1 CLIENT: M/S HINDUSTAN PETROLEUM CORPORATION LTD (HPCL) FINAL REPORT ON GEOTECHNICAL INVESTIGATION FOR DIESEL HYDRO TREATER PROJECT AT VISAKHA REFINARY (HDHT), VIZAG - Control Room Prepared By M/s SOHAMS FOUNDATION ENGG. PVT. LTD. 301, Thaper Complex, Sector-15, CBD Belapur, Navi Mumbai Tel: , Fax: sohamsfoundation@vsnl.net Website: JOB NO.: 0827 SEPTEMBER 2009
2 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai REPORT ON GEOTECHNICAL INVESTIGATION FOR DIESEL HYDRO TREATER PROJECT AT VISAKH REFINERY (HDHT), VIZAG CONTROL ROOM 1.0 Preamble Hindustan Petroleum Corporation Ltd. (HPCL) has planned to develop the Diesel Hydro Treater (DHT) at Visakh Refinery. It is necessary to carry out the soil investigation to design the suitable type of foundation. The work of Geotechnical investigation was awarded to M/s Sohams Foundation Engineering Pvt. Ltd. (SFEPL), Mumbai. 301/02/03, Thaper Complex, Plot No 51, Sector-15, CBD Belapur, Navi Mumbai Scope of Work 2.1 The objectives of investigation were to obtain: A) Subsurface profile detailing different stratum and their variation along the alignment. B) To determine the engineering properties of the stratum and design parameters to decide the suitable foundation. 2.2 To study the properties of the strata, it was decided to take two boreholes. The locations of the boreholes are shown in the location plan (Annexure I). 2.3 Two boreholes were drilled during the period of 5 th February 2009 to 9 th February. The diameter of the boreholes was 100 mm in soil or top of rock whichever occurs earlier, as per specification and instruction of Engineer-in -charge. The sides of the boreholes were supported by temporary casing. Drilling was carried out in rock stratum using Nx size diamond Bit and Double Tube core barrel. All work was executed as per IS The borehole logs, detailing the reference number of borehole, the description of the material with depth, the results of in-situ testing, and the depth of boreholes are presented in boring logs Annexure II. 2.4 The undisturbed soil (UDS) samples were collected at 3.0 m interval in the clayey soil. Undisturbed soil samples were collected using thin walled tube samplers. The ends of the sampler were immediately packed using a thin layer of wax to avoid further disturbance of samples, loss of moisture etc. Report By: Kumar Job No-827 Checked By: SPB Page 1
3 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai The identification marks such as project, location; borehole number and depth were marked / painted immediately on the sampler. 2.5 In-situ field-test such as Standard Penetration Tests were conducted in each boreholes at a vertical interval of 3.0 m. The tests were conducted as per IS The test is basically a penetration test in which, a thick wall split tube sampler, is driven into the undisturbed soil at the bottom of the hole under the blows of a 63.5 kg drive weight with 75 cm free fall. The sampler is first driven through 15 cm as a seating drive. It is further driven through 30 cm or until 50 blows have been applied. The number of blows required to drive the sampler 30 cm beyond the seating drive is termed as Penetration Resistance N. The samples collected were preserved in polythene bags and were used as disturbed samples for laboratory testing. The tag of identification marks such as project, location, borehole number, sample number, penetration resistance with blows for each 15 cms and depth were attached to the sample. 2.6 In-situ field test such as Vane shear Test (VST) are conducted in the boreholes when the soil has very low shear strength or SPT penetration resistance N is less than or equal to 1. In-Situ Vane Shear Test for soils was conducted as per IS In this test when the borehole was drilled till the test depth the vane of 50 mm size was attached to the rods and lowered in the borehole to the test depth. The vane was pushed with a moderate steady force up to a depth of five times the diameter of the borehole. Then the torque applicator was fixed to the anchor plate and rods were connected to it. The vane was rotated at the rate 0.1 deg/sec with the help of gear handle. The maximum torque reading was noted. 2.7 The Dynamic cone penetration test (DCPT) was carried out as per IS 4968 (Part-I). The test is basically to determine resistance of different soil strata to dynamic penetration of a 50 mm cone. In this test 50 mm diameter cone 60 fitted loosely to the driving rod through a cone adopter. The cone is driven into the undisturbed soil at the bottom of the hole under the blows of a 63.5 kg drive weight with 75 cm free fall. The number of blows for every 10 cm penetration of the cone is recorded. The process is repeated till the cone is driven to the required depth or till the refusal. Report By: Kumar Job No-827 Checked By: SPB Page 2
4 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai Field California Rearing Ratio (CBR) Test was carried out at the locations indicated by engineer-in-charge to determine the strength of sub-grade and bases of roads. The test basically a penetration test. The load is applied using a loading jack and truck or tractor shall be used to give the necessary reaction. The surcharge annular weight of kg shall be placed at the location of test indicated by engineerin-charge. Load shall be applied so that the penetration is approximately 1.25 mm/min. The load readings shall be taken at penetration of 0.0, 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 4.0, 5.0, 7.5, 10.0, 12.5 mm. The maximum load and penetration shall be recorded if it occurs for a penetration less than 12.5 mm. 2.9 Disturbed split spoon samples were obtained from the boreholes. Disturbed samples using a split barrel tube sampler were obtained at every depth where SPT was performed in the soil formation Depth of Ground water table was recorded in each borehole after 24 hrs and water samples were collected for chemical analysis Selected Disturbed Soil Samples were tested in SFE Lab for the following tests: Natural Moisture Content (NMC) Specific Gravity Grain Size Analysis Atterbergs Limits Free Swell Index Chemical Analysis (ph, Sulphates and Chlorides) The Undisturbed soil sample was tested for the following tests in addition to these tests. Bulk Density Unconsolidated Undrained Triaxial Test Unconfined Compressive Strength (UCS) Test Consolidation Test 2.12 Water Samples were tested for the following tests: ph Sulphates Chlorides Report By: Kumar Job No-827 Checked By: SPB Page 3
5 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai The field and laboratory work was executed generally in accordance with the I.S. specifications listed below. IS : Classification and identification of soils for general engineering purpose. IS 2131: Method for standard penetration test for soils. IS 2132: Code of practice for thin walled tube sampling of soils. IS 2720 (I): Preparation of Dry Samples various Tests. IS 2720 (II): Determination of Water Content. IS 2720 (III): Determination of specific gravity of soil IS 2720 (IV): Grain Size Analysis IS 2720 (V): Determination of Liquid and Plastic Limit. IS (XI): Determination of shear strength parameter of soil Unconsolidated Untrained triaxial compression test without measurement of pore pressure. IS (XL): Free swell Index Test IS 4464: Code of practice for information and core description in foundation investigation. IS 2911 (II/2): Code of practice for design and construction of bored cast- insitu concrete piles. IS Code of practice for design and construction of Shallow Foundation on Rock. IS Code of practice for design and construction of bored cast- in situ piles foundation on rocks - Guidelines 2.14 The fieldwork carried out is summarized as follows: Report By: Kumar Job No-827 Checked By: SPB Page 4
6 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai Sr. No. Table 1: Summary of fieldwork BH. No. Co-ordinate RL Depth of Water table Northing Easting below existing GL (m) Depth of Borehole below existing GL (m) 1 BH BH CBR DCPT ERT Findings of Investigation Based on the data of these three boreholes, the sub-surface in this area was observed as 1. Filling Material with Gravels and Boulders 2. Brownish to Grayish Silty/Sandy Clay 3. Light Brownish/Grayish colored Highly Weathered Rock The ground water table was observed at a depth of m below the existing ground level. However the same may rise above during the monsoons. The top layer observed was filled up material, with gravels and boulders having thickness of 1.5 m. The second layer identified was Brownish to Grayish Silty/Sandy Clay up to the depth of 9.0 m. The Standard Penetration Tests, Vane shear Test were conducted in this stratum and N-values found in the range from 4 to 19. The laboratory tests conducted on selected disturbed soil samples and undisturbed soil samples indicated the following range of values (Ref. Annexure III) Natural Moisture content : (%) Specific Gravity : Bulk Density : (g/cc) Gravel : 0 (%) Sand : (%) Silt + Clay : (%) Report By: Kumar Job No-827 Checked By: SPB Page 5
7 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai Liquid Limit : (%) Plastic Limit : 30 (%) Free Swell Index : 10 (%) Triaxial Shear properties : Cohesion (Cuu) : 0.07 (kg/cm²) Angle of Friction, uu : 22 (deg) Unconfined Compressive Strength(qu) : 0.12 (kg/cm²) Shear Strength from VST : (kg/cm²) The final layer observed in the borehole was Light Brownish/Grayish colored Highly Weathered Rock. The core recovery in this stratum was Nil whereas RQD is Nil. 4.0 General Discussions for the Choice of Suitable Foundation Based on the field observations and laboratory test results the founding levels and the allowable bearing capacity which can be considered at that level shall be determined by considering the basic criteria as The foundation should carry the maximum loads coming from the structure with margin of factor of safety, and, The probable maximum and differential settlement of the soil under any part of the foundation must be limited to safe and tolerable limits. 5.0 Conclusions and Recommendations According to the field and laboratory investigation, subsurface conditions, engineering analysis and practical experience, it can be concluded that proposed structures/ facilities can be satisfactorily supported by the ground at site, provided that the following suggestions are taken into considerations: Shallow Foundation on Engineered Fill It has been found that the upper stratum is filled up Material with Gravels and Boulders. This stratum is existed up to 1.50 m BEGL. The layer of Brownish to Grayish Silty/Sandy Clay layer is the followed by upper filling material. The layer varies from 1.5 m to 9.0 m BEGL. Based on the SPT value and laboratory test results the safe bearing capacity of this is evaluated as 4.0 t/m 2. The type of soil mainly constituting for foundation as per Table-1 of IS1893 (Part1):2002 is Type III-Soft soils. Report By: Kumar Job No-827 Checked By: SPB Page 6
8 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai The minimum depth of foundation shall be 1.0 m BEGL. The compound wall foundation, light weight structures, security cabin foundation, road construction could be rested in this filled up soil or underlain clay soil, with treated below A. Excavate the existing ground surface to a depth of 1.0 m below the foundation level and laterally to a minimum of 1.0 m from the edge of the foundation. B. Excavation work will be above water table, so dewatering would not be required. However, incase dewatering is necessary, dewatering level shall be minimum 0.5 m below excavation level to achieve proper compaction. C. The exposed sub grade at 2.0 m depth should be proof rolled by heavy vibratory roller (roller with 10 to 20 tons roller usually used in roads construction). Any soft, organic or any other unsuitable material exposed shall be removed and replaced with well compacted granular material. D. Granular materials shall be laid in the layers of 250 mm thick to maximum dry density of 95 %. E. A biaxial/uniaxial Geodrid can be use below the footing for uniform distribution of structural load on soil. Shallow foundation on improved soil by Stone column The light to medium loaded structures, area loading structures, tank foundation, roads etc. required the SBC more than 10 t/m 2 to 15 t/m 2, it is suggested to treat the soft ground by using stone column. The treatment by using stone column improves the bearing capacity of foundation soil and also reduces post construction settlement of foundation and also reduces settlement potential of soft layer below the heavily loaded roads. Vibroreplacement method is used to create a stone column of 750 mm to 900 mm diameter up to 11.0 m below the existing ground level by sinking the vibratory device, backfilling the induced hole by adding stones commonly ranges in gradation from 25 mm to 75 mm. The spacing of stone column shall be decided from the structural requirement. Road Construction The upper filling layer shall be considered as sub grade for road construction. Report By: Kumar Job No-827 Checked By: SPB Page 7
9 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai The CBR test was conducted on existing filled up material and the average CBR value is %. Excavation In case of deep excavation more than 4 m it is advisable to design the deep excavation system. A. The touch pile system. B. A sheet pile wall for lateral support. C. Diaphragm wall system. Pile Foundation on Rock (For Heavy Structures) The study of the field tests and laboratory tests clearly indicate that a soft soil is present up to a depth of 9.0 m below the existing ground level. The soil can be described as Highly Compressible Soft Sandy/ Silty Clay based on the laboratory test results. Such soils can not bear the loads of high magnitudes and also undergoes a large amount of settlements even under the application of very small load. Moreover the foundation has to sustain heavy loads from the structure. Hence the boredcast-in-situ piles shall be provided at this location to transfer the load of structure to the rock. The pile can be designed for end bearing. Socket lengths of three times diameter shall be provided for piles. Based on the laboratory test results theoretically the capacity of the bored cast-in-situ pile is tabulated in the following page. The values in Table 5.1 are estimated for preliminary design. A detailed final design should be carried out by the structural engineer taking into consideration all possible loading conditions, which may be applied on piles. Table 5.1: Safe Bearing Capacity of piles Depth of Safe Vertical Lateral Net Uplift Diameter of pile Capacity of Capacity of capacity of piles BEGL pile piles piles (mm) (m) (Tons) (Tons) (Tons) The typical Calculations are appended as Annexure V. Report By: Kumar Job No-827 Checked By: SPB Page 8
10 Client: Hindustan Petroleum Corporation Ltd. Report Control Room SOHAMS FOUNDATION ENGG PVT LTD 301,Thaper Complex, Sector 15, CBD Belapur, Navi Mumbai Piles shall be embedded in the stratum identified as Light Brownish/Grayish colored Highly Weathered Rock The piles shall be socketed below the depth at which t he chiseling energy imparted to the rock shall not less than 100 T-m/sqm/cm penetrations. The piles shall be terminated at the level mentioned in the table or chiseling criteria whichever meets earlier. The load carrying capacity shall be verified by conducting Initial. Lateral and uplift Pile load tests. The type of soil mainly constituting for deep foundation as per Table-1 of IS1893 (Part1):2002 is Type I-Rock or hard soil. 6.0 Chemical Analysis The Chemical analysis of the soil samples indicate the ph values ranging from 8.0 to The Chloride content of the soil is varying from 0.16 % to 0.18 % and Sulphate as SO 3 - is varying from % to %. As per IS 456, as the sulphate is less than 0.20 % Ordinary Portland Cement or Rapid Hardening Portland Cement or combination of the same can be used for concrete. Minimum Cement content shall be 310 kg/m 3 for concreting and the maximum water cement ratio shall be 0.55 for concreting. The Chemical analysis of water sample indicate the following range of values ph : Chloride : ppm Sulphate : ppm Report By: Kumar Job No-827 Checked By: SPB Page 9
11 ANNEXURE I LOCATION PLAN
12
13 ANNEXURE II BORELOGS
14 ANNEXURE III LABORATORY TEST RESULTS
15
16
17 Project: Geotechnical Investigations for Diesel Hydro Treater Project SOHAMS FOUNDATION ENGG PVT LTD at Visakh Refinery 301-3,THAPAR COMPLEX,SECTOR 15,CBD BELAPUR, NAVI MUMBAI Client: M/s Hindustan Petroleum Corporation Limited,Mumbai TEL: / FAX: sohamsfoundation@vsnl.net website: Summary of Laboratory Test Results - Disturbed Samples Location BH No Sample Sample NMC Sp Gravel Sand Silt Clay LL PL PI FSI Details Depth(m) (%) Gravity (%) (%) (%) (%) (%) (%) (%) (%) Control Room BH 48 SPT Control Room BH 48 SPT NP - - Control Room BH 49 SPT Control Room BH 49 SPT N M C : Natural Moisture Content L L : Liquid Limit S L : Shrinkage limit γb: Bulk Density G S A : Grain Size Analysis P L : Plastic Limit FSI :Free Swell Index C: undrained cohesion NP : Non-Plastic P I : Plasticity Index Swp: Swelling Pressure φ : Angle of internal friction Tests as per IS 2720 Conducted By: H.D Checked By: KuMaR Job No 827 Soil Classification as per IS 1498 Prepared By: TARULATA Page No
18 Project: Geotechnical Investigations for Diesel Hydro Treater Project SOHAMS FOUNDATION ENGG PVT LTD at Visakh Refinery 301-3,THAPAR COMPLEX,SECTOR 15,CBD BELAPUR, NAVI MUMBAI Client: M/s Hindustan Petroleum Corporation Limited,Mumbai TEL: / FAX: sohamsfoundation@vsnl.net website: Summary of Laboratory Test Results - Undisturbed Samples Location BH No Sample Details Sample Depth NMC Sp Gravity Gravel Sand Silt Clay LL PL PI γb Triaxial Test(UU) Unconfined Compressive Strength (qu) Consolidation Test Cuu Фuu Cc eo Cv (m) (%) (%) (%) (%) (%) (%) (%) (%) (g/cc) (kg/cm²) (Deg) (kg/cm²) (m 2 /yr) Control Room BH-48 UDS Control Room BH-49 UDS N M C : Natural Moisture Content L L : Liquid Limit γb: Bulk Density Cc : Compression Index G S A : Grain Size Analysis P L : Plastic Limit C: undrained cohesion e0 : Initial Void Ratio NP : Non-Plastic P I : Plasticity Index φ : Angle of internal friction Cv:Coefficient of Consolidation Tuu : Unconsolidated Undrained TriaS L : Shrinkage limit pc : Preconsolidation Pressure Tests as per IS 2720 Conducted By: H.D Checked By: KuMaR Job No 827 Soil Classification as per IS 1498 Prepared By: TARULATA Page No
19 Project: Soil Investigation and Topographical Survey for DHT Project at Visakha Refinery, Visakhapatnam Client: Hindustan Petroleum Corporation Ltd. SFE Summery of Chemical Analysis of Soil and Water Location Sample Details Sample Depth, m p H Chloride Sulphate Sulphates as So3 with 2:1 Water soil extract Unit % % % Limit as per IS % 0.04% BH 48 Soil BH 49 Soil Unit PPM PPM Limit as per IS PPM 400 PPM BH 48 Water BH 49 Water
20 Project: Client: Soil Investigation and Topographical Survey for DHT Project at Visakha Refinery, Visakhapatnam Hindustan Petroleum Corporation Ltd. SFE Field Vane Shear Test Results BH No Depth Shear Strength Cohesion (m) BHGL kg/cm 2 kg/cm 2 BH BH
21 Sohams Foundation Engg Pvt Ltd Project: Geotechnical Investigation for Diesel Hydro 301, Thaper Complex, Sector 15, Navi Mumbai Treater Project at Visakha Refinery Tel: , Fax : Client :Hindustan Petroleum Corporation Limited,Mumbai Determination of N Value from Dynamic Cone Penetration Test (DCPT - 11) Sr. No. Depth of test, m BEGL Dynamic Cone Penetration Value N Values
22 Sohams Foundation Engg Pvt Ltd Project: Geotechnical Investigation for Diesel Hydro 301, Thaper Complex, Sector 15, Navi Mumbai Treater Project at Visakha Refinery Tel: , Fax : Client :Hindustan Petroleum Corporation Limited,Mumbai Dyanamic Cone Penetration Test (DCPT - 11) at Control Room 0.0 No of Blows Depth of Test BOGL (m)
23 Project : Client : Geotechnical Investigations for Diesel Hydro Treater Project at Visakh Refinery M/s Hindustan Petroleum Corporation Limited,Mumbai CALIFORNIA BEARING RATIO TEST ( CBR) SFE Location CBR Capacity of Proving Ring 5.00 Tons Test Date 14-Mar-09 Proving Ring Constant Test Depth 5 cm BEGL L.C. of Proving Ring mm Co-Ordinates E , N L.C. of Dial Gauge mm Condition of Test- soaked Moisture Content 34.0 % Surcharge Weight used 5.00 kg Penetration Actual Load Penetration Standard Load mm kg mm kg Bearing 2.50 mm penetration Load (k kg) Penetration (mm) Bearing 5.00 mm penetration CBR Value (%) Location CBR Capacity of Proving Ring 5.00 Tons Test Date 14-Mar-09 Proving Ring Constant 6.30 Test Depth 5 cm BEGL L.C. of Proving Ring mm Co-Ordinates E , N L.C. of Dial Gauge mm Condition of Test- soaked Moisture Content 34.0 % Surcharge Weight used 5.00 kg Penetration Actual Load Penetration Standard Load mm kg mm kg Bearing 2.50 mm penetration Bearing 5.00 mm penetration CBR Value (%) Load (kg) Penetration (mm)
24 Project : Client : Geotechnical Investigations for Diesel Hydro Treater Project at Visakh Refinery M/s Hindustan Petroleum Corporation Limited,Mumbai CALIFORNIA BEARING RATIO TEST ( CBR) Location CBR Capacity of Proving Ring 5.00 Tons Test Date 14-Mar-09 Proving Ring Constant 6.30 Test Depth 5 cm BEGL L.C. of Proving Ring mm Co-Ordinates E , N L.C. of Dial Gauge mm Condition of Test- Soaked Moisture Content 34.0 % Surcharge Weight used 5.00 kg Penetration Actual Standard Penetration Load Load 600 mm kg mm kg Bearing 2.50 mm penetration Lo oad (kg) SFE Penetration (mm) Bearing 5.00 mm penetration CBR Value (%)
25 ANNEXURE IV TYPICAL CALCULATIONS
26 Project: Client: Soil Investigation and Topographical Survey for DHT Project at Visakha Refinery, Visakhapatnam Hindustan Petroleum Corporation Ltd. SFE Determination of Bearing Capacity (Bearing Capacity Based on SPT "N" Resistance) BH No BH 49 Strata Identification Silty Clayey Sand Depth (From / To) 1.50 to 9.0 Thickness of stratum Ground water Table, (m) BGL 0.90 SPT Penetration "N" 8 Now, based on the SPT penetration the allowable safe bearing capacity for 25 mm settlement and with factor of safety 3 can be calculated as per Terzaghi & Peck as - q ap = 3.5 (N - 3) [(B+0.3) / 2B] 2 R w2 Rd (T/m 2 ) Where, q ap : Allowable safe bearing capacity based on SPT penetration "N" in T/m 2 N : Average Standard Penetration Resistance = 8 B : Width of Footing (or least lateral dimension) in (m) = 1.00 D : Depth of foundation below ground level in (m) = 2-6 R w2 : Correction for Water table = 0.5 [ 1 + (Z w2 / B) ] Z w2 : Depth of water table below foundation in (m) Rd : Correction for depth = (D/B) (maximum limited to 1.20) Now, N - 3 = 5 R w2 = 0.50 Rd = 1.20 [(B+0.3) / 2B] 2 = 0.42 Hence, q ap = 3.50 * 5 * 0.42 * 0.50 * 1.20 q ap = 4.44 consider q ap = 4 T/m 2 Hence, the allowable safe bearing capacity based on SPT penetration "N" can be considered as 4 T/sqm at a depth of 2-6 m below ground level
27 Project: Client: Soil Investigation and Topographical Survey for DHT Project at Visakha Refinery, Visakhapatnam Hindustan Petroleum Corporation Ltd. SFE Determination of Bearing Capacity - Shear Criteria (Bearing Capacity as per IS 6403) BH No BH 48 Strata Identification Silty/Sandy Clay Ground water Table, (m) BGL 1.00 Now, based on the IS 6403 equation for general shear failure the Ultimete net bearing capacity can be calculated as, q d = c N c s c d c i c + q(n q -1)s q d q i q + 1/2 Bγ N γ s γ d γ i γ W' (T/m 2 ) Where, q d : Ultimete net bearing capacity in T/m 2 q : Effective surcharge at the base level of foundation = γ D f = 4.0 c : Average Cohesion in T/m 2 = 0.24 N c : Bearing capacity factor = N q : Bearing capacity factor = 8.10 N γ : Bearing capacity factor = 7.59 s c : Shape Factor for square footing = 1.30 sq : Shape Factor for square footing = 1.20 sγ : Shape Factor for square footing = 0.80 d c : Depth Factor = D f /B(Nφ) 1/2 = 1.04 dq : Depth Factor = D f /B(Nφ) 1/2 for φ > 10 = 1.02 dγ : Depth Factor = D f /B(Nφ) 1/2 for φ > 10 = 1.02 i c : inclination factor = (1- α/90) 2 = 1.00 iq : inclination factor = (1- α/90) 2 = 1.00 iγ : inclination factor = (1- α/φ) 2 = 1.00 W' : Water Correction factor = 0.5 φ : Angle of Internal friction = 22 Nφ : tan 2 (π/4 + φ/2) = D f : Depth of Footing, m = 2.0 γ : Unit Weight of soil, T/m 2 = 2.0 B : Width of footing ( Assume), m = 2.0 α : Inclination of the load to the vertical in degree = 0 Hence, q d = T/m 2 Consider Factor of Safety = 3 Hence, the net safe bearing capacity based on IS 6403 equation can be considered as = 46.55/3 = T/m 2
28 Project: Client: Soil Investigation and Topographical Survey for DHT Project at Visakha Refinery, Visakhapatnam Hindustan Petroleum Corporation Ltd. SFE Determination of Load Carrying capacity of Pile (As per IS 14593) Based on the study of the field results, the strata can be described as Highly to Moderately Weathered Rock Hence, the safe load carrying capacity of pile shall be evaluated as per IS From the various methods available, the pile capacity can be determined using Shear Strength Parameters As per cluase of IS , the safe load capacity of pile can be determined as - Qu = C u N c x πd 2 /4 + α C s πd ls Where Qu Ultimate capacity of pile in compression, T D Diameter of Pile, m 0.6 Cu Shear Strength of rock below pile tip, t/m T/m 2 Nc Bearing Capacity Factor 9.00 Cs Average shear strength of rock adjacent to the shaft 0.10 in the socketed length, t/m α 0.90 Fs Factor of safety 6.00 Is Socket length, m 1.80 Hence Qu = Tons Hence,Ultimate load carrying capacity of pile = Qu = Tons Safe load Carrying capacity of pile = Qu/6 = / Tons say, safe load carrying capacity = 90 Tons
29 Project: Client: Soil Investigation and Topographical Survey for DHT Project at Visakha Refinery, Visakhapatnam Hindustan Petroleum Corporation Ltd. SFE Determination of Capacity of Pile (As per Cole & Stroud Approach) Using Cole & Stroud approach, capacity of bored piles in weathered and soft rock is given by Qap = [ (Cu. Nc. Ap) + α. Ca. π. D. L ] / FS Cu = Cohesion value at Pile tip = 100 T/m 2 Nc = = 9 D = Pile diameter = 0.6 m Ap = C/s area of pile = 0.28 sqm α = Reduction factor = 0.30 Ca = Cohesion along socketed length = 100 T/m 2 L = Socketted length of pile (3 times of dia) = 1.8 m F.S = For end bearing = 2.5 F.S = For skin friction = 3.5 Considering pile is resting on highly weathered/soft rock which is encountered at about m N value of highly weathered rock is observed as more than 100 for 5 cm penetration (bore log). Extrapolated N value for 30cm penetration will be more than 500. For calculation purpose, limit the N value to the possible lowest value of 150 From Cole & Stroud graph, for N value of 150, the corresponding shear strength value is 100 t/m 2. End Bearing Component (Cu. Nc. Ap) / F.S = 100 * 9 * 0.28 / 2.5 = 102 Tons Skin Friction α. Ca. π. D. L = = ( 0.30 * 100 * 3.14 * 0.6 * 1.8 ) / 3.5 = 29 Tons Total geotechnical capacity of pile = Tons = 131 Tons In some of the bore holes, very soft clay layer is encountered for a stretch length of about 1.5 m To 9.0 m. By considering the possibility of negative skin friction, the vertical load carrying capacity is limited to 100 Tons. Now, Uplift Capacity of pile Net Safe uplift resistance of piles = 70 % of safe skin friction (as per Tomlinson) = 0.70 * 29 Tons = 20 Tons
30 Project: Client: Soil Investigation and Topographical Survey for DHT Project at Visakha Refinery, Visakhapatnam Hindustan Petroleum Corporation Ltd. SFE Determination of Lateral Capacity of Pile (As per IS Part I /Sec 2) The lateral capacity of pile shall be evaluated based on the effective length of pile and for maximum deflection of 5 mm. Hence the safe lateral capacity of Bored cast-in-situ pile (Fixed Head Pile) can be determined as - Y = Q (L 1 + L F ) 3 / 12 EI Where Y Deflection of pile head 0.50 cm Q Safe Lateral Load Pile Capacity Tons L 1 Length of pile above ground level 0.00 cm L F Deph of point of contraflexure below GL Depends on R = (EI/k 2 ) 0.25 E Modulus of elasticity of concrete, 5700*sqrt(fck) in kg/cm kg/cm 2 fck Strength of concrete in kg/cm kg/cm 2 I Moment of inertia of pile cross section = π D 4 / cm 4 D Diameter of pile 0.60 meter K 2 From Table 2 of IS 2911, Part 1 / section kg/cm 2 R = (EI/k 2 ) cm Hence, from Table 2 of IS 2911, Part 1 / section 2 L F / R 1.90 L F Hence Y = Q (L 1 + L F ) 3 / 12 EI Now 12 E I = 2.18E+12 kg-cm 2 (L 1 + L F ) 3 = 4.10E+08 cm cm Hence, for Y = 0.50 cm Hence, Q = 0.50 * 2.18E+12 / 4.10E+08 = 2651 kgs Q = 3 Tons
TOYO ENGINEERING INDIA LIMITED
ENGINEERING SPECIFICATION FOR FOR NITROGEN UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT JOB NO. : 6261 DOCUMENT NO. : A-6261- TOTAL NO. OF PAGES: 26 (INCLUDING THIS PAGE) 0
More informationSubsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015
Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering
More informationGEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY
GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15
More informationtechie-touch.blogspot.com www.vidyarthiplus.com CE2305 FOUNDATION ENGINEERING 2 MARKS QUESTIONS & ANSWERS 16 MARKS QUESTIONS UNIT -1 1. What are components of total foundation settlement? elastic settlement,
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More informationDownloaded from Downloaded from /1
PURWANCHAL UNIVERSITY VI SEMESTER FINAL EXAMINATION-2003 LEVEL : B. E. (Civil) SUBJECT: BEG359CI, Foundation Engineering. Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates are required to give their
More informationConsultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations
Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Mn/DOT Geotechnical Section - Office of Materials & Road Research http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract.asp
More informationSCOPE OF WORK FOR PILING JOB
SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala
More informationPE Exam Review - Geotechnical
PE Exam Review - Geotechnical Resources and Visual Aids Item Page I. Glossary... 11 II. Parameters... 9 III. Equations....11 IV. Tables, Charts & Diagrams... 14 1. Module 1 - Soil Classification... 14
More informationEarth Mechanics, Inc. Geotechnical & Earthquake Engineering
Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo
More informationGEOTECHNICAL REPORT B-1942
GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,
More informationConventional Field Testing Methods and Issues
Conventional Field Testing Methods and Issues Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 15 17 October, 2015 1 Conventional
More informationA Case Study: Foundation Design in Liquefiable Site
RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,
More informationApril 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationGeotech Services, X-18, MIDC, Hingna, Nagpur, Maharashtra. Discipline Mechanical Testing Issue Date
Last Amended on 11.01.2014 Page 1 of 14 I. BUILDING MATERIALS 1. Soil / Rock Plate Load Test IS 1888 1982 (Reaffirmed-2007) Cyclic Plate Load Test IS 5249 1992 Clause 6 (Reaffirmed-2010) Load Test On In-Situ
More informationModule - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome
Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome Ability to conduct a Unconsolidated Undrained (UU) triaxial test Ability to evaluate the undrained shear strength
More informationGEOTECHNICAL ENGINEERING REPORT
GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841
More informationDESIGN SPECIFICATION FOR FOUNDATIONS
FOR HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT JOB NO. : 6261 DOCUMENT NO. : A-6261-110-006 TOTAL NO. OF PAGES: 11 (INCLUDING THIS PAGE) 0 16-11-2009 FOR APPROVAL
More informationCase study of deep excavation in existing underground structure of three-story basement and diaphragm wall
Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8 Case study of deep excavation in existing
More informationCIV E Geotechnical Engineering I Consolidation
Purpose Determine the magnitude and time rate of settlement for a compressible cohesive soil. Required reading Das 2006 Sections 10.4 to 10.16 (pages 312 to 358). Theory Bringing soil samples into the
More informationExample of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil
Introduction Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil The Unified Design procedure involves two main steps. The first is verifying that the loads
More informationNPTEL Course GROUND IMPROVEMENT USING MICROPILES
Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West
More informationOweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement
Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,
More informationMinimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08
Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced
More informationFlorida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS
Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS 1. SCOPE Designation: FM 5-527 Modified AASHTO T-222-78 1.1 This method covers the making of nonrepetitive
More informationUNDERPINNING A CRANE FOUNDATION
UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New
More informationWORKING OF PREFABRICATED VERTICAL DRAIN- Α CASE STUDY
WORKING OF PREFABRICATED VERTICAL DRAIN- Α CASE STUDY Aniket S. Shukla 1, A. R. Kambekar 2 P.G. Student, Construction Management, Department of Civil Engineering, Sardar Patel College of Engineering, Andheri
More informationResearch Paper PERFORMANCE OF STRIP FOOTING ON SANDY SOIL DUE TO TUNNELING S.Hariswaran 1, K.Premalatha 2, K.Raja 3
Research Paper PERFORMANCE OF STRIP FOOTING ON SANDY SOIL DUE TO TUNNELING S.Hariswaran 1, K.Premalatha 2, K.Raja 3 Address for Correspondence 1 Assistant Professor, Department of Civil Engineering, Agni
More informationAssessment of the Structural Integrity of an In-service School Building at Risk Using Geotechnical Measurement Parameters
Journal of Emerging Trends in Engineering and Applied Sciences (JETEAS) 4(5): 763-767 Scholarlink Research Institute Journals, 2013 (ISSN: 2141-7016) jeteas.scholarlinkresearch.org Journal of Emerging
More informationCase study on a deep excavation in Baku: Flame Towers project earth retaining system
Case study on a deep excavation in Baku: Flame Towers project earth retaining system H. A. Afatoglu 1 ENAR Engineers Architects & Consultants, Istanbul, Turkey ABSTRACT Baku Flame Towers Project, consisting
More informationAED Design Requirements: Geotechnical Investigations (Provisional)
US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: (Provisional) Various Locations, Afghanistan January 2010, Version 1.0 TABLE OF CONTENTS AED DESIGN REQUIREMENTS FOR GEOTECHNCIAL
More informationINDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR Department of Civil Engineering Soil Mechanics Laboratory
THEORY: INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR CONSOLIDATION TEST- (OEDOMETER TEST) (IS 2720-PART-15-1986) Reaffirmed-2002 When a compressive load is applied to soil mass, a decrease in its volume
More informationApplication of Vibro Techniques for Infrastructure Projects in India
Application of Vibro Techniques for Infrastructure Projects in India Rainer Wegner Contract Manager, Keller Grundbau GmbH, Germany Dr. V.R. Raju Director, Keller Ground Engineering India Pvt Ltd, India
More informationUPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS
8.0 GEOTECHNICAL INVESTIGATIONS Throughout this section, reference to the Contractor simply means the entity responsible for the subject work. The same procedures and requirements generally apply to anyone
More informationpatersongroup Geotechnical Investigation Proposed Commercial Development 700 Hunt Club Road Ottawa, Ontario Prepared For Lone Star Group of Companies
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Commercial Development 700 Hunt Club Road Ottawa, Ontario
More informationSubsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois
AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,
More informationLecture Retaining Wall Week 12
Lecture Retaining Wall Week 12 Retaining walls which provide lateral support to earth fill embankment or any other form of material which they retain them in vertical position. These walls are also usually
More informationPartial Factors of Safety
APPENDIX A Partial Factors of Safety A.I Introduction The capacity of single piles in axial compression should provide an adequate safety factor against failure due to insufficient soil-pile interface
More informationRIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.
H A Y W A R D B A K E R I N C. RIGID INCLUSIONS Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. Above: HBI installed Rigid Inclusions on a congested downtown
More informationStudy of Various Techniques for Improving Weak and Compressible Clay Soil under a High Earth Embankment
MATEC Web of Conferences 11, 03006 ( 2014) DOI: 10.1051/ matecconf/ 20141103006 C Owned by the authors, published by EDP Sciences, 2014 Study of Various Techniques for Improving Weak and Compressible Clay
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,
More informationPD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE
PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE 4 3 2 1 D D C C B B A A 4 3 2 1 Thrust Restraint Design Equations and Soil Parameters These equations and soil
More informationInterpretation of Danish Chalk Parameters Applicable to Foundation Design
NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Interpretation of Danish Chalk Parameters Applicable to Foundation Design L. Kellezi
More informationSection C3 TECHNICAL SPECIFICATIONS. Section C3 TECHNICAL SPECIFICATIONS...1 to Surveying Works Soil Investigation...
Section C3 TECHNICAL SPECIFICATIONS Section C3 TECHNICAL SPECIFICATIONS...1 to 241 1 Surveying Works... 1 2 Soil Investigation... 2 3 Earthwork and Rockwork... 7 4 Concrete Works... 20 5 Structural Steel
More informationgeotechnical and construction materials consultants
geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com
More informationGeotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services
Engineering and Construction Materials Testing Services February 27, 15 Central Louisiana Economic and Development Alliance P.O. Box 465 Alexandria, Louisiana 719 Attention: Mr. Rick Ranson Vice President
More informationExperience of a Large Scale Unintentionally Long Surcharge on Organic Soils
Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils Ying Liu, Ph.D., P.E., Senior Engineer, Group Delta Consultants, Inc., 37 Amapola Ave., Suite 212, Torrance, CA. Email: yingl@groupdelta.com
More informationPlease include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.
JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-109B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering,
More informationSPECIFICATION FOR REINFORCED SOIL WALL
SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details
More informationTypical Subsurface Profile. November 28, 2016
November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530
More informationis a possibility of the existence of permafrost as a result
111.2 CERTAIN ASPECTS OF ALASKA DISTRICT ENGINEERS EXPERIENCE IN AREAS OF MARGINAL PERMAFROST E. L. Long In nearly twenty years of engineering and construction experience in Alaska, the Alaska District
More informationGROUND IMPROVEMENT SITE INVESTIGATON
GROUND IMPROVEMENT SITE INVESTIGTON November 2009 Lankelma ltd old Harbour arn old Harbour Lane Iden, East Sussex TN31 7UT U.K. T: +44 (0)1797 280050 E: info@lankelma.com www.lankelma.com Gardline Lankelma
More informationCase Studies on Soil Nailed Retaining Systems for Deep Excavations
Indian Geotechnical Conference 2010, GEOtrendz December 16 18, 2010 IGS Mumbai Chapter & IIT Bombay Case Studies on Soil Nailed Retaining Systems for Deep Excavations Murthy, B.R. Srinivasa Professor e-mail:
More informationBi-Directional Static Load Testing of Driven Piles
Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear
More informationConstruction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT
CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim
More informationComparative Study and Analysis of the Lateral and Vertical Loads Of Pile Foundation
Comparative Study and Analysis of the Lateral and Vertical Loads Of Pile Foundation Shashi Kumar 1, Harika Priya 2 1,2 Department of Civil Engineering 1,2 Lords Institute of Engineering and Technology,
More informationTemporary Structures. Excavations and Excavation Supports
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Excavations and Excavation Supports CM 420
More informationCombined Pile Foundation System for a Residential Complex
Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil
More informationSubsurface Investigation Report
AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland
More informationEffective improvement depth for ground treated with rapid impact compaction
Scientific Research and Essays Vol. 5(18), pp. 2686-2693, 18 September, 2010 Available online at http://www.academicjournals.org/sre ISSN 1992-2248 2010 Academic Journals Full Length Research Paper Effective
More informationWashtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI
Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI 4810-4800 GEOTECHNICAL INVESTIGATION FOR Proposed Pavement Rehabilitation Parking Lots
More informationREPORT ON. GEOTECHNICAL INVESTIGATION PROPOSED LIGHT INDUSTRIAL BUILDING 6945 McKEOWN DRIVE OSGOODE WARD, GREELY CITY OF OTTAWA, ONTARIO
Civil Geotechnical Structural Environmental Hydrogeology 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED
More informationt ghi yr Cop
In many situations, soil itself is used as a construction material Highway embankments Railway embankments Earth dams Highway / Airfield pavements Backfilled trenches Landfills When soil is used as foundation
More informationC. Installers licensed by the Geopier Foundation Company, Inc. (www.geopier.com) will be accepted as approved installer.
SPECIFICATION FOR RAMMED AGGREGATE PIER SYSTEMS AND RIGID INCLUSION FOUNDATION PART 1: GENERAL REQUIREMENTS 1.01 Description Work shall consist of designing, furnishing and installing Rammed Aggregate
More informationHelical Foundation Systems Engineering Reference Manual
Helical Foundation Systems Engineering Reference Manual TABLE OF CONTENTS SECTION INTRODUCTION 1 GLOSSARY OF TERMS 2 PRODUCT DESIGN AND SELECTION 3 PRELIMINARY CONSIDERATIONS 4 LOADS - FACTOR OR SAFETY
More informationTHE STUDY OF t-z AND q-z CURVES ON BORED PILE BASED ON THE RESULTS OF INSTRUMENTED PILE LOAD TEST IN MEDIUM AND STIFF CLAYS
Proceedings of Pile 2013, June 2-4 th 2013 THE STUDY OF t-z AND q-z CURVES ON BORED PILE BASED ON THE RESULTS OF INSTRUMENTED PILE LOAD TEST IN MEDIUM AND STIFF CLAYS Aswin Lim 1, Aksan Kwanda 2 and Paulus
More informationREPORT STATUS: DATE: Report n :
REPORT: Expanded clay LWA in CEA Lightweight fill and thermal insulation products for civil engineering applications. Installation and structural quality control on site. STATUS: Technical report DATE:
More informationRavi Sundaram. Cengrs Geotechnica Pvt. Ltd. Noida A-100 Sector 63, Noida Ph: (O): (M):
Ravi Sundaram Cengrs Geotechnica Pvt. Ltd. Noida A-100 Sector 63, Noida Ph: (O): 0120-42067111 (M): 9810538095 1 What makes a Good Pile? To perform successfully, a pile should: Have adequate soil resistance
More information6A General Information A. Introduction. 1 B. Definitions...1
Design Manual Chapter 6 - Geotechnical Table of Contents TOC Table of Contents Chapter 6 - Geotechnical 6A General Information 6A-1---------------------------------General Information A. Introduction.
More informationBORED MICROPILES. I.S.M 2009 London (10 th to 13 th may) 9 th International worksop on micropiles - by A. Jaubertou -
BORED MICROPILES FRENCH PRACTICE MICROPILES Definition Construction principles (type of micropile) Grouting effect Capacity ( structural and geotechnical ) Load test Connection considerations Mauritius
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationSection 1: Geotechnical Report Manual
Version 1.0 Tennessee Department of Transportation Geotechnical Engineering Section Geo Manual Section 1 Issued: 3/15/07 Section 1: Geotechnical Report Manual 6601 Centennial Boulevard Nashville, TN 37243-0360
More informationChapter 11 Compressibility of Soil
Page 11 1 Chapter 11 Compressibility of Soil 1. The compression of soil layers as a result of foundation or other loadings is caused by (a) deformation of soil particles. (b) relocation of soil particles.
More informationPerformance of Mechanically Stabilized Earth walls over compressible soils
Performance of Mechanically Stabilized Earth walls over compressible soils R.A. Bloomfield, A.F. Soliman and A. Abraham The Reinforced Earth Company, Vienna, Virginia, USA ABSTRACT: Two projects have recently
More informationExperiences on embankment fill in land expressway over soft ground
Second International Seminar on the Design & Construction of the Second Penang Bridge Experiences on embankment fill in land expressway over soft ground Prepared by ; AZMI MADMARJUKI Project Location JAMBATAN
More informationHURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS
HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS Revised March 2015 Preliminary Flood Wall Pile Analysis
More informationNumerical Analysis for High-rise Building Foundation and Further Investigations on Piled Raft Design
ctbuh.org/papers Title: Authors: Subject: Keyword: Numerical Analysis for High-rise Building Foundation and Further Investigations on Piled Raft Design Jinoh Won, Deputy General Manager, Samsung C&T Corporation
More informationREPORT OF SUBSURFACE EXPLORATION
REPORT OF SUBSURFACE EXPLORATION WELDING & JOINING TECHNOLOGY FACILITY NORTH GEORGIA TECHNICAL COLLEGE CLARKESVILLE, GEORGIA S&ME PROJECT NO. 161-10-061 Prepared For: LW Engineering, P.C. Post Office Box
More informationS.No Description Unit Quantity Rate (Rs) Amount (Rs)
, S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation
More informationGROUND IMPROVEMENT USING DYNAMIC REPLACEMENT FOR NCIG CET3 COAL STOCKYARD
FOR NCIG CET3 COAL STOCKYARD Charles CH Chua 1, Ming Lai 2, Graeme Hoffmann 2 and Brett Hawkins 1 1 Connell Hatch, Australia, 2 Keller Ground Engineering Pty Ltd ABSTRACT This paper presents an overview
More informationaggregate piers / vscs
aggregate piers / vscs 1 2 HT1.0 1-1 1-2 1' - 1" 34' - 0" 16' - 11" 1' - 1" 13' - 10" BOF 817' - 6" (TYPICAL WITHIN HATCHED REGION) 1-17 1-32 1-47 1-62 1-3 1-18 1-33 1-48 1-63 1-4 1-19 1-34 1-49 1-64 1-5
More informationTime-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill
Time-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill Jeffrey Evans 1, and Christopher Ryan 2 1 Bucknell University, Department of Civil and Environmental Engineering, Lewisburg, PA 17837
More informationVARIATION OF STRENGTH OF COHESIVE SOIL WITH MOISTURE CONTENT AND TIME
5th 5th INDIAN GEOTECHNICAL CONFERENCE 17th 19th DECEMBER 215, Pune, Maharashtra, India VARIATION OF STRENGTH OF COHESIVE SOIL WITH MOISTURE CONTENT AND TIME J.Maity1, B.C.Chattopadhyay2 ABSTRACT Strength
More informationEarthquake Reinforcement Using Jet Grouting for a Factory in Operation
6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Earthquake Reinforcement Using Jet Grouting for a Factory in Operation J. Kawamura 1 ABSTRACT
More informationAugust 15, 2006 (Revised) July 3, 2006 Project No A
August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway
More informationSTABILIZATION OF PLASTIC SOIL USING MARBLE DUST, RICE HUSK AND FLY ASH : Review
STABILIZATION OF PLASTIC SOIL USING MARBLE DUST, RICE HUSK AND FLY ASH : Review Krichphon Singh 1, V.K.Arora 2 1 Department of Civil Engineering, NIT Kurukshetra, (India) 2 Department of Civil Engineering,
More informationSuitability of Different Materials for Stone Column Construction
Suitability of Different Materials for Stone Column Construction Dipty Sarin Isaac and Girish M. S. Department of Civil Engineering College of Engineering, Trivandrum, Kerala diptyisaac@yahoo.com, girishmadhavan@yahoo.com
More informationGEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax
GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 October 28, 2016 City of Vermillion 25 Center Street 57069 Attn:
More informationMSE WALLS CASE STUDIES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch
MSE WALLS CASE STUDIES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch COMMON RETAINING WALL TYPES CONCRETE BLOCK MSE TEMPORARY EARTH SPREAD FOOTING Gabions Drilled Shaft Soil Nail Tiedback
More informationENGINEERING DIRECTIVE
Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel
More informationDIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA
0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3726 Issued 10/2017 This report is subject to renewal 10/2018. DIVISION: 31 00 00
More informationCONNECTICUT DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING MANUAL Edition
CONNECTICUT DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING MANUAL 2005 Edition Rev. Feb. 09 Connecticut Department of Transportation Geotechnical Engineering Manual Introduction This manual has
More informationAPPROXIMATE ANALYSIS OF PILED RAFT. Rameez Gahlot1, Roshni J John2
APPROXIMATE ANALYSIS OF PILED RAFT Rameez Gahlot1, Roshni J John2 1 PG Student, Dept of Civil Engg, Saraswati College of Engineering, Kharghar-4121, India rameezgahlot@gmail.com.2 Head of Civil Engineering
More informationGeogrid-Reinforced Segmental Block Retaining Wall Design Computations (Keystone Retaining Wall Systems) D Street Improvements. Purcellville, Virginia
Geogrid-Reinforced Segmental Block Retaining Wall Design Computations (Keystone Retaining Wall Systems) D Street Improvements Purcellville, Virginia 19955 Highland Vista Drive, Suite 170, Ashburn, Virginia
More informationStudy on Effect of Waste Tyres in Flexible Pavement System
INDIAN GEOTECHNICAL SOCIETY CHENNAI CHAPTER Study on Effect of Waste Tyres in Flexible Pavement System R. M. Subramanian 1 and S. P. Jeyapriya 2 ABSTRACT: Today most tyres, especially those fitted to motor
More information