1 QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS QUESTION: Site Lighting. The prints show that the existing site lighting structures are to be relocated on site. Is this the only site lighting to be used on site, or will additional light towers need to be added? If so, will this be out of our scope and done by the County, as there is no information in the prints, but is made mention of in the spec book as to be performed by the sub. The site lighting will be handled by others during construction (MUSCO) and the sitework contractor shall coordinate work areas as needed. The installation of the wiring, conduit, light poles, trenching, and any related items will be handled by MUSCO. The contractor for sitework will not be required to move or install any site lighting poles. QUESTION: Will we need to price a bleacher? There is no mention of any bleachers on the plans or in the specs. Is this is a need to be added, what spec and how many need to be accounted for? There are no bleachers included in the project scope. QUESTION: Chain link fence. The prints show the removal of a chain link fence, but the specs go into detail of installing a new chain link. If this is the case there is no information in the prints as to how many feet and/or available specs for the new chain link fence. There will not be any chain link fence construction required. Existing Chain link fence to be removed will be handled by contractor under the clearing and grubbing bid item and will belong to contractor after demolition. There is no fence in the contract. QUESTION: Will the low flow sewer service be connected to an existing grinder pump. Or will the service be run new all the way to the main and if so what specs are available for the grinder pump? The grinder pump shall be a Barnes Series OGP-AUF 2 HP, 3450 RPM, 60 HZ with Level Control simplex grinder pump with a 48 fiberglass tank and top cover as shown on Pump and Process schematic drawing dated The pumps, control panel, and assembly shall meet Regional Utilities requirements. Contractor shall include costs to procure 1

2 and install the system as outlined in the attachment to this addendum including quick disconnect at panel and wires from concession building power panel to the control panel. QUESTION: Sodding, what spec do you want to use for the sports field sod? Also the prints show a general sodding area, and a sports field sodding area. Is the general surface to be different from the sports field surface and if so what is that spec? The specifications for the sodding have been revised to include Bermuda 419 for the sports fields and common Bermuda for all other sodded areas of the site. The Walton County Parks Department will be installing irrigation prior to the installation of the sod on the fields and after final grading is completed by the contractor. Please find additional sodding specifications that will be included in addendum #4 for details. QUESTION: The prints show the new utility running up the path to the existing building. The prints do not make mention of tearing out the existing path to make room for the new services and replacing the walking path. The utility plans have been revised to include a 60 direction bore under Moll Drive for connection to the existing 6 Water Main and the routes have been revised to both water and sewer. The utility plans also call for a cut and patch across the 8 concrete sidewalk for the waterline crossing. Costs for the directional bore, cut and patch, watermeter, saddles, and backflow preventer shall be included in the cost of project. QUESTION: Will the park be closed during construction to allow for the work to be performed without obstruction? The park will not be closed during construction however construction fencing may be used to block off the roadway and work areas adjacent to the existing softball field to prevent access to the construction site area. Walton County will assist with closing off any sections required during the utility installations and will coordinate with the contractor. QUESTION: The specs make mention of a bid schedule. There is not a bid schedule in the specs after the fact that it was made mention of. The bid schedule is in the front end bid documents and will be included with addendum #4 along with revisions. Contractors shall submit the revised bid schedule. 2

3 QUESTION: Construction schedule. When is the project to be completed? In the specs it makes mention of liquidated damages, what will they be and what procedure need to be accounted for before LD s are to occur? After pre-bid, it was determined to change contract time from 120 days to 180 days to substantial completion with an additional 30 days to final completion. QUESTION: The utility prints do not indicate a double check or meter on the water service that ties to the concession stand. Will there be a need for the double check and/or meter? The Utility Plans have been revised to include the meter, backflow preventer, directional bore, concrete patch location, saddles for connection, and 2 valve that is required. QUESTION: Is there a Soil Investigation Report? The Geotechnical Testing was completed by Southern Earth Sciences and will be included in addendum #4 for your review. QUESTION: Does all sidewalks get base stone and stabilized subgrade? The prints Indicate this in the typical road section, include a sidewalk detail, but there is a sidewalk that is onsite that would not be indicated in the road section A? There is no stabilized subgrade required under the sidewalks however the contractor shall provide compaction to 95% modified proctor prior to pouring and may either use existing materials or imported select sand. QUESTION: The building plans are incomplete as there is very limited information for us to be able to submit an accurate bid. The building plans have been revised to include additional details and specifications. Attention is called to the notes that have been included for use as well as door and finish schedules. QUESTION: Is there an engineer s estimate for cut/fill raw volume? The estimated volume of cut on the project is 2410 CY and the estimated volume of fill on the project is 4233 CY for a net fill of 1823 CY. These estimates are not factored and are raw volumes based on the surface model for the project. Contractors should use factors for the material that they anticipate using and include the overall costs under the lump sum Earthwork pay item. 3

4 QUESTION: Will there be a bid item for subgrade? The Type B Stabilized Subgrade (LBR 40 Min.) pay item has been added to the bid schedule and is required under the roadway extension and under the parking lot. There is no limerock or stabilized subgrade required under the concrete sidewalks or curb. The typical section has been revised to eliminate any limerock or stabilized subgrade under the sidewalks and curb. QUESTION: Will there be a bid item for grinder station or details in the plans for what type or what size it should be? ANSWER The specifications for the lift station have been added to the bid schedule and also added in this addendum. Please refer to the drawing and specifications package from Pump and Process that will be included with addendum #4.. QUESTION: Will the 18 perforated ADS pipe require sock or bedding stone? The 18 perforated ADS pipe will require a sock and will not require bedding stone. QUESTION: The bid schedule shows to relocate the existing goal post on site. There are two goal post on site. The bid schedule make mention of four goal posts. Is this replacing the two new goal post to go along with the two existing? Are there any specs on the goal post as to what size and mounting spec? The bid schedule has been revised and only shows relocation of the two goal posts. The posts should be in sleeves and will require the installation of new sleeves mounted in concrete. Contractors should estimate installation costs based on a 6 section of 8 PVC pipe and 10 bags of cement per post. Any changes required based on existing posts will be evaluated during construction for any increase in cost. QUESTION: Batting cage pad demo, I noticed that there wasn t a batting cage to demo. The area marked on the plans was covered in grass with no visible concrete pad, is this to be removed from the bid schedule? The batting cage slabs have been removed by county and are no longer shown on the bid schedule. QUESTION: Asphalt thickness on the plans are marked TC-01 under typical road section A-A. It calls for 2 of asphalt SP 12.5mm, but describes that to be 150lb/SY. That is the pounds per SY of 1.5. Is the asphalt to be 1.5 or 2? Also there is no mention of a prime coat. 4

5 The asphalt mix for the project shall be 2 SP-12.5 (220 lb/sy) superpave asphalt. QUESTION: On bid item #2, the bid schedule shows 6 of limerock base on the parking lot, but the prints show 8. What specs do we use, the prints or bid schedule? The contractors shall bid 8 limerock base as shown in the plans and as shown on the revised bid schedule. QUESTION: On bid schedule #5, the spec that indicates the concrete sidewalk, Detail TC-01 shows to use class 2 concrete with filter fabric. Is this needed for the sidewalk? It also shows 8 of lime rock and a stabilized subgrade extending under the sidewalk, is this the way we are to price? The concrete for the sidewalks shall be 3000 PSI and does not require filter fabric. The limerock and stabilized subgrade has been eliminated under the sidewalk on the typical section. QUESTION: The plans do not show any specs for any of the structures or the headwall that is connected to the 24 ADS. Also there is no bid schedule for the headwall. The headwall is an FDOT Index 250 concrete headwall that is governed by the FDOT 2016 Specifications for Road and Bridge Construction. The Index has been added to the bid schedule for clarification. They Type C inlets are also governed by FDOT specifications as well as the Index 272 Mitered End Section that has been further clarified on the bid schedule. QUESTION: Bid item #28 scoreboard relocation, need specs as how you want this to be remounted and connected to electric, no site electric plans. Are there any specs on relocation of the sign and specs on the footer with a site electric prints? No mention on the demo print of removing exiting site electric. The scoreboard relocation has been removed from the bid schedule. Walton County will relocate the score board for the field and provide the electrical connection. QUESTION: Specific requirements for sod quality was mentioned in the pre-bid. In the specs, ASPA specs were listed for weeds and installation, however no specs were mentioned whether the sod is to be blue tag certified. Is blue tag certified sod required? 5

6 The specifications for the sports field sod (419 Bermuda) and other sodded areas (Common Bermuda) will be included in the specifications issued with addendum #4.. QUESTION: Unable to locate specs for the sports field construction, please advise; What are the specs for establishing the rootzone for the sports field? Will importing of rootzone material be required? Will the subsoil require loosening with a cutting harrow to a depth of 6-8? Will there be a requirement to remove foreign debris with a Harley rake or equivalent? Will the fields require laser grading? If laser grading is required, will the tolerance be the typical 1/10 of an inch? If laser grading is required, would tracked equipment be permitted or should the equipment be rubber tired equipment (tractors)? Please refer to the Sportsfield Preparation and Construction and Sodding specifications that will be added to addendum #4. QUESTION: During re-bid, it was stated that the sports field contractor will need to have met specific qualifications, can you provide these qualifications? The Prime Contractor shall be a licensed General Contractor. There are no requirements for a sports field contractor in the bidding and contract documents. QUESTION: What is the type of grass for the athletic field sod? Certified? Please refer to the specifications for sports field sod that will be included with addendum #4. QUESTION: What is the type of grass for other areas that has been defined as sod? Certified? Please refer to the specifications for common Bermuda that will be included with addendum #4. QUESTION: Is a rootzone mix required? What specifications of the rootzone mix? Are there specifications for how it should be applied? How deep? Where is it to be applied? The root zone requirements are included in section 3600 Sportsfield Preparation and Construction. 6

7 QUESTION: Is there subsurface drainage on the athletic fields? There is no surface drainage included on the athletic fields. QUESTION: What is the percolation rate of the native soil and material used as fill? The percolation rate of the existing soils is approximately 9 in/hr as established by Southern Earth Sciences with DRI testing. QUESTION: Is a Grow-in or Maintenance period required? Yes please refer to specifications that will be added to addendum #4. QUESTION: Are there specifications for constructing the athletic fields? The specifications will be included with addendum #4. QUESTION: Are there specifications for athletic field grading other than plans DR-01? The specifications for grading requirements on the athletic fields will be included with addendum #4 CLARIFICATIONS: The Contractor will provide and install the panel for ballfield lighting and stub out the conduit for the field lighting to a distance of 5 feet beyond the building foundation. Existing irrigation will be abandoned in place and new irrigation will be installed by Walton County. This Question and Answer now becomes a part of the original ITB. Acknowledge receipt of this Question and Answer. Failure to do so may result in in your Bid being found non-responsive. Bidder: By: Address: Phone: City, State: Date: Authorized Signature 7

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

Forsyth County Procurement

Forsyth County Procurement August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank

More information

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations Q1. LASCO Fittings, Inc. is a manufacturer of PVC fittings and specialized irrigation components such as Swing Joints. I noticed in the specifications shown below that Toro Company is listed as the lead

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER

More information

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 UTILITY UNDERGROUNDING GRAUWYLER ROAD @ IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. ADDENDUM IS

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

CITY OF MIAMI Capital Improvements Program BID NO.:

CITY OF MIAMI Capital Improvements Program BID NO.: CITY OF MIAMI Capital Improvements Program BID NO.: 11-12-027 Museum Park Baywalk and Promenade Phase II and III, B-30538 ADDENDUM NO. 9 August 17, 2012 Additional Plan Sheets - Irrigation The detail sheets

More information

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction

More information

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded) Bid Form TxDOT CSJ No. 17HGRCKPT Project: Aransas County Airport - 2017 Hangar Project Project Description: Schedule 1A Base Bid: Construct TxDOT 360 concrete apron pavement for box hangar. Schedule 1A

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505) CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505) 599-1377 http://www.fmtn.org IMMEDIATE ATTENTION Grading and Drainage Construction for Cottonwood Substation, BID

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,

More information

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA BASE BID 1 01000 MOBILIZATION 1.00 L. SUM $799,945.96 $799,945.96 $1,150,000.00 $1,150,000.00 2 01510 FIELD ENGINEER'S OFFICE 1.00 L. SUM $40,000.00 $40,000.00 $5,000.00 $5,000.00 3 ALL-1 4 ALL-2 5 MISC-1

More information

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: UTILITY NOTES PROPOSED LEGEND 66.50 66.50 GROUND SPOT ELEVATION GROUND SPOT ELEVATION (MATCH EXISTING GRADE) MATCH EXISTING GRADE MITERED END SECTION

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form. ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION

6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION 6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION SYSTEMS REQUIREMENTS SITE PREPARATION TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

BID FORM - LUMP SUM BID

BID FORM - LUMP SUM BID BID FORM - LUMP SUM BID PROJECT: Livingston Northside Park and Soccer Fields Phase 1 Construction LOCATION: Livingston, Montana Ladies & Gentlemen: Pursuant to and in compliance with the Advertisement

More information

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum: ADDENDUM #1 AIRFIELD IMPROVEMENTS EXTEND, MARK, AND LIGHT RUNWAY 6-24 AND TAXIWAY ALPHA REHABILITATE RUNWAY 6-24 at the LAKE WALES MUNICIPAL AIRPORT FAA AIP NO: TBD FDOT FM NO: TBD BID NO: 16-412 5/11/16

More information

ADDENDUM #1 INVITATION TO BID CITY OF CORINTH. March 21, Shady Shores Road Culvert Removal & Pavement Replacement BID #1114 PROPOSALS DUE:

ADDENDUM #1 INVITATION TO BID CITY OF CORINTH. March 21, Shady Shores Road Culvert Removal & Pavement Replacement BID #1114 PROPOSALS DUE: ADDENDUM #1 INVITATION TO BID CITY OF CORINTH March 21, 2018 Shady Shores Road Culvert Removal & Pavement Replacement BID #1114 PROPOSALS DUE: THURSDAY, APRIL 5, 2018 2:00 PM CST ADDENDUM #1 Addendum to

More information

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax:

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax: ADDENDUM NO. 1 GOODWYN, MILLS AND CAWOOD, INC. 2701 1 st Avenue South Suite 100 Birmingham, Alabama Ph: 205-879-4462 Fax: 205-879-4493 To: ALL PLAN HOLDERS Date: March 24, 2017 Fax #: Pages: 10, including

More information

Sewer Service Line Installation & Inspection Process

Sewer Service Line Installation & Inspection Process Sewer Service Line Installation & Inspection Process January 2018 White House Utility District Details for Gravity Sewer Service Connections to Main-Line Stub-outs and connections to Water Service Stub-outs

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

PART 5 WATER SYSTEMS

PART 5 WATER SYSTEMS PART 5 WATER SYSTEMS Abbreviations and Symbols Plan 501 Abbreviations and symbols for water... 205 Concrete Boxes and Hardware 502 27" Frame and cover... 207 503 38" Frame and cover... 209 505 Concrete

More information

YOUR SPLASH PAD RESOURCE

YOUR SPLASH PAD RESOURCE 1 Index Permits & Inspections Material List Warnings Splash Pad Types Pre-Site Grading Plumbing Schematic Pressure Testing Concrete Preparation and Pour Housing/Nozzle Installation Above Ground Water Feature

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate

More information

City of Naples Utilities Department Wastewater Collections Division

City of Naples Utilities Department Wastewater Collections Division City of Naples Utilities Department Wastewater Collections Division Request for Proposal Reclaimed Water Fire Hydrant & Water Service Installations February 2015 Reclaimed Water Fire Hydrant & Services

More information

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS October 1990 CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Testing and Approval...1 5.3 Irrigation Pipe and Fittings...1

More information

The bid opening has been extended to Thursday, May 3, 2018 at 2:00 p.m.

The bid opening has been extended to Thursday, May 3, 2018 at 2:00 p.m. April 16, 2018 To: All Potential Bidders Re: ITB 18-12 Christopher s Crossing (Sanner) Roadway Construction Consisting of: RFIs and City Response, Bid Opening Extension This addendum is made part of the

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Engineering Design Center. Standard Drawings. 1st Edition -January 2016 Engineering Design Center Standard Drawings 1st Edition -January 2016 Golden State Water Company Standard Drawings 1/11/2016 Table of Contents PART A STANDARD DRAWINGS Section I Pipeline Construction P-1

More information

PROPOSAL OF, a corporation. an individual doing business as

PROPOSAL OF, a corporation. an individual doing business as PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to instructions and invitations to bidders, the undersigned proposes

More information

Specifications for Electrical Underground Residential Distribution Systems

Specifications for Electrical Underground Residential Distribution Systems Specifications for Electrical Underground Residential Distribution Systems Specification DDS-2 Revision 13, February 2010 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND RESIDENTIAL

More information

Basic Service. This Section provides information regarding a. Introduction

Basic Service. This Section provides information regarding a. Introduction Basic Service Introduction This Section provides information regarding a new electric Basic Service for a single phase service less than or equal to 400 amps, and a three phase service less than 50kW.

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

SECTION MONITORING WELL ABANDONMENT

SECTION MONITORING WELL ABANDONMENT SECTION 027300 MONITORING WELL ABANDONMENT PART I GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 1 - GENERAL REQUIREMENTS,

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

Providence Corner HOA Upper Providence Township, Pennsylvania

Providence Corner HOA Upper Providence Township, Pennsylvania DEFICIENCY REPORT FOR THE Providence Corner HOA Upper Providence Township, Pennsylvania Project Number: 15-1064 Date: July 8, 2016 W:\2015\15-1064\CORR\Deficiency\Providence Corner Deficiency Report 07

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB#

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB# ADDENDUM NO. 1 DATE: January 22, 214 TO: Prospective Bidders via individual e-mails FROM: Alan Wise, P.E. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: 23.15 ---- Wakulla Co

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

ADDENDUM #1 BL Construction of Club Drive Park: Phase II October 25, 2017 ADDENDUM #1 BL094-17 Construction of Club Drive Park: Phase II 1389 Peachtree Street, NE Suite 200 Atlanta, GA 30309 Phone: 404.873.6730 www.tsw-design.com Principals: William Tunnell

More information

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION The City received a total of 67Pre-Bid Questions listed in table below. Note that some of the questions are duplicate. Formal responses are forthcoming via addendum shortly. No. 1 2 3 4 5 6 Plan/SSP/ Page

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT Funded by: California Department of Housing and Community Development (HCD) through its Community Development Block Grant (CDBG) Program and the County of Imperial.

More information

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No. ADDENDUM #3 STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No. 2016-003; Federal Project No. DEM10L-5209(008) November 9, 2017 Addendum for: AND IA STATE ROUTE 60 AT POTRERO

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Forsyth County Procurement

Forsyth County Procurement July 7, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 BID 17-63-3150 For: Providing all labor, materials and equipment for the construction of the Brookwood

More information

Federal Project No.: NONE

Federal Project No.: NONE Schedule of Items Page: 2 0001 BASE BID- STA. 10+00-23+00 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 301 00110 LUMP SUM LUMP SUM CLRING AND

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

February 1, 2018 ADDENDUM NO. 3 TO ALL BIDDER S:

February 1, 2018 ADDENDUM NO. 3 TO ALL BIDDER S: CITY OF MANASSAS, VIRGINIA FINANCE DEPARTMENT PURCHASING DIVISION 8500 Public Works Drive, Manassas, VA 20110 Telephone: (703) 257-8368 Facsimile: (703) 257-5813 Website: www.manassascity.org February

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

CITY OF GRAND RIVERS LIVINGSTON COUNTY, KENTUCKY

CITY OF GRAND RIVERS LIVINGSTON COUNTY, KENTUCKY CONTRACT I CONTRACT II CONTRACT III WASTEWATER TREATMENT PLANT INFLUENT PUMP STATION, FORCE MAIN, AND WATER MAIN EXTENSION WWTP & INFLUENT PUMP STATION ELECTRICAL CITY OF GRAND RIVERS LIVINGSTON COUNTY,

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

SECTION 903 EROSION CONTROL

SECTION 903 EROSION CONTROL SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

GENERAL CONSTRUCTION

GENERAL CONSTRUCTION GENERAL CONSTRUCTION 1. All construction work shall be done in accordance with the current version of the Idaho Standards for Public Works Construction (ISPWC), the City of Meridian Supplemental Specifications

More information

Trials and Tribulations of Building a New Sports Field Complex. Roger D. Havlak *Parks Superintendent (City of San Angelo) *Turfgrass Consultant

Trials and Tribulations of Building a New Sports Field Complex. Roger D. Havlak *Parks Superintendent (City of San Angelo) *Turfgrass Consultant Trials and Tribulations of Building a New Sports Field Complex Roger D. Havlak *Parks Superintendent (City of San Angelo) *Turfgrass Consultant Rio Concho Sports Complex Construction began September 2007

More information

Section 2: Underground

Section 2: Underground Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,

More information

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section.

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section. Specification Sheet Grass Paver TECHNICAL SPECIFICATION - Grass Covered Flexible Porous Paver with 92% Void Space and Soil Conditioner/Fertilizer Mixture CSI Master Format 32 12 43 Flexible Porous Pavement

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

Grasspave2 TECHNICAL SPECIFICATION SECTION 02795

Grasspave2 TECHNICAL SPECIFICATION SECTION 02795 Grasspave2 TECHNICAL SPECIFICATION SECTION 02795 PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section. 1.02 Description

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

DOCUMENT ADDENDUM No. 2

DOCUMENT ADDENDUM No. 2 DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS PART 1 - GENERAL WORK INCLUDED A. Provide all equipment and materials, and do all work necessary to construct a HydroGrid subsurface irrigated fastdry

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

Rural Servicing Guidelines

Rural Servicing Guidelines Rural Servicing Guidelines for Low-Pressure Sanitary Sewer System and Trickle Feed Water Distribution System FOREWORD This manual is intended to provide information to Developers, Engineering and Geotechnical

More information

APPENDIX B - STANDARD CONSTRUCTION NOTES: GENERAL NOTES:

APPENDIX B - STANDARD CONSTRUCTION NOTES: GENERAL NOTES: APPENDIX B - STANDARD CONSTRUCTION NOTES: GENERAL NOTES: 1. Contractor shall procure and conform to all construction permits required. 2. Contractor shall procure a right-of-entry permit from ODOT State

More information

PAVING SLABS ON A CONCRETE BASE

PAVING SLABS ON A CONCRETE BASE SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Noah Valenstein

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH Presentation Outline General Introduction Part II Site Preparation & Earthwork Part III Base Courses

More information

CONSTRUCTION SPECIFICATIONS FOR CITY OF LINCOLN LINCOLN, NORTH DAKOTA

CONSTRUCTION SPECIFICATIONS FOR CITY OF LINCOLN LINCOLN, NORTH DAKOTA CONSTRUCTION SPECIFICATIONS FOR CITY OF LINCOLN LINCOLN, NORTH DAKOTA 74 Santee Road, Lincoln, ND 58504, Kadrmas, Lee & Jackson, Inc, City Engineer May, 2013 NOTE/DISCLAIMER: The specifications represented

More information

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax MEMPHIS LIGHT, GAS, AND WATER DIVISION Application for Utility Services for Residential Subdivisions Residential Engineering P.O. Box 430 Memphis, TN 38101-0430 (Deliveries at 5791 Summer Trees Memphis,

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information