Project: Rama Phosphates Ltd., Udaipur Document: EES/RAMA/001/138-EC/ IND./2016. Executive Summery. Enkay Enviro Services PVT Ltd 28

Size: px
Start display at page:

Download "Project: Rama Phosphates Ltd., Udaipur Document: EES/RAMA/001/138-EC/ IND./2016. Executive Summery. Enkay Enviro Services PVT Ltd 28"

Transcription

1 Executive Summary 28

2 INDEX S. No. CONTENTS PAGE No. 1.1 INTRODUCTION SALIENT FEATURES OF THE PROJECT RAW MATERIAL PRODUCT SOLID WASTE FINANCIAL AND SOCIAL BENEFITS CONCLUSION 36 29

3 EXECUTIVE SUMMARY 1.1 INTRODUCTION Rama Phosphates Ltd. is an existing phosphate fertilizer manufacturing unit, which is situated at # 4807/11, Jhamarkotra Road, Village-Umra, Tehsil-Girwa, Distt.-Udaipur (Raj.). The unit was established in the year The ministry of Environment, Forests vide letter no F.No J-11011/116/2009-IA-II(I) dated 05/05/2009 has accorded Environmental Clearance for the Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant (Annexure-D). Further, MoEF&CC, GoI vid eletter no J-11011/292/2011-IA-II (I) dated 18/09/2014 granted Environmental Clearance for Expansion project of Single Super Phosphate (1,81,000 to 3,15,000 TPA) and 300,000 TPA converted in Granular SSP), NPK (60,000 TPA), and additional Boronated SSP (25,000 TPA) and LABSA (20,000TPA)of M/s Rama Phosphates Ltd at 4807/11, Jhamar Kotra Road village Umra Girva District Udaipur Rajasthan.(Annexure-E) Now since Micronutrient (Zinc & Boron) deficiency can be overcome by use of Fortified Fertilizer (SSP fortified with Zinc, SSP fortified with Boron, DAP & NPK.) (Annexure E), therefore our unit is proposing to produce ( a )SSP fortified Zinc (75000 TPA) from the same SSP produced at Unit, no additional SSP will be produced for fortification and ( b) to increase the capacity of Boronated SSP from TPA to 75000TPA. Further after the approval of E.C. for the above desired SSP fortified with Boron and SSP fortified with Zinc, the total productio4 of SSP ( powder /granular ) will be unchanged. The status of the E.C. after proposed amendment in EC would be as below:- S.No. Details Existing 1. SSP 3,15, ,15, GSSP 3,00, ,00, NPK 60, , Boronated SSP LABSA 20, ,000 Total after Expansion/amendment 30

4 6. Zincated SSP Nil 75,000 75,000 If we consider the process of producing SSP fortified with Zinc, its only mixing in proper proposition with already produced SSP (powder) after curing and ready to pack. The details of the process is given below with equipment and flow chart, it is visible from the process only powder Zinc Sulphate will be mixed with SSP, which is totally a physical mixing process and no chemical reaction is involved. The proposed capacity is TPA the raw materials are Zinc Sulphate (ZnSO4) and cured SSP powder. SSP is available in house and Zinc Sulphate will be procured either from local market or imported from outside. The existing project cost is Rs Lakh. The proposed project cost for modernization (amendment in EC) of Boronated SSP &Zincated SSP (only) is Rs Lakh. Thus, after Amendment in EC the capital cost will be Rs Lakh. As per the Gazette Notification dated Sept.14 th 2006 and subsequent amendment in the Gazette Notification on dated 1 st Dec. 2009, under 5(a), all fertilizer units except SSP will be treated as A category project. Thus, the project is treated as A. The proposed modernization (Amendment in EC) and addition is coming up within the same premises; hence no additional land will be required. The total land area of the unit is 73,200 sq.m. REGULATORY COMPLIANCE Consent to Establish granted for implementation for Pollution Control scheme for proposed SSP unit by RSPCB vide letter no. F 12(30-139)RSPCB/Gr.IV dated 29/06/1995. Consent to Operate for Single Super Phosphate & GSSP powder issued by RSPCB vide letter no F (Tech)/Udaipur(Girwa)/82(1)/ /6303 dated 16/3/2010. The ministry of Environment, Forests vide letter no F.No J-11011/116/2009-IA-II(I) dated 05/05/2009 has accorded Environmental Clearance for the Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant at 4807/11, Jhamar Kotra Road village Umra Girva District Udaipur Rajasthan. MOEF GOI Regional Office, Central Region Lucknow vide letter F No IV/ENV/R/IND- 109/742/2009/453 dated 23/11/2012 has certified the compliance report. Consent to Operate for Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant issued by RSPCB vide letter no F (Tech)/Udaipur(Girwa)/4(1)/ / dated 22/09/

5 Corrigendum in Consent to Operate for Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant issued by RSPCB vide letter no F(HDF-125)RPCB/553 dated 7/10/10 Authorization under HWMHR 2008 has been issued by RSPCB vide letter no F (HSW)/Udaipur(Girwa)/44(1)/ / dated 22/10/2010. MoEF&CC, GoI vid eletter no J-11011/292/2011-IA-II (I) dated 18/09/2014 granted Environmental Clearance for Expansion project of Single Super Phosphate (1,81,000 to 3,15,000 TPA) and 300,000 TPA converted in Granular SSP), NPK (60,000 TPA), and additional Boronated SSP (25,000 TPA) and LABSA (20,000TPA)of M/s Rama Phosphates Ltd. Consent to Establish (stage-iii) for Expansion project of Single Super Phosphate (1,81,000 to 3,15,000 TPA) and 300,000 TPA converted in Granular SSP), NPK (60,000 TPA), and additional Boronated SSP (25,000 TPA) and LABSA (20,000TPA)issued by RSPCB vide letter no F (PLG)/Udaipur(Girwa)/25(1)/ / dated 16/03/2016 The existing one time water demand is KLD. Daily fresh water demand for industrial purposes is KLD and domestic water is 13 KLD.Therefore total fresh water is Recycled water is 100 KLD. After modernization no additional water will be required. The existing water demand is being met through water tanker supply There is no legal issue against the project in the court of law. 1.2 SALIENT FEATURES OF THE PROJECT S. No. Parameter Description 1. Plant S.No. Details Existing Total after modernization /amendment 1. SSP 3,15, ,15, GSSP 3,00, ,00, NPK 60, , Boronated SSP LABSA 20, , Zincated SSP Nil 75,000 75,000 32

6 S. No. 2. Parameter Total area of the plant 3. Capital cost 73,200 sq.m. Description The existing project cost is Rs Lakh. The proposed project cost for modernization of Boronated SSP &Zincated SSP (only) is Rs Lakh. Thus, after expansion the capital cost will be Rs Lakh. The proposed modernization project is located # 4807/11, Jhamarkotra Road, Village-Umra, Tehsil-Girwa, Distt.-Udaipur (Raj.) and the modernization will take place within the existing premises. The geographical location of the unit is as under:- NW NE 4. Location Latitude (N) Latitude (N) Longitude Longitude (E) (E) SE SW Latitude (N) Latitude (N) Longitude Longitude (E) (E) 5 Water Requirement/Source S. Particulars Water Demand (KLD) No. Existing Total 1. One time water NIL demand 2. Industrial daily fresh A Requirement water demand 3. Domestic purposes Total Fresh water demand 4. Recycled water demand B Source of Existing water source - Tanker supply water C Total waste water generation Purpose Existing (KLD) (KLD) Total (KLD) Industrial 95 NIL 95 Domestic 8 8 Total Waste Water Management Employment generation The industrial waste water will be reused completely Domestic waste water will be treated in Sewage treatment plant. Existing = 84 workers No additional manpower will be required 33

7 S. No. Parameter Description S.No Particulars Existing Total () () () 1 Connected Load 2550 Nil Power Supply/ Start up Power S.No. Equipment Existing 1. D.G Set 500 and Transformer 1600 NIL NIL After Expansion 500 and RAW MATERIAL SSP SSP S. No Plant Existing NIL Total 3,15,000 TPA 3,15,000 TPA 1. Rock Phosphate 1,76,400 1,76, Sulphuric Acid (98%) 1,13,400 1,13, Water 50,400 50, Less Evaporation 25,200 25,200 Net SSP 3,15,000 3,15,000 GSSP GSSP (86-92 % of Total SSP production) S.No. Existing TPA TPA Total TPA Plant 3,00,000 3,00, Feed SSP 3,22,078 3,22, Water 13,140 13, Total 3,35,218 3,35, Less evaporation 35,218 NIL 35,218 5 Net GSSP 3,00,000 3,00,000 Boronated SSP BORONATED SSP Feed SSP Boron 135 Total MTA 34

8 LABSA (Linear Alkyl Benzene Sulphonic Acid) Zincated SSP LABSA Plant MT/day INPUT OUTPUT LAB* 4121 Kg. LABSA 60,606 Kg. Con. H 2 SO Kg. Dilute H 2 SO Kg. Water Kg. Total Kg. Total Kg. *Linear Alkyl Benzene Zincated SSP Feed SSP Zinc 135 Total MTA 1.4 PRODUCT S.No. Details Existing 1. SSP 3,15, ,15, GSSP 3,00, ,00, NPK 60, , Boronated SSP LABSA 20, , Zincated SSP Nil 75,000 75,000 Total after Expansion/amendment 1.5 SOLID WASTE S. No. Particulars Category under HWMR Existing Quantity TPA Quantity TPA Total after Modernizati on Disposal 1. Wet scrubber sludge NIL 391 Reused in the process 2. Used oil KLPA 0.8 KLPA Reused as lubricant 3. Spent acid Reused in SSP plant 4. Dust from dust collector (bag filter) TPA 0.07 TPA Reused in the process 1.6 FINANCIAL AND SOCIAL BENEFITS 35

9 The existing project cost is Rs Lakh. The proposed project cost for expansion of Boronated SSP &Zincated SSP (only) is Rs Lakh. Thus, after modernization (amendment in EC) the capital cost will be Rs Lakh. 1.7 CONCLUSION The unit is already an existing one. All adequate preventive measures are being / will be adopted to keep the various pollutants within permissible limits imposed by Regulatory Bodies. Green belt development in & around the area will increase aesthetic property, as tool for effective pollution mitigate measure, and will also serve as biological indicators for that particular site. 36

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE PREAMBLE: EIA follow up commonly referred to as Compliance reporting is the process of monitoring, evaluation and validation of the

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Six Monthly Compliance Status Report

Six Monthly Compliance Status Report Six Monthly Compliance Status Report Annexure -1 Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan)

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Six Monthly Compliance Status Report

Six Monthly Compliance Status Report Six Monthly Compliance Status Report Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan) Project

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 PART A : SPECIFIC CONDITIONS 1. CONSTRUCTION PHASE S. 1

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

fgunqlrku ftad fyfevsm PIN Code

fgunqlrku ftad fyfevsm PIN Code lh-ih-ih-]t+koj ekbzul HINDUSTAN ZINC LIMITED CPP, Zawar Mines fiu dksm & 313901 fgunqlrku ftad fyfevsm PIN Code 313901 ftyk & mn;iqj (jkt.) Telephone - (0294) 2726600, Fax-2726243 Dist - Udaipur (Raj.)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02

More information

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana F.No.10-12/201S-IA.III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003. To The Director, Mjs Vulcan Waste

More information

BRIEF DESCRIPTION OF THE PROJECT

BRIEF DESCRIPTION OF THE PROJECT BRIEF DESCRIPTION OF THE PROJECT. Introduction M/s Indorama Industries Limited is proposing to expand their project known as Indorama Spandex for manufacture of manmade textile fibre using petro chemical

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler Compliance report of Environment Clearance from SEIAA, Rajasthan, Letter No. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project/Cat8(b)B1/(484)/12-12

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD

ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD ANNEXURE: AFFADIVIT ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD ANNEXURE:RECTIFICATION DEED BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,A FORM 1 ANNEXURES ANNEXURE NAME OF THE ANNEXURE PAGE NO. ANNEXURE I Detail of product 2 ANNEXURE II Detail of Raw Materials 3 ANNEXURE III ANNEXURE IV

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict. PRE FEASIBILITY REPORT FOR Proposed Barytes Mine over an Extent of 49.46 Ha, In Sy. No. 1021/15, 1021/3, 1021/5 of Vemula Village, Vemula Mandal, Y.S.R.Kadapa District, Andhra Pradesh. Submitted To Ministry

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1.

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1. Shriram Vinyl & Chemical Industries, : Kota (A Unit of DCM Shriram Ltd.) Compliance Report of Environmental Clearance Fl(4)/SEIAA/SEAC- Raj/Sectt/Project/Cat.8(b) B1 (15054)/16-17 dated 12 th July 2017

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

BRIGADE RESIDENTIAL DEVELOPMENT

BRIGADE RESIDENTIAL DEVELOPMENT BRIGADE RESIDENTIAL DEVELOPMENT Terms of Reference (TOR) At Plot No. R5 and Plot No. R8, Hi Tech, Defense and Aerospace park (Hardware Sector), KIADB Industrial Area, Jala Hobli, Yelahanka Bengaluru North

More information

: Industrial Projects - 2. : 26th October, 2016

: Industrial Projects - 2. : 26th October, 2016 1. Proposal No. : IA/AP/IND/26243/2014, 2. MoEFCC File No. : J-11011/408/2014-IA II (I) 3. Category of the Proposal : Industrial Projects - 2 4. Name of the proposal : M/s Divis laboratories limited, Unit

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB) Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

.,~) si.j Encl.: As above W ~Z. CIN No,-U40104TG2001PTC Ref.: MoE&F, LKN/KPBK/l040124/340 Date:

.,~) si.j Encl.: As above W ~Z. CIN No,-U40104TG2001PTC Ref.: MoE&F, LKN/KPBK/l040124/340 Date: Ref.: MoE&F, LKN/KPBK/l040124/340 Date: 27.04.2018 VS Works Registered Office Village Gurha, 8-2-293182/N431/A, l'ehsil Kolayal, Road No. 22, Jubilee Hills, Dis!. Bikaner, Hyderabad - 500033 Rajilslhan.

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report

More information

AGENDA ITEMS FOR 63rd MEETING OF TECHNICAL REVIEW COMMITTEE (TRC)

AGENDA ITEMS FOR 63rd MEETING OF TECHNICAL REVIEW COMMITTEE (TRC) AGENDA ITEMS FOR 63rd MEETING OF TECHNICAL REVIEW COMMITTEE (TRC) Dated: 21 st July 2017, at 10:00 AM Venue:- Narmada Conference Hall, Ground Floor, Jal Block, Ministry of Environment, Forest & Climate

More information

Amendment required in the existing EC

Amendment required in the existing EC Amendment required in the existing EC Change/Addition in Phase I; 250 KLPD Grain based Distillery with 20 MW Co-gen Power Plant / Molasses 160 KLPD based distillery with 12 MW Co-gen Power Plant in Environmental

More information

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat)

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat) SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR Expansion of Viscose Staple Fibre Unit, Captive Power Plant and Setting up Solvent Spun Cellulosic Fibre At Plot No. 1, GIDC Industrial Area,

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

FORM-V (See Rule - 14) Part-A

FORM-V (See Rule - 14) Part-A FORM-V (See Rule - 14) Environmental Statement for the financial year ending 31 st March, 2016 Part-A Name and address of the owner / occupier : K. Rahul Raju of the Industry Managing Director Nagarjuna

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT The proposal for obtaining Environmental Clearance for Marble Mining Project M. L. No. 56/02, Area 4.0 ha with production capacity 40,000 TPA Near Village:

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

Sub: - An application for obtaining Environment Clearance for New Unit.

Sub: - An application for obtaining Environment Clearance for New Unit. Brief Note: Sub: - An application for obtaining Environment Clearance for New Unit. We M/s. Nemi Chem Industries Unit-2 are planning to manufacturing activity following products at Plot 1, Survey 316,

More information

meeting held on meeting held on The SEAC observed that:

meeting held on meeting held on The SEAC observed that: Excerpt pertaining to item no. 147.14 of 147 th meeting of SEAC held on 30.06.2016 Item no.147.14: Application for obtaining Environmental Clearance under EIA notification dated 14.09.2006 for area development

More information

ENVIRONMENTAL STATEMENT REPORT (FORM-V)

ENVIRONMENTAL STATEMENT REPORT (FORM-V) ENVIRONMENTAL STATEMENT REPORT (FORM-V) YEAR 2017-18 Mine Lease for Shale (30,000 TPA Limestone Production) MY HOME INDUSTRIES PRIVATE LIMITED Mellacheruvu (Vil. & Mdl.) - 508 246 Suryapet District, Telangana

More information

PRE- FEASIBILITY REPORT terms of provision of EIA Notification. For

PRE- FEASIBILITY REPORT terms of provision of EIA Notification. For PRE- FEASIBILITY REPORT (In terms of provision of EIA Notification 2006) For Amendment to Zinc Smelter (2, 50,000 TPA) and CPP (100 MW) (F. No. J-11011/279/2006-IA. II (I) dated 6 th December 2006) By:

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka

M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka South Zonal Office, Bangalore 1 Name/ address of CETP/ company: M/s Malur CETP, Malur Industrial Estate, Malur Kolar, Karnataka 2 Area occupied

More information

REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE JUSTIFICATION FOR MODIFICATION IN THE SCHEME FOR SPENT WASH HANDLING IN THE DISTILLERY PLANT

REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE JUSTIFICATION FOR MODIFICATION IN THE SCHEME FOR SPENT WASH HANDLING IN THE DISTILLERY PLANT AMENDMENT IN ENVIRONMENTAL CLEARANCE GRANTED BY MINISTRY OF ENVONMENT AND FORESTS, NEW DELHI VIDE FILE NO. J-11011/773/2007 IA II (I) DATED 16 TH JANUARY, 2008 REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT 01-07-2018/R3 PRE-FEASIBILITY REPORT FOR EXPANSION OF STEEL MANUFACTURING UNIT BY REPLACING EXISTING INDUCTION FURNACE CAPACITY Steel Billets/ Ingots- 28,800 TPA to 75,240 TPA By M/S TRISHALA ALLOYS PVT.

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

For TOR New. 1. Basic Information of the Project:

For TOR New. 1. Basic Information of the Project: SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )

More information

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun Dr. Mahesh K. Verma Arki Limestone Project 1 Name and address of the project In-charge along with their telephone, fax, mobile and email address ARKI, Distt. Solan 173208 (H.P.) Mob. 0945 942 9428 Tel:0177-2674052

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

M/s. COROMANDEL INTERNATIONAL LIMITED

M/s. COROMANDEL INTERNATIONAL LIMITED [Vide EIA Notification dated 14 th September, 2006 & Subsequent Amendments] PRE-FEASIBILITY REPORT For PROPOSED EXPANSION AND ADDITI ON OF NEW PRODUCTS FOR MANUFACTURI NG OF CHEMI CAL FERTI LI ZERS By

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information