1 LEED EB O&M 2009: Detailed Review Ken Sidebottom, CEM, LEED AP Program Consultant, Sustainable Buildings Johnson Controls, Inc. USGBC N. TX Board Chair 2009
2 Learning Objectives Understand LEED EB O&M 2009 Rating System Understand USGBC process for Certifying Existing Buildings (GBCI Update) Learn when to use LEED EB O&M Rating system and when it s not appropriate
3 Government Education Private Sector Green Initiatives are abundant and growing 9 Federal agencies use LEED as standard cities, higher education facilities and others have mandated LEED NACo Green Government initiative US Conference of Mayors Climate Initiative Energy Independence and Security Act 2007 Clinton Climate Initiative Building Retrofit Program American College and University Presidents Climate Commitment Association for the Advancement of Sustainability in Higher Education Collaboration for High Performance School BOMA 7-Point Challenge/CCI Center for Energy and Climate Solutions (Dallas BOMA Shades of Green) USGBC/Clinton Climate Build Green Schools initiative Green Grid (IT) Green Guide for Healthcare Architecture 2030
4 Environmental Impact of Buildings People spend as much as 90% of time indoors. Buildings: Consume almost 40% of all energy. Add 40% to atmospheric emissions. Use 68% of all electricity. Use 2% freshwater, 88% potable water. Up to 40% of municipal solid waste stream. Exploit significant amounts of land.
5 Green Buildings
6 Top Sustainability Needs. Reduce energy usage across all operations 2. Increase the use of energy from renewable sources 3. Reduce levels of greenhouse gas emissions 4. Simplify/streamline the reporting of energy and environmental data 5. Increase flexibility to change energy sources 6. Extend the effective life of equipment and assets 7. Reduce operating costs across the organization 8. Reduce the impact of energy cost volatility 9. Increase use of energy-efficient building systems and equipment 0. Reduce the cost of operations through energy efficiency and/or emissions credits Sustainability Navigation Session Results (n = 37)
7 U.S. Green Building Council National coalition representing all sectors of the building industry. Non-Profit trade organization. Promotes design, construction, operation of environmentally responsible, profitable, healthy places to live and work. Market Transformation to Build & Operate Green Buildings Launched Leadership in Energy and Environmental Design (LEED) in Rating system to guide sustainable project development for new construction projects.
8 U.S. Green Building Council Growth 20,000+ member companies, firms, government agencies or organizations 22,000+ Registered building projects 2,250+ Certified Buildings 00,000+ LEED APs 80 Local Chapters in US (4 in TX) Local Contact: Jane Baxter-Lynn, Executive Director USGBC Central Texas Chapter centraltexas.org May 2009 figures
9 LEED EB Market Growth Almost 2300 EB Registered projects (0% of total for all LEED projects) About 50 EB Certified Buildings since Pilot in (2200 total buildings LEED Certified) Represents only 7% of buildings but. EB Represents 22% of total SF of all LEED Certified Buildings (Large Buildings) 90+ Registered for LEED EB in Texas Only 4 Certified in Texas to date Over 35 LEED EB Registered projects in Austin area represent almost 0 MM GSF of space. (Over 270,000 SF/Bldg. average) May 2009 figures
10 USGBC LEED Related Programs Building Certification (GBCI) Certified, Silver, Gold & Platinum Levels Professional Accreditation of People (GBCI) LEED AP (O&M, D&C, ID&C) Training workshops Educational resources Website
11 USGBC Membership & LEED AP Exam USGBC Memberships are by Firm, Co. or Org. (Fee based on market segment and size) Unlimited individual members (Employees) Membership Benefits: Lower Project Cert. fees, reference materials & education program costs. Lower local chapter fees for all employees. People are LEED Accredited Professionals (AP). Exams available for NC, EB O&M and CI Rating Systems New Program Available on May 8th: $00 Application Fee Required to GBCI. Levels of Professional Credentialing change in Green Associate: General Knowledge - Know the USGBC/GBCI Websites and Certification Process (GBCI Study & Ref. Guides) LEED AP Exams: Reference Guides for (D&C, EB O&M and ID&C) Exam is closed book computerized test ($300 per person per test for members/$450 for non-members) Prometric is the testing company. Purchase Study & Reference Guides online (Members discount - $40-$50/copy) $50/copy) Website: (LEED)
12 LEED Products Rating Systems For New Construction NC For Existing Buildings EB For Commercial Interiors CI For Core and Shell CS For (New) Schools For (New) Homes Green Guide for Healthcare (Review) For Neighborhood Developments (Pilot) For Retail (Pilot) Under Development
13 LEED EB History/Future LEED EB Pilot Program: Released in 2003 (00 projects registered Approx. 25% Certified) JCI Brengel Technology Center one of the first 2 LEED NC Certified buildings by USGBC - Only Building to Re- Certify (Using LEED EB Pilot) Silver to Gold. LEED EB v.0: Released in Fall 2004 LEED EB v2.0: October 2006 LEED EB O&M: September 2008 (Current) LEED EB O&M 2009: Available April 27, 2009 New LEED Online goes live LEED EB O&M (LEED AP Exam): May 8, 2009 LEED EB O&M 2009: Mandatory after June 26, 2009 No Additional fee to upgrade (EBOM) until January, 200
14 LEED EB O&M: When to Use it Re-Certify a building that was LEED NC Certified previously (JCI Brengel Center) Certify Existing Whole Buildings (Not for individual tenant spaces or parts of existing buildings) Most commercial and institutional building types are applicable including retail, multiuse and mid/high-rise Residential (4 stories or greater). Campuses can be Certified with EB O&M (Utility metering to individual building level is required for BTU/SF/Yr. assessment) Quantify the Sustainability of a building (Use LEED EB O&M as the metric)
15 LEED EB O&M Minimum Project Requirements Building must be occupied for at least 2 months with 75% occupancy rate or greater per industry standards for building type 90%+ of the building SF must be included in LEED Certification project (Up to 0% SF exclusion allowed but only for areas with separate use/management practices) Must meet all regulatory requirements for hazardous material management (PCB/Asbestos/Mercury in lamps) & waste water discharge Min. 3 month performance period required for all credits pursued (One year minimum for Energy)
16 LEED Categories All Rating Systems Sustainable Sites Materials & Resources Water Efficiency Energy & Atmosphere Indoor Environmental Quality Innovation in Operations Regional Priority
17 LEED EB O&M 2009 Detailed Review (00 Possible Points + 0 Bonus) Levels of Certification Certified Silver Gold Platinum Points Required Points Points Points 80+ Points
18 LEED EB: O&M Prerequisites per Category. Sustainable Sites 0 2. Water Efficiency 3. Energy and Atmosphere 3 4. Materials and Resources 2 5. Indoor Environ. Quality 3 6. Innovation in Ops (IO) 0 7. Regional Priority 0 Total 9
19 LEED EB O&M Point Structure CREDIT CATAGORIES Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environ. Quality Innovation in Operations Regional Priority TOTAL Points Available POINTS
20 Sustainable Sites Overview Goals and Objectives Effective Grounds Management Low-Impact Hardscapes Planting Sustainable Landscapes Reducing Emissions from Transportation to Site Protecting Surrounding Habitat Managing Storm Water Runoff Reducing Heat Island Effect Eliminating Light Pollution
21 Sustainable Sites 8 Credits 26 Point(s) Credit : LEED Certified D&C (LEED NC) 4 Credit 2: Bldg. Exterior & Hardscape Management) Plan Credit 3: Integrated Pest Management, Erosion & Landscape Management Plan Credit 4*: Alternative Transportation 5 Credit 5*: Reduced Site Disturbance Credit 6*: Storm Water Management Credit 7*: Reduce Heat Island (Roof & Landscape) Credit 8: Light Pollution Reduction *Exemplary Performance - Innovation in Ops 2 IO
22 Sustainable Sites Credit : LEED Certified Design & Construction (D&C) Option : Whole Building was Certified under LEED NC Program 4 Points OR Option 2: Whole Building was Certified under LEED for Schools OR Option 3: Building was Certified under LEED Core & Shell (LEED C&S) for Leased Office Buildings AND At least 75% of the leased tenant space is Certified under LEED Commercial Interiors (CI)
23 Sustainable Sites Credit 2: Bldg. Exterior & Hardscape Management Plan Employ a plan that is low-impact to the environment in the following areas: Point General Maintenance Equipment (Low noise and emissions) Snow & Ice removal (No salt or harsh chemicals) Cleaning of Building exterior (No toxic cleaners) Paints & Sealants used on Building exterior (low-voc products) Cleaning of sidewalks, pavement & other hardscapes (low-impact equipment, materials and procedures)
24 Sustainable Sites Credit 3: Integrated Pest Management, Erosion & Landscape Site Management Plan Employ a plan to reduce impact of chemical use & runoff, energy waste, air pollution and solid waste as compared to standard practices. Address the following areas: Point Integrated Pest Management Plan (IPM) Erosion & Sedimentation Control (SWPPP) Divert Landscape Waste from Landfills (Compost on-site or off-site) Reduce Chemical Fertilizer Use Green Roofs for Zero Lot line properties can also be used in place of this plan
25 Sustainable Sites Credits : Alternative Transportation 5 points Reduce the number of commuting trips by building occupants using single occupant standard vehicles. Participate in or provide a program that includes: Points Telecommuting/Compressed Work Weeks Mass/Public Transit (Provide incentives) Car or Van pooling/low-emitting vehicles Human-Powered/Vehicle Transport (Walk or Bicycle) Provide documentation of Program Compliance based on total occupancy of the building for all participants: 0% participation 25% participation 50% participation 75% participation 95%+ participation (Exemplary Performance) IO
26 Sustainable Sites Credit 5: Reduced Site Disturbance Point Have native or adaptive vegetation on 25% of the site open space or 5% of site including building footprint (Whichever is greater) Provide 50% equivalent amount of off-site area, that is dedicated to conservation. Must be documented with owner of off-site property. Water bodies, rock, un-vegetated ground or other natural/native habitat to the region qualify Vegetated roof will apply in urban setting (Must be at least 5% of the total site area) Innovation credit opportunity to provide 50% open space on site or 00% equivalent off-site (Exemplary Performance) IO
27 Sustainable Sites Credit 6: Storm Water Management Point Implement a plan that infiltrates, collects and reuses runoff or evapotranspirates 5% of precipitation falling on the site for both: A Two-Year Storm event A 24 hour design storm event Implement an Annual Inspection and Repair Program Document inspection and maintenance & repairs during the performance period Make any needed repairs within 60 days of inspection Innovation credit opportunity to retain 30% of water falling on site (Exemplary Performance) IO
28 Sustainable Sites Credit 7.: Reduce Heat Island (Non-Roof) Point Option A: : Any Combination of Strategies for 50% of the site hardscape (Roads, Sidewalks, courtyards & Parking lots) Shade by tree canopy within 5 years of planting Shading by structures with Solar Thermal/Photovoltaic Panels Architectural shading devices with Solar Reflectivity Index (SRI) rating of 29 or better Hard scape materials with SRI of 29 or better Open grid pavers (At least 50% pervious) Option B: : 50% or more of all parking spaces are covered. (Under ground, deck or building) Roofs must have SRI of 29 or better Exemplary performance for doing both options IO
29 Sustainable Sites Credit 7.2: Reduce Heat Island (Roof) Point Option A: : Use roofing materials with a Solar Reflectivity Index (SRI) of 29 for pitched roofs (>2:2 slope) and SRI of 78 for flat roofs (<2:2 slope) or better on 75% of all roof surface area. Implement a maintenance program to maintain reflectance value. Option B: : Install a vegetated roof on 50% or more of all roof surface area. Option C: : Install a combination of a vegetated roof and a qualifying reflective roof (meeting the criteria in Option A) per the following formula: (Area of SRI Roof/0.75) + (Area of Vegetated Roof/0.5) >/= Total Roof area Exemplary Performance: Provide a combination of options to exceed individual option goals IO
30 Sustainable Sites Credit 8: Light Pollution Reduction Point Interior Lighting (Non-Emergency) with direct line of site to exterior openings must be controlled to turn off after-hours. (For at least 50% of annual night time hours 290 hrs/year) Exterior Lighting must comply with one of following: Option : Verify Compliance with SS credit 8 if LEED Certified in New Construction Option 2: Partially or fully shield all fixtures with lamps 50 watts and over to not emit light into night sky Option 3: Measure light levels at perimeter to verify compliance. 00 ft. site perimeter (Min. 8 data points) Max. 20% increase in levels with bldg./site lights on vs off. Exemplary Performance for doing all three options IO
31 Water Efficiency Overview Goals and Objectives Monitoring Water Consumption Performance Reducing Indoor Potable Water Consumption Reducing Water Consumption to Save Energy & Improve Environmental well-being Practicing Water-Efficient Landscaping
32 Water Efficiency Prerequisite & 4 Credits Prerequisite : Minimum Fixture & Fitting Water Efficiency 4 Points Required Points Credit *: Water Performance Measurement - 2 Metering Credit 2*: Plumbing Water Performance (0, 5 20, 30% Reduction from Baseline) Credit 3: Water Efficient Landscaping (50,75, 5 00% Reduction) Credit 4*: Cooling Tower Water Management 2 (Chemicals & Non-Potable Water) *Exemplary Performance - Innovation in Ops IO
33 Water Efficiency Prerequisite : Minimum Fixture & Fitting Water Efficiency Plumbing Fixture aggregate efficiency as compared to the Baseline: 2006 Uniform/International Plumbing Code (UPC/IPC) fixture performance (Flush & Flow rates are based on EPA 992 Water Efficiency Standards). Required Allowable calculated baseline water use depends on Age of Fixture Installation: Installed before 993: 60% of Baseline use (Or retrofits of valves, aerators & showers) Installed after 993: 20% of Baseline use Pro-rated rated average based on any combination Policy in place to assess retrofit economics Develop & Implement a Policy for upgrades to compliant fixtures based on economic evaluation.
34 Water Efficiency Prerequisite : Minimum Fixture & Fitting Water Efficiency Document Compliance based on one of the following: Required Option : Provide Reviewer comments for a LEED NC or LEED C&S/CI Certified project. Option 2: Provide declaration that all fixtures were installed after January, 994 and has compliant fixtures Option 3: Provide other tangible evidence of documentation from Installation event if a retrofit was done. Option 4: Provide the calculated baseline and actual usage. Provide cut sheets or a 20% sample of actual use measurements if other than compliant fixtures are installed
35 Water Efficiency Credit : Water Performance Measurement - Metering Credit.: Meter incoming water to facility site Credit.2: Sub-metering of one or more of the following systems (Weekly data recording req d.): Irrigation of Grounds (80% of irrigated site) Indoor Fixtures and fittings (80% of total) Cooling Tower(s) 2 Points Points IO for 2 + Sub- metering systems Domestic Hot Water (80% of total) Process water use (80% of total) Reclaimed or Gray water use alternate Data-logged metering required
36 Water Efficiency Credit 2: Plumbing Water Performance (Reduction from Baseline) Credit : Indoor Fixture & Fitting Efficiency Reduce below the baseline calculated allowable use by: 0% 5% 20% 25% 30% 40% or more (Exemplary Performance) 5 Points Points IO
37 Water Efficiency Credit 3: Water Efficient Landscaping 5 Points Reduce Potable Water for Landscape Irrigation from Baseline using one of the following methods: Option : Sub-metering historical data (3-Years) compared to a calculated baseline. Option 2: Calculate estimated actual use by vegetation type, Regional evapotranspiration rate, species factor, Density Factor and Microclimate Landscape Coefficient. Compare with baseline established using conventional rates, plant types and system design factors. Option 3: Use independent irrigation calculation tools from local, regional or other sources.
38 Water Efficiency Credit 3: Water Efficient Landscaping Reduction from Baseline Reduce Potable Water use compared to the Baseline calculation by the following levels: Reduce consumption by 50% from Baseline Calculation Reduce consumption by 62.5% from Baseline Calculation Reduce consumption by 75% from Baseline Calculation Reduce consumption by 87.5% from Baseline Calculation Reduce consumption by 00% from Baseline Calculation 5 Points Points
39 Water Efficiency Credit 4: Cooling Tower Water Management 2 Points Points Credit 4.: Chemical Management Implement a water management plan including the following components: Chemical Treatment Water Bleed-Off Biological Control O&M Staff Training Credit 4.2: 50% Non-Potable Water Use to include one or more of the following: Rainwater, condensate, tower blow-down water, recycled water, reclaimed water, etc. Innovation credit for 95% non-potable water use IO
40 Energy & Atmosphere Overview Goals and Objectives Monitoring & Improving Building Energy Performance Eliminating CFC s & Minimizing use and impact of Refrigerants in HVAC&R and Fire Protection Systems on the Protective Atmospheric Ozone Layer Using Renewable Energy Alternatives
41 Energy & Atmosphere 3 Prerequisites & 6 Credits Prerequisite : Energy Efficiency Best Management Practices Planning, Documenting & Opportunity Assessment Prerequisite 2: Minimum Energy Performance (Energy Star or Alternate Method) Prerequisite 3: CFC Reduction in HVAC&R Equipment (Re: Ozone depletion report) 35 Points Required Required Required Credit *: Optimize Energy Performance 8 Credit 2: Existing Building Commissioning 6 Credit 3: Performance Measurement 3 Credit 4: Renewable Energy (IOM opportunity) 6 Credit 5: Refrigerant Management Credit 6: Emissions Reduction Reporting *Exemplary Performance IO
42 Energy & Atmosphere Prerequisite : Energy Efficiency Best Management Practices Planning, Documenting & Opportunity Assessment Document Current Sequence of Operations for the Building Systems Required Develop a Building Operating Plan for Operations & Maintenance. Min. information: Occupancy Schedule Equipment run-time schedule Design set points for HVAC equipment Design Lighting Levels Daily, Weekly and Seasonal Changes Validate during performance period Systems level Narrative for Mechanical & Electrical Systems
43 Energy & Atmosphere Prerequisite : Energy Efficiency Best Management Practices Planning, Documenting & Opportunity Assessment Narrative of Preventative Maintenance (PM) Plan for all equipment in Systems Narrative. Required Document PM s in Performance Period Conduct an Energy Audit per ASHRAE Level I requirements to include: Square Footage and Utility Rate & Historical Data review/analysis (EUI & Cost/SF methods for -3 years of data) ENERGY STAR Portfolio Manager/Target Finder analysis Facility Walk-Through Audit with Owner Identify potential low-cost and no-cost improvements for energy efficiency
44 Energy & Atmosphere Prerequisite 2: Minimum Energy Performance (EPA - ENERGY STAR Portfolio Manager & Alternate Methods) Min. score of 69 in ENERGY STAR or 9% below CBECS Avg. to meet E&A prerequisite 2 Required E&A Credit : Intent is to Optimize Energy Performance Achieve increased levels of energy efficiency performance relative to similar building types in a similar climate zone Case - ENERGY STAR Portfolio Manager: EUI (BTU/SF/Yr) Benchmarking - 2 months of historical utility data & basic building info required. 00 point scale (Score of 7 required for point Score of 95+ for 8 points) 2 Building Types in ENERGY STAR Program (Covers about 67% of all C&C RE & Inst. buildings) Exemplary Performance Points Every 2 ENERGY STAR points = LEED EB Energy Performance point up to 8 max. IO
45 LEED EB Energy Performance Rating Rank buildings with ENERGY STAR Portfolio Manager (Free EPA Tool) Is 20 MPG high or low for an automobile? Fuel Efficiency 5-60 MPG Is 80 kbtu/sf/yr high or low for a building? Energy Efficiency Score = -00
46 Portfolio Manager - Eligible Space Types Supermarkets Hospitals Offices (general, courthouse, branch bank, financial center) K-2 Schools Medical Offices Hotels Post Offices Warehouses Residence Halls/ Dormitories
47 Energy & Atmosphere Credit : Optimize Energy Performance (Alt. Methods Case 2: Options,2a,2b & 2c) Case 2: Opt. - CBECS: Score point by being 2% below avg. use. (Compare yr. of historical energy data to CBECS median energy use data in ENERGY STAR Portfolio Manager) Use of 45% below avg. is required for 8 points. (Use the Offline Spreadsheet Calculator for historical data comparison LEED Online Referenced tools) -88 Points Points -88 Option 2a Streamlined Baseline: Use Portfolio Manager and Offline Calculator to compare to CBECS Tables (-year data min.) Option 2b Building Historical Baseline: Use Offline Calculator (Avg. the 3 highest consecutive years of historical data over the last 6 years max.) Option 2c Building Historical Baseline plus Comparable Buildings: Compare 2b history to at least 3 other similar buildings (2-years data min.) IO (47%)
48 Energy & Atmosphere Prerequisite 3: CFC Reduction in HVAC&R Equipment (Leakage rates & reporting) Do not use CFC Refrigerants in HVAC&R base building systems unless third party audit/study indicates it is not economically feasible to retrofit refrigerant or replace equipment within 0 year simple payback. Required If CFC s are used commit to 5-year phase out plan from end of Performance period. Annual leakage rate <5% of total equipment refrigerant charge. Total leakage cannot exceed 30% over remaining equipment life. If leakage rate is greater than allowed or payback is less than 0 years, then repair or replace equipment to meet prerequisite. Equipment with less than 0.5 pounds of refrigerant are exempt from the calculation. (Refrigerators, Water Coolers, Window A/C, etc.)
49 Energy & Atmosphere Prerequisite 3: CFC Reduction in HVAC&R Equipment (Compliance Documentation Requirements) Option : LEED NC, C&S or LEED for Schools Certified with CFC Phase out Documentation of final review/approval If Phase out plan, list system components phased out to date & remaining plan dates Describe any changes to phase out plan Option 2: No CFC s in Building Provide year of installation, refrigerant management program and list of refrigerants Provide Mfr s. or Maintenance providers description or specifications showing refrigerant use information. Option 3: CFC s are used in Building Provide info above plus Third party Report Required
50 Energy & Atmosphere Credit 2.: Existing Building Commissioning Investigation & Analysis Option : Commissioning Process 2 Points Develop a re/retro/ongoing commissioning plan for major energy use systems Conduct the investigation & analysis phase Document the breakdown of building energy use List operating problems that affect occupant comfort and energy use. Develop changes that will solve them Identify capital improvements for cost-effective energy savings and document cost-benefit analysis of each Option 2: ASHRAE Level II Energy Survey & Audit Conduct Audit and document energy use breakdown Perform cost/savings analysis of ECM s to meet owner economic criteria and O&M procedures Document improvement recommendations and deliver to owner for implementation
51 Energy & Atmosphere Credit 2.2: Existing Building Commissioning - Implementation Implement no-cost & low-cost operational improvements and create a capital plan for major system or equipment upgrades 2 Points Demonstrate the observed or anticipated financial costs and benefits of the measures implemented to date Update the building operating plan to reflect any changes in occupancy schedule, equipment run time schedule, design set points or lighting levels. Provide Training for Management staff to build awareness and skills in sustainable building operations topics such as: Energy Efficiency Building Systems and Equipment Operations & Maintenance best practices
52 Energy & Atmosphere Credit 2.3: Existing Building Commissioning Ongoing Commissioning Program Implement an ongoing program including: 2 Points Planning System testing Performance Verification Corrective action response Ongoing measurement & documentation Create a written plan that summarizes commissioning cycle by building equipment or building system group as follows: Cycle shall not exceed 24 months Includes a building equipment list Performance measurement frequency Steps to respond to deviation from expected performance parameters
53 Energy & Atmosphere Credit 2.3: Existing Building Commissioning Ongoing Commissioning Program (Cont d.) Complete at least 50% (By dollar value) of all recommended improvements within 24 months of plan development and prior to submittal for LEED Certification. 2 Points Only work completed within two years prior to submittal may be included to show progress in the commissioning cycle. Update the building operating plan to reflect any changes in occupancy schedule, equipment run time schedule, design set points or lighting levels.
54 Energy & Atmosphere Credit 3.: Performance Measurement Building Automation System (BAS) Have in place a BAS that monitors and controls key building systems including but not limited to: Point HVAC Systems Lighting Systems Have a Preventative Maintenance (PM) plan in place that ensures BAS components are tested, repaired and replaced according to Mfr. recommendations. Demonstrate BAS is used to inform decisions regarding changes in building operations and energy saving investments Describe the function and operation of the BAS, document proper function of system sensors & actuators during performance period
55 Energy & Atmosphere Credit 3.2 & 3.3: Performance Measurement System Level Metering Breakdown of building energy use (E&A Credits 2. & 2.2 or energy bills), spot metering or other means to determine energy end use by mechanical systems and end-use applications. 2 Points Points Based on breakdown, employ system level metering covering major end-use systems: EA Credit 3.2: 40% of total energy consumption. At least one of the two largest energy use categories from the breakdown must be metered to the extent of 80% of it s total use. EA Credit 3.3: 80% of total energy consumption. At least two of the three largest energy use categories from the breakdown must be metered to the extent of 80% of each items total use.
56 Energy & Atmosphere Credit 4: Renewable Energy (On-Site and Off-Site Options) On-site Renewable sources that qualify are: 6 Points Photovoltaic Solar Thermal Bio-fuel based electrical systems (wood, animal or agricultural waste & landfill gas) Geothermal heating or electric systems (Not geo-exchange exchange such as Ground Source Heat Pumps) Low-impact hydroelectric Wave and tidal power Environmental Impact credits must be retained or retired and cannot be sold
57 Energy & Atmosphere Credit 4: Renewable Energy On-Site and Off-Site Options Off-site sources 6 Points Points Green-e e products certified by CRS. 2 yr contract for RECs & Commitment beyond that to purchase ongoing RECs Performance Levels: On-site Production/ Off-Site Procurement 3% of total use/ 25% of total use 4.5% of total use/ 37.5% of total use 6% of total use/ 50% of total use 7.5% of total use/ 62.5% of total use 9% of total use/ 75% of total use 2% of total use/ 00% of total use - Exemplary Performance (3.5+% on-site) IO
58 Energy & Atmosphere Credit 5: Refrigerant Management Point Reduce Ozone depletion and support early compliance with Montreal Protocol while minimizing direct contribution to global warming Option A: Do not use refrigerants in base building HVAC&R systems. Option B: Complete Refrigerant Impact Formulas LCGWP + LCODP x 05 < 00 LCGWP = Life-Cycle Global Warming Potential* LCODP = Life-Cycle Ozone Depletion Potential* [(LCGWP + LCODP x 0 5 ) x Qunit]/Qtotal < 00 * See details in Reference Guide
59 Energy & Atmosphere Credit 6: Emissions Reduction Reporting Point Identify Building Performance Parameters that reduce conventional energy use and emissions, qualify reductions and report via formal tracking program. Track and record emissions reductions delivered by energy efficiency measures, operational improvements, renewable energy and other emissions reduction measures including renewable energy credits. Report emissions reductions (Tons CO 2 equivalent per year) using a third-party program. (EPA Climate Leaders, ENERGY STAR, or World Resource Inst. or World Business Council for Sustainable Development protocols) Option A: Actual measured reduction Option B: Compare to an ENERGY STAR Score of 50 for the building
60 Materials and Resources Overview Goals and Objectives Selecting Sustainable Materials Practicing Waste Reduction Strategies Reducing Waste at the Source Reusing & Recycling Reducing Mercury Pollution
61 Materials and Resources 2 Prerequisites & 9 Credits (*Exemplary Performance IO) Prerequisite : Sustainable Purchasing Policy Prerequisite 2: Solid Waste Mgmt Policy Credit *: Sustainable Purchasing - Consumables 0 Points Required Required Credit 2. & 2.2*: Sustainable Purchasing - Durable Goods (Electric Equipment & Furniture) Credit 3*: Facility Alterations & Additions Materials 2 Credit 4*: Reduced Mercury in Lamps Credit 5*: Sustainable Purchasing - Food Credit 6: Waste Stream Audit Credit 7*: Ongoing Consumable Recycling Credit 8: Waste Management Durable Goods Credit 9*: Waste Management Alt. & Add. Mt ls.
62 Materials and Resources Prerequisite : Sustainable Purchasing Policy Have a product purchasing policy in place for ongoing consumables, including at least the following items within control of the project team: Paper (Copying, printing, notebooks, envelopes, etc) Toner Cartridges Binders Batteries Desk Accessories Include at least one additional purchased product category from the following list in the policy: Durable Goods (Electric powered equipment, Appliances, & Furniture) Facility Alterations and Additions (Construction materials for base building, excluding FF&E) Reduce Mercury in Lamps The prerequisite requires only policies, not ongoing performance measurement. Note: Measurement and documentation of purchases during the project performance period, allow projects to achieve points in M&R Credits through 4 toward Certification. Required
63 Materials and Resources Prerequisite : Sustainable Purchasing Policy The EB O&M Reference Guide Introduction has a Policy Model outline section. The LEED for Existing Buildings O&M Registered project tools page provides a Policy Template to follow. Refer to the EPA Environmentally Preferable Purchasing (EPP) Program guidelines. ( Criteria for purchases shall include the following: Contain 0% post consumer or 20% post industrial materials Contain 50% rapidly renewable materials Contain 50% materials harvested, extracted and processed within 500 miles of the project site Consists of at least 50% FSC certified paper Batteries are Rechargeable Required
64 Materials and Resources Prerequisite 2: Solid Waste Management Policy Have a solid waste management policy in place for ongoing consumables, including at least the following items within control of the project team: Paper (Copying, printing, notebooks, envelopes, etc) Toner Cartridges Binders Batteries Desk Accessories Durable Goods (Electric powered equipment, Appliances, & Furniture) Facility Alterations and Additions (Construction materials for base building) Lamps Containing Mercury The prerequisite requires only policies, not ongoing performance measurement. Measurement and documentation of compliance with the policy during the performance period allows projects to achieve points in M&R Credit 7 toward Certification. Required
65 Materials and Resources Credits..3: Sustainable Purchasing Ongoing Consumables Maintain a product purchasing program for ongoing consumables, including at least the following items within control of the project team: Paper (Copying, printing, notebooks, envelopes, etc) Toner Cartridges Binders Batteries Desk Accessories Document compliance with program requirements for material type, recycled content, sourcing and procurement methods as defined in the EPP with the following levels of performance: 60% of purchases during performance period 95+%+ purchases during performance period (Exemplary Performance) (90% of building space must be included in program) Point Points IO
66 Materials and Resources Credits 2. & 2.2: Sustainable Purchasing - Durable Goods Maintain a product purchasing program for Durable Goods, including at least the following items within control of the project team Option: Electric powered equipment Building O&M/Office equipment, A/V Equipment, External power adapters) Appliances (Refrigerators, dishwashers, water coolers, etc.) Option2: Furniture (Same criteria for ongoing consumables for material recycled content, origin, material type, salvaged, etc.) Document compliance with program requirements for the following levels of performance: 40% purchases during performance period for Option 40% purchases during performance period for Option 2 *80% purchases during performance period for Option or 2 (*Exemplary Performance) 2 Points Points IO
67 Materials and Resources Credit 3: Facility Alterations & Additions Materials Maintain a product purchasing program for Building Materials attached to the building in facility alteration and/or addition projects during the project performance period, including all of the following items: Contain 0% post consumer or 20% post industrial materials Contain 70% salvaged materials from an on-site or internal organization reuse program or an off-site external reuse program Contain 50% rapidly renewable materials Contain 50% materials harvested, extracted and processed within 500 miles of the project site Consists of at least 50% FSC certified wood Adhesives and sealants meet cited VOC standards Paints and coatings meet Green Seal GS- VOC requirements Point
68 Materials and Resources Credit 3: Facility Alterations & Additions Materials (Continued) Maintain a product purchasing program for Building Materials attached to the building in facility alteration and/or addition projects during the project performance period, including all of these additional items: Hard surface floors (covering 25% or more of the building floor area) are FloorScore-certified certified products Carpet meets CRI Green Label Plus testing program requirements Carpet Cushion (Pad) meets CRI Green Label Plus testing program requirements Composite Panels and Agri-fiber products contain no urea-formaldehyde Document that 50% of all purchases of these products during the Performance Period meet these requirements Document that 95%+ of all purchases of these products during the Performance Period meet these requirements for Exemplary Performance Point Points IO
69 Materials and Resources Credit 4: Reduced Mercury in Lamps Develop and maintain a lighting purchasing plan that specifies maximum levels of mercury in lamps purchased for the building and grounds. The program must: Specify a target of 90 picograms per lumen-hour or less Include lamps in the building and in outdoor fixtures (both hard wired and portable) Require at least 90% of all mercury containing lamps apply May exclude screw-in CFL s (If meeting NEMA Std.) Only new replacement lamps purchased in the performance period apply (Not existing lamps) Implement the program during the building performance period and document compliance as follows: 90 picograms/lumen-hour 70 picograms/lumen-hour Point Points IO (Exemplary Performance)
70 Materials and Resources Credit 5: Sustainable Purchasing - Food Achieve sustainable purchases of at least 25% of all combined food and beverage purchases during the project performance period, that meet the following criteria: Labeled USDA Certified Organic Food Alliance Certified Rainforest Alliance Certified Protected Harvest Certified Fair Trade Maine Stewardship Council s Blue Eco-Label Purchased products are produced within 00 miles of the project site Multiple criteria can be counted for the same product. Example: A USDA Certified organic product purchased within 00 miles of the site, counts twice (By value) in the calculation for program compliance. Point Points Minimum 25% purchased Exemplary Performance for 50% purchased IO
71 Materials and Resources Credit 6: Waste Stream Audit Conduct a waste stream audit of the projects on- going consumable wastes. (Do not include Durable Goods or Building Materials in the audit). Identify the major categories of waste to include at least the following: Waste to disposal (Landfill or incineration for example) Waste diverted from disposal (Recycled, reused or composted for example) Use the audit to establish a baseline of waste types for each category in the building and on the site. Determine the amount of each waste type (By weight or volume) that can/will be or is being diverted from disposal. Audit must be conducted during the project performance period. Document actual diversion rate performance and accomplish points toward Certification using MR Credit 7. Point
72 Materials and Resources Credit 7: Solid Waste Management - Ongoing Consumable Recycling Implement and maintain a waste management program that addresses materials with a low-cost per unit that are regularly used in the building and grounds in normal business use. These materials include but are not limited too: Paper (Office Use, Cardboard, Corrugated Cardboard, etc.) Toner Cartridges Glass Plastic Metals Food waste Battery recycling of 80% min. (All types included) Document waste diversion during the project performance period: 2 Points Points Divert 50% from waste stream Divert 95% from waste stream IO
73 Materials and Resources Credit 8: Waste Management Durable Goods Implement and maintain a waste reduction and reuse and recycling program that addresses durable goods replaced infrequently and that may require a capital expense to replace. Durable Goods include but are not limited to: Office Equipment (Copiers, printers, computers, etc) Appliances (Refrigerators, dishwashers, etc.) External Power Adapters Televisions & other A/V equipment Returned leased equipment qualifies. Relocated equipment (within the building) does not. Document waste diversion during the project performance period (by weight, volume or replacement value): Credit 8: Reuse or recycle 75% from waste stream Point Points
74 Materials and Resources Credit 9: Waste Management Alterations & Additions Materials Divert 70% of waste (by volume) generated from facility alterations & additions from disposal. This applies only to base building elements attached to the building. Materials include building components and structures, wall panels, attached finishings, carpet, flooring materials, paints sealants and coatings. It does not include MEP equipment or other specialty systems like elevators. Document the recycled volume during the performance period as a percentage of the total waste generated by the alteration or addition event. Performance levels for point award is as follows: Divert 70% from disposal (Minimum) Divert 95%+ from disposal (Exemplary Performance) Point Points IO
75 Indoor Environmental Quality Overview Goals and Objectives Improve Ventilation Manage Air Contaminants Implement Green Cleaning Specify Less Harmful Materials Allow Occupants Control of Comfort Provide Daylight and Views
76 Indoor Environmental Quality 3 Prerequisites & 3 Credits 5 Points Prerequisite : Minimum IAQ Performance Prerequisite 2: Tobacco Smoke Control Prerequisite 3: Green Cleaning Policy Credit : IAQ Best Management Practices (IAQ Program, O/A monitors, Increased O/A, Reduce particulates, IAQ plan for alterations and addition projects) Credit 2: Occupant Comfort (Occupant Survey, lighting and thermal control, Daylight & Views) Credit 3: Green Cleaning Activities: Required Required Required High Performance Cleaning Program () Custodial Effectiveness Assessment () Sustainable Cleaning Products, Materials & Equipment (2) Indoor Chemical & Pollutant Source Control () Indoor Integrated Pest Management Program ()
77 Indoor Environmental Quality Prerequisite : Outdoor Air and Exhaust Systems Case : Maintain ASHRAE compliance for all AHUs Required Case 2: Maintain at least 0 CFM/person for all AHUs if ASHRAE 62. is not possible due to physical constraints In either option verify that each AHU has adequate outside air at minimum flow conditions (VAV systems especially) by measurement. Additionally: Verify each exhaust fan operates and provides CFM indicated per intended design use Implement and maintain an HVAC maintenance program to ensure proper operation of system components (Dampers, actuators, controllers, CO 2 sensors, etc.)
78 Indoor Environmental Quality Prerequisite 2: Environmental Tobacco Smoke (ETS) Control Case - Option : Prohibit smoking in the building and designate outside areas for smoking that are 25 feet from any opening to the building. (Doors, operable windows, intakes, etc.) Req d Case - Option 2: Prohibit smoking in the building except in designated smoking rooms that are designed to ASHRAE Standards with negative pressure and sealed walls to deck. Test room to confirm negative relation to surroundings. Case 2: Residence & Hospitality Buildings Only Prohibit smoking in common areas Limit leakage between units by sealing doors, openings in walls, floors and adjacent chases Test for air leakage and do progressive sampling
79 Indoor Environmental Quality Prerequisite 3: Green Cleaning Policy Have in place a green cleaning policy for the building and site addressing: Reqd. Purchase of sustainable cleaning, hard floor & carpet care products (EQ C3.3) Purchase of cleaning equipment meeting criteria in EQ credit 3.4 Establish Std. Operating Procedures for floor cleaning systems to assure performance & protect occupants Develop strategies for proper hand hygiene Develop guidelines for safe handling & storage of chemicals and managing spills Develop requirements for staff training on cleaning procedures, chemical handling, storage, dispensing and clean-up of spills Develop a means of occupant feedback for program improvement
80 Indoor Environmental Quality Credit..5: IAQ Best Management Practices IAQ Management Program Credit.: Develop & implement an IAQ management program based on EPA s I-BEAM model. Program shall address minimizing the potential for typical IAQ problems. The program may also address one or more of the following components: Credit.2: O/A Delivery Monitoring Provide O/A measuring devices in all AHUs and CO 2 sensors in densely occupied areas and O/A. Control on CO 2 levels. Credit.3 Increased O/A Increase O/A by 30% over ASHRAE Standard 62. for AHUs or CIBSE Manual (Natural Ventilation) Credit.4 Reduce Particulates Provide MERV 3 filtration or better for all AHUs serving occupied spaces Credit.5: IAQ plan for Building Alterations and Addition projects Require use of SMACNA IAQ Guidelines on all construction/renovation projects. Perform fresh air flush- out or indoor air testing prior to occupancy 5 Points Points
81 Indoor Environmental Quality Credit : Occupant Comfort 4 Points Credit 2.: Occupant Survey - Implement an occupant comfort survey and complaint response system. Solicit 30%+ of all occupants for feedback to address at least the following: Points Thermal comfort Acoustics Indoor air quality Lighting levels Building cleanliness Credit 2.2 Lighting Control Provide lighting controls for 50% of occupants to allow individual control (For all enclosed office, cubical & open plan spaces) Provide Control for all occupants (Exemplary Performance) IO
82 Indoor Environmental Quality Credit : Occupant Comfort (Cont d) Credit 2.3 Comfort Control Have a system in place to continuously track and optimize systems to regulate comfort conditions (air temperature, humidity, air speed and radiant temperature). Building must establish the following: 4 Points Points Continuous monitoring (at a minimum) of air temperature and humidity Periodic testing of air speed and radiant temperature in occupied spaces Alarms for conditions requiring adjustment or repair. Provide a list of sensors, zone set points & limit values that trigger alarm Procedures to deliver rapid problem response
83 Indoor Environmental Quality Credit : Occupant Comfort (Cont d) Credit 2.4 Daylight & Views Option : Daylight - Achieve 2% daylight factor or 25 FC in 50% of all occupied spaces 4 Points Points Compliance may be obtained by one or more of the following methods: Path : Computer modeling for 25 FC confirmation Path 2: Calculation Prescriptive Method Path 3: Measurement Confirm 25 FC maintained Path 4: Combination of Methods Option 2: Views - Achieve direct line of sight to vision glazing for 45% of occupied spaces Accomplish both Options (Exemplary Performance) IO
84 Indoor Environmental Quality Credit 3.: High-Performance Green Cleaning Program: Have in place a high-performance cleaning program supported by a policy that addresses the following: Point Points Provide appropriate Staffing Plan Training of Custodial Staff on hazards, use, maintenance, disposal and recycling of cleaning chemicals, dispensing equipment and packaging Use of chemical concentrates with appropriate dilution systems to minimize chemical use Use of sustainable cleaning materials, products, equipment, janitorial paper products and trash bags (including microfiber tools and wipes) Use of sustainable cleaning and hard floor & carpet products Provide a copy of the program in the submittal
85 Indoor Environmental Quality Credit 3.2: Green Cleaning Program Custodial Effectiveness Custodial Effectiveness Assessment Conduct an audit in accordance with APPA Custodial Leadership Guidelines performed by the project team. Audit shall consist of the following steps: Point Points Asses the building spaces during normal operations with one or more auditors identified Select a min.0% sample of all spaces and types with a minimum of 5 spaces audited per space type Provide an analysis for each space using the APPA 5-level appearance scoring system ( = best & 5 = worst). Average scores from spaces audited, per auditor, for an aggregate average facility score Submit the Summary results of the audit: Credit 3.2: Facility Averaged score of 3 or less
86 Indoor Environmental Quality Credit 3.3: Purchase of Sustainable Cleaning Products and Materials Implement a sustainable purchasing program for all cleaning materials and products, janitorial paper products and trash bags used by custodial staff/cleaning service provider. Products must meet one or more of the following criteria: Point Green Seal GS-37 for general cleaning products Green Seal GS-40 for disinfectants & harsh cleaners Appropriate Environmental Choice CCD standards for special use application cleaning products Green Seal GS-0 for tissue products, GS-09 for paper towel products or appropriate CCD standards and US EPA procurement guidelines for trash can liners Green Seal GS-4 or CCD Standard for Hand Soaps California Code of Regulations for VOC content
87 Indoor Environmental Quality Credit 3.3: Purchase of Sustainable Cleaning Products, Materials & Equipment Submit documentation indicating the percent of purchased products (During the Performance Period) that meet the criteria. Points are awarded as follows: Credit 3.3: 30% of all purchases meet criteria Exemplary Performance: 60% of all purchases meet criteria Point Points IO Provide documentation from Manufacturers that purchased products meet the criteria Provide calculations indicating percent of compliant product to total purchased products Verify building is managed by entity that has control of all operational elements related to cleaning with no exemptions for tenants
88 Indoor Environmental Quality Credit 3.4: Sustainable Cleaning Equipment Implement a program for use of janitorial equipment to reduce building contaminants & noise. Cleaning equipment program must require that: Vacuum cleaners be Certified by CRI. Sound levels < 70dBA Point Points Carpet extraction equipment is Certified by CRI Floor maintenance equipment (burnishers and buffers) include vacuums & appropriate guards for capturing particulates & operating sound levels are < 70dBA Propane powered equipment meets CARB emission standards & operating sound levels are < 90dBA Scrubbing machines are equipped with variable speed pumps and chemical metering systems to reduce chemicals Gel Batteries are used for all equipment using batteries Equipment is ergonomically designed with added safety features to reduce damage to building components Project team submits equipment log with purchase, repair & maintenance data. Include Mfr. specification sheets
89 Indoor Environmental Quality Credit 3.5: Indoor Chemical & Pollutant Source Control Utilize entryway walk-off systems (grilles, grates and/or mats) to reduce dirt, dust, pollen and other particulate from entering the building. Develop cleaning strategies to maintain systems as well as exterior walkways. Point Points A minimum of 0 lineal feet of surface must be available inside all public entry doors. Entryways not in use or those dedicated for emergency egress only, do not apply. Submittals for Certification Documentation: Option : For previously LEED Certified new construction projects, submit proof of acceptance (Final Review Comments) Option 2: Provide a floor plan of all entryways and the cleaning procedures used for all systems
500 WEST PUTNAM AVENUE GREENWICH, CT
LEED-CI ANALYSIS June 2015 500 WEST PUTNAM AVENUE GREENWICH, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability
More information2016 LEED Equivalency Analysis for Stanford Campus
6 LEED Equivalency Analysis for Stanford Campus Analysis performed by: Moira Hafer, LEED AP O+M Office of Sustainability Department of Sustainability & Energy Management Stanford University Category Type
More informationLEED Application Guide for Multiple Buildings and On-Campus Building Projects
LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011
More informationLEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP
LEED 2009 for Commercial Interiors Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP Homes Commercial Interiors Core & Shell New Construction Schools Healthcare Existing Building Operations
More informationLEED Application Guide for Multiple Buildings and On Campus Building Projects
LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011
More informationLEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods
LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods
More informationLEED -Existing Buildings. Crescent Ridge Corporate Center I
LEED -Existing Buildings Crescent Ridge Corporate Center I LEED Leadership in Energy and Environmental Design The U.S. Green Building Council is a coalition of leaders in the building industry promoting
More informationSustainable Design A DIVISION OF SHIVE-HATTERY
Sustainable Design A DIVISION OF SHIVE-HATTERY our transition to sustainability must be a deliberate choice to leave the linear surge of an extractive economy and enter a circulating, renewable one. Janine
More informationLEED for Operations and Maintenance
LEED for Operations and Maintenance Bill Green PE, LEED AP Jessie Jones, EIT, LEED AP O+M The RMH Group September 16, 2010 Topics of Discussion Overview of USGBC s LEED Rating System(s) Benefits of LEED
More informationA Building Commissioning Overview. Presented by: Goetting & Associates Commissioning
A Building Commissioning Overview Presented by: Goetting & Associates Commissioning www.goettingcx.com What is the Definition of Commissioning? Building Commissioning is a Quality Assurance Process of
More informationLEED And Your Indoor Environment
LEED And Your Indoor Environment An overview of LEED v3 and Indoor Air Quality David McCauley, CIE Council Certified Indoor Environmentalist ACAC CIE #1008005 USGBC's Mission To transform the way buildings
More informationAnalysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA
Analysis 1 LEED Analysis of Laboratory Buildings Background The LEED program (Leadership in Energy and Environmental Design) established by the U.S. Green Building Council is becoming the standard by which
More informationLEED for Existing Buildings:
LEED for Existing Buildings: Operations and Maintenance 101 0 Agenda 1. Overview of changes to LEED-EBOM 2009 3. Assessing Building Opportunities Building Exterior and Site Water Efficiency Energy & Atmosphere
More informationConstruction Specifications Canada Conference May 23, BOMA BESt
Construction Specifications Canada Conference May 23, 2013 BOMA BESt Creating a sustainable environment one building at a time. BOMA Calgary BOMA Canada BOMA Calgary BOMA BESt local administrator BOMA
More informationCONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability
01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationGLADYS VALLEY HALL. Materials & Resources Innovation & Design Process
Instructional Facility VeterinaryVeterinary MedicineMedicine Instructional Facility GOING FOR GOLD Valley Hall has achieved LEED Platinum certification. The Leadership in Energy and Environmental Design
More informationo o o o o o o Percentage of floor area appropriate for a particular rating system 0% 40% 60% 100% Should not use that rating system Project team s choice Should use that rating system LEED 2009 CREDITS:
More informationLEED REQUIREMENTS. Source reference: Supplemental Guidance to the Minimum Program Requirements (MPR), Rev. 2, 9/1/2011
OVERVIEW: The University of Illinois at Urbana-Champaign Facilities Standards includes language to comply with LEED Building Design and Construction Rating System developed by the U.S. Green Building Council.
More informationLEED version 4 Leadership in Energy and Environmental Design
LEED version 4 Leadership in Energy and Environmental Design United States Green Building Council Founded in 1993, the United States Green Building Council (USGBC) was the first Green Building Council
More informationGenentech Building 20 Office LEED-CI Gold XL CONSTRUCTION
Genentech Building 20 Office LEED-CI Gold Above and Beyond A LEED Gold 50,00 s.f. tenant improvement, the space was originally designed with a goal to achieve LEED silver certification. Innovative approaches
More informationLEED Project Delivery Process Manual Appendices
LEED Project Delivery Process Manual Appendices November 2016 Second Edition Appendices Page Appendix 1: Other Alberta Requirements and Green Building Standards 3 Appendix 2: Integrated Design Process
More information1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2)
1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2) A. 52.2-2007 B. 55-2010 C. 62.1-2010 D. 90.1-2010 E. 189.1 Answer A and C. 52.2-2007 - ASHRAE Standard
More informationLEED v4 Building Design and Construction Quiz #8 EQ
LEED v4 Building Design and Construction Quiz #8 EQ 1. Which of these is considered an unoccupied space? [Choose three] A. School classroom B. Mechanical room C. Meeting room D. Locker room E. Restroom
More informationProjected actual points. Responsible for UNC -- Project name. Remarks
UNC LEED Checklist Total points available Projected Responsible for UNC -- Project name Cost documentation Sustainable Sites Prerequisite- Erosion and Sediment control Prerequisite REQ Y All campus projects
More informationGreen Building Rating System
An Introduction to the U.S. Green Building Council and the LEED TM Green Building Rating System March 2004 U.S. Green Building Council The nation's foremost coalition of leaders from across the building
More informationCIMS-Green Building: Elevate Your Green Cleaning and Prepare for LEED
CIMS-Green Building: Elevate Your Green Cleaning and Prepare for LEED Jim Peduto Senior Partner, American Institute for Cleaning Sciences SESSION NO.:T1.41 TUESDAY, MARCH 15, 2011 ROOM NO.: 341 Elevate
More informationWMU Facility Life Cycle Design Guidelines Update (Approved by VP Van Der Kley & Facilities Management on 4/28/16)
Update (Approved by VP Van Der Kley & Facilities Management on 4/28/16) Developed by Sustainable Design Committee: Christopher Caprara, Devon Miller, Carolyn Noack, Eleonora Philopoulos, Kelsey Pitschel,
More informationLEED for Commercial Interiors
LEED-CI LEED for Commercial Interiors Kim Lam Renee Webley What is the LEED-CI Rating System? The benchmark for tenant improvements of new or existing office space. An integrated design tool that sets
More informationLEED Leadership in Energy and Environmental Design
LEED Leadership in Energy and Environmental Design United States Green Building Council (USGBC) Founded in 1993, the United States Green Building Council (USGBC) was the first Green Building Council formed
More informationMcCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007
Project Highlights McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 > 42.7% reduction in potable water usage achieved with high-efficiency low-flow fixtures > 94.6% of the construction
More informationSustainable Sites (SS)
Sustainable Sites (SS) Category SS C1 Leed Certified Design & Construction Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations To reward
More informationLEED 2009 for New Construction and Major Renovations
LEED 2009 for New Construction and Major Renovations Bayshore District Operations Building Project Checklist 4.28.6 20 4 0 Sustainable Sites Possible Points: 26 Y? N d/c Notes: Y C Prereq Construction
More informationCALGREEN NON-RESIDENTIAL BUILDING Checklist
CALGREEN NON-RESIDENTIAL BUILDING Checklist REVISED 11/18/14 New non-residential buildings shall be designed to include the green building mandatory measures specified in this checklist. This checklist
More informationLeased Space Environmental and Energy Efficiency Attributes Tenant Instructions
Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions This document is to evaluate the Environmental and Energy Efficiency attributes of a leased facility/space. The tenant s
More informationGreen Building Ordinance Overview
Green Building Ordinance Overview September, 2013 City of Dallas Sustainable Development and Construction Dallas Green Ordinance 2008 Task Force Recommendations Two-phase implementation strategy Solution
More informationNPS Project Sustainability Checklist Building Projects (For New Construction or Major Renovation)
PS Project Sustainability Checklist Building Projects (For ew Construction or Major Renovation) Project Title: Zielenski Court Complex Fund Source: Other Gross Project Construction Cost: $3,000,000 Description:
More informationCase Study: Element PROJECT DESCRIPTION
Case Study: Element PROJECT DESCRIPTION Project type: Project gross SF: Number of keys: Location: Hotel (Hospitality), extended-stay prototype Varies, prototypical SF: 79,035 SF gross Varies, prototypical:
More informationSustainable Building Operations & Upgrades
Sustainable Building Operations & Upgrades LEED for Existing Buildings 2010 Energy / Facilities Connections Conference Brightworks & Glumac Eric Baxter and Todd McGuire 12 May, 2010 The Value Proposition
More informationGREEN BUILDING GUIDELINES
018110 GREEN BUILDING GUIDELINES PART 1: GENERAL 1.01 INTENT AND BACKGROUND A. Cornell is signatory to the American College and University Presidents Climate Commitment (PCC). By signing this document,
More informationThe 2010 California Green Building Code; "CalGreen" effective January 1st, 2011
1 The 2010 California Green Building Code; "CalGreen" effective January 1st, 2011 Existing Culver City Building Safety Division Green Programs: The Culver City Mandatory Photovoltaic Requirement, effective
More informationTHERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS
SUSTAINABLE DESIGN FORM 010.901 REV 1211 THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN GUIDE StopWaste.Org LEED-NC Platinum Energy Foundation LEED-CI Platinum Adobe East Tower LEED-EB
More informationErrata Sheet. LEED for Schools Reference Guide First Edition for the document titled:
Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic
More informationLEED 2009 FOR EXISTING BUILDINGS OPERATIONS AND MAINTENANCE ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S.
LEED 2009 FOR EXISTING BUILDINGS OPERATIONS AND MAINTENANCE ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S. October 2011 This is a draft document and can be used only in the interim until LEED
More informationLEED for Homes Project Checklist
LEED for Homes Project Checklist Builder Name: Project Team Leader: Home Address (Street/City/State): Project Description Adjusted Certification Thresholds Building Type: Project type: Certified: 45.0
More informationLEED CERTIFICATION PROJECT REVIEW REPORT
LEED CERTIFICATION PROJECT REVIEW REPORT How to Interpret this Report Purpose Leadership in Energy and Environmental Design (LEED) was designed by the US Green Building Council to encourage and facilitate
More information37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium
Taubman Building, 15 Eliot St., Cambridge, MA, 02138 LEED CI V2009 GOLD The is a 2,943 square foot space located in the Taubman Building of the Harvard Kennedy School of Government. The project scope includes
More informationGreen Building and Operating Practices and Guidelines
Green Building and Operating Practices and Guidelines The University of Alberta s commitment to sustainability is expressed throughout its institutional plans and guiding documents, including the Institutional
More informationExisting vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.
Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in
More informationUSGBC & LEED. A Summary of the LEED Development as a primer for LEED ND
USGBC & LEED A Summary of the LEED Development as a primer for LEED ND US Green Building Council USGBC Basic USGBC information LEED (Leadership in Energy and Environmental Design GBCI (Green Building Certification
More informationAlpen Windows - LEED Impact Analysis
ALPEN WINDOWS MATERIALS: Energy Efficient Windows Alpen Windows - LEED Impact Analysis SECTION I. PRODUCT IDENTIFICATION Product Name: Alpen Windows Manufacturer: Alpen High Performance Products 6268 Monarch
More information- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best
CASE STUDY #3 A SUSTAINABLE SITE & BUILDING Macy Brannan, Kiana Fannin, & Chase Muchow MCALLEN MAIN LIBRARY Located in McAllen, TX Architects: MSR Design 120,000 sq. ft. Completed in 2011 Largest single
More informationGreen Building Rating System For Commercial Interiors
Green Building Rating System For Commercial Interiors Version 2.0 *Updated December 2005 November 2004 *With revised EA section for projects registered after June 26, 2007. LEED for Commercial Interiors
More informationBalco, Inc. Stair Nosings
Balco, Inc. Stair Nosings Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. Stair Nosings Contributes to LEED Credits Zero maintenance, reducing
More informationASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers?
ASHRAE/USGBC/IES Standard 189.1-2009 What Does It Mean for Commissioning Providers? Kent W. Peterson, PE, FASHRAE, LEED AP P2S Engineering, Inc. kent.peterson@p2seng.com What is Standard 189.1? ANSI standard
More informationCALGREEN NON-RESIDENTIAL BUILDING Plan Submittal Checklist
CALGREEN NON-RESIDENTIAL BUILDING Plan Submittal Checklist VERSION 1.0 REVISED 12/19/16 New non-residential buildings shall be designed to include the green building mandatory measures specified in this
More informationUBC Residential Environmental Assessment Program
UBC Residential Environmental Assessment Program Developer: Architect: Project Name: Neighbourhood: Lot No.: Street Address: Project Stage: UBC DP Reference No.: Date: Project Information Wall Financial
More informationATTACHMENT N LEED PROJECT PROCEDURES
ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation
More informationBuilding Typology Draft Metrics
Building Typology Draft Metrics Seattle s Sustainable Building Tool www2.ci.seattle.wa.us/implement DRAFT MEASURING METRICS SUCCESS Building Typology Principles 1. Design based on building type 2. Provide
More informationResearch Analysis: Building Envelope and LEED Credits Introduction
: Building Envelope and LEED Credits Introduction Green buildings are no longer a new idea and are quickly becoming the trend in the slowly changing industry of building construction. Even though the essence
More informationThe Fort Collins Discovery Museum LEED stands for Leadership in Energy and Environmental Design.
The Fort Collins Discovery Museum is has achieved LEED Platinum Certification, the highest level of achievement in the rating system. LEED stands for Leadership in Energy and Environmental Design. LEED
More information360 HAMILTON AVENUE WHITE PLAINS, NY
LEED-CI ANALYSIS June 2015 360 HAMILTON AVENUE WHITE PLAINS, NY To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability
More informationUNIVERSITY OF ROCHESTER DIVISION 01 SPECIFICATIONS November 4, 2013 SECTION SUSTAINABLE DESIGN REQUIREMENTS - LEED FOR NEW
SECTION 018113.13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More information2012 USGBC Central Florida Chapter LEEDership Awards Outstanding Green Building of the Year: Valencia College, Lake Nona Campus Valencia College s
2012 USGBC Central Florida Chapter LEEDership Awards Outstanding Green Building of the Year: Valencia College, Lake Nona Campus Valencia College s fifth campus the first new campus in 15 years is in Southeast
More informationSACRAMENTO County New Animal Care Facility LEED Elements
Construction Activity Pollution Prevention We reduced pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust generation by creating an Erosion and
More informationP-7A PROGRAM GSF FAR / NSF FAR COMMENT Basement - BOH Program 3,975 0 Below grade NIC below grade Ground Level - Lobby Program 3,935 includes elevator floors 9'-0" Level 2 - Lounge/F+B Program 5,765 5,367
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationPROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition
PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition Chapter 1 GENERAL SECTION 101 GENERAL 101.1 Title. These regulations shall be known as the California San Francisco Green Building Standards
More informationGREENING EXISTING FEDERAL BUILDINGS:
P a g e 1 GREENING EXISTING FEDERAL BUILDINGS: EXECUTIVE ORDERS, GUIDING PRINCIPLES AND ENERGY STAR S PORTFOLIO MANAGER Conrad T. Kelso, PE, CEM, LEED AP O+M Facility Engineering Associates, P.C. 12701
More informationLEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction
LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction Summary Date of Application Path Project Project Address Owner Architect Third Party Third Party Provider
More informationFOAMGLAS Insulation, Sustainable Design, and LEED
FOAMGLAS Insulation, Sustainable Design, and LEED A report to Pittsburgh Corning on the attributes on FOAMGLAS Insulation relative to sustainable building design. Christine A. Subasic, P.E., LEED AP 6/8/2010
More informationIgCC Basics. The International Green Construction Code Implications for Wood Construction. Learning Objectives. Copyright Materials
The International Green Construction Code Implications for Wood Construction Jim Bowyer Dovetail Partners, Inc. The Wood Products Council is a Registered Provider with The American Institute of Architects
More informationOne That is Already Built.
Montgomery County Planning Board 2009 Growing Smarter Speaker Series Thursday, February 12 th, 2009 Green Building: Today s Practices Tomorrow s Challenges Carl Elefante, FAIA, LEED AP Principal Director
More informationGreen Building Rating System For Commercial Interiors. Version 2
Green Building Rating System For Commercial Interiors Version 2 November 2004 Leadership in Energy and Environmental Design (LEED ) Buildings fundamentally impact people s lives and the health of the planet.
More informationEcole Connaught Community School Welcomes. CaGBC Sask Chapter Members & Colleagues
Ecole Connaught Community School Welcomes CaGBC Sask Chapter Members & Colleagues Who we Are as the Comets We are a Dual Track French Immersion School and with an enrollment of 435 students, 43 staff and
More informationGreen Building: Today s Practices Tomorrow s Challenges
Montgomery County Planning Board 2009 Growing Smarter Speaker Series Thursday, February 12 th, 2009 Green Building: Today s Practices Tomorrow s Challenges Carl Elefante, FAIA, LEED AP Principal Director
More informationGreen Guide for Health Care Version 2.2 Operations Section, 2008 Revision Comparison with GGHC Version 2.2, January 2007
Green Guide for Health Care Version 2.2 Operations Section, 2008 Revision Comparison with GGHC Version 2.2, January 2007 2.2 Mod New 0 79 42 Green Guide for Health Care Version 2.2 Operations Section,
More informationStarSeal PS. LEED Guide
LEED Guide 2008 Vexcon Chemicals, Inc. 2 Table of Contents I. Introduction 4 II. US Green building Council (USGBC) & LEED 5 III. Short Spec 9 IV. Energy & Atmosphere (EA) 11 V. Materials & Resources (MR)
More informationCAST STONE AND LEED v4 [1 of 6]
CAST STONE AND LEED v4 [1 of 6] INTRODUCTION Sustainable design has become one of the most prominent trends in the building industry. Designers aiming for a more environmentally-friendly building design
More informationColony NorthStar ESG Policy. March 2018
Colony NorthStar ESG Policy March 2018 Introduction, Mission and Vision Responsible Investing for a Sustainable Future Colony NorthStar has established a strong foundation for our Corporate Responsibility
More informationCertification Checklist
1. Quality System: This section describes quality system requirements. It sets forth a general framework to ensure effective operations and continual improvement. Elements include: 1.1. Definition of Cleaning
More informationEvergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program
Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program The following table provides a brief description of the documentation that will be required of successful LIHTC
More informationWEST WINDSOR TOWNSHIP GREEN DEVELOPMENT PRACTICES CHECKLIST
The Green Development Practices are intended to function as guiding principles for all Site and Subdivision applications in West Windsor Township. Each applicant shall be expected to responsibly incorporate
More informationSECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.21 SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES A. This section describes general requirements and procedures to comply with the Green Building
More informationNCMA TEK CONCRETE MASONRY & HARDSCAPE PRODUCTS IN LEED 2009 TEK 6-9C
Provided by: Concrete Block Insulating Systems, Inc. (CBIS) National Concrete Masonry Association an information series from the national authority on concrete masonry technology NCMA TEK CONCRETE MASONRY
More informationChapter 6:Energy & Atmosphere
Chapter 6:Energy & Atmosphere Category with highest number of points 1 Learning Objectives Fundamental & Enhanced commissioning and verification Minimum & Optimize energy performance Building-level & Advanced
More informationLEED FACT SHEET AND BACKGROUND
Updated 2012 LEED FACT SHEET AND BACKGROUND Tupper Lake, NY - The Wild Center in Tupper Lake, New York, received a Leadership in Energy and Environmental Design (LEED) Silver certification. The LEED certification,
More informationWINDMILL DEVELOPMENT GROUP
USGBC and LEED for Homes Mid-Rise If targets for greenhouse gas emissions reduction are to be met, decisionmakers must unlock the potential of the building sector with much greater seriousness and vigor
More informationLEED-EB Checklist. Sustainable Sites - 14 points 3/9/ Documentation Required. Not Pursued Key Party. Purchase Record. Targeted.
Sustainable Sites - 4 points Map(s) ord Prereq Erosion & Sedimentation Control Required TC/JR/ BM X X X Prereq 2 Age of Building Required JJ X Credit. Green Site & Building Exterior Management, 4 actions
More informationPROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 General Requirements A. These guidelines are intended to provide a framework to evaluate building projects for the University of Texas at Austin to: 1. Verify the feasibility of options
More informationSession no. B LEAD WITH LEED
Session no. B LEAD WITH LEED Paul Kai Architect, R.A., LEED AP Jon Yoshinaga Civil/Environmental Engineer, P.E., LEED AP U.S. Army Corps of Engineers 20 May 2010 US Army Corps of Engineers Agenda Background
More informationEnOcean Technology and LEED Enabling Sustainability
Rev A 2010-01-22 Prepared by Building Intelligence Group LLC: Paul Ehrlich, PE Jeffrey Seewald, PE (651) 204-0105 info@buildingintelligencegroup.com www.buildingintelligencegroup.com Building Intelligence
More informationLEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise
LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise About LEED Certification The U.S. Green Building Council s LEED green building program
More information35% reduction in water use below code maximum 83% 88% 49% reduction in lighting power density 12%
Science Center Cabot Library Project LEED CI v4.0 1 Oxford Street, Cambridge, ma LEED Certified Project Profile December 2017 The Science Center Cabot Library project was comprised of renovating the entry,
More informationCALGreen Mandatory Regulatory Provisions and Synergies with LEED. Antea USA, Inc.
CALGreen Mandatory Regulatory Provisions and Synergies with LEED Background Information on CALGreen EO S-20-04 Designing, constructing and operating all new and renovated state-owned facilities paid for
More information75% 40% reduction in water consumption. 43% 68% 90%
HOLOKE EIGHTH FLOOR CAMPUS SERVICE CENTER 75 Mount Auburn Street, Cambridge, MA 02138 LEED-CI V3 GOLD The Harvard Campus Service Center LEED CI project is an interior renovation of existing office space
More informationLEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN
LEADERSHIP IN ENERGY AND Leadership in Energy and Environmental Design (LEED) Green Building Rating System is a third-party certification for the design, construction and operation of environmentally friendly
More informationGSA Public Buildings Service. GSA LEED Applications Guide
GSA Public Buildings Service GSA LEED Applications Guide February 2005 Acknowledgements The authors of the GSA LEED Applications Guide would like to thank Mr. David B. Eakin, Chief Engineer in the Office
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 8113.53 - SUSTAINABLE DESIGN REQUIREMENTS - GREEN GLOBES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationEnvironmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program
Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program Agenda EWaS Overview History Who is EWaS? Mission EWaS Standards & Tools Energy Efficiency HVAC equipment
More informationBenefits of Green Buildings. Government Finance Officers Association of Texas April 2014
Benefits of Green Buildings Government Finance Officers Association of Texas April 2014 Overview LEED History and information General Purpose & Examples LEED Scoring & Benefits City of Irving Projects
More information