Quantifying building sustainability and resilience

Size: px
Start display at page:

Download "Quantifying building sustainability and resilience"

Transcription

1 Quantifying building sustainability and resilience Jeremy Gregory PNWER Summit Infrastructure Working Group July 18, 2016

2 Sustainability: we want our world to last Ecological These are interconnected systems Social Technical Slide 2

3 Measuring performance of systems Functional Environmental Economic Social Measuring absolute sustainability is difficult We tend to measure trends: Are we moving towards or away from sustainability? Slide 3

4 Measuring performance of systems Functional Environmental Economic We can measure performance during conditions that are: Typical/intended Atypical/unintended Resilience: a system s response to problems Social Slide 4

5 Resilience: a system s response to problems Hazard Resistance Slide 5

6 Buildings are integral to sustainability Ecological Quantifying sustainability performance is essential for progress Social Technical Slide 6

7 Infrastructure & buildings decisions involve trade-offs Performance Analyze and balance trade-offs Environmental impacts Cost Slide 7

8 A life cycle perspective is key for sustainability and resilience decisions Multiple mechanisms for reducing environmental impact and cost Materials Production Use recycled content Reduce energy Improve performance Design & Construction Use less (i.e., stronger) material Create longerlasting designs Use Reduce energy consumption Reduce heat island effects End-of-Life Enable material recovery Plan for component reuse Slide 8

9 Sustainable infrastructure achieved by: Increasing performance Design process Analyze and balance trade-offs Reducing environmental impacts LCA Reducing cost LCCA Slide 9

10 Which is preferred from a life cycle perspective? Lower design standard Lower initial cost Likely worse energy performance Worse hazard resistance Same location Same appearance Higher design standard Higher initial cost Likely better energy performance Better hazard resistance Quantitative information is lacking on economic and environmental benefits of sustainable and resilient construction Slide 10

11 Present Value of Costs Present Value of Costs LCCA Life-cycle cost analysis: Method for evaluating total costs of ownership 18 Transform individual building expenditures for design A and design B over time into 18 life-cycle cost B A A B 6 0 B B B A A A 0 Life-cycle costs Slide 11

12 Life cycle cost analysis with hazard resistance Build Energy Use Wear & Tear Hazard Repair End of Life Raw materials, labor, equipment, & energy Electricity, gas, and oil consumption throughout life Painting, windows, siding, etc. Combines probability of hazard with damage from hazard Waste and recycling, labor, equipment, & energy Slide 12

13 Expected Cost Probability Probability Probability Probabilistic Hazard Repair Estimation Hazard Curves Fragility Curves Hazard intensity Hazard Intensity Minor Damage model Damage Level Severe Design A Design B Life Cycle Cost Analysis Building Lifetime Slide 13

14 Present Value of Life Cycle Cost (thousands) Key finding: life cycle perspective is important LCC varies by location, discount rate, and hazard resistance $800 $600 $400 $200 Hurricane Earthquake Improvements Maintenance Energy Initial $0 Minimum Enhanced Minimum Enhanced Minimum Enhanced 2 story, 1800sf, wood frame house San Francisco Charleston New Orleans Slide 14

15 Probabilistic LCCA approach enables expected payback period San Francisco, CA Charleston, SC New Orleans, LA No Payback 5 year payback 2 year payback $800 $800 $800 $600 $600 $600 $400 $400 $400 $200 $200 $200 $ Year $ Year $ Year Enhanced resistance design Minimum resistance design Slide 15

16 Present Value Thousands If $250k to build standard house, how much more would you pay for hazard resistance? $300 $250 Mitigation cost 14.3% on top of Initial A $200 $150 $100 $50 $0 20% of Initial A Design A Initial Hazard Design B 5% of Initial B Slide 16

17 Present Value Thousands How much mitigation can you afford in order to break-even across life cycle? $300 $250 Mitigation cost to break even Mitigation $200 $150 Initial A Initial A $100 $50 $0 Hazard Design A Difference in Hazard cost Hazard Design B Hazard Initial A Mitigation Slide 17

18 Present Value Thousands How much mitigation can you afford in order to break-even across life cycle? $300 $250 Mitigation cost to break even 14.3% of Initial A Mitigation $200 $150 Initial A Break Even Mitigation Percent Initial A $100 $50 $0 Hazard Design A Difference in Hazard cost Hazard Initial A Mitigation Hazard Design B Slide 18

19 Break Even Mitigation Percent Example: South Carolina wood frame home Comparing mitigation options 2.0% 1.5% 1.0% 0.5% 0.0% Coastal Toenail to Strap Gable to Hip Inland Slide 19

20 Example: Mid-rise non-engineered masonry Break Even Mitigation Percent for enhanced roof Break Even Mitigation Percent % Based on FEMA Benefit Cost Analysis tool Slide 20

21 Example: Mid-rise change in structure Non-engineered wood to Engineered concrete Nonengineered wood Engineered concrete Based on FEMA Benefit Cost Analysis tool Slide 21

22 Mitigation decisions involve many stakeholders Money Info Regulate New Building Owners Mitigate? Architect & Builder Insurance Company Government Agencies Engineers & Code councils Hazard Engineer Consultants & Universities Slide 22

23 CSHub contribution: quantifying sustainability and resilience performance Sustainable infrastructure achieved by: Increasing performance Design process Analyze and balance trade-offs Reducing environmental impacts Reducing cost LCA LCCA Slide 23

24 More information available at:

25 Back-up Slides Slide 25

26 Present Value Present Value Cost Cost representations across life cycle Initial cost Energy Improvement Maintenance Hazard damage Year Discounted to Present Value Present Value of Cumulative Expected Cost Year Slide 26

27 Case study: Single family wood frame CUREE-Caltech Woodframe Project Two level of resistance: Minimum code compliant Enhanced Seismic enhancements: reduce nailing spacing in the shear walls Hurricane enhancements: Increasing the resistance of roof shingle Stronger nails for roof panels Annealed glass thickens Stronger hurricane clip for roof to wall connection Slide 27

28 Present Value Thousands How to calculate Break Even Mitigation Percent $300 $250 Mitigation cost 14.3% on top of Initial A $200 $150 $100 $50 $0 20% of Initial A Design A Initial Hazard Design B 5% of Initial B Slide 28

29 FEMA Benefit Cost Analysis tool Slide 29

30 Compare life-cycle cost of hazards Slide 30

31 Embedded FEMA buildings types Manufactured home Wood & masonry single family Wood, masonry, concrete multi-family Engineered / non-engineered Strip mall Industrial/warehouse/factory Commercial Slide 31

32 Hurricane mitigation examples Shutters Roof: Type: Gable vs Hip vs Flat Cover: Built-up vs EPDM Roof-wall connection: Toe-nail vs strap Spacing of nails in roof-deck attachment Masonry reinforced Window area (Low, Med, High) Slide 32

The importance of a life cycle perspective in designing pavements and buildings

The importance of a life cycle perspective in designing pavements and buildings The importance of a life cycle perspective in designing pavements and buildings Jeremy Gregory Cement Sustainability Initiative Forum October 1-2, 2013 Vancouver, Canada Life cycle thinking is important

More information

THE 113 CALHOUN ST. PROJECT: MAKING HOMES MORE RESISTANT TO FLOOD, WIND AND EARTHQUAKE

THE 113 CALHOUN ST. PROJECT: MAKING HOMES MORE RESISTANT TO FLOOD, WIND AND EARTHQUAKE Coasts at the Millennium Proceedings of the 17th International Conference of The Coastal Society, Portland, OR USA THE 113 CALHOUN ST. PROJECT: MAKING HOMES MORE RESISTANT TO FLOOD, WIND AND EARTHQUAKE

More information

Pavement-related research at the MIT Concrete Sustainability Hub

Pavement-related research at the MIT Concrete Sustainability Hub Pavement-related research at the MIT Concrete Sustainability Hub Jeremy Gregory Iowa Concrete Paving Association 51 st Annual Concrete Paving Workshop February 4-6, 2015 MIT Concrete Sustainability Hub

More information

Hurricane- Resistance. designations: WHY FORTIFIED? DESIGNATION PROCESS

Hurricane- Resistance. designations: WHY FORTIFIED? DESIGNATION PROCESS Hurricane- Resistance Designation The goal of the FORTIFIED for Existing Homes program is to strengthen your home against specific regional natural hazards through a retrofitting process. Depending on

More information

ISO Types 1-6: Construction Code Descriptions

ISO Types 1-6: Construction Code Descriptions ISO 1 Frame (combustible walls and/or roof) Typically RMS Class 1 Wood frame walls, floors, and roof deck Brick Veneer, wood/hardiplank siding, stucco cladding Wood frame roof with wood decking and typical

More information

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy Inspection Date: 08/12/2011 Owner Information Owner Name: Steve Owner Contact Person: Joe Contact Address:

More information

Performance-Based Design of Wood Shearwalls Considering Performance of the Overall Structure

Performance-Based Design of Wood Shearwalls Considering Performance of the Overall Structure Performance-Based Design of Wood Shearwalls Considering Performance of the Overall Structure David V. Rosowsky Ph.D. (99), Johns Hopkins University Richardson Chair in Wood Engineering Professor of Civil

More information

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification

More information

FEMA P-58 Overview, Recent Adoption on Projects, and the Future in our Profession

FEMA P-58 Overview, Recent Adoption on Projects, and the Future in our Profession Resilience-Based Design & Risk Management using FEMA P-58 1 FEMA P-58 Overview, Recent Adoption on Projects, and the Future in our Profession Curt B. Haselton, PhD, PE Professor of Civil Engineering @

More information

Pavement Management Techniques to Improve Network Performance

Pavement Management Techniques to Improve Network Performance Pavement Management Techniques to Improve Network Performance Jeremy Gregory and CSHub Research Team Ohio Transportation Engineering Conference October 10, 2017 The US is not sufficiently investing in

More information

4.6 Procedures for Connections

4.6 Procedures for Connections 4.6 Procedures for Connections This section provides Tier 2 evaluation procedures that apply to structural connections: anchorage for normal forces, shear transfer, vertical components, interconnection

More information

Mitigating wind and flood: The increased wind vulnerability of static elevation vs. amphibious retrofit

Mitigating wind and flood: The increased wind vulnerability of static elevation vs. amphibious retrofit 8 th International Colloquium on Bluff Body Aerodynamics and Applications Northeastern University, Boston, Massachusetts, USA June 7-11, 2016 BBAA VIII Mitigating wind and flood: The increased wind vulnerability

More information

CALBO Annual Business Meeting The Building Official and the CEA

CALBO Annual Business Meeting The Building Official and the CEA CALBO Annual Business Meeting The Building Official and the CEA Janiele Maffei, S.E. Chief Mitigation Officer CEA Established Following Northridge Earthquake 2 1 Northridge Earthquake $20 Billion residential

More information

Subject Index. STP1258-EB/Mar. 1996

Subject Index. STP1258-EB/Mar. 1996 STP1258-EB/Mar. 1996 Subject Index Acoustic emissions, 175 Adhesion, Air infiltration, 235 Allowable stress design, 186 Alteration crests, cleaning, 376 Aluminum cast, terra cotta dome reconstruction,

More information

Vulnerability Curves to Predict Loss on Mitigated Residential Buildings

Vulnerability Curves to Predict Loss on Mitigated Residential Buildings Vulnerability Curves to Predict Loss on Mitigated Residential Buildings Jean-Paul Pinelli 1, Boback Bob Torkian 2, Kurt Gurley 3, Chelakara Subramanian 4, Shahid Hamid 5 1 Professor of Civil Engineering,

More information

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708 Insurance Appraisals Reserve Studies Wind Mitigation COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc. 401 150th Avenue Madeira Beach, FL 33708 As

More information

Chapter 2 EARTHQUAKE-RESISTANCE REQUIREMENTS

Chapter 2 EARTHQUAKE-RESISTANCE REQUIREMENTS Chapter 2 EARTHQUAKE-RESISTANCE REQUIREMENTS This chapter explains the International Residential Code s (IRC s) general earthquake-resistance requirements as well as specific IRC requirements concerning

More information

Keri M. Rayborn Silver Rayborn Consultants P.O. Box 1565 Tallahassee, FL P F

Keri M. Rayborn Silver Rayborn Consultants P.O. Box 1565 Tallahassee, FL P F To: Subject: Cindy Walden RE: To Be Read Into the Record: Notice of Propose Rule Development regarding 690-170.0155 (OIR-B1-1802 "Uniform Mitigation Verification Inspection Form" From: Keri Rayborn [mailto:krayborn@earthlink.net]

More information

FEMA P-593 STEP-BY STEP PRESCRIPTIVE RETROFIT FOR CRIPPLE WALL BRACING & ANCHORAGE TO FOUNDATION

FEMA P-593 STEP-BY STEP PRESCRIPTIVE RETROFIT FOR CRIPPLE WALL BRACING & ANCHORAGE TO FOUNDATION INTRODUCTION Objective of provisions: The provisions of IEBC Appendix Chapter A3 are intended to reduce hazard of earthquake-induced damage (IEBC A301.1). These provisions are not intended to eliminate

More information

Evaluation and Repair of Earthquake Damage in Woodframe Buildings. John Osteraas, PhD, PE Exponent Failure Analysis Associates

Evaluation and Repair of Earthquake Damage in Woodframe Buildings. John Osteraas, PhD, PE Exponent Failure Analysis Associates Evaluation and Repair of Earthquake Damage in Woodframe Buildings John Osteraas, PhD, PE Exponent Failure Analysis Associates Agenda Introduction & Background Damage Assessment References The CUREE Woodframe

More information

METAL ROOFING: RE-ROOFING QUESTIONS & ANSWERS

METAL ROOFING: RE-ROOFING QUESTIONS & ANSWERS METAL ROOFING: RE-ROOFING QUESTIONS & ANSWERS Building contractors are always looking for installation methods that will provide them with savings on labor and materials expenses. Here are some important

More information

Research. CUREE Consortium of Universities for Research in Earthquake Engineering. What My Mother Didn t Tell Me About..

Research. CUREE Consortium of Universities for Research in Earthquake Engineering. What My Mother Didn t Tell Me About.. Research What My Mother Didn t Tell Me About.. 15 th ANNUAL WESTFORD SYMPOSIUM ON BUILDING SCIENCE 1 15 th ANNUAL WESTFORD SYMPOSIUM ON BUILDING SCIENCE 2 CUREE Consortium of Universities for Research

More information

Available at: Last Modified: December 2012

Available at:  Last Modified: December 2012 6.3 Architectural Components 6.3.7 Chimneys and Stacks 6.3.7.1 Unreinforced Masonry Chimney Unreinforced masonry (URM) chimneys are extremely vulnerable to earthquake damage; their behavior has long been

More information

PSEUDO-DYNAMIC TESTING OF UNREINFORCED MASONRY BUILDING WITH FLEXIBLE DIAPHRAGM. Jocelyn Paquette 1 and Michel Bruneau 2 ABSTRACT

PSEUDO-DYNAMIC TESTING OF UNREINFORCED MASONRY BUILDING WITH FLEXIBLE DIAPHRAGM. Jocelyn Paquette 1 and Michel Bruneau 2 ABSTRACT PSEUDO-DYNAMIC TESTING OF UNREINFORCED MASONRY BUILDING WITH FLEXIBLE DIAPHRAGM Jocelyn Paquette 1 and Michel Bruneau 2 ABSTRACT A full-scale one-story unreinforced brick masonry specimen having a wood

More information

+ Soil Maps + Building Inventory Maps

+ Soil Maps + Building Inventory Maps Presentation Overview The Use of HAZUS for Earthquake Scenarios Hope A. Seligson MMI Engineering Very brief HAZUS overview Examples of HAZUS use in previous scenarios Strategies for improving HAZUS results

More information

High Performance and Durability of Commercial Construction

High Performance and Durability of Commercial Construction Future-Proofing Your Buildings for High Performance and Durability High Performance and Durability of Commercial Construction Chuck Miccolis Vice President, Commercial Lines Insurance Institute for Business

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

What is NUFORM HOUSE KIT?

What is NUFORM HOUSE KIT? Introduction Nuform Building Technologies Inc. (NUFORM ) is creating a better way to deliver affordable housing the NUFORM HOUSE KIT is a solution for creating neighborhoods where people live with pride

More information

EVALUATION OF NONLINEAR STATIC PROCEDURES FOR SEISMIC DESIGN OF BUILDINGS

EVALUATION OF NONLINEAR STATIC PROCEDURES FOR SEISMIC DESIGN OF BUILDINGS EVALUATION OF NONLINEAR STATIC PROCEDURES FOR SEISMIC DESIGN OF BUILDINGS By H.S. Lew 1 and Sashi K. Kunnath Presented at the rd Joint Meeting of the UJNR Panel on Wind and Seismic Effects ABSTRACT This

More information

1996 Bachelor of Science, Civil Engineering University of Central Florida, Orlando, Florida

1996 Bachelor of Science, Civil Engineering University of Central Florida, Orlando, Florida ENGINEER: STUCTURAL/CIVIL J. DAVID HORNE, P.E. Engineering Design & Testing Corp. Charleston District Office Post Office Box 50368 Summerville, SC 29485 Telephone: (843) 832-1052 dhorne@edteningeers.com

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

HAZUS Coastal Storm Surge Model

HAZUS Coastal Storm Surge Model HAZUS User Conference Indianapolis August 24, 2010 HAZUS Coastal Storm Surge Model Frank Lavelle, Peter Vickery, Bo Yu, and Sudhan Banik Applied Research Associates, Inc. Raleigh, NC (919) 582-3350 Project

More information

RE: Notice of Propose Rule Development regarding (OIR-B "Uniform Mitigation Verification Inspection Form"

RE: Notice of Propose Rule Development regarding (OIR-B Uniform Mitigation Verification Inspection Form Cindy Walden Government Analyst I Office of Insurance Regulation Property & Casualty Product Review (850) 413-2616 (Phone) (850) 922-3865 (Fax) Cindy.Walden@floir.com September 20, 2011 RE: Notice of Propose

More information

The ATC-58 Project Development Of Next-Generation Performance-Based Seismic Design Criteria For Buildings

The ATC-58 Project Development Of Next-Generation Performance-Based Seismic Design Criteria For Buildings The ATC-58 Project Development Of Next-Generation Performance-Based Seismic Design Criteria For Buildings R.O. Hamburger Project Technical Director Andrew S. Whittaker Structural Performance Products Team

More information

SEISMIC LOSS ASSESSMENT OF EXISTING TALL STELL BUILDINGS IN LOS ANGELES

SEISMIC LOSS ASSESSMENT OF EXISTING TALL STELL BUILDINGS IN LOS ANGELES SECED 2015 Conference: Earthquake Risk and Engineering towards a Resilient World 9-10 July 2015, Cambridge UK SEISMIC LOSS ASSESSMENT OF EXISTING TALL STELL BUILDINGS IN LOS ANGELES Aysegul GOGUS 1 Huseyin

More information

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Preparation of Seismic Design Manuals for Earthquake Disaster Mitigation Volume 1 HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Part I: A house and its behavior during earthquake A House? How

More information

Post-Earthquake Building Damage Assessment. John Osteraas, PhD, PE Exponent Failure Analysis Associates

Post-Earthquake Building Damage Assessment. John Osteraas, PhD, PE Exponent Failure Analysis Associates Post-Earthquake Building Damage Assessment John Osteraas, PhD, PE Exponent Failure Analysis Associates Agenda Introduction & Background Damage Assessment References ATC-43 Concrete & Masonry Wall Damage

More information

Embodied Carbon & Life Cycle Considerations in Building Structures

Embodied Carbon & Life Cycle Considerations in Building Structures Embodied Carbon & Life Cycle Considerations in Building Structures WALSH Seminar June 7 th & 8th, 2016 Frances Yang, SE, LEED AP BD+C Structures and Materials Specialist Energy + Resources Group Global

More information

LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS

LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS 1 LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS Thomas Castle, S.E. 2 This presentation is published by the Cold-Formed Steel Engineers Institute ( CFSEI ). The information herein shall not constitute

More information

BUILDING ENCLOSURE DESIGN GUIDE WOOD FRAME MULTI-UNIT RESIDENTIAL BUILDINGS. Summary. 1. Introduction

BUILDING ENCLOSURE DESIGN GUIDE WOOD FRAME MULTI-UNIT RESIDENTIAL BUILDINGS. Summary. 1. Introduction BUILDING ENCLOSURE DESIGN GUIDE WOOD FRAME MULTI-UNIT RESIDENTIAL BUILDINGS David Ricketts M.Sc., P.Eng. RDH Building Engineering Ltd., 224 West 8 th Avenue, Vancouver, B.C. V5Y 1N5 Summary 1. Introduction

More information

Disaster Risk in School Infrastructure The Global Program for Safer Schools

Disaster Risk in School Infrastructure The Global Program for Safer Schools Disaster Risk in School Infrastructure The Global Program for Safer Schools Fernando Ramirez Cortes Senior Disaster Risk Management Specialist The World Bank Group Message 1 Children and teachers are increasingly

More information

ON DRIFT LIMITS ASSOCIATED WITH DIFFERENT DAMAGE LEVELS. Ahmed GHOBARAH 1 ABSTRACT

ON DRIFT LIMITS ASSOCIATED WITH DIFFERENT DAMAGE LEVELS. Ahmed GHOBARAH 1 ABSTRACT ON DRIFT LIMITS ASSOCIATED WITH DIFFERENT DAMAGE LEVELS Ahmed GHOBARAH ABSTRACT Performance objectives in performance-based design procedures have been described in several ways according to the operational

More information

Thesis Proposal. CHRIS VANDELOGT Structural Option

Thesis Proposal. CHRIS VANDELOGT Structural Option Thesis Proposal CHRIS VANDELOGT Global Village Rochester Institute of Technology The Pennsylvania State University Faculty Advisor: Dr. Hanagan Revised: 1/13/2012 Original: 12/12/2011 Executive Summary

More information

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Technical Report 3 Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Site and Location La Jolla Commons, San Diego, California General

More information

Life cycle cost and environmental assessment research at MIT s Concrete Sustainability Hub

Life cycle cost and environmental assessment research at MIT s Concrete Sustainability Hub Spring TTCC/National Concrete Consortium, April 2-4, 2013 Life cycle cost and environmental assessment research at MIT s Concrete Sustainability Hub Jeremy Gregory Governments are being forced to do more

More information

Environmental Implications of Increasing Wood Use in Building Construction. Dr. Jim Bowyer Dovetail Partners Minneapolis, MN

Environmental Implications of Increasing Wood Use in Building Construction. Dr. Jim Bowyer Dovetail Partners Minneapolis, MN Environmental Implications of Increasing Wood Use in Building Construction Dr. Jim Bowyer Dovetail Partners Minneapolis, MN Environmental Implications of Increasing Wood Use in Building Construction Importance

More information

Bay Area Retrofit

Bay Area Retrofit Bay Area Retrofit www.bayarearetrofit.com August 25, 2010 510-548-1111 Workers Comp. #2246 Contractors Lic. #558462 Bond #6334450 Submitted to: John Doe San Francisco, CA 415-222-2222 Dear Mr. Doe, The

More information

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2014 lecture one Syllabus & Student Understandings structural behavior, systems and design Introduction 1 Architectural Structures

More information

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX Hansen Pole Buildings Planning Guide Toll Free 866-200-9657 / Toll Free FAX 866-200-9658 While we strive to earn your business, whether you purchase from us or not, we would hope you would utilize this

More information

Data Documentation Template and Earthquake Checklist. Earthquake Data Analysis Methodology: Structural Retrofits of Buildings

Data Documentation Template and Earthquake Checklist. Earthquake Data Analysis Methodology: Structural Retrofits of Buildings Data Documentation Template and Earthquake Checklist Earthquake Data Analysis Methodology: Structural Retrofits of s This data documentation template is designed to assist Benefit-Cost (BC) analysts in

More information

EVALUATION OF SEISMIC RETROFITS FOR POST AND PIER FOUNDATION SYSTEMS

EVALUATION OF SEISMIC RETROFITS FOR POST AND PIER FOUNDATION SYSTEMS EVALUATION OF SEISMIC RETROFITS FOR POST AND PIER FOUNDATION SYSTEMS Eric Tomishima and Ian N. Robertson Research Report UHM/CEE/11-10 December 2011 Abstract A research study was performed to evaluate

More information

Structural Assessment Report 2118 Milvia Street Berkeley, California

Structural Assessment Report 2118 Milvia Street Berkeley, California 2118 Milvia Street Berkeley, California REPORT PREPARED FOR: PERALTA COMMUNITY COLLEGE DISTRICT REPORT PREPARED BY: KPW STRUCTURAL ENGINEERS, INC KPW PROJECT NO. 14C199.00 19 JUNE 2014 Table of Contents

More information

1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: Karardi, Shibpur, Narsingdi, Narsingdi Dhaka Bangladesh 10 May 2013 The Alliance for Bangladesh Worker Safety Page 1/15 10 May 2013 Introduction

More information

BARN MAIN FLOOR PLAN. #G457a 12 x 20 x 8 Gentleman Bunkhouse Shed By SDS-CAD Specialized Design Systems 12'-0" 3'-0" 4'-0" 1'-6" 3'-0" 1'-6" 20'-0"

BARN MAIN FLOOR PLAN. #G457a 12 x 20 x 8 Gentleman Bunkhouse Shed By SDS-CAD Specialized Design Systems 12'-0 3'-0 4'-0 1'-6 3'-0 1'-6 20'-0 3'-0" 12'-0" '-0" 3'-0" BWP 010 BWP BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. BARN TO BE BUILT AS PER LOCAL CODE REQUIREMENTS

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered civil engineer, mechanical engineer, fire protection engineer, and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

Plan Check No. Checked by: An Appointment Is Required for Verification

Plan Check No. Checked by: An Appointment Is Required for Verification SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION

More information

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (Print first / last name) Phone:

More information

Legal Notice. Page 2 of 81

Legal Notice. Page 2 of 81 Page 1 of 81 Legal Notice Reprinted 2011. Copyright 2007, 2008 IBHS. All rights reserved. The FORTIFIED for Safer Living registered service mark may not be used without the express written permission of

More information

FEMA 450 and 451. Acknowledgments. NEHRP Recommended Provisions: Instructional Materials (FEMA 451B) FEMA 451B Handouts Introduction 1

FEMA 450 and 451. Acknowledgments. NEHRP Recommended Provisions: Instructional Materials (FEMA 451B) FEMA 451B Handouts Introduction 1 NEHRP Recommended Provisions: Instructional Materials (FEMA 451B) These instructional materials complement FEMA 451, NEHRP Recommended Provisions: Design Examples Needed are copies of FEMA 451 and FEMA

More information

POSSIBLE TREATMENT STRATEGIES 1/3 From Archibald Johnston Mansion Stabilization Study - Recommendations

POSSIBLE TREATMENT STRATEGIES 1/3 From Archibald Johnston Mansion Stabilization Study - Recommendations POSSIBLE TREATMENT STRATEGIES 1/3 Minimal short-term stabilization The plan for minimal short-term stabilization represents all of the recommended items to be completed if the Township only wishes to buy

More information

Disaster Mitigation Strategies

Disaster Mitigation Strategies Disaster Mitigation Strategies Team members Bill Read Lixion Avila Jose Rubiera Andrew Burton Dale Destin USA USA Cuba Australia Antigua ITWC VI key mitigation recommendations WMO assist developing countries

More information

VULNERABILITY. A Presentation to the Global Earthquake Model Workshop Trinidad. By R. Clarke, Dept Civil & Environmental Engineering, UWI

VULNERABILITY. A Presentation to the Global Earthquake Model Workshop Trinidad. By R. Clarke, Dept Civil & Environmental Engineering, UWI SEISMIC STRUCTURAL VULNERABILITY A Presentation to the Global Earthquake Model Workshop Trinidad By R. Clarke, UWI (3 May 2011) 1 PRESENTATION OUTLINE A. DEFINITION AND ASSOCIATED TERMINOLOGY B. HOW IS

More information

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division GARAGES/ONE-STORY City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

Resilient Design Guide CONCRETE CONSTRUCTION EDITION

Resilient Design Guide CONCRETE CONSTRUCTION EDITION Resilient Design Guide CONCRETE CONSTRUCTION EDITION RESILIENT DESIGN GUIDE RESILIENT DESIGN GUIDE 1 The purpose of the Resilient Design Guide Concrete Edition is to provide information regarding the effective

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

INTEGRASPEC. Specify Integrity in your next project: Please visit us at "The User Friendly ICF" PRODUCT LINE.

INTEGRASPEC. Specify Integrity in your next project: Please visit us at  The User Friendly ICF PRODUCT LINE. INTEGRASPEC "The User Friendly ICF" Commercial 90 o Corners 90 o Corners Headers Santa Fe Bucks IntegraBucks Inserts/ Furring Strips Standard Panels 45 o Corners Brickledge PRODUCT LINE H Clips Taper Panels

More information

Light Steel Framing ~ From Concept to Completion

Light Steel Framing ~ From Concept to Completion Light Steel Framing ~ From Concept to Completion Panelization made simple for the 21st century Automated Construction Equipment Automated Construction Equipment (ACE) is a leader in the design, development

More information

Healing the Hurt: Hurricane Restoration

Healing the Hurt: Hurricane Restoration Healing the Hurt: Hurricane Restoration a presentation by: George M. Fletcher President/CEO Adache Group Architects, Inc. Ft. Lauderdale and Pensacola, FL Healing the Hurt The past couple of hurricane

More information

hurricane resilient wooden houses safer building and retrofitting guidelines

hurricane resilient wooden houses safer building and retrofitting guidelines hurricane resilient wooden houses safer building and retrofitting guidelines hurricane resilient wooden houses safer building and retrofitting guidelines Author of text and drawings Arch. Celia Izquierdo

More information

OREGON BENEFIT-COST ANALYSIS TOOL

OREGON BENEFIT-COST ANALYSIS TOOL OREGON BENEFIT-COST ANALYSIS TOOL FOR EVALUATION OF SEISMIC REHABILITATION GRANT PROGRAM APPLICATIONS USER S GUIDE September 28, 2015 TABLE OF CONTENTS 1.0 WHAT IS BENEFIT-COST ANALYSIS?... 1 1.1 Overview...

More information

HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES

HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES Connecticut Commission on Culture & Tourism, One Constitution Plaza, 2nd Floor, Hartford, CT 06103 * Note: Please attach any additional or expanded

More information

"Nuts & Bolts How fast can wind destroy a home? Simple construction tips to keep yours standing

Nuts & Bolts How fast can wind destroy a home? Simple construction tips to keep yours standing "Nuts & Bolts How fast can wind destroy a home? Simple construction tips to keep yours standing The 23 rd Advanced Severe Weather Seminar March 15, 2014 Gone in Seconds 95 mph Straight Line Winds EF-2

More information

3.1 Noise Overlay District

3.1 Noise Overlay District 3.1 A. Purpose The purpose of this District is to establish a Noise Overlay Zoning District within the. B. Special Definitions As used in this Article only, the following terms shall be defined as set

More information

Construction Waste Minimization and Reuse Management

Construction Waste Minimization and Reuse Management Construction Waste Minimization and Reuse Management Mr.M.KalilurRahman 1, Mr.S.S.Janagan 2 1 Student M.E., (CE&M), Gnanamani College of Engineering, Namakkal-637018, Tamilnadu, India 2 Assistant Prof,

More information

The Home Owner s Guide to Seismic Retrofitting

The Home Owner s Guide to Seismic Retrofitting This guide is intended to help you evaluate a home to determine if it needs retrofitting or has been retrofitted properly. Every house is different and no house matches exactly what you will see here,

More information

THE USE OF FRICTION DAMPERS FOR SESIMIC RETROFIT OF THE MONTEREY COUNTY GOVERNMENT CENTER

THE USE OF FRICTION DAMPERS FOR SESIMIC RETROFIT OF THE MONTEREY COUNTY GOVERNMENT CENTER THE USE OF FRICTION DAMPERS FOR SESIMIC RETROFIT OF THE MONTEREY COUNTY GOVERNMENT CENTER Carlos Y.L. Chang, S.E. 1, Avtar Pall, Ph.D., P.Eng. 2, and Jason J.C. Louie, S.E. 1 ABSTRACT Built in 1966, the

More information

5.0 Elevating Your Home

5.0 Elevating Your Home 5.0 Elevating Your Home One of the most common retrofitting methods for homes is elevation. When a home is properly elevated, the living area should be above most flood levels. Several elevation techniques

More information

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata) SEVENTH PRINTING (Updated October 13, 2014) Figure 1608.2 GROUND SNOW LOADS, p g, FOR THE UNITED STATES (psf) (Revise southern California values as indicated in the figure) SIXTH PRINTING (Updated June

More information

A Simple Solution for Meeting

A Simple Solution for Meeting A Simple Solution for Meeting Narrow Wall Bracing Requirements AND BUILDING A STRONGER, SAFER HOME. APA s Narrow Wall Bracing Method, combined with walls that are fully sheathed with plywood or OSB, helps

More information

Business Models for Deconstruction and Building Materials Salvage

Business Models for Deconstruction and Building Materials Salvage Business Models for Deconstruction and Building Materials Salvage Sponsored by Yale University February 2, 2010 1 Why Salvage Building Materials? 2 Improves the Environment 3 Saves Embodied Energy 4 Provides

More information

Critical parameters in deriving fire fragility functions for steel gravity frames

Critical parameters in deriving fire fragility functions for steel gravity frames Proceedings of the 9 th International Conference on Structures in Fire (SiF 16) 8-10 June 2016, Princeton University, NJ, USA Critical parameters in deriving fire fragility functions for steel gravity

More information

Calculated Quantities and Details

Calculated Quantities and Details Estimate # 8/14/2007 Estimate For: Bill Johnston Finest Quality Homes 1234 Heght Blvd #204 Houston Tx 77079- Ph: (281) 555-5555 Fax: (281) 555-5556 P.O. Box 323 Simonton Tx. 77476 Phone: (281) 346-2462

More information

Heel Blocking Requirements and Capacity Analysis. Overview Revised 3/22/2017

Heel Blocking Requirements and Capacity Analysis. Overview Revised 3/22/2017 Heel Blocking Requirements and Capacity Analysis Overview Revised 3/22/2017 SBCA has been the voice of the structural building components industry since 1983, providing educational programs and technical

More information

Slave Housing Data Base

Slave Housing Data Base Slave Housing Data Base Building Name: Tuckahoe Plantation, Quarter B Evidence Type: Extant Site ID: Historical Site Name: Tuckahoe Plantation City or Vicinity: County: Goochland State: Virginia UTM: @NW

More information

Resilient Design Guide HIGH WIND WOOD FRAME CONSTRUCTION EDITION

Resilient Design Guide HIGH WIND WOOD FRAME CONSTRUCTION EDITION Resilient Design Guide HIGH WIND WOOD FRAME CONSTRUCTION EDITION RESILIENT DESIGN GUIDE RESILIENT DESIGN GUIDE 1 The purpose of this Resilient Design Guide is to provide architects, designers or even homeowners

More information

CHANGES TO THE US ENERGY CODES COMMERCIAL & RESIDENTIAL

CHANGES TO THE US ENERGY CODES COMMERCIAL & RESIDENTIAL Many changes have been made to the new energy code requirements. Among them the demand for better building envelope designs that require more airtight structures with a continuous air barrier, and greater

More information

Overturning Forces. 12 times 300 lbs = 3,600 lbs of shear force along top of wall. Shear Wall

Overturning Forces. 12 times 300 lbs = 3,600 lbs of shear force along top of wall. Shear Wall 2,400 lbs of compression Overturning Forces Overturning forces act on all shear walls. However, sometimes a shear wall will be subjected to very strong overturning forces that can damage the shear wall.

More information

SEISMIC REHABILITATION OF A COMMON TYPE OF URM BUILDING IN IRAN

SEISMIC REHABILITATION OF A COMMON TYPE OF URM BUILDING IN IRAN SEISMIC REHABILITATION OF A COMMON TYPE OF URM BUILDING IN IRAN A. Mahdavi 1, F. Arbabi 2, M. Ghafory-Ashtiany 2 1 Graduate Student, Structural Research Center, International Institute of Earthquake Engineering

More information

SEISMIC PERFORMANCE OF CONCRETE TILT-UP BUILDINGS: CURRENT WALL-TO-SLAB CONNECTIONS

SEISMIC PERFORMANCE OF CONCRETE TILT-UP BUILDINGS: CURRENT WALL-TO-SLAB CONNECTIONS SEISMIC PERFORMANCE OF CONCRETE TILT-UP BUILDINGS: CURRENT WALL-TO-SLAB CONNECTIONS Frank Devine, 1 Omri Olund, 2 Ken Elwood 3 and Perry Adebar 4 1 Graduate Student, Dept. of Civil Engineering, University

More information

Comparison of Chilean and US Seismic Design Provisions for Timber Structures

Comparison of Chilean and US Seismic Design Provisions for Timber Structures Comparison of Chilean and US Seismic Design Provisions for Timber Structures J. Daniel Dolan Professor and Director of Codes and Standards, Wood Materials and Engineering Laboratory, Washington Peter Dechent

More information

RAPID STRUCTURAL ASSESSMENT REPORT

RAPID STRUCTURAL ASSESSMENT REPORT Structure Type: SUPERSTRUCTURE Work Order: 5540 Facility Name: Pier 68 Warehouse FIN: 1680036 Building- Bldg. # 36 Asset Number: 1680-BLDG36 Facility Code: 3490 Asset Activity: STRUCTURE TWO YR Port Engineer:

More information

Life Cycle Assessment and Life Cycle Costing of the World s Longest Pier:

Life Cycle Assessment and Life Cycle Costing of the World s Longest Pier: Life Cycle Assessment and Life Cycle Costing of the World s Longest Pier: A case study on the environmental and economic benefits of stainless steel rebar 2014 [avnir] Conference, Life Cycle in Practice

More information

City of South San Francisco Construction and Demolition Waste Management Plan Information for the Applicants

City of South San Francisco Construction and Demolition Waste Management Plan Information for the Applicants City of South San Francisco Construction and Demolition Waste Management Plan Information for the Applicants General The City of South San Francisco is mandated by the State of California to divert 65

More information

Thermal Bridging in Building Thermal Envelope Assemblies: Repetitive Metal Penetrations

Thermal Bridging in Building Thermal Envelope Assemblies: Repetitive Metal Penetrations Thermal Bridging in Building Thermal Envelope Assemblies: Repetitive Metal Penetrations Educational Overview Revised 2/6/2017 Introduction Thermal bridging is caused by highly conductive elements that

More information

SEE Social (Social Equity) Environment Economics. Sustainability. Three Legged Stool 8/18/2011. The Next Steps for Preservation Beyond Green

SEE Social (Social Equity) Environment Economics. Sustainability. Three Legged Stool 8/18/2011. The Next Steps for Preservation Beyond Green The Next Steps for Preservation Beyond Green Sustainability Defined by the Brundtland Commission (1988) as: "..development that t meets the needs of the present without compromising the ability of future

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information