Prepared by: Amec Foster Wheeler Environment & Infrastructure, Inc Albemarle Point Place, Suite 115 Chantilly, VA 20151

Size: px
Start display at page:

Download "Prepared by: Amec Foster Wheeler Environment & Infrastructure, Inc Albemarle Point Place, Suite 115 Chantilly, VA 20151"

Transcription

1 INITIAL ABATEMENT REPORT ALLIED AVIATION RONALD REAGAN WASHINGTON NATIONAL AIRPORT FUEL FARM FACILITY Pollution Complaint # Air Cargo Road ARLINGTON, VA Prepared for: Mr. Randy Chapman, Case Manager Virginia Department of Environmental Quality Northern Regional Office Crown Court, Woodbridge, Virginia Prepared by: Amec Foster Wheeler Environment & Infrastructure, Inc Albemarle Point Place, Suite 115 Chantilly, VA On Behalf of: Allied Aviation Fueling Company of National Airport, LLC. 11 Air Cargo Road, Ronald Reagan National Airport Washington, DC December 4, 2015 Amec Foster Wheeler Project No

2 December 4, 2015 Mr. Randy Chapman Environmental Remediation Manager Virginia Department of Environmental Quality Crown Court, Woodbridge, VA Subject: Report of Initial Abatement Measures Allied Aviation, Ronald Reagan Washington National Airport Fuel Farm Facility LUST Case#: Dear Mr. Chapman, On behalf of Allied Aviation Fueling Company of National Airport, LLC. (Allied). Amec Foster Wheeler Environment & Infrastructure, Inc. (Amec Foster Wheeler) is pleased to present this report describing the Initial Abatement Activities conducted at the Ronald Reagan Airport Fuel Farm Facility (site) located at Thomas Avenue, Arlington, Virginia. This report has been prepared in response to your November 3, 2015 letter regarding the confirmed petroleum release from the site on October 30, 2015 (Pollution Complaint # ). If you have any questions regarding this report, please do not hesitate to contact Mr. Brian Sariano of Amec Foster Wheeler at or via at or Mr. Jim Buchanan of Allied Aviation at or Sincerely, Amec Foster Wheeler Environment & Infrastructure, Inc. Daniel Dunlap, P.G. Geologist Brian Sariano Associate - Environmental Scientist Cc: Mr. Jim Buchanan, Allied Aviation Mr. Al Voelkle, P.G., Allied Aviation Correspondence: Amec Foster Wheeler Albemarle Point Place, Suite 115 Chantilly, Virginia USA Tel +1 (703) Fax +1 (703) amecfw.com

3 TABLE OF CONTENTS EXECUTIVE SUMMARY INTRODUCTION STORAGE TANK INFORMATION RELEASE INFORMATION INITIAL ABATEMENT MEASURES TAKEN CORRECTIVE ACTION MEASURES... 6 TABLE 1 Surface Water Analytical Results FIGURES 1 Site Location Map 2 Monitoring Well and Site Feature Map APPENDICES APPENDIX A Virginia DEQ Correspondence APPENDIX B Certificates of Disposal and Emergency Response Contractor Field Reports APPENDIX C Amec Foster Wheeler Memo APPENDIX D Laboratory Analytical Report APPENDIX E DCA Fuel Release Recap of Fuel Accounting APPENDIX F Corrective Action Plan APPENDIX G Daily Outfall Inspection Logs

4 EXECUTIVE SUMMARY A release of approximately 13,620 gallons of Jet Fuel A occurred at the Ronald Reagan Washington National Airport Fuel Farm Facility operated by Allied Aviation Fueling Company of National Airport, LLC (Allied) on October 29, Initial assessments indicated that the fuel release had been limited to airport property. Upon further review some quantity of free product and rain water was likely discharged to a storm sewer line located adjacent to the Fuel Farm Facility which discharges to Four Mile Run, located approximately 700 feet to the south, through Outfall-18. Additional response, abatement, and remediation activities were carried out in the vicinity of Outfall-18, Four Mile Run, and the Potomac River. Allied s emergency response contractor, together with various airport, local, and federal authorities responded to the release. Approximately 11,899 gallons of fuel has been recovered through various mediums, which leaves approximately 1,721 gallons unaccounted for. The difference in fuel may be attributed to several factors including; temperature variations associated with the fuel delivery itself, approximate estimates of fuel recovered utilizing sorbent material, and evaporation. The area around Outfall- 18 has been monitored daily since the release, and the sorbent booms placed around the outfall are being changed and maintained on a regular basis. Allied has completed a Corrective Action Plan which details the various measures they have and will implement to prevent a similar release in the future. A Site Characterization Report will be prepared by Amec Foster Wheeler on behalf of Allied to assess site conditions and make recommendations on risk mitigation and remediation if required. 1

5 1.0 INTRODUCTION At the request of Allied Aviation Fueling Company of National Airport, LLC. (Allied), Amec Foster Wheeler Environment & Infrastructure, Inc. (Amec Foster Wheeler) has prepared this Initial Abatement Report in response to the Virginia Department of Environmental Quality (DEQ) for the Ronald Reagan Washington National Airport Fuel Farm Facility (Site) confirmed petroleum release, Pollution Complaint # , which occurred on October 29, The DEQ correspondence is included in Appendix A. This Initial Abatement report includes relevant site background information, mitigation measures and details of free product recovery and site cleanup. The Ronald Reagan National Airport is currently operated by the Washington Metropolitan Airports Authority (MWAA). 2.0 STORAGE TANK INFORMATION The Ronald Reagan Washington National Airport Fuel Farm Facility currently operates four 60- foot diameter, 40-foot tall, 840,000 gallon Jet Fuel-A Aboveground Storage Tanks (ASTs) which are filled via a six-inch pipeline operated by Plantation Pipeline Company (Plantation). The four tanks were constructed in 1993 and are currently active and in use. The site is located on the southern portion of Airport near the intersection of West Post Office Road and Thomas Road and is approximately 700 feet north of Four Mile Run (see Figure 1). 3.0 RELEASE INFORMATION At approximately 0200 hours on Thursday October 29, 2015 it is believed a discharge valve on a pressurized filter vessel pipe at the Site was not fully closed and resulted in a loss of approximately 13,620 gallons 1 of fuel during filling operations. According to Allied personnel it was raining at the time of the release. Weatherunderground.com 2 reports that Arlington, Virginia received 0.22 inches of rain between 12:46am and 1:52am. According to the National Oceanographic and Atmospheric Administration (NOAA) the tidal Potomac at Indian Head, Maryland 3 which is located south of the Site on the Potomac River, low tide occurred in the vicinity of 0300 hours. The subsequent high tide water at approximately 1300 hours on October 30, The release estimates were obtained through comparison of the quantity of fuel sent through the pipeline by Plantation and the quantity of fuel that was received by Allied in their AST. When the discharge 1 Data is included in the DCA Fuel Release Recap of Fuel Accounting document included in Appendix E tidesandcurrents.noaa.gov/noaatidepredictions/noaatidesfacade.jsp?stationid= &bmon=10&bday=29&byear=2015&edate=&timelength=daily 2

6 was identified the flow of fuel was shut off and the discharge was believed to have been contained to airport property. The fuel farm resumed normal operations. At approximately 2115 hours on Thursday, October 29, 2015, airport personnel responded to reports of a fuel odor on the south side of the airport property. At 2225 hours, responding personnel identified a fuel sheen in the water near Outfall-18 which discharges into Four Mile Run. The outfall is located adjacent to the location of the initial odor reports. Airport Operations, Airport Engineering and Maintenance, and Airport Fire and Rescue, in coordination with the District of Columbia Harbor Patrol, placed booms in the river to contained the observed spill. At 0700 hours on Friday October 30, 2015 the Transportation Security Administration Integration Facility (TSIF) building, located due west of the site, reported a fuel odor inside the building. The Airport Fire and Rescue responded as a precautionary measure. The TSIF building was evacuated and remained closed through Monday November 2, Figure 2 details the location of relevant site features. Based on the observations of fuel and petroleum odor located at locations outside the Fuel Farm Facility at the TSIF building and Outfall-18 following the 0200 hours release on October 29, 2015, it is likely that a portion of the released product was flushed into Four Mile Run. An Oil Water Separator (OWS) located at the Fuel Farm Facility is utilized to remove petroleum products from water discharged to the storm sewer system. It is likely that a portion of this OWS system failed and allowed some quantity of fuel to be discharged to the storm sewer or fuel was able to bypass the OWS and reach the storm sewer which leads to Outfall-18. At the conclusion of the initial abatement activities, Allied prepared an estimate of the fuel lost during the release. According to the DCA Fuel Release Recap of Fuel Accounting document provided to Amec Foster Wheeler by Allied, the Fuel Farm Facility began receiving fuel from Plantation on October 28, 2014 at 0750 hours. At 0159 hours on October 29, 2015, the fuel receipt was completed. The fuel receipt included three batches totaling approximately 385,980 gallons. The Allied records indicate that the volume of fuel received after the Plantation delivery to be approximately 372,360 gallons, which is a difference of approximately 13,620 gallons. However, it must be noted that the volume of fuel sent versus the volume of fuel received often varies due to the temperature at which the fuel was sent by Plantation (in Newington, VA) and then subsequently received by Allied (in Virginia/DC). This variance may be statistically insignificant. 3

7 4.0 INITIAL ABATEMENT MEASURES TAKEN Initial abatement measures can be classified into two events, the initial response on October 29, 2015 and the additional response measures carried out from October 30 through October 31, During the initial response Allied Aviation personnel utilized vacuum trucks and sorbent materials to contain the majority of the release to the confines of the Fuel Farm Facility. The recovered fuel and water was containerized on site pending analysis for reclamation and/or disposal by a qualified contractor (See Appendix B). A portion of the recovered fuel has already been removed for the site for disposal. The additional response measures included the deployment of Allied s emergency response contractor, Miller Environmental on October 30, The additional response measures were directed primarily at preventing free product from reaching Four Mile Run and the Potomac River from Outfall-18. Miller Environmental and the other responding authorities placed booms around the outfall to prevent the observed petroleum sheen from migrating. Additional sorbent materials were deployed along with the use of a vacuum truck to recover product floating in the area outside Outfall-18. These activities were performed between October 30 and November 2, Allied Aviation records indicate that NOAA and the U.S. Fish and Wildlife Service believe that the environmental impact to Four Mile Run and the Potomac River will be limited 4. According to Allied Aviation personnel the tidal fluctuations in the Potomac River are capable of flooding portions of the storm sewer line which discharges to Outfall-18. It is likely that the high tide kept the petroleum products from flowing from the storm sewer line located behind the Fuel Farm Facility through Outfall-18 and into Four Mile Run. This allowed the response contractor to recover the bulk of the fuel that entered the storm sewer. The containment booms have remained in place at Outfall-18 and are changed on a regular basis by Allied Aviation personnel. As of the writing of this report, the containment boom and pads have been changed 4 times. The booms outside Outfall- 18 are scheduled to be reconfigured on December 3, The inner booms located adjacent to the outfall and the third boom located furthest from the outfall will be removed. A hard boom was installed on December 1, 2015 and will remain in place. A 160 foot by five inch sorbent boom has installed between the hard boom and the outfall and will remain in place (See Figure 2). 4 NOAA and US Fish and Wildlife assessments information was included in the Metropolitan Washington Airports Authority Emergency Operations Center (EOC) Situation Report #1 for October 31, 2015 at 0900 hours. 4

8 The additional response measures were considered to have been completed on October 31 with continued recovery and collection of residual fuel in the area surrounding Outfall-18 through November 2, Amec Foster Wheeler mobilized to the site on October 31, 2015 and collected surface water samples from Four Mile Run ( Four Mile Run A through E ) outside of the boomed area and an additional surface water sample from inside the boomed area (Outfall-18). The details of the sampling including the sampling locations and photo documentation are included in the Amec Foster Wheeler Memo to Mr. James Buchanan of Allied Aviation on November 3, 2015 which is included in Appendix C. The analytical laboratory sampling results from the October 31, 2015 surface water sampling documented low concentrations (between milligrams per liter (mg/l) in sample Four Mile-E and mg/l in sample Four Mile-D) of total petroleum hydrocarbons (TPH) gasoline range organics (GRO) and low concentrations (0.36 micrograms per liter (ug/l) in sample Four Mile-D to 1.27 ug/l in Outfall-18 Boom) of Xylenes. Naphthalene (4.6 ug/l) and TPH-Diesel Range Organics (DRO) concentrations were also detected in the Outfall 18 Boom sample. The laboratory analytical results are summarized in Table 1. The laboratory analytical reports are included in Appendix D. According to the DCA Fuel Release Recap of Fuel Accounting document (Appendix E), the following quantities of product were recovered: Entity Approximate Volume (gallons) Method/Storage Location MWAA 1, bags of 8 inch boom 15 bags of 5 inch boom 6 boxes of sorbent pads Miller Environmental 1, bales of sweep (on-water sorbent pads) 27 bags of 5 inch boom 10 boxes of sorbent pads 2 bags of granular absorbent Crystal Clean (Allied) 4,075 Vacuum Truck Recovery Allied 4,627 Vacuum recovery into two Frac Tanks Allied inch booms 7 bags of granular absorbent Total Volume: 11,899 Approximately 13,620 gallons of fuel released and approximately 11,899 gallons of fuel were recovered, for a difference of approximately 1,721 gallons. The difference in released and recovered fuel may be attributed to the following: Petroleum products are subject to changes in volume and density due to temperature and pressure. Currently the temperature of fuel leaving the Plantation facility is monitored, while the fuel volume received by Allied is not corrected for changes in temperature which 5

9 may account for a change in volume, however, this volume differential may not be statistically significant. The estimates of fuel recovered utilizing sorbent booms, pads, sweep and granular material are approximate and are based on the manufacturer s specifications which may not reflect actual field conditions. Jet fuel is a volatile liquid and some quantity of product was likely lost due to evaporation over the course of the initial abatement and remediation activities. The variable site conditions during the initial abatement and remediation make an approximation of the volume of fuel lost to evaporation difficult to quantify. A Site Characterization Report (SCR) will be prepared to address the possible quantities of fuel that entered the storm sewer system and were contained at Outfall CORRECTIVE ACTION MEASURES Amec Foster Wheeler reviewed a Corrective Action Plan prepared by Allied, dated November 30, A copy of the Corrective Action Plan is included in Appendix F. The Corrective Action Plan details the steps that are currently being implemented as well as the measures that have already been enacted to prevent a similar event from taking place in the future. These correct actions include: Installation of a storm drain plug in the OWS system to prevent any further discharge to the storm sewer system until a more complete engineering study can be completed to assess the OWS. The manual sump drain valve which was responsible for the release has been replaced with a spring loaded, normally closed valve. Each of the other manual sump drain valves have also been replaced with these same valves. Allied is also in the process of implementing revised and enhanced safety and emergency response training for the Fuel Farm Facility new hires as well as additional training for current employees. Additional emergency response resources are being placed on retainer to provide more flexibility during an incident. Allied personnel have been monitoring the outfall daily since the release. The observation logs compiled by Allied are included in Appendix G. 6

10 TABLES

11 OUTFALL 18 SURFACE WATER ANALYTICAL RESULTS Four Mile Run at Ronald Reagan National Airport October 31, 2015 SAMPLE ID Parameter Method Matrix Units FOUR MILE - A FOUR MILE - B FOUR MILE - C FOUR MILE - D FOUR MILE - E OUTFALL 18 BOOM BTEX Benzene EPA 8260 Water ug/l <0.25 <0.25 <0.25 <0.25 <0.25 <0.25 Toluene EPA 8260 Water ug/l <0.26 <0.26 <0.26 <0.26 <0.26 <0.26 Ethylbenzene EPA 8260 Water ug/l <0.30 <0.30 <0.30 <0.30 <0.30 <0.30 Xylene (Total) EPA 8260 Water ug/l <0.66 <0.66 <0.66 <0.66 <0.66 <0.66 m&p-xylene EPA 8260 Water ug/l <0.66 <0.66 <0.66 <0.66 < J o-xylene EPA 8260 Water ug/l <0.23 < J 0.36 J < J Petroleum Constituents TPH-GRO EPA 5030/8015 Modified Water mg/l J J J J J J TPH-DRO EPA 8015 Modified Water mg/l <0.10 <0.10 <0.10 <0.10 < PAHs Acenaphthene EPA 8270 Water ug/l <1.7 <1.7 <1.7 <1.7 <1.7 <1.7 Acenaphthylene EPA 8270 Water ug/l <1.8 <1.8 <1.8 <1.8 <1.8 <1.8 Anthracene EPA 8270 Water ug/l <1.1 <1.1 <1.1 <1.1 <1.1 <1.1 Benzo(a)anthracene EPA 8270 Water ug/l <0.72 <0.72 <0.72 <0.72 <0.72 <0.72 Benzo(a)pyrene EPA 8270 Water ug/l <0.71 <0.71 <0.71 <0.71 <0.71 <0.71 Benzo(b)fluoranthene EPA 8270 Water ug/l <0.81 <0.81 <0.81 <0.81 <0.81 <0.81 Benzo(g,h,i)perylene EPA 8270 Water ug/l <0.97 <0.97 <0.97 <0.97 <0.97 <0.97 Benzo(k)fluoranthene EPA 8270 Water ug/l <0.87 <0.87 <0.87 <0.87 <0.87 <0.87 Chrysene EPA 8270 Water ug/l <0.65 <0.65 <0.65 <0.65 <0.65 <0.65 Dibenz(a,h)anthracene EPA 8270 Water ug/l <0.70 <0.70 <0.70 <0.70 <0.70 <0.70 Fluoranthene EPA 8270 Water ug/l <0.87 <0.87 <0.87 <0.87 <0.87 <0.87 Fluorene EPA 8270 Water ug/l <1.6 <1.6 <1.6 <1.6 <1.6 <1.6 Indeno(1,2,3-cd)pyrene EPA 8270 Water ug/l <1.8 <1.8 <1.8 <1.8 <1.8 <1.8 Naphthalene EPA 8270 Water ug/l <1.5 <1.5 <1.5 <1.5 < J Phenanthrene EPA 8270 Water ug/l <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 Pyrene EPA 8270 Water ug/l <0.53 <0.53 <0.53 <0.53 <0.53 <0.53 LEGEND ug/l mg/l TPH-GRO TPH-DRO Bold J micrograms per liter milligrams per liter Total Petroleum Hydrocarbons-Gasoline Range Organics Total Petroleum Hydrocarbons-Diesel Range Organics Analyte detection Analyte detected at concentration less than the Reporting Limit (RL) and greater than or equal to the Method Detection Limit (MDL). Concentrations within this range are estimated

12 FIGURES

13 Potomac River Site Location Ronald Reagan Washington National Airport Four Mile Run Outfall-18 Fuel Farm Facility Source: Google Earth N N.T.S. SITE LOCATION MAP FIGURE 1 PROJECT NAME: Initial Abatement Report Allied Aviation Ronald Reagan Airport Fuel Farm Facility PROJECT NO.: DATE: November 3, 2015 Amec Foster Wheeler, Albemarle Point Place Suite 115, Chantilly, VA 20151

14 Location of Filter Vessel Pipe Fuel Farm Facility Tanks N 400 Feet Source: Google Earth Legend Monitoring Well Location Oil Water Separator Location Approximate Storm Sewer Location Monitoring Well and Site Feature Map FIGURE 2 PROJECT NAME: Initial Abatement Report Allied Aviation Ronald Reagan Airport Fuel Farm Facility PROJECT NO.: DATE: November 3, 2015 Amec Foster Wheeler, Albemarle Point Place Suite 115, Chantilly, VA 20151

Tennessee Cleanup Standards for Hydrocarbon Contaminated Groundwater

Tennessee Cleanup Standards for Hydrocarbon Contaminated Groundwater Tennessee Cleanup Standards f Hydrocarbon Contaminated Groundwater Product (Residential) 0.001 mg/l 0.005 mg/l 0.072 mg/l Toluene 0.001 mg/l 1.0 mg/l 4.31 mg/l Gasoline Ethylbenzene 0.002 mg/l 0.7 mg/l

More information

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA)

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA) Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial National Oilheat Research Alliance (NORA) Forward Heating oil is used to heat many private homes as well as small commercial

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement and Contracts Dept., MA-29 November 13,

More information

Study Summary. Evaluation of Soil Rx For Crude Oil Impacted Soil

Study Summary. Evaluation of Soil Rx For Crude Oil Impacted Soil Study Summary Evaluation of Soil Rx For Crude Oil Impacted Soil Study Completed In Cooperation With OES Industries Vinland Energy 3 Tier Technologies LLC June 2010 William M. Mitchell, PG, OES Industries

More information

TEKLAB, INC ANALYTICAL QC SUMMARY REPORT. TestCode: SV_8310S_W. CLIENT: Kelron Environmental Work Order: Project: CHMGP/

TEKLAB, INC ANALYTICAL QC SUMMARY REPORT. TestCode: SV_8310S_W. CLIENT: Kelron Environmental Work Order: Project: CHMGP/ TEKLAB, INC CLIENT: Kelron Environmental Date: 16-Jun-5 Sample ID: MB-25734 MBLK SeqNo: 12673 Acenaphthene ND.1.3 Acenaphthylene ND.5.15 Anthracene ND.1.3 Benzo(a)anthracene ND.3.9 Benzo(a)pyrene ND.4.12

More information

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to LAKE EWAUNA TRAIL LEVEL 2 FIELD SAMPLING ASSESSMENT the proposed alignment (Figure 1). The trail will also include the installation of a geothermal snow melt system, allowing for year round use of the

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

2.BACKGROUND SITE INFORMATION

2.BACKGROUND SITE INFORMATION 2.BACKGROUND SITE INFORMATION A. Site History The site is located in the south-central portion of Scott County and more specifically in Oneida, Tennessee. In the early 1950s, a cross-tie treatment facility

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM NEWTON GEO-HYDROLOGY CONSULTING SERVICES P.O. BOX 0 SANTA BARBARA, CALIFORNIA 0 TECHNICAL MEMORANDUM TO: FROM: Citizens For Responsible Oil And Gas (CFROG) Brad Newton, Ph.D., P.G. 0 0 0 RE: Summary Review

More information

gauging of site monitoring wells MW-1, MW-2 and MW-3 was completed on October 25, 2018 (tank field observation pipes were gauged as dry this day);

gauging of site monitoring wells MW-1, MW-2 and MW-3 was completed on October 25, 2018 (tank field observation pipes were gauged as dry this day); November 28, 2018 Ms. Susan Bull Oil Control Program Maryland Department of the Environment 1800 Washington Blvd, Suite 620 Baltimore, Maryland 212 RE: SECOND SEMI-ANNUAL 2018 MONITORING REPORT MDE Case

More information

Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater

Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater Product Parameter/ Constituent Lab Test Protocol & Number Water Standard / Action Level Leaded Gasoline, Aviation Gasoline, Jet

More information

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M SEPTEMBER 22 TO OCTOBER 19, 2015

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M SEPTEMBER 22 TO OCTOBER 19, 2015 MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M SEPTEMBER 22 TO OCTOBER 19, 2015 1 Introduction The Canadian Natural Resources Limited Primrose South in situ oil sands project is located in the

More information

LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT

LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT REPORT ON LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT 2005 Greenwood Road Shreveport, Louisiana October 2012 Prepared for: Biomedical Research Foundation of Northwest Louisiana 1505 Kings Highway Shreveport,

More information

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 Prepared for: THE MICHIGAN CITY REDEVELOPMENT COMMISSION 100 EAST MICHIGAN BOULEVARD

More information

REPORT OF ENGINEERING SERVICES Phase II Environmental Site Assessment. 130 London Bridge Road Virginia Beach, Virginia 23454

REPORT OF ENGINEERING SERVICES Phase II Environmental Site Assessment. 130 London Bridge Road Virginia Beach, Virginia 23454 REPORT OF ENGINEERING SERVICES Phase II Environmental Site Assessment London Bridge Commerce Park GPIN 2407-04-8646 130 London Bridge Road Virginia Beach, Virginia 23454 Prepared for City of Virginia Beach

More information

Phase II Environmental Site Assessment (ESA) Update. Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 Ottawa, Ontario K1B 5N1

Phase II Environmental Site Assessment (ESA) Update. Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 Ottawa, Ontario K1B 5N1 Phase II Environmental Site Assessment (ESA) Update 2720 Richmond Road Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 K1B 5N1 Centre Multiservices Francophone de l Ouest d Ottawa

More information

January 13, Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region East Avon Lima Road Avon, New York 14454

January 13, Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region East Avon Lima Road Avon, New York 14454 January 13, 2017 Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region 8 6724 East Avon Lima Road Avon, New York 14454 Re: Quarterly Monitoring Report Third Quarter 2016 Buckeye

More information

Nez Perce Tribe Groundwater Assessment and Cleanup

Nez Perce Tribe Groundwater Assessment and Cleanup Nez Perce Tribe Groundwater Assessment and Cleanup Nez Perce Tribal Response Program Multidisciplinary program, including LUST Prevention, LUST Assessment, Brownfields, and Emergency Response Two properties

More information

Levels. 1.0 Screening. ntal Quality. Salt Lake. Dear Chris, health to. collected. Based on. the Liberty. Park Lake. Red Butte. sources, in.

Levels. 1.0 Screening. ntal Quality. Salt Lake. Dear Chris, health to. collected. Based on. the Liberty. Park Lake. Red Butte. sources, in. December 8, 2011 Christopher Bittner Project Manager Utah Department of Environmen ntal Quality 195 North 1950 West Salt Lake City, Utah 84114 Subject: Risk-based Health Screening Levels in Support of

More information

Masse Environmental Consultants Ltd 1

Masse Environmental Consultants Ltd 1 Masse Environmental Consultants Ltd. 812 Vernon St. Nelson, BC, V1L 4G4 Tel.: 250-352-1147 Fax: 250-352-0422 www.masseenvironmental.com Fred Bullen May 5, 2017 Western Pacific Marine Ltd. 7721 Upper Balfour

More information

Spill Response Procedures

Spill Response Procedures Spill Response Procedures [your municipality] Purpose: The purpose of this Standard Operating Procedure (SOP) is to provide guidance for the proper response and corrective actions to be followed in the

More information

Scope of Work for Water Sampling

Scope of Work for Water Sampling Scope of Work for Water Sampling From: Meghan Betcher, Environmental Scientist Downstream Strategies, LLC 100 Railroad Ave. 304-445-7200 mbetcher@downstreamstrategies.com Date: June 26, 2017 Downstream

More information

FINAL REPORT. Environmental Monitoring Services during the Underground Storage Tank Removal at Fire Hall # Nicola Street

FINAL REPORT. Environmental Monitoring Services during the Underground Storage Tank Removal at Fire Hall # Nicola Street FINAL REPORT Environmental Monitoring Services during the Underground Storage Tank Removal at Fire Hall #6 1001 Nicola Street Prepared for: City of Vancouver 453 West 12 th Avenue Vancouver, BC V5Y 1V4

More information

Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report

Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report Gasoline Fueling Station Royal Farms #96 500 Mechanics Valley Road North East, MD 21901 MDE OCP Case No. 2011-0729-CE Facility ID

More information

QuES&T Quality Environmental Solutions & Technologies, Inc.

QuES&T Quality Environmental Solutions & Technologies, Inc. QuES&T Quality Environmental Solutions & Technologies, Inc. May 11, 2012 White Plains City School District Facilities Building 580 North Street White Plains, NY 10605 Attn: Frank Stefanelli, Director of

More information

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Residual Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Background Information Linebach Funkhouser, Inc. (LFI) personnel performed permanent closure, assessment and corrective

More information

EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS

EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS GENERAL Industrial operations have been conducted on Port of Long Beach property since the 1930s. Though it is unlikely that hazardous substances will be encountered

More information

PLEASANT PARK LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT TONKA BAY, MINNESOTA. January 14, 2016

PLEASANT PARK LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT TONKA BAY, MINNESOTA. January 14, 2016 LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT PLEASANT PARK TONKA BAY, MINNESOTA January 14, 2016 for City of Tonka Bay 1901 Manitou Road Tonka Bay, MN 55331 WSB PROJECT NO. 1987-570 701 Xenia Avenue

More information

California Regional Water Quality Control Board San Francisco Bay Region

California Regional Water Quality Control Board San Francisco Bay Region California Regional Water Quality Control Board San Francisco Bay Region Linda S. Adams Secretary for Environmental Protection 1515 Clay Street, Suite 1400, Oakland, California 94612 (510) 622-2300 Fax

More information

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M AUGUST 19 TO SEPTEMBER 22, 2014

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M AUGUST 19 TO SEPTEMBER 22, 2014 MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M AUGUST 19 TO SEPTEMBER 22, 2014 1 Introduction The Primrose South in situ oil sands project is located in the Cold Lake Air Weapons Range approximately

More information

July 2011 Silvertip Pipeline Crude Oil Discharge to the Yellowstone River

July 2011 Silvertip Pipeline Crude Oil Discharge to the Yellowstone River July 2011 Silvertip Pipeline Crude Oil Discharge to the Yellowstone River Presentation to the Montana Section of the American Water Resources Association October 11, 2012 Laura Alvey, Project Officer Montana

More information

SURPLUS SOIL-MATERIAL REUSE REQUIREMENTS

SURPLUS SOIL-MATERIAL REUSE REQUIREMENTS SURPLUS SOIL-MATERIAL REUSE REQUIREMENTS GENERAL Surplus soil-materials generated from most, if not all, Long Beach Harbor Department projects are unlikely to meet established Port Export Soil-material

More information

Phase II Environmental Site Assessment Results MWV Southern Rail; NEI Project Number P1.2 Dorchester County, South Carolina

Phase II Environmental Site Assessment Results MWV Southern Rail; NEI Project Number P1.2 Dorchester County, South Carolina Charleston, SC Bluffton, SC 9 June 2009 Dr. Michael Dyer MWV 180 Westvaco Road Summerville, South Carolina 29483 Re: Phase II Environmental Site Assessment Results MWV Southern Rail; NEI Project Number

More information

Petcoke-Coal Test. David L. MacIntosh, Sc.D., C.I.H., Chief Science Officer. January 13, 2014

Petcoke-Coal Test. David L. MacIntosh, Sc.D., C.I.H., Chief Science Officer. January 13, 2014 Petcoke-Coal Test Results David L. MacIntosh, Sc.D., C.I.H., Chief Science Officer January 13, 2014 Findings No evidence of petcoke or coal on surfaces or in soil of East Side and South Deering neighborhoods

More information

North Carolina Cleanup Standards for Hydrocarbon Contaminated Groundwater

North Carolina Cleanup Standards for Hydrocarbon Contaminated Groundwater North Carolina Cleanup Standards for Hydrocarbon Contaminated Groundwater The North Carolina Department of Environment and Natural Resources has adopted Risk-Based Assessment and Corrective Action procedures

More information

WASTE CHARACTERIZATION: IN-SITU SOIL LOCATED AT ISRA OUTFALL 009 PLANNED EXCAVATION B1-1D

WASTE CHARACTERIZATION: IN-SITU SOIL LOCATED AT ISRA OUTFALL 009 PLANNED EXCAVATION B1-1D B1-1D WASTE CHARACTERIZATION: IN-SITU SOIL LOCATED AT ISRA OUTFALL 009 PLANNED EXCAVATION B1-1D Introduction This report presents supporting detailed information for the April 27, 2010 in-situ characterization

More information

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS C3.1 Purpose... C3-1 C3.2 Responsibility of Implementation... C3-2 C3.3

More information

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES 1. Introduction This guidance document applies to soil recovery facilities which exceed the operational

More information

OSHA Exposure Assessment Onshore and Offshore in the Deepwater Horizon Oil Spill Response

OSHA Exposure Assessment Onshore and Offshore in the Deepwater Horizon Oil Spill Response OSHA Exposure Assessment Onshore and Offshore in the Deepwater Horizon Oil Spill Response Dean Wingo, MS, CIH, CSP Assistant Regional Administrator, USDOL/OSHA Dallas Regional Office OSHA Activities Ensure

More information

Groundwater Discharge Permit Reference Sheet

Groundwater Discharge Permit Reference Sheet Groundwater Discharge Permit Reference Sheet Alternate Disposal Options: All reasonable alternatives to sewer disposal, such as legally permissible reuses, must be explored before discharge will be approved.

More information

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M MAY 19 TO JUNE 22, 2015

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M MAY 19 TO JUNE 22, 2015 MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M MAY 19 TO JUNE 22, 2015 1 Introduction The Canadian Natural Resources Limited Primrose South in situ oil sands project is located in the Cold Lake

More information

Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites. Bud Ivey Ivey International

Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites. Bud Ivey Ivey International Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites Bud Ivey Ivey International SMART Remediation Ottawa, ON February 16, 2017 SMART is Powered by: www.vertexenvironmental.ca

More information

Cadmium B ug/l HRL Chromium B ug/l MCL 100

Cadmium B ug/l HRL Chromium B ug/l MCL 100 Appendix 4, Table A4-1 Inorganics/Metals Arsenic 7440-38-2 6010B ug/l 25 4.41 10 MCL 2 Barium 7440-39-3 6010B ug/l 10 1.04 2000 HRL Use Tier 2 5 (or hardnessspecific value if lower) Cadmium 7440-43-9 6010B

More information

Alaska Department of Environmental Conservation Division of Spill Prevention and Response

Alaska Department of Environmental Conservation Division of Spill Prevention and Response Alaska Department of Environmental Conservation Division of Spill Prevention and Response REQUEST FOR QUOTE (RFQ) 180000031 1003 2 nd Street, Douglas Heating Oil Tank Investigation Date of Issue: October

More information

Toledo Botanical Gardens Hill Ditch Stream Restoration and Dam Removal Project Sediment Feasibility Study

Toledo Botanical Gardens Hill Ditch Stream Restoration and Dam Removal Project Sediment Feasibility Study 1800 Indian Wood Circle * Maumee, Ohio 43537 P: 419-891-2222 * F: 419-891-1595 * www.manniksmithgroup.com March 7, 2012 Ms. Jessica Hickey Davey Resource Group A Division of the Davey Tree Expert Company

More information

Phase 2 Environmental Site Assessment of the Fuel Station Located at (& 11509)Wyoming Street, Detroit MI 48204

Phase 2 Environmental Site Assessment of the Fuel Station Located at (& 11509)Wyoming Street, Detroit MI 48204 Timmermans Environmental Services, Inc. Phase 2 Environmental Site Assessment of the Fuel Station Located at 11511 (& 1159)Wyoming Street, Detroit MI 4824 Prepared For: Fast Track Ventures 2541 Ecorse

More information

Urban Area Polycyclic Aromatic Hydrocarbons Study Tiered Approach to Corrective Action Objectives

Urban Area Polycyclic Aromatic Hydrocarbons Study Tiered Approach to Corrective Action Objectives Urban Area Polycyclic Aromatic Hydrocarbons Study Tiered Approach to Corrective Action Objectives Two background studies were recently completed investigating certain polycyclic aromatic hydrocarbon (PAHs)

More information

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY File No. 0506-013-07 Contaminated Media Management Plan Midland

More information

E N V I R O N M E N T A L I N C O R P O R A T E D

E N V I R O N M E N T A L I N C O R P O R A T E D H P E N V I R O N M E N T A L I N C O R P O R A T E D April 10, 2015 Ms. Lisa Wiersma Development Manager Vornado/Charles E. Smith 2345 Crystal Drive Suite 1100 Arlington Virginia 22202 Re: Limited Phase

More information

Attenuation Factors for Hydrocarbons Associated With a Diesel Spill

Attenuation Factors for Hydrocarbons Associated With a Diesel Spill Attenuation Factors for Hydrocarbons Associated With a Diesel Spill By Lindsay Breyer, CIH and James B. Cowart, PE Walsh Environmental Scientists and Engineers, Boulder, Colorado Site Location: Mandan,

More information

Sabine River Authority of Texas Summary Report MtBE Contamination in Lake Tawakoni from Gasoline Pipeline Rupture 5. TREATMENT AND REMEDIATION

Sabine River Authority of Texas Summary Report MtBE Contamination in Lake Tawakoni from Gasoline Pipeline Rupture 5. TREATMENT AND REMEDIATION 5. TREATMENT AND REMEDIATION Explorer is responsible for the treatment and remediation of areas contaminated by the gasoline spill, including the reservoir. Explorer has worked cooperatively with SRA to

More information

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b Product Parameter/ Constituent Lab Test c Protocol &Number Cleanup Level d,e,h GA Groundwater Cleanup

More information

Tom Myers, Ph.D., Hydrogeologic Consultant Reno NV Re: Assessment of Groundwater Sampling Results Completed by the U.S.

Tom Myers, Ph.D., Hydrogeologic Consultant Reno NV Re: Assessment of Groundwater Sampling Results Completed by the U.S. TECHNICAL MEMORANDUM September 30, 2012 Prepared by: Tom Myers, Ph.D., Hydrogeologic Consultant Reno NV Re: Assessment of Groundwater Sampling Results Completed by the U.S. Geological Survey Summary The

More information

APPENDIX B. Soil Sample Certificate of Analysis

APPENDIX B. Soil Sample Certificate of Analysis APPENDIX B Soil Sample Certificate of Analysis 5 SHOREHAM DR DOWNSVIEW, ON M3N1S4 SOIL ANALYSIS REVIEWED BY: Mike Muneswar, BSc (Chem), Senior Inorganic Analyst TRACE ORGANICS REVIEWED BY: Jacky Takeuchi,

More information

Submittal Guidelines for Imported Soil. Soil Review & Acceptance Process

Submittal Guidelines for Imported Soil. Soil Review & Acceptance Process The following guidelines are provided as a prescriptive step process to ensure the contractual and regulatory requirements for Baylands Soil Processing are met and the appropriate quality control documentation

More information

Fort George G. Meade

Fort George G. Meade Fort George G. Meade Restoration Advisory Board Meeting September 18, 2014 Preliminary Assessment/ Site Inspection (PA/SI) Update Southwest Areas of Interest (AOIs) 1 Ft Meade PA/SI Last RAB update of

More information

Table B1: Analytical Results for Nutrients in Surface Water

Table B1: Analytical Results for Nutrients in Surface Water Table B1: Analytical Results for Nutrients in Surface Water Sample ID 1 2 Physical Tests Colour, True (Colour Units) 15 (4) units absolute, or 5 units above background (30-day average)

More information

1. What is the cleanup level look-up table and where can I find it?

1. What is the cleanup level look-up table and where can I find it? Voluntary Remediation Program (VRP) (307) 777-7752 http://deq.state.wy.us/volremedi/index.asp Soil Cleanup Levels In its 2000 session, the Wyoming Legislature created new opportunities, procedures, and

More information

UST SYSTEM REMOVAL OSFM SITE ASSESSMENT REPORT

UST SYSTEM REMOVAL OSFM SITE ASSESSMENT REPORT UST SYSTEM REMOVAL OSFM SITE ASSESSMENT REPORT UST SYSTEM REMOVAL OSFM SITE ASSESSMENT REPORT COMMUNITY CONSOLIDATED SCHOOL DISTRICT 181 THE LANE ELEMENTARY SCHOOL 500 NORTH ELM STREET HINSDALE, DUPAGE

More information

Automated Solid Phase Extraction of PAH Compounds Utilizing the SPE-DEX 5000

Automated Solid Phase Extraction of PAH Compounds Utilizing the SPE-DEX 5000 Automated Solid Phase Extraction of PAH Compounds Utilizing the SPE-DEX 5000 Melissa Lever, Horizon Technology, Inc., Salem, NH USA Key Words PAH, polycyclic aromatic hydrocarbons, EPA 870, water extraction,

More information

Quarterly Monitoring Report

Quarterly Monitoring Report Quarterly Monitoring Report CHESTER RIVER HOSPITAL CENTER 208 Fourth Quarter Monitoring Report Submitted to: Maryland Department of the Environment Oil Control Program 800 Washington Boulevard, Suite 620

More information

SAUGERTIES HARBOR, NY ESOPUS CREEK, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

SAUGERTIES HARBOR, NY ESOPUS CREEK, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING Public Notice In replying refer to: Public Notice No. SH-AFO-15 Published: March 23, 2015 Expires: April 21, 2015 New York District Albany Field Office 1 Bond Street Troy, N.Y. 12180 ATTN: CENAN-OP-A SAUGERTIES

More information

Field Data From Oil in Water Polishing of Produced Water for Discharge and Reinjection with Osorb Media

Field Data From Oil in Water Polishing of Produced Water for Discharge and Reinjection with Osorb Media Field Data From Oil in Water Polishing of Produced Water for Discharge and Reinjection with Osorb Media October 22, 2014 Gregory Scott Hallahan 2014 Presentation Outline Osorb Media Introduction How Osorb

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. November 15, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. November 15, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 November 15, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

file:///users/rachelhood/library/containers/com.apple.mail/dat...

file:///users/rachelhood/library/containers/com.apple.mail/dat... U.S. ENVIRONMENTAL PROTECTION AGENCY POLLUTION/SITUATION REPORT (E13611) Exxon Pipeline Mayflower Arkansas Oil Spill - Removal Polrep UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Region VI Subject: POLREP

More information

A Laboratory Test to Evaluate Potential for Steam Enhanced Removal of Coal Tar in a Sand Matrix. Ishwar P. Murarka, Ph.D. Chief Scientist, Ish Inc.

A Laboratory Test to Evaluate Potential for Steam Enhanced Removal of Coal Tar in a Sand Matrix. Ishwar P. Murarka, Ph.D. Chief Scientist, Ish Inc. A Laboratory Test to Evaluate Potential for Steam Enhanced Removal of Coal Tar in a Sand Matrix Ishwar P. Murarka, Ph.D. Chief Scientist, Ish Inc. Kent S. Udell, Ph.D. Professor, University of California

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. October 12, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. October 12, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 October 12, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

APPENDIX D HAZARD EVALUATIONS / WORST CASE DISCHARGE CALCULATIONS

APPENDIX D HAZARD EVALUATIONS / WORST CASE DISCHARGE CALCULATIONS APPENDIX D HAZARD EVALUATIONS / WORST CASE DISCHARGE CALCULATIONS D.1 Hazard Identification 2 D.1.1 Tank Leak, Rupture or Overfill 2 D.1.2 Tank Truck Leak or Overfill 2 D.1.3 Piping or Valve Rupture or

More information

Treatment System Locations. Treatment System Sampling Activities and Analytical Results. June 15, 2011

Treatment System Locations. Treatment System Sampling Activities and Analytical Results. June 15, 2011 June 15, 2011 Mr. David Anderson Oregon Department of Environmental Quality Eastern Region 475 NE Bellevue Drive, Suite 110 Bend, Oregon 97701-7415 Re: Status Report: May 2011 Keno Area Wide Groundwater

More information

APPENDIX A BLANK RECORDKEEPING FORMS AVI-CPL-001

APPENDIX A BLANK RECORDKEEPING FORMS AVI-CPL-001 APPENDIX A BLANK RECORDKEEPING FORMS Checklist 1 Quarterly SWP3 Inspection Business Name: Date: Weather: Inspector(s): Inspector Affiliation: Inspector familiar with industrial activities performed at

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT

MARYLAND DEPARTMENT OF THE ENVIRONMENT MARYLA DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Suite 620 Baltimore, Maryland 21230-1719 410-537-3442 800-633-6101 x 3442 www.mde.state.md.us Land Management Administration Oil Control Program

More information

Memo. Spill Report Page1 of 6

Memo. Spill Report Page1 of 6 Memo To: Dean Vanderhoff, Emergency Response Section From: Jeff Tyler, District 4 Field Inspector Through: Kerri McCabe, Inspector Supervisor Date: May 13, 2013 Re: 13-0289-Quality Petroleum in Crawford

More information

McKissack & McKissack Washington, DC

McKissack & McKissack Washington, DC REPORT ON ASTM PHASE I ENVIRONMENTAL SITE ASSESSMENT AND LIMITED PHASE II SUBSURFACE SAMPLING POTOMAC AVENUE & 1 ST STREET SW WASHINGTON, DC by Haley & Aldrich, Inc. McLean, Virginia for McKissack & McKissack

More information

33101 TAMPERE.

33101 TAMPERE. Measurement of odours and hazardous gaseous emissions from steel foundry 16.-17..5.2013 Project 10745Y12A 15.10.2013 Kuokkamaantie 4 P.O. BOX 428 33101 TAMPERE Tel +358 3 2680 111 Fax +358 3 2110 106 www.ax.fi

More information

NATMI National Truck Terminals, LLC 101 West Washington Street Indianapolis, Indiana 46255

NATMI National Truck Terminals, LLC 101 West Washington Street Indianapolis, Indiana 46255 LIMITED PHASE II SUBSURFACE INVESTIGATION FORMER FEDEX FREIGHT 3907 TRANSPORTATION DRIVE FORT WAYNE, INDIANA 46818 ATC PROJECT NO. 90.75313.0001 Prepared For: NATMI National Truck Terminals, LLC 101 West

More information

To: Ken Kerns and Janet Dalgleish, University of Minnesota From: Jim Eidem and Kristen Schimpke Subject: Oiled Roads Investigation Summary, Delisted U

To: Ken Kerns and Janet Dalgleish, University of Minnesota From: Jim Eidem and Kristen Schimpke Subject: Oiled Roads Investigation Summary, Delisted U Technical Memorandum To: Ken Kerns and Janet Dalgleish, University of Minnesota From: Jim Eidem and Kristen Schimpke Subject: Oiled Roads Investigation Summary Delisted UMRRC Superfund Site Date: December

More information

DES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH

DES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH DES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH 03302 0095 Underground Storage Tank Closure Report Concord Steam 123 Pleasant Street Concord, NH NHDES Site Number: 198608003 Project

More information

file:///users/rachelhood/library/containers/com.apple.mail/dat...

file:///users/rachelhood/library/containers/com.apple.mail/dat... U.S. ENVIRONMENTAL PROTECTION AGENCY POLLUTION/SITUATION REPORT (E13611) Exxon Pipeline Mayflower Arkansas Oil Spill - Removal Polrep UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Region VI Subject: POLREP

More information

New 13 C PACs. (Polycyclic Aromatic Compounds) Cambridge Isotope Laboratories, Inc. isotope.com ENVIRONMENTAL CONTAMINANT STANDARDS

New 13 C PACs. (Polycyclic Aromatic Compounds) Cambridge Isotope Laboratories, Inc. isotope.com ENVIRONMENTAL CONTAMINANT STANDARDS Cambridge Isotope Laboratories, Inc. isotope.com New 13 C PACs (Polycyclic Aromatic Compounds) Benzo[j]fluoranthene CLM-9590-1.2 Benzo[c]fluorene CLM-9363-1.2 The advantages of 13 C-labeled over deuterated

More information

ONGOING INPUTS OF PERSISTENT ORGANIC POLLUTANTS TO THE ANACOSTIA RIVER

ONGOING INPUTS OF PERSISTENT ORGANIC POLLUTANTS TO THE ANACOSTIA RIVER ONGOING INPUTS OF PERSISTENT ORGANIC POLLUTANTS TO THE ANACOSTIA RIVER Nathalie Lombard, Mandar Bokare, Varapapa Thodpanich, Sam Magee, Upal Ghosh Department of Chemical, Biochemical, and Environmental

More information

Site Background December 2005

Site Background December 2005 Site Background December 2005 The South of Runway 18-36 Area consists of the lowland area surrounding the southern portion of runway 18-36. It extends from the East Canal of the airport ditch system on

More information

West Shore Pipe Line Release

West Shore Pipe Line Release West Shore Pipe Line Release Regional Response Team Meeting Wednesday, October 10, 2012 West Shore Pipe Line Company West Shore Pipe Line Company is a common carrier petroleum pipeline system that transports

More information

ANALYTICAL REPORT. Job Number: SDG Number: MVCSD- High School Job Description: Orange-Ulster BOCES

ANALYTICAL REPORT. Job Number: SDG Number: MVCSD- High School Job Description: Orange-Ulster BOCES ANALYTICAL REPORT Job Number: 420-141918-1 SDG Number: MVCSD- High School Job Description: Orange-Ulster BOCES For: Orange-Ulster BOCES 53 Gibson Road Goshen, NY 10924 Attention: Jack DeGraw Meredith W

More information

SUBSURFACE INVESTIGATION AND PUMPING TEST REPORT

SUBSURFACE INVESTIGATION AND PUMPING TEST REPORT SUBSURFACE INVESTIGATION AND PUMPING TEST REPORT DeVito Service Station 880 Old Post Road (Route 35) Cross River, New York DUNS #0015-2900 NYSDEC Spill #84-01923 Project #97010 June 11, 2007 Prepared For:

More information

City of Sarnia. 255 Christina Street South Sarnia, Ontario N7T 7N2. Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure

City of Sarnia. 255 Christina Street South Sarnia, Ontario N7T 7N2. Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure City of Sarnia 255 Christina Street South Sarnia, Ontario N7T 7N2 Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure Environmental Subsurface Investigation Project Name 1541 Blackwell Road,

More information

Re: Amendment to Certificate of Property Use No JWJJC (CPU) West Don Lands Group 1, Toronto (Property) for Property Specific Standards (PSS)

Re: Amendment to Certificate of Property Use No JWJJC (CPU) West Don Lands Group 1, Toronto (Property) for Property Specific Standards (PSS) Ministry of the Environment and Climate Change Central Region Office 5775 Yonge Street 8 th Floor North York ON M2M 4J1 Tel.: 416 326-6700 Fax: 416-325-6346 Ministère de l Environnement et de l Action

More information

Before the Committee on Transportation and the Environment Council of the District of Columbia

Before the Committee on Transportation and the Environment Council of the District of Columbia Testimony of Mr. Thomas P. Jacobus General Manager, Washington Aqueduct Performance Oversight Fiscal Years 2017 and 2018 Before the Committee on Transportation and the Environment Council of the District

More information

Hand Delivered. October 9, 2009

Hand Delivered. October 9, 2009 BUILDING A BETTER WORLD Hand Delivered October 9, 2009 Mr. Art Lenox Ms. Lori Blair The Boeing Company Santa Susana Field Laboratory 5800 Woolsey Canyon Road Canoga Park, CA 91304 Subject: Happy Valley

More information

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon.

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon. December 5, 2012 Mrs. Jenny Herman Maryland Department of the Environment Oil Control Program 1800 Washington Boulevard Baltimore, Maryland 212301719 Re: Additional Monitoring Well Installation Report

More information

ANALYTICAL REPORT. Job Number: SDG Number: Minisink Valley CSD - Middle School Job Description: Orange-Ulster BOCES

ANALYTICAL REPORT. Job Number: SDG Number: Minisink Valley CSD - Middle School Job Description: Orange-Ulster BOCES ANALYTICAL REPORT Job Number: 420-143395-1 SDG Number: Minisink Valley CSD - Middle School Job Description: Orange-Ulster BOCES For: Orange-Ulster BOCES 53 Gibson Road Goshen, NY 10924 Attention: Jack

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

Site Status Report: Third Quarter 2018 Bel Air Xtra Fuels 2476 Churchville Road, Bel Air Maryland MDE Case # HA and HA

Site Status Report: Third Quarter 2018 Bel Air Xtra Fuels 2476 Churchville Road, Bel Air Maryland MDE Case # HA and HA Drake Petroleum Company, Inc. Site Status Report: Third Quarter 2018 Bel Air Xtra Fuels 2476 Churchville Road, Bel Air Maryland 21028 MDE Case #2011-0112-HA and 2013-0007-HA October 3, 2018 Site Status

More information

TRAIN DERAILMENT EMERGENCY RESPONSE

TRAIN DERAILMENT EMERGENCY RESPONSE TRAIN DERAILMENT EMERGENCY RESPONSE CHICAGO CENTRAL & PACIFIC (CC&P) RAILROAD LINE MILE POST 80.1 ROCKFORD, WINNEBAGO COUNTY, ILLINOIS Presented by: U.S. Environmental Protection Agency (U.S. EPA) DERAILMENT

More information

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT FIELD INSPECTION REPORT Date June 19, 2018 Project Northern Natural Gas Company (Northern) Cedar Station Upgrade Project Dakota County, Minnesota Authority: Section 7(c) Personnel FERC Staff: Company Staff:

More information

Site Investigation Report. Don Miller 802 and 854 East Washington Avenue Madison, Wisconsin. Presented to:

Site Investigation Report. Don Miller 802 and 854 East Washington Avenue Madison, Wisconsin. Presented to: Site Investigation Report Don Miller 802 and 854 East Washington Avenue Madison, Wisconsin Presented to: C i t y o f M a d i s o n City of Madison Engineering Department 210 Martin Luther King Jr. Boulevard

More information

George s Used Equipment Removal Action Report Laboratory analytical results were compared to the cleanup objectives outlined in the previously approve

George s Used Equipment Removal Action Report Laboratory analytical results were compared to the cleanup objectives outlined in the previously approve July 10, 2015 Ed Olson MPCA 520 Lafayette Avenue North St. Paul, MN 55115 RE: George s Used Equipment Response Action Report UMore Park OU2 and OU3 Rosemount, MN Bay West Proposal J140651 Dear Mr. Olson:

More information

PROPOSED REMEDIAL ACTION PLAN. NYSEG - Ithaca First St. MGP Ithaca, Tompkins County Site No February 2011

PROPOSED REMEDIAL ACTION PLAN. NYSEG - Ithaca First St. MGP Ithaca, Tompkins County Site No February 2011 PROPOSED REMEDIAL ACTION PLAN NYSEG - Ithaca First St. MGP Ithaca, Tompkins County Site No. 755006 February 2011 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Executive Summary. ES.1 Objectives and Scope

Executive Summary. ES.1 Objectives and Scope Executive Summary This Remedial Investigation and Focused Feasibility Study (RI/FFS) report was prepared on behalf of Northern States Power Co. (NSP) to document the findings of the multi-media environmental

More information

IN THE MATTER of a CONTRAVENTION. of the OIL AND GAS ACTIVITIES ACT. [SBC 2008] Chapter 36. Before. The BC OIL & GAS COMMISSION. Case File

IN THE MATTER of a CONTRAVENTION. of the OIL AND GAS ACTIVITIES ACT. [SBC 2008] Chapter 36. Before. The BC OIL & GAS COMMISSION. Case File IN THE MATTER of a CONTRAVENTION of the OIL AND GAS ACTIVITIES ACT [SBC 2008] Chapter 36 before The BC OIL & GAS COMMISSION Case File 2017-061 BETWEEN The BC Oil & Gas Commission AND Pavilion Energy Corporation

More information

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland 2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland Prepared for: Lockheed Martin Corporation Prepared by: Tetra Tech, Inc.

More information