1 Building 1550 & 1600 HVAC & Lighting Renovations Bid. B15-01 Exhibit A ***Hazardous Materials Inspection Report*** Bid RFI Questions Due: Monday, vember 10th, :00PM Gale Stevens, Buyer gasteven@cabrillo.edu

2

3 September 9, 2014 Mr. Joe Nugent Director of Facilities & Planning Operations Cabrillo College C/o Mr. Jeff Wilden Project Manager Slatter Construction, Inc. 126 Fern Street Santa Cruz, CA Via Re: Pre-Renovation Hazardous Material Inspections of Buildings 1500, 1550, and 1600 at the Cabrillo College Located at 6500 Soquel Drive in Aptos, California M 3 Project Task 1 Dear Mr. Nugent: At your request, M 3 Environmental Consulting, LLC (M 3 ) conducted inspections for asbestos-containing material (ACM), lead-containing paint (LCP), and other hazardous materials in buildings 1500, 1550, and 1600 at the Cabrillo College located at 6500 Soquel Drive in Santa Cruz, California. It is to M 3 s understanding that the buildings are to undergo a future planned heating ventilation and air conditioning (HVAC) and lighting renovation project. Building renovation plans were provided to M 3 for sample location purposes. The buildings were occupied by school staff at the time of the inspections. The inspections were performed from August 18, 2014 to August 21, 2014 by Mr. Garrett Rodewald, California Certified Site Surveillance Technician (CSST) , California Department of Public Health (CDPH) Certified Lead in Construction Sampling Technician , and Environmental Technician with M 3, under the direction of Ms. Linda C. Arceo, California Certified Consultant (CAC) , California Department of Public Health (CDPH) Inspector/Assessor. 532, and Director of Environmental Services with M 3. The asbestos inspection was performed to identify ACM that will be impacted by the planned renovation project. The Monterey Bay Unified Air Pollution Management District (MBUAPCD) Rule 424 requires a comprehensive survey be conducted for ACM prior to any planned renovation or demolition activity in accordance with the Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart M). The purpose for the collection of paint chips and bulk samples was to determine the location of leadcontaining materials prior to planned renovation activities to comply with the California Occupational Safety and Health Administration (Cal/OSHA) Construction Lead Standard (Title 8 CCR Section ) requirement for worker protection. The purpose of determining if polychlorinated biphenyls (PCB) ballasts, fluorescent light tubes, and mercury containing switches were present was for proper disposal purposes. Inspection The following services were performed during this survey: 9821 Blue Larkspur Lane, Suite 100, Monterey, CA P: F:

4 Conducted walk through inspections of the buildings to delineate the scope of work, and to sample suspect ACM from throughout the interior, exterior, and roof of the buildings. The inspections were non-destructive in nature, in that we did not sample behind hard walls or above ceilings. Analyzed collected samples in an American Hygiene Association-accredited laboratory using polarized light microscopy (PLM) according to the Environmental Protection Agencyrecommended method. Lead in Paint Paint chip or bulk samples were collected from selected components from throughout the buildings and analyzed to determine if they contain detectable levels of lead prior to activities that may impact them, as the California Occupational Safety and Health Administration (Cal/OSHA) lower threshold for lead in paint is anything above laboratory detection. Submitted paint chip and bulk samples to a laboratory accredited under the National Institute of Standards and Technology's (NIST) National Voluntary Lab Accreditation Program (NVLAP) and certified by the State of California CDPH Environmental Laboratory Accreditation Program (ELAP). Samples were analyzed in accordance with EPA Method-SW Flame Atomic Absorption Spectrometry (FAA). Other Hazardous Materials Conducted an inspection for other hazardous materials, including, polychlorinated bi-phenyls (PCB) light ballasts, fluorescent light tubes, and mercury containing switches. Building Description Building 1500 The subject structure was a two-story, wood-framed school building on a concrete slab. The first floor consisted of a reception area, offices, conference rooms, teacher/staff break room, storage rooms, janitor s closet, restrooms, a pre-school, toddler center, and recently constructed Margo Lynn Trombetta Infant Center. The pre-school (1500), toddler center (1501), and new infant center (1502) all included classrooms, observation areas, nap rooms, kitchens, restrooms, and laundry rooms. The second floor consisted of classrooms, conference rooms, offices, storage room, restrooms, janitor s closet, and electrical closet. A mezzanine was located in the attic space, accessible through the second floor electrical closet. The building s water heater and heating ventilation and air conditioning (HVAC) system and ductwork were located in the mezzanine. Additional boiler units were located in the first floor, exterior entry boiler room (1554) and the Trombetta Center (1502) interior boiler closet. The windows were single-paned, aluminum-framed throughout. Heat was supplied to the building via forced-air heating and several individual room wall heaters. HVAC system ductwork with fiberglass insulation was noted in the ceiling cavities throughout the building. Interior building finishes consisted of carpet, vinyl floor tile (VFT), resilient sheet flooring (RSF), ceramic floor tile (CFT), ceramic wall tile (CWT), brick and mortar, wallboard/joint compound (WB/JC) with and without texturing, lay-in acoustic ceiling panels (ACP), and acoustic ceiling tiles (ACT). The exterior of the building was composed of brick and mortar, concrete, and stucco. Transite TM wall panels were located under the windows throughout the 2 nd floor exterior. Exterior faux wood siding was noted around the Trombetta Center addition on the west end of the building. The roof was composed of composition shingle with various penetrations and associated mastics. Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 2

5 Building 1550 The subject structure was a single-story, wood-framed school building on a concrete slab. The building consisted mainly of teacher/staff offices, with a reception area, kitchenette, and electrical room. Two separate offices stood adjacent to the building, connected by a covered walkway. The windows were single-paned, aluminum-framed throughout. Heat was supplied to the building via forced air heating. The building s HVAC unit and water heater were located in the exterior entry electrical room. The HVAC system ductwork with fiberglass insulation was noted in the ceiling cavities throughout the building. Interior finishes consisted of carpet, VFT, brick and mortar, WB/JC with and without texturing, and ACT. The exterior was composed of brick and mortar, and stucco. The roof was composed of composition shingle with various penetrations and associated mastic. Building 1600 The subject structure was a single-story, wood-framed school building on a concrete slab. The building consisted of classrooms, offices, restrooms, and a janitor s closet. A safe was located in classroom 1605, however no access was granted. A mezzanine was located in the attic space, accessible through the janitor s closet. The building s water heater and HVAC system and ductwork were located in the mezzanine. The windows were single-paned, aluminum-framed throughout. Heat was supplied to the building via forced air heating. The HVAC system ductwork with fiberglass insulation was noted in the ceiling cavities throughout the building. Interior finishes consisted of carpet, VFT, CFT, CWT, brick and mortar, WB/JC with and without texturing, and lay-in ACP. The exterior of the building was composed of brick and mortar, concrete, and stucco. Transite TM wall panels were located under the windows throughout the exterior. The roof was composed of composition shingle with various penetrations and associated mastic Sampling and Analysis Bulk Sampling A total of 212 ACM bulk samples were collected and analyzed by Polarized Light Microscopy (PLM) using the Environmental Protection Agency (EPA) Method (EPA/600/R-93/116, July 1993) Method for the Determination of in Bulk Building Materials. The laboratory results of the materials sampled during field investigation are presented as estimated percentages of asbestos by types (e.g. amosite, chrysotile, crocidolite), as well as types of non-fibrous fibrous materials or non-detect (ND). Lead Bulk Sampling A total of 117 bulk samples of suspect lead containing materials were collected, and analyzed by the laboratory in accordance with EPA Method 600/R-93/200 and analyzed in accordance with EPA Method- SW Flame Atomic Absorption Spectrometry (FAA). Results are presented in percent lead by weight (wt%) for paint, parts per million (ppm) for bulk, and below the reporting limit (BRL) if non-lead containing. All samples were analyzed by EMC Labs Inc. in Phoenix, Arizona Results The laboratory results, chains of custody of the materials sampled during the field investigation, and floor plans with sample locations are included in the attached appendices. Building 1500 The following materials were analyzed and determined to contain detectable concentrations of asbestos: Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 3

6 Material. Material Description Location Friable NESHAP Category Content 5 Interior black window Windows throughout caulking building Category I 3% 13 Hardwood pattern RSF with cream mastic 1520, 1520E, 1522A, 1522B RACM 14 Pink sink undercoating 1520 Category II 5% Black mastic associated 1 st floor main corridor, 1505, 22 with non-acm 12- by , east entry, 1508B, inch white VFT with beige 1500, 1500 storage, 1500A, Category I 8% specks 1500 laundry, by 12-inch off-white VFT with olive specks and black mastic 12- by 12-inch tan VFT with light/dark specks and black mastic 12- by 12-inch dark beige VFT with light/dark specks and black mastic 12- by 12-inch beige VFT with off-white specks and black mastic 12- by 12-inch beige VFT with maroon specks and black mastic 12- by 12-inch cream VFT with off-white specks and beige/black mastic and non- ACM gray levelling compound Sub-layer beige VFT with black mastic underneath non-acm purple carpet with specks and beige mastic Black/brown mastic associated with non-acm 12- by 12-inch cream VFT 46 WB/JC without texturing 54 WB/JC with smooth texturing 55 Smooth texturing over WB Suspect gray Transite TM wall panels under windows Exterior window/wall panel trim caulking (gray) Exterior window caulking (dark gray) Exterior stucco over metal lath 1 st floor main corridor, 1505, 1507, east entry, 1508B, 1500, 1500 storage, 1500A, 1500 laundry, st floor main corridor, 1505, 1507, east entry, 1508B, 1500, 1500 storage, 1500A, 1500 laundry, st floor main corridor, 1505, 1507, east entry, 1508B, 1500, 1500 storage, 1500A, 1500 laundry, st floor main corridor, 1505, 1507, east entry, 1508B, 1500, 1500 storage, 1500A, 1500 laundry, st floor main corridor, 1505, 1507, east entry, 1508B, 1500, 1500 storage, 1500A, 1500 laundry, 1508 Category I Category I Category I Category I Category I 1 st floor janitor s closet, 1505 Category I 1508A Category I RSF 3% Mastic ND VFT 2% Mastic 8% VFT 2% Mastic 5% VFT 2% Mastic 10% VFT 3% Mastic 8% VFT 2% Mastic 5% VFT 2% Mastic 5% VFT 2% Mastic 10% 1501, 1501 kitchen Category I 3% Mezzanine, ceiling cavities throughout building, 1554 Throughout building (except 1503B, 1503C, 1504A, 1504B, 1502) Throughout building (except 1503B, 1503C, 1504A, 1504B, 1502) Windows throughout 2 nd floor Windows throughout 2 nd floor RACM <1% RACM <1% RACM 2-3% Category II 10% Category I 15% Windows throughout 1 st floor Category I 10% Throughout exterior RACM <1% Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 4

7 Material Material Description Location Friable Texturing over concrete roof overhang support pillars Light gray expansion joint caulking in seams of concrete walkways Light gray mastic on roof penetrations NESHAP Category Content Throughout exterior RACM <1% Exterior concrete walkways throughout 1 st and 2 nd floor Category I 2% Roof Category I 8% Assumed Material Description Location Friable NESHAP Category Potential mastic above ACT Throughout interior Category I Potential mastic behind chalkboards, whiteboards, and mirrors Throughout interior Category I Potential Transite TM flues Throughout interior, roof Category II Fire-rated doors and door frames Throughout building RACM Potential vapor barrier behind stucco wall Throughout exterior Category I n- The following materials were analyzed and determined not to contain detectable concentrations of asbestos: Material Material Description Location. Content 1 Gray/blue carpet with maroon specks and 1524, 1520, 1520 med. rm., 1523, beige mastic 1503, 1504A, 1506A-D ND , 1520, 1520A, 1520E, 1520 med. rm., SIM theater, 1521A-B, 1522A-B, 1523, 1504B, 1 st floor main corridor, 1 st floor janitor s 4-inch black baseboard with closet, 1505, 1507, 1 st floor east cream/brown/beige mastic entry, 1508A-B, 1500B-C, throughout 1500, 1500 storage, 1500A storage, 1500 laundry, 1508, 1501A ND 1524, 1520, 1520 med. rm., SIM 3 White Formica TM theater, 1503, 1505, 1507, 1 st floor countertop with adhesive east entry, 1508A-B, 1500A-B, 1500 ND kitchen 4 White sink/countertop caulking 1524, 1520 med. rm., SIM theater, 1505, 1507, 1500 kitchen, 1500A, ND 1508, 1501 restroom, 1501 kitchen 6 2- by 4-foot off-white lay-in ACP 1524, 1520A, 1523, 1503, 1503A-C, 1505, 1506A-D, 1507, 1 st floor east entry, 1508A-B, throughout 1500, ND 1500 storage, throughout by 1-inch brown CFT with gray grout 1526, 1525, SIM theater, 1505A-B, 1500 restroom, 1501 restroom ND 8 4- by 4-inch beige CWT with white grout 1526, 1525, SIM theater, 1505A-B, and yellow mastic 1500 restroom, 1501 restroom ND 9 White toiler/urinal caulking 1526, 1525, 1505A-B ND by 4-foot off-white lay-in ACP with holes 1520, 1521A-B, 1522A-B, 1504A-B ND 11 Gray carpet with orange/green/blue specks and beige mastic 1520A, 1503A-C, 1504B ND 12 Orange-red carpet with beige mastic 1520A, 1500C, 1501A ND Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 5

8 Material Material Description Location. Content 15 Beige sink pipe caulking (underneath sink) 1520 ND 16 Sub-layer teal RSF with specks and cream mastic under carpet 1520 med. rm. ND 17 Beige RSF with light/dark specks and beige mastic SIM theater ND 18 Dark teal carpet with beige mastic and sublayer RSF with cream mastic 1521A-B, 1508 (no sub-layer RSF) ND 19 4-inch gray baseboard with cream/brown 1503, 1504A, 1506A-D, 1500 entry, mastic 1500 classroom, 1508, 1502 waiting ND 20 4-inch blue-gray baseboard with cream/brown mastic 1503A-C, 1504B ND 21 Brick with mortar (wall) Throughout 1 st floor ND by 12-inch off-white ACT with holes and fissures 1500C, 1500 restroom, 1501A ND by 12-inch beige VFT with light/dark streaks and gray mastic 1500B ND 32 Black sink under pad 1500B ND 33 Olive carpet with orange specks and beige mastic with sub-layer cream VFT and 1500 entry, 1500 classroom ND brown mastic 35 4-inch brown baseboard with brown/beige/cream mastic 1501, 1501 restroom, 1501 kitchen ND by 24-inch off-white lay-in ACP Throughout 1502, 1502 observation ND by 12-inch white VFT with streaks and Throughout 1502, 1502 observation, beige mastic with levelling compound 1502 boiler closet ND 38 4-inch beige baseboard with cream mastic Throughout 1502, 1502 observation, 1502 boiler closet ND 39 Gray Formica TM countertop with adhesive 1502 diapering, 1502 kitchen ND 40 White sink undercoating 1502 toddler sink, 1502 kitchen ND 41 4-inch outside diameter (O.D.) white paper/foil wrapped fiberglass insulation 1502 boiler closet ND over pipes 42 Off-white/light blue pipe putty on boiler unit lines 1502 boiler closet ND 43 Red penetration mastic (pipe through wallboard wall) 1502 boiler closet ND 44 4-inch O.D. off-white fibrous fitting under metal bracket (4-inches long) 1502 boiler closet ND 45 Gray sink undercoating 1502 diapering ND to 4-inch O.D. off-white paper/foil Mezzanine, ceiling cavities wrapped fiberglass insulation over pipes throughout building ND 48 Off-white pipe putty on water heater lines (1- to 2-inch O.D.) Mezzanine ND 49 White compound on ends of fiberglass Mezzanine, ceiling cavities insulated pipe runs throughout building ND 50 Beige pipe putty on HVAC air handler lines (1- to 2-inch O.D.) Mezzanine ND 51 Yellow pipe putty on air compressor lines (1-inch O.D.) Mezzanine, 1554 ND 52 Black flex connector on HVAC air handler/ductwork Mezzanine ND 53 Off-white duct tape on HVAC air Mezzanine, ceiling cavities handler/ductwork throughout building ND 56 WB/JC with texturing 1503B-C, 1504A-B, throughout 1502 ND 57 Texturing over wallboard 1503B-C, 1504A-B, throughout 1502 ND 59 Exterior window caulking (black) Windows throughout 2 nd floor ND 62 Cream fibrous board wall panel under Windows throughout 1 st floor north windows and east sides of building ND Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 6

9 Material. Lead Material Description Location Content 66 Black tar paper vapor barrier under stucco weep screed Throughout exterior ND 67 Gray composition roofing shingles Main Roof ND 69 Black roof vapor barrier under shingles Main Roof ND 70 White mastic/caulking on metal rooftop cap (seams and flashing) Main Roof ND 71 Black/dark gray mastic on mezzanine vents Main Roof ND 72 Dark gray composition roofing shingles 1502 Roof ND 73 Black roof vapor barrier under shingles 1502 Roof ND 74 Light gray roof flashing mastic (around chimney unit and flashing) 1502 Roof ND 75 Brown composition roofing shingles Southwest roof overhang (over 1501 kitchen) ND 76 Tan caulking along roof/concrete wall seam Southwest roof overhang (over 1501 kitchen) ND 77 Exterior siding above stucco Exterior 1502 ND The following samples were analyzed and determined to contain detectable concentrations of lead: Sample. Color Substrate Component Content - wt% L2 Brown Metal Interior door 1.32 L3 Brown Metal Interior door frame L7 Brown Ceramic 1- by 1-inch CFT 103 ppm L10 Teal Metal Interior HVAC air handler L11 Gray Metal Interior air compressor unit L12 Off-white Metal Interior door frame L24 Beige Metal Interior wall vents L26 Beige Metal Interior door 2.17 L35 Dark gray Metal Exterior door L36 Light gray Metal Exterior door frame L53 Dark gray Metal Exterior roof penetration n-lead The following samples were analyzed and determined not to contain detectable concentrations of lead: Sample. Color Substrate Component Content - wt% L1 Off-white Wallboard Interior wall BRL L4 Beige Wood Interior window frame/trim/sill BRL L5 Cream Metal Interior cabinetry BRL L6 Off-white Wood Interior storage shelf BRL L8 Cream Ceramic Interior 4- by 4-inch CWT BRL L9 Blue Metal Interior toilet stall BRL L13 Off-white Wood Interior window frame/trim/sill BRL L14 White Wallboard Interior wall BRL L15 Beige Wood Interior door frame BRL L16 White Wallboard Interior wall BRL L17 Cream Metal Interior floor heater BRL L18 White Brick Interior wall BRL L19 Light blue Wallboard Interior wall BRL L20 Light blue Brick Interior wall BRL L21 Off-white Metal Interior electrical panel box BRL Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 7

10 Sample. Color Substrate Component Content - wt% L22 Bright green Wallboard Interior wall BRL L23 Off-white Wallboard Interior wall BRL L24 Beige Metal Interior wall vents BRL L25 Beige Metal Interior window pillar BRL L27 Cream Wallboard Interior wall BRL L28 Light blue Wallboard Interior wall BRL L29 White Wood Interior window frame BRL L30 White Metal Interior door BRL L31 White Metal Interior door frame BRL L32 White Wallboard Interior wall BRL L33 Cream Stucco Exterior wall BRL L34 White Concrete w/ texture Exterior roof overhang support pillar BRL L37 Light gray Wood Exterior window trim BRL L38 Gray TransiteTM Exterior wall panel BRL L39 Dark gray Wood Exterior hand railing BRL L40 White Metal Exterior door BRL L41 White Metal Exterior door frame BRL L42 Cream Stucco Exterior wall BRL L43 Beige Wood Exterior siding BRL L44 Cream Metal Exterior rain gutter downspout BRL L45 Dark gray Metal Exterior stairs BRL L46 Cream Wood Exterior siding BRL L47 White Metal Exterior rain gutter downspout BRL L48 Red Metal Exterior fire equipment pipes/valves BRL L49 Gray Wood Exterior roof overhang support beam BRL L50 Cream Wood Exterior roof overhang support underside BRL L51 Dark gray Wood Exterior roof fascia BRL L52 Dark gray Metal Exterior rain gutter BRL L54 Brown Metal Exterior roof fascia/rain gutter BRL L55 White Metal Exterior roof penetration chimney unit BRL Other Hazardous Materials Approximately 692 standard fluorescent lighting tubes were noted during this evaluation. Approximately 27 compact fluorescent light (CFL) bulbs were noted during this evaluation. Quantities being removed during renovation activities should be verified by the contractor. PCB ballasts were noted during this evaluation; however, not all ballasts were individually checked. Ballasts being removed during renovation activities should be verified by the contractor. One mercury (Hg) switch was noted in classroom Building 1550 The following materials were analyzed and determined to contain detectable concentrations of asbestos: Material. 7 8 Material Description Location Friable 12- by 12-inch white VFT with light brown specks and black mastic Black mastic associated with non-acm 12- by 12- inch white VFT with light 1550 kitchenette, 1550 reception (underneath carpet), 1550A (underneath carpet) 1550 kitchenette, 1550 reception (underneath carpet), 1550A (underneath NESHAP Category Category I Content VFT 3% Mastic 8% Category I 5% Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 8

11 Material Material Description Location Friable brown specks 12- by 12-inch beige VFT with light/dark specks and black mastic 12- by 12-inch cream VFT with off-white specks and black mastic 12- by 12-inch cream VFT with dark specks and black mastic 12- by 12-inch off-white VFT with olive specks and black mastic carpet) 1550 kitchenette, 1550 reception (underneath carpet), 1550A (underneath carpet) 1550 kitchenette, 1550 reception (underneath carpet), 1550A (underneath carpet) 1550 kitchenette, 1550 reception (underneath carpet), 1550A (underneath carpet) 1550 kitchenette, 1550 reception (underneath carpet), 1550A (underneath carpet) NESHAP Category Category I Category I Category I Category I Content VFT 2% Mastic 8% VFT 3% Mastic 10% VFT 2% Mastic 8% VFT 3% Mastic 5% 15 WB/JC without texturing 1550B, server closet RACM <1% 19 WB/JC with texturing 1552D RACM <1% Assumed WB/JC with smooth texturing Smooth texturing over wallboard Throughout building RACM <1% Throughout building RACM 2% Material Description Location Friable NESHAP Category Potential mastic above ACT Throughout interior Category I Potential mastic behind pin-boards Throughout interior Category I Potential Transite TM flues Throughout interior, roof Category II Potential vapor barrier behind stucco wall Throughout exterior Category I n- The following materials were analyzed and determined not to contain detectable concentrations of asbestos: Material. Material Description Location Content 1 Gray carpet with orange/green specks and adhesive 1550, 1550A, 1551A, 1551B, 1553A ND 2 4-inch black baseboard with cream/brown 1550, 1550A, 1551A, 1551B, mastic 1552A-D, 1553A-E ND by 12-inch white ACT with holes and 1550, 1550A, 1551A, 1551B, fissures 1552A-D, 1553A-E ND 4 Brick with mortar (wall) Throughout building (interior and exterior) ND 5 Interior black window caulking Windows throughout building ND 6 White Formica TM countertop with adhesive 1550 reception, 1550 kitchenette ND 13 White sink/countertop caulking 1550 kitchenette ND 14 Red-orange carpet with beige mastic 1552A-D, 1553B-E ND 16 Beige pipe putty on 1-inch O.D. lines 1550B ND 17 Light blue pipe putty on air compressor unit 1550B ND Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 9

12 Material. Lead Material Description Location Content 18 4-inch O.D. off-white paper/foil wrapped 1550B, ceiling space throughout fiberglass insulation over pipes building ND 20 Texturing over wallboard 1552D ND 23 Residual beige mastic on concrete subfloor underneath carpet 1551A, 1551B, 1553A ND 24 Exterior black window caulking Windows throughout ND 25 Cream suspect TransiteTM wall panels under windows Throughout exterior ND 26 Exterior stucco over metal lath Throughout exterior ND 27 Texturing over concrete roof overhang support pillars Throughout exterior ND 28 Gray composition roofing shingles Roof ND 29 Black/brown vapor barrier underneath shingles Roof ND 30 White/brown roof penetration mastic/caulking Roof ND 31 Off-white duct tape on HVAC system ductwork Ceiling space throughout building ND The following samples were analyzed and determined to contain detectable concentrations of lead: Sample. Color Substrate Component Lead Content - wt% L6 Dark gray Metal Interior door 1.05 L13 Metallic blue Metal Interior air compressor unit L15 Gray Metal Exterior door L21 Gray Metal Exterior rain gutter downspout drain filler 20.2 L22 Light gray Wood Exterior roof overhang framing L25 Dark gray Metal Exterior rain gutter 1.26 L26 Light gray Metal Exterior roof penetrations n-lead The following samples were analyzed and determined not to contain detectable concentrations of lead: Sample. Color Substrate Component Lead Content - wt% 1 White Wallboard Interior wall BRL 2 White Metal Interior door frame BRL 3 White Brick Interior wall BRL 4 White Wood Interior shelves BRL 5 Beige Metal Interior door frame BRL 7 Tan Fibrous board Interior wall panel BRL 8 Beige Wood Interior door frame BRL 9 Off-white Wallboard Interior wall BRL 10 Off-white Metal Interior door frame BRL 11 Light gray Plywood Interior wall backing behind panel BRL 12 Gray Metal Interior boiler unit BRL 14 Light gray Metal Exterior door frame BRL 16 Beige Fibrous board Exterior wall panel BRL 17 Gray Wood Exterior hand railing BRL Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 10

13 Sample. Color Substrate Component Lead Content - wt% 18 Cream Stucco Exterior wall BRL 19 White Concrete w/ texture Exterior roof overhang support pillar BRL 20 White Metal Exterior rain gutter downspout BRL 23 Cream Wood Exterior roof overhang underside BRL 24 Dark gray Wood Exterior roof fascia BRL Other Hazardous Materials Approximately 74 standard fluorescent lighting tubes were noted during this evaluation. Quantities being removed during renovation activities should be verified by the contractor. PCB ballasts were noted during this evaluation; however, not all ballasts were individually checked. Ballasts being removed during renovation activities should be verified by the contractor. mercury (Hg) switches were noted. Building 1600 The following materials were analyzed and determined to contain detectable concentrations of asbestos: Material Material Description Location Friable 12- by 12-inch tan VFT with light/dark specks and beige mastic 12- by 12-inch off-white VFT with light/dark specks and black mastic 12- by 12-inch off-white VFT with dark streaks and black mastic 12- by 12-inch light beige VFT with dark streaks and black mastic 12- by 12-inch beige VFT with dark streaks and beige mastic 12- by 12-inch light gray VFT with dark streaks and black mastic Brown mastic associated with non-acm 4-inch black baseboard Brown mastic associated with non-acm brown with white/red streaks vinyl baseboard/step flashing Black mastic associated with non-acm gray/orange/green carpet Sub-layer beige VFT with black mastic (underneath material no. 20) Suspect brown Transite TM wall panels with black mastic under windows 1606, 1605, 1605 closet, , 1605, 1605 closet, 1604, 1602A 1606, 1605, 1605 closet, , 1605, 1605 closet, , 1605, 1605 closet, , 1605, 1605 closet, , 1605, 1605 closet, 1604, 1603, 1601, 1601A NESHAP Category Category I Category I Category I Category I Category I Category I Content VFT 3% Mastic 2% VFT 3% Mastic 5% VFT 5% Mastic 5% VFT 3% Mastic 5% VFT 3% Mastic ND VFT 5% Mastic 5% Category I 3% 1604 Category I 3% 1602, 1602B Category I 5% 1603 Category I Throughout exterior Category II VFT 5% Mastic ND Panel 12% Mastic ND Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 11

14 Material Material Description Location Friable Exterior window caulking (black) Black roof penetration mastic NESHAP Category Content Throughout exterior Category I 10% Roof Category I 10% Assumed Material Description Location Friable NESHAP Category Potential mastic behind whiteboards/chalkboards Throughout interior Category I Potential mastic behind mirrors Throughout interior Category I Potential Transite TM flues Throughout interior, roof Category II Potential ACM associated with wall heater unit 1604A RACM Potential ACM associated with safe 1605 (no access) RACM Potential vapor barrier behind stucco wall Throughout exterior Category I n- The following materials were analyzed and determined not to contain detectable concentrations of asbestos: Material. Material Description Location Content by 12-inch cream VFT with light/dark specks and beige mastic 1606, 1605, 1605 closet, 1604 ND by 12-inch light tan VFT with light/dark specks and beige mastic 1606, 1605, 1605 closet, 1604 ND by 12-inch light brown VFT with light/dark specks and beige mastic 1606, 1605, 1605 closet, 1604 ND 11 Brick with brown mortar (wall) Throughout building (interior and exterior) ND by 4-foot off-white lay-in ACP 1605, 1605 closet, 1604, 1604A, 1603, 1601, 1601A, 1600A ND 13 Interior brown window caulking Windows throughout building ND 14 Light blue/gray carpet with adhesive 1604 A ND by 1-inch browns CFT with brown grout Men s restroom, women s restroom ND by 4-inch beige CWT with off-white grout Men s restroom, women s restroom ND 17 Off-white toilet/urinal caulking Men s restroom, women s restroom ND 18 Gray sink putty (underneath) Men s restroom, women s restroom ND 20 Purple/pink/green carpet with yellow mastic 1603 ND 22 4-inch teal baseboard with cream mastic 1602, 1602A, 1602B ND 23 Gray carpet with maroon specks and adhesive 1601, 1601A, 1600A ND 24 4-inch cream baseboard with cream/brown mastic 1604A, 1600A ND by 4-foot off-white lay-in ACP with holes 1606 ND 26 WB/JC with smooth texturing Throughout building (except 1604B janitor s closet) ND 27 Smooth texturing over wallboard Throughout building (except 1604B janitor s closet) ND 28 WB/JC with texturing 1604B (janitor s closet) ND 29 Texturing over wallboard 1604B (janitor s closet) ND 30 WB/JC without texturing Throughout mezzanine ND 31 White duct tape on HVAC system ductwork Throughout mezzanine ND 32 Black flex connector on HVAC system Throughout mezzanine ND Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 12

15 Material. Lead Material Description Location Content ductwork 33 Beige pipe putty on pipes throughout Throughout mezzanine ND 34 Off-white pipe putty on compressor unit Mezzanine (back) ND 35 4-inch O.D. off-white paper/foil wrapped fiberglass insulated pipe runs Mezzanine (front) ND 39 Exterior light gray window trim caulking Throughout exterior ND 40 Exterior stucco over metal lath Throughout exterior ND 41 White texturing over concrete roof overhang support pillars Throughout exterior ND 42 Gray composition roofing shingles Roof ND 43 Black roof vapor barrier under shingles Roof ND 45 Gray flashing mastic/caulking around mezzanine vents Roof ND 46 Black lab table top material 1606, 1605, 1604 ND 47 Black lab table sink under-side material 1606, 1605, 1604 ND The following samples were analyzed and determined to contain detectable concentrations of lead: Sample. Color Substrate Component Content - wt% L2 Beige Metal Interior window pillars L4 Beige Metal Interior door frame L5 Brown Metal Interior door L13 Off-white Metal Interior window pillar L17 Brown Metal Interior door frame L18 Gray Metal Interior wall sheeting (behind WB) 73.5 L19 Light blue Wallboard Interior wall L22 Metallic blue Metal Interior air compressor unit L23 Gray Metal Exterior door L24 Gray Metal Exterior door frame L28 Dark gray Metal Exterior door L34 Dark gray Stucco Exterior wall L35 Dark gray Metal Exterior mezzanine vents (on roof) L36 Dark gray Metal Exterior roof penetrations 17.2 n-lead The following samples were analyzed and determined not to contain detectable concentrations of lead: Sample. Color Substrate Component Content - wt% L1 White Wallboard Interior wall BRL L3 Beige Wood Interior window sill BRL L6 White Wood Interior door BRL L7 White Wood Interior door frame BRL L8 White Brick Interior wall BRL L9 Brown/light brown Ceramic Interior 1- by 1-inch CFT BRL L10 Cream Ceramic Interior 4- by 4-inch CWT BRL L11 Blue Metal Interior toilet stall BRL L12 Off-white Wallboard Interior wall BRL L14 Black Wood Interior lab table top BRL L15 Sea foam green Brick Interior wall BRL L16 Sea foam green Wallboard Interior wall BRL L20 Light blue Brick Interior wall BRL Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 13

16 Sample. Color Substrate Component Content - wt% L21 Dark gray Metal Interior HVAC air handler fan BRL L25 Gray Wood Exterior window trim BRL L26 Cream Stucco Exterior wall BRL L27 White Concrete w/ texture Exterior roof overhang support pillar BRL L29 White Metal Exterior rain gutter downspout BRL L30 Gray Wood Exterior roof overhand framing BRL L31 Cream Wood Exterior underside of roof overhang BRL L32 Dark gray Wood Exterior roof fascia BRL L33 Dark gray Metal Exterior rain gutter BRL Other Hazardous Materials Approximately 216 standard fluorescent lighting tubes were noted during this evaluation. Approximately 13 compact fluorescent light (CFL) bulbs were noted during this evaluation. Quantities being removed during renovation activities should be verified by the contractor. PCB ballasts were noted during this evaluation; however, not all ballasts were individually checked. Ballasts being removed during renovation activities should be verified by the contractor. mercury (Hg) switches were noted. Standards and Guidelines Federal Regulations The USEPA National Emissions Standards for Hazardous Air Pollutants (NESHAP), Title 40 Code of Federal Regulations [CFR] Part 61, Subpart M regulation, applies to certain demolition and renovation projects in facilities containing ACM. The NESHAP rule usually requires that all friable ACM and some categories of nonfriable ACM be removed before a building is demolished, and may require localized removal before or as part of a renovation. For renovation projects where friable ACM will be disturbed, the NESHAP rule may require appropriate work practices or procedures for the control of emissions. The following USEPA NESHAP definitions of ACM are very important in interpreting which NESHAP requirements may apply to your building: -containing material (ACM): Any material that contains more than 1% asbestos as determined using PLM analysis Friable ACM: Any material containing more than 1% asbestos, determined using PLM analysis, that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. Category I nonfriable ACM: -containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1% asbestos as determined using PLM. Category II nonfriable ACM: Any material excluding Category I nonfriable ACM, containing more than 1% asbestos as determined using PLM that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Regulated asbestos-containing material (RACM): (1) friable ACM; (2) Category I nonfriable ACM that has become friable; (3) Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; or (4) Category II nonfriable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the materials in the course of demolition or renovation operations regulated by NESHAP. RACM need not be removed before demolition if: Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 14

17 It is Category I nonfriable ACM that is in good condition and is not friable. It is on a facility component that is enclosed in concrete or other similarly hard material and is adequately wet whenever exposed during demolition. It was discovered after demolition began, and as a result, cannot be safely removed. If not removed, the material must be kept wet until disposal. It is Category II nonfriable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition. NESHAP also requires that the USEPA or the state (if the state has been delegated authority under NESHAP) be notified before a building is demolished, or before certain renovations impacting RACM begin. State Regulations The State of California has specific regulations regarding asbestos. California standards for the workplace are issued primarily by the California Occupational Safety and Health Administration (Cal/OSHA). Specific asbestos requirements are contained in Title 8 of the California Code of Regulations (CCR) and in the California Health and Safety Code. Under Cal/OSHA, an ACM means any material containing 1% asbestos. Any manufactured construction materials (friable and non-friable) containing more than 0.1% asbestos by weight are defined as asbestos containing construction material (ACCM). The ACCM designation is applicable only to reporting (user registration, temporary worksite notification, and incident reporting). The removal or disturbance of 100 square feet or more of ACM must be performed by a contractor certified by the California Contractors State License Board to conduct asbestos-related work and/or an employer/contractor registered with the California Division of Occupational Safety and Health (DOSH) to perform asbestos-related work. Monterey Bay Unified Air Pollution Control District The MBUAPCD under Rule 424, has adopted regulations and policies to implement the asbestos demolition and renovation requirements developed by the USEPA under the NESHAP regulation. An asbestos notification must be submitted to the MBUAPCD at least ten working days prior to (1) any regulated demolition, or (2) any renovation disturbing at least 160 square feet of RACM, 260 linear feet of asbestos-containing pipe insulation, or 35 cubic feet of RACM (where the length or area could not be measured previously) from facility components. Point Counting Friable materials that were determined to contain low concentrations asbestos by PLM visual estimation may be point counted to further quantity the asbestos concentration. If the these materials are not point counted, they must be assumed to be greater than 10% asbestos and a RACM, and in accordance with the NESHAP, must be disposed of in a landfill that accepts friable asbestos waste (Class I landfill). te: The lower limit of reliable detection for asbestos using the PLM visual estimation analytical method is one percent (1%) by volume. When less than 1% appears in this report, it should be interpreted as meaning that asbestos was present in the sample, but the exact percentage is unknown. Any sample can be subjected to the more stringent Point Count Method of analysis to more precisely determine the actual asbestos content. However Cal/OSHA states that employers performing construction activities on materials containing any detectable asbestos must comply with all applicable provisions of 8 CCR 1529 (Title 8, section 1529, California Code of Regulations). Therefore, those non-friable materials which fall outside the NESHAP definition of an ACM are regulated by Cal/OSHA, and should be handled as ACM's by qualified personnel. Additionally, those materials which may fall below the Cal/OSHA limit of 0.1%, but still contain some detectable levels of asbestos, would also be subject to the Cal/OSHA regulations. The Cal/OSHA definition in Title 8 CCR 1529 of an asbestos containing material (ACM) is one which contains 1% asbestos, and any work which disturbs ACM or presumed ACM is defined by Cal/OSHA as Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 15

18 Class I, II, III, or IV asbestos work. For the purposes of reporting and contractor registration, Cal/OSHA defines an asbestos containing construction material (ACCM) as one which contains more than one tenth of one percent (0.1%) asbestos by weight. Lead in Paint Federal OSHA and Cal/OSHA do not define an amount of lead in a product that triggers their regulations. The OSHA Lead Standard applies based upon worker exposure to lead during the work performed. This is interpreted in the industry to mean that the regulation must be followed when there is any "detectable" lead in the product. With respect to lead related tasks, until the employer performs an employee exposure assessment and documents that the employee performing the task is not exposed above the Permissible Exposure Limit (PEL) of 50 ug/m3, the employer shall treat the employee as if the employee were exposed above the PEL for the trigger tasks outlined in the OSHA Lead Standard. Hazardous Waste Criteria Waste Reduction The Resource Conservation and Recovery Act (RCRA) requires that solid waste containing hazardous material as identified by the EPA be properly disposed in accordance with EPA's regulations 40 CFR 261. RCRA requires, relative to the presence of lead in waste, testing of the solid waste to determine the level of toxicity present. The test is termed the Toxicity Characteristic Leaching Procedure (TCLP), and it determines the leaching potential of the known hazardous constituent (lead) from the waste to be disposed. As a result of the TCLP test, if the leachable waste under RCRA is greater than 5.0 milligrams per liter (mg/l), the solid waste must be disposed as hazardous waste under RCRA requirements and Department of Transportation (DOT) regulations. When waste is generated in California, at a minimum it is required to follow the California EPA testing requirements. The characteristics for hazardous waste have been promulgated in the California Code of Regulations (CCR), Title 22, Section as the total threshold limit concentrations (TTLC). In California the waste is considered hazardous if any sample results exceed the TTLC of 1,000 milligrams per kilogram (mg/kg). If there is less than 1,000 mg/kg of solid lead, the waste extraction test (WET) is performed. If the results exceed the soluble threshold limit concentrations (STLC) of 5 mg/l, the waste is considered hazardous in California. The WET is more stringent than TCLP. In California, it is not necessary to do the TCLP since if the waste fails the WET as it will always fail TCLP. If the waste is to be disposed of outside of California, then TCLP must be done. TCLP is also performed because Federal RCRA requires hazardous waste be stabilized before being buried. Lead waste is normally stabilized by mixing with cement kiln dust. This is performed by a waste management firm, treatment site, or waste site. Since this is a Federal requirement, if waste passes the Federal tests (TCLP), but fails the WET, it is considered a hazardous waste in California but does not need to be stabilized. Discussion NESHAP and the MBUAPCD regulations require that regulated ACM (friable and greater than 1% asbestos) be removed from the building prior to demolition or renovation and be disposed of as hazardous waste NESHAP regulations require that regulated ACM (greater than 1%) be removed from the building prior to demolition or renovation that will impact these materials. In addition, Cal/OSHA regulations apply to asbestos related work involving materials containing asbestos at concentrations of more than 0.1%. Certain aspects of Cal/OSHA regulations may apply when material(s) containing any amount of asbestos are involved. Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 16

19 The Cal/OSHA definition in Title 8 CCR 1529 of an asbestos containing material (ACM) is one which contains 1% asbestos, and any work which disturbs ACM or presumed ACM is defined by Cal/OSHA as Class I, II, III, or IV asbestos work. For the purposes of reporting and contractor registration, Cal/OSHA defines an asbestos containing construction material (ACCM) as one which contains more than one tenth of one percent (0.1%) asbestos by weight. Lead There are building materials that contain detectable concentrations of lead. All building components similar to those determined to contain lead should be treated as lead containing. It is M 3 s opinion that a paint film containing any detectable concentration of lead must be viewed as a potential source of lead exposure and health hazard, and should be properly abated or managed in-place in accordance with current guidance available. Other Hazardous Materials There are mercury containing fluorescent lighting tubes and switches present. All Universal Waste handling, labeling, shipping, and disposal must be performed to the current standards promulgated in California Code of Regulations, Title 22. Division 22, Chapter 23. Recommendations Lead Conduct PLM point counting to 400 points on WB/JC samples determined to have low concentrations of asbestos by the PLM visual estimation technique. If this material is point counted to 400 points and the result is less than 1% asbestos, it may be disposed of as nonhazardous material. However, some Cal/OSHA regulations will apply for removal operations such as removal and disposal of non-hazardous waste by a California licensed asbestos abatement contractor using proper engineering control (negative pressure containments) and worker protection (disposable suits and respirators). Prior to demolition or renovation activities that will impact the materials identified in this report as asbestos containing or assumed to be asbestos containing must be removed and disposed of by a registered asbestos abatement contractor using proper engineering controls and worker protection. If any other suspect ACM not identified in this report is found during any demolition or renovation, work should cease and additional sampling and analysis should be performed to determine if the materials contain asbestos. Contractors and others responsible for any renovation/demolition activities on the property should be notified as to the presence of the asbestos so that compliance with regulatory requirements may be met in any planning and bidding phases. Abatement contractors must notify the nearest Cal/OSHA district office at least 24 hours prior to any asbestos related work. tification to the appropriate Planning and Building Department and MBUAPCD advising that this survey has been conducted. Prior to renovation of any painted components, all flaking, peeling paint should be removed and disposed of from the interior and exterior by a licensed abatement contractor using CDPH Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 17

20 certified workers using worker protection and proper engineering controls. All other interior and exterior paint in good condition (not peeling from the substrate) may remain in place during demolition. Lead related activities should not include the use of wire brushing, flame torching, dry scraping, sanding, stripping, abrasive methods, or the use of heat guns unless proper engineering controls and worker protection are in place. At the time of removal of any LCP, samples of the lead containing/contaminated waste should be collected and analyzed by the TTLC, STLC and TCLP in order to determine whether wastes are classified as non-hazardous solid or hazardous waste in California or as defined under the RCRA before transportation and disposal to either a Class I, II, or III landfill. Contractors bidding for renovation work should be compliant with the requirements of the Cal/OSHA Lead in Construction Standard (Title 8 CCR ) for training, medical surveillance, and worker protection and the lead standard from the Environmental Protection Agency (EPA) Renovation, Repair and Painting Rule (RRP) 40 CFR [Code of Federal Regulations] Part 745. Lighting and Mercury Waste Mercury containing fluorescent light tubes are Universal Waste. The tubes, in any quantity, must be considered hazardous waste. Uniform hazardous Waste Manifest is required, but documentation must be provided demonstrating the tubes were managed properly. Tubes may be taken to Household Hazardous Waste Collection Facility for disposal. Fluorescent lighting ballasts may contain polychlorinated biphenyls (PCBs) and mercury. All ballasts should be removed and disposed of as hazardous waste. Environmental Consulting The use of M 3 or another qualified environmental consulting firm to assist in the design of hazardous material abatement specifications, observe abatement activities, conduct area air monitoring during abatement, visual inspections, and conduct air clearances after abatement/removal activities. Limitations A reasonable effort is made by M 3 personnel to locate and sample suspect materials. However, for any facility the existence of unique or concealed hazardous material debris is a possibility. M 3 does not warrant, guarantee or profess to have the ability to locate or identify all hazardous material in a facility. M 3 s hazardous material testing, results are applicable for the time that testing was conducted and for the condition of surfaces at the time they were tested. During demolition/renovation operations, materials may be uncovered which were not identified during our assessment. Personnel in charge of demolition/renovations should be alerted to note materials uncovered during these operations, which differ substantially from those included in this assessment. M 3 does not guarantee or warrant that the areas surveyed are safe, nor does M 3 s involvement in this property relieve the Owner of any continuing responsibility of providing a safe environment. M 3 is not, and has no responsibility as a generator, operator, treater, storer, transporter or disposer of hazardous materials or waste found or identified as a result of M 3 's work. Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 18

21 Thank you for the opportunity to perform these services for you. Please call M 3 at with any questions. Sincerely, M 3 Environmental Consulting LLC Garrett Rodewald Environmental Technician CSST CDPH Sampling Technician Linda C. Arceo Director of Environmental Services California CAC CDPH Lead Certified. 532 Attachments: Appendix Appendix Appendix A s Laboratory Results and Chain of Custody B Lead Laboratory Results and Chain of Custody C Floor Plans with Sample Locations Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1 Page 19

22 APPENDIX A ASBESTOS LABORATORY RESULTS AND CHAINS OF CUSTODY Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1

23 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 1A CONF. RM 1524 Carpet, Blue/ Gray/ Maroon Specks Mastic, Beige/ Gray ne Detected Synthetic Fiber 85% Binder/Filler 15% ne Detected Synthetic Fiber <1% Binder/Filler 99% BLDG ND FL- 2A CONF. RM " Baseboard, Black Mastic, Cream/ Brown/ Beige te: Difficult to separate adjacent layer ne Detected ne Detected Cellulose Fiber Synthetic Fiber 1% <1% Binder/Filler 98% BLDG ND FL- 3A CONF. RM 1524 Formica Counter Top, White/ Brown Adhesive, Yellow ne Detected Cellulose Fiber 85% Binder/Filler 15% ne Detected Cellulose Fiber 3% Binder/Filler 97% BLDG ND FL- 4A CONF. RM 1524 Sink/ Counter Top Caulking, White ne Detected Talc 2% Binder/Filler 98% Page 1 of 26

24 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 5A CONF. RM 1524 Window Caulking, Black Chrysotile 3% Binder/Filler 97% BLDG ND FL- 6A CONF. RM 'x4' ACP Lay-in, Off White/ Yellow ne Detected Fibrous Glass 85% Wollastonite 3% Binder/Filler 12% BLDG ND FL- 7A MEN'S RR "x1" CFT, Brown/ Gray ne Detected Grout, Gray ne Detected BLDG ND FL- 8A MEN'S RR "x4" CWT, Beige Grout, White LAYER 3 Mastic, Yellow ne Detected ne Detected ne Detected Cellulose Fiber 2% Binder/Filler 98% Page 2 of 26

25 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 9A MEN'S RR 1525 Toilet/ Urinal Caulking, White ne Detected BLDG ND FL- 10A CLASSRM 'x4' ACP Lay-in w/ Holes, Off White/ Lt Gray ne Detected Mineral Wool 90% Binder/Filler 10% BLDG ND FL- 11A OFFICE 1520A Carpet, Gray/Orange/Green/Blue Specks Mastic, Beige/ Gray ne Detected Synthetic Fiber 75% Foam Binder/Filler 25% ne Detected Synthetic Fiber 2% Binder/Filler 98% BLDG ND FL- 12A OFFICE 1520A Carpet, Red-Orange Mastic, Beige/ Gray ne Detected Synthetic Fiber 70% Foam Binder/Filler 30% ne Detected Synthetic Fiber 1% Binder/Filler 99% Page 3 of 26

26 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 13A CLASSRM 1520 RSF Hardwood Pattern, Brown/ Tan Mastic, Cream Chrysotile 3% Foam Binder/Filler 97% ne Detected Cellulose Fiber <1% Binder/Filler 99% BLDG ND FL- 14A CLASSRM 1520 Sink Undercoating, Pink Chrysotile 5% Binder/Filler 95% BLDG ND FL- 15A CLASSRM 1520 Undersink Pipe Caulking, Beige ne Detected BLDG ND FL- 16A MED. RM 1520 RSF w/ Specks Sub-layer, Teal ne Detected Foam Mastic, Cream ne Detected Page 4 of 26

27 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 17A "SIM" THEATER RSF w/ Light & Dark Specks, Beige/ Gray Mastic, Beige ne Detected Cellulose Fiber 17% Fibrous Glass 3% Binder/Filler 80% ne Detected Cellulose Fiber 2% Binder/Filler 98% BLDG ND FL- 18A CLASSRM 1521 A/B Carpet, Dark Teal Mastic, Cream ne Detected Synthetic Fiber 70% Foam Binder/Filler 30% ne Detected Synthetic Fiber Cellulose Fiber 1% <1% Binder/Filler 98% BLDG ST FL- 19A RECEPTION " Baseboard, Gray ne Detected Mastic, Cream/ Brown te: Difficult to separate adjacent layer ne Detected Page 5 of 26

28 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 20A OFFICE 1503A 4" Baseboard, Blue-Gray ne Detected Mastic, Cream/ Brown te: Difficult to separate adjacent layer ne Detected Cellulose Fiber <1% Binder/Filler 99% BLDG ST FL- 21A OFFICE 1503A Brick, Tan/ Gray ne Detected Mortar, Gray ne Detected BLDG ST FL- 22A MAIN CORRIDOR 12"x12" VFT, White w/ Beige Specks ne Detected Mastic, Black Chrysotile 8% Binder/Filler 92% BLDG ST FL- 23A MAIN CORRIDOR 12"x12" VFT, Off White w/ Olive Specks Chrysotile 2% Binder/Filler 98% Mastic, Black Chrysotile 8% Binder/Filler 92% Page 6 of 26

29 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 24A MAIN CORRIDOR 12"x12" VFT, Tan w/ Light & Dark Specks Chrysotile 2% n-fibrous Tremolite 3% Binder/Filler 95% Mastic, Black Chrysotile 5% Cellulose Fiber 2% Binder/Filler 93% BLDG ST FL- 25A MAIN CORRIDOR 12"x12" VFT, Dark Beige w/ Lt & Dk Specks Chrysotile 2% n-fibrous Tremolite 3% Binder/Filler 95% Mastic, Black Chrysotile 10% Binder/Filler 90% BLDG ST FL- 26A MAIN CORRIDOR 12"x12" VFT, Beige w/ Off White Specks Chrysotile 3% Binder/Filler 97% Mastic, Black Chrysotile 8% Cellulose Fiber 2% Binder/Filler 90% BLDG ST FL- 27A MAIN CORRIDOR 12"x12" VFT, Beige w/ Maroon Specks Chrysotile 2% Binder/Filler 98% Mastic, Black Chrysotile 5% Cellulose Fiber 2% Binder/Filler 93% Page 7 of 26

30 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 28A JANITORS CLOSET 12"x12" VFT, Beige w/ Off White Specks Mastic, Black LAYER 3 Leveling Compound, White Chrysotile 2% Binder/Filler 98% Chrysotile 5% Cellulose Fiber 3% Binder/Filler 92% ne Detected BLDG ST FL- 29A OFFICE 1508A Carpet, Purple w/ Specks ne Detected Synthetic Fiber 75% Foam Binder/Filler 25% Mastic, Beige ne Detected Synthetic Fiber Cellulose Fiber 1% <1% Binder/Filler 98% LAYER 3 12"x12" VFT, Beige Chrysotile 2% Binder/Filler 98% LAYER 4 Mastic, Black Chrysotile 10% Binder/Filler 90% BLDG ST FL- 30A OBSERVATION 1500C 12"x12" Acoustical Ceiling Tile w/ Holes & Fissure, Off White/ Beige ne Detected Cellulose Fiber Mineral Wool 40% 40% Perlite Binder/Filler 20% Page 8 of 26

31 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 31A KITCHEN 1500B 12"x12" VFT, Beige w/ Lt. & Dk. Streaks ne Detected Mastic, Black ne Detected BLDG ST FL- 32A KITCHEN 1500B Sink Under Pad, Black ne Detected BLDG ST FL- 33A 1500 ENTRY Carpet, Olive w/ Orange Specks ne Detected Synthetic Fiber 85% Binder/Filler 15% Mastic, Beige ne Detected Cellulose Fiber Synthetic Fiber 2% 1% Binder/Filler 97% LAYER 3 12"x12" VFT, Cream ne Detected LAYER 4 Mastic, Black/Brown ne Detected Cellulose Fiber 1% Binder/Filler 99% Page 9 of 26

32 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 34A KITCHEN "x12" Vinyl Floor Tile, Cream ne Detected Mastic, Black/Brown Chrysotile 3% Cellulose Fiber 1% Binder/Filler 96% BLDG ST FL- 35A KITCHEN " Baseboard, Brown ne Detected Mastic, Brown/Beige/Cream ne Detected Cellulose Fiber 1% Binder/Filler 99% BLDG ST FL- 36A "x24" Lay-in Acoustical Ceiling Panel, Off White ne Detected Mineral Wool 50% Cellulose Fiber 30% Perlite Binder/Filler 20% Page 10 of 26

33 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 37A "x12" Vinyl Floor Tile, White w/ Streaks ne Detected Mastic, Black/Brown ne Detected Cellulose Fiber <1% Binder/Filler 99% LAYER 3 Leveling Compound, White ne Detected BLDG ST FL- 38A " Baseboard, Beige ne Detected Mastic, Cream ne Detected BLDG ST FL- 39A KITCHEN 1502 Formica Countertop, Gray ne Detected Cellulose Fiber 75% Binder/Filler 25% Adhesive, Yellow ne Detected Cellulose Fiber 10% Binder/Filler 90% Page 11 of 26

34 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 40A KITCHEN 1502 Sink Undercoating, White ne Detected Cellulose Fiber 15% Binder/Filler 85% BLDG ST FL- 41A BOILER RM 1502 Insulation, Yellow ne Detected Fibrous Glass 98% 2% Foil Wrap, Silver/White ne Detected Cellulose Fiber Fibrous Glass 25% 10% Aluminum Binder/Filler 65% BLDG ST FL- 42A BOILER RM 1502 Pipe Putty, Lt. Blue/White ne Detected Talc 3% Binder/Filler 97% BLDG ST FL- 43A BOILER RM 1502 Penetration Mastic, Red ne Detected BLDG ST FL- 44A BOILER RM " Fitting, Off White ne Detected Cellulose Fiber 30% Fibrous Glass 5% Binder/Filler 65% Page 12 of 26

35 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 45A DIAPERING 1502 Sink Undercoating, Gray ne Detected Cellulose Fiber 15% Binder/Filler 85% BLDG ST FL- 46A MEZZANINE Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED ne Detected Cellulose Fiber 11% Binder/Filler 89% BLDG ST FL- 46B MEZZANINE Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED Chrysotile <1% Cellulose Fiber 11% Binder/Filler 88% BLDG ST FL- 47A MEZZANINE Insulation, Yellow ne Detected Fibrous Glass 97% 3% Foil Wrap, Silver/White ne Detected Cellulose Fiber Fibrous Glass 30% 10% Aluminum Binder/Filler 60% Page 13 of 26

36 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 47B MEZZANINE Insulation, Yellow ne Detected Fibrous Glass 97% 3% Foil Wrap, Silver/White ne Detected Cellulose Fiber Fibrous Glass 30% 10% Aluminum Binder/Filler 60% BLDG ST FL- 48A MEZZANINE Pipe Putty, Off White ne Detected Talc 3% Binder/Filler 97% BLDG ST FL- 49A MEZZANINE Insulation, Yellow ne Detected Fibrous Glass 95% 5% Foil Wrap, Silver/White ne Detected Cellulose Fiber Fibrous Glass 25% 5% Aluminum Binder/Filler 70% LAYER 3 Compound, White ne Detected Fibrous Glass 5% Binder/Filler 95% BLDG ST FL- 50A MEZZANINE Pipe Putty, Beige ne Detected Cellulose Fiber <1% Binder/Filler 99% Page 14 of 26

37 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 51A MEZZANINE Pipe Putty, Yellow ne Detected BLDG ST FL- 52A MEZZANINE Flex Connector, Black ne Detected Fibrous Glass 30% Binder/Filler 70% BLDG ST FL- 53A MEZZANINE Duct Tape, Off White ne Detected Cellulose Fiber 40% Binder/Filler 60% BLDG ST FL- 53B MEZZANINE Duct Tape, Off White ne Detected Cellulose Fiber 40% Binder/Filler 60% BLDG ND FL- 54A CLASSRM 1520 Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED Chrysotile <1% Cellulose Fiber Fibrous Glass 10% 1% Binder/Filler 88% Page 15 of 26

38 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 54B CLASSRM 1522B Joint Compound, White te: Wallboard Present Smooth Texturing/ Paint, White te: Layer is mainly Paint - little Texture present ne Detected Perlite ne Detected Cellulose Fiber <1% Binder/Filler 99% BLDG ST FL- 54C RECEPTION 1503 Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED ne Detected Cellulose Fiber 10% Fibrous Glass 1% Perlite Binder/Filler 89% BLDG ST FL- 54D CLASSRM 1508 Smooth Texturing, White te: Wallboard Present Chrysotile 3% Cellulose Fiber 1% Binder/Filler 96% BLDG ND FL- 55A CLASSRM 1520 Smooth Texturing, White te: Wallboard Present ne Detected Page 16 of 26

39 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 55B CLASSRM 1522B Smooth Texturing, White te: Wallboard Present ne Detected Perlite BLDG ST FL- 55C RECEPTION 1503 Smooth Texturing, White te: Wallboard Present ne Detected Perlite BLDG ST FL- 55D CLASSRM 1508 Smooth Texturing, White te: Wallboard Present Chrysotile 3% Binder/Filler 97% BLDG ND FL- 55E MEN'S RR 1526 Smooth Texturing, White te: Wallboard Present Chrysotile 2% Cellulose Fiber 1% Binder/Filler 97% BLDG ST FL- 55F MAIN CORRIDOR Smooth Texturing, White te: Wallboard Present ne Detected Perlite Page 17 of 26

40 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 55G STORAGE 1500 Smooth Texturing, White te: Wallboard Present ne Detected Perlite BLDG ST FL- 56A OFFICE 1503B Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED ne Detected Cellulose Fiber Fibrous Glass 10% 2% Perlite Binder/Filler 88% BLDG ST FL- 56B LAY RM 1502 Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED ne Detected Cellulose Fiber 10% Fibrous Glass 2% Perlite Binder/Filler 88% BLDG ST FL- 57A OFFICE 1503B Texturing, White ne Detected Perlite BLDG ST FL- 57B LAY RM 1502 Texturing, White ne Detected Perlite Page 18 of 26

41 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 57C BOILER CL Texturing, White ne Detected Perlite BLDG ST FL- 57D OBSERVATION 1502 Texturing, White ne Detected Cellulose Fiber 1% Perlite Binder/Filler 99% BLDG ST FL- 57E OFFICE 1504A Texturing, White te: Wallboard Present ne Detected Cellulose Fiber 2% Perlite Binder/Filler 98% BLDG ND FL- 58A EXTERIOR Transite, Gray Chrysotile 10% Binder/Filler 90% BLDG ND FL- 59A EXTERIOR Exterior Window Caulking/ Paint, Black ne Detected Page 19 of 26

42 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 60A EXTERIOR Exterior Window/Wall Panel Trim Caulking, Gray Chrysotile 15% Binder/Filler 85% BLDG ST FL- 61A EXTERIOR Exterior Window Caulking, Dk Gray/ Black Chrysotile 10% Binder/Filler 90% BLDG ST FL- 62A EXTERIOR Wall Panel, Cream/ Brown ne Detected Cellulose Fiber 90% Binder/Filler 10% BLDG ST FL- 51B BOILER RM 1554 Pipe Putty, Yellow/ Beige ne Detected BLDG ND FL- 63A EXTERIOR Stucco-Scratch Coat, Gray ne Detected Stucco-Finish Coat, Beige ne Detected LAYER 3 Stucco-Coating/ Paint, Beige te: Difficult to separate adjacent layer ne Detected Page 20 of 26

43 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 63B EXTERIOR Stucco-Scratch Coat, Gray ne Detected Stucco-Finish Coat, Beige ne Detected LAYER 3 Stucco-Coating/ Paint, Beige te: Difficult to separate adjacent layer ne Detected BLDG ND FL- 63C JANITOR'S CLOSET Stucco-Scratch Coat, Gray ne Detected Stucco-Finish Coat, Beige Chrysotile <1% Binder/Filler 99% Page 21 of 26

44 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ST FL- 63D EXTERIOR Stucco-Scratch Coat, Gray ne Detected Stucco-Finish Coat, White ne Detected LAYER 3 Stucco-Coating/ Paint, Beige te: Difficult to separate adjacent layer ne Detected BLDG ST FL- 63E EXTERIOR Stucco-Scratch Coat, Gray ne Detected Stucco-Finish Coat, Beige Chrysotile <1% Binder/Filler 99% LAYER 3 Stucco-Coating/ Paint, Beige te: Difficult to separate adjacent layer ne Detected BLDG ND FL- 64A EXTERIOR Texture over Concrete, Beige/ White Chrysotile <1% Binder/Filler 99% Page 22 of 26

45 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG ND FL- 64B EXTERIOR Texture over Concrete, Beige/ White Chrysotile <1% Binder/Filler 99% BLDG ST FL- 64C EXTERIOR Texture over Concrete, Beige/ White Chrysotile <1% Binder/Filler 99% BLDG ND FL- 65A EXTERIOR Expansion Joint Caulking, Gray Chrysotile 2% Binder/Filler 98% BLDG ND FL- 66A EXTERIOR Tar Paper Vapor Barrier, Black ne Detected Synthetic Fiber 15% Binder/Filler 85% BLDG 1500-MAIN- 67A ROOF Comp. Roof Shingles, Gray/ Beige/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% Comp. Roof Shingles, Gray/ Black ne Detected Fibrous Glass 20% Binder/Filler 80% LAYER 3 Comp. Roof Shingles, Dk. Gray/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% Page 23 of 26

46 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1500-MAIN- 68A ROOF Roof Penetration Mastic, Lt. Gray Chrysotile 8% Binder/Filler 92% BLDG 1500-MAIN- 69A ROOF Roof Vapor Barrier, Black ne Detected Cellulose Fiber 65% Binder/Filler 35% Roof Vapor Barrier, Black ne Detected Cellulose Fiber 65% Binder/Filler 35% BLDG 1500-MAIN- 70A ROOF Mastic/ Caulking/ Paint, White/ Gray te: Difficult to separate adjacent layer ne Detected BLDG 1500-MAIN- 71A ROOF Mastic, Black/ Dark Gray te: Difficult to separate adjacent layer ne Detected Page 24 of 26

47 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A ROOF Comp. Roof Shingles, Gray/ Beige/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% Comp. Roof Shingles, Gray/ Black ne Detected Fibrous Glass 20% Binder/Filler 80% LAYER 3 Comp. Roof Shingles, Dk. Gray/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% BLDG A ROOF Roof Vapor Barrier, Black ne Detected Cellulose Fiber 50% Binder/Filler 50% BLDG A ROOF Roof Flashing Mastic/ Paint, Lt. Gray ne Detected BLDG 1500-SW- 75A ROOF OVERHANG Comp. Roof Shingles, Brown/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% Comp. Roof Shingles, Brown/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% LAYER 3 Vapor Barrier, Black/ Brown ne Detected Cellulose Fiber 65% Binder/Filler 35% Page 25 of 26

48 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/21/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1500 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1500-SW- 76A ROOF OVERHANG Caulking/ Paint, Tan/ Black ne Detected BLDG ST FL- 77A EXTERIOR Exterior Siding, Tan ne Detected Cellulose Fiber 20% Binder/Filler 80% Analyst - Kurt Kettler Signatory - Lab Manager - Ken Scheske Distinctly stratified, easily separable layers of samples are analyzed as subsamples of the whole and are reported separately for each discernible layer. All analyses are derived from calibrated visual estimate and measured in area percent unless otherwise noted. The report applies to the standards or procedures identified and to the sample(s) tested. The test results are not necessarily indicated or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. These reports are for the exclusive use of the addressed client and that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. The report shall not be reproduced except in full, without written approval by our laboratory. The samples not destroyed in testing are retained a maximum of thirty days. The laboratory measurement of uncertainty for the test method is approximately less than 1 by area percent. Accredited by the National Institute of Standards and Technology, Voluntary Laboratory Accreditation Program for selected test method for asbestos. The accreditation or any reports generated by this laboratory in no way constitutes or implies product certification, approval, or endorsement by the National Institute of Standards and Technology. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Polarized Light Microscopy may not be consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. Page 26 of 26

49

50

51

52

53

54

55

56

57

58

59

60

61 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1550-RM A Carpet, Gray w/ Orange/Green Specks Adhesive, Clear ne Detected Synthetic Fiber 70% Foam Binder/Filler 30% ne Detected Synthetic Fiber 5% Binder/Filler 95% BLDG 1550-RM A 4" Baseboard, Black Mastic, Cream/ Brown te: Difficult to separate adjacent layer ne Detected ne Detected Cellulose Fiber 1% Binder/Filler 99% BLDG 1550-RM A 12"x12" ACT, White/ Beige te: Holes & Fissures ne Detected Cellulose Fiber Mineral Wool 40% 40% Perlite Binder/Filler 20% Page 1 of 11

62 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1550-RM A Brick, Gray ne Detected Cellulose Fiber <1% Binder/Filler 99% Mortar, Gray ne Detected LAYER 3 Coating, White ne Detected BLDG 1550-OFFICE 5A 1550A Interior Window Caulking, Black/ White ne Detected Talc 2% Binder/Filler 98% BLDG 1550-RM A Formica Counter Top, White/ Brown Adhesive, Clear ne Detected Cellulose Fiber 60% Binder/Filler 40% ne Detected Cellulose Fiber 3% Binder/Filler 97% BLDG 1550-RM A 12"x12" VFT, White w/ Lt Brown Specks Mastic, Black Chrysotile 3% Wollastonite 2% Binder/Filler 95% Chrysotile 8% Cellulose Fiber 2% Binder/Filler 90% Page 2 of 11

63 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1550-RM A 12"x12" VFT, Tan w/ Lt & Dk Specks Mastic, Black ne Detected Wollastonite 3% Binder/Filler 97% Chrysotile 5% Cellulose Fiber 3% Binder/Filler 92% BLDG 1550-RM A 12"x12" VFT, Beige w/ Lt & Dk Specks Mastic, Black Chrysotile 2% Binder/Filler 98% Chrysotile 8% Cellulose Fiber 2% Binder/Filler 90% BLDG 1550-RM A 12"x12" VFT, Cream w/ Off White Specks Mastic, Black Chrysotile Chrysotile 10% 3% Wollastonite 2% Binder/Filler 95% Binder/Filler 90% BLDG 1550-RM A 12"x12" VFT, Cream w/ Dark Specks Mastic, Black Chrysotile 2% Binder/Filler 98% Chrysotile 8% Cellulose Fiber 2% Binder/Filler 98% Page 3 of 11

64 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1550-RM A 12"x12" VFT, Off White w/ Olive Specks Mastic, Black Chrysotile 3% Binder/Filler 97% Chrysotile 5% Cellulose Fiber 2% Binder/Filler 93% BLDG 1550-RM A Sink/ Counter Top Caulking, White ne Detected Talc 1% Binder/Filler 99% BLDG 1550-OFFICE 14A 1552A Carpet, Red-Orange/ Gray ne Detected Synthetic Fiber 70% Foam Binder/Filler 30% Adhesive, Beige ne Detected Synthetic Fiber 1% Binder/Filler 99% BLDG A ELECTRICAL RM 1550B Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED BY CLIENT Chrysotile <1% Cellulose Fiber 11% Binder/Filler 88% BLDG A ELECTRICAL RM 1550B Pipe Putty, Beige/ Tan ne Detected Page 4 of 11

65 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A ELECTRICAL RM 1550B Pipe Putty, Lt. Blue/ Black te: Difficult to separate adjacent layer ne Detected Wollastonite 3% Binder/Filler 97% BLDG A ELECTRICAL RM 1550B Pipe Insulation, Yellow ne Detected Fibrous Glass 100% Pipe Wrap, Silver/ Beige/ Off White ne Detected Cellulose Fiber Fibrous Glass 50% 10% Aluminum Binder/Filler 40% BLDG B SERVER CLOSET Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED BY CLIENT Chrysotile <1% Cellulose Fiber Fibrous Glass 10% 1% Binder/Filler 88% BLDG 1550-OFFICE 19A 1552D Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED BY CLIENT Chrysotile <1% Cellulose Fiber Fibrous Glass 10% 1% Binder/Filler 88% BLDG 1550-OFFICE 20A 1552D Texturing, White/ Off White ne Detected Perlite Page 5 of 11

66 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1550-OFFICE 20B 1552D Texturing, White/ Off White ne Detected Perlite BLDG 1550-OFFICE 20C 1552D Texturing, White/ Off White ne Detected Perlite BLDG 1550-RM A Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED BY CLIENT Chrysotile <1% Cellulose Fiber Fibrous Glass 10% 1% Binder/Filler 88% BLDG 1550-OFFICE 21B 1553A Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED BY CLIENT Chrysotile <1% Cellulose Fiber Fibrous Glass 10% 1% Binder/Filler 88% BLDG 1550-OFFICE 21C 1551B Wallboard/ Joint Compound Composite, White/ Brown/ Off White te: COMPOSITE ANALYSIS REQUESTED BY CLIENT Chrysotile <1% Cellulose Fiber Fibrous Glass 10% 1% Binder/Filler 88% Page 6 of 11

67 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1550-RM A Smooth Texturing, White/ Off White Chrysotile 2% Binder/Filler 98% BLDG 1550-OFFICE 22B 1553A Smooth Texturing, White/ Off White Chrysotile 2% Cellulose Fiber <1% Binder/Filler 97% BLDG 1550-OFFICE 22C 1551B Smooth Texturing, White/ Off White Chrysotile 2% Binder/Filler 98% BLDG 1550-OFFICE 22D 1552A Smooth Texturing, White/ Off White Chrysotile 2% Binder/Filler 98% BLDG 1550-OFFICE 22E 1553A Smooth Texturing, White/ Off White ne Detected BLDG 1550-OFFICE 23A 1551A Residual Mastic, Beige/ Gray te: Difficult to separate adjacent layer ne Detected Cellulose Fiber 3% Binder/Filler 97% Page 7 of 11

68 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A EXTERIOR Window Caulking, Black ne Detected Talc 3% Binder/Filler 97% BLDG A EXTERIOR Wall Panel, Cream/ Brown ne Detected Cellulose Fiber 85% Binder/Filler 15% BLDG A EXTERIOR Stucco-Scratch Coat, Gray ne Detected Cellulose Fiber <1% Binder/Filler 99% Stucco-Finish Coat, Beige ne Detected BLDG B EXTERIOR Stucco-Scratch Coat, Gray ne Detected Cellulose Fiber <1% Binder/Filler 99% Stucco-Finish Coat, Beige ne Detected Page 8 of 11

69 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG C EXTERIOR Stucco-Scratch Coat, Gray ne Detected Cellulose Fiber <1% Binder/Filler 99% Stucco-Finish Coat, Beige ne Detected BLDG A EXTERIOR Texturing, Off White/ Beige ne Detected BLDG B EXTERIOR Texturing, Off White/ Beige ne Detected BLDG C EXTERIOR Texturing, Off White/ Beige ne Detected Page 9 of 11

70 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1550-ROOF 28A Comp. Roof Shingles, Beige/Gray/Red/Black ne Detected Fibrous Glass 15% Binder/Filler 85% Comp. Roof Shingles, Beige/Gray/Black ne Detected Fibrous Glass 15% Binder/Filler 85% LAYER 3 Comp. Roof Shingles, Gray/Black ne Detected Fibrous Glass 15% Binder/Filler 85% LAYER 4 Comp. Roof Shingles, Dark Gray/Black ne Detected Fibrous Glass 15% Binder/Filler 85% BLDG 1550-ROOF 29A Vapor Barrier, Black/ Brown ne Detected Cellulose Fiber 60% Binder/Filler 40% BLDG 1550-ROOF 30A Roof Penetration Mastic/Caulking, White/ Gray/ Brown ne Detected Silicone BLDG B CEILING SPACE 4" O.D. Pipe Insulation, Yellow ne Detected Fibrous Glass 97% Cellulose Fiber 1% Binder/Filler 2% Pipe Wrap, Silver/ Beige te: Difficult to separate adjacent layer ne Detected Cellulose Fiber Fibrous Glass 50% 10% Aluminum Binder/Filler 40% Page 10 of 11

71 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 09/02/2014 Collected: 08/20/2014 Date Reported: 09/02/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1550 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A CEILING SPACE Duct Tape, Off White/ Beige ne Detected Cellulose Fiber 60% Binder/Filler 40% BLDG B CEILING SPACE Duct Tape, Off White/ Beige ne Detected Cellulose Fiber 60% Binder/Filler 40% Analyst - Johann Hofer Signatory - Lab Director - Kurt Kettler Distinctly stratified, easily separable layers of samples are analyzed as subsamples of the whole and are reported separately for each discernible layer. All analyses are derived from calibrated visual estimate and measured in area percent unless otherwise noted. The report applies to the standards or procedures identified and to the sample(s) tested. The test results are not necessarily indicated or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. These reports are for the exclusive use of the addressed client and that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. The report shall not be reproduced except in full, without written approval by our laboratory. The samples not destroyed in testing are retained a maximum of thirty days. The laboratory measurement of uncertainty for the test method is approximately less than 1 by area percent. Accredited by the National Institute of Standards and Technology, Voluntary Laboratory Accreditation Program for selected test method for asbestos. The accreditation or any reports generated by this laboratory in no way constitutes or implies product certification, approval, or endorsement by the National Institute of Standards and Technology. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Polarized Light Microscopy may not be consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. Page 11 of 11

72

73

74

75

76

77

78 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A CLASSRM "x12" VFT, Tan Light & Dark Specks Chrysotile 3% Binder/Filler 97% Mastic, Beige Chrysotile 2% Binder/Filler 98% LAYER 3 Concrete, Gray ne Detected Cellulose Fiber <1% Binder/Filler 99% BLDG A CLASSRM "x12" VFT, Cream Light & Dark Specks ne Detected Mastic, Beige ne Detected Cellulose Fiber <1% Binder/Filler 99% BLDG A CLASSRM "x12" VFT, Off-White Light & Dark Specks Chrysotile 3% Binder/Filler 97% Mastic, Black Chrysotile 5% Binder/Filler 95% Page 1 of 17

79 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A CLASSRM "x12" VFT, Lt. Tan Light & Dark Specks ne Detected Mastic, Beige ne Detected Cellulose Fiber <1% Binder/Filler 99% BLDG A CLASSRM "x12" VFT, Lt. Brown Light & Dark Specks ne Detected Mastic, Beige ne Detected BLDG A CLASSRM "x12" VFT, Off-White Dark Streaks Chrysotile 5% Binder/Filler 95% Mastic, Black Chrysotile 5% Binder/Filler 95% Page 2 of 17

80 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A CLASSRM "x12" VFT, Lt. Beige Dark Streaks Chrysotile 3% Binder/Filler 97% Mastic, Black Chrysotile 5% Binder/Filler 95% BLDG A CLASSRM "x12" VFT, Beige Dark Streaks Chrysotile 3% Binder/Filler 97% Mastic, Beige ne Detected Cellulose Fiber 2% Binder/Filler 98% BLDG A CLASSRM "x12" VFT, Lt. Gray Dark Streaks Chrysotile 5% Binder/Filler 95% Mastic, Black Chrysotile 5% Binder/Filler 95% Page 3 of 17

81 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A CLASSRM " Baseboard, Black ne Detected Mastic, Brown Chrysotile 3% Cellulose Fiber <1% Binder/Filler 96% BLDG A CLASSRM 1605 Brick, Gray ne Detected Mortar, Gray ne Detected Cellulose Fiber <1% Binder/Filler 99% BLDG A CLASSRM 'x4' Lay-in Acoustical Ceiling Panel, Off White/ Yellow ne Detected Fibrous Glass 90% Binder/Filler 10% BLDG A CLASSRM 1605 Interior Window Caulking, Brown ne Detected Fibrous Glass 2% Binder/Filler 98% Page 4 of 17

82 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-OFFICE 14A 1604A Carpet, Lt. Blue/ Gray ne Detected Synthetic Fiber 45% Binder/Filler 55% Adhesive, Clear ne Detected Synthetic Fiber <1% Binder/Filler 99% BLDG 1600-MEN'S 15A RESTRM 1x1 Ceramic Floor Tile, Brown/ Beige ne Detected Diatoms Grout, Brown/ Gray ne Detected BLDG 1600-MEN'S 16A RESTRM 4x4 Ceramic Wall Tile, Off White ne Detected Grout, Off White ne Detected Cellulose Fiber <1% Binder/Filler 99% Page 5 of 17

83 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-MEN'S 17A RESTRM Toilet/ Urinal Caulking, Off White ne Detected Wollastonite 2% Binder/Filler 98% BLDG 1600-MEN'S 18A RESTRM Sink Putty, Gray/ Tan ne Detected Sink Putty, Gray ne Detected Synthetic Fiber 95% Binder/Filler 5% BLDG A CLASSRM 1604 Vinyl Baseboard/ Step Flashing, Brown/ White/ Red Streaks ne Detected Mastic, Brown Chrysotile 3% Cellulose Fiber 1% Binder/Filler 96% BLDG 1600-RM A Carpet, Purple/ Pink/ Green Mastic, Yellow ne Detected Synthetic Fiber 95% Binder/Filler 5% ne Detected Cellulose Fiber Synthetic Fiber 1% <1% Binder/Filler 98% Page 6 of 17

84 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-RM A Carpet, Gray/ Orange/ Green Adhesive, Black ne Detected Synthetic Fiber 45% Binder/Filler 55% Chrysotile 5% Cellulose Fiber 3% Binder/Filler 92% BLDG 1600-RM A 4" Baseboard, Teal Mastic, Cream LAYER 3 Compound, White ne Detected ne Detected Cellulose Fiber <1% 99% ne Detected Perlite BLDG 1600-OFFICE 23A 1600A Carpet, Gray/ Maroon Specks ne Detected Synthetic Fiber 45% Binder/Filler 55% Adhesive, Clear ne Detected Cellulose Fiber 1% Binder/Filler 99% Page 7 of 17

85 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-OFFICE 24A 1600A 4" Baseboard, Cream ne Detected Mastic, Cream ne Detected LAYER 3 Mastic, Brown ne Detected Cellulose Fiber <1% Binder/Filler 99% LAYER 4 Compound, White ne Detected BLDG A CLASSRM 'x4' Lay-in Acoustical Ceiling Panel, Off White/ Beige Holes ne Detected Mineral Wool 80% Binder/Filler 20% BLDG A CLASSRM 1606 Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED ne Detected Cellulose Fiber 10% Fibrous Glass 2% Binder/Filler 88% Page 8 of 17

86 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-MEN'S 26B RESTRM Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED ne Detected Cellulose Fiber 10% Fibrous Glass 2% Binder/Filler 88% BLDG 1600-RM C Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED ne Detected Cellulose Fiber Fibrous Glass 10% 2% Binder/Filler 88% BLDG A CLASSRM 1606 Smooth Texturing, White ne Detected BLDG 1600-MEN'S 27B RESTRM Smooth Texturing, White ne Detected BLDG 1600-RM C Smooth Texturing, White/ Lt. Green ne Detected Page 9 of 17

87 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-OFFICE 27D 1600A Smooth Texturing, White ne Detected Cellulose Fiber <1% Perlite Binder/Filler 99% BLDG E CLASSRM 1605 Smooth Texturing, White ne Detected Cellulose Fiber <1% Perlite Binder/Filler 99% BLDG 1600-RM F Smooth Texturing, White ne Detected Cellulose Fiber <1% Perlite Binder/Filler 99% BLDG 1600-OFFICE 27G 1604A Smooth Texturing, White ne Detected Perlite Page 10 of 17

88 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG B- 28A JANITOR'S CLOSET Wallboard, White/ Brown Joint Compound, White LAYER 3 Texturing, White ne Detected ne Detected Cellulose Fiber 10% Fibrous Glass 2% 88% ne Detected Cellulose Fiber <1% Perlite Binder/Filler 99% BLDG B- 29A JANITOR'S CLOSET Texturing, White ne Detected Perlite BLDG B- 29B JANITOR'S CLOSET Texturing, White ne Detected Cellulose Fiber 1% Perlite Binder/Filler 99% BLDG B- 29C JANITOR'S CLOSET Texturing, White ne Detected Page 11 of 17

89 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A MEZZANINE Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED BY CLIENT ne Detected Cellulose Fiber 9% Fibrous Glass 1% Binder/Filler 90% BLDG B MEZZANINE Wallboard/ Joint Compound Composite, White/ Brown te: COMPOSITE ANALYSIS REQUESTED BY CLIENT ne Detected Cellulose Fiber Fibrous Glass 9% 1% Binder/Filler 90% BLDG A MEZZANINE Duct Tape, White ne Detected Synthetic Fiber 60% Binder/Filler 40% BLDG B MEZZANINE Duct Tape, White ne Detected Synthetic Fiber 60% Binder/Filler 40% BLDG A MEZZANINE Flex Connector, Black ne Detected Fibrous Glass 50% Cellulose Fiber 5% Binder/Filler 45% BLDG A MEZZANINE Pipe Putty, Beige ne Detected Page 12 of 17

90 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A MEZZANINE Pipe Putty, Off White ne Detected Wollastonite 10% Binder/Filler 90% BLDG A MEZZANINE 4' O. D. Pipe Run Insulation, Yellow ne Detected Fibrous Glass 98% 2% 4' O. D. Paper/ Foil Wrapped, White/ Silver ne Detected Cellulose Fiber Fibrous Glass 40% 10% Aluminum Binder/Filler 50% BLDG 1600-RM A VFT, Beige Mastic, Black/ Yellow Chrysotile 5% Binder/Filler 95% ne Detected Cellulose Fiber 2% Binder/Filler 98% BLDG A EXTERIOR Transite Wall Panel, Brown/ Gray Chrysotile 12% Binder/Filler 88% Mastic, Black ne Detected Fibrous Glass 2% Binder/Filler 98% BLDG A EXTERIOR Exterior Window Caulking, Black Chrysotile 10% Binder/Filler 90% Page 13 of 17

91 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG A EXTERIOR Exterior Window Trim Caulking, Lt. Gray/ Dk. Brown ne Detected BLDG A EXTERIOR Ext. Stucco-Scratch Coat, Gray ne Detected Ext. Stucco-Finish Coat, Lt. Yellow ne Detected BLDG B EXTERIOR Ext. Stucco-Scratch Coat, Gray ne Detected Ext. Stucco-Finish Coat, Lt. Yellow ne Detected Page 14 of 17

92 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG C EXTERIOR Ext. Stucco-Scratch Coat, Gray ne Detected Ext. Stucco-Finish Coat, Lt. Yellow ne Detected BLDG A EXTERIOR Concrete Texturing, White/ Lt. Yellow ne Detected BLDG B EXTERIOR Concrete Texturing, White/ Lt. Yellow ne Detected BLDG C EXTERIOR Concrete Texturing, White/ Lt. Yellow ne Detected Page 15 of 17

93 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-ROOF 40D Ext. Stucco, Gray ne Detected BLDG 1600-ROOF 40E Ext. Stucco, Gray ne Detected BLDG 1600-ROOF 42A Composition Roofing Shingle/ Tar, Black ne Detected Cellulose Fiber 2% Binder/Filler 98% Composition Roofing Shingle, Gray/ Tan/ Green/ Red/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% LAYER 3 Composition Roofing Shingle, Tan/ Black ne Detected Fibrous Glass 15% Binder/Filler 85% BLDG 1600-ROOF 43A Vapor Barrier, Black ne Detected Cellulose Fiber 60% Binder/Filler 40% BLDG 1600-ROOF 44A Penetration Mastic, Gray/ Black Chrysotile 10% Binder/Filler 90% Page 16 of 17

94 Lab ID Client ID Sample Location EMC LABS, INC S. 51st Street, Suite B109, Phoenix, AZ Phone: or Fax: (480) Bulk Analysis by Polarized Light Microscopy Layer Name / Sample Description NVLAP# Client: M3 ENVIRONMENTAL CONSULTING Job# / P.O. #: T1 Address: 9821 BLUE LARKSPUR LN, STE 100 Date Received: 08/25/2014 MONTEREY CA Date Analyzed: 08/29/2014 Collected: 08/19/2014 Date Reported: 08/29/2014 Project Name: CABRILLO COLLEGE-6500 SOQUEL DR, EPA Method: EPA 600/R-93/116 APTOS, CA Address: BLDG 1600 Submitted By: GARRETT RODEWALD Collected By: Detected Type (%) n- Constituents Laboratory Report BLDG 1600-ROOF 45A Flashing Mastic, Gray ne Detected Perlite Caulking, Lt. Gray ne Detected BLDG A CLASSRM 1604 Lab Table Top, Black/ Tan ne Detected Cellulose Fiber 60% Binder/Filler 40% BLDG A CLASSRM 1604 Lab Table Sink Material, Black ne Detected Analyst - Kurt Kettler Signatory - Lab Manager - Ken Scheske Distinctly stratified, easily separable layers of samples are analyzed as subsamples of the whole and are reported separately for each discernible layer. All analyses are derived from calibrated visual estimate and measured in area percent unless otherwise noted. The report applies to the standards or procedures identified and to the sample(s) tested. The test results are not necessarily indicated or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. These reports are for the exclusive use of the addressed client and that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. The report shall not be reproduced except in full, without written approval by our laboratory. The samples not destroyed in testing are retained a maximum of thirty days. The laboratory measurement of uncertainty for the test method is approximately less than 1 by area percent. Accredited by the National Institute of Standards and Technology, Voluntary Laboratory Accreditation Program for selected test method for asbestos. The accreditation or any reports generated by this laboratory in no way constitutes or implies product certification, approval, or endorsement by the National Institute of Standards and Technology. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Polarized Light Microscopy may not be consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. Page 17 of 17

95

96

97

98

99

100

101

102

103 APPENDIX B LEAD PAINT LABORATORY RESULTS AND CHAINS OF CUSTODY Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1

104 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53412 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College, 6500 Soquel Dr., Aptos, CA (Multiple Bldgs.) P.O. NO.: PROJECT NO.: Task 1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 1 08/21 L1 Off-White/WB/Wall/Interior BRL 2 08/21 L2 Brown/Metal/Door/Interior /21 L3 Beige/Metal/Door Frame/Interior /21 L4 Beige/Wood/Window Frame Trim/Sill/Interior BRL 5 08/21 L5 Cream/Metal/Cabinetry/Interior BRL 6 08/21 L6 Off-White/Wood/Storage Shelf/Interior BRL 7 08/21 L9 Blue/Metal/Toilet Stall/Interior BRL 8 08/21 L10 Teal/Metal/HVAC Air Handler/Interior-Mezzanine /21 L11 Gray/Metal/Air Compressor Unit/Interior-Mezzanine ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 1 of 6

105 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53412 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College, 6500 Soquel Dr., Aptos, CA (Multiple Bldgs.) P.O. NO.: PROJECT NO.: Task 1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 10 08/21 L12 Off-White/Metal/Door Frame/Interior-1521A /21 L13 Off-White/Wood/Window Frame Trim/Sill/Interior- 1521A BRL 12 08/21 L14 White/WB/Wall/Interior-1522A BRL 13 08/21 L15 Beige/Wood/Door Frame/Interior-1503B BRL 14 08/21 L16 White/WB/Wall/Interior-1503B BRL 15 08/21 L17 Cream/Metal/Floor Heater/Interior-1503B BRL 16 08/21 L18 White/Brick/Wall/Interior 1503B BRL 17 08/21 L19 Lt. Blue/WB/Wall/Interior-1503C BRL 18 08/21 L20 Lt. Blue/Brick/Wall/Interior-1504A BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 2 of 6

106 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53412 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College, 6500 Soquel Dr., Aptos, CA (Multiple Bldgs.) P.O. NO.: PROJECT NO.: Task 1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 19 08/21 L21 Off-White/Metal/Electrical Panel Box/Interior-Main Corridor BRL 20 08/21 L22 Bright Green/WB/Wall/Interior-1500 (Entry) BRL 21 08/21 L23 Off-White/WB/Wall/Interior-Main Corridor BRL 22 08/21 L24 Beige/Metal/Wall Vents/Interior-1500 (Classroom) /21 L25 Beige/Metal/Window Pillar/Interior-1500 (Classroom) BRL 24 08/21 L26 Beige/Metal/Door/Interior-1500 (Classroom) ^ 25 08/21 L27 Cream/WB/Wall/Interior-1502 (Waiting) BRL 26 08/21 L28 Lt. Blue/WB/Wall/Interior BRL 27 08/21 L29 White/Wood/Window Frame/Interior BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 3 of 6

107 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53412 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College, 6500 Soquel Dr., Aptos, CA (Multiple Bldgs.) P.O. NO.: PROJECT NO.: Task 1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 28 08/21 L30 White/Metal/Door/Interior-1502 (Office) BRL 29 08/21 L31 White/Metal/Door Frame/Interior-1502 (Office) BRL 30 08/21 L32 White/WB/Wall/Interior-1502 (Office) BRL 31 08/21 L33 Cream/Stucco/Wall/Exterior (Around 1520) BRL 32 08/21 L34 White/Concrete W/Texturing/Roof Overhang Support Pillar/Exterior (Around 1520) BRL 33 08/21 L35 Dark Gray/Metal/Door/Exterior (Around 1520) /21 L36 Lt. Gray/Metal/Door Frame/Exterior (Around 1520) /21 L37 Lt. Gray/Wood/Window Trim/Exterior (Around 1520) BRL 36 08/21 L38 Gray/Transite/Wall Panel/Exterior (Around 1520) BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 4 of 6

108 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53412 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College, 6500 Soquel Dr., Aptos, CA (Multiple Bldgs.) P.O. NO.: PROJECT NO.: Task 1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 37 08/21 L39 Dark Gray/Wood/Hand Railing/Exterior (Around 1520) BRL 38 08/21 L40 White/Metal/Door/Exterior-1502 (Observations) BRL 39 08/21 L41 White/Metal/Door Frame/Exterior-1502 (Observations) BRL 40 08/21 L42 Cream/Stucco/Wall/Exterior BRL 41 08/21 L43 Beige/Wood/Siding/Exterior BRL 42 08/21 L44 Cream/Metal/Rain Gutter Downspout/Exterior BRL 43 08/21 L45 Dark Gray/Metal/Stairs/Exterior BRL 44 08/21 L46 Cream/Wood/Siding/Exterior-1504B BRL 45 08/21 L47 White/Metal/Rain Gutter Downspoout/Exterior-1504B BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 5 of 6

109 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53412 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College, 6500 Soquel Dr., Aptos, CA (Multiple Bldgs.) P.O. NO.: PROJECT NO.: Task 1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 46 08/21 L48 Red/Metal/Fire Equipment Pipes & Valves/Exterior- 1503A BRL 47 08/21 L49 Gray/Wood/Roof Overhang Support Beam/Exterior BRL 48 08/21 L50 Cream/Wood/Roof Overhang Underside/Exterior BRL 49 08/21 L51 Dark Gray/Wood/Roof Fascia/Exterior BRL 50 08/21 L52 Dark Gray/Metal/Rain Gutter/Exterior BRL 51 08/21 L53 Dark Gray/Metal/Roof Penetration/Exterior /21 L54 Brown/Metal/Roof Fascia/Rain Gutter/Exterior BRL 53 08/21 L55 White/Metal/Roof Penetration Chimney Unit/Exterior BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 6 of 6

110

111

112

113

114

115

116 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53413 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/25/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1500 P.O. NO.: PROJECT NO.: Task 1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT IN PPM Pb IN PPM 1 08/21 L7 Brown / Ceramic / 1 x1 CFT / Interior /21 L8 Cream / Ceramic / 4 x4 CWT / Interior BRL ^ = Dilution Factor Changed Ins. = Insufficient Sample for Analysis * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 1 of 1

117

118

119 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53411 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1550 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 1 08/20 L1 White/ WB/ Wall/ Interior 1550 (Reception) BRL 2 08/20 L2 White/ Metal/ Door Frame/ Interior 1550A BRL 3 08/20 L3 White/ Brick/ Wall/ Interior BRL 4 08/20 L4 White/ Wood/ Shelves/ Interior 1550A BRL 5 08/20 L5 Beige/ Metal/ Door Frame/ Interior 1551A BRL 6 08/20 L6 Dark Gray/ Metal/ Door/ Interior 1551A /20 L7 Tan/ Fibrous Board/ Wall Panel/ Interior 1552A BRL 8 08/20 L8 Beige/ Wood/ Door Frame/ Interior 1553A BRL 9 08/20 L9 Off-White/ WB/ Wall/ Interior 1553A BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 1 of 3

120 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53411 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1550 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 10 08/20 L10 Off-White/ Metal/ Door Frame/ Interior 1553D BRL 11 08/20 L11 Lt. Gray/ Plywood/ Wall Backing Behind Panel/ Interior 1550B BRL 12 08/20 L12 Gray/ Metal/ Boiler Unit/ Interior 1550B BRL 13 08/20 L13 Metallic Blue/ Metal/ Air Compressor Unit/ Interior B /20 L14 Lt. Gray/ Metal/ Door Frame/ Exterior BRL 15 08/20 L15 Gray/ Metal/ Door/ Exterior /20 L16 Beige/ Fibrous Board/ Wall Panel/ Exterior BRL 17 08/20 L17 Gray/ Wood/ Hand Railing/ Exterior BRL 18 08/20 L18 Cream/ Stucco/ Wall/ Exterior BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 2 of 3

121 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53411 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/27/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1550 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 19 08/20 L19 White/ Concrete W/Texturing/ Roof Overhang Support Pillar/ Exterior BRL 20 08/20 L20 White/ Metal/ Rain Gutter Downspout/ Exterior BRL 21 08/20 L21 Gray/ Metal (Suspect Lead)/ Downspout Drain Pillar/ Exterior ^ 22 08/20 L22 Lt. Gray/ Wood/ Roof Overhang Framing/ Exterior /20 L23 Cream/ Wood/ Roof Overhang Underside/ Exterior BRL 24 08/20 L24 Dark Gray/ Wood/ Roof Fascia/ Exterior BRL 25 08/20 L25 Dark Gray/ Metal/ Rain Gutter/ Exterior ^ 26 08/20 L26 Lt. Gray/ Metal/ Roof Penetrations/ Exterior ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 3 of 3

122

123

124

125

126 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53409 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/26/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1600 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 1 08/19 L1 White/ WB/ Wall/ Interior BRL 2 08/19 L2 Beige/ Metal/ Window Pillars/ Interior /19 L3 Beige/ Wood/ Window Sill/ Interior BRL 4 08/19 L4 Beige/ Metal/ Door Frame/ Interior /19 L5 Brown/ Metal/ Door/ Interior /19 L6 White/ Wood/ Door/ Interior BRL 7 08/19 L7 White/ Wood/ Door Frame/ Interior BRL 8 08/19 L8 White/ Brick/ Wall/ Interior Men s RR BRL 9 08/19 L11 Blue/ Metal/ Toilet Stall/ Interior Men s RR BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 1 of 4

127 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53409 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/26/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1600 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 10 08/19 L12 Off-White/ WB/ Wall/ Interior Janitor s Closet (1604B) BRL 11 08/19 L13 Off-White/ Metal/ Window Pillar/ Interior /19 L14 Black/ Wood/ Lab Table Top/ Interior BRL 13 08/19 L15 Seafoam Green/ Brick/ Wall/ Interior BRL 14 08/19 L16 Seafoam Green/ WB/ Wall/ Interior BRL 15 08/19 L17 Brown/ Metal/ Door Frame/ Interior /19 L18 Gray/ Metal (Suspect Lead)/ Wall Sheeting/ Interior 1602A ^^ 17 08/19 L19 Lt. Blue/ WB/ Wall/ Interior ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 2 of 4

128 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53409 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/26/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1600 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 18 08/19 L20 Lt. Blue/ Brick/ Wall/ Interior BRL 19 08/19 L21 Dark Gray/ Metal/ HVAC Air Handler Fan/ Interior Mezzanine BRL 20 08/19 L22 Metalic Blue/ Metal/ Air Compressor Unit/ Interior Mezzanine /19 L23 Gray/ Metal/ Door/ Exterior /19 L24 Gray/ Metal/ Door Frame/ Exterior /19 L25 Gray/ Wood/ Window Trim/ Exterior BRL 24 08/19 L26 Cream/ Stucco/ Wall/ Exterior BRL 25 08/19 L27 White/ Concrete W/Text./ Roof Overhang Support Pillar/ Exterior BRL ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 3 of 4

129 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53409 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/26/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1600 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT (%Pb by weight) %Pb BY WEIGHT 26 08/19 L28 Dark Gray/ Metal/ Door/ Exterior /19 L29 White/ Metal/ Rain Gutter Downspout/ Exterior BRL 28 08/19 L30 Gray/ Wood/ Roof Overhang Framing/ Exterior BRL 29 08/19 L31 Cream/ Wood/ Underside of Roof Overhang/ Exterior BRL 30 08/19 L32 Dark Gray/ Wood/ Roof Fascia/ Exterior BRL 31 08/19 L33 Dark Gray/ Metal/ Rain Gutter/ Exterior BRL 32 08/19 L34 Dark Gray/ Stucco/ Wall/ Exterior /19 L35 Dark Gray/ Metal/ Mezzanine Rents/ Exterior /19 L36 Dark Gray/ Metal/ Roof Penetrations/ Exterior ^ ^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 4 of 4

130

131

132

133

134 EMC LABS, INC South 51 st Street, Suite B-109 / PHOENIX, ARIZONA / or / FAX emclab@emclabs.com LEAD (Pb) IN PAINT CHIP SAMPLES EMC SOP METHOD #L01/1 EPA SW-846 METHOD 7420 EMC LAB #: L53410 DATE RECEIVED: 08/25/14 CLIENT: M3 Environmental Consulting REPORT DATE: 08/28/14 DATE OF ANALYSIS: 08/25/14 CLIENT ADDRESS: 9821 Blue Larkspur Lane, Suite 100 Monterey, CA PROJECT NAME: Cabrillo College Hazmat Reno Survey 6500 Soquel Dr., Aptos, CA Building 1600 P.O. NO.: PROJECT NO.: T1 EMC # L SAMPLE DATE /14 CLIENT SAMPLE # DESCRIPTION REPORTING LIMIT IN PPM Pb IN PPM 1 08/19 L9 Brown/Lt. Brown / Ceramic / 1 x1 CFT / Interior Men s RR 100 BRL 2 08/19 L10 Cream / Ceramic / 4 x4 CWT / Interior Men s RR 100 BRL ^ = Dilution Factor Changed Ins. = Insufficient Sample for Analysis * = Excessive Substrate May Bias Sample Results BRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Result This report applies to the standards or procedures identified and to the samples tested only. The test results are not necessarily indicative or representative of the qualities of the lot from which the sample was taken or of apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted. Unless otherwise noted, all quality control analyses for the samples noted above were within acceptable limits. Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased. The lead content of such sample may, in actuality, be greater than reported. EMC makes no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate. Resampling is recommended in such situations to verify original laboratory results. These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special written permission. Samples not destroyed in testing are retained a maximum of sixty (60) days. Rev. 11/30/08 ANALYST: Jason Thompson QA COORDINATOR: Kurt Kettler Page 1 of 1

135

136

137 APPENDIX C FLOOR PLANS WITH SAMPLE LOCATIONS Cabrillo College C/o Slatter Construction 6500 Soquel Dr., Aptos, CA Pre-Renovation Hazardous Material Inspections M 3 Project Task 1

138

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan July 13, 2011 TTL Project No. 7615.02 Ms. Paula Boase Downriver Community Conference Brownfield Consortium 15100 Northline Road Southgate, Michigan 48195 Dear Ms. Boase: NESHAP Asbestos and Limited Hazardous

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084 POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for SSOE, Inc. 1050 Wilshire Drive Suite 260 Troy, Michigan 48084 at Michigan State University Physics Astronomy Building (Now Psychology) East

More information

Asbestos, Lead and Hazardous Materials Pre-demolition Survey Report

Asbestos, Lead and Hazardous Materials Pre-demolition Survey Report A ACUMEN INDUSTRIAL HYGIENE INC 1032 IRVING ST. #922 SAN FRANCISCO CA 94122 TEL 415 242 6060 FAX 415 242 6006 WWW.ACUMEN-IH.COM Asbestos, Lead and Hazardous Materials Pre-demolition Survey Report for John

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION Bentson Bunker Fieldhouse was originally constructed in 1931; the building has had several renovations, notably, a 1976-1980 multi-phase renovation throughout

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant Asbestos and Lead Considerations in Construction Projects Sean Purcer Senior Consultant Anthony Price Senior Consultant Who We Are History Founded in 1990 by Environmental, Health and Safety (EHS) managers

More information

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) Los Rios Community College District Sacramento City College ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) GENERAL This addendum forms a part

More information

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED

More information

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414 July 5, 2007 REPORT: Full Building Survey TO: Linda McCracken-Hunt, Project Development, 400 Shops Building Fay Thompson, Department of Environmental Health and Safety, Director Tim Nelson, Facilities

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Survey & Lead-Based Paint Inspection/Risk Assessment Report

Asbestos Survey & Lead-Based Paint Inspection/Risk Assessment Report Asbestos Survey & Lead-Based Paint Inspection/Risk Assessment Report Fourplex 861 and 863 Burr Street, St. Paul, MN 55130 Property BB Housing Associates (651) 260-5528 Property Owner & Phone Number Submitted

More information

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: File 1601-909-62-4465 - IFB for: 24 Gus Garcia Demolition and Reconstruction Please note the following change:

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

Pre-Renovation Asbestos Survey

Pre-Renovation Asbestos Survey Pre-Renovation Asbestos Survey L640 Level 2 Remodel College Complex Los Medanos College Pittsburg, California November 23, 2016 Terracon Project No. R1167D98 Prepared for: Contra Costa Community College

More information

Asbestos-Containing Material and Hazardous Material Survey Summary Report

Asbestos-Containing Material and Hazardous Material Survey Summary Report Asbestos-Containing Material and Hazardous Material Survey Summary Report Site: Haas Park Fieldhouse PS1757 2404 North Washtenaw Street Chicago, Illinois 60647 Survey Date: January 15, 2010 PBCC Project

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

1116 Willow Pass Court DESTRUCTIVE TESTING Concord, CA SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT

1116 Willow Pass Court DESTRUCTIVE TESTING Concord, CA SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SUMMARY OF HAZARDOUS MATERIALS WORK DESTRUCTIVE TESTING 1.01 GENERAL A. The San Francisco Unified School District (SFUSD) is soliciting proposals for conducting asbestos related work to support Destructive

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan

More information

Final Asbestos Inspection Report and Lead Paint Survey

Final Asbestos Inspection Report and Lead Paint Survey Final Asbestos Inspection Report and Lead Paint Survey Proposed Retail Takeover, Store #3178-00 2444 East Powell Boulevard Gresham, Multnomah County, Oregon October 7, 2011 Terracon Project No. 82117017

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0027

More information

ASBESTOS & HAZARDOUS MATERIALS INSPECTION

ASBESTOS & HAZARDOUS MATERIALS INSPECTION ASBESTOS & HAZARDOUS MATERIALS INSPECTION of Homewood Montessori School 7100 Hamilton Avenue Pittsburgh, Pennsylvania Prepared for Facilities Division Pittsburgh Public Schools 1305 Muriel Street 15203-1513

More information

ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING "A" & CLASSROOM A "B" STREET SELMA, CALIFORNIA

ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING A & CLASSROOM A B STREET SELMA, CALIFORNIA T. BROOKS & ASSOCIATES ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING "A" & CLASSROOM A125 2535 "B" STREET SELMA, CALIFORNIA February 16, 2017 PREPARED FOR: Mr.

More information

Asbestos Survey Report

Asbestos Survey Report Asbestos Survey Report Downtown Duluth Old City Hall Block Buildings for renovation 3087 Main Street, 3097 Main Street, New Dawn Theater, 3530 W. Lawrenceville Street, Old City Hall/Church Duluth, Georgia

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

PREPARED FOR: City of Beverly Hills 345 North Foothill Road Beverly Hills, California 90210

PREPARED FOR: City of Beverly Hills 345 North Foothill Road Beverly Hills, California 90210 HAZARDOUS BUILDING MATERIAL SURVEY BEVERLY GARDENS PARK RESTROOM STRUCTURE SANTA MONICA BOULEVARD AND NORTH BEVERLY DRIVE BEVERLY HILLS, CALIFORNIA 90210 PREPARED FOR: City of Beverly Hills 345 North Foothill

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary.

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary. DATE: April 20, 2017 ARLINGTON INDEPENDENT SCHOOL DISTRICT 1203 W. Pioneer Parkway Arlington, Texas 76013 ADDENDUM II FROM: Tammy Craig Director Purchasing RE: CSP 17-79 Amos & Atherton Elementary Renovations

More information

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2059

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2059

More information

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

Learn Charter School Excel Campus

Learn Charter School Excel Campus ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Limited Hazardous Materials Survey Report

Limited Hazardous Materials Survey Report Limited Hazardous Materials Survey Report Contra Costa Community College Applied Arts Building Chiller Replacement Project 2600 Mission Bell San Pablo, California RGA Project No: R1167404 June 29, 2016

More information

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 Issued 6/1/95 Revised 11/08/2004; 3/6/06 Please direct any questions or comments about the applicability of this document to Luigi

More information

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: PROJECT NO. 1197 REPORT TO CITY OF STRATFORD ON ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: 1099 KINGSTON ROAD, SUITE 260 PICKERING, ONTARIO L1V 1B5 Tel: (416) 410-4333

More information

Asbestos/Lead Paint Survey

Asbestos/Lead Paint Survey Asbestos/ Survey At: Camp Lejeune Bldg. 500 Repair Indoor Physical Fitness Center Prepared for: The Walker Group Architecture Inc. PO Box 541 New Bern, NC 28563 PEI Project No.: Walker Group Project No.:

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-381X

More information

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos Elevator Industry Workshop November 25, 2015 Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement

More information

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for ENVIRONMENTAL SERVICES, LLC PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA Prepared for CITY OF OCALA REVITILIZATION STRATEGIES-CODE ENFORCEMENT DIVISION

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and Asbestos What is asbestos? Asbestos is a naturally occurring fibrous mineral that is mined from the earth and found in many parts of the world. Its composition is such that it can be separated into smaller

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2207

More information

Rowan University Asbestos Management Program

Rowan University Asbestos Management Program Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2270

More information

Crothers Environmental Group, LLC

Crothers Environmental Group, LLC , LLC Morrisville, Vermont 05661 Phone 802-888-1936 info@crothersiaq.com June 26, 2009 Mr. Joe Aja, Project Engineer State of Vermont - Department of Buildings & General Services 5 Perry Street, Suite

More information

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT Prepared For: TALLEY & SMITH ARCHITECTURE, INC. 409 EAST MARION STREET SHELBY, NORTH CAROLINA 28150 Regarding: DELIVERY ORDER NO. 0051 FY 15 DEMOLISH FACILITIES,

More information

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843) ASBESTOS INSPECTION REPORT 1814 PRINCE STREET 2-STORY Georgetown, South Carolina Asbestos Inspections, LLC Project # 2017-48 Performed in general accordance with SCDHEC regulation 61-86.1 along with OSHA

More information

Residential Building 718 Orange Avenue East St. Paul, Minnesota. Prepared for. Ramsey County. Project B March 22, 2018

Residential Building 718 Orange Avenue East St. Paul, Minnesota. Prepared for. Ramsey County. Project B March 22, 2018 Pre-Renovation Hazardous Building Materials Inspection Report Residential Building 718 Orange Avenue East St. Paul, Minnesota Prepared for Ramsey County Project B1801954 March 22, 2018 Braun Intertec Corporation

More information

Asbestos Inspection Cover Letter

Asbestos Inspection Cover Letter Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right

More information

Asbestos & Lead-Based Paint Survey Report Fort Gordon Gate 1 AAFES Station Augusta, Georgia S&ME Project No

Asbestos & Lead-Based Paint Survey Report Fort Gordon Gate 1 AAFES Station Augusta, Georgia S&ME Project No Asbestos & Lead-Based Paint Survey Report Fort Gordon Gate 1 AAFES Station Augusta, Georgia S&ME Project No. 1419-15-020 Prepared for: Marshall Waters Woody Associates 1736 E. Sunshine Street, #311 Springfield,

More information

Report of. Asbestos Survey

Report of. Asbestos Survey Report of Asbestos Survey of Curtis Block and Marlowe Buildings 14501, 14505, 14509, 14511 & 14515 Detroit Avenue and 1412 Marlowe Avenue Lakewood, Ohio 44107 Prepared for City of Lakewood 12650 Detroit

More information

Residential Building 4173 Clover Avenue Vadnais Heights, Minnesota. Prepared for. Ramsey County. Project B April 9, 2018

Residential Building 4173 Clover Avenue Vadnais Heights, Minnesota. Prepared for. Ramsey County. Project B April 9, 2018 Pre-Renovation Hazardous Building Materials Inspection Report Residential Building 4173 Clover Avenue Vadnais Heights, Minnesota Prepared for Ramsey County Project B1801954 April 9, 2018 Braun Intertec

More information

HAZARDOUS MATERIAL INSPECTION

HAZARDOUS MATERIAL INSPECTION HAZARDOUS MATERIAL INSPECTION Former School Building 16 Dewey Ave. Sandwich, MA 02563 Prepared For: Town of Sandwich 130 Main Street Sandwich, MA 02563 Attn.: Ted Hamilton Facilities Director April 20,

More information

April 12, 2011 (revised July 19, 2011) Project Number

April 12, 2011 (revised July 19, 2011) Project Number Environmental Consultants 1360 Truxtun Avenue 843 746-8525 and Contractors Suite 100 FAX 843 746-8865 North Charleston, SC 29405 www.scsengineers.com April 12, 2011 (revised July 19, 2011) Project Number

More information

Asbestos Containing Building Material Survey

Asbestos Containing Building Material Survey Former 55 th Street South Trust Bank - ACBM Survey Asbestos Containing Building Material Survey Former South Trust Bank Property 9 55 th Street South Birmingham, AL Submitted to: Kelleigh Gamble Housing

More information

SURVEY FINDINGS Building: 1101

SURVEY FINDINGS Building: 1101 SURVEY FINDINGS Building: 1101 Friable ACM identified DESCRIPTION LOCATION Date Quantity No friable ACM records found in database Non-friable ACM identified DESCRIPTION LOCATION Date Quantity ROOFING SEALANT,

More information

WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN

WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN 1. INTRODUCTION 1.1 OBJECTIVES Asbestos-containing materials (ACM) have been used widely in the construction industry. Although use of ACM in buildings

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM California Institute of Technology ASBESTOS MANAGEMENT PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3013

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4)

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4) ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, 763.86 and 763.85(a)(4) Assessment Completed for Clint Moore, ASLA Planning, Research and Development City of Florence 324 West Evans Street

More information

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free / / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary

More information

ASBESTOS AND LEAD BASED PAINT SURVEY HIGH MAR PROPERTY 4990 MOORHEAD AVENUE BOULDER, COLORADO

ASBESTOS AND LEAD BASED PAINT SURVEY HIGH MAR PROPERTY 4990 MOORHEAD AVENUE BOULDER, COLORADO ASBESTOS AND LEAD BASED PAINT SURVEY HIGH MAR PROPERTY 4990 MOORHEAD AVENUE BOULDER, COLORADO Prepared for: Boulder Housing Partners 4800 North Broadway Boulder, Colorado 80304 Attention: Ms. Shannon Cox

More information

McMaster University Asbestos Awareness

McMaster University Asbestos Awareness McMaster University Asbestos Awareness Presented by Christopher Hurley Environmental & Occupational Health Support Services Topics Covered Properties of asbestos Uses of asbestos Health hazards of asbestos

More information

ASBESTOS BUILDING INSPECTION

ASBESTOS BUILDING INSPECTION ASBESTOS BUILDING INSPECTION LOCATION: BURT HALL 2651 SW ORCHARD AVENUE CORVALLIS, OREGON 97331 NOVEMBER 28, 2008 FORENSIC ANALYTICAL PROJECT NO. PJ6263 PREPARED FOR: OREGON STATE UNIVERSITY 127 OAK CREEK

More information

PROPERTY FACT SHEET Former Northview Heights School

PROPERTY FACT SHEET Former Northview Heights School 5168 Campbells Run Road, Su. 204 Pittsburgh, PA 15205 PROPERTY FACT SHEET Former Northview Heights School 310 Mt. Pleasant Road, Pittsburgh, PA 15214 Tax Parcel: 077-C-245 Year Built: 1962/1966 Year Closed:

More information

ADDENDUM 2 TECHNICAL SPECIFICATIONS REMOVAL OF HAZARDOUS MATERIALS PROJECT NEON DEMOLITION PACKAGE C LAS VEGAS, NEVADA

ADDENDUM 2 TECHNICAL SPECIFICATIONS REMOVAL OF HAZARDOUS MATERIALS PROJECT NEON DEMOLITION PACKAGE C LAS VEGAS, NEVADA ADDENDUM 2 TECHNICAL SPECIFICATIONS REMOVAL OF HAZARDOUS MATERIALS PROJECT NEON DEMOLITION PACKAGE C LAS VEGAS, NEVADA Converse Project No.: 12-43224-01 Prepared For Nevada Department of Transportation

More information

ARTICLE 4: ASBESTOS CONTROL STANDARDS

ARTICLE 4: ASBESTOS CONTROL STANDARDS ARTICLE 4: ASBESTOS CONTROL STANDARDS SECTION 4.01 ASBESTOS DEFINITIONS Adopted 06/08/95 (818) Revised 02/12/98 (863), 07/13/00 (918), 09/26/02 (978), 02/27/03 (987), 03/26/09 (1148) (a) AHERA BUILDING

More information

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

ST. LUKE CATHOLIC ELEMENTARY SCHOOL ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street

More information

ANNUAL SURVEY FOR DESIGNATED SUBSTANCES AND HAZARDOUS MATERIALS

ANNUAL SURVEY FOR DESIGNATED SUBSTANCES AND HAZARDOUS MATERIALS ANNUAL SURVEY FOR DESIGNATED SUBSTANCES AND HAZARDOUS MATERIALS East York Civic Centre 850 Coxwell Avenue Toronto, Ontario Presented to: Sara Reid City of Toronto Corporate Services Facilities Management

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

FACILITY ASBESTOS MANAGEMENT PLAN

FACILITY ASBESTOS MANAGEMENT PLAN WASHINGTON ADVENTIST UNIVERSITY DEPARTMENT OF PUBLIC SAFETY DIVISION FACILITY ASBESTOS MANAGEMENT PLAN TAKOMA PARK CAMPUS REVIEWED and APPROVED BY: Patrick Farley WAU- V.P. of Finance Steven Lapham WAU-Executive

More information

Asbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650

Asbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650 Asbestos Survey Site: Edmundson Elementary School 15121 Grayland Avenue, Norwalk, CA 90650 Prepared for: Norwalk-La Mirada Unified School District 12820 Pioneer Boulevard, Norwalk, CA 90650 October 24th,

More information

ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT

ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT HUNTER COLLEGE - Hunter High School and Hunter Elementary School (The Campus Schools) HVAC UPGRADE 71 EAST 94 th STREET NEW YORK, N.Y. 10128 PREPARED

More information

Asbestos Awareness Program

Asbestos Awareness Program Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes

More information

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related

More information

Washington University Asbestos Operations and Maintenance Plan

Washington University Asbestos Operations and Maintenance Plan 1. Purpose 2. Asbestos Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to

More information

PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125

PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125 PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125 Prepared For: City of Miami Capital Improvements & Transportation Program 444 SW 2 nd Avenue, 8 th Floor Miami,

More information

Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan. Mount Vernon Apartments II LDHA, LP

Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan. Mount Vernon Apartments II LDHA, LP Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan Mount Vernon Apartments II LDHA, LP February 26, 2016 Asbestos-Containing Material Inspection

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment

FINAL REPORT. Asbestos-Containing Building Material Assessment FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Nativity of Our Lord Catholic School 35 Saffron Crescent Etobicoke, Ontario PROJECT NO. 1025760 PROJECT

More information

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING In Ontario, section 30 of the Occupational Health and Safety Act requires that a project owner identify designated substances on the project and provide a list to prospective constructors before contracts

More information

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California for Bay Shore Library Bret Harte Library Dana Library Background Information Site/Building Owner: City of Long Beach Site Contact: The City of Long Beach Public Works Department, 333 West Ocean Blvd. Long

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral References Asbestos Hazard Emergency Response Act (AHERA) AHERA Accredited Inspector Training Manuel For Asbestos Control What

More information

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY Wal-Mart #0097 628 Highway 51 North Ripley, TN 38063 ATC Project Number 30.75300.0612 Prepared for: Wal-Mart Stores, Inc. Ms. Vicki Ingram Store Planning

More information

SOUND ENVIRONMENTAL SOLUTIONS, Inc.

SOUND ENVIRONMENTAL SOLUTIONS, Inc. SOU ENVIRONMENTAL SOLUTIONS, Inc. Indoor Air Quality Industrial Hygiene Safety Training Environmental Compliance October 13, 2011 Mr. John Kaniss Construction Manager Pacific Lutheran University Tacoma,

More information

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Prepared for: Northside Development Group 410 Magnolia Street Spartanburg, South Carolina Prepared by: Apex Environmental

More information

Asbestos Management Program

Asbestos Management Program ENVIRONMENTAL HEALTH & SAFETY Reed College 3203 Southeast woodstock boulevard Portland, Oregon 97202-8199 Asbestos Management Program Effective Date: 6/16/2009 Revision Dates or Last Date: 2/2016 I. Purpose...

More information

SCA SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION 135 VAN NESS AVENUE SAN FRANCISCO, CA 94102

SCA SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION 135 VAN NESS AVENUE SAN FRANCISCO, CA 94102 HAZARDOUS MATERIALS ABATEMENT SPECIFICATIONS SAN FRANCISCO UNIFIED SCHOOL DISTRICT MALCOLM X ELEMENTARY SCHOOL CAFETERIA PAINTING PROJECT 350 HARBOR ROAD SAN FRANCISCO, CA 94124 PREPARED FOR: SAN FRANCISCO

More information