametrix)
More informationDRAFT Subject to Modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT Subject to Modifications To: Regional Planning Council Members AGENDA ITEM 5J From: Date: Subject: Staff December 11, 2009 Regional Planning
More informationTRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO)
TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO) Statewide Strategic Plan Texas Association of Metropolitan Planning Organization (TEMPO) Meeting March 2, 2018 Today s Speakers Marco Cameron, P.E,
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R October 26, 2018
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2018-822 October 26, 2018 Application
More informationAutonomous/Connected Vehicle Guidance. Dan Beaty, AICP HNTB
Florida Department of TRANSPORTATION Autonomous/Connected Vehicle Guidance Dan Beaty, AICP HNTB Metropolitan Planning Organization Advisory Council Staff Directors Meeting June 1, 2017 Outline Purpose
More informationAir Quality Analysis Technical Memorandum
Air Quality Analysis Technical Memorandum Segment 3: State Road 400 (SR 400)/Interstate 4 (I-4) from One Mile East of SR 434 to East of SR 15-600/US 17-92 Seminole County (77160), Florida July 2016 Air
More informationI-295/I-76/RT. 42 INTERCHANGE
Agency Coordination Meeting #4 I-295/I-76/RT. 42 INTERCHANGE History of Studies and Findings 1987-2003 March 26, 2003 PRESENTATION OVERVIEW! 1985 NJDOT Begins Design of Route 42 Widening! 1987 Preliminary
More informationFlorida Department of Transportation. Lane Elimination
Florida Department of Transportation Lane Elimination FDOT D6 Lane Elimination Review and Approval Process Developed to assure consistency in FDOT D6 s handling of the Lane Elimination Review and Approval
More informationIntelligent Transportation Systems Master Plan
Space Coast Transportation Planning Organization Intelligent Transportation Systems Master Plan April 15, 2014 Version 1.0 Prepared for: Space Coast Transportation Planning Organization 2725 Judge Fran
More informationII. Approval of June 23, 2015 Meeting Notes. IV. Recap of the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.
Regional Transportation Technical Advisory Committee (RTTAC) Transportation System Management & Operations (TSM&O) Subcommittee Meeting Agenda July 20, 2016 10:00 AM FDOT District Four Headquarters Auditorium
More informationSTATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM 1. GENERAL INFORMATION County: Miami-Dade Project Name: SR 826/Palmetto Expressway PD&E Study Project
More informationStakeholder Interview Information Packet December 14-17, 2015
Stakeholder Interview Information Packet December 14-17, 2015 Overview 1 Background and History 4 Public and Agency Engagement Strategy 2 Overview of Scope and Schedule for the Study 5 Decision-making
More information