1 ESSEX FRANKLIN BERK SHIR E MIDDLESEX HAMPSHIRE WORCESTER SUFFOLK NORFOLK HAMPDEN BRISTOL PLYMOUTH SALEM BARNSTABLE DUKES NANTUCKET LOCATION MAP SALEM, MA SWAMPSCOTT ROAD AT FIRST STREET ROUNDABOUT CONSTRUCTION PROJECT LOCATION SHEET NO. TITLE 1 TITLE SHEET AND INDEX 2 KEY PLAN 3-4 EXISTING CONDITIONS PLANS 5-7 TYPICAL SECTIONS 8-9 CONSTRUCTION PLANS -11 PROFILES GRADING PLANS 14 DRAINAGE PIPE & STRUCTURE SCHEDULE 15 CONSTRUCTION DETAILS VICINITY MAP 1" = 00' CITY MAYOR KIMBERLEY DRISCOLL SEPTEMBER 2017 Project Number: NOTICE OF INTENT PLANS CITY ENGINEER DAVID KNOWLTON, P.E.

2 STA N E PC PCC PRC PCC PRC FIRST STREET 12 STA N E SWAMPSCOTT ROAD 13 2 PRC PRC PCC FIRST= SWAMPSCOTT PC SWAMPSCOTT ROAD 16 STA N E STA N E PLAN TYPE SHEET NUMBER X X EXISTING CONDITIONS PLANS CONSTRUCTION PLANS X PROFILES SCALE: 1" = 40'

3 M E R I D I A N A S S O C I A T E S 500 CUMMINGS CENTER, SUITE MILK STREET, SUITE 302 BEVERLY, MASSACHUSETTS WESTBOROUGH, MASSACHUSETTS TELEPHONE: (978) TELEPHONE: (508) Copyright by Meridian Associates, Inc. All rights reserved.

4 M E R I D I A N A S S O C I A T E S 500 CUMMINGS CENTER, SUITE MILK STREET, SUITE 302 BEVERLY, MASSACHUSETTS WESTBOROUGH, MASSACHUSETTS TELEPHONE: (978) TELEPHONE: (508) Copyright by Meridian Associates, Inc. All rights reserved.

5 PAVEMENT NOTES: PAVEMENT RECLAMATION (SWAMPSCOTT ROAD): 50'-0" LAYOUT SURFACE: 1.5" SUPERPAVE SURFACE COURSE 9.5 (SSC-9.5) OVER 5" SUPERPAVE INTERMEDIATE COURSE 19.0 (SIC-19.0) (35'-11"± TO 60'-1"±) ROADWAY B L CONSTRUCTION SUBBASE: RECLAIM: 4" MIN* RECLAIMED BASE COURSE MATERIAL (SUPPLEMENT WITH DENSE GRADED CRUSHED STONE IF NECESSARY) * MAY REQUIRE OVER EXCAVATION OF SUB-BASE MATERIAL TO MEET MINIMUM DEPTH 12" DEPTH 6'-0" PAVEMENT RECLAMATION (FIRST STREET): SPLITTER ISLAND SURFACE: 1.5" SUPERPAVE SURFACE COURSE 9.5 (SSC-9.5) OVER 5" SUPERPAVE INTERMEDIATE COURSE 19.0 (SIC-19.0) 6:1 6" (TYP) 1.5%* MAX. 1.5%* MAX. 2.0% 2.0% EXISTING STONE WALL SUBBASE: 4" MIN* RECLAIMED BASE COURSE MATERIAL (SUPPLEMENT WITH DENSE GRADED CRUSHED STONE IF NECESSARY) * MAY REQUIRE OVER EXCAVATION OF SUB-BASE MATERIAL TO MEET MINIMUM DEPTH RECLAIM: " DEPTH PROP GRANITE CURB, TYPE VA-4 (TYP) PROP 4" CEM CONC (TYP) TYPE B (TYP) TYPE B (TYP) PROP 4" CEM CONC ISLAND 1.5" SUPERPAVE SURFACE COURSE 9.5 5" SUPERPAVE INTERMEDIATE COURSE " MIN RECLAIMED BASE COURSE PAVEMENT MILL AND HMA OVERLAY (SWAMPSCOTT ROAD): SURFACE: 1.5" SUPERPAVE SURFACE COURSE 9.5 (SSC-9.5) MILLING: 1.5" MICROMILL PROP 4" LOAM AND SEED TYPICAL SECTION - FIRST STREET STA. 2+22± TO STA. 2+74± PAVEMENT MILL AND HMA OVERLAY (FIRST STREET): SURFACE: 1.5" SUPERPAVE SURFACE COURSE 9.5 (SSC-9.5) MILLING: 1.5" MICROMILL ASPHALT EMULSION FOR TACK COAT: ASPHALT EMULSION FOR TACK COAT SHALL BE PLACED ON ALL MILLED SURFACES (APPLICATION RATE = 0.07 GAL/SY) AND BETWEEN ALL NEW PAVEMENT LAYERS (APPLICATION RATE = 0.05 GAL/SY) 18'-3"± TO 18'-8"± 13'-2"± TO 18'-6"± 32'-0" 13'-2"± TO 18'-6"± 18'-3"± TO 18'-8"± CIRCULAR ROADWAY TRUCK APRON LANDSCAPED ISLAND TRUCK APRON CIRCULAR ROADWAY BL CONSTRUCTION 3" (TYP) 2.0% 6" (TYP) 2.0% PROP GRANITE CURB, TYPE M-0, SEE DETAIL TYPE B (TYP) PROP 8" STAMPED CONCRETE TRUCK APRON WITH #4 12" OC (TYP) TYPE B (TYP) PROP 4" LOAM AND SEED TYPICAL SECTION - FIRST STREET STA. 1+30± TO STA. 2+22± TYPICAL SECTION - SWAMPSCOTT ROAD STA ± TO STA ± PROP GRANITE CURB, TYPE VA-4 (TYP) PROP GRANITE CURB, TYPE M-0, SEE DETAIL 1.5" SUPERPAVE SURFACE COURSE 9.5 5" SUPERPAVE INTERMEDIATE COURSE " MIN RECLAIMED BASE COURSE R=1" 3" 9" 2" PROP STAMPED CONC TRUCK APRON (8" CONCRETE WITH 4" 12" OC) 30'-0" 1'-0" R ROADWAY BL CONSTRUCTION 1'-0" R PROP GRANITE CURB, TYPE M-0 PROP HIGH EARLY STRENGTH CEMENT CONCRETE (4,000 PSI, 3 4", 6) 6" 6" R=1 1 2" 6" 20" 6" 2'-0" 2'-0" 6" 6" 6" (TYP) GRANITE CURB M0 DETAIL NOT TO SCALE 6:1 2.0% 2.0% 6:1 PROP 4" LOAM AND SEED TYPICAL SECTION - FIRST STREET STA. 0+90± TO STA. 1+30± 1.5" SUPERPAVE SURFACE COURSE 9.5 5" SUPERPAVE INTERMEDIATE COURSE " MIN. RECLAIMED BASE COURSE HOR. SCALE IN FEET VER. SCALE IN FEET

6 50'-0" LAYOUT (37'-11"± TO 38'-2"±) ROADWAY BL CONSTRUCTION EXISTING 18'-"± TO 19'-5"± 18'-9"± TO 19'-1"± EXISTING 1.5" MICROMILL AND 1.5" SUPERPAVE SURFACE COURSE 9.5 OVERLAY TYPICAL SECTION - FIRST STREET STA. 4+37± TO STA. 4+62± 50'-0" LAYOUT (35'-11"± TO 38'-2"±) ROADWAY BL CONSTRUCTION GORE AREA 6'-0" SHOULDER SHOULDER EXISTING STONE WALL 6:1 6" (TYP) 1.5%* MAX. 1.5%* MAX. 2.0% 2.0% PROP 4" CEM CONC (TYP) TYPE B (TYP) PROP 4" LOAM AND SEED PROP GRANITE CURB, TYPE VA-4 (TYP) 1.5" SUPERPAVE SURFACE COURSE 9.5 5" SUPERPAVE INTERMEDIATE COURSE 19.0 TYPICAL SECTION - FIRST STREET STA. 2+74± TO STA. 4+37± 4" MIN RECLAIMED BASE COURSE HOR. SCALE IN FEET VER. SCALE IN FEET

7 60'-0" LAYOUT (37'-0"± TO 51'-3"±) (35'-11"± TO 52'-9"±) ROADWAY BL CONSTRUCTION 6'-0" SPLITTER ISLAND 1.5%* MAX. 2.0% 2.0% 6" (TYP) GUARD RAIL STA 12+44± TO STA 12+92± PROP 4" CEM CONC (TYP) PROP 8" GRAVEL SUBBASE (TYP) TYPE B (TYP) PROP 4" CEM CONC ISLAND PROP GRANITE CURB, TYPE VA-4 (TYP) TYPICAL SECTION - SWAMPSCOTT ROAD STA ± TO STA ± STA ± TO STA ± 1.5" SUPERPAVE SURFACE COURSE 9.5 5" SUPERPAVE INTERMEDIATE COURSE " MIN RECLAIMED BASE COURSE 60'-0" LAYOUT (33'-6"± TO 37'-0"±) (28'-0"± TO 35'-11"±) ROADWAY BL CONSTRUCTION GORE AREA 2'-0" 6'-0" MIN. SHOULDER SHOULDER 1.5%* MAX. 2.0% 2.0% 6" (TYP) GUARD RAIL STA 11+54± TO STA 12+44± PROP 4" CEM CONC (TYP) TYPE B (TYP) PROP GRANITE CURB, TYPE VA-4 (TYP) TYPICAL SECTION - SWAMPSCOTT ROAD STA. +50± TO STA ± STA ± TO STA ± 60'-0" LAYOUT 1.5" SUPERPAVE SURFACE COURSE 9.5 5" SUPERPAVE INTERMEDIATE COURSE " MIN RECLAIMED BASE COURSE (33'-0"± TO 33'-6"±) 28'-0"± ROADWAY BL CONSTRUCTION EXISTING 16'-6"± TO 16'-7"± 13'-4"± TO 13'-6"± 16'-5"± TO 17'-0"± 14'-6"± TO 14'-8"± 1.5" MICROMILL AND 1.5" SUPERPAVE SURFACE COURSE 9.5 OVERLAY TYPICAL SECTION - SWAMPSCOTT ROAD STA. +25± TO STA. +50± STA ± TO STA ± HOR. SCALE IN FEET VER. SCALE IN FEET

8 +00 PAVEMENT MILL AND OVERLAY SILT SACK, TYP. PAVEMENT MILL AND OVERLAY STA N E S30 36'43"E 43.76' RET TREE PROP SAWCUT PC R&R GRANITE CURB BEGIN GUARDRAIL STA , 23.60' LT FIRST STREET CONSTRUCTION BASELINE STA N E PROP STEEL W-BEAM HIGHWAY GUARD WITH MODIFIED POST INSTALLATION LIMIT OF GRADING PROP CEMENT CONC R&R GRANITE CURB RET TREE PROP SAWCUT PROP GRANITE CURB, TYPE VA-4 SWAMPSCOTT ROAD R =9.00' L= ' COMPOST FILTER TUBE, TYP. PROP CEMENT CONC PCC RET TREE PROP FULL-DEPTH ROADWAY RECONSTRUCTION 4 R = ' L= ' LIMIT OF GRADING R&R GRANITE CURB PROP FULL-DEPTH ROADWAY RECONSTRUCTION SWAMPSCOTT ROAD CONSTRUCTION BASELINE 12 R =600.00' L= ' RET TREE R&R HYDRANT PROP WHEELCHAIR RAMP NO. 1 REM TREE RET TREE END GUARDRAIL STA , 33.89' LT 3 FIRST STREET PROP CEMENT CONC PROP CEMENT CONC ISLAND PCC FULL-DEPTH ROADWAY RECONSTRUCTION 13 RET TREE PRC R =600.00' L=8 8.73' PRC PROP CEMENT CONC ISLAND PROP WHEELCHAIR RAMP NO. 2 PROP CEMENT CONC ISLAND PROP UTILITY POLE (BY NATIONAL GRID) PROP LANDSCAPED CENTER ISLAND PRC R=630.00' L=37.40' SWAMPSCOTT= FIRST PC PROP STAMPED CONC TRUCK APRON REM TREE PCC PROP FULL-DEPTH ROADWAY RECONSTRUCTION PROP BITUMINOUS BERM 1 PRC LIMIT OF GRADING REM TREE LIMIT OF GRADING PROP PARKING LOT EXPANSION R =5 0.00' L=288.65' R&D BITUMINOUS BERM ' N65 56'49"E REM TREE LIMIT OF GRADING FIRST STREET CONSTRUCTION BASELINE 0+00 R&R UTILITY POLE (BY NATIONAL GRID) SCALE: 1" = 20'

9 4 3 R= ' L=214.36' FIRST STREET SILT SACK, TYP. PCC SWAMPSCOTT= FIRST R=630.00' PROP L=37.40' STAMPED CONC TRUCK APRON 13 PRC R = ' L=88.73' PRC PROP CEMENT CONC ISLAND PCC PROP WHEELCHAIR RAMP NO. 3 PROP CEMENT CONC R&R GRANITE CURB SWAMPSCOTT ROAD CONSTRUCTION BASELINE PROP CEMENT CONC ISLAND LIMIT OF GRADING PROP FULL-DEPTH ROADWAY RECONSTRUCTION 14 PRC PRC R =50.00' L= ' 15 PAVEMENT MILL AND OVERLAY PC PROP CEM CONC WALK SWAMPSCOTT ROAD R&R UTILITY POLE (BY NATIONAL GRID) PROP BITUMINOUS BERM R&D BITUMINOUS BERM LIMIT OF GRADING PROP SAWCUT PROP GRANITE CURB, TYPE VA-4 COMPOST FILTER TUBE, TYP. STA N E N65 56'49"E ' PROP BITUMINOUS BERM 0+00 STA N E SCALE: 1" = 20'

10 PROJECT BEGIN STA N E GRADE BREAK STA = ELEV = % GRADE BREAK STA = ELEV = % GRADE BREAK STA = ELEV = % GRADE BREAK STA = ELEV = % GRADE BREAK STA = ELEV = % PVC: ELEV: PVI STA = PVI ELEV = A.D. = 2.93% K = ' VC 293.3' HSD PVT: NAVD 88 BASE ELEV ELEV: GRADE BREAK STA = ELEV = 3.20 GRADE BREAK STA = PROJECT END STA N E % 7.35% ELEV = 5.03 STA FIRST = STA SWAMPSCOTT SEA RAA SEA FIRST STREET PROFILE H:1"=20' V:1"=4'

11 1 0 GRADE BREAK STA = ELEV = GRADE BREAK STA = PVC: ELEV = ELEV: % -4.78% PROJECT BEGIN STA N E PVI STA = PVI ELEV = A.D. = 2.94% K = ' VC 296.9' HSD PVT: ELEV: % GRADE BREAK STA = NAVD 88 BASE ELEV ELEV = % 2.00% 0.00% -2.00% -0.43% GRADE BREAK STA = ELEV = GRADE BREAK STA = ELEV = GRADE BREAK STA = ELEV = GRADE BREAK STA = ELEV = CONTINUED BELOW STA SWAMPSCOTT = STA FIRST GRADE BREAK STA = ELEV = GRADE BREAK STA = ELEV = SEA RAA SEA CONTINUED ABOVE -0.43% -0.52% 90 PROJECT END STA N E SWAMPSCOTT ROAD PROFILE H:1"=20' V:1"=4' 11

12 STA N E PC STA N E SW PCC AM PS CO 12 PCC ET 3 AD FI RS T ST RE WCR 1 PRC PRC WCR 2 PRC SWAMPSCOTT= FIRST TC BC PC PRC WCR RO PCC TC WCR HIGH POINT OFFSET: % % HIGH POINT OFFSET: RT TT SCALE: 1" = 20' 0

13 FIRST STREET 4 3 PCC WCR SWAMPSCOTT= FIRST WCR 2 PRC PRC PCC PRC WCR PCC BC TC PC PRC WCR 3 15 SWAMPSCOTT ROAD TC HIGH POINT OFFSET: % % HIGH POINT OFFSET: RT STA N E STA N E SCALE: 1" = 20'

14 DRAINAGE STRUCTURE TABLE PIPE TABLE NAME STATION RIM OFFSET INCOMING PIPES OUTGOING PIPES PIPE SIZE & TYPE LENGTH SLOPE E-CB LT I=88.' (P-CBCI-4) P-CBCI-1 TO 24 LF E-CB LT I=87.70' (P-CBCI-16) I=87.70' (P-CBCI-17) P-CBCI-3 TO P-DMH-13 P-CBCI-4 TO E-CB-7 57 LF 22 LF P-CBCI LT I=87.00' () P-CBCI-6 TO P-DMH LF P-CBCI RT I=87.50' (P-DMH-13) P-CBCI-12 TO P-DMH LF P-CBCI LT I=88.20' (E-CB-7) P-CBCI-14 TO P-DMH LF P-CBCI LT I=86.30' (P-DMH-19) P-CBCI-16 TO E-CB-15 LF P-CBCI RT I=88.20' (P-DMH-13) P-CBCI-17 TO E-CB LF P-CBCI RT I=87.00' (P-DMH-13) P-DBCB-8 TO 5 LF P-CBCI-16 P-CBCI LT 13.2 RT I=87.80' (E-CB-15) I=87.90' (E-CB-15) P-DBCB- TO P-DMH-13 TO P-DMH-19 6 LF 55 LF P-DBCB LT I=93.30' () P-DBCB RT I=94.50' () P-DMH RT I=88.00' (P-CBCI-12) I=86.60' (P-CBCI-14) I=87.00' (P-CBCI-3) I=86.40' (P-DMH-19) P-DMH LT I=86.20' (P-CBCI-6) I=86.00' (P-DMH-13) SCALE: 1" = 20'

15 AREA OF AREA OF DISTURBANCE DISTURBANCE PROTECTED AREA PROTECTED AREA EXISTING TREE(S) WOODEN OR METAL POSTS (MAX 8' SPACING) LIMIT OF FENCING (MULTIPLE TREES) PRUNE PER ISA STANDARDS REMOVE DEAD & DAMAGED BRANCHES TIE BRANCHES UP TO AVOID DAMAGE FROM CONSTRUCTION EQUIPMENT WOODEN OR METAL POSTS (TYP) INSTALL FENCING AT EDGE OF DRIPLINE OR AS FAR FROM TRUNK AS POSSIBLE MIN DISTANCE IS 6' FROM TRUNK MAY BE PLASTIC SNOW FENCE OR CHAIN LINK, MIN 4' HIGH ZONE OF CONSTRUCTION IMPACT (CUT/FILL) PRUNE DAMAGED OR EXPOSED ROOTS DAMAGED WITH A SHARP SAW LIMIT OF DRIPLINE () 6' MIN NO STORAGE OF EQUIPMENT OR STOCKPILING OF MATERIALS WITHIN DRIPLINE 2X4 DIM LUMBER ATTACHED W/ METAL STRAPPING (OPT) AT 2 LOCATIONS (MIN) CLADDING SHALL BE 8' HIGH WITH 6" SPACING OF BOARDS WRAP BARK W/ BURLAP PRIOR TO ARMORING EXISTING GRADE LIMIT OF FENCING (MULTIPLE TREES) LIMIT OF FENCING (INDIVIDUAL TREE) LIMIT OF CONSTRUCTION IMPACT (REFER TO PLANS) PLAN VIEW EXISTING TREE EXISTING TREE LIMIT OF FENCE (INDIVIDUAL TREE) LIMIT OF CANOPY () GENERAL NOTES: 1. PROVIDE A MINIMUM TUBE DIAMETER OF 12 INCHES FOR SLOPES UP TO 50 FEET IN LENGTH WITH A SLOPE RATIO OF 3H:1V OR STEEPER. LONGER SLOPES OF 3H:1V MAY REQUIRE LARGER TUBE DIAMETER OR ADDITIONAL COURSING OF FILTER TUBES TO CREATE A FILTER BERM. REFER TO MANUFACTURER'S RECOMMENDATIONS FOR SITUATIONS WITH LONGER OR STEEPER SLOPES. 2. INSTALL TUBES ALONG CONTOURS AND PERPENDICULAR TO SHEET OR CONCENTRATED FLOW. 3. TUBE LOCATION MAY BE SHIFTED TO ADJUST TO LANDSCAPE FEATURES, BUT SHALL PROTECT UNDISTURBED AREA AND VEGETATION TO MAXIMUM EXTENT POSSIBLE. 4. DO NOT INSTALL IN PERENNIAL, EPHEMERAL OR INTERMITTENT STREAMS. 5. ADDITIONAL TUBES SHALL BE USED AS REQUIRED BY THE ENGINEER. 6. ADDITIONAL STAKING SHALL BE USED AS REQUIRED BY THE ENGINEER. GEOTEXTILE SKIRT RETRIEVAL STRAP 48" 36" GEOTEXTILE FABRIC CATCH BASIN GRATE OVERFLOW 24" NOTE: USE TWO SILT SACKS AT DOUBLE GRATE CATCH BASINS DIRECTION OF FLOW COMPOST FILTER TUBE MINIMUM 12 INCHES IN DIAMETER WITH AN EFFECTIVE HEIGHT OF 9.5 INCHES. TUBES FOR COMPOST FILTERS SHALL BE JUTE MESH OR APPROVED BIODEGRADABLE MATERIAL, HOWEVER PHOTO-BIODEGRADABLE FABRIC SHALL BE REMOVED AT END OF CONTRACT. TAMP TUBES IN PLACE TO ENSURE GOOD CONTACT WITH SOIL SURFACE, IT IS NOT NECESSARY TO TRENCH TUBES INTO EXISTING GRADE. COMPOST TUBES SHALL BE STAKED OR LEANED AGAINST SUPPORTS (TREES, CINDER BLOCKS) ON SLOPES 2:1 OR GREATER. WHERE NECESSARY, STAKING SHALL BE MIN. 1 INCH X 1 INCH X 3 FEET UNTREATED HARDWOOD STAKES, UP TO 5 FEET APART OR AS REQUIRED TO SECURE TUBES IN PLACE. TUBES SHALL BE STAKED ACCORDING TO MANUFACTURERS RECOMMENDATIONS. 3.0 FT MIN PROVIDE A 3 FT MINIMUM OVERLAP AT ENDS OF TUBES TO JOIN IN A CONTINUOUS BARRIER AND MINIMIZE UNIMPEDED FLOW. STAKE JOINING TUBES SNUGLY AGAINST EACH OTHER TO PREVENT UNFILTERED FLOW BETWEEN THEM. SECURE ENDS OF TUBES WITH STAKES SPACED 18 IN APART THROUGH TOPS OF TUBES. TUBES CAN BE PLACED DIRECTLY ON EXISTING PAVEMENT WHEN NECESSARY. EXISTING TREE EXISTING HEADWALL OR OTHER OBSTACLE STREAM TUBES MAY BE PLACED ON THE UPHILL SIDE OF WELL- ANCHORED, STATIONARY FEATURES SUCH AS EXISTING TREES IN LIEU OF STAKING. UNDISTURBED SOIL & VEGETATION. TUBES SHALL BE PLACED AS CLOSE TO LIMITS OF SOIL DISTURBANCE AS POSSIBLE. UNTREATED HARDWOOD STAKE (TYP) DIRECTION OF FLOW COMPOST FILTER TUBE (TYP) LOOSE COMPOST LAYER PLAN VIEW - JOIN DETAIL CURVE ENDS UPHILL TO PREVENT DIVERSION OF UNFILTERED RUN-OFF. PLAN VIEW

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016 ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP #2017-01 NOTICE TO PROSPECTIVE BIDDERS June 7, 2016 Prospective bidders are hereby informed of the following corrections, additions, deletions, and/or modifications

More information

PERMEABLE PATH PAVING

PERMEABLE PATH PAVING SAWCUT CONTROL JOINT: 1 WIDE x 1" DEEP SIGN B: R5-1 24" (1 REQ'D) SIGN C: R5-11 24"x 1 (1 REQ'D) PADOT STANDARD SIGNAGE INSTALL PER PADOT SPECIFICATIONS. HIGH INTENSITY PRISMATIC SIGN ON 0.080" THICK ALUMINUM

More information

Provide a Table of Contents that identifies all sections of the proposal, including Appendices.

Provide a Table of Contents that identifies all sections of the proposal, including Appendices. CONTRACTOR so-called, which shall be responsible for guaranteeing the delivery of the PROJECT on time and on budget in accordance with the contract provisions. Provide the name, title, address, telephone

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

IN T R A / M IN T R A M

IN T R A / M IN T R A M SPRING MESA SUBDIVISION CONSTRUCTION PLANS A PART OF SECTION 35, TOWNSHIP 2 SOUTH, RANGELINE 70 WEST, 6th. PRINCIPAL MERIDIAN. CITY OF ARVADA, COUNTY OF JEFFERSON, STATE OF COLORADO COVER SHEET MARTIN

More information

ELLIOTT WAY IMPROVEMENTS

ELLIOTT WAY IMPROVEMENTS OWNER: THE VILLAGE OF CROTON-ON-HUDSON CROTON-ON-HUDSON TOWN HALL 1 VAN WYCK STREET CROTON-ON-HUDSON, NY 1050 ACTING VILLAGE MANAGER: JANINE KING LOCATION MAP SITE * COMMISSIONER OF PUBLIC WORKS: MARCO

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,417,760.75 Scott Construction - Falmouth, ME $1,418,884.50 T Buck Construction - Auburn, ME $1,520,203.00 Page 1 of 16 CPM Constructors

More information

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

William M. Scott, PE CME Associate

William M. Scott, PE CME Associate ADDENDUM NO. 2 TO THE CONFORMED MANUAL for Project No. 17-692 Date of Addendum: March 27, 2018 Date of Bid Receipt: March 29, 2018 (NO CHANGE) Time of Bid Receipt: 11:00 a.m. (EDT) (NO CHANGE) Date of

More information

E.P. CLARKE ELEMENTARY SCHOOL SITE IMPROVEMENTS

E.P. CLARKE ELEMENTARY SCHOOL SITE IMPROVEMENTS o:\projects\2016\ ep clarke elementary circulation\cad\_civil\ TL.dwg, 1, /5/2016 2:5:02 PM, mle, 1:1 NOTES: Sheet List Table SHT NO. DESCRIPTION COUNTY KEY OFFICIALS LOCAL UTILITIES CALL MISS DIG PROJECT

More information

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

D-1 THE CITY OF HARRISBURG 1 1/2 MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2 MIN. ID-2 BINDER COARSE EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

TOWN OF HOLLIS, NEW HAMPSHIRE

TOWN OF HOLLIS, NEW HAMPSHIRE TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall

More information

ROGER'S PIANO 135 Cambridge Street Burlington, MA 01803

ROGER'S PIANO 135 Cambridge Street Burlington, MA 01803 TOWN OF BURLINGTON PLANNING BOARD SUBMISSION FOR ROGER'S PIANO 5 Cambridge Street Burlington, MA 080 Prepared By SHEET INDEX SHEET NO. DESCRIPTION TITLE SHEET AND INDEX GENERAL NOTES & LEGEND (C0.0) EXISTING

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES:

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES: Figure 4.1 Alternative Flow Dispersal Trench NOTES: galvanized bolts 2" x 12" pressure treated grade board 2" x 2" notches 18" O.C. *20% max 12" min. 36" max 1' - 6" min *20% max 4" x 4" support post clean

More information

RAINBOW POND AND DOWNSTREAM GENERAL NOTES & ABBREVIATIONS CHANNEL SHEET 2 OF 28

RAINBOW POND AND DOWNSTREAM GENERAL NOTES & ABBREVIATIONS CHANNEL SHEET 2 OF 28 90 9 9 9 0 Commercial Dr. S.E. GENERAL NOTES & ABBREVIATIONS CURB AND GUTTER SUBGRADE 9 MATERIALS STRUCTURAL FILL IN THE BUILDING AREA SUB BASE FOR SLAB SUPPORT MISCELLANEOUS BACKFILL BELOW STRUCTURAL

More information

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance To: Project Name: Bidding Company Site Work Project Contact: Address: Various Phone: Fax: Bid Number: Project Location: Various, Anywhere, PA Bid Date: 7/16/2014 Clarifications: This takeoff does not include

More information

Common Construction-Site BMPs Quick Reference Guide

Common Construction-Site BMPs Quick Reference Guide Common Construction-Site BMPs Quick Reference Guide Installation and Inspection Requirements For more information visit the Town of Truckee Clean Water Program Website: http://www.townoftruckee.com/engineering/clean-water-program

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

HIGH SCHOOL TRACK EDGE OF TRACK ELEV BLEACHERS PAD

HIGH SCHOOL TRACK EDGE OF TRACK ELEV BLEACHERS PAD SHED.54 14' 175 WILLIAMS STREET B.M. SPIN. CHAP. HYD..01 BOOK 61 PAGE 59 TREES.27.57.72.91 1.7'.55 1.87.34 174.93 175.20.04.17.55 178.41.96.16 TENNIS S 175 GRADES #3 #2 #1 178 78' 78' 1.8' 179 TRANSFORMER

More information

Dial or (800)

Dial or (800) GENERAL NOTES 2 EROSION CONTROL ITEMS TO BE PLACED AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER. NO TREES (AND/OR SHRUBS) ARE TO BE REMOVED WITHOUT THE APPROVAL OF THE ENGINEER. 2 EXCAVATION FOR

More information

CITY OF MADISON UNIVERSITY RELIEF STORM SEWER PROJECT NO. 53W1399 PROJECT OVERVIEW SHEET NO. CAMPUS DRIVE LAUNCHING PIT EXISTING 96" STORM

CITY OF MADISON UNIVERSITY RELIEF STORM SEWER PROJECT NO. 53W1399 PROJECT OVERVIEW SHEET NO. CAMPUS DRIVE LAUNCHING PIT EXISTING 96 STORM ORIGINATOR: CITY OF MADISON, STREETS DIVISION 22 UNIVERSITY AVE CASA BLANCA APARTMENTS 25 UNIVERSITY AVE 25 UNIVERSITY APARTMENTS REV. DATE: RECEIVING PIT WALNUT STREET EXISTING 96" STORM Conc Conc Wal

More information

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.

More information

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 November 17, 2017 Ms. Sheila Page, Town Planner 101 Main

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2017

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2017 SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2017 STANDARD SPECIFICATIONS 102.12 Best Value Contracting Partial payments shall be withheld if contractor is working on site and has not satisfied

More information

SITE IMPROVEMENT PLANS FOR THE HILLS OF LILLY LAKE TOWN OF WHEATLAND, WISCONSIN

SITE IMPROVEMENT PLANS FOR THE HILLS OF LILLY LAKE TOWN OF WHEATLAND, WISCONSIN SITE IMPROVEMENT PLANS FOR THE HILLS LILLY LAKE TOWN WHEATLAND, WISCONSIN SITE IMPROVEMENT PLANS FOR THE HILLS LILLY LAKE TOWN WHEATLAND, WISCONSIN 4 5 0 SHEET INDEX TITLE SHEET, SHEET INDEX, VICINITY

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD

PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD NORTH SECTION 5, TOWNSHIP 27N, RANGE 2E PCAS #P10113R2 VICINITY MAP PROJECT LOCATION SCALE: 1" = 100' DATUM: ELEV. NAVD 88 NORTH: NAD83/1991

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS 16.01 GENERAL Specifications in this section shall apply to the construction of storm sewer systems including excavation, trenching, backfilling,

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

SHOULDER DETAIL CONCRETE CURB SHOULDER DETAIL ASPHALT CURB SHOULDER DETAIL PAVEMENT JOINT DETAIL PAVEMENT JOINT DETAIL NORMAL SECTION COMMON AND ASPHALT ALTERNATE NOTES ITEM LEGEND EX. ITEM LEGEND CONCRETE

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1 Section 7 Roadway GENERAL REQUIREMENTS...7-1 I. TYPICAL SECTION...7-1 7.1 LANE WIDTHS...7-1 7.2 SHOULDER WIDTHS...7-1 7.3 CROSS SLOPE...7-2 7.4 CURB AND UNDERDRAINS...7-2 7.5 SIDEWALKS AND DRIVEWAYS...7-2

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities. SECTION 01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Prevention of erosion due to construction activities. B. Prevention of sedimentation of waterways, open drainage

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

ACTIVITY: Silt Fence ES 14

ACTIVITY: Silt Fence ES 14 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 610S.1 This item shall govern the proper care and treatment of all trees and other vegetation

More information

ITB EXHIBIT D

ITB EXHIBIT D ITB 17031 EXHIBIT D ITB 17031 EXHIBIT D GENERAL NOTES INDEX OF LIST OF HIGHWAY STANDARDS...\plotdrv\pdfBW_Default.plt COPYRIGHT 2017, BY BAXTER & WOODMAN, INC....\CADD\Plots\16 12_Pen.tbl I:\Chiago\ORLPK\16

More information

Organic Filter Tubes. Fe= (Depends on soil type)

Organic Filter Tubes. Fe= (Depends on soil type) 3.6 Sediment Control Description: Organic filter tubes are comprised of an open weave, mesh tube that is filled with a filter material (compost, wood chips, straw, coir, aspen fiber, or a mixture of materials).

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

MILL STREET STORM DRAIN GENERAL NOTES

MILL STREET STORM DRAIN GENERAL NOTES 4. 4" LOAM SHALL BE PLACED ON ALL DISTURBED AREAS EXCEPT SLOPES BEHIND GUARDRAILS OR UNLESS OTHERWISE SPECIFIED ON THE PLANS. ACTUAL PLACEMENT OF THE LOAM SHALL BE AS DESIGNATED BY THE ENGINEER. 5. ALL

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

PERMANENT PAVEMENT REPAIR NO SCALE

PERMANENT PAVEMENT REPAIR NO SCALE SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE

More information

Recommended Technical Standards for Existing Roads UNH Technology Transfer Center

Recommended Technical Standards for Existing Roads UNH Technology Transfer Center Recommended Technical Standards for Existing Roads UNH Technology Transfer Center Purposes and Acknowledgements These model standards provide New Hampshire cities and towns with a set of recommendations

More information

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

BOULDER COUNTY TRANSPORTATION DEPARTMENT ENGINEERING DIVISION OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES

BOULDER COUNTY TRANSPORTATION DEPARTMENT ENGINEERING DIVISION OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES Kelsey.Dempsey ::45 AM 5/4/208 pw:\\dcpwapp.bkr.mbakercorp.com:pwprod\documents\projects\lakewood_office\boulder_county_emergency_transportation\to3\08_sheet_files\06_structures\dgn\38067_wall_00.dgn GENERAL

More information

SUPPLEMENTAL DRAWINGS

SUPPLEMENTAL DRAWINGS CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

EMULSIFIED ASPHALT MULCH ' E OF FRONT SLOPE WHEN ALGEBRAIC DIFFERENCE IN ROADWAY GRADES EXCEEDS 4% 2' 100' MIN. LOW POINT OF SAG DING (OVERLAPPED) SEE OVERLAPPED FLUME (BELOW) 100' MIN. ' EMULSIFIED ASPHALT

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY SILT FENCE TYPE TB PERIMETER CONTROL OF WATERWAY STEEL FENCE POST LESS THAN /3 ANCHOR TO LAND (TYP.) THE STREAM/RIVER WIDTH STREAM BANK CARRIER FLOAT LENGTH CURTAIN FABRIC STEEL TENSION CABLE WATER SURFACE

More information

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address

More information

GENERAL NOTES AND CONDITIONS STORM SEWER 1. ALL EARTHWORK, GRADING AND PAVING SHALL BE PERFORMED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION IN ILLINOIS, STATE OF ILLINOIS

More information

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL This section covers the restoration of roadways and sidewalks, in whole or in part, with bituminous concrete paving. WITHIN 4 DAYS OF BACKFILLING IN AREAS

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1 UPPER SKAGIT INDIAN TRIBE COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO. 1 (7 pages total) Issue Date: May 11, 2016 General: Recitations of each and every section of the bid documents impacted

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

EXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES

EXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES GENERAL NOTES 1. THE CONTRACTOR SHALL VERIFY AND DETERMINE THE LOCATION, SIZE AND ELEVATION OF ALL EXISTING UTILITIES SHOWN OR NOT SHOWN ON THESE PLANS PRIOR TO THE START OF ANY CONSTRUCTION. THE CONTRACTOR

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS Version 2014-11-11 Prepared by: Building Development Division Department of Development Services 5 County Complex Ct. Suite 120 Prince William, VA 22192

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

TOWN OF GREENWICH, CONNECTICUT WILLIAM STREET BALL FIELD REMEDIATION WILLIAM STREET WEST, GREENWICH, CONNECTICUT

TOWN OF GREENWICH, CONNECTICUT WILLIAM STREET BALL FIELD REMEDIATION WILLIAM STREET WEST, GREENWICH, CONNECTICUT TOWN OF GREENWICH, CONNECTICUT WILLIAM ST BALL FIELD REMEDIATION WILLIAM ST WEST, GREENWICH, CONNECTICUT MARCH 2016 SHEET NO. C-1 C-2 C-3 C-4 C-5 C-6 C-7 TITLE CONDITIONS PLAN HISTORICAL SAMPLE LOCATION

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

Tree Protection Policy

Tree Protection Policy Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.

More information

7. A saucer of soil shall be formed so that water is directed down through the roots or root ball rather than around the root ball.

7. A saucer of soil shall be formed so that water is directed down through the roots or root ball rather than around the root ball. Adopted 12/5/00; revised 3/5/02 Marietta Tree Commission Rules and Regulations I. Tree Planting A. Planting Specifications These specifications are Adapted from recommendations of the OSU Extension Service.

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS CLASS 2 EROSION CONTROL PERMIT STANDARDS TABLE OF CONTENTS EROSION CONTROL PRACTICES FLOW CHART 1 EROSION CONTROL PERMIT FORM 2 EXAMPLE EROSION

More information

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP RECONSTRUCT RUNWAY 14-32: SUMMARY., BID SUMMARY TOTAL COST TOTAL COST TOTAL COST TOTAL COST TOTAL COST Schedule 1 Cost of Construction $4,717,480.00 $5,106,762.00 $5,697,026.50 $4,430,910.42 $4,640,166.10

More information

ADDENDUM NUMBER 1 Bid #33-17 Outer Islington Street Improvements. Issued January 25, 2017

ADDENDUM NUMBER 1 Bid #33-17 Outer Islington Street Improvements. Issued January 25, 2017 City of Portsmouth Department of Public Works 680 Peverly Hill Road Portsmouth, New Hampshire 03801 ADDENDUM NUMBER 1 Bid #33-17 Outer Islington Street Improvements Issued January 25, 2017 The addendum

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information