2 Full-scale Aquifer Test Approach for a High Water-Demand Project Watertech 2016 Andre Laforest, P.Eng., M.Sc. Hydrogeologist HCL

3 Plan Regulatory background Technical background Match Plan Exploratory program Regional context / Hydrosystem description Field work Pilot test Numerical model Outcomes

4 Regulatory Background Post-Walkerton Effect Environment Quality Act Regulation respecting the Quality of Drinking Water Groundwater Catchment Regulation Directives and Guidelines Province wide Municipal Reorganization (mergers)

5 Technical Background Surface Water Source (lake) + Disinfection Shrinking Water Source Frequent [THM] and Turbidity Non-Compliance

6 Match Plan Ministerial Order New Water Supply (2 concurrent approaches) for the Amalgamated Town Municipality Population 27,000 + Industrial / Commercial / Institutional Current Daily Needs = 14,380 cu.m./day

7 Exploratory Program Phase 1 - Exploration 12 Sectors / Aquifers Preliminary Work: Geophysics, Exploratory Drilling and Aquifer Testing Conclusion: Expand Search Area

8 Exploratory Program Phase 2 - Exploration 5 Sectors/Aquifers Preliminary Work: Geophysics, Exploratory Drilling and Aquifer Testing Conclusion: one Potentially Outstanding Aquifer with High Environmental Impact

9 Exploratory Program Phase 3 - Regulatory Approval Opposition: Local Municipality, Citizen Group, Environmental Groups Legal Actions Were Enforced Exploratory Program / Mitigation Plan

10 Exploratory Program Phase 3 - Regulatory Approval Wetland Agriculture Resident Rivers and Spawning Areas Fauna and Flora

11 Exploratory Program Phase 3 - Regulatory Approval Access Roads and Power Line (winter) Drilling and Well Development (no release) Pilot Test and Impact Monitoring Dismantling Social Licence: Negotiation, Implementation, Monitoring, Mitigation and Emergency Response

12 Exploratory Program Phase 4 - Preparation to Pilot Test 12 Exploratory Drillings 16 Observation Wells 2 Pumping Wells (+ 1 from phase 2) 3 Early Detection Observation WW 13 Wetland Monitoring Stations 7 River Flow Monitoring Stations

13 Testing program Phase 5 - Pilot Test Hydro-Stratigraphic Units Properties: Individual Tests Technical Assessment of Aquifer Capabilities: 5-month pilot test 1 pilot test at low water conditions 1 flood simulation

14 Reporting Program Phase 6 - Reporting Hydrosystem Characterization Synthesized Study Detailed Studies Groundwater and Surface Water Chemistry Environmental Impact Assessment Design and Estimates

15 Conceptual Model

16 Conceptual Model Area Geography

17 GCM - Hydrosystem

18 Leading Factors Component Desired impact Measure River Flow 10% Q2-7 Monitoring Wetland Minimal Monitoring Groundwater Users Agriculture Trace WHPA Rules Monitoring Calculation and Compensation

19 Time Line feb mar apr may jun jul aug sep oct nov dec jan

20 Testing Program Preliminary Aquifer and Well Tests Pilot Test - Monitoring True Scale Diversion vs Time Line True Scale Water Quality Testing True Scale Impacts Low Water Aquifer Test

21 Pilot Test - Control Points

22

23 Individual Aquifer and Well Tests Thetford Mines Pumping well: PE-4 Observation: PE m.cu./min Drawdown (m) 5.35 m.cu./min 2.66 m.cu./min 1.33 m.cu./min time (min)

24 Pilot Test - Groundwater Levels pumping site PE-2 PE-3 PE-4 04-mar 25-mar 15-apr 06-may 27-may 17-jun 08-jul 29-jul 19-aug 09-sep 30-sep 21-oct 11-nov

25 Pilot Test - River Impact

26 Pilot Test - Vertical Gradients Wetland and Surroundings 23-may 26-aug

27 Water Chemistry Results Surface Water: High Colour, High and Variable Coliform, TOC and P Groundwater: Compliant with Drinking Water Standards Groundwater and Surface Water Hydraulically Connected Non-GWUDI according to Micro and Chemistry Results Groundwater Vulnerable according to DRASTIC Low Risk of Contamination

28 Numerical Model 5 Hydro-Stratigraphic Units Boundary Conditions recharge (5 zones) constant head (bedrock unit) rivers and streams drain Simulations flow before and end of pilot test optimal yield - natural conditions and artificial recharge optimal pumping installation

29 Numerical Model 5 Hydro-Stratigraphic Units Boundary Conditions recharge (5 zones) constant head (bedrock unit) rivers and streams drain Simulations flow before and end of pilot test optimal yield - natural conditions and artificial recharge optimal pumping installation

30 Numerical Model 5 Hydro-Stratigraphic Units Boundary Conditions recharge (5 zones) constant head (bedrock unit) rivers and streams drain Simulations flow before and end of pilot test optimal yield - natural conditions and artificial recharge optimal pumping installation

31 Numerical Model 5 Hydro-Stratigraphic Units Boundary Conditions recharge (5 zones) constant head (bedrock unit) rivers and streams drain Simulations flow before and end of pilot test optimal yield - natural conditions and artificial recharge optimal pumping installation

32 Numerical Model 5 Hydro-Stratigraphic Units Boundary Conditions recharge (5 zones) constant head (bedrock unit) rivers and streams drain Simulations flow before and end of pilot test optimal yield - natural conditions and artificial recharge optimal pumping installation

33 Recommendation

34 Cost Comparison Groundwater Solution Surface Water Solution Dual Preliminary Study $4.2M Water Intake $9.3M $12.1M Pipeline Water Conditioning $34.3M $16.2M $30.7M Other $7.0M $7.0M Total (incl. contingencies) $54.8M $70.2M Operation $0.6M/y $1.4M/y

35 Finance Preliminary Estimate Groundwater Solution Surface Water Solution Canada $17.0M $18.9M $25.2M Quebec $17.0M $18.9M $25.2M Thetford Mines $17.0M $17.0M $17.0M Total $51.0M $54.8M $67.4M

36 Conclusions 2 Sustainable Solutions: Groundwater Solution: Potential Environmental Impact Social Licence Issue: Regional (NIMBY) Surface Water Solution: Actual Environmental Impact: Provincial Park Social Licence Issue: Local (water tax) Politics rule

37 Avenue NW Edmonton, Alberta, Canada T5S 2W3 P hcl.ca

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Prepared By: Mike Squire, AScT AWS / ERWS Program Manager Program

More information

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks Source Water Protection Integrating with Existing Watershed and Water Management Frameworks Steph Neufeld, M.Sc. Watershed Specialist 1 Overview There are multiple, competing land and water planning and

More information

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012 Irrigation modeling in Prairie Ronde Township, Kalamazoo County SW Michigan Water Resources Council meeting May 15, 2012 Development of a Groundwater Flow Model INFLOWS Areal recharge from precipitation

More information

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance

More information

Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities

Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information

STANDARDS AND GUIDELINES FOR MUNICIPAL WATERWORKS, WASTEWATER AND STORM DRAINAGE SYSTEMS

STANDARDS AND GUIDELINES FOR MUNICIPAL WATERWORKS, WASTEWATER AND STORM DRAINAGE SYSTEMS STANDARDS AND GUIDELINES FOR MUNICIPAL WATERWORKS, WASTEWATER AND STORM DRAINAGE SYSTEMS January 2006 Drinking Water Branch Environmental Policy Branch Environmental Assurance Division Pub. No.: T/840

More information

Municipal Solid Waste Characteristics

Municipal Solid Waste Characteristics CITY OF LETHBRIDGE Municipal Solid Waste Characteristics Juliane Ruck, the City of Lethbridge and Xiaomei Li, Alberta Innovates Energy and Environmental Solutions SWANA Northern Lights 2015 Conference

More information

GCI Survey---Lake Winnipeg Watershed

GCI Survey---Lake Winnipeg Watershed IISD-GWSP Conference. Winnipeg May 1-4, 2012 Water-Energy-Food Nexus GCI Survey---Lake Winnipeg Watershed A. A. WARKENTIN Hydrometeorologist GCI Survey Lake Winnipeg Watershed PRESENTATION OUTLINE WATERSHED

More information

A Time Series Approach to Instream Flow Mitigation Forecasting. Presented by Alan Keizur

A Time Series Approach to Instream Flow Mitigation Forecasting. Presented by Alan Keizur A Time Series Approach to Instream Flow Mitigation Forecasting Presented by Alan Keizur Agenda Brief background on project Brief overview of model Some results and application GoldSim highlights Introduction

More information

Water planning and climate change: actionable intelligence yet?

Water planning and climate change: actionable intelligence yet? Water planning and climate change: actionable intelligence yet? Christopher Milly, USGS U.S. Department of the Interior U.S. Geological Survey What is Actionable Intelligence? Information about water in

More information

The Impacts of Climate Change on Portland s Water Supply

The Impacts of Climate Change on Portland s Water Supply The Impacts of Climate Change on Portland s Water Supply Richard Palmer and Margaret Hahn University of Washington Department of Civil and Environmental Engineering Joe Dvorak, Dennis Kessler, Azad Mohammadi

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

Continuous Simulation Example Problem

Continuous Simulation Example Problem Continuous Simulation Example Problem The following examples provided an introduction to the continuous simulation hydrograph in the PONDS 3.2 Refined Method software, with an emphasis on wetland hydroperiod

More information

Natural Gas Development in the Susquehanna River Basin. Jennifer Hoffman September 29, 2010 Pittsburgh, PA

Natural Gas Development in the Susquehanna River Basin. Jennifer Hoffman September 29, 2010 Pittsburgh, PA Natural Gas Development in the Susquehanna River Basin Jennifer Hoffman September 29, 2010 Pittsburgh, PA Susquehanna River Basin The Basin 27,510-square-mile watershed Comprises 43 percent of the Chesapeake

More information

Hydrogeology 101 3/7/2011

Hydrogeology 101 3/7/2011 Hydrogeology 101 W. Richard Laton, Ph.D., PG, CPG Associate Professor of Hydrogeology California State University, Fullerton Department of Geological Sciences 1 Hydrogeology 101 The objective is to obtain

More information

Coagulation Optimization: Improving the heart of the water treatment process

Coagulation Optimization: Improving the heart of the water treatment process Coagulation Optimization: Improving the heart of the water treatment process Gwyn Norman 1, Ian Douglas 1,2, Jeff Beaty 3, Josh Elliott 1,2 1 City of Ottawa Drinking Water Services 2 University of Toronto,

More information

Stormwater Reuse Through Aquifer Storage & Recovery

Stormwater Reuse Through Aquifer Storage & Recovery Stormwater Reuse Through Aquifer Storage & Recovery CITY OF NAPLES, FLORIDA PRESENTED BY: GREGG R. STRAKALUSE, P.E. DIRECTOR-STREETS & STORMWATER DEPT. DECEMBER 12, 2014 FLORIDA STORMWATER ASSOCIATION

More information

Delaware River Basin Commission

Delaware River Basin Commission New York City Water Supply System is greater than 100 years old Provides water to 9 million people 1.3 billion gallons per day on average The Delaware System provides 50% of the City s water supply need

More information

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016 United Water Conservation District November 216 Hydrologic Conditions Report 217 Water Year December 6, 216 Page Intentionally Left Blank PRECIPITATION (INCHES) PRECIPITATION (INCHES) PRECIPITATION (INCHES)

More information

2012 ANNUAL WATER REPORT

2012 ANNUAL WATER REPORT 2012 ANNUAL WATER REPORT May 2013 TABLE OF CONTENTS Page 2 1.0 INTRODUCTION... 3 2.0 PARKSVILLE WATER SYSTEM... 3 3.0 DISTRIBUTION SYSTEM... 6 4.0 SCADA... 9 5.0 WATER SAMPLING AND TESTING... 10 6.0 WATER

More information

District of Peachland Annual Drinking Water Report 2017

District of Peachland Annual Drinking Water Report 2017 District of Peachland Annual Drinking Water Report 2017 1 INTRODUCTION The District of Peachland is legally required by the Drinking Water Protection Act to provide an annual report on their water supply

More information

Lessons Learned During In Situ Chemical Oxidation - Failure & Success?

Lessons Learned During In Situ Chemical Oxidation - Failure & Success? Lessons Learned During In Situ Chemical Oxidation - Failure & Success? by Gary Millard (Shell Canada Products) Nancy Hansen, Jarek Kuczynski (O Connor Associates Environmental Inc.) Presented by Gary Millard

More information

Deep well water extraction

Deep well water extraction Water Act Presentation Souris Oct. 20, 2014 Dr. John te Raa Ph.D Synthetic Organic Chemistry 1972 (U of Manitoba) I live in the Winter River Watershed. Water matters to every Islander and our agricultural

More information

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct 2006 1 Presentation Outline Geography of the Pacific Northwest Bonneville Power Administration

More information

Legislative Committee on Public Lands

Legislative Committee on Public Lands Legislative Committee on Public Lands EXHIBIT D2 May 28, 2004 EXHIBIT D2 Committee Name Lands Document consists of 74 Slides Entire document provided. Due to size limitations, pages provided. A copy of

More information

2.2.3 Water Quality of Groundwater and Surface Water

2.2.3 Water Quality of Groundwater and Surface Water The Study on Water Supply Systems in Mandalay City and in the Central Dry Zone Part II Study for Mandalay City 2.2.3 Water Quality of Groundwater and Surface Water (1) Water Quality Standards for Drinking

More information

Overview Water Sensitive SA Program & Opportunities for collaboration

Overview Water Sensitive SA Program & Opportunities for collaboration Overview Water Sensitive SA Program & Opportunities for collaboration Green Infrastructure Project Working Group Mellissa Bradley, Program Manager 18 May 2015 Water Sensitive SA - established to build

More information

Draft 2011 Long-term Transmission Plan. Stakeholder Session June 20, 2011

Draft 2011 Long-term Transmission Plan. Stakeholder Session June 20, 2011 Draft 2011 Long-term Transmission Plan Stakeholder Session June 20, 2011 Agenda Highlights of draft 2011 Long-term Transmission Plan Discussion of project costs and rate impact Impact of transmission constraints

More information

Annual State of Drinking Water Quality Report

Annual State of Drinking Water Quality Report Annual State of Drinking Water Quality Report 2009 Reporting Briefing to Operating Board June 2010 Presentation Overview Regulatory Status Source Raw Water Quality Source Treatment (Cedar & Tolt Supplies)

More information

Gail Melgren, Executive Director, Tri-State Water Resources Coalition. Southwest Missouri Water Resource Study: Summary of Phases

Gail Melgren, Executive Director, Tri-State Water Resources Coalition. Southwest Missouri Water Resource Study: Summary of Phases Memorandum To: From: Gail Melgren, Executive Director, Tri-State Water Resources Coalition Donie Grimsley, CDM Smith Date: (Current as of July 13, 2016) Subject: Southwest Missouri Water Resource Study:

More information

OVERVIEW OF WATER RESOURCE ISSUES IN THE CARSON RIVER WATERSHED EDWIN JAMES, P.E. CWSD GENERAL MANAGER 2016

OVERVIEW OF WATER RESOURCE ISSUES IN THE CARSON RIVER WATERSHED EDWIN JAMES, P.E. CWSD GENERAL MANAGER 2016 OVERVIEW OF WATER RESOURCE ISSUES IN THE CARSON RIVER WATERSHED EDWIN JAMES, P.E. CWSD GENERAL MANAGER 2016 Carson River Watershed ~ 3,966 square miles Carson River - 184 miles Population: Current: 156,000

More information

Peatland management impacts on flood regulation

Peatland management impacts on flood regulation water@leeds Peatland management impacts on flood regulation Joseph Holden water@leeds School of Geography University of Leeds Key points are: Impact of management on flood regulation from peatlands depends

More information

Sustaining Our Buildings & Grounds

Sustaining Our Buildings & Grounds Sustaining Our Buildings & Grounds The Next 100 Years University of Alberta June 1 3 2008 Located Edmonton Alberta 3rd largest University in Canada 32,000 undergrads 6,000 grad students 13.9 million sq.

More information

Wetland Water Balance Linking hydrogeological processes to ecological effect

Wetland Water Balance Linking hydrogeological processes to ecological effect Wetland Water Balance Linking hydrogeological processes to ecological effect Don Ross & David Gasca Outline Background Wetland-scale processes Water balance approach Hydrogeological inputs & ecological

More information

UCMR 4. What will be its challenges and costs?

UCMR 4. What will be its challenges and costs? UCMR 4 What will be its challenges and costs? FRWA Conference August 8, 2017 Paul R. Jackson Program Manager, Specialty Services Paul.Jackson@pacelabs.com 813-731-1595 UCMR 4 Challenges & Costs 1 Safety

More information

The Sustainability of Floods Pond

The Sustainability of Floods Pond The Sustainability of Floods Pond Bangor Water District s Public Water Supply Presented By: Rick Pershken Bangor Water District Overview Brief BWD History Watershed Characteristics Lake Characteristics

More information

Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka

Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka AYUBOWAN Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka By Dr. R M S K Ratnayake Director Central Environmental Authority Sri Lanka Democratic Socialist Republic

More information

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: August 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

Integrated Watershed Management Plan

Integrated Watershed Management Plan mighty peace watershed alliance Integrated Plan SUMMARY What is the Plan? The Mighty Peace Alliance (MPWA) supports the three goals of Alberta s Water for Life Strategy: safe secure drinking water, healthy

More information

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1 PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 218 ROUTINE STATUS REPORTS ITEM 1 Hydrologic Conditions Report MEMORANDUM Project: Hydrologic Conditions Report

More information

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, MAY 21, 2014

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, MAY 21, 2014 Agenda Item # REPORT # EPR- REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, MAY, SUBJECT WATER QUALITY REPORT FOR SOOKE LAKE RESERVOIR NOVEMBER - FEBRUARY ISSUE To present the monitoring

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Decentralised Wastewater Management. A sustainable strategy for wastewater management

Decentralised Wastewater Management. A sustainable strategy for wastewater management Decentralised Wastewater Management A sustainable strategy for wastewater management Key Message 1. Big Plant Not the only Option 2. Consider alternatives to Ocean discharge British Columbia Water and

More information

Role of high frequency water quality analysis in confirming catchment hydrology interpretation

Role of high frequency water quality analysis in confirming catchment hydrology interpretation Role of high frequency water quality analysis in confirming catchment hydrology interpretation Michael DONN, Olga BARRON, Tony BARR CSIRO Land and Water, Australia Introduction Nutrient export to the Swan

More information

Performance of the Groundwater Containment System at the Former Canada Creosote Site. Tom Jacklin, M.Eng., P.Eng.

Performance of the Groundwater Containment System at the Former Canada Creosote Site. Tom Jacklin, M.Eng., P.Eng. Performance of the Groundwater Containment System at the Former Canada Creosote Site Tom Jacklin, M.Eng., P.Eng. March 20, 2012 Presentation Overview 1. 1995 Remedial Actions and Containment 2. Evaluation

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE GUIDELINES FOR HYDROGEOLOGIC ASSESSMENT AND REPORTING REQUIREMENTS NEW DEVELOPMENTS ON MUNICIPAL SERVICES REVISED

More information

Cape Town water outlook 2018

Cape Town water outlook 2018 Cape Town water outlook 2018 25 January 2018 Department of Water and Sanitation City of Cape Town Cape Town s water is part of an integrated system Cape Town gets its water from a system of dams that supply

More information

Exploring the Possibilities At Prado Dam

Exploring the Possibilities At Prado Dam Exploring the Possibilities At Prado Dam Greg Woodside, P.G., C.HG. Executive Director of Planning & Natural Resources December 5, 2017 The Orange County groundwater basin lies at the base of the Santa

More information

2011 ANNUAL WATER REPORT

2011 ANNUAL WATER REPORT 2011 ANNUAL WATER REPORT June 2012 Engineering and Operations Department TABLE OF CONTENTS Page 2 1.0 INTRODUCTION... 3 2.0 PARKSVILLE WATER SYSTEM... 3 3.0 DISTRIBUTION SYSTEM... 6 4.0 SCADA... 9 5.0

More information

Nutrient distributions and the interaction between coastal wetlands and the nearshore of Lake Ontario

Nutrient distributions and the interaction between coastal wetlands and the nearshore of Lake Ontario Nutrient distributions and the interaction between coastal wetlands and the nearshore of Ontario Krista Chomicki and Gary Bowen International Association of Great s Research, 25 Type Durham Region Coastal

More information

August 22, City of Gooding. Public Meeting. Keller Associates, Inc. 305 N. 3 rd, Suite A Pocatello, ID Water System Evaluation

August 22, City of Gooding. Public Meeting. Keller Associates, Inc. 305 N. 3 rd, Suite A Pocatello, ID Water System Evaluation August 22, 2012 City of Gooding Public Meeting Water System Evaluation Keller Associates, Inc. 305 N. 3 rd, Suite A Pocatello, ID 83201 Existing Conditions The City maintains two water systems: Non-potable

More information

The Palouse Basin A Relatively Successful Model for Collaborative Water Management

The Palouse Basin A Relatively Successful Model for Collaborative Water Management The Palouse Basin A Relatively Successful Model for Collaborative Water Management 2017 AWRA Annual Conference Monday, November 6, 2017 Paul J. Kimmell, Palouse Basin Aquifer Committee Palouse Basin Boundaries

More information

Water Supply in Coastal Georgia Meeting Water Demand Using Alternative Water Sources to the Upper Floridan Aquifer

Water Supply in Coastal Georgia Meeting Water Demand Using Alternative Water Sources to the Upper Floridan Aquifer Water Supply in Coastal Georgia Meeting Water Demand Using Alternative Water Sources to the Upper Floridan Aquifer John Clarke U.S. Geological Survey Georgia Water Science Center U.S. Department of the

More information

Song Lake Water Budget

Song Lake Water Budget Song Lake Water Budget Song Lake is located in northern Cortland County. It is a relatively small lake, with a surface area of about 115 acres, and an average depth of about 14 feet. Its maximum depth

More information

Nichole M. Embertson, Ph.D. Whatcom Conservation District. May 2, 2012 Abbotsford-Sumas Aquifer Groundwater Nitrate Science Forum Abbotsford, CN

Nichole M. Embertson, Ph.D. Whatcom Conservation District. May 2, 2012 Abbotsford-Sumas Aquifer Groundwater Nitrate Science Forum Abbotsford, CN Nichole M. Embertson, Ph.D. Whatcom Conservation District May 2, 2012 Abbotsford-Sumas Aquifer Groundwater Nitrate Science Forum Abbotsford, CN Background ARM System Assessment Development Implementation

More information

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP Stormwater and LEED Vancouver LEED User s Group May 27, 2005 Craig Kipkie, M.Sc., P.Eng, LEED AP Outline Sustainable Sites 2 Stormwater credits SSc6.1 SSc6.2 Synergies with other Credits Case Study How

More information

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations 13 Conclusions and Recommendations 7166P02/Vol. II, Recommendations Table of Contents 13. Conclusions and Recommendations 13-1 13.1 Conclusions 13-1 13.2 Summary of Results of Feasibility Study 13-2 13.3

More information

Diurnal Fluctuations in Hydrology

Diurnal Fluctuations in Hydrology Effects of Photosynthesis and Groundwater Exchange on Diurnal Fluctuations of Water Quality in a Pre-Alpine River Masaki Hayashi 1, Tobias Vogt 2, Lars Mächler 2, Mario Schirmer 2 1 Department of Geoscience,

More information

Bolton Town Hall February 24, George Knoecklein Northeast Aquatic Research Mansfield, CT

Bolton Town Hall February 24, George Knoecklein Northeast Aquatic Research Mansfield, CT Bolton Town Hall February 24, 214 George Knoecklein Northeast Aquatic Research Mansfield, CT Working Hypothesis 1. Deep drawdowns of Middle Bolton Lake fueled high growth rates of naiad in Lower Bolton

More information

System Needs: An Energy Planning Perspective. Randy Reimann

System Needs: An Energy Planning Perspective. Randy Reimann System Needs: An Energy Planning Perspective Randy Reimann TOPICS BCUC 2006 IEP/LTAP Decision 2008 LTAP Workplan Resource Options Update System Planning and Criteria 2 BCUC IEP/LTAP DECISION Key findings:

More information

ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY

ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY Landau Colliery DWA Quarterly Report No. 5 April to June 2013 ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY Department of Water Affairs (DWA) Quarterly Report No. 2 1 st April 30 th June 2013 1 Table of

More information

City of San Clemente Water Usage Report

City of San Clemente Water Usage Report Monthly Usage (AF) ACRE FEET City of San Clemente Overview of Usage FY 217-18 Monthly Water Use Type of Supply Total MWDOC 723 722 657 629 - - - - - - - - 2,731 Local Groundwater 33 23 69 84 - - - - -

More information

WaterNSW Water Operations Report. Murray-Lower Darling November 2017

WaterNSW Water Operations Report. Murray-Lower Darling November 2017 WaterNSW Water Operations Report Murray-Lower Darling 110% 100% Dam Storages Dartmouth Dam Storage 2013/14 2014/15 2015/16 2016/17 2017/18 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Jul Aug Sept Oct Nov Dec

More information

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 PRESENTATION OVERVIEW Introductions Project Overview Summary of Analysis Supporting Model Development Model Development

More information

Township of Huron-Kinloss Ripley Drinking Water System Water Quality Summary Report 2017

Township of Huron-Kinloss Ripley Drinking Water System Water Quality Summary Report 2017 Township of Huron-Kinloss Ripley Drinking Water System Water Quality Summary Report 2017 Veolia Water Canada Goderich Water Treatment Plant 100 Cove Rd., Goderich, ON Canada N7A 3Z2 Tel 519-524-6583/ Fax

More information

Traffic Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results. Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.

More information

EXTREME EVENTS AFFECTING WATER RESOURCES IN THE HOPE RIVER WATERSHED IN JAMAICA: USE OF WETSPRO FOR BASEFLOW SEPARATION AND ITS LONG TERM TREND

EXTREME EVENTS AFFECTING WATER RESOURCES IN THE HOPE RIVER WATERSHED IN JAMAICA: USE OF WETSPRO FOR BASEFLOW SEPARATION AND ITS LONG TERM TREND EXTREME EVENTS AFFECTING WATER RESOURCES IN THE HOPE RIVER WATERSHED IN JAMAICA: USE OF WETSPRO FOR BASEFLOW SEPARATION AND ITS LONG TERM TREND A.Mandal 1, P.Donk 2, J.Sidial 1 and M.Curtis 1 1. Department

More information

4 DETERMINATION OF WELLHEAD PROTECTION AREAS

4 DETERMINATION OF WELLHEAD PROTECTION AREAS 4 DETERMINATION OF WELLHEAD PROTECTION AREAS A wellhead protection area is defined as the surface and subsurface area surrounding a well, wellfield or spring that supplies a public water supply through

More information

Planning Beyond the Supply/Demand Gap: Water Supply Vulnerabilities in New Mexico Presented by NM Universities Working Group on Drought

Planning Beyond the Supply/Demand Gap: Water Supply Vulnerabilities in New Mexico Presented by NM Universities Working Group on Drought Planning Beyond the Supply/Demand Gap: Water Supply Vulnerabilities in New Mexico Presented by NM Universities Working Group on Drought 1 Janie Chermak, David Gutzler, Peggy Johnson, J. Phillip King, Lee

More information

Dawson City Wastewater

Dawson City Wastewater Ken Johnson Planner and Engineer CRYOFRONT COOL IDEAS for management - technology - media Oxygen Concentration Dawson City Wastewater What is bad about sewage? Environment Oxygen depletion Eutrification

More information

Supplemental Guide II-Delineations

Supplemental Guide II-Delineations Supplemental Guide II-Delineations Contents Source Water Protection Area Delineation... 1 Delineation Criteria for Systems Using Groundwater Sources... 2 Time of Travel... 4 Flow Boundaries... 4 Delineation

More information

Water Operations Report. Namoi-Peel Valleys June 2018

Water Operations Report. Namoi-Peel Valleys June 2018 Water Operations Report Namoi-Peel Valleys June 2018 Dam storages 110% 100% Keepit Dam storage 2013/14 2014/15 2015/16 2016/17 2017/18 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Jul Aug Sep Oct Nov Dec Jan

More information

Provincial Groundwater Policy Initiatives

Provincial Groundwater Policy Initiatives Provincial Groundwater Policy Initiatives Petri Nieminen, Alberta Environment WaterTech, April 22, 2010 Banff Provincial Groundwater Policy Initiatives Building Capacity Working within GOA and with other

More information

Reservoir Drought Operations

Reservoir Drought Operations Reservoir Drought Operations Kevin J. Landwehr, P.E., D.WRE Chief, Hydrology and Hydraulics Branch 4 March 2013 Purpose Awareness of Drought Contingency Plans 2012/13 Reservoir Operations Drought Management

More information

Environmental Protection Licence 2688

Environmental Protection Licence 2688 Perilya Environmental Protection Licence 2688 Licensee Perilya Broken Hill Limited (PBHL) Address Wentworth Rd, Broken Hill, NSW, 2880. Environmental Protection Licence 2688 (Southern Operations) Link

More information

Abbotsford-Sumas Aquifer

Abbotsford-Sumas Aquifer Abbotsford-Sumas Aquifer Long-Term Groundwater Monitoring and Nitrogen Isotope Study Abbotsford-Sumas Aquifer Groundwater Nitrate Science Forum II May 1, 12 Abbotsford, BC Gwyn Graham Environment Canada

More information

RAINWATER HARVESTING FOR DOMESTIC CONSUMPTION IN BANGLADESH

RAINWATER HARVESTING FOR DOMESTIC CONSUMPTION IN BANGLADESH RAINWATER HARVESTING FOR DOMESTIC CONSUMPTION IN BANGLADESH Ifte Choudhury & Farzana Sultana March 25-26, 2013 1 Introduction Problem Statement The purpose of this study is to assess a sustainable rainwater

More information

Heat Pump Field Trials and Implications for Design

Heat Pump Field Trials and Implications for Design Heat Pump Field Trials and Implications for Design GSHPA 26 th June 2012 Chris Laughton Managing Director The Solar Design Company 1 Contents German Fraunhofer trials 2011 Comparison with UK Heat Pump

More information

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION SCENARIOS Direct withdrawal from surface water (SW): PA MOU w/padep NY MOU w/nysdec MD No

More information

What is Run-of-river hydro?

What is Run-of-river hydro? The Project: The Corporation of the Village of Slocan submitted a waterpower project application on Springer Creek in May 2010 Engineering & Environmental studies were performed on the project site to

More information

Estimating the Delaware Inland Bays Watershed Seasonal Population Using Wastewater Flows. By: Brittany Kiessling

Estimating the Delaware Inland Bays Watershed Seasonal Population Using Wastewater Flows. By: Brittany Kiessling Estimating the Delaware Inland Bays Watershed Seasonal Population Using Wastewater Flows By: Brittany Kiessling Introduction Question Hypotheses Goals Overview of previous estimates Delaware Visitor Profile

More information

The Statutes of Upper Canada and the Province of Canada, 1792 to 1866

The Statutes of Upper Canada and the Province of Canada, 1792 to 1866 The Statutes of Upper Canada and the Province of Canada, 1792 to 1866 On Self-Service Microfilm INTRODUCTION This finding aid is a reel-by-reel listing of the Archives of Ontario s microfilm holdings of

More information

DWR s Sustainable Groundwater Management Implementation Groundwater Sustainability Plan (GSP) & Alternative (Alt) Emergency Regulations

DWR s Sustainable Groundwater Management Implementation Groundwater Sustainability Plan (GSP) & Alternative (Alt) Emergency Regulations DWR s Sustainable Groundwater Management Groundwater Plan (GSP) & (Alt) Emergency Regulations Advisory Group Meetings December 17, 2015 1 Presentation Overview Background Regulation Considerations Next

More information

CRT Operations in Low Water Conditions

CRT Operations in Low Water Conditions CRT Operations in Low Water Conditions Friday, May 27, 2016 Outline Utility Planning Background CRT Rule Curves 2015 Operations Future possibilities? Integrated Resource Plan - Key Planning Questions 1.

More information

Examining Reservoir Water Retention During SAGD. Thursday January 31 st, 2013

Examining Reservoir Water Retention During SAGD. Thursday January 31 st, 2013 Examining Reservoir Water Retention During SAGD Thursday January 31 st, 2013 Forward-looking information and advisories This presentation contains "forward-looking information" within the meaning of applicable

More information

Intro to sustainable hydropower and environmental flows

Intro to sustainable hydropower and environmental flows Environmental Flows Workshop Ankara 21 November 2013 Intro to sustainable hydropower and environmental flows Key Issues, intro to methods Dr. Jian-hua Meng, WWF International Environmental Flows Workshop

More information

Project Risk Management Bootcamp. Contents are subject to change. For the latest updates visit

Project Risk Management Bootcamp. Contents are subject to change. For the latest updates visit Bootcamp Page 1 of 7 Why Attend The overall aim of this program is to enable participants to plan, manage and control project risks. Moreover, participants will be able to develop project risk management

More information

Impact of Climate Change on Water Resources of a Semi-arid Basin- Jordan

Impact of Climate Change on Water Resources of a Semi-arid Basin- Jordan Impact of Climate Change on Water Resources of a Semi-arid Basin- Jordan Prof. Fayez Abdulla Civil Engineering Department Jordan University of Science & Technology Presented at the Water in an Arid Land,

More information

Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit)

Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit) Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit) Lake Taupo From 1905 to 1941 Lake Taupo was an unmanaged natural Lake. With the

More information

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016 Dec. 2015 Dec. 2015 Jan. 2016 Jan 2016 Fairfield Public Schools Develops Project Team Initial Funding request analysis (including temporary classrooms costs) for services through Design Development Board

More information

CONSERVATION OF SCARCE WATER RESOURCES AT RÖSSING URANIUM MINE Rainer Schneeweiss and Sandra Müller Rössing Uranium Ltd.

CONSERVATION OF SCARCE WATER RESOURCES AT RÖSSING URANIUM MINE Rainer Schneeweiss and Sandra Müller Rössing Uranium Ltd. CONSERVATION OF SCARCE WATER RESOURCES AT RÖSSING URANIUM MINE Rainer Schneeweiss and Sandra Müller Rössing Uranium Ltd. Introduction The Rössing Uranium Mine is located approximately 65 km inland from

More information

Water Security Agency. Plan for saskatchewan.ca

Water Security Agency. Plan for saskatchewan.ca Water Security Agency Plan for 2016-17 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 8 Financial Summary...

More information

Measuring & modelling soil water balance and nitrate leaching of perennial crops in New Zealand

Measuring & modelling soil water balance and nitrate leaching of perennial crops in New Zealand Measuring & modelling soil water balance and nitrate leaching of perennial crops in New Zealand Steve Green, Brent Clothier, Karin Müller Key facts: Water allocation in New Zealand Abundant freshwater

More information

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Division Public Works Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the

More information

REGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS

REGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS REGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS Professor Ånund Killingtveit NTNU/CEDREN Workshop on Hydro Scheduling in Competitive Electricity Markets Trondheim, Norway, September 17-18

More information

Woking. q business confidence report

Woking. q business confidence report Woking q1 business confidence report Woking q1 report headlines saw a new record in company registrations in Woking when compared to any previous. was a record quarter for company registrations in Woking

More information

LUST Site Corrective Action in Ozark Karst - Yellville, Arkansas

LUST Site Corrective Action in Ozark Karst - Yellville, Arkansas LUST Site Corrective Action in Ozark Karst - Yellville, Arkansas ASTSWMO Mid-Year Meeting North Little Rock, Arkansas April 23, 2015 Mikel R. Shinn, P.G. Professional Geologist - Regulated Storage Tanks

More information

PUBLIC WATER SYSTEM ANNUAL REPORT

PUBLIC WATER SYSTEM ANNUAL REPORT PUBLIC WATER SYSTEM ANNUAL REPORT 2015 TOWN OF BEAUSEJOUR WATER WORKS DEPARTMENT General Office: (204) 268-7550 Water Works Shop: (204) 268-7561 Water Treatment Plant: (204) 268-7563 After Hours Emergency:

More information

Climate Change Impacts for the Central Coast and Hunter Regions

Climate Change Impacts for the Central Coast and Hunter Regions Climate Change Impacts for the Central Coast and Hunter Regions http://www.ozcoasts.gov.au/climate/ima ges/f1_risks.jpg Peter Smith 1 Climate change will have increasing impacts on a wide range of natural

More information