Additional Information
|
|
- Lizbeth Carroll
- 5 years ago
- Views:
Transcription
1
2
3 Additional Information Proposed 5 MLD CETP Project at Village-Pandoga Tehsil Haroli, District - Una, Himachal Pradesh by M/s Himachal Pradesh State Industrial Development Corporation Limited - Environmental Clearance (IA/HP/MIS/30340/2015; F.No /2015-IA-III) Reference: Minutes of the 19th Expert Appraisal Committee (Infra-2) meeting held 25th 27th May Sr. No. Points Page No. Letter 1 As per the MoEF&CC standards for CETP s, seek the inlet 01 quality standards from the State Pollution Control Board and put up before the EAC 2 NOC from ground water department for use of groundwater 02 3 Details of water balance to be provided 03 4 Issues raised and commitments made by the project proponent during the Public hearing to be provided in the form of tabular chart with action plan for complying with the commitments made. 5 Details of member industries, their production capacity, waste 07 generation, effluents characteristic and primary treatment provided by the member units. 6 Details design of green belt to be provided
4 Annexure 1.-Letter for Inlet Parameter from HPSPCB 2
5 Annexure 2.-Water Tanker Supplier Letter 3
6 Annexure 3 Water Balance Diagram 4
7 Annexure 4 Issues raised during public hearing along with commitments Public hearing of the proposed project was conducted by HPSPCB on at am at project site. Issues raised during public hearing along with commitments is given in below table. S. No Name and Address Issues/suggestion raised Reply 1. Shri.Ranajit Rana Ex.Zila Parisad Member,Village Pandoga,Dist Una 2. Shri Ashok,Ex.Pradhan Village Pandoga, Dist Una He said we have no problem for establishment of CETP unit. However, he also raised concern about pollution. He said we don t have any problem after establishing of this project. The GM HPSIDC replied that, proposed CETP will treat the treated Industrial effluent. Same shall be given to industries for reuse. No treated water shall be released in to the water body or land. - 5
8 Annexure 5.- Details of member industries, their production capacity, waste generation, effluents characteristic and primary treatment. The member unit for which the CETP plant is going to be proposed is yet not decided. Therefore, the wastewater generation from the individual industries is only on assumption basis. or on the list of industries which was described in the DPR and it is mandatory for all of the individual member unit to install their own treatment unit with the specific technology along with online monitoring system so that only the recommended limit and quality of treated water reach to the CETP plant. S. No Plant Capacity Textile 1 5 MLD 500 KLD Food & Bev 1000 KLD Detergent Paper Pharma Misc 500 KLD 250 KLD 1500 KLD 1250 KLD All the effluent released from the individual industrial unit will be collected in the CETP plant either through the underground pipe line with the suitable pump station at the various location and through pipeline to the collection sump and Expected Quantity of Waste Water from each Industries. Characteristic of Treated Effluent That Should Be Enter In CETP S. No Industries ph TSS COD BOD TDS Oil & Grease Phenolic Comp Bioassay 1 Textile 6-8 <2000 <2000 <1000 <2200 <20 <1 90 % 2 F & B 6-8 <1200 <7000 <3500 <2000 <100 <1 90 % 3 Paper 6-8 <600 <1800 <400 <1300 <50 <1 90 % 4 detergent 6-8 <800 <600 <200 <3000 <25 <1 90 % 5 pharma 6-8 <1000 <4000 <1000 <2000 <50 <1 100 % 6 Miscc 6-8 <600 <2500 <1200 <120 < % 6
9 Annexure 6: Detail of green belt Creation of green belt development using local species along the approach road, inside campus, open space, surrounding CETP Plant etc. Total Plot a rea sqm. and proposed green belt area is Sqm. Refer Figure No. 1 Green Belt Layout Sr. No. Species Name Habit 1 Aegle marmelos (L.) Corr. Tree 2 Azadirachta indica Linn. Tree 3 Ziziphus jujuba L. Tree 4 Butea monosperma L. Tree 5 Pongamia pinnata (L.) Pierre Tree 6 Dalbergia latifolia Roxb. Tree 7 Acacia catechu (L.f.) Willd. Tree 8 Syzygium cumini (L.) Skeels Tree 9 Tectona grandis L.f. Tree 10 Phyllanthus emblica L. Tree 11 Ricinus communis L. Tree 12 Ficus benghalensis L. Tree 13 Ficus religiosa L. Tree 14 Ficus racemosa L. Tree 15 Caryota urens L. Tree 16 Dendrocalamus strictus Nees Herb List of Some Hedge Plants 17 Justicia adhatoda L. Shrub 18 Nerium indicum Mill. Shrub 19 Ocimum americanum L. Herb 20 Vitex negundo L. Shrub 7
10 Figure No. 1 Green Belt layout 8
ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan
ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL
More informationLetter from Maharashtra Pollution Control Board
ADS Cover Letter Letter from Maharashtra Pollution Control Board Consent to Establish by MPCB Irrigation Management Plan Irrigation Management Plan 1. Total treated effluent is 810 CMD 2. Total
More information: Industrial Projects - 2. : 26th October, 2016
1. Proposal No. : IA/AP/IND/26243/2014, 2. MoEFCC File No. : J-11011/408/2014-IA II (I) 3. Category of the Proposal : Industrial Projects - 2 4. Name of the proposal : M/s Divis laboratories limited, Unit
More informationWoody Species Composition of Naturally Revegetated Coal Mine Spoils on Singrauli Coalfields, India
Article International Journal of Environment and Bioenergy, 2014, 9(3): 236-242 International Journal of Environment and Bioenergy Journal homepage: www.modernscientificpress.com/journals/ijee.aspx ISSN:
More information3. DATA COLLECTION 3.1 DATA COLLECTION 3.2 DATA COLLECTION AGENCIES
3. DATA COLLECTION 3.1 DATA COLLECTION Systematic data collection helps for effective outcome of research work. Record of the data helps to identify the characteristics of the selected plant. In the present
More informationPreparation, Validation and Registration of HP CDM Project. S.D.Sharma MCT Participant -HP
Preparation, Validation and Registration of HP CDM Project S.D.Sharma MCT Participant -HP somdsharma@gmail.com Title- India: Himachal Pradesh Reforestation Project- Improving Livelihoods and Watersheds
More informationThe SEAC has examined the proposal in the light of amended Notification dated
1 Minutes of the 85 th meeting of State Environment Impact Assessment Authority held on. 09.12.2015, under the Chairmanship Sh. Bharat Bhushan IAS (Retd.), Chairman, SEIAA held in the meeting room of office
More informationo Protected Forest (~ 9.1 km in NE direction)
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introduction M/s. UltraTech Cement Limited, earlier Vikram Cement (A unit of M/s. Grasim Industries Ltd.), is nestled in Malwa region of Madhya Pradesh, at
More informationSTANDARD OPERATING PROCEDURE
STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame
More informationAIR POLLUTION TOLERANCE INDICES OF FEW PLANTS GROWING NEAR RAIGARH (INDIA)
AIR POLLUTION TOLERANCE INDICES OF FEW PLANTS GROWING NEAR RAIGARH (INDIA) S. Tiwari* 1 and M. Tiwari 2 1. Govt. Arts and Comm. College, Bhopal (INDIA) 2. Research Laboratory of Botany, Saifia Science
More informationM/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka
M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka South Zonal Office, Bangalore 1 Name/ address of CETP/ company: M/s Malur CETP, Malur Industrial Estate, Malur Kolar, Karnataka 2 Area occupied
More informationMinistry of Environment & Forests (C.P. Division) Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs)
Ministry of Environment & Forests (C.P. Division) ++ Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs) 1. Introduction: Under the Water (Prevention and Control
More informationTo The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar
March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT
More informationDuring the discussions, the Committee finalized the following additional TOR for further study:
Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special
More informationAction taken (NGT Order dated 07 th August vide OA No. 138, 139/2018)
Action taken (NGT Order dated 07 th August vide OA No. 138, 139/2018) Till date, eight meetings of the Executing Committee have been conducted i.e. one at Shimla and seven at Chandigarh where HPPCB participated
More informationDated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana
F.No.10-12/201S-IA.III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003. To The Director, Mjs Vulcan Waste
More informationPROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT
PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT
More informationProject: Rama Phosphates Ltd., Udaipur Document: EES/RAMA/001/138-EC/ IND./2016. Executive Summery. Enkay Enviro Services PVT Ltd 28
Executive Summary 28 INDEX S. No. CONTENTS PAGE No. 1.1 INTRODUCTION 30 1.2 SALIENT FEATURES OF THE PROJECT 32 1.3 RAW MATERIAL 34 1.4 PRODUCT 35 1.5 SOLID WASTE 35 1.6 FINANCIAL AND SOCIAL BENEFITS 35
More informationGUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS
GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS Florida Department of Environmental Regulation July 1992 TABLE OF CONTENTS PURPOSE AND APPLICABILITY................... 1 Purpose............................
More informationREPORT ON PERFORMANCE EVALUATION OF SEWAGE TREATMENT PLANT TIRUNELVELI, TAMILNADU
REPORT ON PERFORMANCE EVALUATION OF SEWAGE TREATMENT PLANT TIRUNELVELI, TAMILNADU As per mandate of Ministry of Environment & Forest, New Delhi, Central Pollution Control Board has taken up study on performance
More informationAICRP on Agroforestry, Rajendranagar, Professor Jayashankar Telangana State Agricultural University, Hyderabad , TS, India
Journal of Agricultural Science and Technology B 7 (2017) 351-357 doi: 10.17265/2161-6264/2017.05.008 D DAVID PUBLISHING Agro-biodiversity Park for Conservation and Preservation of Native Flora and Fauna
More informationConceptual Plan LIST OF ANNEXURE
Conceptual Plan LIST OF ANNEXURE Annexure No. Description I. Aerial View II. III. IV. Site Location Plan & DP Plan Contour Plan Master Layout V. Ground Coverage Statement & Refuge area statement VI. VII.
More informationM/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:
Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited
More informationEXECUTIVE SUMMARY. Table No. : 1. Green belt Area ha. B. Capacity details Unit Proposed Capacity. Clinker Capacity.
1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY Revati Cements Private Limited (RCPL) is a private limited company with its registered office at Indore (M.P.). RCPL is promoted by Ruchi Group
More informationANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal
ANNEXURE Annexure 1: Production Details Annexure 2: Site Location Map Annexure 3: Site Layout Map & Area breakup for Terminal Annexure 4: Operation Philosophy Annexure 5: Copy of Consent to Operate Annexure
More informationCRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB
Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 2, 2017 To, Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai
More informationM/S. HETERO INFRASTRUCTURE SEZ LIMITED
ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH
More informationSakun Publishing House (SPH): IJPLS. Explorer Research Article Dwivedi, 8(12): Dec., 2017: ] CODEN (USA): IJPLCP ISSN:
INTERNATIONAL JOURNAL OF PHARMACY & LIFE SCIENCES (Int. J. of Pharm. Life Sci.) Traditional Knowledge among the Natives of Singrauli district in Madhya Pradesh Rajesh Kumar Dwivedi MIG-1, Deendayal Nagar,
More informationProposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad
1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon
More informationEffect of Stone Mining Area Flora on Sustenance of Local People
Effect of Stone Mining Area Flora on Sustenance of Local People *Alok Pandey and Kumud Dubey Centre for Social Forestry and Eco-Rehabilitation. New Katra Allahabad (Uttar Pradesh), India *Email: alok.pndy01@gmail.com
More informationCOMPLIANCE REPORT THE CONDITIONS ENVIRONMENTAL CLEARANCE ORDER NO: 35/SEIAA/KL/6090/2012 DT
1 COMPLIANCE REPORT TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE ORDER NO: 35/SEIAA/KL/6090/2012 DT. 14 11 2012 BY STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA) FOR PROPOSED QUARRY PROJECT AT Sy.Nos.
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationBY Dr. A.N. Singh Department of Botany, Panjab University Chandigarh 29 th May, 2015
17 th International Symposium on Landscape and Landscape Ecology, 27-29 May, 2015, Nitra, Slovakia Comparative Restoration Potential of certain Native and Exotic Woody Species planted on degraded mine
More informationADDITIONAL STUDIES PUBLIC CONSULTATION As per EIA notification 14 th September 2006 and ToR issued by Expert Appraisal Committee (EAC) Ministry
ADDITIONAL STUDIES 7 7.1 PUBLIC CONSULTATION As per EIA notification 14 th September 2006 and ToR issued by Expert Appraisal Committee (EAC) Ministry of Environment, Forest and Climate Change (MoEFCC),
More informationREPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN
REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN FOR INCREMENTAL INCREASE IN PRODUCTION CAPACITY DUE TO PROCESS OPTIMIZATION FROM 359 KTPA to 371 KTPA AUGMENTATION IN ALUMINIUM METAL PRODUCTION
More informationEXECUTIVE SUMMARY OF THE PROPOSED FERTILISER UNIT OF M/s. SUMAN PHOSPHATES & CHEMICAL LTD., MATRALA, MADHYA PRADESH
EXECUTIVE SUMMARY OF THE PROPOSED FERTILISER UNIT OF M/s. SUMAN PHOSPHATES & CHEMICAL LTD., MATRALA, MADHYA PRADESH 1.0 INTRODUCTION M/s. Suman Phosphates and Chemical Ltd., has proposed to set-up a Single
More information1726M/1, 1725M/2, 1724M, 1056M, 1058M,
To, Date 22.03.2018 Member Secretary Expert Appraisal Committee II Infrastructure Development, Coastal Regulation Zone, Building/Construction and Miscellaneous projects Ministry of Environment, Forest
More informationFile No /2008-FC
5 Agenda-2 File No. 8-107/2008-FC 1. The Addl. Principal Chief Conservator of Forests (Land Management) and Nodal dated 18.06.2013 submitted a proposal to obtain prior approval of the Central Government,
More informationM/S. Dain Colour Chem
PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS
More informationPre-Feasibility Report
Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &
More informationmeeting held on meeting held on The SEAC observed that:
Excerpt pertaining to item no. 147.14 of 147 th meeting of SEAC held on 30.06.2016 Item no.147.14: Application for obtaining Environmental Clearance under EIA notification dated 14.09.2006 for area development
More informationNMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.
NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),
More informationENVIRONMENT IMPACT ASSESSMENT & ENVIRONMENT MANAGEMENT PLAN FOR ENVIRONMENT CLEARANCE OF COMMON EFFLUENT TREATMENT PLANT
ENVIRONMENT IMPACT ASSESSMENT & ENVIRONMENT MANAGEMENT PLAN FOR ENVIRONMENT CLEARANCE OF COMMON EFFLUENT TREATMENT PLANT PROPOSED AT KHASRA NO. 19/21, 20/24, 20/25, 28/4, 28/5, 28/6 and 28/7 VILLAGE SAIDPURA,
More informationNatural Regeneration for Landscape Restoration: Potential, Opportunities and Barriers in Central India
Natural Regeneration for Landscape Restoration: Potential, Opportunities and Barriers in Central India On behalf of: Mr. Krishna Kumar Singh, President, Vindhya Environment and Livelihood Trust, India
More informationDiameter-Age Growth Curve Modelling for Different Tree Species in Drylands of North Karnataka
Global Journal of Science Frontier Research Agriculture and Veterinary Sciences Volume 13 Issue 1 Version 1.0 Year Type : Double Blind Peer Reviewed International Research Journal Publisher: Global Journals
More information3 ANNEXURES. Annexure 1: Existing EC Letter FORM 1 FOR CETP EXPANSION AND CRZ CLEARANCE FOR SUBMARINE PIPELINE SYSTEM WITH DIFFUSER OUTFALL
SARIGAM CLEAN INITIATIVE FORM 1 FOR CETP EXPANSION AND CRZ CLEARANCE FOR SUBMARINE PIPELINE SYSTEM WITH DIFFUSER OUTFALL 3 S Annexure 1: Existing EC Letter KADAM ENVIRONMENTAL CONSULTANTS FEBRUARY 2019
More informationFeasibility Report of Proposed ETP cum STP. M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand)
Feasibility Report of Proposed ETP cum STP M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand) 1.0 Introduction M/S Zakiya Healthcare is planning to install an Effluent cum Sewage
More informationA SURVEY OF MULTIPURPOSE TREE SPECIES IN THE FOREST NURSERIES OF SOUTHERN TAMIL NADU
A SURVEY OF MULTIPURPOSE TREE SPECIES IN THE FOREST NURSERIES OF SOUTHERN TAMIL NADU E. Mohan & K. Rajendran Research Centre in Botany, Thiagarajar College, Madurai, Tamil Nadu, India Corresponding author
More informationBIO-MASS MONITORING IN OUR SCHOOL
BIO-MASS MONITORING IN OUR SCHOOL Pavana.V 9 th Shalini.G.K 9th K.K English High School ENVIRONMENT MONITORING It is essential for evaluating environmental planning. Long term monitoring helps in identifying
More informationCRZ Clearance for Proposed construction of Ghodbundar Jetty, Thane by MMB
Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 9, 2017 To, Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai
More informationCompliance Report for Granite Quarry Area ( Ha) of M/s Fortune Stone Ltd.,
Compliance status of conditions mentioned in Environment Clearance Letter No. 248/EPCO-SEIAA/10 MOEF, Dated 22/07/2010 Special Condition Condition: No Two pits shall be simultaneously worked i.e. before
More informationEnvironment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:November 6, 2018
To, Mr. Anil Mane at Plot No. 113/114 MIDC Dhatav Industrial Estate. Dhatav village, Roha Taluka, Raigad Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:November
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,
More informationADDITIONAL INFORMATION VENSUB LABORATORIES PVT. LTD. PROPOSED BULK DRUG & INTERMEDIATES MANUFACTURING UNIT
ADDITIONAL INFORMATION FOR VENSUB LABORATORIES PVT. LTD. ON PROPOSED BULK DRUG & INTERMEDIATES MANUFACTURING UNIT AT SY.No:29, TUPAKULAGUDEM (V), TALLAPUDI (M), WESTGODAVARI (DIST.) ANDHRA PRADESH Proposal
More informationPlant Biodiversity and Phytosociological Studies on Tree Species diversity of Khammam District, Telangana State, India
Plant Biodiversity and Phytosociological Studies on Tree Species diversity of Khammam District, Telangana State, India Abstract D. Srinivasa Rao*, P.Prayaga Murthy and O.Aniel Kumar Department of Botany,
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationImproving Watersheds & Community Livelihoods Through CDM Carbon Revenue Case Study from Himachal Pradesh, India
Improving Watersheds & Community Livelihoods Through CDM Carbon Revenue Case Study from Himachal Pradesh, India RAJ KUMAR KAPOOR Adll. Pr. Chief Conservator of Forests cum Chief Project Director Mid Himalayan
More informationPre-Feasibility Report For
Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,
More informationANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal
ANNEXURE Annexure 1: Production Details Annexure 2: Site Location Map Annexure 3: Site Layout Map & Area breakup for Terminal Annexure 4: Operation Philosophy Annexure 5: Copy of Consent to Operate Annexure
More informationCarbon Sequestration Efficacy Of Trees Of Vinoba Bhave University Campus, Hazaribag
Carbon Sequestration Efficacy Of Trees Of Vinoba Bhave University Campus, Hazaribag Amit Ranjan Hazaribag, Jharkhand India. amitranjan811@gmail.com Subir kumar khawas Hazaribag, Jharkhand, India subirkumarkhawas@gmail.com
More informationANNEXURE- II Proposed TOR
ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,
More informationSTATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala
STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.
More informationPRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR
PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,
More informationCONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016
CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified
More informationScanned with CamScanner
MINUTES OF MEETING OF PUBLIC HEARING FOR EC FOR EXPANSION OF AIRPORT PROJECT HELD ON DATE 02/06/2018 BY M/S AIRPORT AUTHORITY OF INDIA, JOLLYGRANT AIRPORT, DISTRICT DEHRADUN The Public Hearing was Conducted
More informationSHRI.LAKSHMAN NAMDEV KOLI
PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS
More informationSIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat)
SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR Expansion of Viscose Staple Fibre Unit, Captive Power Plant and Setting up Solvent Spun Cellulosic Fibre At Plot No. 1, GIDC Industrial Area,
More informationProposed TOR Calix Industries
1 A tabular with index for point-wise compliance of below mentioned TORs. 2 Executive summary of the project giving a prima facie idea of the objectives of the proposal, use of resources, justification,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationCONCEPTUAL PLAN AND ENVIRONMENT MANAGEMENT PLAN
CONCEPTUAL PLAN AND ENVIRONMENT MANAGEMENT PLAN FOR RESIDENTIAL PROJECT Residential Block AT VILLAGE Salaiya, TEHSIL- HUZUR, DIST- BHOPAL (MP) Proposed by M/s shri Shiv developers, Bhopal 1. Introduction:-
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802
More informationAGENDA. Please Check the MoEF&CC Website at
27 th MEETING OF EXPERT APPRAISAL COMMITTEE (INFRA-2) FOR PROJECTS RELATED TO ALL SHIP BREAKING YARD INCLUDING SHIP BREAKING UNIT, AIRPORTS, COMMON HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES,
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation
More informationEnvironment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.
To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,
More informationThe Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations.
The 309 th meeting of the State Expert Appraisal Committee (SEAC) was held on 23 rd March, 2018 under the Vice-Chairmanship of Shri. R. Maheshwari, for the projects / issues received from SEIAA. The following
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect
More informationLec.1 ROLE OF FORESTS. Forests serve two roles viz., a) Productive role and B) Protective role. a) Productive role b) Protective role
Lec.1 ROLE OF FORESTS Forests serve two roles viz., a) Productive role and B) Protective role a) Productive role b) Protective role 1. Food 1. Climate amelioration 2. Fuel 2. Soil and water Conservation
More informationLife sciences Leaflets 6: , ISSN
Published on: 1 st Aug 2010 STATUS OF MATURE TREES, SEEDLINGS AND SAPLINGS IN TROPICAL THORN FOREST (TTF) OF NORTH GUJARAT REGION (NGR), GUJARAT, INDIA S. Rajendrakumar 1 and S. Kalavathy 2 1. Research
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT ON PROPOSED PROJECT OF MANUFACTURING OF ORGANIC CHEMICALS OF AARTI INDUSTRIES LIMITED (UNIT-II) LOCATED AT Plot Z/103/D, Dahej SEZ-II, Dahej, Bharuch-392110 1.0 EXECUTIVE SUMMARY
More informationForest-based Value Chains in Nepal. an MSFP Working Paper MULTI STAKEHOLDER FORESTRY PROGRAMME KATHMANDU, NEPAL JULY, Government of Nepal
Forest-based Value Chains in Nepal an MSFP Working Paper MULTI STAKEHOLDER FORESTRY PROGRAMME KATHMANDU, NEPAL JULY, 2016 Government of Nepal Published by the Multi Stakeholder Forestry Programme (MSFP)
More informationPART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan
Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10
More informationREPORT TREATABILITY STUDIES, FEASIBILITY REPORT FOR TREATMENT OF WASTE WATER FOR. M/s DEEPAK NITRITE LTD., MIDC Taloja
REPORT ON TREATABILITY STUDIES, FEASIBILITY REPORT FOR TREATMENT OF WASTE WATER FOR M/s DEEPAK NITRITE LTD., MIDC Taloja January -- 2017 PREPARED BY Goldfinch Engineering Systems Private Limited Plot No.
More informationEPA Waste Water Discharge Licence Application
Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update
More informationEnvironmental Impact Assessment for Ispat Dolomite Quarry, Capacity 2.0 MTPA at Baraduar Mining Lease
Impact Assessment for Ispat Dolomite Quarry, Capacity 2.0 MTPA at Baraduar Mining Lease in Janjgir Champa District, Chhattisgarh (India) Sponsor: Bhilai Steel Plant (BSP), Steel Authority of India Limited
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-
More informationSOIL AND VEGETATION STUDIES AT SOUTH BALAGHAT, MADHYA PRADESH IN A MIXED PLANTATION FOREST AREA R. Sett *1, R. Nayak 2 and S.K.
International Journal of Science, Environment and Technology, Vol. 2, No 6, 2013, 1426 1440 ISSN 2278-3687 (O) SOIL AND VEGETATION STUDIES AT SOUTH BALAGHAT, MADHYA PRADESH IN A MIXED PLANTATION FOREST
More informationTABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village
TABLE-1 PROJECT AT A GLANCE Registered Address M/s. Pallavada Technical Textiles Park Private Limited, No. 78, Greams Road, Thousand Lights, Chennai-600006. Communication Address of M/s. Pallavada Technical
More informationWelspun Maxsteel Limited
00 Summary 00.01 Introduction The US$ 3.5 billion Welspun Group is one of India s fastest growing conglomerates having registered a CAGR of 30% over the last decade. It has a presence across five business
More informationProcess Monitoring and Performance Evaluation of 10 MLD Sewage Treatment Plant at Kotra
Process Monitoring and Performance Evaluation of 1 MLD Sewage Treatment Plant at Kotra Harish Nema 1, Charan Singh Thakur 2 1Student, Dept. of Civil Engineering, Shri Ram Group of Institution, Jabalpur
More informationEMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh
EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS
More informationCONCEPTUAL PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF. Gwalior
PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF Gwalior AT Village Baretha & Laxangarh, Tehsil & District Gwalior (M.P.) Proponent Mr. P.K. Hedau Executive Engineer MPH&IDB,
More informationConceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -
Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63
More informationEXISTING PROJECT FOR ORDINARY SAND MINING
(C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationPLANT COMMUNITY STRUCTURE AND CARBON STOCK ASSESSMENT THROUGH PHYTOSOCIOLOGICAL APPROACH AT DRY TROPICS OF BANKA FOREST DIVISION, BIHAR
PLANT COMMUNITY STRUCTURE AND CARBON STOCK ASSESSMENT THROUGH PHYTOSOCIOLOGICAL APPROACH AT DRY TROPICS OF BANKA FOREST DIVISION, BIHAR *Saroni Biswas 1 and Subhas Chandra Mukhopadhyay 2 1 Development
More informationETP Monitoring Solution System
An ISO 9001:2008 company ETP Monitoring Solution System www.aiplindia.com www.enviroconnect.in Background Effluent Treatment Plant (ETP) are operated for cleaning of water with treatment of effluents so
More information