1 Industrial Hygiene Survey Zapolski Real Estate, LLC. 501 Washington Street Durham, NC Prepared by: The EI Group, Inc Gateway Centre Blvd. Morrisville, NC Original Report Date: September 16, 2016 Project ID: IHMO Cameron Faulconer Industrial Hygienist Christopher B. Murray, CIH, CSP Senior Vice President Operations

2 TABLE OF CONTENTS Executive Summary 3 Introduction 4 Sampling Methodology 5 Findings and Discussion 6 Conclusions 11 Appendix 13 Field Sample Data Sheet Asbestos (Area and Clearance) Laboratory Analytical Results EMSL Analytical, Inc. 2

3 EXECUTIVE SUMMARY Asbestos abatement air monitoring was conducted September 1-2, 2016 by Mr. Cameron Faulconer, Industrial Hygienist of The EI Group, Inc. (EI), during off-peak hours at the office of the University of North Carolina (UNC) Institute for the Environment located at 137 East Franklin Street (Floor 6) in Chapel Hill, NC, to evaluate area concentrations during gross removal and clearance sampling following the completion of abatement of approximately fifteen (15) square feet of asbestos-containing spray-applied fireproofing containing five percent (5%) chrysotile asbestos. Samples were collected by Cameron Faulconer, Industrial Hygienist, of The EI Group (EI). Two area sample results, collected adjacent to the mini-containment constructed in the staircase foyer and on the desk of cubicle 6501A, returned results above the EPA-established clearance level of 0.01 fibers per cubic centimeter. The two remaining viable area samples, collected in the Conference Room and in the adjacent walkway of cubicles 6601A&B were below a concentration of 0.01 fibers per cubic centimeter. 3

4 INTRODUCTION An asbestos air monitoring study was conducted at the office of the University Of North Carolina (UNC) Institute for the Environment located at 137 East Franklin Street (Floor 6) in Chapel Hill, NC to evaluate area concentrations of airborne asbestos during gross removal and clearance sampling following the completion of abatement. Samples were collected on September 1-2, 2016 by Mr. Cameron Faulconer, Industrial Hygienist of The EI Group Inc. A total of approximately fifteen square feet of asbestos-containing spray-applied fireproofing overspray was removed in order to allow for temporary leak-prevention measures to be applied to the affected thermal systems insulation (TSI) on which the fireproofing was adhered. It should be noted that the TSI on the cast iron piping was confirmed by The EI Group, Inc. to be negative for asbestos content via a Comprehensive Asbestos Survey performed on July 14-15, 2015 (Report Date: July 31, 2015; contains 85% mineral wool and 15% non-fibrous material). A total of five (5) area samples were collected to characterize the concentration of airborne asbestos during gross removal in order to ascertain the possibility of a breach in containment (or other means of asbestos fiber escape, such as improper work practices) from the isolated work areas during gross removal. Objectives The study was conducted to assess the area concentrations of airborne asbestos during gross removal of approximately fifteen (15) square feet of asbestos-containing spray-applied fireproofing. Scope Every effort has been made to provide as complete and comprehensive an evaluation as professionally practical. However, inherent constraints of time, observation and scope of work must be recognized. The findings are representative of conditions apparent at the time and not necessarily indicative of previous or current conditions. It should not be construed that actions taken as a result of this work will achieve complete compliance with every regulatory standard nor prevent every possible accident or loss. Neither should it be considered that any recommendations noted are the only possible actions to be taken. Management should assess and analyze each recommendation in relation to corporate resources, objectives and activities. This report is intended for the exclusive use of Zapolski Real Estate, LLC and shall not be relied upon by other parties without prior written consent of The EI Group, Inc. 4

5 SAMPLING METHODOLOGY Asbestos Asbestos air samples were collected on 25-millimeter (mm), 0.8-micrometer pore-size, mixed cellulose ester (MCE) filter cassettes. Samples were analyzed on-site by Cameron Faulconer, Industrial Hygienist, of The EI Group, Inc. (EI), North Carolina Licensed Air Monitor # Four (4) area samples were collected by attaching a sampling train to a surface determined to best characterize the concentration of asbestos in the vicinity of the sample area. Three (3) clearance samples were collected inside the negative-pressure enclosures (NPE s, or containments ). Two field blanks were analyzed with the sample set for quality control. Sample media was prepared and analyzed according to the National Institute of Occupational Safety and Health Method 7400, B Counting Rules utilizing Phase Contrast Microscopy. Copies of the Field Sampling Data Sheet may be referenced in the Appendix of this report. EI participates in the Proficiency Analytical Testing (PAT) which allows the participants to demonstrate proficiency with established test methods. The object of the program is to demonstrate their ability to correctly analyze samples by determination of assigned values for quantitative analysis and correct identification of those test items on a quarterly basis. FINDINGS AND DISCUSSION Asbestos All samples were taken while EHG, LLC. asbestos abatement personnel were performing gross removal of asbestos-containing spray-applied fireproofing building material. Work practices, methods of removal, and integrity of engineering controls (negative air-pressure machines, negative-pressure enclosures, and decontamination methods) were monitored by The EI Group, Inc. periodically before and during gross removal. Proper donning and doffing of personal protective equipment (PPE) waste bag-out, disposal methods were also monitored. The work was completed satisfactorily for the full duration of abatement. Low-volume negative-pressure verification checks were conducted periodically by Mr. Faulconer and returned satisfactory results. All negative-pressure machines were operating at a setting of two-thousand cubic feet per minute (CFM) on the HIGH setting. EHG abatement personnel wore coveralls, half-face respirators, safety glasses, and safety-toed boots. Decontamination methods were observed to be performed to satisfaction. 5

6 Gross removal was performed in three (3) small NPE s ( mini-containments ) composed of two layers of six-millimeter (6-mm) polyethylene sheeting with one negative air-pressure unit facilitating a negativepressure environment within the enclosure. Each containment was delineated as a regulated area with OSHA-approved signage displayed on the entrance to each enclosure. One employee performed gross removal tasks while one employee applied amended water (wet methods for gross removal of asbestos; contains soap water with surfactant) during removal, bagging, and performed bag-out tasks following removal. All asbestos-containing material (ACM) waste was placed in a six-millimeter polyethylene waste bag and was goose-necked with an air-tight seal. Amended water was also applied while placing material within the waste bags. A total of five (5) area samples were collected to characterize the concentration of airborne asbestos during gross removal in order to ascertain the possibility of a breach in containment (or other means of asbestos fiber escape, such as improper work practices) from the isolated work areas during gross removal. The clearance level of 0.01 fibers per cubic meter (f/cc), established by the Environmental Protection Agency (EPA), was used as a reference value, although the concentration is not mandated to be utilized by either the EPA or Occupational Safety and Health Administration (OSHA). One (1) area sample was collected in the staircase foyer, near the entrance to the staircase on the sixth floor (University of North Carolina at Chapel Hill - Institute for the Environment). The sample period was started at the beginning of gross removal within the approximately sixteen (16) square foot containment area and ended at the completion of gross removal, yielding a total sampling period of two hundred and thirty-nine (239) minutes. Entrance and egress flaps were constructed and the walls and floor of the area were isolated from the external environment with two layers of six-millimeter (6-mm) polyethylene sheeting and utilized on both doorways on the southwestern and northeastern ends of the foyer. The average flow rate for sampling period was liters per minute (lpm) with a total sample volume of 2397 liters (L). Approximately two (2) square feet of asbestos-containing fireproofing overspray was removed from the surface of fiberglass TSI, covered with a paper jacket. The sample was analyzed on-site following termination of the sampling period and returned a result of fibers per cubic centimeter (f/cc). This result was above the EPA-established clearance level. One (1) area sample was collected in Conference Room (Room #209) along the northern wall of the room. The sample period was started at the beginning of gross removal within the approximately sixteen (16) square foot containment area and ended at the completion of gross removal, yielding a total sampling period of two hundred and eight-seven (287) minutes. A mini-containment was constructed 6

7 with two layers of flooring and wall material with six-millimeter polyethylene material. The average flow rate for the sampling period was liters per minute (lpm) with a total sample volume of 2890 liters (L). Approximately six (6) square feet of asbestos-containing fireproofing overspray was removed from the surface of fiberglass TSI, covered with a paper jacket. The sample was analyzed on-site following termination of the sampling period and returned a result of fibers per cubic centimeter (f/cc). This result was below the EPA-established clearance level. One (1) area sample was collected between cubicles 6601A&B in the adjacent walkway to the four cubicles in the room along the northern wall of the room. This sample was collected to ascertain the concentration that are possibly being entrained into the office area. The nearest area of asbestos abatement was the mini-containment constructed in the staircase foyer. The duration of the sampling period was one hundred and seventy (170) minutes. The average flow rate for the sampling period was liters per minute (lpm) with a total sample volume of 2463 liters (L). The sample was analyzed onsite following termination of the sampling period and returned a result of fibers per cubic centimeter (f/cc). This result was above the EPA-established clearance level. One (1) area sample was collected in the Telecom room; the sampling filter cassette was positioned on the entrance doorway to the room. The sample period was started at the beginning of gross removal within the approximately sixteen (16) square foot containment area and ended at the completion of gross removal, yielding a total sampling period of one hundred and fifty-five minutes (155) minutes. A minicontainment was constructed with two layers of flooring and wall material with six-millimeter polyethylene material. The sample was voided due to possible obstruction of the sampling train. EI made this determination by receiving three results from the sampling filter cassette with a value of zero (0) fibers per cubic centimeter (f/cc). Approximately two (2) square feet of asbestos-containing fireproofing overspray was removed from the surface of fiberglass TSI, covered with a paper jacket. One (1) area sample was collected on the desk of cubicle 6501A in the nearby office approximately fifty (50) feet northwest of the stairway foyer containment. This sample was collected to ascertain the concentration that are possibly being entrained into the office area. The duration of the sampling period was two hundred and seventy-two (272) minutes. The average flow rate for the sampling period was 2.69 liters per minute (lpm) with a total sample volume of 731 liters (L). The sample was collected with a personal pump and analyzed on-site following termination of the sampling period and returned a result of fibers per cubic centimeter (f/cc) with average flow rate of 2.69 liters per minute. This result was above the EPA-established clearance level. 7

8 A total of three (3) clearance samples were collected and analyzed on-site by EI immediately following sample termination of the sampling period. These samples were taken for the purpose of determining whether the concentration of airborne asbestos fibers were safe for re-entry following abatement. The sampling period was started immediately following final cleaning and encapsulation within the regulated area (mini-containment) and terminated after a minimum volume of 1500 liters was reached. The of 0.01 fibers per cubic centimeter (f/cc), established by the EPA, was used as a concentration of regulatory compliance. Upon return of sample results, EHG, LLC. personnel were permitted and instructed to deconstruct the containments. One (clearance) sample was collected inside the regulated area (cassette was inserted through an orifice on the southwestern wall of the containment and sealed immediately following placement) within the fire staircase foyer and analyzed on-site by EI immediately following the termination of the sampling period. The duration of the sampling period was a total of one hundred and seven (107) minutes with an average flow rate of liters per minute and total sample volume of 1514 liters. The sample returned a result of fibers per cubic meter, which was below the EPA-established clearance level. One (clearance) sample was collected inside the regulated area (cassette was inserted through an orifice on the southeastern wall of the containment and sealed immediately following placement) within the Conference Room (Room #209) and analyzed on-site by EI immediately following the termination of the sampling period. The duration of the sampling period was a total of one hundred and sixteen (116) minutes with an average flow rate of liters per minute and total sample volume of 1627 liters. The sample returned a result of fibers per cubic meter, which was below the EPA-established clearance level. One (clearance) sample was collected inside the regulated area (cassette was inserted through an orifice on the southeastern wall of the containment and sealed immediately following placement) within the Telecom room and analyzed on-site by EI immediately following the termination of the sampling period. The duration of the sampling period was a total of one hundred and thirty (130) minutes with an average flow rate of liters per minute with a total sampling volume of 1829 liters. The sample returned a result of fibers per cubic meter, which was below the EPA-established clearance level. At the top of the next page, a table displaying the results of the area and clearance samples taken on September 1, 2016 through September 2, 2016: 8

9 Table 1: Area and Clearance Sample Results Sample Location Sample Type Volume Concentration Detection (L) (f/cc) Limit Staircase Foyer Conference Room (Room #209) Area (Gross Between Cubicles 6601A&B Removal) Telecom VOID Cubicle 6501A on desk Staircase Foyer Conference Room Clearance Telecom EPA Clearance Level (NIOSH 7400): 0.01 f/cc Two area sample results, collected adjacent to the mini-containment constructed in the staircase foyer and on the desk of cubicle 6501A, returned results above the EPA-established clearance level of 0.01 fibers per cubic centimeter. The two remaining viable area samples, collected in the Conference Room and in the adjacent walkway of cubicles 6601A&B were below a concentration of 0.01 fibers per cubic centimeter. Upon the return of samples results that exceeded the EPA-established clearance level, EI submitted the samples to EMSL Analytical, Inc. (EMSL) of Morrisville, North Carolina for analysis utilizing Transmission Electron Microscopy (TEM, NIOSH Method 7402), Selected Area Electron Diffraction (SAED), and Energy Dispersive X-Ray Microanalysis (EDX), which is a composite analysis termed the EPA Level II Method. EMSL is accredited by the American Industrial Hygiene Association s National Voluntary Laboratory Accreditation Program (NVLAP). The EPA Level II Method is capable of yielding results with greater relevance and accuracy than that of the Phase Contrast Microscopy Method. The Phase Contrast Microscopy Method (NIOSH Method 7400) initially conducted on-site by EI includes all fibers within the one hundred (100) viewing fields that meet the condition of being at least 5 micrometers in length with a three to one aspect ratio (3:1, length to width). The EPA Level II Method includes all fibers that fall within this criteria, however the magnification is 10,000x during analysis, whereas the magnification is 40x when performing the PCM method. Ten percent (10%) of the samples were analyzed utilizing SAED and EDX to confirm the presence or absence of asbestos fibers by refractory index and elemental composition analyses, respectively. Table 2 on the next page displays the results of the EPA Level II (TEM) analysis conducted by EMSL: 9

10 Table 2: Area Sample Results EPA Level II (TEM) EMSL Analytical, Inc. Sample Location Sample Type Concentration Analytical (s/mm 2 ) Sensitivity Staircase Foyer <7.70 < Conference Room (Room #209) Area (Gross <7.70 < Between Cubicles 6607A&B Removal) <7.70 < Cubicle 6501A on desk <7.70 < EPA Clearance Level (NIOSH 7402): 70 s/mm 2 Any detected fibers that return results indicative of either of the two classes of asbestos (serpentine or amphibole) are included in the calculation of the fiber loading, which is measured as a unit of area (structures per millimeter squared, s/mm 2 ). All sample results were below the laboratory Minimum Reporting Limit (MRL) of 7.70 s/mm 2, which is well below the EPA Clearance Level for TEM analysis in terms of asbestos fiber loading of 70 s/mm 2. The results returned by this analysis are the final results for the area samples collected on September 1-2,

11 CONCLUSIONS Asbestos abatement air monitoring was conducted September 1-2, 2016 by Mr. Cameron Faulconer, Industrial Hygienist of EI, during off-peak hours at the office of the University of North Carolina (UNC) Institute for the Environment located at 137 East Franklin Street (Floor 6) in Chapel Hill, NC, to evaluate area concentrations during gross removal and clearance sampling following the completion of abatement of approximately fifteen (15) square feet of asbestos-containing spray-applied fireproofing containing five percent (5%) chrysotile asbestos. Samples were collected by Cameron Faulconer, Industrial Hygienist, of The EI Group (EI). Two area sample results, collected adjacent to the mini-containment constructed in the staircase foyer and on the desk of cubicle 6501A, returned results above the EPA-established clearance level of 0.01 fibers per cubic centimeter NIOSH Method 7400 (Phase Contrast Microscopy). The two remaining viable area samples, collected in the Conference Room and in the adjacent walkway of cubicles 6601A&B were below a concentration of 0.01 fibers per cubic centimeter. All area (gross removal) samples collected on September 1-2, 2016 were submitted to EMSL Analytical, Inc. for analysis via Transmission Electron Microscopy (TEM), NIOSH Method 7402 for confirmation of asbestos loading. All four area samples returned results below the Laboratory Minimum Reporting Limit (MRL) at <7.70 s/mm 2 (structures per millimeter squared), which is well below the EPA-established clearance level in terms of asbestos fiber loading of 70 s/mm 2. 11

12 APPENDIX Field Sample Data Sheet Asbestos (Area and Clearance) Laboratory Analytical Results EMSL Analytical, Inc.

13 The EI Group, Inc. PCM Analysis Summary: Air Sampling Project Information: Job Number: IHMO Client Name: RESOLUTE, Inc. Job Location: Apex Baptist Church Salem Street, Apex, NC Shift Time1st Cassette Size: 25mm Area(s) of Work: Multi-purpose Room Air Monitor: Cameron Faulconer Signature: Sampling Date: 9/1/2016-9/2/2016 Respiratory Protection Analyst: Cameron Faulconer Signature: Analysis Date: 9/2/16 (Clearance), 9/15/2016 (Area) X 1/2 Face Reviewed By: Christopher Murray Signature: Review Date: 9/16/2016 PAPR Key for the Type of Sampling : 1=Background, 2=Gross Removal, 3=Fine Cleaning, 4=Finals, X= Voided Sample, P=personnel Type C/other IWA =Inside Work Area, OWA =Outside Work Area Blank Sample Data: Sample# Fiber Count 0 Fields: 100 Sample# Fiber Count 0 Fields: 100 Avg. Cnt: 0 Area Sampling Data: Sample# Sample Type Sample Location and Notes Start Time End Time Total Time (Minutes) Avg. Flow Rate (LPM) Sample Volume (Liters) Fiber Count Fields Counte d Fiber Per CC (F/CC) Detection limit Staircase Foyer 8:58:00 PM (9/1/2016) 12:57:00 AM (9/2/2016) Conference Room 21:10 (9/1/2016) 00:57 (9/2/2016) Between Cubicles 6601A&B (Walkway) 21:20 (9/1/2016) 1:10 (9/2/2016) Telecom 22:20 (9/2/2016) 00:55 (9/2/2016) 155 VOID Cubicle 6501A (on desk) 22:15 (9/1/2016) 2:47 (9/2/2016) C - Staircase Foyer 00:45 (9/2/16) 2:32 (9/2/16) C - Conference Room 1:16 (9/2/2016) 3:12 (9/2/2016) C - Telecom 2:02 (9/2/16) 4:12 (9/2/16) Gateway Centre Boulevard Suite 200, Morrisville, NC Tel (919) , Fax (919)

14 EMSL Analytical, Inc Gateway Centre Blvd., Suite 600, Morrisville, NC Phone/Fax: (919) / (919) raleighlab@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: ENVI67 Attn: Carra Herring The EI Group, Inc Gateway Centre Blvd, Suite 200 Morrisville, NC Phone: (919) Fax: (919) Received: 09/22/16 2:25 PM Analysis Date: 9/23/2016 Collected: 9/1/2016 Project: IHMO Test Report: Asbestos Fiber Analysis by Transmission Electron Microscopy (TEM), Selected Area Electron Diffraction (SAED), and Energy Dispersive X-Ray Microanalysis (EDX) - Performed by EPA Level II Method. Sample Volume (liters) Asbestos # Structures Analytical Sensitivity Concentration Type(s) Asbestos Non-Asb. (S/cc) (S/mm²) S/cc Notes AB None Detected <7.70 < Conference Room None Detected <7.70 < A None Detected <7.70 < Staircase Foyer None Detected <7.70 < Analyst(s) Kelly Gallisdorfer (4) Billy Barnes, Asbestos Lab Manager or other approved signatory Disclaimers: The laboratory is not responsible for data reported in structures/cc, which is dependent on volume collected by non-laboratory personnel. This report may not be duplicated, except in full, without written permission by EMSL Analytical, Inc. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. This report relates only to the samples reported above. Quality control data (including 95% confidence limits and laboratory and analysts' accuracy and precision) is available upon request. The test results contained within this report meet the requirements of NELAC unless otherwise noted. Samples received in good condition unless otherwise noted. Samples analyzed by EMSL Analytical, Inc. Morrisville, NC Initial report from 09/26/ :16:37 THIS IS THE LAST PAGE OF THE REPORT. Test Report TEMLevelII Printed: 9/26/2016 9:16:37 AM 1

Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager, Occupational Health and Safety Department

Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager, Occupational Health and Safety Department 701210-356 2 April 2014 Toronto Catholic District School Board Catholic Education Centre 80 Sheppard Avenue East North York, Ontario M2N 6E8 Attention: Re: Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager,

More information

Asbestos Abatement Air Monitoring Report

Asbestos Abatement Air Monitoring Report Thomas Mifflin Elementary School 3624 Conrad Street Philadelphia, Pennsylvania Asbestos Abatement Air Monitoring Report AUGUST 15, 2018 PREPARED FOR: School District of Philadelphia 440 North Broad Street,

More information

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919) OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 31, 2016 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701

More information

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919) OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 10, 2015 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701

More information

No dry drains/traps were found, eliminating a potentially concern for odors.

No dry drains/traps were found, eliminating a potentially concern for odors. January 5, 2017 Ms. Alix Zapolski Zapolski Real Estate, LLC. 501 Washington Street Durham, NC 27701 Re: Limited Indoor Air Quality Assessment Women s Restroom 137 E. Franklin Street, Chapel Hill, NC UNC

More information

October 1, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted,

October 1, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted, October 1, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 Dear Ted, Enclosed please find the Roosevelt Elementary School East Side Asbestos Removal and O & M Final

More information

Chapter 10 Air Sampling and Analysis

Chapter 10 Air Sampling and Analysis Air Sampling and Analysis This chapter is designed to provide inspectors general information concerning the equipment, methods and procedures involved in air monitoring and air sample analysis. Although

More information

LIMITED ASBESTOS INSPECTION REPORT

LIMITED ASBESTOS INSPECTION REPORT LIMITED ASBESTOS INSPECTION REPORT Conducted for: Woodbridge Township Education Association 34 Green Street Woodbridge, New Jersey 07095 Conducted at: Indiana Avenue School 256 Indiana Avenue Iselin, New

More information

September 29, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted,

September 29, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted, September 29, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 Dear Ted, Enclosed please find the Homecroft Elementary School West Side Asbestos Removal and O & M Final

More information

ASBESTOS AND LEAD PAINT INSPECTION REPORT

ASBESTOS AND LEAD PAINT INSPECTION REPORT ASBESTOS AND LEAD PAINT INSPECTION REPORT for the former HENRY SILER SCHOOL 502 WEST THIRD STREET SILER CITY, NC March 2012 prepared by Herrick Engineering, Inc. 526 Lochness Lane Cary, NC 27511 (919)

More information

Occupational Exposure Assessment Report: Airborne Asbestos Fibers

Occupational Exposure Assessment Report: Airborne Asbestos Fibers June 13, 2016 Occupational Exposure Assessment Report: Airborne Asbestos Fibers VAV Repair Stevenson Hall 1801 E. Cotati Avenue Rohnert Park CA 94928 Prepared for: Craig Dawson 1801 E. Cotati Avenue Rohnert

More information

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

CLASS I AND II ABATEMENT PROJECT SUBMITTALS 5.1 Pre-Work Submittals CLASS I AND II ABATEMENT PROJECT SUBMITTALS Abatement contractors shall submit the following in a bound notebook to AU or our designated representative at the mandatory pre-construction

More information

TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204 & 206 WINDSOR, ONTARIO. Issued: March 15 th, 2010

TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204 & 206 WINDSOR, ONTARIO. Issued: March 15 th, 2010 Environmental Consultants 931 Commissioners Rd East, Suite 100 London, Ontario N5Z 3H9 Tel: (519) 685-9048 Fax: (519) 685-1042 TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION REQUEST FOR PROPOSAL ASBESTOS AIR MONITORING SERVICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION REQUEST FOR PROPOSAL ASBESTOS AIR MONITORING SERVICES NORTH DAKOTA DEPARTMENT OF TRANSPORTATION REQUEST FOR PROPOSAL ASBESTOS AIR MONITORING SERVICES September 12, 2008 INTRODUCTION North Dakota Department of Transportation (NDDOT) is seeking an asbestos

More information

If you have any questions or require further assistance, please do not hesitate to contact me at

If you have any questions or require further assistance, please do not hesitate to contact me at April 9, 2013 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Prosperity Heights Elementary Room 0104 Chalkboard/Tackboard Removal Final Report,

More information

KELSAY Environmental Consulting

KELSAY Environmental Consulting KELSAY Environmental Consulting September 25, 2015 Wayne Layman Canby School District 1130 S. Ivy Street Canby, OR 97013 RE: ASBESTOS ABATEMENT CLOSE OUT REPORT 2015 Eccles Elementary School Hallway Remodel

More information

Asbestos Abatement Air Monitoring Report

Asbestos Abatement Air Monitoring Report Olney Elementary School 5301 N. Water Street Philadelphia, Pennsylvania Asbestos Abatement Air Monitoring Report AUGUST 16, 2018 PREPARED FOR: School District of Philadelphia 440 North Broad Street, Room

More information

Final Visual Inspection and Air Monitoring Report Asbestos Abatement Activities 804 Chipeta Road Montrose, Colorado.

Final Visual Inspection and Air Monitoring Report Asbestos Abatement Activities 804 Chipeta Road Montrose, Colorado. Final Visual Inspection and Air Monitoring Report Asbestos Abatement Activities 804 Chipeta Road Montrose, Colorado November 21, 2016 Final Visual Inspection and Air Monitoring Report Asbestos Abatement

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CEMP-RT Engineer Pamphlet 1110-1-23 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design ASBESTOS ABATEMENT AIR MONITORING STANDARD SCOPE OF WORK EP 1110-1-23

More information

T. Harris Environmental Management Inc.

T. Harris Environmental Management Inc. T. Harris Environmental Management Inc. Environmental Consultants 93 Skyway Avenue, Suite 101 Toronto, Ontario M9W 6N6 Tel. (416) 679-8914 Fax. (416) 679-8915 1-888-ASK-THEM, York University 4700 Keel

More information

February 15, 2019 GEM Environmental P.O. Box 9053 Missoula, MT CLIENT PROJECT: U of M - Cringhead Room 106A + 107A, LAB CODE: T Dea

February 15, 2019 GEM Environmental P.O. Box 9053 Missoula, MT CLIENT PROJECT: U of M - Cringhead Room 106A + 107A, LAB CODE: T Dea February 15, 2019 GEM Environmental P.O. Box 9053 Missoula, MT 59807 CLIENT PROJECT: U of M - Cringhead Room 106A + 107A, 19-030 LAB CODE: T190603 Dear Customer: Enclosed are asbestos analysis results

More information

SUMMARY OF BID ITEMS

SUMMARY OF BID ITEMS Addendum 4 Request for Information Village of North Palm Beach Contractor Solicitation Roof Replacement Library & Public Works Facility Invitation for Bids Bid Opening October 9, 2014 3:00 PM E.S.T. Following

More information

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc. The following work procedures are specified on all full containment asbestos abatement projects that we design. A. Preliminary Air Sampling: Many buildings contain background fiber levels prior to, or

More information

Work Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928

Work Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928 ABATEMENT WORK PLAN FOR EMERGENCY ASBESTOS ABATEMENT PROJECT CONSENTINO MIDDLE SCHOOL 685 WASHINGTON STREET HAVERHILL, MASSACHUSETTS Work Plan dated February 17, 2016 Prepared by Axiom Partners, Inc. Stephen

More information

September 30, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,

September 30, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted, September 30, 2014 Providing Trusted Health and Safety Solutions Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Parkway Montessori School

More information

Negative Exposure Assessment Study Using the Wonder Makers Asbestos Bulk Sampler

Negative Exposure Assessment Study Using the Wonder Makers Asbestos Bulk Sampler Negative Exposure Assessment Study Using the Wonder Makers Asbestos Bulk Sampler Conducted by Wonder Makers Environmental and EMSL Laboratories December 7, 2017 Copyright December 2017 TABLE OF CONTENTS

More information

Prepared For: ICA Engineering Columbia, South Carolina. May 26, Lady Street, Suite E Columbia, SC (803)

Prepared For: ICA Engineering Columbia, South Carolina. May 26, Lady Street, Suite E Columbia, SC (803) Asbestos Inspection Report I-20 Road Widening & Bridge Replacement Project I-20 Bridges over Norfolk Southern Railroad & Meat Plant Road Lexington County, South Carolina Prepared For: ICA Engineering Columbia,

More information

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 2 Definitions 2 Responsibilities 3 Hazard

More information

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials Revised November 21, 2013 Application Code of Practice Where asbestos is present or believed to be present in a workplace

More information

1-B. Asbestos Exposure Assessment and Control in Occupational Settings

1-B. Asbestos Exposure Assessment and Control in Occupational Settings 1-B. Asbestos Exposure Assessment and Control in Occupational Settings Contents a) Methodologies related to the environmental monitoring of asbestos Asbestos in air Asbestos in bulk materials b) Work practices

More information

March 29 th, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

March 29 th, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 March 29 th, 2017 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and TEM

More information

Mr. Thomas Geary Director of Facilities Haverhill Public Schools 4 Summer Street Haverhill, MA AXIOM Project #

Mr. Thomas Geary Director of Facilities Haverhill Public Schools 4 Summer Street Haverhill, MA AXIOM Project # MAIN OFFICE: 545 Salem Street Wakefield, MA 01880 (781) 213-9198 (781) 213-6992 Fax BRANCH OFFICES: 46 Watergate Lane West Barnstable, MA 02668 (508) 746-5218 (508) 732-0281 Fax 10 Diamond Drive Derry,

More information

May 1 st, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

May 1 st, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 May 1 st, 2018 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and TEM

More information

INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC.

INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC. October 22, 2012 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Battle Creek Magnet Portable #19 Ceiling Tile Removal Final Report, IEA Project

More information

September 11, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

September 11, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 September 11, 2017 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and

More information

Mr. Shawn Harris February 16, 2018 County of Bastrop State of Texas 804 Pecan Street Bastrop, Texas

Mr. Shawn Harris February 16, 2018 County of Bastrop State of Texas 804 Pecan Street Bastrop, Texas Ralph E. Bonnell, CIH 6802 Manzanita, Austin, Texas 78759 Ind. Asbestos Consultant TDH #105638 Email: AEGAustin@sbcglobal.net Tel: (512) 913-0077 Web: www.aegaustin.com Mr. Shawn Harris February 16, 2018

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 201 Caulder Avenue Spartanburg, South Carolina Prepared

More information

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Prepared for: Northside Development Group 410 Magnolia Street Spartanburg, South Carolina Prepared by: Apex Environmental

More information

Enclosed please find one Inspection for House Relocation Report for the above-referenced location.

Enclosed please find one Inspection for House Relocation Report for the above-referenced location. July 22, 2015 Dave Grandy Director of Buildings and Grounds Waconia Public Schools 512 Industrial Blvd. Waconia, MN 55387 RE: Asbestos Inspection for House Relocation located at: 11820 94 th Street, Cologne,

More information

VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f:

VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f: VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA 02189 www.vertexeng.com p: 781.952.6000 f: 781.335.3543 EZRA BAKER ELEMENTARY SCHOOL/GYMNASIUM ASBESTOS ABATEMENT WORK PLAN ASBESTOS CONTAINING

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 444 Tryon Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 444 Tryon Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 444 Tryon Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 201 Caulder Avenue Spartanburg, South Carolina Prepared by:

More information

FACILITY ASBESTOS MANAGEMENT PLAN

FACILITY ASBESTOS MANAGEMENT PLAN WASHINGTON ADVENTIST UNIVERSITY DEPARTMENT OF PUBLIC SAFETY DIVISION FACILITY ASBESTOS MANAGEMENT PLAN TAKOMA PARK CAMPUS REVIEWED and APPROVED BY: Patrick Farley WAU- V.P. of Finance Steven Lapham WAU-Executive

More information

ASBESTOS SURVEY REPORT 840 MANTOLOKING ROAD, APT NO. 3 BRICK, NEW JERSEY SRP D.003

ASBESTOS SURVEY REPORT 840 MANTOLOKING ROAD, APT NO. 3 BRICK, NEW JERSEY SRP D.003 PARS Environmental Inc. 500 Horizon Drive Suite 540 Robbinsville, NJ 08691 Tel: 609-890-7277 Fax: 609-890-9116 March 17, 2014 Mr. Chris DeBruyn Delaware Valley Estimating Gilbane Building Company 4814

More information

Mr. John Serraino QEP Vice President Product Management & Development 1001 Broken Sound Parkway, NW Boca Raton, FL 33487

Mr. John Serraino QEP Vice President Product Management & Development 1001 Broken Sound Parkway, NW Boca Raton, FL 33487 November 30, 2017 via email: jserraino@qep.com Mr. John Serraino QEP Vice President Product Management & Development 1001 Broken Sound Parkway, NW Boca Raton, FL 33487 Re: Respirable Dust Sampling During

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC. CLIENT: City of Rock Hill P.O. Box Rock Hill, SC 29731

AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC. CLIENT: City of Rock Hill P.O. Box Rock Hill, SC 29731 AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC CLIENT: City of Rock Hill P.O. Box 11706 Rock Hill, SC 29731 LOCATION: 460 Fewell Street Rock Hill, SC 29730 DATE OF INSPECTION:

More information

Asbestos Inspection Cover Letter

Asbestos Inspection Cover Letter Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right

More information

September 26, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,

September 26, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted, September 26, 2012 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Bruce Vento Elementary Summer 2012 Asbestos Removal Final Report, IEA Project

More information

HOL-11 Exterior Pipe wrap Lagging (fiber) PLM None detected. HOL-09 Room 10 - Floor Tile, Grey 12x12 PLM None detected

HOL-11 Exterior Pipe wrap Lagging (fiber) PLM None detected. HOL-09 Room 10 - Floor Tile, Grey 12x12 PLM None detected Laboratory results - Asbestos School Sample no. Sample Location Material Sample Type Result Holbrook Elementary HOL-01 Room 12 Floor - Linoleum Tan Linoleum PLM 30% Chrysotile Floor tile PLM None detected

More information

SAN BERNARDINO COMMUNITY COLLEGE DISTRICT FOR CRAFTON HILLS COLLEGE

SAN BERNARDINO COMMUNITY COLLEGE DISTRICT FOR CRAFTON HILLS COLLEGE October 4, 2016 Michael Strong Vice President of Administrative Services SAN BERNARDINO COMMUNITY COLLEGE DISTRICT FOR CRAFTON HILLS COLLEGE 114 South Del Rosa Drive San Bernardino, California 92408 Re:

More information

INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC.

INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC. October 19, 2015 Providing Trusted Health and Safety Solutions Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Humboldt Senior High Gymnasium

More information

HEALTH AND SAFETY PROGRAM ASBESTOS

HEALTH AND SAFETY PROGRAM ASBESTOS Page 1 of 6 1.0 PURPOSE The purpose of this document is to provide a written program to ensure awareness to Axiall employees in the health and safety aspects of working with asbestos or asbestos containing

More information

FINAL COPY. Airborne Asbestos Risk Assessment Basic Medical Sciences Building University of Manitoba, Bannatyne Campus

FINAL COPY. Airborne Asbestos Risk Assessment Basic Medical Sciences Building University of Manitoba, Bannatyne Campus COPY Airborne Asbestos Risk Assessment Prepared for: University of Manitoba Environmental Health and Safety 191 Frank Kennedy Centre Winnipeg, Manitoba R3T 2N2 Attention: Mr. Grant McCaughey, P.Eng., CRSP

More information

Mei. Dear Mr. Gregersen

Mei. Dear Mr. Gregersen Mei gregersen.hans@mail.dc.state.fl.us 501 South Calhoun Street Tallahassee, FL 32399-2500 850 / 717 3934 Mihir Environics Inc. Environmental Health & Safety Consultants 3161 ELIZA ROAD UNIT # 2, TALLAHASSEE,

More information

University of South Carolina State Project No: H Wardlaw AHU-2 Replacement

University of South Carolina State Project No: H Wardlaw AHU-2 Replacement University of South Carolina State Project No: H27-6117 Wardlaw AHU-2 Replacement Addendum One March 14, 2017 NOTE: The following amendments, additions, and deletions shall be made to the Construction

More information

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION SECTION 13280 ASBESTOS CONTAINING MATERIALS REMEDIATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Furnishing all labor, materials, equipment, and transportation necessary for properly and safely removing,

More information

Transmitted via electronic mail to

Transmitted via electronic mail to October 1, 2016 Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Transmitted via electronic mail to wadesboromanager@windstream.net Re: 125 S. Washington Street Asbestos Sampling

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 November 23, 2015 Mr. Dennis Zimmer City of Dayton, Division

More information

Asbestos Survey Report University of Alaska Anchorage SSB Building-Mechanical Rooms (1 st, 3 rd Floors & Room 205) Prepared for:

Asbestos Survey Report University of Alaska Anchorage SSB Building-Mechanical Rooms (1 st, 3 rd Floors & Room 205) Prepared for: Asbestos Survey Report University of Alaska Anchorage SSB Building-s (1 st, 3 rd Floors & Room 205) Prepared for: University of Alaska Anchorage 3211Providence Drive Anchorage, AK 99508 Ms. Patricia Baum

More information

Appendix D Location Specific Technical Reports

Appendix D Location Specific Technical Reports Appendix D Location Specific Technical Reports SEL Project Number 119917 March 29, 2017 Air Sampling Program University of Toronto Medical Sciences Building 1 King s College Circle, Toronto, Ontario Page

More information

CENTRAL MICHIGAN UNIVERSITY

CENTRAL MICHIGAN UNIVERSITY CENTRAL MICHIGAN UNIVERSITY 2017 ASBESTOS CONSULTANT INITIAL PREQUALIFICATION APPLICATION Consultants interested in providing asbestos related services to Central Michigan University (CMU) must first be

More information

ADDENDUM No. 1 July 11, 2013 ASBESTOS ABATEMENT SPECIFICATIONS. Crawlspace Abatement and New Beginnings Academy

ADDENDUM No. 1 July 11, 2013 ASBESTOS ABATEMENT SPECIFICATIONS. Crawlspace Abatement and New Beginnings Academy BID No. 13.01 ADDENDUM No. 1 July 11, 2013 ASBESTOS ABATEMENT SPECIFICATIONS Crawlspace Abatement and Reinsulation @ New Beginnings Academy Owner NEW BEGINNINGS ACADEMY 211 East Michigan Avenue Ypsilanti,

More information

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards

More information

Emergency Asbestos Abatement Project Monitoring September 21, 2013 Peebles Elementary School Bourne, Massachusetts

Emergency Asbestos Abatement Project Monitoring September 21, 2013 Peebles Elementary School Bourne, Massachusetts Emergency Asbestos Abatement Project Monitoring September 21, 2013 Peebles Elementary School Bourne, Massachusetts Bourne Public Schools Bourne, Massachusetts February 5, 2014 Fuss & O Neill EnviroScience,

More information

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843) ASBESTOS INSPECTION REPORT 1816 PRINCE STREET Georgetown, South Carolina Asbestos Inspections, LLC Project # 2017-48 Performed in general accordance with SCDHEC regulation 61-86.1 along with OSHA regulation

More information

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related

More information

BID SHEET EAST AND WEST TECHNOLOGY ASBESTOS ABATEMENT

BID SHEET EAST AND WEST TECHNOLOGY ASBESTOS ABATEMENT Renovations Asbestos Abatement BID SHEET EAST AND WEST TECHNOLOGY ASBESTOS ABATEMENT Asbestos Material Quantity Unit Price Bid Price Mud Compound Insulation 795 each Floor Tile 10,560 sf Lab Counter Tops

More information

PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL

PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL At 130 Liberty Street New York, New York Lower Manhattan Development Corporation

More information

The following non-friable asbestos products were identified at the site:

The following non-friable asbestos products were identified at the site: April 27, 2018 Ms. Jessica Kenney Boulder Housing Partners 4800 Broadway Street Boulder, Colorado 80304 RE: Limited Asbestos-Containing Building Materials Survey Canyon Point Apartments First Floor 700

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843)

AHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843) AHERA/NESHAP ASBESTOS INSPECTION REPORT CLIENT: City of Florence 324 West Evans Street Florence, SC 29501-3430 (843) 665-3173 LOCATION: 814 Gladstone Street Florence, SC 29501 DATE OF INSPECTION: September

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 187 Sunny Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 187 Sunny Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 187 Sunny Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 201 Caulder Avenue Spartanburg, South Carolina Prepared by:

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

September 27, Ted Sherman Saint Paul Public Schools 360 Colborne Street St. Paul, MN Dear Ted:

September 27, Ted Sherman Saint Paul Public Schools 360 Colborne Street St. Paul, MN Dear Ted: September 27, 2007 Ted Sherman Saint Paul Public Schools 360 Colborne Street St. Paul, MN 55102 Dear Ted: Enclosed please find two (2) copies of the Hazel Park Middle School Summer 2007 Asbestos Removal,

More information

NESHAP Asbestos Survey Report Vacant Single-Family Home 5955 Woodhall Street Detroit, Michigan

NESHAP Asbestos Survey Report Vacant Single-Family Home 5955 Woodhall Street Detroit, Michigan NESHAP Asbestos Survey Report Vacant Single-Family Home 5955 Woodhall Street Detroit, Michigan July 2013 1915 North 12 th Street Toledo, OH 43604-5305 T (419) 324-2222 F (419) 321-6252 www.ttlassoc.com

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 November 23, 2015 Mr. Dennis Zimmer City of Dayton, Division

More information

These procedures are to be followed by all persons required to perform the following work:

These procedures are to be followed by all persons required to perform the following work: These procedures are to be followed by all persons required to perform the following work: Entry into any ceiling space above which an asbestos-containing fireproofing or thermal insulation is present.

More information

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions MANAGEMENT PLANNER INITIAL Asbestos Training Course Federal Edition Training Services International www.training.com What management planning qualifications exist? How do I become certified to perform

More information

LIMITED ASBESTOS INSPECTION REPORT

LIMITED ASBESTOS INSPECTION REPORT LIMITED ASBESTOS INSPECTION REPORT FOR CITY OF ROCK HILL 150 Johnson Street Rock Hill, SC 29731 (803) 817-5147 LOCATION Building #842, #844, #846, & #848 Crest Street Rock Hill, South Carolina INSPECTION

More information

Asbestos Abatement Project Monitoring Report

Asbestos Abatement Project Monitoring Report Asbestos Abatement Project Monitoring Report Peebles Elementary School, Bourne High School, & Otis Memorial Elementary School February 15, 2013 February 20, 2013 Bourne Public Schools Bourne, Massachusetts

More information

Asbestos Inspection Report

Asbestos Inspection Report ECH CONSULTANTS Asbestos Inspection Report 406 Vista Street Florence, South Carolina Prepared for: City of Florence Prepared by: Enga Hair, AHERA Building Inspector License #BI-01591 May 30, 2017 Project

More information

Test Report: Asbestos Analysis of Bulk Materials by PLM via the NY State ELAP Method

Test Report: Asbestos Analysis of Bulk Materials by PLM via the NY State ELAP Method 031214474 Phone: (518) 453-0146 Received: 05/11/12 9:59 AM Analysis Date: Project: Test Report: Analysis of Bulk Materials by PLM via the NY State ELAP 198.1 Method Non- Sample Description Appearance %

More information

ASBESTOS ABATEMENT PROJECT COMPLETION REPORT

ASBESTOS ABATEMENT PROJECT COMPLETION REPORT ASBESTOS ABATEMENT PROJECT COMPLETION REPORT Windows and Door Replacement Program Falstaff Community Centre 50 Falstaff Avenue Toronto, Ontario M6L 2C7 Presented to: City of Toronto, Parks, Forestry &

More information

UNIVERSITY OF COLORADO AT BOULDER

UNIVERSITY OF COLORADO AT BOULDER UNIVERSITY OF COLORADO AT BOULDER SPECIFICATION FOR INDUSTRIAL HYGIENE CONSULTING SERVICES ASBESTOS ABATEMENT PROJECTS IN FACILITIES FACILITY ASSESSMENTS- PROJECT SURVEILLANCE-AIR MONITORING PROCEDURES

More information

LIMITED ASBESTOS INSPECTION REPORT

LIMITED ASBESTOS INSPECTION REPORT LIMITED ASBESTOS INSPECTION REPORT FOR CITY OF ROCK HILL 150 Johnson Street Rock Hill, SC 29731 (803) 817-5147 LOCATION Building #838 & #840 Crest Street Rock Hill, South Carolina INSPECTION DATE: February

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT

AHERA/NESHAP ASBESTOS INSPECTION REPORT AHERA/NESHAP ASBESTOS INSPECTION REPORT CLIENT: Julie M. Wilkie City of Greenwood Assistant City Manager 520 Monument St., PO Box 40 Greenwood, SC 29648 (864) 942-8411 LOCATION: 230 Mineral Ave Greenwood,

More information

Prepared for: Infrastructure Consulting Engineers, PLLC Turnbull Avenue North Charleston, South Carolina 29405

Prepared for: Infrastructure Consulting Engineers, PLLC Turnbull Avenue North Charleston, South Carolina 29405 ASBESTOS & LEAD-BASED PAINT ASSESSMENT REPORT I-85 Widening MM80-96 SC 110 BRIDGE OVER I-85 STRUCTURE NO. 4240011000100 COWPENS, SOUTH CAROLINA S&ME Project No. 1426-14-161 Prepared for: Infrastructure

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 January 11, 2016 Mr. Dennis Zimmer City of Dayton, Division

More information

Asbestos and Lead Building Building Inspection/Survey

Asbestos and Lead Building Building Inspection/Survey Asbestos and Lead Building Building Inspection/Survey Residence 2510 Burton Street Stockton, CA 95203 Presented to: Doi Do Administrative Analyst Housing Authority of the County of San Joaquin 421 South

More information

Asbestos Abatement Project Monitoring Closeout Report. Bourne Public Schools Bourne, Massachusetts

Asbestos Abatement Project Monitoring Closeout Report. Bourne Public Schools Bourne, Massachusetts Asbestos Abatement Project Monitoring Closeout Report Bourne High School, James F. Peebles Elementary School and Otis Memorial Elementary School July 14 August 25, 2015 Bourne Public Schools Bourne, Massachusetts

More information

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY: ASBESTOS SURVEY Old Detective s Building Wadesboro, NC PREPARED FOR: Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Date of Inspection September 28, 2016 Date of Report October

More information

Crothers Environmental Group, LLC

Crothers Environmental Group, LLC , LLC Morrisville, Vermont 05661 Phone 802-888-1936 info@crothersiaq.com June 26, 2009 Mr. Joe Aja, Project Engineer State of Vermont - Department of Buildings & General Services 5 Perry Street, Suite

More information

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION Procedure No.: IH-6 Page: 1 of 16 Preparer: Owner: Approver: RECORD OF REVISIONS Date Details of Change 11/02/01 Added a Record of Revisions table. 08/14/08 Review of entire procedure. Deleted 4.3.3 and

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

September 19, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,

September 19, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted, September 19, 2012 Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN 55108 Dear Ted, Enclosed please find the Wellstone Elementary West Penthouse Glovebag Abatement Final Report, IEA

More information

S (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised

S (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised S-11-83 (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised ARM Project # 16-314-15 April 17, 2017 Prepared For: HDR-ICA 1122

More information

DST Consulting Engineers Inc. RE: Field Inspection Report #30 Week Ending February 19th, 2016 Plan No.: F; Project ID: B3165A-0001

DST Consulting Engineers Inc. RE: Field Inspection Report #30 Week Ending February 19th, 2016 Plan No.: F; Project ID: B3165A-0001 Suite 15, Parkwood Office Centre 9353-50th Street Tel: (780) 454-2120 www.dstgroup.com 23 February 2016 Mr. Pedro Mendonca Project Procurement Specialst Alberta Infrastructure 6950 113 Street, 2 nd Floor,

More information

AIR MONITORING REPORT

AIR MONITORING REPORT AIR MONITORING REPORT Boiler Room Tunnel Hayden Heights Elementary School 1863 Clear Avenue St. Paul, MN 55119 September 29, 2005 Nova Client No.: STPAU006/Project No: H05-1309 AIR MONITORING REPORT Boiler

More information

Prepared for: Infrastructure Consulting Engineers, PLLC Turnbull Avenue North Charleston, South Carolina 29405

Prepared for: Infrastructure Consulting Engineers, PLLC Turnbull Avenue North Charleston, South Carolina 29405 ASBESTOS & LEAD-BASED PAINT ASSESSMENT REPORT I-85 Widening MM80-96 SC 18 BRIDGE OVER I-85 STRUCTURE NO. 1140001800400 GAFFNEY, SOUTH CAROLINA S&ME Project No. 1426-14-161 Prepared for: Infrastructure

More information

Asbestos Inspection Report

Asbestos Inspection Report ECH CONSULTANTS Asbestos Inspection Report 113 E. Pine Street Florence, South Carolina Prepared for: The City of Florence Prepared by: Enga Hair, AHERA Building Inspector License #BI-01591 Project Number:18-192-1

More information

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND Prepared for: Memorial University of Newfoundland St. John s, NL Pinchin LeBlanc Environmental

More information

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Investigation Remediation 10448 Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Mailing Address: P.O. Box 2160 Brighton, MI 48116-2160 800 395-ASTI Fax: 810.225.3800 www.asti-env.com

More information