CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/23/2016 to 10/29/2016

Size: px
Start display at page:

Download "CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/23/2016 to 10/29/2016"

Transcription

1 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074 FAP No.: BH-1104 (013) CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/23/2016 to 10/29/2016 Project Website: coming soon Page 1 of 10

2 PAGE 2 of EXECUTIVE SUMMARY Project Description: Page 2 of 10 The AECOM Construction Management and Inspection team is providing construction and inspection services for the Rehabilitation of the Francis Scott Key Bridge over the Potomac River (Bridge No. 0007), G.W. Parkway, Whitehurst Freeway and the C & O Canal that includes the East Ramp Structure to the Whitehurst Freeway. The scope of the construction work includes the followings: 1. Installing pedestrian/bicycle detection loops and warning flashers on the Bridge at the ramp to eastbound Whitehurst Freeway. 2. Cleaning and painting the existing steel pedestrian railing on the bridge. 3. Removing the concrete bollards from the east sidewalk at the east ramp exit. 4. Removing and installing new street light poles on the bridge. 5. Removing and resetting portion of the precast concrete traffic barrier on the Bridge. 6. Repairing the precast concrete traffic barrier and grout pads. 7. Repairing the northwest concrete traffic barrier end post. 8. Strengthening the deck overhangs with carbon fiber reinforced polymer bars. 9. Repairing the concrete wearing surface on the bridge. 10. Repairing grout pockets at the post-tensioned deck hold down bolts. 11. Replacing the non-armored expansion joint seal (B-0007 and East Ramp). 12. Replacing the armored expansion joint seals (B-0007 and East Ramp) 13. Overlaying the right lanes (inbound and outbound directions) on the bridge with a high molecular weight methacrylate resin (HMWM) overlay. 14. Milling and overlaying the Rosslyn Approach Structure with a very high early strength latex-modified concrete (LMC-VE). 15. Cleaning debris from all bridge deck drainage scuppers and pier chambers. 16. Removing and replacing the Bridge deck drainage downspout. 17. Rehabilitating the support for a 30-inch Washington Aqueduct water main on the bridge. 18. Repairing portions of the concrete encased and the reinforced concrete floor beams. 19. Cleaning and painting the exposed end of the steel floor beams. 20. Replacing failed concrete deck pedestals. 21. Replacing portions of the utility gallery floor slabs full depth. 22. Repairing portions of the concrete superstructure, including but not limited to: deck soffit, deck pedestals, spandrel arches, spandrel columns, main arches, diaphragm walls, deck slab, and arch struts. 23. Repairing portions of the concrete substructure, including the piers, abutments, abutment chambers, and wing walls. 24. Encapsulating the pier footings with fiber reinforced polymer jackets at the waterline. 25. Removing and replacing the fixed steel access ladder at north Abutment. 26. Installing a new fixed steel access ladder at the south abutment. 27. Removing and replacing portion of chain link fencing (bridge access deterrent) on the main arches. 28. Cleaning the Bridge fascia with pressurized water. 29. Applying an anti-graffiti treatment to portions of the piers. 30. Removing and applying new pavement markings (B-0007 and East Ramp). 31. Maintenance of pedestrian and vehicular traffic during construction of the project, including temporary lane and sidewalk closures necessary to perform the work.

3 PAGE 3 of STATUS OF CONSTRUCTION / PROGRESS SUMMARY Progress Summary: 1. Continued the utility coordination with Washington Gas for the two 12-inch gas pipe risers at the North Pier abutment. Washington Gas delayed the previously scheduled completion date for the North Pier abutment to October 25, Washington Gas completed and evacuated the site, as scheduled, on October 25, Continued the utility coordination with Pepco along Water Street where the construction trailers were placed and mitigated the apparent conflict with the staging area. Continued efforts to setup coordination meeting with Pepco regarding site-related activities. Received information from Pepco regarding the onsite superintendent s contacts and invited them to the Key Bridge progress meetings. 3. Although contractor was given limited NTP for 45-days which started from September 27, 2016 and pending baseline schedule approval, we continued working on resubmittal of the baseline schedule and also provided contractor direct contact with the project team s schedule reviewer to enable them engage directly on on-going BL schedule build up issues. 4. Continued to update the RFI and submittal logs. 5. Continued to document and generate project meeting minutes. 6. Continued to transmit RFI s and submittals to the appropriate discipline for review. 7. Continued to coordinate and facilitate meetings between NPS and Technopref for the special use permit so that Technopref can secure the NPS site, including access to the Potomac River, though staging preparations are currently ongoing. 8. Continued Constructability Review of Plans and site conditions to assist Technopref in any potential conflict resolution issues. 9. Continued to maintain project filing and document management systems (electronics). 10. Continued to maintain and manage the Project SharePoint. 11. Continued working with contractor and design engineer to compile lists of anticipated submittals. 12. Continued to review potential risks that may impact the project and conducted a Risk Assessment and Mitigation Plan meeting at DDOT office at DDOT s request. 13. Continued to prepare forms and formats to be used on the project. 14. Developed a list of project existing and unforeseen safety risks, and a proposed mitigation plan. CM Community Outreach Activities 15. Prepared, planned and conducted first Public Meeting on October 24, Continued to develop the project website with DDOT branding. The website is now approved by DDOT and will soon be going live. 17. Continued following-up with businesses along Water Street as part of the project s community outreach program. 18. We continue to reach out to stakeholders and community with the established dedicated project telephone number daily, respond to any project phone calls and s accordingly and provide updates of weekly outreach activities as follows: Page 3 of 10 We visited the key stakeholders during the week to give them project status updates and identify any concerns that they might have about the project. The following were noted: o 3526 Water Street Sean visited on 10/27. No one was home o 3526 Water Street Sean visited on 10/27. No one was home o 3524 Water Street Sean visited on 10/27 informed residents that scaffolding erection would start next week o Key Bridge Boat House Closing for the Season on Monday. Sean, Ali and Joe met onsite to discuss boat dock removal. Sean followed up with Portia Sampson-Knapp regarding boat dock relocation on 10/27

4 PAGE 4 of 10 o Malmaison -Zubair Popal Sean visited on 10/27; Followed up on Public Meeting and checked for any concerns. 19. We continue to reach out to businesses in close proximity to the project and provide construction updates and ensure that any concerns were noted and addressed. Notes: Team hosted Key Bridge Public Meeting on 10/24 and discussed the project with stakeholders Communications team member, Monica Ray attended CAG meeting on 10/24 Sean met with Betsy Cooley of the CAG. Will confirm 11/29 CAG meeting Sean met with Georgetown Suites management to finalize invoicing from Partnering Meeting on 10/27 Sean sent notification to DDOT regarding removing project staging area, bus parking and loading areas from the bus and truck online map, and other publications on 10/28 Sean sent an to Jason Freeze of the National Park Service regarding potential damage to the boat dock due to scaffolding erection and NPS timeline for relocation Key Takeaways': Bus parking and bus traffic at the west end of Water Street are a concern for stakeholders as buses are blocking residences and businesses. They indicate safety concerns as buses are forced to back up on Water Street as there is no place for them to turn around The location of the BID s construction dumpster is still a concern to the contractor Congestion and the mix of cyclists, vehicles and pedestrians continues to be a major issue PEPCO and DDOT coordination is still important as problems created by PEPCO's work may have negative repercussions for DDOT as opposed to PEPCO even though they (Pepco) may be at fault. 3. ISSUES / ACTION ITEMS - Ongoing Issues / Items: Community relations with Malmaison restaurant along Water Street. - New Issues / Items: Construction level utility coordination with Pepco and Washington Gas. - Action Items: Baseline Schedule yet to be approved, DDOT issued Limited NTP to the contractor on September 27, Also NPS issued Limited Special Use permit same day but continue to work on the full permit to have access to the river. 4. MEETINGS / PROJECT COORDINATION - Weekly coordination meeting with DDOT team, utility meetings and updates, project progress meeting with DDOT and the contractor. - Key Bridge Public Meeting No.01 - Risk Assessment and Mitigation Plan meeting - Conference call with contractor when we cannot possibly hold physical meeting Page 4 of 10

5 PAGE 5 of DAILY WORK PERFORMED Monday 10/24/16 1. NPL, which is a contractor working for Washington Gas, continued installing the steel bollard and backfilled the exposed section of the 2-12 mains that were corroded with GAB. Washington Gas was on site to test the anodes wire to the repaired 2-12 gas mains section. 2. Technopref was on-site working on their site staging area, and continued building their floating dock. They also power-washed the area on the North Abutment east wall in preparation for mock-ups. Tuesday 10/25/16 m 1. NPL continued installing the steel bollard and backfilling, and placed hot-mix asphalt as a finish grade. NPL finished the repair work for 2-12 gas mains section. NPL / Washington Gas cleaned and evacuated the site. 2. Technopref was on-site working on their site staging area, and continued building their floating dock. They also posted one Federal Aid Project Sign on M Street and the Key Bridge SW corner. Wednesday 10/26/16 1. Technopref was on-site working on their site staging area, and continued building their floating dock. They removed the chain-link fence between the staging area and North abutment. Technopref cleared and trimmed trees located underneath and surrounding the North abutment. They also removed/relocated temporary PCC barriers and cleaned the winter salt residue around the North Abutment NE side. 2. FIBRWRAP, a subcontractor for Technopref, was on-site for mock-up work. However, the work was cancelled due to lack of sufficient equipment. Thursday 10/27/16 1. Technopref was on-site working on their site staging area, and continued building their floating dock. They also began cleaning and clearing the debris from the chambers at the North abutment. 2. Technopref installed chain-link fence at Parking Lot B in front of Georgetown Suites. Friday 10/28/16 1. Technopref was on-site working on their site staging area, and continued building their floating dock. They also continued cleaning and clearing the debris from the chambers at the North abutment. Technopref also placed a dirt ramp at the North abutment staging area. 2. Technopref installed screening for the chain-link fence at Parking Lot B in front of Georgetown Suites. They also erected stakes with ropes 5 to 8 feet away from the hotel building. Page 5 of 10

6 PAGE 6 of INSPECTION & MATERIAL TESTS PERFORMED - Pay item worked this week are: Engineers Field Office. We were on site to observe the installation Mobilization. We were on site to observe mobilization activities Tree Trimming. We were on site to observe the tree cutting and trimming Federal Aid Project Sign. We were on site to observe the signs installation Employee Training. We were on site to observe Employee Training. - Contractor continued to work on limited schedule work activities. 7. RFI s / SUBMITTALS - Requests For Information: o RFI. No. 006 Vertical and horizontal minimum clearance for the protection shield. DDOT waits to obtain the information during the next meeting with USACE or with Ms. Booker. o RFI. No. 010 Three trucks for latex-modified concrete overlay DDOT is working on it. o RFI. No. 016 Noise Measurement and Variance DDOT is working on it. o RFI. No. 019 Specification of glass fiber wrap material. DDOT is working on it o RFI. No. 023 Damaged Pedestrian railing Forwarded to JMT on 10/27/16 for review and approval, still under review. - Submittals: o Submittal No. 041 A Material Bridge deck drainage System Forwarded to DDOT on 10/27/16 for review and approval, still under review. 8. CHANGE ORDERS/TASK ORDERS - Noneyet; 9. DBE or CBE PARTICIPATION SUMMARIES - AECOM DBE Activity: o CSMI Project Public out Reach. o CKI Aid to Construction Management and Inspection Services - Technopref o Intelect Corporation Scaffolding erection o Handon Diving Services Inc. Page 6 of 10

7 PAGE 7 of 10 Capsulation of the piers 10. ACCIDENTS / INCIDENTS - There were no reported personnel or safety accidents within the limits of the project during this reporting period Page 7 of 10

8 PAGE 8 of PHOTOS OF WORK PERFORMED THIS PERIOD NPL paving over backfill for 2-12 inch main repaired Post tree-trimming for staging area at North abutment Technopref removing temp PCC barriers around the North abutment NE side Subcontractor, FIBRWRAP chipped area for mock-up on North abutment east side Page 8 of 10

9 PAGE 9 of 10 Chain-link fence on 29th Street and K Street Carpentry work for dock and barges Technopref installing Federal Aid Sign on M Street Debris from North abutment chambers Page 9 of 10

10 PAGE 10 of 10 Inside North abutment chamber after cleaning Ramp staging area at North abutment Debris from the chambers at North abutment Installing screening to chain-link fence on 29 th Street and K Street Page 10 of 10

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017 AECOM Field Office 3550 Water Street, NW Under the Key Bridge North Abutment REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.:

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 06/04/2017 to 06/10/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 06/04/2017 to 06/10/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 04/09/2017 to 04/15/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 04/09/2017 to 04/15/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 12/11/2016 to 12/17/2016

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 12/11/2016 to 12/17/2016 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 08/12/2018 to 08/18/2018

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 08/12/2018 to 08/18/2018 AECOM Field Office 3550 Water Street, NW Under the Key Bridge North Abutment REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN, WASHINGTON, DC. DC Contract No.:

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 03/05/2017 to 03/11/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 03/05/2017 to 03/11/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 02/26/2017 to 03/04/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 02/26/2017 to 03/04/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT PROJECT OFFICE PARK 7, SUITE 112, 4020 MINNESOTA AVENUE NE, WASHINGTON, DC 20019 MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT 12/04/2017 12/09/2017 12/07/2017

More information

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT PROJECT OFFICE PARK 7, SUITE 112, 4020 MINNESOTA AVENUE NE, WASHINGTON, DC 20019 MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S 12/11/2017 12/16/2017 12/14/2017 Minnesota Ave. NE Sta.

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION April 2016 ELLIS Engineering Inc. 214 Martindale Road, Suite 201 St. Catharines, Ontario L2S 0B2 www.ellis.on.ca

More information

City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River

City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River 5525 Merle Hay Road Suite 200 Johnston, IA 50131 Main 515.278.2913 + Fax 515.278.1846 H R G R E E N. C O M City of Des Moines Activity ID: 01-2015-008 Bridge Rehabilitation: Court Avenue over the Des Moines

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

Northeast Bridge Preservation Partnership Meeting

Northeast Bridge Preservation Partnership Meeting Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.

More information

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE Conference Center at the Maritime Institute Anne Arundel County, Maryland Thursday, April 28, 2016 Two bridges in Two Months - Accelerated

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot

More information

Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement

Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement November 2015 From: Greg Woodsmall, Chief Executive Officer,

More information

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara

More information

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC 2 Presentation Outline Construction Manager/General Contractor (CM/GC) and ABC CM/GC Project Highlights Hartford Bridge Replacement

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer St. Anthony Falls I-35W Bridge Replacement ASHE National Conference June 13, 2014 Dustin Thomas, P.E. I-35W Bridge Construction Engineer The Former Bridge - 9340 Opened to traffic in 1967 Steel truss bridge

More information

Capital Projects Progress Report. January Presented by

Capital Projects Progress Report. January Presented by Capital Projects Progress Report January 2019 Presented by February 8, 2018 Loretta Orologio District Superintendent Churchville-Chili Central School District 139 Fairbanks Road Churchville, New York 14428

More information

Federal Project No.: STP-BR04 (304)

Federal Project No.: STP-BR04 (304) Order : A10 Schedule of Items Page: 2 Oversight/State Project : (NFO) 9999-964-582, N501 Federal Project : STP-BR04 (304) 0010 303 00120 REGULAR EXCAVATION 0020 306 307 10035 CEM. STAB. APPROACH SLAB GROUT

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES The District of West Vancouver requires a Traffic Management Plan (TMP) to be submitted for acceptance by the Land Development

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

Exhibit G. Construction Mitigation Plan

Exhibit G. Construction Mitigation Plan Exhibit G Construction Mitigation Plan Construction Period Mitigation 1. A construction period mitigation plan shall be prepared by the applicant for approval by the Public Works Department prior to issuance

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Federal Project No.: BH-BR04(273)

Federal Project No.: BH-BR04(273) Order : M39 Schedule of Items Page: 2 Oversight/State Project : (NFO) 9999-964-541, N501 Federal Project : BH-BR04(273) 0010 303 00120 REGULAR EXCAVATION 6.000 0020 ATTD 10035 CEM. STAB. APPROACH SLAB

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

Accelerated Bridge Construction in USA

Accelerated Bridge Construction in USA Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration

More information

CONSTRUCTION MANAGEMENT PLAN LIMELIGHT HOTEL PREPARED FOR THE CITY OF KETCHUM, IDAHO

CONSTRUCTION MANAGEMENT PLAN LIMELIGHT HOTEL PREPARED FOR THE CITY OF KETCHUM, IDAHO CONSTRUCTION MANAGEMENT PLAN LIMELIGHT HOTEL PREPARED FOR THE CITY OF KETCHUM, IDAHO Table of Contents A. General Information and Schedule a. General Information Pg. 1 b. Site Location Map Pg. 2 c. Anticipated

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

Baseline Document Change Announcement

Baseline Document Change Announcement BDC16D-01 Page 1 of 7 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANNOUNCEMENT: BDC16D-01 DATE: September

More information

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201 Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING 1727 Oak Avenue Evanston, IL 60201 General Contractor Owner Architect Construction Management Plan Phase 1 3 October

More information

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No. 605287 25% Design Public Hearing Chelsea City Hall January 24, 2018 6:30 p.m. Introduction Welcome & Introductions by MassDOT PM

More information

Federal Project No.: BH-BR04(273)

Federal Project No.: BH-BR04(273) Order : M39 Schedule of Items Page: 2 Oversight/State Project : (NFO) 9999-964-541, N501 Federal Project : BH-BR04(273) 0010 303 00120 REGULAR EXCAVATION 6.000 0020 ATTD 10035 CEM. STAB. APPROACH SLAB

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.04 CLEANING AND PAINTING STEEL STRUCTURES - CIDER HILL ROAD UNDERPASS BRIDGE - MILE 6.2, CAPTAIN THOMAS ROAD UNDERPASS BRIDGE - MILE 14.8, ROUTE 126

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

Whittier Bridge/I-95 Improvement Project. Public Information Meeting Whittier Bridge/I-95 Improvement Project Public Information Meeting October 23, 2013 Agenda: WHITTIER BRIDGE / I-95 IMPROVEMENT PROJECT Introduce the Design-Build Team Current Project Schedule Design Project

More information

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY NEWINGTON-DOVER, 11238S August 15, 2016 Vanasse Hangen Brustlin, Inc.

More information

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY

More information

LRFD Bridge Design Manual Changes

LRFD Bridge Design Manual Changes LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and

More information

City of Reno Public Works

City of Reno Public Works City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE11-00XXX Applicant: Job Description:

More information

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com

More information

WORK AND PROJECT REQUIREMENTS

WORK AND PROJECT REQUIREMENTS WORK AND PROJECT REQUIREMENTS BID PACKAGE 3A SITE CONCRETE & CONCRETE TURNKEY CRABAPPLE MIDDLE SCHOOL REPLACEMENT April 26, 2018 EXHIBIT B CONSTRUCTION DOCUMENTS AND SPECIFICATIONS shall be acknowledged

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,417,760.75 Scott Construction - Falmouth, ME $1,418,884.50 T Buck Construction - Auburn, ME $1,520,203.00 Page 1 of 16 CPM Constructors

More information

LAKE + FOREST CONSTRUCTION TIMELINE

LAKE + FOREST CONSTRUCTION TIMELINE LAKE + FOREST CONSTRUCTION TIMELINE Below is a construction timeline in connection with the project at Lake Street and Forest Avenue. All dates are approximate and subject to change based on weather and

More information

Fiber Reinforced Polymer (FRP) Panels for Rail Station Platforms

Fiber Reinforced Polymer (FRP) Panels for Rail Station Platforms Fiber Reinforced Polymer (FRP) Panels for Rail Station Platforms Introduction Scott Reeve, President, Composite Advantage Dayton, Ohio Engineered Solutions and Products for Infrastructure Large parts High

More information

Alaskan Way Viaduct Independent Technical Review

Alaskan Way Viaduct Independent Technical Review Final Report Alaskan Way Viaduct Independent Technical Review Prepared for Seattle Department of Transportation April 10, 2015 1100 112th Avenue NE Suite 500 Bellevue, WA 98004 Contents Section Page Acronyms

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing OVERVIEW Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing Construction Liaison Group Nov 7th, 2013 1 WORKS IN PROGRESS Construction Liaison Group Nov 7 th, 2013

More information

CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST

CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST Abbreviations AB 1-3 Section 11 Purpose and Definitions 11-1 Purpose PD 1 11-2 Construction Practice PD 1 11-3 Definitions PD 1 Section 12 Construction Area

More information

Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts

Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts Technical Memorandum Introduction The comparison of rehabilitation versus replacement of the Sellwood Bridge is being conducted in

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

Highway Bridge Structure Components

Highway Bridge Structure Components Highway Bridge Structure Components Basic Bridge Components 1 Deck and 2 Stringer 3 Bearing 4 Pedestal 5 Footing 6 Piles 7 Underpass 8 Embakment 9 Live Loading Basic Bridge Components 1-Deck & wearing

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

National Roads Authority

National Roads Authority Project nr 2008-1/049 Belfast: 22-23 June 2009 Presentation to Trans-national Workshop NRA: Maintenance and repair of bridges Albert Daly National Roads Authority, IRELAND Investing in our common future

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6 NORFOLK COUNTY MISENER DAM Site Number 980501 LYNN STREET, PORT DOVER 0.65 km N of Highway 6 Ontario Structure Inspection Manual - Inspection Form Site Number: 980501 Inventory Structure Name Misener Dam

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016 District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016 Ohio Transportation Engineering Conference 2016 Columbus, Ohio Agenda About

More information

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY State of ew Jersey EW JERSEY DEPARTMET OF TRASPORTATIO 103 PARKWAY AVEUE P.O. Box 00 TRETO, EW JERSEY 082-000 STRUCTURE O. 0910-13 J ROUTE 7 (BELLEVILLE TURPIKE) OVER CORAIL (EWARK BRACH) TOW OF KEARY

More information

Pre-Construction Meeting Minutes

Pre-Construction Meeting Minutes Project Name Project # Project Address Tel: Fax: Gilbane Building Company Pre-Construction Meeting Date Start End Next Meeting Next Time Prepared By Company Purpose Location Next Location General Notes

More information

If a new residence s electrical service is not located within 200 feet of existing

If a new residence s electrical service is not located within 200 feet of existing Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

The Main Street Bridge - Supporting Transportation Systems

The Main Street Bridge - Supporting Transportation Systems The Main Street Bridge - Supporting Transportation Systems October 28, 2015 So what is the Transportation System Project Background BACKGROUND N DOWNTOWN 70 70 SOUTH INNERBELT STUDY Existing Condition

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 On Maintenance of Traffic Details Sheet No. 46 there is a note that states I-49 Stage Construction is to be Completed Prior to Beginning Work on Hwy.

More information

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018 Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018 Topics of Presentation 1. Team Introductions 2. Project Overview Location, Aerial View & Site Plan 3. Overall Schedule 4. Sequence

More information

The FHWA Long-Term Bridge Performance Program

The FHWA Long-Term Bridge Performance Program The FHWA Long-Term Bridge Performance Program by John M. Hooks, J. M. Hooks & Associates An ever-growing volume of cars and trucks move people and goods on modern bridges spanning highways and topographical

More information

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson

More information

High Bridge Re-Deck Project

High Bridge Re-Deck Project High Bridge Re-Deck Project MnDOT Contract No. 1000532 Presented to: Minnesota Department of Transportation Bridge Repair Recommendations - September 22, 2016 Bridge Overview 11 Total Spans, 2755-0 Long

More information

Construction Report. Owner: City of Kissimmee. Project Manager: John Tulak. Prepared By: Infrastructure Engineers, Inc.

Construction Report. Owner: City of Kissimmee. Project Manager: John Tulak. Prepared By: Infrastructure Engineers, Inc. 2014 Construction Report Fall Report Owner: City of Kissimmee Project Manager: John Tulak Prepared By: Infrastructure Engineers, Inc. Prime Contractor: Gibbs and Register, Inc. Engineer: VHB, Inc. 1 of

More information

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING

More information

Virginia Concrete Conference March, Open Spandrel Concrete Arches New and Old

Virginia Concrete Conference March, Open Spandrel Concrete Arches New and Old Virginia March, 2006 Open Spandrel Concrete Arches New and Old Introduction William M. (Bill) Davidge IV, P.E. Vice President - Wiley & Wilson, Inc. Education B.S. Civil Engineering - 1973 University of

More information

Cast in place concrete parapet and Ministry standard sidewalk railing.

Cast in place concrete parapet and Ministry standard sidewalk railing. BRIDGE INSPECTION BRIDGE NO./NAME 62-003A: Farwell Canyon FSR (21.00 KM) Inspection Date: September 12 th 2012 Inspected By: D. Chen, J. Rupar Gilliatt Year Built: 2007 Number of Spans: 3 Span Lengths:

More information