1 Group Eight Engineering Limited Structural Mechanical Electrical 499 King Street East, Suite 200 Hamilton, ON L8N 1E1 Consulting Engineers Tel: (905) Fax: (905) Website: group8eng.com STRUCTURAL CONDITION REPORT FOR BUILDINGS 1B, 2 & 3A GREENWICH BUILDINGS 1 & 2-66 MOHAWK BRANTFORD, ONTARIO PROJECT NO APRIL 2008 Prepared By: E. H Chapman, P. Eng. Q:\Project\2008\08018 Condition Report 3 Bldgs Brantford\Documents\Reports\G8\ Structural Condition Report (EHC).doc

2 Group Eight Engineering Limited Consulting Engineers Structural Mechanical Electrical Tel: (905) Fax: (905) King Street East, Suite Hamilton, ON L8N 1E1 Website: group8eng.com April 17, 2008 The Corporation of the City of Brantford 100 Wellington Square Brantford, Ontario N3T 2M3 Attention: Subject: Mr. Jim Quin, B.Sc. Manager of Technical Services Structural Condition Report Buildings 1 & 2-66 Mohawk Brantford, Ontario Our Project No Dear Sir: Please find enclosed herewith, our report on Buildings 1B, 2 and 3A, 347 Greenwich and Buildings 1 and 2, 66 Mohawk in Brantford, Ontario. We have completed our site reviews. The observations from our site reviews have been examined and analysed. Deficient conditions are detailed. Costs to maintain and restore the buildings are noted in the text of the report. Since our conclusions are based on visual examination only, we cannot guarantee the total extent of deficiencies have been determined, However, our recommendations are based on the observations, as well as our considerable experience in the assessment of these types of building problems. Furthermore, the construction estimates are our opinion of probable construction costs based on our experience and knowledge of costs of work of this nature. This does not rule out the possibility of the final construction costs being higher or lower. The determination of cost is very dependent on determining the exact amount of work required, and our visual examination will not have included all possible damaged areas. Costs also depend on the styles and methods of repair chosen. In addition, these costs will be dependent on the workload in the marketplace, additional inflationary pressures and your business relationships that may exist with potential contractors. We trust this report is self-explanatory and meets with your requirements. Q:\Project\2008\08018 Condition Report 3 Bldgs Brantford\Documents\Reports\G8\ Structural Condition Report Letter(EHC).doc Principals: E.H. Chapman, P.Eng.; A.E. Cipriani, P.Eng.; A.P. Cyriac, P.Eng.; G.E. Elliott, P. Eng. (Honorary); E.A. Kolodziejski, P.Eng.; G.G. Matsis, P.Eng.; D.L. Thompson, P. Eng.; M.W. Wickham, P.Eng.

3 Structural Condition Report Buildings 1 & 2-66 Mohawk Brantford, Ontario Project No April 17, 2008 If there are any questions regarding the contents of the report, please contact the writer. Yours truly, Group Eight Engineering Limited E. H. Chapman, P.Eng. encl. /ls

4 Buildings 1 & 2-66 Mohawk Brantford, Ontario SYNOPSIS An assessment and review was completed of building structures at 347 Greenwich Street and 66 Mohawk Street, Brantford, Ontario. The purpose of the review is to determine the following: establish the condition of building envelope and structural components determine whether buildings are salvageable for future use establish costs to maintain the buildings establish costs to repair noted deficiencies establish construction costs for new buildings of similar sizes The proposed use of the existing buildings for comparison purposes is "residential occupancy". For the purposes of the analysis, a replacement cost of $ per square foot for new residential construction was used. Based on the analysis of reuse/repair costs versus replacement costs, the condition of the current buildings and the potential building lifespans, it is not recommended that any of the buildings be reused. ii

5 Buildings 1 & 2-66 Mohawk Brantford, Ontario TABLE OF CONTENTS SYNOPSIS...II 1.0 INTRODUCTION BACKGROUND EXISTING BUILDINGS DESCRIPTION Building 1B Greenwich Building Greenwich Building 3A Greenwich Building 1-66 Mohawk Building 2-66 Mohawk OBSERVATIONS Building 1B Greenwich Interior Exterior Building Greenwich Interior Exterior Building 3A Greenwich Interior Exterior Building 1-66 Mohawk Interior Exterior Building 2-66 Mohawk Interior DISCUSSION Design Loads Building 1B Greenwich Building Greenwich Building 3A Greenwich Building 1-66 Mohawk Building 2-66 Mohawk OPINION OF PROBABLE REPAIR COSTS General Building 1B Greenwich Building Greenwich Building 3A Greenwich Building 1-66 Mohawk Building 2-66 Mohawk iii

6 Buildings 1 & 2-66 Mohawk Brantford, Ontario REPLACEMENT COSTS Greenwich Buildings Building 1B Buildings 2 and 3A Mohawk Buildings REUSE VERSUS REPLACEMENT SUMMARY APPENDICES Appendix A - Group Eight Engineering Limited Proposal Letter, dated January 16, Appendix B - Photographs iv

7 Buildings 1 & 2-66 Mohawk Brantford, Ontario INTRODUCTION Group Eight Engineering Limited was retained by the City of Brantford to examine and comment on the condition of the building envelope and structural components of Buildings 2 and 3A Greenwich and Buildings 1 and 2-66 Mohawk, Brantford, Ontario. Building 1B Greenwich was added to the list after the original proposal. The purpose of the review is to determine the following: establish the condition of building envelope and structural components determine whether buildings are salvageable for future use establish costs to maintain the buildings establish costs to repair noted deficiencies establish construction costs for new buildings of similar sizes The proposed reuse of the existing buildings for comparison purposes is "residential occupancy". The review was visual. No testing of existing materials or structural members was completed. Not all areas of the buildings were reviewed, and not all structural components were reviewed due to the wall and ceiling finishes still in place. Our recommendations and comments are based on this limited review, as well as our experience in the assessment of these types of buildings. But we cannot guarantee the total extent of the structural deficiencies have been determined. The on-site reviews were completed February 1 and 5, 2008 and March 18, The date noted on photographs for Building 1B, 347 Greenwich is be to ignored. The camera date function did not operate properly.

8 Buildings 1 & 2-66 Mohawk Brantford, Ontario This report, prepared by Group Eight Engineering Limited, is intended for the exclusive use of the City of Brantford. Neither Group Eight Engineering Limited nor the City of Brantford assume any liability for the use of this report, or for the use of any information disclosed in the report, or for damages resulting from the use of this report, by other parties.

9 Buildings 1 & 2-66 Mohawk Brantford, Ontario BACKGROUND The site at 347 Greenwich consists of a number of occupied and unoccupied buildings. The three buildings noted as Buildings 1B, 2 and 3A, were reviewed for this report. Photographs No. 1 and 2 show Building 1B, Photographs No. 3 and 4 show Building 2 and Photograph No. 5 shows Building 3A. Portions of buildings 2 and 3A have been damaged by fire and/or collapsed. These areas were not reviewed and were not considered within the context of the building area to be salvaged. The approximate foot print areas of the three buildings at 347 Greenwich being reviewed and considered for reuse are, as follows: Building 1B - 60' x 210 = 12,600 ft² Building 2-56' x 160' = 8,960 ft² Building 3A - 55' x 145' = 7,975 ft² The total approximate floor area for potential future use is, as follows: Building 1B - 4 x 12,600 ft² = 50,400 ft² Building 2-3 x 8,960 ft² = 26,880 ft² Building 3A - 3 x 7,975 ft² = 23,925 ft² Buildings at 66 Mohawk consist of the office area, Building 1, and the original manufacturing/warehouse, Building 2, and the timekeepers building. The timekeepers building is not part of this review. Photographs No. 6, 7, and 8 show Buildings 1 and 2. The date of construction of any of the buildings is unknown. Previous reports have noted the date of construction of Building 1B as 1940 and of Building 2A as between 1897 and There are no architectural or structural drawings of the buildings available for review.

10 Buildings 1 & 2-66 Mohawk Brantford, Ontario Two previously completed reports were available for review. Relevant portions of the following report was provided by the City of Brantford: Greenwich-Mohawk Streets, Brantford Site Remediation Study, Opportunities and Constraints Report, prepared by Planning & Engineering Initiatives Ltd., Wiebe Engineering Group Inc., dated October 28, 2002 The second report reviewed was: Structural Stabilization Report for 66 Mohawk Street, Brantford, Ontario, prepared by Group Eight Engineering Limited, dated, March, 2005.

11 Buildings 1 & 2-66 Mohawk Brantford, Ontario EXISTING BUILDINGS DESCRIPTION 3.1 Building 1B Greenwich Building 1B is a 4-storey reinforced concrete structure. The building structure consists of cast-in-place concrete roof and floor slabs. Slabs are supported by rectangular exterior concrete columns and circular interior concrete columns. All columns have drop panels and the interior columns have capitals (Photograph No. 9). In the areas of the stairwells and elevator shaft, the openings have additional concrete beam framing. The thickness of the structural concrete slabs (2nd, 3rd, 4th floors and roof) is not known. The floor to underside of floor slab is 13'-4, first floor; 11'-4 second, third and fourth floors. The first floor is a cast-in-place concrete slab on grade. Exterior walls are double wythe brick masonry between exposed concrete columns and concrete spandrel beams or double wythe brick masonry short walls with glazing between exposed concrete columns and concrete spandrel beams. Visible portions of foundation walls are cast-in-place concrete.

12 Buildings 1 & 2-66 Mohawk Brantford, Ontario Building Greenwich Building 2 is a three-storey structure. The lowest Floor is partially buried on the north side, Greenwich Street (Photograph No. 3). The structure consists of heavy timber construction with load-bearing masonry brick exterior walls. The building is separated into fire compartments. Firewalls are loadbearing masonry. The west end of the building, first fire compartment, appears to have been an office area in the original building layout. This area would appear to have a basement or crawl-space below the First Floor. This area is not part of our review. The next fire compartment is the area subject to our review. Building structure west of this fire compartment has been destroyed by fire. Typical floor constriction is, as follows: floor sheathing, running east-west floor sheathing, spanning north-south timber floor beams spanning east-west timber girders spanning north-south which bear on three (3) interior timber columns and exterior load-bearing masonry walls (Photograph No. 10) Roof support structure is similar to the typical floor construction. Interior timber column size increases at each floor level from the roof to the ground Floor. The exterior masonry walls and the interior firewalls consist of multi-wythe brick construction. The first floor slab is a cast-in-place concrete slab on grade. Foundations, where visible, are stone and mortar/concrete construction.

13 Buildings 1 & 2-66 Mohawk Brantford, Ontario Building 3A Greenwich The building is a three-storey timber structure with masonry brick exterior walls. The building is separated into fire compartments by interior masonry walls. Fire compartment lengths from the west end of the building are, as follows: First - 40' (approximately) Second - 40' Third - 145' (This fire compartment is the area subject to our review) Fourth - 130' Typical floor construction is, as follows: floor sheathing, running east-west floor sheathing, spanning north-south timber floor beams, spanning east-west timber girders, spanning north-south which bear on interior timber columns and exterior load-bearing masonry walls (Photograph No. 11) The roof support structure is similar to the typical floor construction. The majority of timber girders have been tension-rod reinforced. The exterior masonry walls and the interior firewalls consist of multi-wythe brick construction. The first floor slab is a cast-in-place concrete slab on grade. Foundations, where visible, are stone and mortar/concrete construction.

14 Buildings 1 & 2-66 Mohawk Brantford, Ontario Building 1-66 Mohawk The building is a three-storey structure with a basement. The building structure is, as follows: Roof Construction: timber sheathing timber joists (2" x 8" x 16" C/C) timber beams (6" x 8") and columns (8" nominal) Floor Construction: timber sheathing timber joists (2" x 12" x 16" C/C) timber beams (11-1/2" x 15-1/2") and columns (8" nominal) (Photograph No. 12) Timber joists bear on the timber beams on the interior, and the exterior and interior (firewall) masonry walls. The timber beams span to timber columns on the interior and to brick masonry pilasters on the exterior. There are concrete slabs at two floor levels associated with the old safe structures. Masonry walls, interior (firewall) and exterior, are multi-wythe brick construction. Foundation walls are multi-wythe brick to grade and cast-in-place concrete below grade. Interior timber columns are supported by brick masonry piers in the Basement. The Basement floor slab is cast-in-place concrete.

15 Buildings 1 & 2-66 Mohawk Brantford, Ontario Building 2-66 Mohawk The building is a three-storey structure with a basement. The building structure is, as follows: Roof Construction: timber sheathing timber beams (6" x 10") and columns (5-1/2" x 9-1/2") Floor Construction: timber sheathing timber joists (2" x 4" x 2" C/C, solid back-to-back joists) timber beams (size varies) and columns (size varies) Roof sheathing spans between beams with an intermediate stiffener at mid-span between beams. Timber beams bear on interior columns and exterior masonry walls. Exterior walls are multi-wythe brick construction. Foundation walls are multi-wythe brick to grade and cast-in-place concrete below grade. Interior timber columns are supported by brick masonry piers in the basement. The basement floor slab is cast-in-place concrete.

16 Buildings 1 & 2-66 Mohawk Brantford, Ontario OBSERVATIONS 4.1 Building 1B Greenwich.1 Interior The concrete floor on the second, third and fourth floors is covered by a membrane (Photograph No. 9). The composition of this membrane was not determined. The thickness of the membrane, where measured, was 1 to 1-1/2 inches. The membrane is heavily cracked on all three floors (Photograph No. 13) In the one area where the membrane has been removed from the concrete floor surface, 2nd floor, the surface of the concrete is spalling (Photograph No. 14). The underside of the concrete floor and roof slabs have spalling concrete, exposed corroding reinforcing steel and cracks (Photographs No. 15, 16, 17). In some of the cracks, water has, and continues to penetrate through the slab. Concrete columns are spalling with steel reinforcing exposed and covered with rust (Photographs No. 18, 19, 20). Typically, exterior columns have more spalling and, typically, the spalling increases the lower the column is in the building (i.e. less on the 4th floor, more on the 1st floor). In some cases, exposed concrete reinforcing is the result of the initial building construction. The reinforcing bars were not set properly and cast with no concrete cover (Photograph No. 21).

17 Buildings 1 & 2-66 Mohawk Brantford, Ontario The concrete steel reinforcing, where exposed, is typically round, un-deformed bar. In some locations, bar is square, un-deformed. Where reinforcing is exposed in exterior, rectangular columns, no ties are visible (Photograph No. 22). Spiral reinforcement ties are visible in interior circular concrete columns, but do not appear to be continuous through floor levels (Photograph No. 23). Construction joints in the concrete slabs are visible. Spalling concrete and rusting reinforcing bars are prevalent at these joints (Photographs No. 24, 25). There is cracking and spalling, various locations, on the interior faces of the spandrel beams (Photograph No. 26). There are areas of missing concrete on the underside of the floor slabs. This condition appears to be from the original concrete placement (Photographs No. 27, 28). Concrete window sills are spalling and cracking. Masonry walls have the following deficiencies: minor cracking, spalling bricks, brick joints with mortar missing, and missing, broken bricks (Photographs No. 29, 30). Rainwater leaders are broken and missing in various locations. Water is flowing in rainwater leaders. The one-storey attached structure on the south side has been destroyed by fire (Photographs No. 2, 31). The fire extended into Building 1B at two overhead doors on the south side..2 Exterior Access to the roof was not available, therefore, the condition of the masonry parapets and the roof membrane could not be reviewed.

18 Buildings 1 & 2-66 Mohawk Brantford, Ontario The exterior faces of the building's concrete columns and spandrel beams are cracked and spalling, Exposed steel reinforcing is rusting (Photographs No. 32, 33, 34, 35, 36, 37, 38). Steel reinforcing stirrups are visible in spalled spandrel beams (Photographs No. 35, 36, 37). The exterior masonry mortar joints are in poor condition. Bricks are spalling and missing is various locations (Photograph No. 39). Masonry parapets have bricks missing and spalling, along with missing mortar from joints (Photographs No ). Concrete window sills are spalling. 4.2 Building Greenwich.1 Interior The condition of the roof membrane could not be viewed due to snow cover (Photograph No. 42). There is heavy checking/splitting/cracking in the timber beams, girders and columns, at each floor level and the roof level (Photographs No. 43, 44, 45). There are locations of roof asphalt seepage through the roof sheathing. Water stains are visible in various locations on the underside of roof framing. There is cracking in the masonry at timber girder bearing at the exterior walls, various locations (Photographs No. 46, 47, 48). Metal bearing plates are corroding (Photograph No. 47).

19 Buildings 1 & 2-66 Mohawk Brantford, Ontario The connecting plate at the girder-column connection is corroding in various locations. Bolts have failed in some locations. There is cracking in the exterior and interior masonry walls (Photographs No. 49, 50, 51). There is some splitting, cracking and spalling of brick. Mortar pointing is required at various brick joints. One rainwater leader is not connected. Floor sheathing has lifted in this location on the Third Floor. White mould is present at this column location at the underside of the Third and Second Floors (Photographs No. 52, 53). There is fire damage to timber beams, girders and columns, Third Floor level and below, on the north side of the building in the third and fourth bay from the west end of the building area being reviewed (Photographs No. 54, 55). Fire damage has occurred to timber beams, girders and columns, Second Floor level and below for three bays at west end of the area being reviewed. Damage has occurred on both north and south sides of the building (Photographs No. 56, 57). Metal column base plates are corroding (Photograph No. 58)..2 Exterior Mortar joints require pointing. Spalling and cracking bricks are visible at various locations. There are cracks in masonry walls, particularly at lintels, various locations (Photographs No. 59, 60). Brick parapets, both north and south side are failing (Photograph No. 61, 62).

20 Buildings 1 & 2-66 Mohawk Brantford, Ontario The firewall at the east end of the area under review has appeared to have shifted. There is a large vertical crack at this location (Photograph No. 63). The exposed foundation wall has mortar/concrete between stones missing (Photograph No. 64). 4.3 Building 3A Greenwich.1 Interior No access was gained to the roof. The wooden stair to the roof has rotted out. No access was gained to the Third Floor at the west end, first fire compartment. The second fire compartment at the Second and Third Floors, and roof has collapsed (Photograph No. 65, 66, 67). The east fire compartment has been damaged by fire. Columns have failed. Floor structure has failed (Photograph No. 68). There is a 6" concrete slab cast on a portion of the Second Floor in the third fire compartment. Concrete is approximately 3 bays long by 1 bay wide (Photograph No. 69). Throughout this building are steel reinforced timber beams, steel monorail systems and steel floor grating over the wood sheathing. Timber columns sit on various styles of baseplates/pedestals (Photographs No. 70, 71). There is checking/cracking/splitting in timber beams, girders and columns (Photographs No. 72, 73).

21 Buildings 1 & 2-66 Mohawk Brantford, Ontario There appears to be signs of movement at the timber beam bearing locations at the interior masonry fire walls (Photograph No. 74). There is cracking in masonry walls at girder bearing locations, exterior walls, various locations (Photographs No. 75, 76). Masonry has cracked in both exterior walls and interior firewalls, various locations (Photographs No. 74, 77, 78). Floor sheathing has lifted from water penetration in various locations. Floors are "soft" throughout. There is minimal fire damage in the third fire compartment at Second Floor level (Photograph No. 79). There is a small hole in the Third Floor, second bay of the third fire compartment. The top of the timber column below is showing signs of wood rot at this location (Photographs No. 80, 81). The timber girder tension rod reinforcing is corroding, various locations. In various locations, white rot is present on timber elements (Photographs No. 82, 83). At one location, the column capital has shifted off the column and girder (Photograph No. 84)..2 Exterior Bricks are spalling. There are a number of locations of missing brick (Photographs No. 85, 86). Mortar is missing in brick joints in various locations (Photographs No. 85, 87).

22 Buildings 1 & 2-66 Mohawk Brantford, Ontario There is cracking in the brick, various locations (Photograph No. 88, 89). Where exposed, foundation stone has mortar/concrete missing (Photograph No. 90). 4.4 Building 1-66 Mohawk.1 Interior There are at least two locations where the roof leaks. Areas of wood rot are visible. White rot is visible throughout all storeys. Water is leaking throughout, including the Basement (Photographs No. 91, 92, 93, 94, 95, 96). Floor sheathing is lifting and rotting, on all floor levels (Photograph No. 97). Structural framing is not visible at the underside of the Second and Third Floors due to ceiling finishes. Wood rot is visible in the Entrance Vestibule (Photographs No. 98, 99). Brick is splitting within the Entrance Vestibule (Photograph No. 100) Wood columns are splitting, checking (Photograph No. 101)..2 Exterior Mortar is missing from brick joints, various locations (Photograph No. 102). Bricks are spalling. Bricks are missing (Photograph No. 103). Brick parapet is failing (Photograph No. 104).

23 Buildings 1 & 2-66 Mohawk Brantford, Ontario There are a number of cracks in the brick masonry, particularly above windows (Photographs No. 105, 106). 4.5 Building 2-66 Mohawk.1 Interior This building has continued to deteriorate since our review completed in February of A fire has occurred in the structure. The roof has failed in two locations (Photograph No. 107, 108). The area of floor failure, Second Floor, has increased. This area of failure is probably three times larger than previously reported (Photographs No. 109, 110, 111). A small failure in the wood joists has occurred at the Third Floor (Photograph No. 112). White rot is visible throughout the building (Photographs No. 113, 114).

24 Buildings 1 & 2-66 Mohawk Brantford, Ontario DISCUSSION 5.1 Design Loads The original design dead, live, snow, wind and seismic loads for each of the buildings are unknown. An analysis of existing structural components needs to be completed to determine whether these members can support the current and/or proposed loads. This applies to all the buildings. A structural analysis cannot be completed on Building 1B until the size and location of steel reinforcing in the slabs, columns and beams is determined. For all buildings, the strength of the various materials (timber, steel, concrete) must be established to complete the analysis. An analysis was completed in 2005 on Buildings 1 and 2-66 Mohawk. Since that time the Building Code snow, wind and seismic loads have changed. Snow and wind return periods have gone from 1 in 30 years to 1 in 50 years. This has resulted in an increase in snow and wind loads. The seismic load used in the analysis will have to be revised to reflect current available data. Some allowance has to be made for seismic upgrading if the buildings are to be reused. 5.2 Building 1B Greenwich The membrane on the second, third and fourth floor slabs covers the surface condition of the concrete. In the one area where the concrete slab is exposed, the concrete surface is spalling. The membrane needs to be removed. Removal of the membrane may expose a spalling concrete surface or result in the removal of the top surface of the concrete slab. In either case, the concrete slabs will need to be repaired. The visible cracking on the underside of the concrete floor slabs is not unexpected. The current state of cracking does not appear to impair the load capacity of the slabs.

25 Buildings 1 & 2-66 Mohawk Brantford, Ontario The spalling concrete and the corroding steel reinforcing has to be repaired in all locations (columns, spandrel beams, slab, interior and exterior) to maintain the integrity of the structural concrete members. The condition of the roof membrane is not known. Water is flowing in the rainwater leaders. Most likely, the membrane requires repair or replacement with the concrete roof slab currently holding the water. Rainwater leaders require repair 5.3 Building Greenwich For reuse of the interior fire compartment, the fire damaged areas on the First, Second and Third Floors have to be replaced. To be replaced in kind, selective demolition has to occur in areas of the building to the east and west of this area. This selective demolition to harvest appropriate beams, girders and columns needs to be done immediately before these members become unusable. The roof membrane and rainwater leaders have to be repaired to make the building water-tight. Masonry repairs, brick replacement, etc., need to be completed to maintain the structural integrity of the building and make the building water-tight. 5.4 Building 3A Greenwich This building has to be made water-tight to maintain its integrity. Until this is completed, deterioration will continue. Deficient structural components need to be repaired, replaced and/or reinforced. Again, selective demolition of areas to the east and west should proceed to save existing timber members for reuse in the area of the building to be maintained. Masonry repairs, brick replacement, etc., need to be completed to maintain the structural integrity of the building and make the building water-tight.

26 Buildings 1 & 2-66 Mohawk Brantford, Ontario The concrete slab on the Second Floor has to be removed to accommodate future use. 5.5 Building 1-66 Mohawk This building has to be made water-tight to maintain its integrity. Until this is completed, deterioration will continue. Interior finishes, partitions, etc., have to be removed to expose all the structural members to determine their condition and the extent of any additional damage. The building is approximately 2,300 ft². It must be determined if saving a building this small has any real valve. It must also be decided what use there is for a 3-storey building this size. 5.6 Building 2-66 Mohawk Significant portions of the building structure have failed. Based on the current level of deterioration, and the deterioration that has occurred in the three years since our last building review, it is our opinion that this building should be demolished.

27 Buildings 1 & 2-66 Mohawk Brantford, Ontario OPINION OF PROBABLE REPAIR COSTS 6.1 General The probable costs for each repair or replacement are detailed on the following pages. The costs presented are April, 2008 values. Increased costs due to inflation, etc., have not been included. The costs are our opinion of probable repair/replacement/ construction costs based on our experience and knowledge for work of this nature. Engineering costs, if required, are not included. Also, costs to remove any asbestos or mould are not included. Construction costs for any required wind and/or seismic lateral load upgrades are not included. 6.2 Building 1B Greenwich Repair/Replacement Costs: 1. Removal and replacement of roof membrane... $84, Removal of floor membrane... $58, Repair of concrete floors (upper surface)... $465, Repair of concrete floors and roof (underside)... $78, Repair of columns... $210, Repair of spandrel beams... $240, Reconnect rainwater leaders... $5, Total... $1,140, Demolition Cost: 1. Demolition... $290, Note: Dumping costs at landfill site are not included.

28 Buildings 1 & 2-66 Mohawk Brantford, Ontario Building Greenwich Repair/Replacement Costs: 1. Removal and replacement of roof membrane... $58, Removal of existing finishes and partitions... $10, Removal and replacement of fire damaged beams, girders, columns... $22, Reconnect existing rainwater leader... $5, Miscellaneous structural repairs... $11, Masonry Repairs... $106, Reinforcement of stone foundations... $105, Total... $318, Demolition Cost: 1. Demolition... $115, Note: Dumping costs at landfill site are not included. Costs for demolition of adjacent areas to select suitable repair members are not included. 6.4 Building 3A Greenwich Repair/Replacement Costs: 1. Removal and replacement of roof membrane... $52, Miscellaneous structural repairs... $10, Concrete removal (Second Floor)... $7, Masonry repairs... $94, Reinforcement of stone foundations... $90, Total... $253,500.00

29 Buildings 1 & 2-66 Mohawk Brantford, Ontario Demolition Cost: 1. Demolition... $100, Note: Dumping costs at landfill site are not included. Costs for demolition of adjacent areas to select suitable repair members are not included. Costs for demolition of steel beam/girder reinforcing and monorail systems are not included. 6.5 Building 1-66 Mohawk Repair/Replacement Costs: 1. Removal of existing floor and ceiling finishes... $12, Removal and replacement of roof membrane... $19, Masonry mortar pointing... $55, Parapet and corbel repairs... $5, Column replacement... $5, Miscellaneous masonry repairs... $2, Miscellaneous structural repairs... $3, Vestibule repairs... $2, Total... $105, Demolition Cost: 1. Demolition... $35, Note: Dumping costs at landfill site are not included. 6.6 Building 2-66 Mohawk Repair is considered prohibitive due to the poor building condition.

30 Buildings 1 & 2-66 Mohawk Brantford, Ontario REPLACEMENT COSTS Greenwich Buildings.1 Building 1B Building 1B has a footprint area of 12,600 ft². There are areas within the existing building for an elevator shaft plus one interior stairwell. Because of their locations (elevator shaft, stairwell), it is assumed an additional elevator shaft, stairwell along with a new common entrance will be added. Therefore, for comparison purposes, we have assumed the replacement building will have a footprint of 14,000 ft². The existing total floor area is 50,400 ft² and the replacement structure floor area will be 56,000 ft². For a four-storey apartment unit, costs, depending on the style of construction, will vary between $ and $ per square foot, with an average cost of approximately $ per square foot. For low income housing, these costs typically drop to the low end, $ per square foot. Building construction cost will be: 14,000 ft² x $100.00/ft² = $1,400, Structure and envelope construction costs (minus insulation, etc.) would be approximately twenty percent of these costs. Structure cost on 14,000 ft² building = $280,000.00

31 Buildings 1 & 2-66 Mohawk Brantford, Ontario Buildings 2 and 3A The areas of buildings 2 and 3A on Greenwich to be potentially reused have footprint areas of approximately 8,000 and 9,000 ft². These areas do not include an elevator, stairwells or a common entrance. These elements will either have to be added on, increasing the building area, or built within, decreasing the usable floor space. For comparison purposes, we have assumed the elevator, stairwells, etc., will be added on. Therefore, for comparison purposes, new buildings with footprints of 9,000 and 10,000 ft² will be used. The total building square footage will be 27,000 ft² and 30,000 ft². For a 3-storey apartment unit, costs, depending on the style of construction, will vary between $ and $ per square foot, with an average at approximately $ per square foot. For low income housing, these costs typically drop to the low end, $ per square foot. Building construction costs are, therefore, 9000 ft² x $100.00/ft² = $900, ft² x $100.00/ft² = $1,000, Structural and envelope construction costs (minus insulation, etc.) would be approximately twenty percent of these costs: Structure Costs on 9000 ft² building = $180, Structure Costs on ft² building= $200,000.00

32 Buildings 1 & 2-66 Mohawk Brantford, Ontario Mohawk Buildings The replacement construction cost for Building 1-66 Mohawk, due to its size and unknown future use, is more difficult to determine. Using a $ per square foot construction cost, the replacement cost is: 2300 ft² x $150.00/ft² = $345, The structure/envelope construction cost would be: $345,000 x 0.2 = $69,000.00

33 Buildings 1 & 2-66 Mohawk Brantford, Ontario REUSE VERSUS REPLACEMENT There are a number of items, other than the upgrade cost, which need to be considered prior to deciding whether to reuse these buildings. These include: 1. There is no information on existing building foundations. Footings need to be exposed to determine construction, condition and depth. A cost allowance has been added to Buildings 2 and 3A, 347 Greenwich St., to cover the reinforcing of the existing stone foundations. 2. If the buildings are reused, the envelope will need to be upgraded to today's standards in terms of vapour/moisture barriers and insulation. 3. Required changes and their costs to accommodate new mechanical and electrical systems. This will include impact on any potential layout of the new facility. 4. Impact of increased usage of storm and sanitary services. In all likelihood, new services will be placed, necessitating slab-on-grade removal and changes to the existing foundations. 5. Possible upgrades/reinforcing to meet required dead, live, wind and seismic loads. The above list is neither exhaustive or complete. The list is presented purely to demonstrate that more information is required to detail the complete cost of retaining the existing buildings. The repair costs developed for each of the buildings do not include all potential costs which will be incurred in reusing the existing buildings. The replacement buildings will not be built with the same form and detail visible on the exterior of the existing buildings. Unfortunately the required repairs will most likely compromise this form and detail or, in some cases, to lower costs, eliminate this form and detail.

34 Buildings 1 & 2-66 Mohawk Brantford, Ontario A cost can be established to replace the form and detail in the new construction but has not been included in the replacement costs presented. Replacement costs represent a reasonable expected cost for buildings of this type. The noted repair costs compared to the calculated structure/envelope replacement costs are, as follows: Building Repair Cost Replacement Cost Building 1B Greenwich $1,140,000.0 $280, Building Greenwich $318, $180, Building 3A Greenwich $253, $200, Building 1-66 Mohawk $105, $69, Directly comparing these costs, all four buildings are more expensive to repair than to replace. The noted repair/replacement costs compared to the calculated structure/envelope replacement costs plus demolition costs are, as follows: Building Repair Cost Replacement Cost + Demolition Cost Building 1B Greenwich $1,140,000.0 $570, Building Greenwich $318, $295, Building 3A Greenwich $253, $300, Building 1-66 Mohawk $105, $104, When the demolition cost is added to the replacement cost, Buildings 1B and 2, 347 Greenwich are still more expensive to repair than replace. Building 1, 66 Mohawk is a trade-off with respect to repairing or replacing.

35 Buildings 1 & 2-66 Mohawk Brantford, Ontario Only Building 3A Greenwich has a potential repair cost lower than the estimated replacement cost combined with demolition cost, although the difference is not large. It is our recommendation that none of these buildings be rebuilt. Repair costs exceed replacement costs for three of the buildings. When considering all the potential "unknowns" with dealing with the reuse of the existing buildings, costs to reuse are more likely to increase.

36 Buildings 1 & 2-66 Mohawk Brantford, Ontario SUMMARY The existing buildings, designated as Buildings 1B, 2 and 3A Greenwich and Buildings 1 and 2-66 Mohawk were reviewed for condition of structural components and the existing envelope elements. The purpose of this review was to determine building condition, costs to repair and whether the buildings could be reused. Overall, all the buildings have been left neglected and exposed to the outdoor environment too long. The buildings have been vandalized, fire damaged and exposed to significant water damage. The full extent of the damage will not be determined until the deterioration is halted. Building 2-66 Mohawk has deteriorated to the point where retaining the building for future use is not recommended. Building 1-66 Mohawk, the remaining portion of the original Cockshutt Plow Building, is a very small building with a repair cost larger than the estimated replacement cost. It is not recommended this building be reused. Building 1B Greenwich has repair costs which exceed estimated replacement costs. It is not recommended this building be reused. Building Greenwich has repair costs which exceed estimated replacement costs. It is not recommended this building be reused. Building 3A Greenwich has estimated repair costs below the estimated replacement costs plus demolition costs. However, considering the small size of the building to be reused, approximately 8,000 ft², the unknowns which will be exposed during or before future construction, and that the estimated replacement costs are only $46, higher than repair costs, it is not recommended this building be reused.

37 Buildings 1 & 2-66 Mohawk Brantford, Ontario The cost analysis of reuse versus replacement is based on our opinion of probable construction cost for the replacement structure at $ per square foot. As the replacement cost increases, i.e. if $120.00/ft² were used instead of $100.00/ft², the potential for reuse, based solely on the reuse and replacement costs presented in the report, increases. Regardless of any cost comparison, it is our opinion that the buildings are in a state beyond reasonable repair, and if repaired, will not have a lifespan matching the replacement buildings. It is our recommendation that the buildings not be repaired and reused.

38 Buildings 1 & 2-66 Mohawk Brantford, Ontario APPENDICES 10.1 Appendix A - Group Eight Engineering Limited Proposal Letter, dated January 16, Appendix B - Photographs

39 APPENDICES TO Buildings 1 & 2-66 Mohawk Brantford, Ontario Appendix A Group Eight Engineering Limited Proposal Letter Dated January 16, 2008

40

41

42

43 APPENDICES TO Buildings 1 & 2-66 Mohawk Brantford, Ontario Appendix B Photographs

44 B1 Photograph No. 1 Photograph No. 2

45 B2 Photograph No. 3 Photograph No. 4

46 B3 Photograph No. 5 Photograph No. 6

47 B4 Photograph No. 7 Photograph No. 8

48 B5 Photograph No. 9 Photograph No. 10

49 B6 Photograph No. 11 Photograph No. 12

50 B7 Photograph No. 13 Photograph No. 14

51 B8 Photograph No. 15 Photograph No. 16

52 B9 Photograph No. 17 Photograph No. 18

53 B10 Photograph No. 19 Photograph No. 20

54 B11 Photograph No. 21 Photograph No. 22

55 B12 Photograph No. 23 Photograph No. 24

56 B13 Photograph No. 25 Photograph No. 26

57 B14 Photograph No. 27 Photograph No. 28

58 B15 Photograph No. 29 Photograph No. 30

59 B16 Photograph No. 31 Photograph No. 32

60 B17 Photograph No. 33 Photograph No. 34

61 B18 Photograph No. 35 Photograph No. 36

62 B19 Photograph No. 37 Photograph No. 38

63 B20 Photograph No. 39 Photograph No. 40

64 B21 Photograph No. 41 Photograph No. 42

65 B22 Photograph No. 43 Photograph No. 44

66 B23 Photograph No. 45 Photograph No. 46

67 B24 Photograph No. 47 Photograph No. 48

68 B25 Photograph No. 49 Photograph No. 50

69 B26 Photograph No. 51 Photograph No. 52

70 B27 Photograph No. 53 Photograph No. 54

71 B28 Photograph No. 55 Photograph No. 56

72 B29 Photograph No. 57 Photograph No. 58

73 B30 Photograph No. 59 Photograph No. 60

74 B31 Photograph No. 61 Photograph No. 62

75 B32 Photograph No. 63 Photograph No. 64

76 B33 Photograph No. 65 Photograph No. 66

77 B34 Photograph No. 67 Photograph No. 68

78 B35 Photograph No. 69 Photograph No. 70

79 B36 Photograph No. 71 Photograph No. 72

80 B37 Photograph No. 73 Photograph No. 74

81 B38 Photograph No. 75 Photograph No. 76

82 B39 Photograph No. 77 Photograph No. 78

83 B40 Photograph No. 79 Photograph No. 80

84 B41 Photograph No. 81 Photograph No. 82

85 B42 Photograph No. 83 Photograph No. 84

86 B43 Photograph No. 85 Photograph No. 86

87 B44 Photograph No. 87 Photograph No. 88

88 B45 Photograph No. 89 Photograph No. 90

89 B46 Photograph No. 91 Photograph No. 92

90 B47 Photograph No. 93 Photograph No. 94

91 B48 Photograph No. 95 Photograph No. 96

92 B49 Photograph No. 97 Photograph No. 98

93 B50 Photograph No. 99 Photograph No. 100

94 B51 Photograph No. 101 Photograph No. 102

95 B52 Photograph No. 103 Photograph No. 104

96 B53 Photograph No. 105 Photograph No. 106

97 B54 Photograph No. 107 Photograph No. 108

98 B55 Photograph No. 109 Photograph No. 110

99 B56 Photograph No. 111 Photograph No. 112

100 B57 Photograph No. 113 Photograph No. 114

STRUCTURAL BUILDING CONDITION SURVEY

STRUCTURAL BUILDING CONDITION SURVEY STRUCTURAL BUILDING CONDITION SURVEY Our Project No. 140565 Prepared For: Mayfair Hotel Development Corporation Date: 3 December 2014; Revised: 15 December 2014 15 December 2014 Mayfair Hotel Development

More information

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax: ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place

More information

East Lyme Middle School EAST LYME MIDDLE SCHOOL

East Lyme Middle School EAST LYME MIDDLE SCHOOL Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

No structural deficiencies were observed to the west exterior elevation.

No structural deficiencies were observed to the west exterior elevation. August 9, 2016 Ms. Jennifer Spencer, AIA, NCARB Gary W. Anderson Architects 200 Prairie Street, Suite 201 Rockford, IL 61107 Subject: Structural Observations 227 North Wyman Street Rockford, IL Dear Ms.

More information

PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT

PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT Prepared for: GATTER ARCHITECTS 111 MAIN ST. PHILMONT, NY 12565 Prepared by: TACONIC ENGINEERING, DPC PO BOX 272 CHATHAM, NY 12037 TACONIC

More information

STRUCTURAL ASSESSMENT REPORT

STRUCTURAL ASSESSMENT REPORT STRUCTURAL ASSESSMENT REPORT FOR WASHINGTON PARK NATIONAL BANK 6300 South Cottage Grove Ave. Chicago, Illinois 60637 Prepared For: Cook County Land Bank Authority 69 W. Washington, Chicago Illinois April

More information

Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan

Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan November 2, 2015 Melissa A. Malcolm Library Director Lapeer District Library 201 Village West Dr S Lapeer, MI 48446 RE: Structural Conditions Assessment of Current Lapeer District Schools Administration

More information

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report 1 THE ODYSSEY ARLINGTON, VA Aaron Snyder Structural Option Advisor: M. Kevin Parfitt, PE Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report Executive

More information

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued)

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued) 2000 IRC 1997 NEHRP Section Provision Section Provision Comments CHAPTER 3 BUILDING PLANNING R301 DESIGN CRITERIA R301.2.2 Seismic Provisions R301.2.2.1 Determination of Seismic Design Category R301.2.2.1.1

More information

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification

More information

Project Findings: Appendix 2

Project Findings: Appendix 2 NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 2. Teleco Office Tower Civil Engineering and Engineering Mechanics Department University of

More information

Structural Technical Report 1 Structural Concepts / Existing Conditions

Structural Technical Report 1 Structural Concepts / Existing Conditions Chris Shelow Structural Advisor: M. Kevin Parfitt Koshland Integrated Natural Science Center 10/05/05 AE 481W Structural Technical Report 1 Structural Concepts / Existing Conditions Executive Summary The

More information

STRUCTURAL ASSESSMENT OBSERVATION REPORT

STRUCTURAL ASSESSMENT OBSERVATION REPORT Consulting Engineers THORSON BAKER & Associates, Inc. 3030 West Streetsboro Road (330) 659-6688 phone Richfield, Ohio 44286 (330) 659-6675 fax www.thorsonbaker.com STRUCTURAL ASSESSMENT OBSERVATION REPORT

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,

More information

Tier 1 Assessment Linderman Gymnasium Polson, MT

Tier 1 Assessment Linderman Gymnasium Polson, MT Tier 1 Assessment Linderman Gymnasium Polson, MT June 15, 2018 Prepared by: 128 W. ALDER ST SUITE a MISSOULA, MT 59802 (406) 274-7671 June 15, 2018 Mr. Paul Bishop Paradigm v.2.0 125 ½ W. Main Street RE:

More information

Commercial Structures

Commercial Structures Commercial Structures Structural Components Footing Piles Foundation Beams Joists Column Substructure Superstructure Reinforced concrete Re-bar Pre-cast concrete panel Deflection Cantilever Footings A

More information

ENG.ACA.0001F Madras. New Zealand significant. (a) spandrel 2010) were solid

ENG.ACA.0001F Madras. New Zealand significant. (a) spandrel 2010) were solid ENG.ACA.0001F.111 Figure 5.15 137 Manchester Street, pull out of the canopy supports 5.4 Clay brick URM building that have been partially or fully demolished 5.4.1 192 Madras Street This building was designed

More information

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf CODES AND REQUIREMENTS The structural design of Northbrook Corporate Center was based on the International Building Code 2003, which incorporates many of the provisions of ASCE 7. The lateral load design

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS APPENDIX 3C DOMINION HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.

More information

* RESIDENTIAL PLAN REVIEW *

* RESIDENTIAL PLAN REVIEW * CITY OF DES MOINES, IOWA COMMUNITY DEVELOPMENT DEPARTMENT PERMIT AND DEVELOPMENT CENTER 602 Robert D. Ray Drive DES MOINES, IOWA 50309 Phone: 515.283.4200 Facsimile: 515.283.4270 Based on the scope of

More information

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS Please note: This construction plan component list is to be used as a guide to assist you with your project. There may be elements unique to your project not

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20 Connaught Facility Audit report for: Connaught Regina, SK Report Created: 2012-04-02 Page 1 of 20 Facility Details Facility Connaught Address: Location: Regina, SK Facility Zone: 8 Grade Configuration:

More information

March 30, 2017 MKM File #

March 30, 2017 MKM File # MKM File # 170161 Paul Jeschke 77 Starbuck Drive Muir Beach, CA Re: Muir Beach Community Building 19 Seacape Drive Muir Beach, CA Dear Paul, At your request, MKM & Associates visited the above referenced

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy

More information

Framing Methods Structural Components

Framing Methods Structural Components Framing Methods Structural Components Balloon Framing *Balloon framing or Eastern framing the exterior studs run from the top of the foundation to the top of the highest level. Benefits of this type of

More information

Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103

Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103 Project For SFCC District Building 33 Gough Street San Francisco, California 94103 Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103 Prepared By Thornton

More information

North Shore at Canton Baltimore, MD Beau Menard Technical Report 1

North Shore at Canton Baltimore, MD Beau Menard Technical Report 1 North Shore at Canton Baltimore, MD Beau Menard Technical Report 1 Structural Schneider 10/05/05 Structural Concepts Executive Summary North Shore at Canton is a 4 story town home and parking garage structure

More information

2003 International Residential Building Code

2003 International Residential Building Code 2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less

More information

Home Not Anchored to Foundation

Home Not Anchored to Foundation IDENTIFY WEAKNESSES Home Not Anchored to Foundation Houses that are not bolted to the foundation can move off their foundations during earthquakes. Go down into the crawl space the area between the first

More information

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number: 27 June 2016 Mr. Shane Chism, AIA Breckenridge Group 4625 E. Fort Lowell Road Tucson, Arizona 85712 Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation

More information

STRUCTURAL EVALUATION

STRUCTURAL EVALUATION SMELTER BUILDINGS STRUCTURAL EVALUATION Resolution Copper Mining, LLC West Plant Area September 7, 2016 Safety Share Preventable Motor Vehicle Accidents 1. Aim High in Steering. 2. Get The Big Picture.

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

Masonry and Cold-Formed Steel Requirements

Masonry and Cold-Formed Steel Requirements PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as

More information

Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI

Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI Courtesy of HGA Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI Jessel Elliott Structural 2011 Architectural Engineering Senior Thesis Studio Advisor: Dr. Richard Behr Date:

More information

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California Reissued June 1, 2002 ICBO Evaluation Service, Inc. 5360 Workman Mill Road, Whittier, California 90601 www.icboes.org Filing Category: DESIGN Concrete DURISOL WALL FORMS FOR CONCRETE CONSTRUCTION DURISOL

More information

WOOD I-JOIST AWARENESS GUIDE

WOOD I-JOIST AWARENESS GUIDE WOOD I-JOIST AWARENESS GUIDE American Wood Council Flange Web Flange American Forest & Paper Association WOOD I-JOIST AWARENESS GUIDE The American Wood Council is part of the wood products group of the

More information

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services

ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services Addenda Dated: 01/25/2019 PURPOSE: The purpose of this Addenda #9 is to provide a

More information

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK )

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK ) WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK ) 1.0 Comparative wall systems Wood stud walls * walls are normally 2x4, but may be 2x6. * studs are spaced 16. * studs carry vertical loads.

More information

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

BUILDING A NEW HOME. Construction Permit Tips For Home Owners BUILDING A NEW HOME Construction Permit Tips For Home Owners This publication provides guidelines for constructing a detached singlefamily home. The code requirements herein are not all inclusive and should

More information

JAY E. BUTLER, being first duly sworn deposes and states as follows: 1. I am a Professional Engineer licensed in the State of New York.

JAY E. BUTLER, being first duly sworn deposes and states as follows: 1. I am a Professional Engineer licensed in the State of New York. SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK In the Matter of DEVELOP DON T DESTROY BROOKLYN; Index No. DANIEL GOLDSTEIN; ATLANTIC AVENUE BETTERMENT ASSOCIATION; RJI No. FORT GREENE ASSOCIATION;

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

EXECUTIVE SUMMARY INTRODUCTION Terms of Reference Building Description Documents Reviewed SUMMARY OF FIELD DATA 4

EXECUTIVE SUMMARY INTRODUCTION Terms of Reference Building Description Documents Reviewed SUMMARY OF FIELD DATA 4 Abbott Place Wood Framed Window Condition Assessment May 30, 2012 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1.0 INTRODUCTION 2 1.1 Terms of Reference 2 1.2 Building Description 3 1.3 Documents Reviewed 3 2.0

More information

111 MORGAN ST. Ryan Friis

111 MORGAN ST. Ryan Friis Technical Report No. 1 September 30, 2002 Executive Summary: 111 Morgan St. is a 9 story cast-in-place concrete condominium building being constructed in Chicago, Illinois. The building s floor system

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville Structural Assessment Live Fire Training Building FSCJ South Campus Jacksonville, Florida Florida State College at Jacksonville November 21, 2011 Report of a Structural Assessment of Live Fire Training

More information

William W. Wilkins Professional Building Columbus, Ohio

William W. Wilkins Professional Building Columbus, Ohio William W. Wilkins Professional Building Columbus, Ohio Technical Assignment 1 October 5, 2006 Michelle Structural Option AE 481W Senior Thesis Faculty Advisor: Dr. Boothby Table of Contents Executive

More information

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings.

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings. Introduction This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings. The future presentations, will cover; Type 3 Ordinary Type 4 Heavy Timber and Type 5 Wood Frame buildings.

More information

Stone and Masonry Veneer

Stone and Masonry Veneer Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over

More information

Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact

Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact Executive Summary:, located in Pigeon Forge, Tennessee, is designed as a multifunctional space and

More information

Nathan Clifford School Building Conditions Assessment Report

Nathan Clifford School Building Conditions Assessment Report Nathan Clifford School Building Conditions Assessment Report Submitted To: The City of Portland April 12, 2013 Prepared By: Winton Scott Architects Becker Structural Engineers, Inc. Conditions Assessment

More information

The Homeowner s Building Application Checklist for Constructing a Residential Addition

The Homeowner s Building Application Checklist for Constructing a Residential Addition The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential

More information

David A. Walenga Technical Assignment #1

David A. Walenga Technical Assignment #1 Executive Summary Contained in this report is design information related to the structural system of the Residence Inn by Marriot located in Stamford, Connecticut. Specifically, this report covers: code

More information

PLANNING DEPARTMENT. Introduction

PLANNING DEPARTMENT. Introduction COUNTY OF SANTA CRUZ PLANNING DEPARTMENT 701 OCEAN STREET - 4 TH FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 KATHLEEN MOLLOY PREVISICH, PLANNING DIRECTOR EVALUATING

More information

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302 Larson Engineering, Inc. 118 S. Clinton Street, Suite 250 Chicago, IL 60661-5775 312.345.0540 Fax: 312.332.1484 www.larsonengr.com May 17, 2016 Mr. Fred Preuss Oak Park River Forest High School 201 North

More information

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:

More information

Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report, Revised to address comments

Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report, Revised to address comments November 4, 2014 Heidi Hubble Facilities and Services MSC 3545 New Mexico State University P.O. Box 30001 Las Cruces, NM 88003 Re: Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report,

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

City of Richmond Zoning Ordinance Page 12-1

City of Richmond Zoning Ordinance Page 12-1 ARTICLE 12 BUILDING DESIGN AND COMPOSITION Section 12.01 Purpose. High quality architectural design and building composition are important elements in reinforcing a comfortable, human-scale environment,

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES CHAPTER 10 CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CUSTOMS HOUSE JULY 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..

More information

PRELIMINARY STRUCTURAL INVESTIGATION REPORT

PRELIMINARY STRUCTURAL INVESTIGATION REPORT 124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ

More information

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete

More information

Letter of Transmittal

Letter of Transmittal Letter of Transmittal November 17, 2014 Ali Said Structural Thesis Advisor The Pennsylvania State University aus59@psu.edu Dear Doctor Said, The following technical report fulfills the fourth Technical

More information

RYAN BIGGS CLARK DAVIS

RYAN BIGGS CLARK DAVIS December 7, 2016 Mr. Timothy Wales, P.E. City Engineer City of Saratoga Springs City Hall - 474 Broadway Saratoga Springs, New York 12866 Re: 26 Caroline Street Investigation Saratoga Springs, New York

More information

CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15

CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15 CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15 Copyright 2004 CONSTRUCTION The following are twenty key construction components and basic facts that are to be considered high priority. Please refer

More information

PB YONGE STREET QUEEN STREET WEST RICHMOND STREET. 2 QUEEN STREET WEST Toronto Preservation Board FORMERLY 184 YONGE 2 QUEEN

PB YONGE STREET QUEEN STREET WEST RICHMOND STREET. 2 QUEEN STREET WEST Toronto Preservation Board FORMERLY 184 YONGE 2 QUEEN PB23.6.1 YONGE STREET FORMERLY 184 YONGE 2 QUEEN QUEEN STREET WEST RICHMOND STREET 2 Queen Street West - P. Jamieson & Co, 1897 (Source: Toronto Public Library) 2 Queen Street West - current condition.

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

INSPECT DIRECT Pty Ltd

INSPECT DIRECT Pty Ltd Web Page: www.inspectdirect.com.au INSPECT DIRECT Pty Ltd Property Address: Sample.Dilapidation.Report Victoria Building Status / Dilapidation Report This is not a Pest Inspection The Building Status /

More information

FASAD: First Floor Existing Condition Report. October 30 th 2015

FASAD: First Floor Existing Condition Report. October 30 th 2015 FASAD: First Floor Existing Condition Report October 30 th 2015 Report Summary Contained in this document are analytical reports which detail the current conditions of the main structural components of

More information

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR Prepared by: Global Village Engineers 23 JANUARY, 2001 23 January 2001 Senor Carlos Cortez Hernandez Alcaldia Municipal de Tecoluca San Vicente, El

More information

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No 000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20

More information

SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS

SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS STRUCTURAL EVALUATION FOR SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON PREPARED BY PCS STRUCTURAL SOLUTIONS NOVEMBER 1, 2017 17-733 TABLE OF CONTENTS Page I. PREFACE ii II. EXECUTIVE

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Executive Summary: 200 Minuteman Park currently stands as a three story commercial building. The original design was limited to three stories by an industrial zoning law in Andover, Massachusetts. If this

More information

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No: 2001 North Main St, Ste 360, Walnut Creek, CA 94596 Ph: 925-944-5411 ; Fax: 925-944-4732 MEMORANDUM To: Ed Byrne From: Moffatt & Nichol Date: April 3, 2006 Subj: Wharf J-10 Evaluation of Structure for

More information

CSE Engineering, Inc.

CSE Engineering, Inc. CSE Engineering, Inc. Consulting Structural Engineers December 3, 2012 Mr. Joel Heenan Plans Examiner City of Albany Building Department 333 Broadalbin Street Albany, OR 97321 Re: : Old Church Building

More information

Pre-schematic Considerations. Who. What. Where

Pre-schematic Considerations. Who. What. Where Who What Where Who, What & Where Who are the users? Church School Manufacturers Researchers Who, What & Where What is the purpose? Fellowship Teaching Manufacturing Production Who, What & Where Location,

More information

Thesis Proposal 12/13/06

Thesis Proposal 12/13/06 Photo courtesy of OTO Development, http://www.otodevelopment.com/ Dr. Memari Thesis Advisor Thesis Proposal 12/13/06 Executive Summary Structural System The in, is an eleven story hotel complex which reaches

More information

Accessory Structures- 430 Third Street Garages Farmington, MN (651) Information Sheet

Accessory Structures- 430 Third Street Garages Farmington, MN (651) Information Sheet 1/18/2017 City of Farmington Accessory Structures- 430 Third Street Garages Farmington, MN 55024 (651) 280-6822 Information Sheet The City of Farmington requires that certain standards be met when constructing

More information

BUILDING CODES Presented by CORUM ENGINEERING

BUILDING CODES Presented by CORUM ENGINEERING BUILDING CODES Presented by CORUM ENGINEERING AGENDA I. The Basics of Foundations A. Footer Designs B. Foundation Walls 1. Non-Backfilled Walls 2. Backfilled Walls (Retaining Walls) C. Slabs vs. Crawl

More information

O DONNELL & NACCARATO Nick Cinalli, PE, SECB / President & CEO

O DONNELL & NACCARATO Nick Cinalli, PE, SECB / President & CEO ATTACHMENT I PHILADELPHIA PRINCETON LEHIGH VALLEY WASHINGTON DC ORLANDO WEST PALM BEACH 111 South Independence Mall East / Suite 950 / Philadelphia, PA 19106-2524 Tel 215.925.3788 / 800.607.7284 / Fax

More information

Commercial Flashing Details

Commercial Flashing Details This technical note illustrates many of the most common flashing details for commercial buildings. The purpose for flashing is to direct moisture to the exterior and in so doing, prevent moisture from

More information

A Design-Build Project: Repairing the Courthouse Square Complex

A Design-Build Project: Repairing the Courthouse Square Complex A Design-Build Project: Repairing the Courthouse Square Complex Cracked drywall in office building Cracked basement walls Separated columns at expansion joint Source: http://djcoregon.com/news/2010/07/22/salem-government-building-unsound-being-vacated/

More information

National Property Inspections

National Property Inspections National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS

More information

Structural Redesign Gravity System

Structural Redesign Gravity System Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides

More information

Fundamentals of Building Construction: Materials and Methods

Fundamentals of Building Construction: Materials and Methods Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of

More information

SECTION 702 DEFINITIONS

SECTION 702 DEFINITIONS ACTION: Final DATE: 05/6/017 :17 PM 4101:1-7-01 Fire and smoke protection features. [Comment: When a reference is made within this rule to a federal statutory provision, an industry consensus standard,

More information

THE STRATA UNIT May 25, 2008

THE STRATA UNIT May 25, 2008 THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What

More information

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016 February 2016 Residential Deck Safety, Construction and Repair Juneau Permit Center, 4 th Floor Marine View Center,(907)586-0770 This handout is designed to help you build your deck to comply with the

More information

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866) TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED

More information

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw RESIDENTIAL CONSTRUCTION DETAILS U.S. EDITION A visual guide to construction detailing Emma Walshaw Contents INTRODUCTION 4 PRINCIPLES OF CONSTRUCTION DETAILING 6 FOUNDATIONS 9 PRINCIPLES OF FOUNDATION

More information

THE FLORIDA BUILDING CODE

THE FLORIDA BUILDING CODE THE FLORIDA BUILDING CODE 1. According to the Florida Building Code, spiral stairway treads must all be identical and rise must be sufficient enough to provide a headroom of minimum. A. 6'- 4" B. 6'- 6"